CN209143498U - A kind of hoisting frame and truss lifting device for boist truss - Google Patents

A kind of hoisting frame and truss lifting device for boist truss Download PDF

Info

Publication number
CN209143498U
CN209143498U CN201821310015.8U CN201821310015U CN209143498U CN 209143498 U CN209143498 U CN 209143498U CN 201821310015 U CN201821310015 U CN 201821310015U CN 209143498 U CN209143498 U CN 209143498U
Authority
CN
China
Prior art keywords
pillar
connecting line
truss
lifter
lifting bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821310015.8U
Other languages
Chinese (zh)
Inventor
王伟强
杨松
黎健
陈进
宁翰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Steel Structure Engineering Co Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201821310015.8U priority Critical patent/CN209143498U/en
Application granted granted Critical
Publication of CN209143498U publication Critical patent/CN209143498U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a kind of hoisting frame for boist truss and truss lifting device, belongs to truss lifting device technical field.For the hoisting frame of boist truss, including the first lifting bracket and the second lifting bracket being oppositely arranged.First lifting bracket and the second lifting bracket include the first pillar, the second pillar, first crossbeam, the first lifter, the second lifter, the first connecting line and the second connecting line.The both ends of first crossbeam are set to the upper end of the first pillar and the second pillar, first lifter is set to one end of first crossbeam and is connect with the first connecting line for shrinking the first connecting line, second lifter is set to the other end of first crossbeam and with the second connecting line for shrinking the second connecting line, one end far from the first lifter of first connecting line is used for truss frame for connecting, and one end far from the second lifter of the second connecting line is used to connect the lower section of the second pillar.It is more stable that this hoisting frame installs the first pillar and the second pillar, avoids its deformation.

Description

A kind of hoisting frame and truss lifting device for boist truss
Technical field
The utility model relates to truss lifting device technical fields, in particular to a kind of mentioning for boist truss Rise frame and truss lifting device.
Background technique
With the rapid development of domestic construction steel construction in recent years, there is the structure shape of many large spans, truss or rack Formula, therefore the difficulty of Construction of Steel Structure is consequently increased.This class formation type construction in, using hydraulic pressure lift be it is more typical and The construction method of safety.
Generally select steel column concrete column or concrete structure as stress main structure, hoisting frame weldering in lifting process It connects on above structure.When using steel column as hoist point, if lift unit weight is larger, not only will to steel consider promoted in The stability of steel column and deformation, must be to operating condition progress load and forcing checkings before promoting operation, and such as deforming larger need to be arranged phase Measure to be answered, prevents from promoting lateral deformation, setting combination promotes moulding bed, is connected between each moulding bed by connection beam and form it into entirety, Eliminate moment of flexure;Or by the way that bearing diagonal is arranged on steel column, reduce the deformation values at the top of steel column.
The steel column of the truss lifting device of the prior art is easily deformed.
Utility model content
The purpose of this utility model is to provide a kind of hoisting frames for boist truss, and steel column is avoided to deform.
The another object of the utility model is to provide a kind of truss lifting device, uses above-mentioned mentioning for boist truss Frame is risen, steel column is avoided to deform.
The utility model adopts the following technical solutions realization:
A kind of hoisting frame for boist truss, including the first lifting bracket and the second lifting bracket being oppositely arranged;
First lifting bracket and the second lifting bracket include the first pillar, the second pillar, first crossbeam, the first promotion Device, the second lifter, the first connecting line and the second connecting line;
The both ends of first crossbeam are set to the upper end of the first pillar and the second pillar, and the first lifter is set to first crossbeam One end and connect with the first connecting line for shrink the first connecting line, the second lifter be set to the other end of first crossbeam and It is used for truss frame for connecting for shrinking the second connecting line, one end far from the first lifter of the first connecting line with the second connecting line, One end far from the second lifter of second connecting line is used to connect the lower section of the second pillar.
Further, in the utility model preferred embodiment, above-mentioned first hoisting frame further includes support frame, support frame One end is connect with the lower end of the second pillar, and the other end connects one end far from the second lifter of the second connecting line.
Further, in the utility model preferred embodiment, above-mentioned support frame includes first crossbar and the first brace, and One end of one cross bar is connect with the lower end of the second pillar, the other end be directed away from the first pillar direction extend and with the first brace One end connection, the other end of the first brace connects the second pillar, and one end far from the second hoisting frame of the second connecting line connects One end far from the second pillar of first crossbar.
Further, in the utility model preferred embodiment, the extending direction of above-mentioned first crossbar and first crossbeam Extending direction is consistent.
Further, in the utility model preferred embodiment, above-mentioned first lifting bracket further includes third pillar, the 4th Pillar, second cross beam, third lifter, the 4th lifter, third connecting line and the 4th connecting line;
The both ends of second cross beam are set to the upper end of third pillar and the 4th pillar, and third lifter is set to second cross beam One end and connect with third connecting line for shrinking third connecting line, the 4th lifter be set to the other end of second cross beam and It is used for truss frame for connecting for shrinking the 4th connecting line, one end of the separate third lifter of third connecting line with the 4th connecting line, One end far from the 4th lifter of 4th connecting line is used to connect the lower section of the 4th pillar.
Further, in the utility model preferred embodiment, above-mentioned first lifting bracket further includes reinforcing rod, reinforcing rod Both ends be separately connected the upper end of the first pillar and the upper end of the second pillar.
Further, in the utility model preferred embodiment, above-mentioned first connecting line and the second connecting line are that steel twists Line.
Further, in the utility model preferred embodiment, above-mentioned first lifter and the second lifter are hydraulic Lifter.
A kind of truss lifting device, including truss and the above-mentioned hoisting frame for boist truss, the both ends of truss connect respectively Connect the first lifting bracket and the second lifting bracket.
Further, in the utility model preferred embodiment, the company of above-mentioned first lifting bracket and the second lifting bracket Line is consistent with the extending direction of truss.
Compared with prior art, the hoisting frame and truss for boist truss that the preferred embodiment of the utility model provides The beneficial effect of lifting device includes: that one end of truss is first fixedly connected on the first lifting bracket when boist truss The first connecting line far from the first lifter one end, the other end of truss is fixed on to the first connecting line of the second hoisting frame Far from the first lifter one end.First lifter and the second lifter work at the same time, and the second lifter makes the second connecting line Stress, the first lifter make the first connecting line stress and raise up truss.During boist truss, first crossbeam two First connecting line and the second connecting line while stress at end, make effect of the two sides of the first pillar and the second pillar by power, It avoids the first pillar and the second pillar from there was only side stress and deforms to the inclination of the direction of truss, it is ensured that the first pillar and the The stability and intensity of two pillars.
Detailed description of the invention
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment Attached drawing be briefly described, it should be understood that the following drawings illustrates only some embodiments of the utility model, therefore should not be by Regard the restriction to range as, for those of ordinary skill in the art, without creative efforts, may be used also The protection scope of the utility model is also belonged to obtain other relevant attached drawings according to these attached drawings.
Fig. 1 is the structural schematic diagram of truss lifting device provided by the embodiment of the utility model;
Fig. 2 is the structural schematic diagram of the first lifting bracket in truss lifting device provided by the embodiment of the utility model;
Fig. 3 is the structural schematic diagram of support frame in truss lifting device provided by the embodiment of the utility model.
Icon: 100- truss;200- is used for the hoisting frame of boist truss;The first lifting bracket of 210-;220- second Lifting bracket;The first pillar of 211-;The second pillar of 212-;213- first crossbeam;The first lifter of 214-;215- second Lifter;The first connecting line of 216-;The second connecting line of 217-;230- support frame;231- first crossbar;232- first is oblique Bar;218- reinforcing rod.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched The embodiment stated is the utility model a part of the embodiment, instead of all the embodiments.Usually here in attached drawing description and The component of the utility model embodiment shown can be arranged and be designed with a variety of different configurations.Therefore, below to attached The detailed description of the embodiments of the present invention provided in figure is not intended to limit the range of claimed invention, But it is merely representative of the selected embodiment of the utility model.Based on the embodiments of the present invention, ordinary skill people Member's every other embodiment obtained without creative efforts, belongs to the model of the utility model protection It encloses.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
Embodiment 1
Referring to Fig. 1,100 lifting device of truss, including truss 100 and for the hoisting frame of boist truss 100, truss 100 both ends are separately connected the first lifting bracket 210 and the second lifting bracket 220, are used for boist truss 100.
The line of first lifting bracket 210 and the second lifting bracket 220 is consistent with the extending direction of truss 100.Make truss 100 be more uniformly stressed, facilitates the promotion of truss 100, avoids truss 100 in the process of ascension by the work of torsional forces With.
Referring to Fig. 2, the hoisting frame of boist truss 100 is used for, including the first lifting bracket 210 and second being oppositely arranged Lifting bracket 220;First lifting bracket 210 and the second lifting bracket 220 include the first pillar 211, the second pillar 212, the One crossbeam 213, the first lifter 214, the second lifter 215, the first connecting line 216 and the second connecting line 217;First crossbeam 213 both ends are set to the upper end of the first pillar 211 and the second pillar 212, and the first lifter 214 is set to first crossbeam 213 One end and connect with the first connecting line 216 for shrinking the first connecting line 216, the second lifter 215 is set to first crossbeam 213 other end and with the second connecting line 217 for shrink the second connecting line 217, the first connecting line 216 far from first promoted One end of device 214 is used for truss frame for connecting 100, and one end far from the second lifter 215 of the second connecting line 217 is for connecting second The lower section of pillar 212.
First lifting bracket 210 is identical with the structure of the second lifting bracket 220, and the mode of setting is symmetrical.In boist truss When 100, one end of truss 100 is first fixedly connected on to separate the first of the first connecting line 216 of the first lifting bracket 210 The other end of truss 100 is fixed on mentioning far from first for the first connecting line 216 of the second hoisting frame by one end of lifter 214 Rise one end of device 214.First lifter 214 and the second lifter 215 work at the same time, and the second lifter 215 makes the second connecting line 217 stress, the first lifter 214 make 216 stress of the first connecting line and raise up truss 100.In the mistake of boist truss 100 Cheng Zhong, first connecting line 216 at 213 both ends of first crossbeam and the second connecting line 217 stress simultaneously make the first pillar 211 and the The two sides of two pillars 212 by the effect of power, avoid the first pillar 211 and the second pillar 212 from there was only side stress and to purlin The direction inclination of frame 100 deforms, it is ensured that the stability and intensity of the first pillar 211 and the second pillar 212.
First hoisting frame further includes support frame 230, and one end of support frame 230 is connect with the lower end of the second pillar 212, another One end far from the second lifter 215 of the second connecting line 217 of end connection.So as to the installation of the second connecting line 217.
Referring to Fig. 3, support frame 230 includes first crossbar 231 and the first brace 232, one end of first crossbar 231 and the The lower end of two pillars 212 connects, and the direction that the other end is directed away from the first pillar 211 extends and one end with the first brace 232 Connection, the other end of the first brace 232 connect the second pillar 212, and one end far from the second hoisting frame of the second connecting line 217 connects Connect one end far from the second pillar 212 of first crossbar 231.So as to the installation of the second connecting line 217.
The extending direction of first crossbar 231 is consistent with the extending direction of first crossbeam 213.First connecting line 216 and second After connecting line 217 has installed, the power that the two sides of the first pillar 211 and the second pillar 212 are subject to more is balanced, stressed effect More preferably, the deformation of the first pillar 211 and the second pillar 212 is further avoided.
First lifting bracket 210 further includes third pillar, the 4th pillar, second cross beam, third lifter, the 4th promotion Device, third connecting line and the 4th connecting line;The both ends of second cross beam are set to the upper end of third pillar and the 4th pillar, and third mentions It rises device to be set to one end of second cross beam and connect with third connecting line for shrinking third connecting line, the 4th lifter is set to The other end of second cross beam and with the 4th connecting line for shrink the 4th connecting line, the separate third lifter of third connecting line One end is used for truss frame for connecting 100, and one end far from the 4th lifter of the 4th connecting line is used to connect the lower section of the 4th pillar.
Four pillars are all arranged in the lifting bracket of every side, increase and use fastness.And truss 100 has certain thickness Degree, the both ends of truss 100 pass through connecting line with two sides and connect for being promoted, and effect is more preferable.
First lifting bracket 210 further includes reinforcing rod 218, and the both ends of reinforcing rod 218 are separately connected the upper of the first pillar 211 The upper end at end and the second pillar 212.Make being more firmly mounted for the first lifting bracket 210 and the second lifting bracket 220.
First connecting line 216 and the second connecting line 217 are steel strand wires.It is able to bear biggish power, avoids damaging Bad, steel strand wires are connect after passing through hydraulic rockshaft with support frame 230 or truss 100.First lifter 214 and the second lifter 215 be hydraulic rockshaft.Keep it more preferable to the promotion effect of steel strand wires.Meanwhile first pillar 211, the second pillar 212, Three pillars and the 4th pillar are steel column, and intensity is more preferable.
The working principle of 100 lifting device of truss provided by the utility model are as follows: first consolidate the two sides of one end of truss 100 Surely the steel for being connected to one end and third lifting bracket far from the first lifter 214 of the steel strand wires of the first lifting bracket 210 twists The two sides of the other end of truss 100 are fixed on the remote of the steel strand wires of the second hoisting frame by one end of the separate third lifter of line One end of the separate third lifter of the steel strand wires of one end and third lifting bracket from the first lifter 214.First promotes branch First lifter 214 of frame 210 and the second lifting bracket 220,215 third lifter of the second lifter and the 4th lifter are simultaneously Work, the equal stress of steel strand wires with the first lifter 214, the second lifter 215 third lifter and the 4th lifter, by truss 100 raise up.During boist truss 100, the steel strand wires while stress at first crossbeam 213 and second cross beam both ends, Make the two sides of the first pillar 211, the second pillar 212, third pillar and the 4th pillar by the effect of power, avoids the first pillar 211, the second pillar 212, third pillar and the 4th pillar only have side stress and deform to the inclination of the direction of truss 100, Ensure the stability and intensity of the first pillar 211, the second pillar 212, third pillar and the 4th pillar.Truss 100, which is promoted, to be completed After, truss 100 is welded and fixed.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (10)

1. a kind of hoisting frame for boist truss, which is characterized in that mentioned including the first lifting bracket being oppositely arranged and second Ascending branch frame;
First lifting bracket and second lifting bracket include the first pillar, the second pillar, first crossbeam, first mention Rise device, the second lifter, the first connecting line and the second connecting line;
The both ends of the first crossbeam are set to the upper end of first pillar and second pillar, and first lifter is set It is placed in one end of the first crossbeam and is connect with first connecting line for shrinking first connecting line, described second mentions It rises device and is set to the other end of the first crossbeam and with second connecting line for shrinking second connecting line, described the One end far from first lifter of one connecting line is used for truss frame for connecting, and second connecting line is mentioned far from described second The one end for rising device is used to connect the lower section of second pillar.
2. hoisting frame according to claim 1, which is characterized in that first lifting bracket further includes support frame, described One end of support frame is connect with the lower end of second pillar, and the other end connects mentioning far from described second for second connecting line Rise one end of device.
3. hoisting frame according to claim 2, which is characterized in that support frame as described above includes first crossbar and the first brace, One end of the first crossbar is connect with the lower end of second pillar, and the direction that the other end is directed away from first pillar is prolonged It stretches and is connect with one end of first brace, the other end of first brace connects second pillar, and described second connects One end far from second lifting bracket of wiring connects one end far from second pillar of the first crossbar.
4. hoisting frame according to claim 3, which is characterized in that the extending direction of the first crossbar and first cross The extending direction of beam is consistent.
5. hoisting frame according to claim 1-4, which is characterized in that first lifting bracket further includes Three pillars, the 4th pillar, second cross beam, third lifter, the 4th lifter, third connecting line and the 4th connecting line;
The both ends of the second cross beam are set to the upper end of the third pillar and the 4th pillar, and the third lifter is set It is placed in one end of the second cross beam and connect with the third connecting line for shrinking the third connecting line, the described 4th mentions It rises device and is set to the other end of the second cross beam and with the 4th connecting line for shrinking the 4th connecting line, described the One end far from the third lifter of three connecting lines is used for truss frame for connecting, and the 4th connecting line is mentioned far from the described 4th The one end for rising device is used to connect the lower section of the 4th pillar.
6. hoisting frame according to claim 1-4, which is characterized in that first lifting bracket further includes adding Strong bar, the both ends of the reinforcing rod are separately connected the upper end of first pillar and the upper end of second pillar.
7. hoisting frame according to claim 1-4, which is characterized in that first connecting line and described second Connecting line is steel strand wires.
8. hoisting frame according to claim 1-4, which is characterized in that first lifter and described second Lifter is hydraulic rockshaft.
9. a kind of truss lifting device, which is characterized in that described in any item for being promoted including truss and claim 1-8 The hoisting frame of truss, the both ends of the truss are separately connected first lifting bracket and second lifting bracket.
10. truss lifting device according to claim 9, which is characterized in that first lifting bracket and described second The line of lifting bracket is consistent with the extending direction of the truss.
CN201821310015.8U 2018-08-14 2018-08-14 A kind of hoisting frame and truss lifting device for boist truss Active CN209143498U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821310015.8U CN209143498U (en) 2018-08-14 2018-08-14 A kind of hoisting frame and truss lifting device for boist truss

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821310015.8U CN209143498U (en) 2018-08-14 2018-08-14 A kind of hoisting frame and truss lifting device for boist truss

Publications (1)

Publication Number Publication Date
CN209143498U true CN209143498U (en) 2019-07-23

Family

ID=67266235

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821310015.8U Active CN209143498U (en) 2018-08-14 2018-08-14 A kind of hoisting frame and truss lifting device for boist truss

Country Status (1)

Country Link
CN (1) CN209143498U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112252482A (en) * 2020-12-07 2021-01-22 中铁建设集团华北工程有限公司 Hydraulic lifting device for steel structure roof and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112252482A (en) * 2020-12-07 2021-01-22 中铁建设集团华北工程有限公司 Hydraulic lifting device for steel structure roof and construction method thereof

Similar Documents

Publication Publication Date Title
CN101210418A (en) Non-floor-bracket construction method for suspension bridge tower frame cross beam
CN211689943U (en) Assembled pier stud template upset buffer
CN209143498U (en) A kind of hoisting frame and truss lifting device for boist truss
CN101633483B (en) Integral lifting apparatus for steel structure net rack
CN104989111B (en) Steel construction high level construction method for hanging
CN201712776U (en) Support for building scaffold boards
CN202031313U (en) Supporting connection structure for overhanging scaffold
CN206693060U (en) A kind of hoisting device for the lifting of suspension bridge saddle bearing plate
CN206970097U (en) Scissor-like jack
CN205555855U (en) Set up promotion support on steel structure platform
CN207108299U (en) A kind of loop wheel machine
CN101806153A (en) Knock-down horizontal truss used for resisting lateral bending in lifting sheet large-span steel truss
CN206752684U (en) A kind of device for improving Elements of Space Grid Truss jacking efficiency
CN203795318U (en) Integral hoisting system for rebar cage for large members
CN210917735U (en) Supporting jig frame structure for large-span prestressed inhaul cable structure
CN210656014U (en) Work basket bracket and aerial work platform work basket
CN203922533U (en) A kind of anti-deformation climbing support safety device
CN209567737U (en) Limited headroom descending reinforcing cage lifts by crane mounting device
CN207737870U (en) A kind of large-scale storage tank fliping lifting device
CN204643648U (en) Pylon and hanging basket thereof
CN207276133U (en) A kind of jacking apparatus
CN200995933Y (en) Self-erection and up-rotating tower-type elevator
CN215296970U (en) Building material intensity detection device for construction
CN210563322U (en) Inner and outer upright rod connecting structure
CN215925677U (en) Hollow thin wall mound bent cap construction bracket of bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Science And Industry Co.,Ltd.

Address before: 518000 Guangdong city of Shenzhen province Nanshan District Guangdong streets Center Road No. 3331 steel built in 27 storey building room 2701

Patentee before: China Construction Steel Structure Corp.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210301

Address after: No.1908, Zhongtian Meijing building, No.2009, Pingshan Avenue, Liulian community, Pingshan street, Pingshan District, Shenzhen, Guangdong 518000

Patentee after: China Construction Steel Engineering Co.,Ltd.

Address before: 3801, 38 / F, China Construction Science and engineering building, No. 3331, Weilan Coast Community Central Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee before: China Construction Science And Industry Co.,Ltd.