CN205928989U - A non - design, can all rotary die plate bodys system for bench is prefabricated - Google Patents

A non - design, can all rotary die plate bodys system for bench is prefabricated Download PDF

Info

Publication number
CN205928989U
CN205928989U CN201620837202.6U CN201620837202U CN205928989U CN 205928989 U CN205928989 U CN 205928989U CN 201620837202 U CN201620837202 U CN 201620837202U CN 205928989 U CN205928989 U CN 205928989U
Authority
CN
China
Prior art keywords
template
bench
marking time
fixed
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620837202.6U
Other languages
Chinese (zh)
Inventor
徐红杰
宋闻辉
郑培君
曹江涛
李阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201620837202.6U priority Critical patent/CN205928989U/en
Application granted granted Critical
Publication of CN205928989U publication Critical patent/CN205928989U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a non - design, can all rotary die plate bodys system for bench is prefabricated solves the longer problem of stair bench production cycle at the construction field (site), including the fixed die block of level, the vertical side form board of placing, the template of marking time and the end mould that corresponds with bench both ends, the template of marking time have the multiunit, the template of marking time is formed by the concatenation of two mutually perpendicular's two rectangular form templates, each group marks time the template next -door neighbour and arranges the structure of marking time that forms the bench, the side form board be platelike structure, each group that the next -door neighbour arranged marks time concave, the umbo that the template formed the cockscomb structure and constructs, and recess that the template of marking time lateral surface formed is equipped with the fixed part respectively, side form board and mark time and be equipped with split bolt between the template, the utility model discloses realize that the bench is prefabricated in advance at the construction field (site), realization batch production, concrete placement and outward appearance shaping quality can be guaranteed prior to major structure preparation in batches in advance at the construction field (site) to the bench, it is extravagant to reduce labour's input and material, reduces construction cost.

Description

For the prefabricated non-type of bench, template system can be had enough to meet the need
Technical field
The utility model is related to the prefabricated field of stair bench, is more particularly to used for the prefabricated non-type of bench, can have enough to meet the need Template system.
Background technology
Architectural stair is a kind of special structural elements in building, and its shape and structure is complex, and dimensional requirement is more smart Really.Currently, commonly used reinforced concrete cast-in-situ bench in architectural engineering, this kind of bench its formwork erection when being cast is multiple Miscellaneous, and easily affected by outside environmental elements when formwork erection and casting, bench concrete appearance Forming Quality is difficult to protect Card, the bench after simultaneously casting needs the long period to cannot be used for transport channel before carrying out maintenance, and form removal, and this is in certain journey Duration be have impact on degree;Next to that carrying out bench in factory prefabricated, batch production prefabricated bench production efficiency is high, and bench makes and is subject to External environment impact is easily controllable compared with primary structural component quality, but the input such as original equipment, factory building and operation cost are higher, are not having On the premise of mandatory popularization policy or subsidy, prefabricated components factory quantity and scale can not meet existing requirement of engineering.
Utility model content
For above-mentioned situation, for overcoming the defect of prior art, the purpose of the utility model is exactly to provide one kind for ladder The prefabricated non-type of section, template system can be had enough to meet the need it is therefore intended that solve stair bench fabrication cycle at the construction field (site) longer and The late maintaining time is longer, makes more difficult problem.
Its technical scheme is, including the fixing bed die of level, the side template vertically placed, template of marking time, and with bench two Hold corresponding end mould;Described template of marking time has multigroup, and template of marking time is formed by two orthogonal two strip template splicings, Each group mark time template arranged adjacent formed bench tread structure;Described side template is platy structure;The each group of arranged adjacent Template of marking time forms jagged concave, convex structure, and the recess that template of marking time lateral surface is formed is respectively equipped with fixed part, fixed part It is provided with two fixed arms, two fixed arms are affixed to merge with two templates of template recess of marking time respectively and are detachably fixed with template of marking time Connect, each fixed arm is detachably fixed the fix bar connecting same level setting respectively, is fixedly connected in same fix bar Fixed part forms the fixed system to template of marking time, and described fixed system has multiple and along template of marking time length direction cloth Put;The lateral surface of described side template is provided with the multiple fix bars corresponding with template of marking time, the corresponding fix bar of side template Be provided with wooden a tree, used in making timber for boats and side template between, between side template and wooden a tree, used in making timber for boats, be detachably fixed between wooden a tree, used in making timber for boats and fix bar and be connected, side template interior Be provided with interval between the medial surface that side and template splicing of marking time are formed, this interval be respectively arranged at two ends with end mould, end mould outer Be provided with locating rod at side, described locating rod is detachably fixed with fix bar and is connected, two ends mould and side template, template of marking time it Between form the chamber that pours for pouring, described pour chamber only upper end open, side template and marking time is provided with to drawing spiral shell between template Bolt.
Described bed die is provided with the concave, convex shape structure corresponding with bench, and bed die is fixed by screws on fixed base, Pedestal is provided with the standing screw for matching with split bolt.
Described fixed part is made up of the angle bar of two vertical weldings, and the bottom surface of two angle bar is respectively equipped with through hole, and angle bar passes through Wood screw passes through through hole and template of marking time to form described being detachably fixed to be connected, between the corresponding fixed part of adjacent template of marking time It is provided with vertical interval, forms the structure of two adjacent fixed part stackings, described fix bar is located between the fixed part of stacking, Gu Fixed pole is provided with location hole, forms described being detachably fixed by U-bolt and be connected between fix bar and the fixed part of stacking.
Described fix bar one end tilts to be provided with a resigning portion, and the other end of fix bar is horizontal ends, resigning portion and fixation Angle between bar and bench upper and lower end and an angle of marking time are adapted, positioned at pour its resigning portions of fix bar of chamber both sides with Horizontal ends are corresponding, and horizontal ends are provided with bolt hole, and horizontal ends are fixedly connected with the railing of an inclination by angle bar, described hurdle Bar is be arranged in parallel with resigning portion, and described locating rod is angle bar, and locating rod is fixedly connected with resigning portion and railing by bolt.
It is prefabricated in advance at the construction field (site) that the utility model realizes bench, realizes batch production, bench can be prior to agent structure Shift to an earlier date batch making at the construction field (site), compared with traditional cast-in-place bench, ensure that concreting and outward appearance Forming Quality, subtract Few labour puts into and waste of material, reduces construction cost, reduces live building waste discharge;Prefabricated bench produces with batch production Compare, reduce equipment and place puts into, save component conveying process, reduce cost of transportation;Form bracing system makes work simultaneously Skill is simple, and to different bench strong adaptabilities, it is convenient that plank sheathing is changed, and form bracing system is steel construction, using conventional type steel Make, processing technology is simple, non-type design several bench it is adaptable to difference is marked time, and can be finely adjusted according to size of marking time, Bench is marked time and is adopted plank sheathing, and it is convenient partly or wholly to change, and bench concrete is poured using common process, need not carry out steam The complicated procedures of forming such as maintenance.Bench concrete can avoid high temperature, the heavy rain period selects a good opportunity and pours as needed, using Field Force, equipment Build, natural curing of watering after the completion of pouring.
Brief description
Fig. 1 is the schematic diagram of the utility model embodiment one.
Fig. 2 is fix bar, fixed part, the cooperation schematic diagram of U-bolt.
Fig. 3 is the enlarged diagram of part A in Fig. 1.
Fig. 4 is use schematic diagram of the present utility model.
Specific embodiment
Below in conjunction with accompanying drawing, specific embodiment of the present utility model is described in further detail.
As shown in Figures 1 to 4, for the prefabricated non-type of bench, embodiment that template system can be had enough to meet the need, solid including level Fixed bed die 1, the side template 2 vertically placed, template of marking time 3, and end corresponding with bench two ends mould 4;Bed die 1, side template 2, Template of marking time 3 and end mould 4 adopt wooden black template to cut out saw, and its size and size are selected according to the design size of prefabricated bench Select, described bed die 1 is provided with the concave, convex shape structure corresponding with bench, bed die 1 is fixed by screws on fixed base 10, Pedestal 10 is provided with the standing screw 11 for matching with split bolt 17, and described template 3 of marking time has multigroup, template of marking time 3 are formed by two orthogonal two strip template splicings, each group mark time template 3 arranged adjacent formed bench tread structure, Template of marking time 3 is used for forming marking time of prefabricated bench;Described side template 2 is platy structure, and side template 2 acts on prefabricated bench The planar structure at the back side at;The each group of arranged adjacent template 3 of marking time forms jagged concave, convex structure, outside template of marking time 3 The recess that face is formed is respectively equipped with fixed part, and fixed part is provided with two fixed arms 5, and described fixed part is by the angle of two vertical weldings Iron is constituted, and the bottom surface of two angle bar is respectively equipped with through hole, angle bar passes through through hole by wood screw and template 3 of marking time formed described can Dismounting is fixedly connected, and adjacent marking time is provided with vertical interval between the corresponding fixed part of template 3, forms two adjacent fixed part stackings Structure, described fix bar 6 is located between the fixed part of stacking, and fix bar 6 is provided with location hole, fix bar 6 and stacking Between fixed part, the described fixation being detachably fixed connection, being fixedly connected in same fix bar 6 is formed by U-bolt 12 Portion forms the fixed system to template 3 of marking time, and described fixed system has multiple and along template 3 of marking time length direction arrangement; The lateral surface of described side template 2 is provided with the multiple fix bars 6 corresponding with template 3 of marking time, the corresponding fix bar of side template 2 It is provided with wooden a tree, used in making timber for boats 7, between side template 2 and wooden a tree, used in making timber for boats 7, detachably solid by wood screw between wooden a tree, used in making timber for boats 7 and fix bar 6 between 6 and side template 2 It is provided with interval, the two ends at this interval are divided between the medial surface that fixed connection, the medial surface of side template 2 and template 3 of marking time are spliced to form It is not provided with end mould 4, side template 2 and mark time and be provided with split bolt 17 between template 3, in side template 2, template of marking time 3 outside respectively Setting vertically place to drawing steel pipe 16, pour chamber 18 both sides to drawing steel pipe 16 to be attached by split bolt 17, realization Clamping to side template 2, template of marking time 3;Described fix bar 6 one end tilts to be provided with a resigning portion 13, the other end of fix bar 6 For horizontal ends 14, the angle between resigning portion 13 and fix bar 6 and bench upper and lower end and an angle of marking time are adapted, positioned at pouring Its resigning portion 13 of fix bar 6 building chamber 18 both sides is corresponding with horizontal ends 14, and horizontal ends 14 are provided with bolt hole, and horizontal ends 14 are led to Cross the railing 15 that angle bar is fixedly connected with an inclination, described railing 15 is be arranged in parallel with resigning portion 13, and described locating rod 8 is Angle bar, locating rod 8 is fixedly connected with resigning portion 13 and railing 15 by bolt, is provided with locating rod 8, institute at the lateral surface of end mould 4 The locating rod 8 stated is detachably fixed with fix bar 6 and is connected, and is formed and be used for pouring between two ends mould 4 and side template 2, template of marking time 3 Pour chamber 18, described pours chamber 18 only upper end open.
A kind of non-type prefabricated for bench, the construction method embodiment that can have enough to meet the need template system include following step Suddenly:
A, determined according to the size of architectural design bench and need the size of prefabricated bench, the size according to prefabricated bench cuts out saw Bed die 1, template of marking time 3, side template 2 and end mould 4, template used adopts wooden black template;
B, making pedestal 10, pedestal 10 can be poured using concrete, for considering split bolt 17, at the bottom of pedestal 10 Portion arranges standing screw 11, and bed die 1 is fixed by screws on the upper surface of pedestal 10;
C, template 3 of marking time is carried out being spliced to form the concave, convex structure marked time, template of marking time 3 is vertically placed and fixed temporarily, Fixation temporarily can adopt gluing;
D, by multiple fixed parts along same level every step be fixed on mark time template 3 lateral surface formation depressed part at, will One fix bar 6 is placed on the horizontal plane that above-mentioned multiple fixed part is formed, and puts and set another group and fix on this fix bar 6 upper surface Portion, this group fixed part is fixedly connected equally every step arrangement and with the depressed part of template 3 lateral surface formation of marking time, and forms adjacent stepping on The fixed part not structure in same level of step template 3 recess, and fix bar 6 is located at the knot between two-layer fixed part Structure, be detachably fixed between fix bar 6 and two-layer fixed part be connected formation one fixed system, described fixed system have multiple and Length direction arrangement along template 3 of marking time;
E, the corresponding fix bar 6 of template 3 of marking time horizontal ends 14 connect railing 15, the template of marking time of railing 15 corresponding position 3 are fixed with end mould 4 temporarily, and what railing 15 was corresponding mark time, and template 3 fits, the two ends of railing 15 pass through respectively angle bar with solid The horizontal ends 14 of fixed pole 6 are detachably fixed connection, and the fixation of template of so far marking time 3 system completes;
F, side template 2 is vertically fixed temporarily, the lateral surface of side template 2 is detachably fixed connection spaced wood a tree, used in making timber for boats 7, Wooden a tree, used in making timber for boats 7 outer end is arranged in a vertical direction and the corresponding fix bar 6 of fix bar 6 in template 3 system of marking time, and side template 2 is corresponding solid The horizontal ends 14 of fixed pole 6 connect railing 15, and the side template 2 of railing 15 corresponding position is fixed with end mould 4 temporarily, and railing 15 is corresponding Side template 2 fit, the two ends of railing 15 are detachably fixed with the horizontal ends 14 of fix bar 6 by angle bar respectively and are connected, extremely The fixation of this side template 2 system completes;
G, bed die 1 of marking time, template of marking time 3, side template 2 and end mould 4 are cleaned out and brushing releasing agent;
H, by marking time, template 3 system lifts on the pedestal 10 being located to bed die 1 and fixes temporarily, according to arrangement of reinforcement blanking simultaneously Assembling reinforcement, operates during colligation on pedestal 10, in this step, needs to arrange pre-buried pin shaft hole, hole for hoist, takes off according to design Mould suspension hook, each hole adopts PVC when reserving, the two ends Continuous pressing device for stereo-pattern of tubing prevents from entering during concreting;Or adopt Tub(60mm×60mm)Preformed hole, is temporarily fixed on two side templates 2 with wood screw, after concreting is complete, takes out Wood screw simultaneously chisels out tub;
I, side template 2 system is lifted on the pedestal 10 being located to bed die 1, and side template 2 body will be realized by locating rod 8 System, being fixedly connected of template of marking time 3 system;
J, be respectively provided with side template 2 system, template of marking time 3 system vertical placement to drawing steel pipe 16, pour chamber 18 Both sides to drawing steel pipe 16 to be attached by split bolt 17, realize the clamping to side template 2 system, template of marking time 3 system, Side template 2 system, template of marking time 3 system are formed with end mould 4 and pour chamber 18;
K, pour to pouring chamber 18, during for avoiding pouring, concreting, to pouring outside chamber 18, is pouring chamber 18 Upper end open at be provided with the baffle plate 19 of two relative tilts, two baffle plate 19 lower end connects with pouring chamber 18, between the baffle plate 19 of upper end two Distance be gradually increased, to prefabricated bench natural curing after pouring.
It is prefabricated in advance at the construction field (site) that the utility model realizes bench, realizes batch production, bench can be prior to agent structure Shift to an earlier date batch making at the construction field (site), compared with traditional cast-in-place bench, ensure that concreting and outward appearance Forming Quality, subtract Few labour puts into and waste of material, reduces construction cost, reduces live building waste discharge;Prefabricated bench produces with batch production Compare, reduce equipment and place puts into, save component conveying process, reduce cost of transportation;Form bracing system makes work simultaneously Skill is simple, and to different bench strong adaptabilities, it is convenient that plank sheathing is changed, and form bracing system is steel construction, using conventional type steel Make, processing technology is simple, non-type design several bench it is adaptable to difference is marked time, and can be finely adjusted according to size of marking time, Bench is marked time and is adopted plank sheathing, and it is convenient partly or wholly to change, and bench concrete is poured using common process, need not carry out steam The complicated procedures of forming such as maintenance.Bench concrete can avoid high temperature, the heavy rain period selects a good opportunity and pours as needed, using Field Force, equipment Build, natural curing of watering after the completion of pouring.

Claims (4)

1. it is used for the prefabricated non-type of bench, template system can be had enough to meet the need, including the bed die that level is fixing(1), the vertical side placed Template(2), template of marking time(3), and end corresponding with bench two ends mould(4)It is characterised in that described template of marking time(3)Have Multigroup, template of marking time(3)Formed by two orthogonal two strip template splicings, each group is marked time template(3)Arranged adjacent shape Become the tread structure of bench;Described side template(2)For platy structure;The each group of arranged adjacent is marked time template(3)Form sawtooth The concave, convex structure of shape, template of marking time(3)The recess that lateral surface is formed is respectively equipped with fixed part, and fixed part is provided with two fixed arms (5), two fixed arms(5)Respectively with template of marking time(3)Two templates of recess are affixed merging and template of marking time(3)It is detachably fixed Connect, each fixed arm(5)It is detachably fixed the fix bar connecting same level setting respectively(6), it is fixedly connected on same fixation Bar(6)On fixed part formed to template of marking time(3)Fixed system, described fixed system has multiple and along marking time template (3)Length direction arrangement;Described side template(2)Lateral surface be provided with and mark time template(3)Locate corresponding multiple fixations Bar(6), side template(2)Corresponding fix bar(6)With side template(2)Between be provided with wooden a tree, used in making timber for boats(7), side template(2)With wooden a tree, used in making timber for boats(7) Between, wooden a tree, used in making timber for boats(7)With fix bar(6)Between be detachably fixed connection, side template(2)Medial surface and template of marking time(3)Splicing shape Become medial surface between be provided with interval, this interval be respectively arranged at two ends with end mould(4), hold mould(4)Lateral surface at be provided with positioning Bar(8), described locating rod(8)With fix bar(6)It is detachably fixed connection, two ends mould(4)With side template(2), template of marking time (3)Between formed and pour chamber for pour(18), described pours chamber(18)Only upper end open, side template(2)With mould of marking time Plate(3)Between be provided with split bolt(17).
2. the non-type prefabricated for bench according to claim 1, template system can be had enough to meet the need it is characterised in that described Bed die(1)It is provided with the concave, convex shape structure corresponding with bench, bed die(1)It is fixed by screws in fixed base(10)On, platform Seat(10)Be provided with for split bolt(17)The standing screw matching(11).
3. the non-type prefabricated for bench according to claim 1, template system can be had enough to meet the need it is characterised in that described Fixed part be made up of the angle bar of two vertical weldings, the bottom surface of two angle bar is respectively equipped with through hole, angle bar pass through wood screw pass through logical Hole and template of marking time(3)What formation was described is detachably fixed connection, adjacent template of marking time(3)It is provided with perpendicular between corresponding fixed part To interval, form the structure of two adjacent fixed parts stackings, described fix bar(6)It is located between the fixed part of stacking, fixing Bar(6)It is provided with location hole, fix bar(6)Pass through U-bolt and the fixed part of stacking between(12)Detachable described in being formed It is fixedly connected.
4. the non-type prefabricated for bench according to claim 1, template system can be had enough to meet the need it is characterised in that described Fix bar(6)One end tilts to be provided with a resigning portion(13), fix bar(6)The other end be horizontal ends(14), resigning portion(13) With fix bar(6)Between angle and bench upper and lower end and an angle of marking time be adapted, positioned at pouring chamber(18)The fixation of both sides Bar(6)Its resigning portion(13)With horizontal ends(14)Corresponding, horizontal ends(14)It is provided with bolt hole, horizontal ends(14)By angle bar It is fixedly connected with the railing of an inclination(15), described railing(15)With resigning portion(13)It is arranged in parallel, described locating rod(8) For angle bar, locating rod(8)By bolt and resigning portion(13)And railing(15)It is fixedly connected.
CN201620837202.6U 2016-08-04 2016-08-04 A non - design, can all rotary die plate bodys system for bench is prefabricated Withdrawn - After Issue CN205928989U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620837202.6U CN205928989U (en) 2016-08-04 2016-08-04 A non - design, can all rotary die plate bodys system for bench is prefabricated

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620837202.6U CN205928989U (en) 2016-08-04 2016-08-04 A non - design, can all rotary die plate bodys system for bench is prefabricated

Publications (1)

Publication Number Publication Date
CN205928989U true CN205928989U (en) 2017-02-08

Family

ID=57924335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620837202.6U Withdrawn - After Issue CN205928989U (en) 2016-08-04 2016-08-04 A non - design, can all rotary die plate bodys system for bench is prefabricated

Country Status (1)

Country Link
CN (1) CN205928989U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108818894A (en) * 2018-08-03 2018-11-16 上海住信住宅工业有限公司 A kind of precast stair mold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108818894A (en) * 2018-08-03 2018-11-16 上海住信住宅工业有限公司 A kind of precast stair mold

Similar Documents

Publication Publication Date Title
CN106113230B (en) The non-type prefabricated for bench, template system and its construction method can be had enough to meet the need
CN207954218U (en) A kind of folded assembling die for beating precast concrete laminated floor slab
CN105220619B (en) A kind of method of quick manufacture two-wire nose circle solid pier
CN205935641U (en) Template formwork system of aluminum alloy shear force wall
CN103774561B (en) The job execution of speedway prefabricated small box girder frock method streamlined
CN204019724U (en) Make the mold of prefabricated case beam framework of steel reinforcement
CN107460889A (en) Integral movable support formwork in underground comprehensive pipe gallery construction and construction method thereof
CN205928989U (en) A non - design, can all rotary die plate bodys system for bench is prefabricated
CN106285002A (en) Cast-in-place walls difference of height tool-type hoisting die construction method
CN207959244U (en) Prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate
CN204221939U (en) A kind of precast concrete cable channel cover plate mold system
CN105804396B (en) A kind of non-type, template system precast stair bench and construction can be had enough to meet the need
CN207436503U (en) Efficient construction of precast floorslab hangs membrane module
CN205955197U (en) A fixing device that be used for prefabricated non - design of bench, can all rotary die boards
CN204826427U (en) Two accuse precast concrete cushions of floor cover to reinforcement
CN206941968U (en) Reinforcing bar limiting card with the upper oblique bayonet socket being parallel to each other
CN207469596U (en) A kind of beam column outer rim is exempted to tear concrete mold open
CN102121312A (en) Construction process for concrete bargeboard in pseudo-classic architecture
CN205976477U (en) Formula of sinking bathroom hangs mould device
CN214531520U (en) Controller for thickness of floor slab and thickness of protective layer of floor slab reinforcing steel bar
CN105984036A (en) Bubble control technique for producing PC (polycarbonate) boards with modular molds
CN108908663A (en) A kind of Novel interior wall plate formwork erection and its application method
CN209397710U (en) Novel pre-fabricated one
CN207920076U (en) The stair tread formwork that both sides are provided with shear wall installs device
CN108590042B (en) Multifunctional stirrup for controlling thickness of steel bar protection layer and floor slab

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170208

Effective date of abandoning: 20180213

AV01 Patent right actively abandoned