CN204805837U - Connecting device is moulded to steel - Google Patents

Connecting device is moulded to steel Download PDF

Info

Publication number
CN204805837U
CN204805837U CN201520177249.XU CN201520177249U CN204805837U CN 204805837 U CN204805837 U CN 204805837U CN 201520177249 U CN201520177249 U CN 201520177249U CN 204805837 U CN204805837 U CN 204805837U
Authority
CN
China
Prior art keywords
steel
pipe
repair
steel pipe
need
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520177249.XU
Other languages
Chinese (zh)
Inventor
宓立新
沈秀环
孙荣波
郑家和
郑慧强
沈秀颖
李伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520177249.XU priority Critical patent/CN204805837U/en
Application granted granted Critical
Publication of CN204805837U publication Critical patent/CN204805837U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Protection Of Pipes Against Damage, Friction, And Corrosion (AREA)

Abstract

The utility model relates to a PE bushing pipe field, especially relate to a tightness height, bearing capacity strong, detect convenient, the high connecting device is moulded to steel of security, including the PE bushing pipe, the PE bushing pipe through hot melting machine welded fastening on the steel pipe of salvageing is made to need, the equal welded fastening in both ends that need make the steel pipe salvageed has the steel ring flange, the steel pipe that need make the steel pipe of salvageing and need not salvage passes through steel ring flange mount, two terminal surfaces of PE bushing pipe all are provided with the PE ring flange, be equipped with sealed the pad between PE ring flange and the steel ring flange, connecting device is moulded to steel's periphery is equipped with the steel protective sheath, the steel protective sheath surrounds in connecting device is moulded to steel entirely. The utility model relates to a connecting device is moulded to steel's design, the device has all obtained very big improvement in tightness, bearing capacity, practicality and security, can detect the tightness at any time moreover, makes the ability of its safe operation also obtain very big improvement.

Description

Connection set moulded by a kind of steel
Technical field
The utility model relates to PE bushing pipe field, particularly relates to a kind of steel and moulds connection set.
Background technique
In prior art, the connecting means doing same caliber PE bushing pipe is: welded by thick for 10mm PE bushing pipe hot-melting machine, its length is less than the steel pipe 1 meter (two ends are respectively less than 500mm) that will repair, make U-shaped, connect drawing head, will U-shaped PE pipe be made to move to from an operating pit operating pit of the pipeline the other end by winch.If old pipeline originally has 90 ° to turn round, then PE bushing pipe traction is herein obstructed, must herein before and after respectively move back 3 meters and separately make working pit.Be greater than the former pipeline inflection point of 45 °, make PE bushing pipe unaffected.
Each painting 100mm viscose outside PE bushing pipe two ends, carry out suitable pressurization to PE pipe, make it return to original diameter, PE pipe combines tightly with former inner-walls of duct, reaches the anticorrosion object with improving former pipeline bearing capacity.The steel pipe finishing reparation is connected with the steel pipe that it goes without doing the repairs method of electric welding.Originally did and rushed to repair the hole that process the iron nail class taking-up of the wood chock carried on the back or repair welding, and do not affect and worn PE bushing pipe just; Restorative procedure is in the past only applicable to the pipe network being less than 0.01MPa operating pressure (low pressure), and the service life of repairing part is relevant with the adhesion strength of glue, does and is no more than 10 years more.
Model utility content
In order to solve the problems of the technologies described above, the utility model provides that a kind of leakproofness is high, bearing capacity is strong, easy to detect, Security is high, connection set moulded by the steel of long service life.
Connection set moulded by a kind of steel of model utility, comprise PE bushing pipe, described PE bushing pipe is fixedly welded on the steel pipe that need do and rush to repair by hot-melting machine, the two ends that described need make the steel pipe rushed to repair all are welded with steel flanges dish, described need are made the steel pipe rushed to repair and are not needed the steel pipe rushed to repair to be mounted with by steel flanges dish, two end faces of described PE bushing pipe are provided with PE flange plate, the steel flanges dish number that described need do on each end face of the steel pipe rushed to repair is 2, described PE flange plate is placed between 2 steel flanges dishes, sealing gasket is provided with between described PE flange plate and steel flanges dish, described steel is moulded the outer of connection set and is arranged with steel protecting jacket, described steel protecting jacket is entirely surrounded on steel and moulds connection set.
Further; described steel protecting jacket comprises doughnut-shaped steel plate and protecting jacket; described distance need be done the 0.5m place, steel pipe outer end rushed to repair and be provided with a doughnut-shaped steel plate; the described 0.5m place, steel pipe outer end rushed to repair that do not need also is provided with doughnut-shaped steel plate; doughnut-shaped steel plate distance on the described steel pipe not needing to rush to repair need be the doughnut-shaped steel plate 1m on the steel pipe rushed to repair; described protecting jacket is fixedly welded on doughnut-shaped steel plate, and described steel protecting jacket is closed state.
Further, described steel flanges dish is buckled bolt and nut be mounted with by logical.
Further; the top of described steel protecting jacket is provided with circular hole; described circular hole is placed in directly over logical button bolt and nut; described circular hole place is provided with steel pipe nipple; described steel pipe nipple is provided with Flange Ball Valves; be provided with blank flange above described Flange Ball Valves to block up, described Flange Ball Valves and steel pipe nipple are fixed by Flange joint.
Further, described PE bushing pipe with need do the same caliber of the steel pipe rushed to repair, the thickness of described PE bushing pipe is 10mm, and the length of described PE bushing pipe is than being the large 20mm of the steel pipe rushed to repair, described PE bushing pipe is U-shaped is placed in the inside, one end need making repairing steel pipe, pulls the other end with winch.
Further, when air feed or pressure of supply water are greater than 0.4MPa, described sealing gasket is anti-high pressure steel pad.
Further, described steel pipe nipple is DN150 steel pipe nipple, and described ball valve is DN150 Flange Ball Valves.
Further, described sealing gasket is spliced by two pieces of sealing gasket assemblies.
Further, the width of described doughnut-shaped steel plate is 2 times of steel flanges dish width.
By such scheme, the utility model at least has the following advantages: device is all greatly improved in leakproofness, bearing capacity, working life, practicability and Security, and leakproofness can be detected at any time, make the ability of its safe operation have also been obtained very large raising; Pipeline runs in situation with pressure, and especially under high pressure conditions, air-flow strengthens the scouring force of pipeline, and device adds steel protecting jacket, and operator can detect by steel protecting jacket the phenomenon whether having and leak or leak gas at any time, operate very convenient.
Above-mentioned explanation is only the general introduction of technical solutions of the utility model, in order to better understand technological means of the present utility model, and can be implemented according to the content of specification, coordinates accompanying drawing to be described in detail as follows below with preferred embodiment of the present utility model.
Accompanying drawing explanation
Fig. 1 is the structural representation that connection set moulded by a kind of steel of the utility model;
Fig. 2 is the sectional view of A-A in Fig. 1;
Fig. 3 is that the need that connection set moulded by a kind of steel shown in Fig. 1 do the steel pipe rushed to repair and the connection sectional drawing not needing the steel pipe rushed to repair;
Fig. 4 is the steel flanges dish connection detailed drawing that connection set moulded by a kind of steel shown in Fig. 1;
Fig. 5 is the sealing gasket splicing construction schematic diagram that connection set moulded by a kind of steel shown in Fig. 1.
Embodiment
Below in conjunction with drawings and Examples, embodiment of the present utility model is described in further detail.Following examples for illustration of the utility model, but are not used for limiting scope of the present utility model.
Shown in Figure 1, connection set moulded by a kind of steel, comprise PE bushing pipe 12, PE bushing pipe 12 is fixedly welded on the steel pipe 1 that need do and rush to repair by hot-melting machine, the two ends need making the steel pipe 1 rushed to repair all are welded with steel flanges dish 3, the steel pipe 1 rushed to repair need be made and do not need the steel pipe 2 rushed to repair to be mounted with by steel flanges dish 3, two end faces of PE bushing pipe 12 are provided with PE flange plate 4, steel flanges dish 3 number that need do on each end face of steel pipe 1 rushed to repair is 2, PE flange plate 4 is placed between 2 steel flanges dishes 3, sealing gasket 6 is provided with between PE flange plate 4 and steel flanges dish 3, steel is moulded the outer of connection set and is arranged with steel protecting jacket 5, steel protecting jacket 5 is entirely surrounded on steel and moulds connection set, steel protecting jacket 5 comprises doughnut-shaped steel plate and protecting jacket, distance need be done the 0.5m place, steel pipe 1 outer end rushed to repair and be provided with a doughnut-shaped steel plate, the 0.5m place, steel pipe 2 outer end rushed to repair is not needed also to be provided with doughnut-shaped steel plate, do not need the doughnut-shaped steel plate distance on the steel pipe 2 rushed to repair need be doughnut-shaped steel plate 1m on the steel pipe 1 rushed to repair, protecting jacket is fixedly welded on doughnut-shaped steel plate, and steel protecting jacket 5 is closed state, the top of steel protecting jacket 5 is provided with circular hole, circular hole is placed in directly over logical button bolt and nut, and circular hole place is provided with steel pipe nipple 7, and steel pipe nipple 7 is provided with Flange Ball Valves 8, be provided with blank flange stifled 9 above Flange Ball Valves 8, Flange Ball Valves 8 and steel pipe nipple 7 are fixed by Flange joint, steel flanges dish 3 is buckled bolt and nut be mounted with by logical, PE bushing pipe 12 with need do the same caliber of steel pipe 1 rushed to repair, the thickness of PE bushing pipe 12 is that 20mm, PE bushing pipe 12 is U-shaped greatly than making the steel pipe 1 rushed to repair for the length of 10mm, PE bushing pipe 12, when air feed or pressure of supply water are greater than 0.4Mpa, sealing gasket 6 is anti-high pressure steel pad, steel pipe nipple 7 is DN150 steel pipe nipple 7, and ball valve 8 is DN150 Flange Ball Valves 8, sealing gasket 6 is spliced by two pieces of sealing gasket assemblies 11, and the width of doughnut-shaped steel plate is 2 times of steel flanges dish 3 width.
Specific operation mode:
Need do steel pipe 1 step-down of rushing to repair stop the supple of gas or steam (cutting off the water) band gas (cutting off the water) cut two places, each disconnected lower 6m pipeline section is as working pit; Need do with high pressure water steel pipe 1 inner wall washing rushed to repair clean, and detect one time with pipeline robot along inner-walls of duct, find that obstacle makes a record, row relax of going forward side by side; Need do the both sides, 0.5m place, steel pipe 1 outer end of rushing to repair in distance and respectively weld the doughnut-shaped steel plate that internal diameter is outer diameter of steel pipes, its width is 2 times of steel flanges dish 3 width that need make the steel pipe 1 rushed to repair; According to the operating pressure that need make the steel pipe 1 rushed to repair, select suitable steel flanges dish 3, the need being welded on stop the supple of gas or steam (cutting off the water) do on the outer wall end face of the steel pipe 1 rushed to repair, and wherein 0.8MPa needs to adopt down hill welding with upward pressure; The PE bushing pipe 12 of thick for 10mm same caliber is welded with hot-melting machine, its length is than being steel pipe 1 20mm greatly rushed to repair, and 10mm is respectively stayed in two ends, and PE bushing pipe 12 is U-shaped, connect drawing head, by winch, U-shaped PE bushing pipe 12 is moved to the operating pit of the other end from the operating pit of one end; By the method for electric heating melting, PE flange plate 4 thick for 10mm is welded on the end face of PE bushing pipe 12, makes the distance between PE flange plate 4 and steel flanges dish 3 be 10mm; Two same caliber steel pipe nipples in operating pit place connect, this steel pipe nipple side welding steel flanges dish 3, be connected with PE flange plate 4, add the rubber gasket (when 0.4Mpa is to adopt anti-high pressure steel pad during upward pressure) of GB between steel flanges dish 3 and PE flange plate 4, the other end of steel pipe nipple be fixedly welded on do not need rush to repair steel pipe 2 on; The doughnut-shaped steel plate that each welding is same on the steel pipe 2 not needing to rush to repair at distance doughnut-shaped steel plate 1m place, the upper protecting jacket of welding, form steel protecting jacket 5, allow steel mould connection set and be in closed state; In steel protecting jacket 5 upper end, gas cutting digs out a circular hole, circular hole position is just to logical button bolt and nut joint below, because pipe network running pressure is more than 0.4MPa, fluid strengthens the impact force of tube wall, tour personnel are in the patrol and detection process that pipe network is regular, if find that there is Seepage, can in time with spanner tightly logical button bolt and nut, until No leakage, at the steel pipe nipple 7 of circular hole place welding DN150, then welding flange, and add sealing gasket, assemble the Flange Ball Valves 8 of DN150 more up, finally seal up blank flange stifled 9; After entirety has been debugged, device is placed in the underground protection well 10 with brick one-tenth.
Device is all greatly improved in leakproofness, bearing capacity, working life, practicability and Security, and can detect leakproofness at any time, makes the ability of its safe operation have also been obtained very large raising; Pipeline runs in situation with pressure; especially under high pressure conditions; fluid strengthens the scouring force of pipeline, and device adds steel protecting jacket 5, for guaranteeing security of operation; blank flange stifled 9 can regularly be pulled down by tour personnel; open Flange Ball Valves 8 and detect whether have gas leakage or water leakage phenomenon, if had, logical button nut has likely loosened; bolt and nut can be detained, until No leakage in time with spanner is tightly logical.Steel pipe inner wall progress to repaired than being pasted by PE bushing pipe 12 with glue in prior art; Because prior art gluing pastes and is only applicable to the pipe network (low-pressure pipe network of as the saying goes) being less than 0.01MPa operating pressure, and the time grown, often occur that viscose lost efficacy, PE bushing pipe 12 with need do the steel pipe 1 the rushed to repair phenomenon from drum, the hole of originally gas leakage (leaking) does not do the process strengthening welding steel, so time length can continue the phenomenon that corrosion air-leakage (leaking) occurs, once gas leakage can be full of the length range that whole need make the steel pipe 1 rushed to repair, the danger of potential safety hazard and gas leakage detonation is very large, and serious consequence is beyond imagination.
The above is only preferred implementation of the present utility model; be not limited to the utility model; should be understood that; for those skilled in the art; under the prerequisite not departing from the utility model know-why; can also make some improvement and modification, these improve and modification also should be considered as protection domain of the present utility model.

Claims (9)

1. connection set moulded by a steel, comprise PE bushing pipe, it is characterized in that, described PE bushing pipe is fixedly welded on the steel pipe that need do and rush to repair by hot-melting machine, the two ends that described need make the steel pipe rushed to repair all are welded with steel flanges dish, described need are made the steel pipe rushed to repair and are not needed the steel pipe rushed to repair to be mounted with by steel flanges dish, two end faces of described PE bushing pipe are provided with PE flange plate, the steel flanges dish number that described need do on each end face of the steel pipe rushed to repair is 2, described PE flange plate is placed between 2 steel flanges dishes, sealing gasket is provided with between described PE flange plate and steel flanges dish, described steel is moulded the outer of connection set and is arranged with steel protecting jacket, described steel protecting jacket is entirely surrounded on steel and moulds connection set.
2. connection set moulded by a kind of steel as claimed in claim 1; it is characterized in that; described steel protecting jacket comprises doughnut-shaped steel plate and protecting jacket; described distance need be done the 0.5m place, steel pipe outer end rushed to repair and be provided with a doughnut-shaped steel plate; the described 0.5m place, steel pipe outer end rushed to repair that do not need also is provided with doughnut-shaped steel plate; doughnut-shaped steel plate distance on the described steel pipe not needing to rush to repair need be the doughnut-shaped steel plate 1m on the steel pipe rushed to repair, and described protecting jacket is fixedly welded on doughnut-shaped steel plate, and described steel protecting jacket is closed state.
3. connection set moulded by a kind of steel as claimed in claim 1, it is characterized in that, described steel flanges dish is buckled bolt and nut be mounted with by logical.
4. connection set moulded by a kind of steel as claimed in claim 3; it is characterized in that; the top of described steel protecting jacket is provided with circular hole; described circular hole is placed in directly over logical button bolt and nut; described circular hole place is provided with steel pipe nipple; described steel pipe nipple is provided with Flange Ball Valves, and be provided with blank flange above described Flange Ball Valves and block up, described Flange Ball Valves and steel pipe nipple are fixed by Flange joint.
5. connection set moulded by a kind of steel as claimed in claim 1, it is characterized in that, described PE bushing pipe with need do the same caliber of the steel pipe rushed to repair, the thickness of described PE bushing pipe is 10mm, the length of described PE bushing pipe is than being the large 20mm of the steel pipe rushed to repair, described PE bushing pipe is U-shaped is placed in the inside, one end need making repairing steel pipe, pulls the other end with winch.
6. connection set moulded by a kind of steel as claimed in claim 1, it is characterized in that, when air feed or pressure of supply water are greater than 0.4MPa, described sealing gasket is anti-high pressure steel pad.
7. connection set moulded by a kind of steel as claimed in claim 4, it is characterized in that, described steel pipe nipple is DN150 steel pipe nipple, and described Flange Ball Valves is DN150 Flange Ball Valves.
8. connection set moulded by a kind of steel as claimed in claim 1, it is characterized in that, described sealing gasket is spliced by two pieces of sealing gasket assemblies.
9. connection set moulded by a kind of steel as claimed in claim 2, it is characterized in that, the width of described doughnut-shaped steel plate is 2 times of steel flanges dish width.
CN201520177249.XU 2015-03-27 2015-03-27 Connecting device is moulded to steel Expired - Fee Related CN204805837U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520177249.XU CN204805837U (en) 2015-03-27 2015-03-27 Connecting device is moulded to steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520177249.XU CN204805837U (en) 2015-03-27 2015-03-27 Connecting device is moulded to steel

Publications (1)

Publication Number Publication Date
CN204805837U true CN204805837U (en) 2015-11-25

Family

ID=54590662

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520177249.XU Expired - Fee Related CN204805837U (en) 2015-03-27 2015-03-27 Connecting device is moulded to steel

Country Status (1)

Country Link
CN (1) CN204805837U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109538882A (en) * 2019-01-11 2019-03-29 南京高传机电自动控制设备有限公司 A kind of pressure pipeline protective device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109538882A (en) * 2019-01-11 2019-03-29 南京高传机电自动控制设备有限公司 A kind of pressure pipeline protective device

Similar Documents

Publication Publication Date Title
CN204717225U (en) A kind of fiber reinforced plastic pipe is damaged and is leaked maintenance unit
CN103090153A (en) Compensative pipeline repair device
CN103558090B (en) The single seam crossing water test unit of major diameter bearing pipe and hydraulic test method
CN104235552B (en) A kind of locking hood type leakage-baffling device leaked for gas pipe line base cradle
CN204805837U (en) Connecting device is moulded to steel
CN202852326U (en) Isolated seal fixture with pressure
CN204254140U (en) sealing clamp for pipe fitting
CN204647619U (en) Anticorrosion composite pipe connects special welding flanged joint
CN105276336A (en) Method for preventing corrosion in welded pipe and pipe used for method
CN208847417U (en) A kind of portable pipe package seal checker
CN206320464U (en) Repairing applied to PCCP pipe fittings connects section
CN204493936U (en) The joint connecting structure of anticorrosion composite pipe
CN105397401A (en) Under-pressure welding method
CN207094059U (en) A kind of threeway closure plate weld leakage is met an urgent need tape-pressure leakage clogging device
CN101586730B (en) Quick high-pressure no transmission stoppage urgent repair method and jig
CN204729797U (en) High pressure resistant leakage proof metal sealing locked clip device formula major diameter pipeline connecting device
CN211122335U (en) Hydraulic test system applied to large-pipe-diameter conveying pipeline
CN204254144U (en) Auxiliary fixing device for pipeline repairing piece
CN209741787U (en) Hydropower station diversion penstock grouting plugging structure
CN203248897U (en) Stopless-conveying external bypass four-way piece for in-service oil and gas pipeline
CN204756216U (en) Two withstand voltage prevention of seepage pipeline connecting device of contact surface metal seal of clamp locking formula
CN203131320U (en) Grouting and glue injecting three-way sealing clamp
KR101281507B1 (en) Tube for inhibiting corrosion of pipe connecting portion
CN207132022U (en) A kind of compensator upstream end pipeline provided with pressure plugging device
CN206513955U (en) A kind of inside and outside bilateral stainless steel corrosion-resistant water supply and sewerage pipeline

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Fu Lixin

Document name: Notice of termination of patent

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151125

Termination date: 20200327