CN203867601U - Tunnel arch replacing construction supporting structure - Google Patents

Tunnel arch replacing construction supporting structure Download PDF

Info

Publication number
CN203867601U
CN203867601U CN201420303814.8U CN201420303814U CN203867601U CN 203867601 U CN203867601 U CN 203867601U CN 201420303814 U CN201420303814 U CN 201420303814U CN 203867601 U CN203867601 U CN 203867601U
Authority
CN
China
Prior art keywords
tunnel
frame
supporting structure
steel arch
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420303814.8U
Other languages
Chinese (zh)
Inventor
邓国栋
刘斌
王俊生
陈跃
王更峰
赛铁兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN201420303814.8U priority Critical patent/CN203867601U/en
Application granted granted Critical
Publication of CN203867601U publication Critical patent/CN203867601U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a tunnel arch replacing construction supporting structure which comprises a tunnel supporting steel arch and foundation beams. The supporting structure is characterized in that a plurality of foundation beams are vertically and downwards arranged on the lower surface of the top of the tunnel supporting steel arch, triangular supports are symmetrically arranged on the two sides of each foundation beam respectively, a connecting rod is fixedly arranged on one corner of each triangular support and is connected with a clamping groove correspondingly formed in the side face of another foundation beam in a clamping mode, one of another two corners of each triangular support is connected with the tunnel supporting steel arch in a contact mode, and the other corner is vertically downward; the supporting structure further comprises triangular ground supports and universal wheels, the triangular ground supports and the universal wheels are provided with sleeves, and a connecting rod connected with the corresponding triangular ground support or the corresponding universal wheel in a sleeved mode is arranged on the vertically-downward corner of each triangular support. The tunnel arch replacing construction supporting structure is simple in structure, convenient to mount and dismount and good in stability, and guarantees construction safety.

Description

Tunnel changes arch construction supporting structure
Technical field
The utility model relates to the constructing structure in constructing tunnel process, is specifically related to tunnel and changes arch construction supporting structure.
Background technology
Along with the continuous progress of society, people's life is produced and is more and more be unable to do without road traffic, and tunnel becomes a part indispensable in road traffic.Highway tunnel construction generally adopts drilling and blasting method at present, the general New Austrian Tunneling Method that adopts of design, in digging process, make full use of the supporting capacity of country rock self, first in the time of excavation, apply preliminary bracing restriction surrouding rock deformation, and stressed together with country rock, common distortion, after again surrouding rock deformation after substantially restraining, to apply the collaborative preliminary bracing of two lining cutting stressed together.In Tunnel work progress, because geological conditions is poor, not in place at shallow embedding, bias voltage etc., or the irrational situation of construction technology, easily in tunnel excavation process or after preliminary bracing completes, occur that arch sinks to invading limit, side wall containing excessive and invade the phenomenon of limit, in order to ensure structural safety, just need to change arch operation.
Changing the safety in the whole work progress of braced structures relation in arch process, so all higher for changing braced structures stability requirement in arch process.Application number is that CN201220311085.1 discloses a kind of constructing structure that changes arch construction for tunnel, this constructing structure comprises the steel arch frame of grade beam, the former preliminary bracing of temporary supporting and tunnel, the foundation frame of temporary supporting is located on the grade beam of bottom surface, tunnel, and the top-supported of temporary supporting is lived the steel arch frame of the former preliminary bracing in tunnel; Steel arch frame top is evenly distributed with and extends to tunnel and invade the injected hole in limit section rock mass along arch, tunnel hoop, is provided with steel floral tube in injected hole.The advantage such as that this constructing structure has is simple in structure, be easy to installation and removal, safety is good, but the temporary supporting in this constructing structure be by many vertical, laterally and hound be spliced, its stability is not fine, in construction, install also cumbersome, and this temporary supporting is located on the grade beam of bottom surface, tunnel, its bottom is a plane, land and shakiness, do not reach great optimization stablizing effect, in the time that needs remove temporary support, also can only dismounting one by one manually move afterwards, relatively waste time and energy.In addition, this constructing structure can not be monitored the detection of the humidity of construction environment in real time, can not well monitor job site humidity.
Summary of the invention
The purpose of this utility model is according to the deficiencies in the prior art, and a kind of good stability is provided, and removes tunnel easily and changes arch construction supporting structure.
The technical scheme that the utility model provides: described a kind of tunnel changes arch construction supporting structure, comprise tunnel support steel arch frame and grade beam, it is characterized in that: described grade beam is provided with many, all be arranged on straight down the soffit of tunnel support steel arch top of the trellis, the upper end of every pile foundation beam is fixedly connected with tunnel support steel arch frame; Be provided with triangle support frame in every pile foundation beam bilateral symmetry, described triangle support frame wherein one jiao be fixed with connecting rod, and by connecting rod with offer the corresponding draw-in groove clamping that is located at grade beam side, other two jiaos wherein one jiao touch with tunnel support steel arch frame, other one jiao vertically downward; Described braced structures also comprises that triangular ground touches and universal wheel, triangular ground touch and universal wheel on be equipped with sleeve, be provided with in triangle support frame bight vertically downward and touch with triangular ground or the connecting rod of universal wheel socket.
The further technical scheme of the utility model: be provided with hygronom on grade beam.
The further technical scheme of the utility model: be provided with support bar between each triangle support frame and tunnel support steel arch frame, and support bar one end and the clamping of tunnel support steel arch frame inwall, the support bar clamping that the other end and triangle support frame are adjacent with tunnel support steel arch frame.
The utility model is technical scheme preferably: described triangle support frame is right-angled triangle bracing frame, and it is highly 2.5-3.0m, and the right angle electrical of described right-angled triangle bracing frame and tunnel support steel arch frame touch.
The utility model is technical scheme preferably: every pile foundation beam is cylindrical structural or cylinder-like structure, and its diameter is 30-40cm, and many pile foundations beam is linearly equidistantly arranged on the soffit of tunnel support steel arch top of the trellis.
The utility model is technical scheme preferably: described connecting rod is whorl brace rod, described triangular ground touch and universal wheel on sleeve be welded on respectively triangular ground and touch and universal wheel upper end, and in sleeve, be provided with the internal thread mutually mating with whorl brace rod.
The utility model is technical scheme preferably: described triangular ground touches and is made up of three pointed metal sheets in lower end.
The beneficial effects of the utility model:
(1) braced structures of the present utility model adopts triangle support frame, utilize leg-of-mutton strong construction, and be equipped with triangle support frame on grade beam both sides, multiple triangular structures, support more surely, guarantee construction safety, simultaneously triangle support frame and grade beam clamping, when guarantee is connected firmly, easy for removal and installation;
(2) be provided with hickey in the bottom of triangle support frame, can touch and universal wheel for connecting triangular ground, in the time that needs support, can by triangular ground touch be connected on bracing frame, can insert underground, guarantee period stability, after construction finishes, screw off and touch, utilize universal wheel easily to remove braced structures, simple and convenient;
(3) the utility model is also provided with hygronom on grade beam, can monitor in real time the humidity of construction environment, the control of constructability process.
The utility model is simple in structure, and installation, convenient disassembly still have fixed bar between each triangle support frame and steel arch frame, can strengthen the stability of braced structures, ensure further construction safety.
Brief description of the drawings
The view in transverse section of Fig. 1 when to be the utility model change arch Construction Support for tunnel;
Fig. 2 is the view in transverse section of bracing frame of the present utility model while removing;
Fig. 3 be the utility model intermediate cam shape the structural representation that touches.
Wherein: 1-grade beam, 2-steel arch frame, 3-triangle support frame, 4-connecting rod, 5-universal wheel, 6-triangular ground touches, 7-branch sleeve, 8-hygronom, 9-fixed bar, 10-connecting rod, 11-sleeve.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is further described.As shown in Figure 1 and Figure 2, described a kind of tunnel changes arch construction supporting structure, comprise tunnel support steel arch frame 2 and grade beam 1, tunnel support steel arch frame 2 is identical with the radian of tunnel roof, its length is generally 5-10 rice, it is characterized in that: described grade beam 1 is provided with many, for cylindrical structural or cylinder-like structure, can directly adopt metal circular tube as grade beam, its diameter is 30-40cm, many pile foundations beam is linearly equidistantly arranged on the soffit at tunnel support steel arch frame 2 tops, and the upper end of every pile foundation beam 1 is fixedly connected with tunnel support steel arch frame 2; Be provided with triangle support frame 3 in every pile foundation beam 1 bilateral symmetry, described triangle support frame 3 preferably adopts right-angled triangle bracing frame, it is highly 2.5-3.0m, the right angle electrical of described right-angled triangle bracing frame 3 and tunnel support steel arch frame 2 touch, can just clamp with tunnel support steel arch frame 2, play the effect of support; Two other angle wherein one jiao be fixed with connecting rod 4, and by connecting rod 4 with establish the corresponding draw-in groove clamping that is located at grade beam 1 side, the draw-in groove that is arranged on grade beam 1 side can one be welded on the metallic channel on grade beam surface, also can be the groove of directly offering on grade beam 1, connecting rod 4 can insert clamping in draw-in groove, also for convenience detach.One jiao in two other oblique angle of right-angled triangle bracing frame 3 touches with tunnel support steel arch frame 2, just clamp with tunnel support steel arch frame 2, also have an oblique angle to contact with ground vertically downward, three of triangle support frame 3 points are supported on respectively tunnel support steel arch frame 2, grade beam 1 and ground like this, form a stable triangular supports.On grade beam 1, be provided with hygronom 8, hygronom 8 can be monitored the humidity of construction environment, the control of constructability process in real time.
As shown in Figure 1 and Figure 2, described braced structures also comprises triangular ground tactile 6 and universal wheel 5, on triangular ground tactile 6 and universal wheel 5, be equipped with sleeve 11, be provided with the connecting rod 10 being socketed with triangular ground tactile 6 or universal wheel 5 in triangle support frame 3 bight vertically downward, for triangular ground touch 6 or universal wheel 5 be socketed more fastening, connecting rod 10 external surfaces can be provided with external screw thread, the inner surface of sleeve 11 is provided with the internal thread mating with it, both,, in the time of socket, can be threaded connection; As shown in Figure 3, described triangular ground touches 6 and is made up of three pointed metal sheets in lower end, and the upper end of three metals is welded on respectively the lower surface of sleeve 11; Described universal wheel 5 adopts existing universal wheel, then welds in the top one and is with female sleeve 11.It is to use in supporting that triangular ground touches 6, and the tip of its lower end can be inserted in soil, makes it more stable, connecting triangular ground at tactile 6 o'clock, as shown in Figure 1, universal wheel 5 is taken off; Universal wheel 5 is to use in movable supporting frame, can move it conveniently, and connecting when universal wheel 5, as shown in Figure 2, the triangular ground of dismantling touches 6.
As shown in Figure 1, it is more stable for triangle support frame 3 is supported, between each triangle support frame 3 and tunnel support steel arch frame 2, be provided with support bar 9, and support bar 9 one end and the 2 inwall clampings of tunnel support steel arch frame, the support bar clamping that the other end is adjacent with tunnel support steel arch frame 2 with triangle support frame 3, the mode of clamping can be that triangle support frame 3 is a draw-in groove with the welding of support bar junction, can make support bar directly embed in draw-in groove clamping just can, it is also convenient to retract.
Using the utility model as changing arch when Construction Support, mechanism in all parts installation drawing is installed, just triangular ground being touched to 6 is connected on the whorl brace rod 10 of bracing frame 3, as shown in Figure 1, each triangle support frame 3 now just can touch 6 by triangular ground and insert in ground, makes whole braced structures more stable; After construction finishes, need to remove triangle support frame 3 time, only need to screw off triangular ground and touch 6, as shown in Figure 2, will utilize universal wheel 5 by sleeve 11 and connecting rod 10 screw thread sockets, just can easily remove braced structures, in whole process, hygronom 8 can be monitored the humidity of construction environment in real time, the control of constructability process, and fixed bar 9 has been strengthened the stability of braced structures, ensure further construction safety, clamping is easy for removal and installation, practical and convenient, is suitable for promoting the use of.
Of the present utility modelly utilize leg-of-mutton strong construction, support more surely, guarantee construction safety, be connected to when ensureing to be connected firmly simultaneously, easy for removal and installation.
More than show and described general principle and principal character and the advantage of the present utility model of utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; description in above-described embodiment and manual just illustrates principle of the present utility model; do not departing under the prerequisite of the utility model spirit and scope; the utility model also has various changes and modifications; these changes and improvements are all within the scope of claimed the utility model, and the claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (7)

1. a tunnel changes arch construction supporting structure, comprise tunnel support steel arch frame (2) and grade beam (1), it is characterized in that: described grade beam (1) is provided with many, all be arranged on straight down the soffit at tunnel support steel arch frame (2) top, the upper end of every pile foundation beam (1) is fixedly connected with tunnel support steel arch frame (2); Be provided with triangle support frame (3) in every pile foundation beam (1) bilateral symmetry, described triangle support frame (3) wherein one jiao be fixed with connecting rod (4), and by connecting rod (4) with offer the corresponding draw-in groove clamping that is located at grade beam (1) side, other two jiaos wherein one jiao touch with tunnel support steel arch frame (2), other one jiao vertically downward; Described braced structures also comprises that triangular ground touches (6) and universal wheel (5), touch on (6) and universal wheel (5) and be equipped with sleeve (11) at triangular ground, be provided with the connecting rod (10) that touches (6) or universal wheel (5) socket with triangular ground in triangle support frame (3) bight vertically downward.
2. a kind of tunnel according to claim 1 changes arch construction supporting structure, it is characterized in that: on grade beam (1), be provided with hygronom (8).
3. tunnel according to claim 1 and 2 changes arch construction supporting structure, it is characterized in that: between each triangle support frame (3) and tunnel support steel arch frame (2), be provided with support bar (9), and support bar (9) one end and tunnel support steel arch frame (2) inwall clamping, the support bar clamping that the other end and triangle support frame (3) are adjacent with tunnel support steel arch frame (2).
4. a kind of tunnel according to claim 1 and 2 changes arch construction supporting structure, it is characterized in that: described triangle support frame (3) is right-angled triangle bracing frame, it is highly 2.5-3.0m, and the right angle electrical of described right-angled triangle bracing frame (3) and tunnel support steel arch frame (2) touch.
5. tunnel according to claim 1 and 2 changes arch construction supporting structure, it is characterized in that: every pile foundation beam (1) is cylindrical structural or cylinder-like structure, its diameter is 30-40cm, and many pile foundations beam is linearly equidistantly arranged on the soffit at tunnel support steel arch frame (2) top.
6. tunnel according to claim 1 and 2 changes arch construction supporting structure, it is characterized in that: described connecting rod (10) is whorl brace rod, the sleeve (11) that described triangular ground touches on (6) and universal wheel (5) is welded on respectively triangular ground tactile (6) and universal wheel (5) upper end, and in sleeve (11), is provided with the internal thread mutually mating with whorl brace rod (10).
7. tunnel according to claim 1 and 2 changes arch construction supporting structure, it is characterized in that: described triangular ground tactile (6) is made up of three pointed metal sheets in lower end.
CN201420303814.8U 2014-06-10 2014-06-10 Tunnel arch replacing construction supporting structure Expired - Lifetime CN203867601U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420303814.8U CN203867601U (en) 2014-06-10 2014-06-10 Tunnel arch replacing construction supporting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420303814.8U CN203867601U (en) 2014-06-10 2014-06-10 Tunnel arch replacing construction supporting structure

Publications (1)

Publication Number Publication Date
CN203867601U true CN203867601U (en) 2014-10-08

Family

ID=51648571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420303814.8U Expired - Lifetime CN203867601U (en) 2014-06-10 2014-06-10 Tunnel arch replacing construction supporting structure

Country Status (1)

Country Link
CN (1) CN203867601U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111779510A (en) * 2020-08-05 2020-10-16 湖南科技大学 Primary support invasion limit arch changing method for high liquid limit red clay surrounding rock tunnel
CN113503173A (en) * 2021-07-12 2021-10-15 内蒙古工业大学 Mine roadway support steel arch frame and mounting method thereof
CN114075989A (en) * 2020-08-17 2022-02-22 李信斌 Support equipment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111779510A (en) * 2020-08-05 2020-10-16 湖南科技大学 Primary support invasion limit arch changing method for high liquid limit red clay surrounding rock tunnel
CN114075989A (en) * 2020-08-17 2022-02-22 李信斌 Support equipment
CN114075989B (en) * 2020-08-17 2024-03-26 李信斌 Supporting equipment
CN113503173A (en) * 2021-07-12 2021-10-15 内蒙古工业大学 Mine roadway support steel arch frame and mounting method thereof

Similar Documents

Publication Publication Date Title
CN203867601U (en) Tunnel arch replacing construction supporting structure
CN103669432A (en) Jacking device for deviation rectification of steel pylon in mining area of coal mine
CN203373665U (en) Arch ring support
CN205000979U (en) Steel bow member jacking strutting arrangement of tunnel hunch portion
CN204326259U (en) A kind of steel column connector
CN203808851U (en) Earth surface drilling machine stabilization frame
CN206140039U (en) Novel steel bow member and connector plates welding position ware
CN204552773U (en) Soft-broken rock body inbreak tunnelling combination steel bracket suspension device
CN207161119U (en) A kind of symmetrical trouble hole supporting construction
CN202047581U (en) Wall connecting piece for scaffold
CN104265329B (en) For steel pipe truss grouting and reinforcing and the supporting and protection structure of heavily stressed weak broken wall rock
CN213359294U (en) Auxiliary tool for paving floor tiles
CN204457828U (en) A kind of hollow type bolt support structure
CN203948036U (en) The fan-shaped stand of self-propelled of fluid,matching drilol press boring
CN208473910U (en) A kind of FLOOR ANCHOR band angle mounting device
CN211819433U (en) Supporting device for coal mine roadway shoulder angle
CN210370726U (en) Underground coal mine support device
CN107387131A (en) A kind of asymmetric trouble hole supporting construction and its construction method
CN214403617U (en) Detachable supporting device for coal mine construction
CN203795824U (en) Suspension type fastener scaffold erecting device
CN203656527U (en) Steel arch strain meter fixing device
CN206681740U (en) Combine inner support walling crib
CN205088985U (en) Cross bridge type liftable escape way
CN203008937U (en) Anchor rod connecting chain
CN207093102U (en) A kind of asymmetric trouble hole supporting construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20141008

CX01 Expiry of patent term