CN201503747U - Prefabricated base for mounting large-scale hollow reactor - Google Patents

Prefabricated base for mounting large-scale hollow reactor Download PDF

Info

Publication number
CN201503747U
CN201503747U CN2009202110903U CN200920211090U CN201503747U CN 201503747 U CN201503747 U CN 201503747U CN 2009202110903 U CN2009202110903 U CN 2009202110903U CN 200920211090 U CN200920211090 U CN 200920211090U CN 201503747 U CN201503747 U CN 201503747U
Authority
CN
China
Prior art keywords
reactor
base
pedestal
installation
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202110903U
Other languages
Chinese (zh)
Inventor
陈小宝
凌情谊
陈勇镐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baosteel Engineering and Technology Group Co Ltd
Original Assignee
Shanghai Baogang Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baogang Engineering Technology Co Ltd filed Critical Shanghai Baogang Engineering Technology Co Ltd
Priority to CN2009202110903U priority Critical patent/CN201503747U/en
Application granted granted Critical
Publication of CN201503747U publication Critical patent/CN201503747U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

The utility model relates to a prefabricated base for mounting a large-scale hollow reactor, which comprises a civil engineering mounting base and a plurality of reactor bases annually arranged thereon, wherein each reactor base comprises a steel plate embedded part, a reactor base bottom plate and a reactor base connection plate, the steel plate embedded parts are arranged on the mounting base, the reactor base connection plates are mounted on two sides of the steel plate embedded parts, and the reactor base bottom plates are mounted on the two reactor base connection plates. When in use, the prefabricated base provided by the utility model simplifies and facilitates the installation of the large-scale hollow reactor, reduces the workload of installation, shortens the construction period, and facilitates the disassembly of the reactor.

Description

Large-scale air-core reactor is installed and is used precast base
Technical field
The utility model relates to large-scale air-core reactor, particularly a kind of precast base that is used to install large-scale air-core reactor.
Background technology
Large-scale air-core reactor is a kind of reactor that is used for electric filtering and large-scale ac arc furnace.The mounting seat of large-scale air-core reactor is made up of the pedestal of a plurality of tape insulation usually, nearly 6~8 pedestals, and each pedestal has the installation screw of four corresponding specifications, and screwhole diameter is
Figure G2009202110903D00011
It is in place to the foundation of civil work that pre-embedded bolt is arranged to be assembled with the reactor of a plurality of insulator pedestals by large lifting equipment during installation, and fixes with nut.
But adopt this installation method to bring following drawback and shortcoming:
One, during first installation in position
1, assembling all-in-one-piece reactor mounting seat is installed equal number bolt pre-buried in screw and the foundation of civil work for its tens and is difficult to identical the aligning, and is high to the position accuracy demand of pre-embedded bolt, is difficult to once implement installing and locating.
2, when clamp nut, usually each pre-embedded bolt adopts two nuts up and down, be used to regulate the installation perpendicularity of reactor body, for the mounting seat of forming by many pedestals, because of the error of each pedestal fastening force, cause that very easily pedestal insulator even reactor body are damaged because of bearing mechanical fasteners stress.
3, the reactor mounting seat adjust, fastening after, the nut adjusting play of each pedestal bottom needs the civil engineering back-grouting to tamp, and has increased the cycle of installation.
Two, ordinary maintenance is once more during installation in position
Need dig the local secondary grout blanket when 1, the reactor dismounting is keeped in repair, increase the dismantlement work amount.
2, once more during installation in position recoverability poor, this because of dismounting up and down nut loosening cause, need readjust the installation perpendicularity of reactor body.
3, need again back-grouting to tamp.
The utility model content
Task of the present utility model provides a kind of large-scale air-core reactor installation precast base, it has solved a series of problems of above-mentioned existing in prior technology, makes that the installation process of large-scale air-core reactor is simple and convenient, has reduced installation workload, shortened construction period, the reactor convenient disassembly.
Technical solution of the present utility model is as follows:
A kind of large-scale air-core reactor is installed and is used precast base, and it comprises civil engineering installation basis, and it also comprises several reactor pedestals of installing on the basis that is arranged on to be circular layout;
Described reactor pedestal is made up of steel plate embedded part, reactor pedestal bottom plate and reactor pedestal connecting plate, the steel plate embedded part is placed in to be installed on the basis, reactor pedestal connecting plate is installed in the both sides of steel plate embedded part, places on two reactor pedestal connecting plates the reactor pedestal bottom plate is installed.
Be connected by bolt between described reactor pedestal bottom plate and the reactor pedestal connecting plate and fastening.
Fixing between described steel plate embedded part and the reactor pedestal connecting plate by being welded to connect.
Large-scale air-core reactor of the present utility model is installed has following major advantage with precast base:
One, during first installation in position
Because tens installation screws are connected also fastening respectively with the installation connecting plate in advance on the assembling all-in-one-piece reactor mounting seat with bolt, during installation as long as pad welding after it is aimed at and adjust perpendicularity with built-in fitting, so overcome fully and avoided tens install screws and bolt be difficult to identical aim at and pedestal insulator even reactor because of bearing the problem that mechanical fasteners stress is damaged, and need not the civil engineering back-grouting, reduce installation workload and shortened construction period.
Two, ordinary maintenance is once more during installation in position
1, in reactor when maintenance dismounting, only need be twisted the reactor mounting seat and be installed that bolt gets final product on the connecting plate, and convenient disassembly has reduced workload.
2, once more during installation in position recoverability good, because of install connecting plate when the first installation in position of reactor with the basis on embedded part welding location, only need reactor mounting seat upper bolt hole and the bolt of screwing on after the connecting plate screw is aimed at is installed, and after checking the installation perpendicularity of reactor body, tighting a bolt successively gets final product.
3. back-grouting again.
Description of drawings
Fig. 1 is that a kind of large-scale air-core reactor of the present utility model is installed the structural representation with precast base.
Fig. 2 is the enlarged diagram of A part among Fig. 1.
Fig. 3 is a B-B cutaway view among Fig. 2.
Number in the figure:
1 is reactor pedestal connecting plate, and 2 is the steel plate embedded part, and 3 is the reactor pedestal bottom plate, and 4 for installing the basis, and 5 is reactor, and 6 is the reactor pedestal, and 7 are welding, and 8 is bolt.
Embodiment
Below in conjunction with drawings and Examples the utility model is elaborated.
Referring to Fig. 1 to Fig. 3, the utility model is a kind of large-scale air-core reactor installation precast base, it mainly by civil engineering basis 4 is installed and several reactor pedestals 6 are formed, and the quantity of reactor pedestal 6 is generally 6~8, and these pedestals 6 are arranged on the form that is circular layout and install on the basis 4.
Each reactor pedestal 6 is made up of steel plate embedded part 2, reactor pedestal bottom plate 3 and reactor pedestal connecting plate 1, steel plate embedded part 2 is placed in to be installed on the basis 4, reactor pedestal connecting plate 1 is installed in the both sides of steel plate embedded part 2, places on two reactor pedestal connecting plates 1 reactor pedestal bottom plate 3 is installed.
As shown in Figure 3, be connected by bolt 8 between reactor pedestal bottom plate 3 and the two reactor pedestal connecting plates 1 and fastening.Be connected and fixed by welding 7 between steel plate embedded part 2 and two reactor pedestal connecting plates 1.
Large-scale air-core reactor of the present utility model is installed with the installation process of precast base as follows:
On the base plate of each reactor pedestal, install with four bolts with the corresponding specification of pedestal screw, and fastening two pedestal connecting plates, be assembled into reactor mounting seat (forming by 6~8 pedestals usually) then, the mounting seat that pedestal bottom plate and pedestal connecting plate are housed is placed on the foundation of civil work that has built-in fitting, after regulating the perpendicularity of reactor installation, welding gets final product.
When first installation in position, reactor pedestal bottom plate 3 is connected also fastening with pedestal connecting plate 1 usefulness bolt 8; When reactor 5 is installed, if with its with pad welding after perpendicularity is aimed at and adjusted to steel plate embedded part 2.
When daily maintenance, twisting and removing the reactor pedestal bottom plate 3 and the bolt 8 of pedestal connecting plate 1 is detachable reactor 5; Once more during installation in position, as long as with the construction bolt hole of reactor pedestal bottom plate 3 and the bolt 8 of screwing on after pedestal connecting plate 1 screw is aimed at.
In sum, adopt large-scale air-core reactor of the present utility model to install and use precast base, it is simple and convenient that large-scale air-core reactor is installed, and reduced installation workload, shortened construction period, the reactor convenient disassembly.
Certainly, those skilled in the art in the present technique field will be appreciated that, the foregoing description only is to be used for illustrating the utility model, and be not with opposing qualification of the present utility model, as long as in connotation scope of the present utility model, all will drop in the scope of the utility model claim conversion, the modification of the foregoing description.

Claims (3)

1. one kind large-scale air-core reactor is installed and is used precast base, and it comprises civil engineering installation basis, it is characterized in that, it also comprises several reactor pedestals of installing on the basis that is arranged on to be circular layout;
Described reactor pedestal is made up of steel plate embedded part, reactor pedestal bottom plate and reactor pedestal connecting plate, the steel plate embedded part is placed in to be installed on the basis, reactor pedestal connecting plate is installed in the both sides of steel plate embedded part, places on two reactor pedestal connecting plates the reactor pedestal bottom plate is installed.
2. large-scale air-core reactor according to claim 1 is installed and use precast base, it is characterized in that, is connected also fastening between described reactor pedestal bottom plate and the reactor pedestal connecting plate by bolt.
3. large-scale air-core reactor according to claim 1 is installed and used precast base, it is characterized in that, and is fixing by being welded to connect between described steel plate embedded part and the reactor pedestal connecting plate.
CN2009202110903U 2009-10-22 2009-10-22 Prefabricated base for mounting large-scale hollow reactor Expired - Fee Related CN201503747U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202110903U CN201503747U (en) 2009-10-22 2009-10-22 Prefabricated base for mounting large-scale hollow reactor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202110903U CN201503747U (en) 2009-10-22 2009-10-22 Prefabricated base for mounting large-scale hollow reactor

Publications (1)

Publication Number Publication Date
CN201503747U true CN201503747U (en) 2010-06-09

Family

ID=42454676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202110903U Expired - Fee Related CN201503747U (en) 2009-10-22 2009-10-22 Prefabricated base for mounting large-scale hollow reactor

Country Status (1)

Country Link
CN (1) CN201503747U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103370484A (en) * 2010-12-15 2013-10-23 株式会社丸高工业 Mounting base

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103370484A (en) * 2010-12-15 2013-10-23 株式会社丸高工业 Mounting base
CN103370484B (en) * 2010-12-15 2015-12-16 株式会社丸高工业 Installation foundation

Similar Documents

Publication Publication Date Title
CN201503747U (en) Prefabricated base for mounting large-scale hollow reactor
CN201739358U (en) Bearing pedestal fixing and center adjusting device
CN201713940U (en) Steel column base structure
CN201540687U (en) Nameplate hold hoop
CN201316996Y (en) Continuous casting segment centering platform
CN111267043B (en) Nuclear power station deflection type manhole cover plate center position adjusting tool and adjusting method
CN212527567U (en) Disconnecting switch conductive seat rotating shaft dismounting device
CN208884983U (en) A kind of aluminum alloy mould plate device being easily installed
CN201352252Y (en) Analog experiment machine frame for GW27/ZCW1 isolating switch
CN102535693B (en) Curtain wall column mounting method and mounting device
CN220382728U (en) Strain clamp device for power engineering
CN215487987U (en) Geothermal well pipeline dismouting strutting arrangement
CN221119399U (en) Inclination-preventing reinforcing device for electric power steel pipe pole
CN219980183U (en) Equipment support
CN220468873U (en) Support changing structure for inner support detachment
CN219242806U (en) Detachable pillar foot applied to pipeline bracket
CN111390819A (en) Disconnecting switch conductive seat rotating shaft dismounting device
CN221442086U (en) Cantilever type steel outer rod vertical rod fixing device
CN217558739U (en) High-precision anchoring screw mounting device
CN221759384U (en) But angle regulation's conversion festival structure
CN220078298U (en) Double-bridge machine stator hoisting device for hydropower house
CN209601912U (en) A kind of large-sized water turbine generator collector ring integral lifting device
CN220450676U (en) Anchoring pier shaft support buttress structure
CN218145317U (en) Combined lifting appliance for lifting flexible tube panel of boiler
CN217419651U (en) Detachable steel support mounting device used in narrow space deep foundation pit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BAOSTEEL ENGINEERING + TECHNOLOGY GROUP CO., LTD.

Free format text: FORMER OWNER: SHANGHAI BAOSTEEL ENGINEERING + TECHNOLOGY CO., LTD

Effective date: 20100701

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20100701

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2510

Patentee after: Baosteel Engeneering &Technology Group Co., Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2510

Patentee before: Shanghai Baogang Engineering Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee