CN110386725A - A kind of sewage based on MBBR and Magneto separate imitates processing system and method entirely - Google Patents

A kind of sewage based on MBBR and Magneto separate imitates processing system and method entirely Download PDF

Info

Publication number
CN110386725A
CN110386725A CN201910652551.9A CN201910652551A CN110386725A CN 110386725 A CN110386725 A CN 110386725A CN 201910652551 A CN201910652551 A CN 201910652551A CN 110386725 A CN110386725 A CN 110386725A
Authority
CN
China
Prior art keywords
pond
aerobic tank
tank
magnetic
mouth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910652551.9A
Other languages
Chinese (zh)
Inventor
吴迪
郑临奥
夏超
苏丹丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Sipurun Intelligent System Co ltd
Qingdao Sipurun Water Environmental Technology Co.,Ltd.
Qingdao Spring Water Treatment Co ltd
Original Assignee
Qingdao Si Purun Water Treatment Limited-Liability Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Si Purun Water Treatment Limited-Liability Co filed Critical Qingdao Si Purun Water Treatment Limited-Liability Co
Priority to CN201910652551.9A priority Critical patent/CN110386725A/en
Publication of CN110386725A publication Critical patent/CN110386725A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F9/00Multistage treatment of water, waste water or sewage
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/48Treatment of water, waste water, or sewage with magnetic or electric fields
    • C02F1/488Treatment of water, waste water, or sewage with magnetic or electric fields for separation of magnetic materials, e.g. magnetic flocculation
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/52Treatment of water, waste water, or sewage by flocculation or precipitation of suspended impurities
    • C02F1/5281Installations for water purification using chemical agents
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/10Inorganic compounds
    • C02F2101/105Phosphorus compounds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/10Inorganic compounds
    • C02F2101/16Nitrogen compounds, e.g. ammonia
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/30Organic compounds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2203/00Apparatus and plants for the biological treatment of water, waste water or sewage
    • C02F2203/006Apparatus and plants for the biological treatment of water, waste water or sewage details of construction, e.g. specially adapted seals, modules, connections
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/08Chemical Oxygen Demand [COD]; Biological Oxygen Demand [BOD]
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/10Solids, e.g. total solids [TS], total suspended solids [TSS] or volatile solids [VS]
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/14NH3-N
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/16Total nitrogen (tkN-N)
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2301/00General aspects of water treatment
    • C02F2301/04Flow arrangements
    • C02F2301/046Recirculation with an external loop
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2301/00General aspects of water treatment
    • C02F2301/08Multistage treatments, e.g. repetition of the same process step under different conditions
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/30Aerobic and anaerobic processes
    • C02F3/308Biological phosphorus removal

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Water Treatment By Electricity Or Magnetism (AREA)
  • Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)
  • Biological Treatment Of Waste Water (AREA)

Abstract

The invention discloses a kind of sewage based on MBBR and Magneto separate to imitate processing system and method entirely, is related to the dirty water decontamination handles field.Including reactor, reactor is handled sewage in such a way that MBBR is combined with Magneto separate precipitating the two, which includes the anaerobic pond being sequentially communicated, the first anoxic pond, the first aerobic tank, the second aerobic tank, secondary settling tank, the second anoxic pond, third aerobic tank, dosing mixing pit, magnetic kind load pond, flocculation tank and final deposition pool;It further include magnetic powder separator and magnetic powder recovering device, the connection of the sludge out pipe of magnetic powder separator and final deposition pool, magnetic powder recovering device is connect with magnetic powder separator, magnetic kind load pond and anaerobic pond respectively, it is connected with nitrification liquid return pipe between the second aerobic tank and the first anoxic pond, mud return line is connected between secondary settling tank and anaerobic pond.The present invention realizes pollutant all referring to mark efficient process, effluent quality index up to class Table IV class water quality standard by combining both MBBR and magnetic separation technique.

Description

A kind of sewage based on MBBR and Magneto separate imitates processing system and method entirely
Technical field
The present invention relates to the dirty water decontamination handles fields, and in particular to a kind of effect processing entirely of the sewage based on MBBR and Magneto separate System and method for.
Background technique
As the continuous of national environmental protection policy requirements was implemented in recent years, to accomplish fluently clear water defended war, quality of water environment is pushed Lasting to improve, various regions watershed and local sewage drainage standard are further stringent.Under maximum discharge standard requirements, change traditional wastewater High energy consumption, high resource consumption disadvantage are handled, seeks a kind of stably reaching standard, efficient low-consume, land occupation save, the simple sewage of operation and maintenance Treatment process is the important development direction in the dirty water decontamination handles field.
Sewage disposal system in the prior art mainly includes MBR, MBBR etc., and the related research report of the prior art is main Have:
CN106630393A discloses a kind of unattended IFAS or MBBR integrated equipment for sewage treatment and system, packet Closed reactive tank, aerator and device for removing phosphorous by electrolysis are included, reactive tank is successively divided into biochemical reaction from side to the other side Pond, sedimentation basin are filled with suspending carrier in biochemical reaction tank, and sewage enters from the water inlet being arranged on biochemical reaction tank, It is connected between biochemical reaction tank and sedimentation basin and between sedimentation basin and filtering ponds, the water inlet pipe and precipitating of device for removing phosphorous by electrolysis Pond connection, outlet pipe is connected to biochemical reaction tank, and biochemical reaction tank is divided into anaerobic pond, anoxic room, aerobic tank, to TN remove according to Lai Yu reflux is unable to reach 80% or more nitrogen removal rate, while using device for removing phosphorous by electrolysis, sludge yield and consumption of electrode Amount is big, and operating cost is high.
CN207259318U discloses a kind of integrated rural sewage disposal device, including tank body and below tank body Mud room, wherein tank body includes from coarse rack room, fine fack room, MBR film process room and the oxidation successively separated from inside to outside Coarse rack room is wrapped up in room, fine fack room, and fine fack room is wrapped up in MBR film process room, and the indoor sewage of fine fack is via the first overflow In mouth overflow to MBR film process room, oxidizing chamber wraps up MBR film process room, and the indoor sewage of MBR film process is via the second overflow port Overflow is to oxidizing chamber, the first mud discharging mouth of fine fack room bottom, the second mud discharging mouth and oxidizing chamber of MBR film process room bottom The third mud discharging mouth of bottom leads to mud room.Setting suspension carrier in anoxic pond and aerobic tank, is separated by solid-liquid separation and uses MBR, first It is short in the presence of suspension carrier service life, it needs to regularly replace, and replace complicated problem, secondly uses MBR, investment and operating cost Height, and easily blocking, cause equipment to be unable to operate normally, and overhaul difficult.
CN206901993U discloses a kind of integration MBBR sewage disposal device, including sequentially connected anaerobic pond, lacks Oxygen pond aerobic tank and sedimentation basin, however, the not set advanced treatment unit of equipment, sedimentation basin is discharged direct emission, and effluent index is outstanding Its TP, SS are unable to reach level-one A standard.
CN109553196A discloses a kind of anaerobic-aerobic multiple-hearth biofilm reactor and its technique, including reactor Tank body, reactor tank body are embedded in backfill, and the bottom of reactor tank body is provided with fine sand basal layer and concrete foundation Layer, the inside of reactor tank body, which divides, anoxic zone, anaerobic zone, aerobic zone, settling zone and filtering sterile zones, and mating is provided with Aerating system and electric-control system, the MBBR biological suspension that different proportion quantity is added in anoxic zone, anaerobic zone, aerobic zone carry Body, pure film MBBR technique are low to colloid in raw water and particle utilization of carbon source, and carbon source deficiency causes biological carbon and phosphorous removal limited, pure film Process requirement secondary settling tank needs timing to backwash, influences technique continuous and steady operation using filter tank as advanced treating.
CN106348528A discloses a kind of magnetic load precipitating and biological aerated filter compound sewage processing system, including magnetic Precipitation unit and biological aerated filter unit are loaded, its working principle is that dosing tank and magnetic separator are respectively to magnetic-coagulation reactor Middle addition coagulant, flocculant and magnetic powder, treatment sewage is entered in magnetic-coagulation reactor by water inlet takes off steady flocculation, then Into first treated is completed in inclined-tube sedimentation tank, most of phosphorus, suspended matter and partial organic substances are removed, subsequently enter aeration life Object filter tank removes ammonia nitrogen and partial organic substances, to realize the secondary treatment of sewage.System design is not in view of removing total nitrogen It removes, does not meet existing discharge standard requirement.
Biochemical treatment is carried out using activated sludge process merely, is difficult to reach in the rough sledding such as water inlet impact and winter low temperature Mark discharge, system loading is low to be taken up a large area;MBR technique membrane module needs timing on-line cleaning, periodically backwash, and there are costs It is high, energy consumption is high, the disadvantages of needing special messenger to safeguard, be badly in need of improving;MBBR technique needs mating advanced treatment process such as efficient sedimentation tank, filter Pond has process flow long, the disadvantages of taking up a large area, is unfavorable for the highly integrated property of technique.
To improve quality of water environment, realizes that stable water outlet is up to standard and equipment high efficiency low consumption simple operation, be badly in need of to existing dirt Water treatment system improves.
Summary of the invention
Based on above-mentioned defect existing in the prior art, the present invention provides a kind of sewage based on MBBR and Magneto separate is complete Imitate processing system and method, it can be ensured that the core index of sewage is up to standard all referring to marking.
One of task of the invention is to provide a kind of sewage based on MBBR and Magneto separate and imitates processing system entirely, uses Following technical scheme:
A kind of sewage based on MBBR and Magneto separate imitates processing system entirely comprising reactor, it is characterised in that: described Reactor is handled sewage in such a way that MBBR is combined with Magneto separate precipitating the two, and the reactor includes successively connecting Logical anaerobic pond, the first anoxic pond, the first aerobic tank, the second aerobic tank, secondary settling tank, the second anoxic pond, third aerobic tank, dosing Mixing pit, magnetic kind load pond, flocculation tank and final deposition pool;
It further include magnetic powder separator and magnetic powder recovering device, the magnetic powder separator goes out with the final deposition pool The connection of mud pipe, the magnetic powder recovering device load pond with magnetic powder separator, magnetic kind respectively;
In the anaerobic pond, the first anoxic pond, the first aerobic tank, the second aerobic tank, the second anoxic pond, third aerobic tank Suspending carrier is inside added;
Dedicated first blender of suspending carrier is provided in the anaerobic pond, the first anoxic pond, the second anoxic pond; First aerobic tank, the second aerobic tank are provided with perforated pipe aerating regulation device, the dosing mixing pit, magnetic kind in third aerobic tank The second blender, third blender, the 4th blender are disposed in load pond, flocculation tank;
The anaerobic pond is connected with water inlet pipe, and the final deposition pool is connected with outlet pipe;
The secondary settling tank is connected with MBBR mud discharging pipe, and the final deposition pool is connected with Magneto separate mud discharging pipe;
It is connected with nitrification liquid return pipe between second aerobic tank and the first anoxic pond, positioned at one end of the second aerobic tank As water inlet, one end positioned at the first anoxic pond is as water outlet;It is connected between the secondary settling tank and the anaerobic pond There is mud return line, positioned at one end of secondary settling tank as mud inlet, one end positioned at anaerobic pond is as mud mouth;The MBBR Mud discharging pipe and the mud return line common sparing pipeline.
As a preferred solution of the present invention, separated between adjacent pond body by partition, on the partition Be provided with the adjacent pond body connection of holding crosses the mouth of a river, the anaerobic pond mistake on the spacing board including being located at anaerobic pond and the first anoxic pond The mouth of a river, the first anoxic pond on the spacing board of the first anoxic pond and the first aerobic tank cross the mouth of a river, be located at the first aerobic tank with The first aerobic tank on the spacing board of second aerobic tank crosses the mouth of a river, second on the spacing board of the second aerobic tank and secondary settling tank Aerobic tank crosses the mouth of a river, the secondary settling tank on secondary settling tank and the spacing board of the second anoxic pond crosses the mouth of a river, be located at the second anoxic pond with The second anoxic pond on the spacing board of third aerobic tank crosses the mouth of a river, on the spacing board of third aerobic tank and dosing mixing pit Third aerobic tank crosses the mouth of a river, the dosing mixing pit on the spacing board in dosing mixing pit with magnetic kind load pond is crossed the mouth of a river, is located at Magnetic kind load pond on the spacing board of magnetic kind load pond and flocculation tank cross the mouth of a river and be located at flocculation tank and final deposition pool it Flocculation tank on spacing board crosses the mouth of a river.
As another preferred embodiment of the invention, the front at the mouth of a river, first anoxic pond are crossed in the anaerobic pond Cross the front at the mouth of a river, second anoxic pond is crossed in front of the mouth of a river to be provided with and detests anoxic and intercept sieve, the anoxic of detesting blocks Cutting sieve is flat screen, and the upper edge for detesting anoxic interception sieve 30cm, lower edge below operating water level are higher than operation water The half of position, the operating water level are lower identical along mounting height with the outlet pipe.
Preferably, first aerobic tank crosses the front at the mouth of a river, second aerobic tank crosses the front at the mouth of a river, institute Crossing in front of the mouth of a river for the third aerobic tank stated is provided with aerobic interception sieve, and the aerobic interception sieve is rotary screen Net, the upper edge of the aerobic interception sieve in operating water level 65% hereinafter, lower edge is higher than the 35% of operating water level, it is described Operating water level is lower identical along mounting height with the outlet pipe.
Preferably, it is connected between the magnetic powder separator and the magnetic powder recovering device by enters mud pipe, it is described Magnetic powder recovering device and described magnetic kind load pond between connected by magnetic kind return pipe.
Preferably, the suspending vehicle density is 0.95-1.04g/cm3, voidage > 90%;In anaerobic pond Suspending vehicle density is 0.95-0.97g/cm3, the suspending vehicle density in the first anoxic pond, the second anoxic pond is 1.02- 1.04g/cm3, suspending carrier effective ratio area is 300-620m2/m3;Suspending vehicle density in the first aerobic tank is 0.95-0.97g/cm3, the suspending vehicle density in the second aerobic tank and third aerobic tank is 0.97-0.99g/cm3, it is located at Suspending carrier effective ratio area in first aerobic tank and third aerobic tank is 450-800m2/m3, it is located in the second aerobic tank Suspending carrier effective ratio area be 620-1200m2/m3
Preferably, the water inlet of the nitrification liquid return pipe is provided with nitrification liquid reflux and intercepts sieve, the nitre Change liquid reflux intercept sieve be flat screen, the opening direction of the perforated pipe aerating regulation device downward, hatch bore diameter 4-6mm, Mounting height is located at the above 30cm of bottom of pond.
Preferably, the secondary settling tank crosses the mouth of a river, dosing mixing pit crosses the mouth of a river, flocculation tank is crossed the upper edge at the mouth of a river and transported 30cm below row water level, mouth of a river lower edge is crossed in the magnetic kind load pond and the bottom of pond in the magnetic kind load pond maintains an equal level.
Another task of the invention is to provide a kind of sewage based on MBBR and Magneto separate and imitates processing method entirely, uses Above-mentioned processing system comprising following steps:
A, treatment sewage initially enters anaerobic pond, and the activated sludge of secondary settling tank reflux is taken using the completion of dirty Organic substance in water The nitrate removal and anaerobic phosphorus release of band, the microorganism of apposition growth completes the hydrolysis to carbon source in water on suspending carrier, fast Speed increases the concentration of high-quality quick carbon source such as volatile fatty acid in sewage;
B, anaerobic pond water outlet enters the first anoxic pond, and the denitrification by apposition growth on activated sludge and suspending carrier is thin Bacterium completes the nitrate removal carried to reflux nitrification liquid, while consuming raw water partial organic substances;
C, the first anoxic pond water outlet enter the first aerobic tank, by activated sludge and suspending carrier apposition growth it is aerobic Heterotroph completes the removal of raw water organic matter, completes going for a small amount of ammonia nitrogen by the nitrobacteria of apposition growth on suspending carrier It removes;
D, the first aerobic tank water outlet enters the second aerobic tank, and the removal of residual organic substances is completed by activated sludge, is passed through The nitrobacteria of apposition growth completes the removal of remaining ammonia nitrogen on suspending carrier;
E, the second aerobic tank water outlet enters secondary settling tank, completes mud-water separation, and the sludge after sedimentation is returned by mud return line It is flow to anaerobic pond, excess sludge is discharged by MBBR mud discharging pipe, secondary clarifier effluent ammonia nitrogen < 1.5mg/L, SS < 100mg/ L;
F, secondary clarifier effluent enters the second anoxic pond, completes total nitrogen by the denitrifying bacteria of apposition growth on suspending carrier Further removal, organic matter needed for denitrification supplemented by outer throwing carbon source;
G, the second anoxic pond water outlet enters third aerobic tank, is realized by the aerobic heterotroph of apposition growth on suspending carrier The guaranteeing role of outlet water organic substance;
H, the water outlet of third aerobic tank is successively by dosing mixing pit, magnetic kind load pond and flocculation tank, by described Magnetic kind load pond and flocculation tank add magnetic kind and flocculant respectively, keep particulate form in sewage and colloidal organic substrate solidifying It is polymerized to the floc sedimentation using magnetic kind as " core ";
I, flocculation tank water outlet enters final deposition pool completion mud-water separation, and supernatant reaches the discharge standard of sewage, by end The outlet pipe discharge in heavy pond;
J, final deposition pool bottom magnetic floc sedimentation enters magnetic powder separator, is broken up magnetic floc sedimentation by shearing force, forms magnetic Powder-wadding body mixed liquor;
K, magnetic powder separator goes out water mixed liquid and enters magnetic powder recovering device, completed under magnetic fields the recycling of magnetic powder with The separation of non magnetic wadding body, the magnetic powder of recycling are back to magnetic kind load pond and realize that magnetic kind recycles, and excess sludge passes through magnetic point It is discharged from mud discharging pipe.
Preferably, the anaerobic pond, the first anoxic pond, the first aerobic tank, the second aerobic tank sludge concentration be 1500- 3000mg/L;Activated Sludge System sludge age < 6d;Anaerobic pond ORP < -200mV;The suspension of first anoxic pond, the second anoxic pond carries Body filling rate is in 10-50%, DO < 0.4mg/L;First aerobic tank, the second aerobic tank, third aerobic tank suspending carrier filling rate In 30-66%, DO 2-6mg/L;Anaerobic pond hydraulic detention time exists in 45-90min, third aerobic tank hydraulic detention time 15-30min;Secondary settling tank surface loading is in 1.2-1.5m3/m2·h;Second anoxic pond, third aerobic tank sludge concentration < 500mg/ L;The hydraulic detention time of dosing mixing pit is 1.5-2min, and the hydraulic detention time that magnetic kind loads pond is 1.5-2min, flocculation The hydraulic detention time of reaction tank is 2-3min, and the residence time of final deposition pool is 20-30min, surface loading 15-30m3/m2· h。
A kind of sewage based on MBBR and Magneto separate of the present invention imitates the working principle of processing system entirely are as follows:
Using the compound MBBR process activity sludge of mud film for raw water utilization of carbon source rate height, organic matter high treating effect, outstanding Float carrier strengthens the characteristics of nitrification effect, and the depth of biological phosphate-eliminating, denitrifying reinforcing and organic matter is realized by ultrashort sludge age Removal, nitration reaction place one's entire reliance upon the biomembrane on suspending carrier;Utilize the high advantage of pure film MBBR technique denitrification load Rear-mounted denitrification is set, TN processing is further strengthened;It is high using Magneto separate load, the characteristics of water inlet SS can be born to 500mg/L, Secondary settling tank surface loading can be increase accordingly, while Magneto separate sedimentation basin load is much higher than efficient sedimentation tank, Magneto separate realize SS and The stably reaching standard of TP is not necessarily to subsequent filter tank, reduces land occupation.
Compared with prior art, present invention offers following advantageous effects:
1) high treating effect: system is discharged ammonia nitrogen < 1.5mg/L, TN < 5mg/L, TP < 0.1mg/L, and SS < 6mg/L is much higher than Level-one A standard can stably reach quasi- IV class standard;
2) enhanced biological phosphorus removal: mud membrane compound technology system SRT < 6d, ultrashort sludge age substantially enhanced biological phosphorus removal effect, Biological phosphorus removal > 90%;
3) load is high, takes up an area province: equipment adds living polymer suspending carrier, and the elimination capacity of pollutant is traditional activated 2-3 times of sludge, magnetic kind add reinforcing floc settling velocity, and surface loading is efficient sedimentation tank 2 times or more;The pure membrane process of MBBR Without traditional secondary settling tank, Magneto separate is not necessarily to subsequent filter tank;50% land occupation can be reduced compared to traditional technology on the whole;
4) capacity of resisting impact load is strong: whether MBBR or Magneto separate can bear Design cooling load 100- in the short time 200% water quality and water impact;
5) operating cost is low: anaerobic pond adds suspending carrier and strengthens carbon source hydrolysis, increases high-quality quick carbon source concentration, strengthens Biological carbon and phosphorous removal;Biological phosphate-eliminating is high-efficient, and added amount of chemical needed for Magneto separate is small, and medicament service efficiency is high, comprehensive to reduce medicine Agent dosage 30-70%, magnetic powder rate of recovery rate are more than 99.5%;
6) operation and maintenance are simple: the compound MBBR process operation of mud film is simple;The pure membrane process of MBBR, no setting is required, and sludge returns Stream, backwash, sludge yield are low;Suspending carrier, perforated pipe aerating regulation, to intercept sieve service life be more than 15 years, without damaged aging, It runs non-maintaining, can be widely used for sewage treatment plant stand or integration apparatus.
Detailed description of the invention
The present invention will be further described with reference to the accompanying drawing:
Fig. 1 is that the sewage based on MBBR and Magneto separate imitates processing system front elevation view entirely.
In figure: Z1- anaerobic pond, the first anoxic pond of Z2-, the first aerobic tank of Z3-, the second aerobic tank of Z4-, Z5- secondary settling tank, The second anoxic pond of Z6-, Z7- third aerobic tank, Z8- dosing mixing pit, Z9- magnetic kind load pond, Z10- flocculation tank, Z11- end Heavy pond;P1- water inlet pipe, P2- mud return line, P3- nitrification liquid return pipe, P4- outlet pipe, P5- sludge out pipe, P6- enters mud pipe, P7- magnetic kind return pipe, P8- Magneto separate mud discharging pipe, P9-MBBR mud discharging pipe;S1- suspending carrier, S2- perforated pipe aerating regulation Device, the first blender of S3-, S4- detest anoxic and intercept sieve, the aerobic interception sieve of S5-, and the reflux of S6- nitrification liquid intercepts sieve, S7- Second blender, S8- third blender, the 4th blender of S9-;M1- magnetic powder separator, M2- magnetic powder recovering device;W1- detests The mouth of a river is crossed in oxygen pond, and the first anoxic pond of W2- crosses the mouth of a river, and the first aerobic tank of W3- crosses the mouth of a river, and the second aerobic tank of W4- crosses the mouth of a river, W5- bis- The mouth of a river is crossed in heavy pond, and the second anoxic pond of W6- crosses the mouth of a river, and W7- third aerobic tank crosses the mouth of a river, and W8- dosing mixing pit crosses the mouth of a river, W9 magnetic kind The mouth of a river is crossed in load pond, and W10- flocculation tank crosses the mouth of a river.
Specific embodiment
The invention proposes a kind of sewage based on MBBR and Magneto separate to imitate processing system and method entirely, in order to make the present invention The advantages of, technical solution it is clearer, clear, below with reference to specific embodiment, the present invention is described in more detail.
As shown in Figure 1, a kind of sewage based on MBBR and Magneto separate of the present invention imitates processing system and method entirely, can solve existing There is the problems such as technical treatment effect is unstable, the excessive inconvenience of equipment is safeguarded.
The present invention is based on the sewage of MBBR and Magneto separate to imitate processing system entirely comprising reactor, reactor pass through MBBR The mode combined with Magneto separate precipitating the two handles sewage, which includes more pond bodies, preferably from left to right successively For anaerobic pond Z1, the first anoxic pond Z2, the first aerobic tank Z3, the second aerobic tank Z4, secondary settling tank Z5, the second anoxic pond Z6, third Aerobic tank Z7, dosing mixing pit Z8, magnetic kind load pond Z9, flocculation tank Z10 and final deposition pool Z11, additionally include relevant Process pipeline, technique pipe fitting and suspending carrier S1;
Above-mentioned process pipeline includes water inlet pipe P1, mud return line P2, nitrification liquid return pipe P3, outlet pipe P4, sludge out pipe P5, enters mud pipe P6, magnetic kind return pipe P7, Magneto separate mud discharging pipe P8, MBBR mud discharging pipe P9;
Above-mentioned technique pipe fitting includes perforated pipe aerating regulation device S2, the first blender S3, detests anoxic interception sieve S4, aerobic interception Sieve S5, nitrification liquid reflux intercept sieve S6, the second blender S7, third blender S8, the 4th blender S9, magnetic powder separation dress Set M1 and magnetic powder recovering device M2;
It is good in anaerobic pond Z1, the first anoxic pond Z2, the first aerobic tank Z3, the second aerobic tank Z4, the second anoxic pond Z6, third Suspending carrier has been added in the Z7 of oxygen pond;
Dedicated first blender of suspending carrier is provided in anaerobic pond Z1, the first anoxic pond Z2, the second anoxic pond Z6 S3;Perforated pipe aerating regulation device S2, dosing mixing pit Z8, magnetic are set in the first aerobic tank Z3, the second aerobic tank Z4, third aerobic tank Z7 The second blender S7, third blender S8, the 4th blender S9 are disposed in kind load pond Z9, flocculation tank Z10;
Water inlet pipe P1 is communicated with the top anaerobic pond Z1;Mud return line P2 is communicated with the side anaerobic pond Z1;Nitrification liquid reflux The one end pipe P3 is communicated with the second aerobic tank Z4, and the other end is communicated with the first anoxic pond Z2;The top outlet pipe P4 and final deposition pool Z11 phase It is logical;The one end sludge out pipe P5 is communicated with the bottom final deposition pool Z11, and the other end is communicated with magnetic powder separator M1;The one end enters mud pipe P6 with Magnetic powder separator M1 is communicated, and the other end is communicated with magnetic powder separator M2;Magnetic kind one end return pipe P7 and magnetic powder separator M2 is communicated, and the other end is communicated with magnetic kind load pond Z9;Secondary settling tank is connected with MBBR mud discharging pipe P9, and final deposition pool is connected with magnetic point From mud discharging pipe P8;
Separated between adjacent pond body by partition, the mistake for keeping adjacent pond body connection is provided on the partition The mouth of a river, the anaerobic pond on the spacing board of anaerobic pond Z1 and the first anoxic pond Z2 cross mouth of a river W1, be located at the first anoxic pond Z2 with The first anoxic pond on the spacing board of first aerobic tank Z3 crosses mouth of a river W2, between the first aerobic tank Z3 and the second aerobic tank Z4 The first aerobic tank on partition crosses mouth of a river W3, the second aerobic tank mistake on the spacing board of the second aerobic tank Z4 and secondary settling tank Z5 Mouth of a river W4, the secondary settling tank on the spacing board of secondary settling tank Z5 and the second anoxic pond Z6 cross mouth of a river W5, are located at the second anoxic pond Z6 With the second anoxic pond on the spacing board of third aerobic tank Z7 cross mouth of a river W6, be located at third aerobic tank Z7 and dosing mixing pit Z8 it Third aerobic tank on spacing board crosses mouth of a river W7, the dosing on the spacing board of dosing mixing pit Z8 and magnetic kind load pond Z9 mixes Close pond cross mouth of a river W8, positioned at magnetic kind load pond Z9 and flocculation tank Z10 spacing board on magnetic kind load pond cross mouth of a river W9 and Flocculation tank on the spacing board of flocculation tank Z10 and final deposition pool Z11 crosses mouth of a river W10.
It is flat screen that the present invention, which preferably detests anoxic to intercept sieve S4, and the upper edge for detesting anoxic interception sieve S4 is being transported 30cm below row water level, lower edge are higher than the half of operating water level;The present invention preferably aerobic interception sieve S5 is roller sieve, upper edge In operating water level 65% hereinafter, lower edge is higher than the 35% of operating water level;It is flat that the preferred nitrification liquid reflux of the present invention, which intercepts sieve S6, Screen net.
The preferred suspending carrier S1 density of the present invention is 0.95-1.04g/cm3, voidage > 90%.The present invention is preferably placed at Suspending vehicle density in anaerobic pond is 0.95-0.97g/cm3, suspending vehicle density in the first anoxic pond, the second anoxic pond For 1.02-1.04g/cm3, suspending carrier effective ratio area is 300-620m2/m3;Suspending carrier in the first aerobic tank Density is 0.95-0.97g/cm3, the suspending vehicle density in the second aerobic tank and third aerobic tank is 0.97-0.99g/ cm3, the suspending carrier effective ratio area in the first aerobic tank and third aerobic tank is 450-800m2/m3, it is located at second Suspending carrier effective ratio area in aerobic tank is 620-1200m2/m3
Downward, hatch bore diameter 4-6mm, mounting height is located at pond to the opening direction of the preferred perforated pipe aerating regulation device S2 of the present invention The above 30cm in bottom.
The preferred secondary settling tank of the present invention crosses mouth of a river W5, dosing mixing pit crosses mouth of a river W8, flocculation tank crosses the upper edge of mouth of a river W10 The 30cm below operating water level, mouth of a river W9 lower edge is crossed in the magnetic kind load pond and the bottom of pond of the magnetic kind load pond Z9 is held It is flat.
The preferred anaerobic pond of the present invention, the first anoxic pond, the first aerobic tank, the second aerobic tank sludge concentration be 1500- 3000mg/L;Activated Sludge System sludge age < 6d;The suspending carrier filling rate of anaerobic pond is in 10-50%, ORP < -200mV;The One anoxic pond, the second anoxic pond suspending carrier filling rate in 10-50%, DO < 0.4mg/L;It is first aerobic tank, second aerobic Pond, third aerobic tank suspending carrier filling rate are in 30-66%, DO 2-6mg/L;Anaerobic pond hydraulic detention time is in 45- 90min, third aerobic tank hydraulic detention time is in 15-30min;Secondary settling tank surface loading is in 1.2-1.5m3/m2·h;Second lacks Oxygen pond, third aerobic tank sludge concentration < 500mg/L;The hydraulic detention time of dosing mixing pit is 1.5-2min, the load of magnetic kind The hydraulic detention time in pond is 1.5-2min, and the hydraulic detention time of flocculation tank is 2-3min, the residence time of final deposition pool For 20-30min, surface loading 15-30m3/m2·h。
Pure embrane method is different from activated sludge, and process performance increases with the increase of DO, therefore the DO of pure film is higher than activity dirt Mud method, and the impact of water inlet fluctuation can be resisted by improving DO.
The present invention feature stable for organic matter high treating effect, nitrification using the compound MBBR technique of mud film, by super Short sludge age realizes the depth removal of organic matter, nitrifies the biomembrane that places one's entire reliance upon;Realize that rear-mounted denitrification ensures using pure film Water TN advanced treating;Since subsequent Magneto separate ensures SS, secondary settling tank surface loading can be increased, reduce occupied area.
The present invention selects magnetic separation technique, easy to operate, without newly-increased filter element, 15~40m of surface loading3/m2H, Dephosphorization advantage is significant, medicament service efficiency is high, reduces dosage 30-70%, and land occupation saves, and operating cost is low.
The present invention selects the suspending carrier of different densities and effective ratio area, and the suspending vehicle density in anaerobic pond is 0.95-0.97g/cm3, for the microorganism of attachment based on heterotroph, biomass is relatively large, selects the suspension of relatively low density Carrier, close to water filler fluidisation can be realized by stirring, the first anoxic pond, second lack in total body density after microorganism colonization Suspending vehicle density 1.02-1.04g/cm in oxygen pond3, it is slightly larger than water, avoids denitrification from producing nitrogen and push carrier floating accumulation; Anaerobic pond, the first anoxic pond, the microorganism adhered on the suspending carrier in the second anoxic pond are based on anoxic heterotroph, organic matter Abundance, biomembrane is thicker, effective ratio area 300-620m2/m3Suspending carrier inside water passage it is relatively wide, can ensure Biomembrane good mass-transfer;First aerobic tank organic loading is higher than the second aerobic tank, third aerobic tank, biomass and biofilm thickness Opposite highest, therefore select density 0.95-0.97g/cm3, effective ratio area 450-800m2/m3Suspending carrier, suspending carrier Density is close in water after biofilm and the wider guarantee mass transfer of runner passes oxygen;Second aerobic tank, third aerobic tank organic loading are far below First aerobic tank, biomass is opposite to be reduced, and selects density for 0.97-0.99g/cm3Suspending carrier, global density is same after biofilm Carrier fluidisation only can be realized by being aerated disturbance close to water in sample;Second aerobic tank is compared with third aerobic tank, the second aerobic tank Interior suspending carrier undertakes main nitrification load, and nitrobacteria slow growth biomembrane is relatively thin, and third aerobic tank undertakes on a small quantity Runner relative narrower may be selected in organic loading on the basis of ensureing biomembrane good mass-transfer, and effective ratio area is bigger to be hanged Float glass process carrier, therefore the second aerobic tank selects effective ratio area 620-1200m2/m3Suspending carrier, third aerobic tank selection 450-800m2/m3Suspending carrier.
Using the compound MBBR process activity sludge of mud film for raw water utilization of carbon source rate height, organic matter high treating effect, outstanding Float carrier strengthens the characteristics of nitrification effect, and the depth of biological phosphate-eliminating, denitrifying reinforcing and organic matter is realized by ultrashort sludge age Removal, nitration reaction place one's entire reliance upon the biomembrane on suspending carrier;Utilize the high advantage of pure film MBBR technique denitrification load Rear-mounted denitrification is set, TN processing is further strengthened;It is high using Magneto separate load, the characteristics of water inlet SS can be born to 500mg/L, Secondary settling tank surface loading can be increase accordingly, while Magneto separate sedimentation basin load is much higher than efficient sedimentation tank, Magneto separate realize SS and The stably reaching standard of TP is not necessarily to subsequent filter tank, reduces land occupation.
Above-mentioned MBBR mud form membrane refers to biological section to the removal of pollutant by the biology on activated sludge and suspending carrier What film was completed jointly, sludge reflux is arranged in 1500-3000mg/L, technique in sludge concentration in reactor.
The above-mentioned pure form membrane of MBBR refers to what biological section completed the removal of pollutant by the biomembrane on suspending carrier, instead Sludge concentration in device is answered to be less than 500mg/L, and active material is mainly the biomembrane to fall off in sludge, technique is not provided with sludge and returns Stream.
The voidage of above-mentioned suspending carrier refers to the voidage of unit suspending carrier percentage of the total volume.
The effective ratio area of above-mentioned suspending carrier refers to that unit volume suspending carrier is able to achieve good mass-transfer and passes oxygen, and can give birth to The shielded surface area of long effective microbe.
The filling rate of above-mentioned suspending carrier refers to that suspending carrier volume accounts for the ratio of added reaction tank pool capacity.
Above-mentioned magnetic powder separator refers to the shearing force generated by high speed rotation in floc sedimentation, make magnetic powder in floc sedimentation and The device of excess sludge solution wadding.
Above-mentioned magnetic powder recovering device refers to by realizing that magnetic powder recycles the device separated with namagnetic substance under magnetic fields.
For known to industry professional, it is standard device that magnetic powder separator, which can be high-shearing dispersion emulsifying machine,;Magnetic Powder reclaiming device is magnetic separator, is standard device, according to magnetic powder and flooded condition reasonable selection.
When above-mentioned reactor can be body structure, for example body structure, main material can be stainless steel, carbon steel, glass The various materials such as glass steel or engineering plastics, those skilled in the art can voluntarily select according to requirements.
Known to personage for the industry, each region pool capacity of system, suspending carrier dosage are according to water, water quality and place Reason standard determines;Mixed liquid recycle ratio, return sludge ratio, aerobic tank DO meet basic demand of the system to sewage treatment.
The structure of processing system and the base of innovative point are imitated entirely having understood a kind of above-mentioned sewage based on MBBR and Magneto separate On plinth, elaborate to its working method.
Embodiment 1:
A kind of sewage based on MBBR and Magneto separate imitates processing method entirely, comprising the following steps:
A, treatment sewage initially enters anaerobic pond, and the activated sludge of secondary settling tank reflux is taken using the completion of dirty Organic substance in water The nitrate removal and anaerobic phosphorus release of band, the microorganism of apposition growth completes the hydrolysis to carbon source in water on suspending carrier, fast Speed increases the concentration of high-quality quick carbon source such as volatile fatty acid in sewage;
B, anaerobic pond water outlet enters the first anoxic pond, and the denitrification by apposition growth on activated sludge and suspending carrier is thin Bacterium completes the nitrate removal carried to reflux nitrification liquid, while consuming raw water partial organic substances;
C, the first anoxic pond water outlet enter the first aerobic tank, by activated sludge and suspending carrier apposition growth it is aerobic Heterotroph completes the removal of raw water organic matter, completes going for a small amount of ammonia nitrogen by the nitrobacteria of apposition growth on suspending carrier It removes;
D, the first aerobic tank water outlet enters the second aerobic tank, and the removal of residual organic substances is completed by activated sludge, is passed through The nitrobacteria of apposition growth completes the removal of remaining ammonia nitrogen on suspending carrier;
E, the second aerobic tank water outlet enters secondary settling tank, completes mud-water separation, and the sludge after sedimentation is returned by mud return line It is flow to anaerobic pond, excess sludge is discharged by MBBR mud discharging pipe, secondary clarifier effluent ammonia nitrogen < 1.5mg/L, SS < 100mg/ L;
F, secondary clarifier effluent enters the second anoxic pond, completes total nitrogen by the denitrifying bacteria of apposition growth on suspending carrier Further removal, organic matter needed for denitrification supplemented by outer throwing carbon source;
G, the second anoxic pond water outlet enters third aerobic tank, is realized by the aerobic heterotroph of apposition growth on suspending carrier The guaranteeing role of outlet water organic substance;
H, the water outlet of third aerobic tank is successively by dosing mixing pit, magnetic kind load pond and flocculation tank, by described Magnetic kind load pond and flocculation tank add magnetic kind and flocculant respectively, keep particulate form in sewage and colloidal organic substrate solidifying It is polymerized to the floc sedimentation using magnetic kind as " core ";
I, flocculation tank water outlet enters final deposition pool completion mud-water separation, and supernatant reaches the discharge standard of sewage, by end The outlet pipe discharge in heavy pond;
J, final deposition pool bottom magnetic floc sedimentation enters magnetic powder separator, is broken up magnetic floc sedimentation by shearing force, forms magnetic Powder-wadding body mixed liquor;
K, magnetic powder separator goes out water mixed liquid and enters magnetic powder recovering device, completed under magnetic fields the recycling of magnetic powder with The separation of non magnetic wadding body, the magnetic powder of recycling are back to magnetic kind load pond and realize that magnetic kind recycles, and excess sludge passes through magnetic point It is discharged from mud discharging pipe.
In the present embodiment, technological parameter is provided that
Certain municipal sewage plant designs water 20000m3/ d, influent COD, BOD5、NH3, TN, TP, SS design value be respectively 400,210,45,60,9,350mg/L, total hrt 10.5h;Anaerobic pond, the first anoxic pond, the first aerobic tank, The sludge concentration of two aerobic tanks is 2500-3000mg/L;Activated Sludge System sludge age is 5-6d;The suspending carrier of anaerobic pond Filling rate is in 20%, ORP < -250mV;First anoxic pond, the second anoxic pond suspending carrier filling rate be 30%, DO < 0.4mg/L;First aerobic tank, the second aerobic tank, third aerobic tank suspending carrier filling rate are respectively 40%, 55%, 30%, DO For 4-6mg/L;Anaerobic pond hydraulic detention time is in 90min, third aerobic tank hydraulic detention time 20min;Secondary settling tank surface is negative Lotus is in 1.2m3/m2H, secondary clarifier effluent SS < 100mg/L, ammonia nitrogen < 1.0mg/L;Second anoxic pond, third aerobic tank sludge are dense Spend < 400mg/L;The hydraulic detention time of dosing mixing pit is 2min, and the hydraulic detention time that magnetic kind loads pond is 2min, wadding The hydraulic detention time of solidifying reaction tank is 3min, and the residence time of final deposition pool is 30min, surface loading 20m3/m2H, water outlet COD、BOD5、NH3, TN, TP, SS average value be respectively 13.5,2.6,0.29,4.65,0.09,5mg/L.
Embodiment 2:
Difference from Example 1 is:
Technological parameter is provided that
Certain integration apparatus designs water 300m3/ d, influent COD, BOD5、NH3, TN, TP, SS design value be respectively 290, 140,30,40,4,250mg/L, total hrt 6.5h;It is anaerobic pond, the first anoxic pond, the first aerobic tank, second best The sludge concentration in oxygen pond is 2000-2500mg/L;Activated Sludge System sludge age is 5d;The suspending carrier filling rate of anaerobic pond In 20%, ORP < -200mV;First anoxic pond, the second anoxic pond suspending carrier filling rate be respectively 40,30%, DO < 0.4mg/L;First aerobic tank, the second aerobic tank, third aerobic tank suspending carrier filling rate are respectively 45%, 50%, 25%, DO For 2-4mg/L;Anaerobic pond hydraulic detention time is in 50min, and third aerobic tank hydraulic detention time is in 15min;Secondary settling tank surface Load is in 1.5m3/m2H, secondary clarifier effluent SS < 100mg/L, ammonia nitrogen < 1.0mg/L;Second anoxic pond, third aerobic tank sludge Concentration < 450mg/L;The hydraulic detention time of dosing mixing pit is 1.5min, and the hydraulic detention time in magnetic kind load pond is 1.5min, the hydraulic detention time of flocculation tank are 2min, and the residence time of final deposition pool is 20min, surface loading 15m3/ m2H is discharged COD, BOD5、NH3, TN, TP, SS average value be respectively 14.5,2.9,0.38,4.11,0.08,4.3mg/L.
Embodiment 3:
Difference from Example 1 is:
Technological parameter is provided that
Certain integration apparatus designs water 500m3/ d, influent COD, BOD5、NH3, TN, TP, SS design value be respectively 450, 200,35,45,5.5,550mg/L, total hrt 8.6h;Anaerobic pond, the first anoxic pond, the first aerobic tank, second The sludge concentration of aerobic tank is 1500-2500mg/L;Activated Sludge System sludge age 5d;The suspending carrier filling rate of anaerobic pond In 25%, ORP < -250mV;First anoxic pond, the second anoxic pond suspending carrier filling rate be respectively 45,25%, DO < 0.4mg/L;First aerobic tank, the second aerobic tank, third aerobic tank suspending carrier filling rate are respectively 35%, 35%, 20%, DO For 3-5mg/L;Anaerobic pond hydraulic detention time is in 60min, and third aerobic tank hydraulic detention time is in 25min;Secondary settling tank surface Load is in 1.5m3/m2H, secondary clarifier effluent SS < 100mg/L, ammonia nitrogen < 1.0mg/L;Second anoxic pond, third aerobic tank sludge Concentration < 500mg/L;The hydraulic detention time of dosing mixing pit is 2min, and the hydraulic detention time that magnetic kind loads pond is 2min, The hydraulic detention time of flocculation tank is 2.5min, and the residence time of final deposition pool is 30min, surface loading 25m3/m2H, It is discharged COD, BOD5、NH3, TN, TP, SS average value be respectively 16.2,3.6,0.33,4.58,0.08,4.6mg/L.
Above-mentioned unlisted part can obviously be realized under the guide of above-described embodiment 1-3.
In the description of the present invention, it is to be understood that, term " center ", "upper", "lower", "front", "rear", " left side ", The orientation or positional relationship of the instructions such as " right side ", "vertical", "horizontal", "top", "bottom" "inner", "outside" is side based on the figure Position or positional relationship, are merely for convenience of description of the present invention and simplification of the description, rather than the device or member of indication or suggestion meaning Part must have a particular orientation, be constructed and operated in a specific orientation, therefore be not considered as limiting the invention.
Specific embodiment described herein is only to spiritual example explanation of the invention.Belonging to the present invention Those skilled in the art can make various modifications or additions to the described embodiments or using similar Mode substitutes, and however, it does not deviate from the spirit of the invention or beyond the scope of the appended claims.

Claims (10)

1. a kind of sewage based on MBBR and Magneto separate imitates processing system entirely comprising reactor, it is characterised in that: described is anti- Device is answered to handle in such a way that MBBR is combined with Magneto separate precipitating the two sewage, the reactor includes being sequentially communicated Anaerobic pond, the first anoxic pond, the first aerobic tank, the second aerobic tank, secondary settling tank, the second anoxic pond, third aerobic tank, dosing it is mixed He Chi, magnetic kind load pond, flocculation tank and final deposition pool;
It further include magnetic powder separator and magnetic powder recovering device, the sludge out pipe of the magnetic powder separator and the final deposition pool Connection, the magnetic powder recovering device are connect with magnetic powder separator, magnetic kind load pond respectively;
In the anaerobic pond, the first anoxic pond, the first aerobic tank, the second aerobic tank, the second anoxic pond, third aerobic tank Suspending carrier is added;
Dedicated first blender of suspending carrier is provided in the anaerobic pond, the first anoxic pond, the second anoxic pond;It is described First aerobic tank, the second aerobic tank are provided with perforated pipe aerating regulation device, the dosing mixing pit, the load of magnetic kind in third aerobic tank The second blender, third blender, the 4th blender are disposed in pond, flocculation tank;
The anaerobic pond is connected with water inlet pipe, and the final deposition pool is connected with outlet pipe;
The secondary settling tank is connected with MBBR mud discharging pipe, and the final deposition pool is connected with Magneto separate mud discharging pipe;
It is connected with nitrification liquid return pipe between second aerobic tank and the first anoxic pond, positioned at one end conduct of the second aerobic tank Water inlet, one end positioned at the first anoxic pond is as water outlet;Dirt is connected between the secondary settling tank and the anaerobic pond Mud return pipe, positioned at one end of secondary settling tank as mud inlet, one end positioned at anaerobic pond is as mud mouth;The MBBR sludge Delivery pipe and the mud return line common sparing pipeline.
2. a kind of sewage based on MBBR and Magneto separate according to claim 1 imitates processing system entirely, it is characterised in that: phase Separated between adjacent pond body by partition, the mouth of a river of crossing for keeping adjacent pond body connection is provided on the partition, including Anaerobic pond on anaerobic pond and the spacing board of the first anoxic pond crosses the mouth of a river, between the first anoxic pond and the first aerobic tank The first anoxic pond on partition crosses the mouth of a river, the first aerobic tank on the spacing board of the first aerobic tank and the second aerobic tank crosses water Mouth, the second aerobic tank on the spacing board of the second aerobic tank and secondary settling tank cross the mouth of a river, are located at secondary settling tank and the second anoxic pond Spacing board on secondary settling tank cross the mouth of a river, the second anoxic pond on the spacing board of the second anoxic pond and third aerobic tank crosses water Mouth, the third aerobic tank on the spacing board of third aerobic tank and dosing mixing pit cross the mouth of a river, are located at dosing mixing pit and magnetic Dosing mixing pit on the spacing board in kind load pond crosses the mouth of a river, the magnetic on the spacing board of magnetic kind load pond and flocculation tank The mouth of a river is crossed in kind load pond and the flocculation tank on the spacing board of flocculation tank and final deposition pool crosses the mouth of a river.
3. a kind of sewage based on MBBR and Magneto separate according to claim 2 imitates processing system entirely, it is characterised in that: In Before the anaerobic pond crosses the front at the mouth of a river, first anoxic pond crosses the front at the mouth of a river, second anoxic pond crosses the mouth of a river Side, which is provided with, detests anoxic interception sieve, and the anoxic of detesting intercepts sieve as flat screen, and the anoxic of detesting intercepts sieve Upper edge below operating water level 30cm, lower edge be higher than operating water level half, the operating water level, with the water outlet Pipe it is lower identical along mounting height.
4. a kind of sewage based on MBBR and Magneto separate according to claim 2 imitates processing system entirely, it is characterised in that: In First aerobic tank crosses the front at the mouth of a river, second aerobic tank crosses the front at the mouth of a river, the third aerobic tank It crosses in front of the mouth of a river and is provided with aerobic interception sieve, the aerobic interception sieve is roller sieve, the aerobic interception In operating water level 65% hereinafter, lower edge is higher than the 35% of operating water level, the operating water level is and described on the upper edge of sieve Outlet pipe it is lower identical along mounting height.
5. a kind of sewage based on MBBR and Magneto separate according to claim 1 imitates processing system entirely, it is characterised in that: institute It is connected between the magnetic powder separator and the magnetic powder recovering device stated by enters mud pipe, the magnetic powder recovering device and institute It is connected between the magnetic kind load pond stated by magnetic kind return pipe.
6. a kind of sewage based on MBBR and Magneto separate according to claim 1 imitates processing system entirely, it is characterised in that: institute The suspending vehicle density stated is 0.95-1.04g/cm3, voidage > 90%;Suspending vehicle density in anaerobic pond is 0.95-0.97g/cm3, the suspending vehicle density in the first anoxic pond, the second anoxic pond is 1.02-1.04g/cm3, suspending carrier Effective ratio area is 300-620m2/m3;Suspending vehicle density in the first aerobic tank is 0.95-0.97g/cm3, it is located at Suspending vehicle density in second aerobic tank and third aerobic tank is 0.97-0.99g/cm3, it is located at the first aerobic tank and third is good Suspending carrier effective ratio area in oxygen pond is 450-800m2/m3, suspending carrier effective ratio table in the second aerobic tank Area is 620-1200m2/m3
7. a kind of sewage based on MBBR and Magneto separate according to claim 1 imitates processing system entirely, it is characterised in that: institute The water inlet for the nitrification liquid return pipe stated is provided with nitrification liquid reflux and intercepts sieve, and the nitrification liquid reflux intercepts sieve and is Flat screen, the opening direction of the perforated pipe aerating regulation device downward, hatch bore diameter 4-6mm, mounting height be located at bottom of pond with Upper 30cm.
8. a kind of sewage based on MBBR and Magneto separate according to claim 2 imitates processing system entirely, it is characterised in that: institute The secondary settling tank stated crosses the mouth of a river, dosing mixing pit crosses the mouth of a river, flocculation tank crosses the upper edge at the mouth of a river 30cm, institute below operating water level Mouth of a river lower edge is crossed in the magnetic kind load pond stated and the bottom of pond in the magnetic kind load pond maintains an equal level.
9. a kind of sewage based on MBBR and Magneto separate imitates processing method entirely, it is characterised in that: it uses claim 1-8 any A kind of sewage based on MBBR and Magneto separate described in imitates processing system entirely, and the processing method successively includes following step It is rapid:
A, treatment sewage initially enters anaerobic pond, and the activated sludge of secondary settling tank reflux completes carrying using dirty Organic substance in water Nitrate removal and anaerobic phosphorus release, the microorganism of apposition growth completes the hydrolysis to carbon source in water on suspending carrier, increases rapidly The concentration of high-quality quick carbon source such as volatile fatty acid in sewage is added;
B, anaerobic pond water outlet enters the first anoxic pond, and the denitrifying bacteria by apposition growth on activated sludge and suspending carrier is complete The nitrate removal that reflux nitrification liquid carries in pairs, while consuming raw water partial organic substances;
C, the first anoxic pond water outlet enters the first aerobic tank, passes through the aerobic heterotrophism of apposition growth on activated sludge and suspending carrier Bacterium completes the removal of raw water organic matter, and the removal of a small amount of ammonia nitrogen is completed by the nitrobacteria of apposition growth on suspending carrier;
D, the first aerobic tank water outlet enters the second aerobic tank, and the removal of residual organic substances is completed by activated sludge, passes through suspension The nitrobacteria of apposition growth completes the removal of remaining ammonia nitrogen on carrier;
E, the second aerobic tank water outlet enters secondary settling tank, completes mud-water separation, and the sludge after sedimentation is back to by mud return line Anaerobic pond, excess sludge are discharged by MBBR mud discharging pipe, secondary clarifier effluent ammonia nitrogen < 1.5mg/L, SS < 100mg/L;
F, secondary clarifier effluent enter the second anoxic pond, by suspending carrier apposition growth denitrifying bacteria complete total nitrogen into One step removes, and organic matter needed for denitrification is supplemented by outer throwing carbon source;
G, the second anoxic pond water outlet enters third aerobic tank, realizes water outlet by the aerobic heterotroph of apposition growth on suspending carrier The guaranteeing role of organic matter;
H, the water outlet of third aerobic tank is successively by dosing mixing pit, magnetic kind load pond and flocculation tank, by the magnetic Kind load pond and flocculation tank add magnetic kind and flocculant respectively, are condensed into particulate form and colloidal organic substrate in sewage Using magnetic kind as the floc sedimentation of " core ";
I, flocculation tank water outlet enters final deposition pool completion mud-water separation, and supernatant reaches the discharge standard of sewage, by final deposition pool Outlet pipe discharge;
J, final deposition pool bottom magnetic floc sedimentation enters magnetic powder separator, is broken up magnetic floc sedimentation by shearing force, forms magnetic powder-wadding Body mixed liquor;
K, magnetic powder separator goes out water mixed liquid and enters magnetic powder recovering device, completed under magnetic fields the recycling of magnetic powder with it is non-magnetic Property wadding body separation, the magnetic powder of recycling is back to magnetic kind load pond and realizes that magnetic kind recycles, and excess sludge is dirty by Magneto separate Mud discharged.
10. a kind of sewage based on MBBR and Magneto separate according to claim 9 imitates processing method entirely, it is characterised in that: The anaerobic pond, the first anoxic pond, the first aerobic tank, the second aerobic tank sludge concentration be 1500-3000mg/L;It is active dirty Mud system sludge age < 6d;The suspending carrier filling rate of anaerobic pond is in 10-50%, ORP < -200mV;First anoxic pond, second lack The suspending carrier filling rate in oxygen pond is in 10-50%, DO < 0.4mg/L;First aerobic tank, the second aerobic tank, third aerobic tank are outstanding Float carrier filling rate is in 30-66%, DO 2-6mg/L;Anaerobic pond hydraulic detention time is in 45-90min, the aerobic tank waterpower of third Residence time is in 15-30min;Secondary settling tank surface loading is in 1.2-1.5m3/m2·h;Second anoxic pond, third aerobic tank sludge are dense Spend < 500mg/L;The hydraulic detention time of dosing mixing pit is 1.5-2min, and the hydraulic detention time that magnetic kind loads pond is 1.5- 2min, the hydraulic detention time of flocculation tank are 2-3min, and the residence time of final deposition pool is 20-30min, and surface loading is 15-30m3/m2·h。
CN201910652551.9A 2019-07-19 2019-07-19 A kind of sewage based on MBBR and Magneto separate imitates processing system and method entirely Pending CN110386725A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910652551.9A CN110386725A (en) 2019-07-19 2019-07-19 A kind of sewage based on MBBR and Magneto separate imitates processing system and method entirely

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910652551.9A CN110386725A (en) 2019-07-19 2019-07-19 A kind of sewage based on MBBR and Magneto separate imitates processing system and method entirely

Publications (1)

Publication Number Publication Date
CN110386725A true CN110386725A (en) 2019-10-29

Family

ID=68285151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910652551.9A Pending CN110386725A (en) 2019-07-19 2019-07-19 A kind of sewage based on MBBR and Magneto separate imitates processing system and method entirely

Country Status (1)

Country Link
CN (1) CN110386725A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111792783A (en) * 2020-07-15 2020-10-20 天津大学 Distributed sewage treatment method for reinforced AO (anaerobic-anoxic-oxic) process by loading coagulation coupling biological membrane
CN112194251A (en) * 2020-09-04 2021-01-08 广东新环环保产业集团有限公司 Magnetized MBBR sewage treatment method and system
CN112830572A (en) * 2021-02-25 2021-05-25 江苏联合创业环保有限公司 Sewage treatment tank and sewage treatment method
CN112850892A (en) * 2019-11-28 2021-05-28 上海市南洋模范中学 Digestion bed device and process for floating ball self-generation microbial film
CN114349273A (en) * 2021-12-28 2022-04-15 安徽普氏生态环境工程有限公司 Nitrogen and phosphorus removal system and process for sewage treatment
WO2023201900A1 (en) * 2022-04-19 2023-10-26 青岛思普润水处理股份有限公司 Bfm-based efficient wastewater treatment method and system using aoa coupled with anaerobic ammonia oxidation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005137992A (en) * 2003-11-05 2005-06-02 Yasukura Sakai Drainage treatment apparatus
US20150210574A1 (en) * 2012-06-11 2015-07-30 Todd Schwingle Treatment Using Fixed Film Processes And Ballasted Settling
CN108585350A (en) * 2018-03-30 2018-09-28 安徽华骐环保科技股份有限公司 A kind of town sewage treatment system up to standard to IV class water of surface water
CN109264932A (en) * 2018-11-09 2019-01-25 深圳市深水水务咨询有限公司 A kind of process for town sewage treatment of the quasi- four class water of earth's surface up to standard
CN109279694A (en) * 2018-10-10 2019-01-29 浙江博华环境技术工程有限公司 A kind of the high-efficient denitrification and dephosphorization device and process of the compound IFAS technology of multistage AO
CN210457847U (en) * 2019-07-19 2020-05-05 青岛思普润水处理股份有限公司 Sewage full-effect treatment system based on MBBR and magnetic separation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005137992A (en) * 2003-11-05 2005-06-02 Yasukura Sakai Drainage treatment apparatus
US20150210574A1 (en) * 2012-06-11 2015-07-30 Todd Schwingle Treatment Using Fixed Film Processes And Ballasted Settling
CN108585350A (en) * 2018-03-30 2018-09-28 安徽华骐环保科技股份有限公司 A kind of town sewage treatment system up to standard to IV class water of surface water
CN109279694A (en) * 2018-10-10 2019-01-29 浙江博华环境技术工程有限公司 A kind of the high-efficient denitrification and dephosphorization device and process of the compound IFAS technology of multistage AO
CN109264932A (en) * 2018-11-09 2019-01-25 深圳市深水水务咨询有限公司 A kind of process for town sewage treatment of the quasi- four class water of earth's surface up to standard
CN210457847U (en) * 2019-07-19 2020-05-05 青岛思普润水处理股份有限公司 Sewage full-effect treatment system based on MBBR and magnetic separation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
沈耀良等: "《废水生物处理新技术 理论与应用 第2版》", 哈尔滨工程大学出版社, pages: 132 - 137 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112850892A (en) * 2019-11-28 2021-05-28 上海市南洋模范中学 Digestion bed device and process for floating ball self-generation microbial film
CN111792783A (en) * 2020-07-15 2020-10-20 天津大学 Distributed sewage treatment method for reinforced AO (anaerobic-anoxic-oxic) process by loading coagulation coupling biological membrane
CN112194251A (en) * 2020-09-04 2021-01-08 广东新环环保产业集团有限公司 Magnetized MBBR sewage treatment method and system
CN112830572A (en) * 2021-02-25 2021-05-25 江苏联合创业环保有限公司 Sewage treatment tank and sewage treatment method
CN114349273A (en) * 2021-12-28 2022-04-15 安徽普氏生态环境工程有限公司 Nitrogen and phosphorus removal system and process for sewage treatment
WO2023201900A1 (en) * 2022-04-19 2023-10-26 青岛思普润水处理股份有限公司 Bfm-based efficient wastewater treatment method and system using aoa coupled with anaerobic ammonia oxidation

Similar Documents

Publication Publication Date Title
CN110386725A (en) A kind of sewage based on MBBR and Magneto separate imitates processing system and method entirely
CN110386724A (en) A kind of sewage whole process processing system and method based on MBBR and Magneto separate
CN105293833B (en) Comprehensive wastewater treatment device and process for iron and steel integrated enterprise
CN110386723A (en) A kind of sewage autotrophy processing system and method based on MBBR and Magneto separate
KR100273913B1 (en) Apparatus and method of biological wastewater treatment
CN103582615A (en) Composite microorganism reactor, and apparatus and method for water treatment using same
CN218025595U (en) Continuous flow aerobic granular sludge system for enhancing nitrogen and phosphorus removal
CN210915752U (en) Compact MBBR and super-efficient separation coupled deep nitrogen and phosphorus removal treatment system
CN108046518A (en) A kind of apparatus and method of the intensified denitrification and dephosphorization of low-carbon-source sewage
CN107585974A (en) A kind of sewage water treatment method based on MBBR techniques
CN110386731A (en) A kind of mainstream autotrophic denitrification system and method based on MBBR
CN109534599A (en) A kind of family sewage water treatment method of strengthened denitrification
CN1309665C (en) Nitrogen and phosphorus removing process
CN207877509U (en) A kind of device of the intensified denitrification and dephosphorization of low-carbon-source sewage
CN207998522U (en) A kind of packing type country sewage integrated treatment unit
CN217809105U (en) Integrated town sewage treatment device
CN108569762A (en) A kind of multifunctional all domestic sewage treatment device
CN108314255A (en) A kind of efficient Chinese herbal medicine extraction sewage treatment process
CN105776749B (en) The catalysis oxidation that organic wastewater is electroplated combines polynary biochemical system and its deep treatment method
CN107973406A (en) One kind realizes dirty Organic substance in water and the separated apparatus and method of ammonia nitrogen
CN110104890A (en) A kind of water treatment technology that MBBR technique is combined with super effect separation system
CN100500593C (en) Combined type wastewater treatment method and equipment
CN210620521U (en) Sewage autotrophic treatment system based on MBBR and magnetic separation
CN210457847U (en) Sewage full-effect treatment system based on MBBR and magnetic separation
CN110540348B (en) High-efficiency sewage nitrogen and phosphorus removal treatment process and equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wu Di

Inventor after: Zhou Jiazhong

Inventor after: Han Wenjie

Inventor after: Xia Chao

Inventor after: Su Dandan

Inventor after: Zheng Linao

Inventor before: Wu Di

Inventor before: Zheng Linao

Inventor before: Xia Chao

Inventor before: Su Dandan

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20230921

Address after: The entire factory building at No. 155 Yanhe Road, Huangdao District, Qingdao City, Shandong Province, 266500

Applicant after: QINGDAO SPRING WATER TREATMENT Co.,Ltd.

Applicant after: Qingdao Sipurun Intelligent System Co.,Ltd.

Applicant after: Qingdao Sipurun Water Environmental Technology Co.,Ltd.

Address before: No. 155, Yanhe Road, Huangdao District, Qingdao City, Shandong Province 266500

Applicant before: QINGDAO SPRING WATER TREATMENT Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191029