CN110150035A - A kind of ecological recovery method and system for big slope angle soil-slope - Google Patents
A kind of ecological recovery method and system for big slope angle soil-slope Download PDFInfo
- Publication number
- CN110150035A CN110150035A CN201910408740.1A CN201910408740A CN110150035A CN 110150035 A CN110150035 A CN 110150035A CN 201910408740 A CN201910408740 A CN 201910408740A CN 110150035 A CN110150035 A CN 110150035A
- Authority
- CN
- China
- Prior art keywords
- soil
- slope
- big
- seed layer
- hypothallus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G20/00—Cultivation of turf, lawn or the like; Apparatus or methods therefor
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G22/00—Cultivation of specific crops or plants not otherwise provided for
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G24/00—Growth substrates; Culture media; Apparatus or methods therefor
- A01G24/10—Growth substrates; Culture media; Apparatus or methods therefor based on or containing inorganic material
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G24/00—Growth substrates; Culture media; Apparatus or methods therefor
- A01G24/10—Growth substrates; Culture media; Apparatus or methods therefor based on or containing inorganic material
- A01G24/12—Growth substrates; Culture media; Apparatus or methods therefor based on or containing inorganic material containing soil minerals
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G24/00—Growth substrates; Culture media; Apparatus or methods therefor
- A01G24/20—Growth substrates; Culture media; Apparatus or methods therefor based on or containing natural organic material
- A01G24/28—Growth substrates; Culture media; Apparatus or methods therefor based on or containing natural organic material containing peat, moss or sphagnum
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G24/00—Growth substrates; Culture media; Apparatus or methods therefor
- A01G24/40—Growth substrates; Culture media; Apparatus or methods therefor characterised by their structure
- A01G24/44—Growth substrates; Culture media; Apparatus or methods therefor characterised by their structure in block, mat or sheet form
- A01G24/46—Growth substrates; Culture media; Apparatus or methods therefor characterised by their structure in block, mat or sheet form multi-layered
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G24/00—Growth substrates; Culture media; Apparatus or methods therefor
- A01G24/50—Growth substrates; Culture media; Apparatus or methods therefor contained within a flexible envelope
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G9/00—Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
- A01G9/02—Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
- A01G9/029—Receptacles for seedlings
- A01G9/0293—Seed or shoot receptacles
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G9/00—Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
- A01G9/02—Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
- A01G9/033—Flat containers for turf, lawn or the like, e.g. for covering roofs
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Environmental Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Inorganic Chemistry (AREA)
- Chemical & Material Sciences (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Botany (AREA)
- Paleontology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Soil Sciences (AREA)
- Cultivation Of Plants (AREA)
Abstract
The invention discloses a kind of ecological recovery methods and system for big slope angle soil-slope, are related to hydraulic engineering technical field.The method of the present invention includes the following steps: digging hole in the slope surface of big slope angle soil-slope;Plant biological bag is packed into using soil, fertilizer and seed as packing material;Water injection pipe is plugged in plant biological bag;It is embedded in hole after plant biological bag is soaked, periodic maintenance;Packing material in plant biological bag successively includes hypothallus, seed layer and soil horizon from bottom to up;Hypothallus thickness is 25cm, seed layer 3cm, soil horizon 2cm;Hypothallus is mixed by adhesive, water-retaining agent, compound fertilizer and soil;Seed layer is mixed by seed and containing humus soil;Soil horizon is containing humus soil.The method of the present invention do not require to slope surface carry out it is smooth, have the characteristics that easy to operate, flexibility is high, and late maintaining is relatively easy, good can solve the problems, such as the ecological recovery of the big slope angle soil-slope in arid-semi-arid region area.
Description
Technical field
The present invention relates to hydraulic engineering technical field more particularly to a kind of ecological recovery sides for big slope angle soil-slope
Method and system.
Background technique
The slope slopes that side slope refers to nature or is artificially formed.Soil-slope and rock side slope can be divided by formation lithology;
Permanent side slope and provisional side slope can be divided by service life.Slope greening is a kind of emerging energy effective protection bare slope
Ecological slope protection mode, it is combined with traditional civil engineering slope protection (reinforced anchor bolt supporting, linked network, lattice etc.), can be effective
Realize that the ecological vegetation of slope surface restores and protects.Not only have the function of conserving water and soil, environment and landscape, side slope can also be improved
Greening is broadly divided into steep side slope and afforests gentle slope greening;Soil-slope greening and rock slope greening.
With the fast development of economic society, Chinese capital construction speed is accelerated, because implementing traffic, water conservancy, mine, electricity
The construction projects such as power and form a large amount of bare slope.These bare slopes not only affect Landscape Ecological, some are also
There are geological disaster hidden danger, influence the safety and stability of main body afforestation project.It is green to start Efforts To Develop side slope for many places as a result,
Change.The environment protection significance of slope greening is fairly obvious, and slope greening can beautify the environment, water conservation, prevents erosion and comes down,
Purify air.For rock slope, the environment protection significance of slope greening is especially prominent.
In arid-semi-arid region area, when the natural earth using some conventional slope ecological recovery methods to slope angle > 45 °
When matter slope or artificial soil-slope carry out ecological recovery, since there are drought and water shortage, slope leveling difficulty is big and sowing is difficult
The problems such as, so that these methods are difficult to play good ecological recovery effect.
Summary of the invention
In view of this, the embodiment of the invention provides a kind of ecological recovery method for big slope angle soil-slope and being
System, main purpose is that ecological recovery effect is poor when solving the problems, such as 45 ° of slope angle or more.
In order to achieve the above objectives, invention broadly provides following technical solutions:
On the one hand, the embodiment of the invention provides a kind of ecological recovery method the methods for big slope angle soil-slope
The following steps are included:
Hole is dug in the slope surface of big slope angle soil-slope to be restored;
Plant biological bag is packed into using soil, fertilizer and seed as packing material;
It will be embedded in the described hole in the slope surface after plant biological bag immersion, periodic maintenance.
Preferably, spacing of the described hole in the slope surface is 20-30cm;The angle of the big slope angle 45 ° with
On;The axis of described hole is vertical with slope surface.
Preferably, the plant biological bag is cylindrical body, diameter 10-25cm;The shape of described hole and size and described
The shape of plant biological bag is adapted to size.
Preferably, the packing material in the plant biological bag successively includes hypothallus, seed layer and soil horizon from bottom to up;
The thickness of the hypothallus is 25cm, and the thickness of the seed layer is 3cm, and the thickness of the soil horizon is 2cm.
Preferably, the hypothallus is mixed by adhesive, water-retaining agent, compound fertilizer and soil;The seed layer is by planting
Son and mixed containing humus soil;The soil horizon is containing humus soil.
Preferably, plugging water injection pipe in the plant biological bag, the soil horizon and the seed layer and insertion base are passed through
Matter layer.
On the other hand, described the embodiment of the invention provides a kind of ecological recovery system for big slope angle soil-slope
System includes: that hole is dug in slope surface to be restored, and described hole is for accommodating packing material;
The installing packing material in plant biological bag, the plant biological bag is for being embedded in described hole;
Water injection pipe is plugged in the plant biological bag, the water injection pipe is connect with external source, for pouring the packing material.
Preferably, the packing material in the plant biological bag successively includes hypothallus, seed layer and soil horizon from bottom to up;
The thickness of the hypothallus is 25cm, and the thickness of the seed layer is 3cm, and the thickness of the soil horizon is 2cm;The hypothallus
It is mixed by adhesive, water-retaining agent, compound fertilizer and soil;The seed layer is mixed by seed and containing humus soil;Institute
Stating soil horizon is containing humus soil.
Preferably, spacing of the described hole in the slope surface is 20-30cm;The plant biological bag is cylindrical body, diameter
For 10-25cm;The shape of described hole is adapted to size and the shape of the plant biological bag with size;The water injection pipe passes through institute
State soil horizon and the seed layer and insertion hypothallus.
Preferably, the angle of the big slope angle is at 45 ° or more;The axis of described hole is vertical with slope surface.
Compared with prior art, the beneficial effects of the present invention are:
The present invention carries out ecological recovery to the soil-like material slope using embedded cylindrical body plant biological bag, which does not require pair
Slope surface progress is smooth, has the characteristics that easy to operate, flexibility is high, and late maintaining is relatively easy, good can solve dry
The ecological recovery problem of the big slope angle soil-slope in drought-semiarid zone.
Detailed description of the invention
Fig. 1 is construction process figure provided in an embodiment of the present invention;
Fig. 2 is cylindrical body plant biological bag sectional view provided in an embodiment of the present invention;
Fig. 3 is cylindrical body plant biological bag plan view provided in an embodiment of the present invention;
Fig. 4 is that cylindrical body plant biological bag slope surface provided in an embodiment of the present invention places schematic diagram.
Appended drawing reference:
1, soil horizon, 2, seed layer, 3, hypothallus, 4, water injection pipe, 5, hole, 6, plant biological bag.
Specific embodiment
For further illustrate the present invention to reach the technical means and efficacy that predetermined goal of the invention is taken, below with compared with
Good embodiment, to specific embodiment, technical solution, feature and its effect applied according to the present invention, detailed description is as follows.Under
Stating the special characteristic, structure or feature in multiple embodiments in bright can be combined by any suitable form.
Embodiment 1 (method)
Dig hole: the slope angle angle of soil-slope to be restored is 45 °, digs hole 5 in slope surface, 5 axis of hole with
Slope surface is vertical, and 5 spacing of hole is 20-30cm;
Production plant biological bag: adhesive, water-retaining agent, compound fertilizer and soil are mixed to form hypothallus 3;By seed and contain humus
Soil is mixed to form seed layer 4, and soil horizon 1 is containing humus soil;It is sequentially filled above-mentioned hypothallus from bottom to up in sack
3, seed layer 2 and soil horizon 1,3 thickness of hypothallus are 25cm, and 2 thickness of seed layer is 3cm, and 1 thickness of soil horizon is 2cm;It is given birth to planting
Bag 6 is fabricated to cylindrical body, diameter 10-25cm;The shape and size of the shape of plant biological bag 6 and size and hole are designed just
Matching;It is inserted into water injection pipe 4 in plant biological bag, water injection pipe 4 is passed through into soil horizon 1 and seed layer 2 and insertion hypothallus, by water injection pipe
It is connect with external source with water pipe;It is embedded in after plant biological bag 6 is soaked in the hole 5 in slope surface, periodically inspection maintenance, such as Fig. 1 institute
Show.
Embodiment 2 (system)
As shown in figs 2-4, a kind of ecological recovery system for big slope angle soil-slope, above system include:
Hole 5 is dug in slope surface to be restored, above-mentioned hole 5 is for accommodating packing material;
The above-mentioned packing material of installing in plant biological bag 6, above-mentioned plant biological bag 6 is for being embedded in above-mentioned hole 5;
Water injection pipe 4 is plugged in above-mentioned plant biological bag, above-mentioned water injection pipe 4 is connect with external source, for pouring above-mentioned filling material
Material.
As the preferred of above-described embodiment, packing material in above-mentioned plant biological bag 6 successively include from bottom to up hypothallus 3,
Seed layer 2 and soil horizon 1;The thickness of above-mentioned hypothallus 3 is 25cm, and the thickness of above-mentioned seed layer 2 is 3cm, above-mentioned soil horizon 1
Thickness is 2cm;Above-mentioned hypothallus 3 is mixed by adhesive, water-retaining agent, compound fertilizer and soil;Above-mentioned seed layer 2 is by seed and contains
Humus soil mixes;Above-mentioned soil horizon 1 is containing humus soil.
As the preferred of above-described embodiment, spacing of the above-mentioned hole 5 in above-mentioned slope surface is 20-30cm;Above-mentioned plant biological bag 6
For cylindrical body, diameter 10-25cm;The shape of above-mentioned hole 5 is adapted to size and the shape of above-mentioned plant biological bag 6 with size;
Above-mentioned water injection pipe 4 passes through above-mentioned soil horizon 1 and above-mentioned seed layer 2 and insertion hypothallus.
As the preferred of above-described embodiment, the angle of above-mentioned big slope angle is at 45 ° or more;The axis and slope surface of above-mentioned hole hang down
Directly.
Place, those skilled in the art can not select from the prior art to the greatest extent in the embodiment of the present invention.
Disclosed above is only a specific embodiment of the invention, but scope of protection of the present invention is not limited thereto, is appointed
What those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, answer
It is included within the scope of the present invention.Therefore, protection scope of the present invention should be with above-mentioned scope of protection of the claims
It is quasi-.
Claims (10)
1. a kind of ecological recovery method for big slope angle soil-slope, which is characterized in that the described method comprises the following steps:
Hole is dug in the slope surface of big slope angle soil-slope to be restored;
Plant biological bag is packed into using soil, fertilizer and seed as packing material;
It will be embedded in the described hole in the slope surface after plant biological bag immersion, periodic maintenance.
2. a kind of ecological recovery method for big slope angle soil-slope as described in claim 1, which is characterized in that the hole
Spacing of the hole in the slope surface is 20-30cm;The angle of the big slope angle is at 45 ° or more;The axis and slope surface of described hole
Vertically.
3. a kind of ecological recovery method for big slope angle soil-slope as described in claim 1, which is characterized in that the plant
Raw bag is cylindrical body, diameter 10-25cm;The shape and size of described hole and the shape and size of the plant biological bag are suitable
Match.
4. a kind of ecological recovery method for big slope angle soil-slope as described in claim 1, which is characterized in that the plant
Packing material in raw bag successively includes hypothallus, seed layer and soil horizon from bottom to up;The thickness of the hypothallus is 25cm,
The thickness of the seed layer is 3cm, and the thickness of the soil horizon is 2cm.
5. a kind of ecological recovery method for big slope angle soil-slope as claimed in claim 4, which is characterized in that the base
Matter layer is mixed by adhesive, water-retaining agent, compound fertilizer and soil;The seed layer by seed and containing humus soil mixing and
At;The soil horizon is containing humus soil.
6. a kind of ecological recovery method for big slope angle soil-slope as claimed in claim 4, which is characterized in that the plant
Water injection pipe is plugged in raw bag;The water injection pipe passes through the soil horizon and the seed layer and insertion hypothallus.
7. a kind of ecological recovery system for big slope angle soil-slope, which is characterized in that the system comprises:
Hole is dug in slope surface to be restored, described hole is for accommodating packing material;
The installing packing material in plant biological bag, the plant biological bag is for being embedded in described hole;
Water injection pipe is plugged in the plant biological bag, the water injection pipe is connect with external source, for pouring the packing material.
8. a kind of ecological recovery system for big slope angle soil-slope as claimed in claim 7, which is characterized in that the plant
Packing material in raw bag successively includes hypothallus, seed layer and soil horizon from bottom to up;The thickness of the hypothallus is 25cm,
The thickness of the seed layer is 3cm, and the thickness of the soil horizon is 2cm;The hypothallus is by adhesive, water-retaining agent, compound fertilizer
And soil mixes;The seed layer is mixed by seed and containing humus soil;The soil horizon is containing humus soil.
9. a kind of ecological recovery system for big slope angle soil-slope as claimed in claim 7, which is characterized in that the hole
Spacing of the hole in the slope surface is 20-30cm;The plant biological bag is cylindrical body, diameter 10-25cm;The shape of described hole
It is adapted to size and the shape of the plant biological bag with size;The water injection pipe passes through the soil horizon and the seed layer and inserts
Enter hypothallus.
10. a kind of ecological recovery system for big slope angle soil-slope as claimed in claim 7, which is characterized in that described
The angle of big slope angle is at 45 ° or more;The axis of described hole is vertical with slope surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910408740.1A CN110150035A (en) | 2019-05-16 | 2019-05-16 | A kind of ecological recovery method and system for big slope angle soil-slope |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910408740.1A CN110150035A (en) | 2019-05-16 | 2019-05-16 | A kind of ecological recovery method and system for big slope angle soil-slope |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110150035A true CN110150035A (en) | 2019-08-23 |
Family
ID=67631054
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910408740.1A Pending CN110150035A (en) | 2019-05-16 | 2019-05-16 | A kind of ecological recovery method and system for big slope angle soil-slope |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110150035A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110670606A (en) * | 2019-09-24 | 2020-01-10 | 山东大学 | Straw type ecological slope protection structure and method |
CN111149468A (en) * | 2020-01-08 | 2020-05-15 | 南京大源生态建设集团有限公司 | Seed swaddle and breeding method thereof |
CN111657012A (en) * | 2020-06-28 | 2020-09-15 | 长江岩土工程总公司(武汉) | High and steep rock slope greening structure and construction method thereof |
CN114041374A (en) * | 2021-09-29 | 2022-02-15 | 张家港市绿岩环境科技有限公司 | Method for recovering vegetation in arid mine |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62178627A (en) * | 1986-01-29 | 1987-08-05 | Junichi Watanabe | Soil improving method |
EP0235218B1 (en) * | 1985-08-23 | 1989-10-25 | Huesker Synthetic GmbH & Co. | Process for constructing a sloping wall or embankment in particular a sound-proofing embankment |
JPH08326060A (en) * | 1993-02-10 | 1996-12-10 | Tenryu Ind Co Ltd | Slope protective structure |
CN102498915A (en) * | 2011-11-24 | 2012-06-20 | 三峡大学 | Method by utilizing paper plant growing bag growing shrubs to afforest side slopes |
CN103340114A (en) * | 2013-07-15 | 2013-10-09 | 新疆大学 | Multilayer plant-cultivating bag made of linen |
CN205357221U (en) * | 2016-03-10 | 2016-07-06 | 曾福英 | Revegetation structure of high steep slag body side slope |
JP2017018049A (en) * | 2015-07-13 | 2017-01-26 | 株式会社アイ・イー・ジェー | Greening method for soilless slope face |
CN208258540U (en) * | 2018-05-14 | 2018-12-21 | 浙江新景市政园林有限公司 | A kind of plant biological bag suitable for shore protection greening |
-
2019
- 2019-05-16 CN CN201910408740.1A patent/CN110150035A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0235218B1 (en) * | 1985-08-23 | 1989-10-25 | Huesker Synthetic GmbH & Co. | Process for constructing a sloping wall or embankment in particular a sound-proofing embankment |
JPS62178627A (en) * | 1986-01-29 | 1987-08-05 | Junichi Watanabe | Soil improving method |
JPH08326060A (en) * | 1993-02-10 | 1996-12-10 | Tenryu Ind Co Ltd | Slope protective structure |
CN102498915A (en) * | 2011-11-24 | 2012-06-20 | 三峡大学 | Method by utilizing paper plant growing bag growing shrubs to afforest side slopes |
CN103340114A (en) * | 2013-07-15 | 2013-10-09 | 新疆大学 | Multilayer plant-cultivating bag made of linen |
JP2017018049A (en) * | 2015-07-13 | 2017-01-26 | 株式会社アイ・イー・ジェー | Greening method for soilless slope face |
CN205357221U (en) * | 2016-03-10 | 2016-07-06 | 曾福英 | Revegetation structure of high steep slag body side slope |
CN208258540U (en) * | 2018-05-14 | 2018-12-21 | 浙江新景市政园林有限公司 | A kind of plant biological bag suitable for shore protection greening |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110670606A (en) * | 2019-09-24 | 2020-01-10 | 山东大学 | Straw type ecological slope protection structure and method |
CN111149468A (en) * | 2020-01-08 | 2020-05-15 | 南京大源生态建设集团有限公司 | Seed swaddle and breeding method thereof |
CN111657012A (en) * | 2020-06-28 | 2020-09-15 | 长江岩土工程总公司(武汉) | High and steep rock slope greening structure and construction method thereof |
CN114041374A (en) * | 2021-09-29 | 2022-02-15 | 张家港市绿岩环境科技有限公司 | Method for recovering vegetation in arid mine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110150035A (en) | A kind of ecological recovery method and system for big slope angle soil-slope | |
CN101864763B (en) | Foundation integrated processing construction method of cover type karst area | |
CN110249813B (en) | Method for greening high and steep rocky slope in mining pit | |
CN106351238A (en) | Vegetation-concrete double-layer protective screening side slope ecological greening system and method for performing side slope ecological greening by using system | |
CN207295737U (en) | Suitable for the ecological revetment system in plateau mountainous region | |
CN104770235A (en) | Multi-layered and multiporous ecological barrel for protective slope ecology and method for ecologically restoring and greening side slopes | |
CN202187355U (en) | Grass-planting and supporting structure used within lattice girder on steep slope | |
CN113343417A (en) | Reconstruction and restoration method for water-resisting layer and surface soil layer based on mining surface crack | |
CN102498772A (en) | Method for in-situ improvement of dredger fill into soil for planting | |
CN203530993U (en) | Steel-bar mesh planting hole | |
CN204014608U (en) | A kind of sash beam greening side slope facility | |
CN204059376U (en) | The slope protection greening structure of the steep exposed rock side slope of a kind of urgency | |
CN109208618A (en) | A kind of ecological restoring method for concrete slope | |
CN103993608A (en) | Protection method for slopes in karst regions and structure thereof | |
CN103609386B (en) | Muddy coastal zone plant groove or plant hole afforestation method | |
CN111733834A (en) | Compound type greening device for repairing and greening damaged mountain | |
CN108130897B (en) | A kind of soil basketing method during highway construction | |
CN107419855B (en) | A kind of large-scale arbor implantation methods suitable on top plate of underground parking garage | |
CN105421471A (en) | Spray sowing, governing and irrigation integrated slope protection governing system | |
CN114753387B (en) | Water-retaining high-steep slope ecological slope protection structure and construction method | |
CN210406343U (en) | A planting technique structure for high steep rock matter side slope | |
CN113089696A (en) | Rock slope plant greening method | |
CN115119655A (en) | Device and method for repairing cracks in mining disturbance area of underground mine | |
CN112400395A (en) | Cutting slope hole-making planting and sowing method | |
CN205100241U (en) | Artificially plant living basin |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190823 |
|
RJ01 | Rejection of invention patent application after publication |