CN110043317B - Mine disaster multi-parameter local danger area judgment and early warning method - Google Patents

Mine disaster multi-parameter local danger area judgment and early warning method Download PDF

Info

Publication number
CN110043317B
CN110043317B CN201910298257.2A CN201910298257A CN110043317B CN 110043317 B CN110043317 B CN 110043317B CN 201910298257 A CN201910298257 A CN 201910298257A CN 110043317 B CN110043317 B CN 110043317B
Authority
CN
China
Prior art keywords
monitoring
point
early warning
danger
index
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910298257.2A
Other languages
Chinese (zh)
Other versions
CN110043317A (en
Inventor
张修峰
王颜亮
韩跃勇
鞠红阳
曲效成
王超
魏全德
谭花文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Anke Technology Co ltd
Yankuang Energy Ordos Co ltd
Yankuang Energy Group Co Ltd
Original Assignee
Beijing Anke Technology Co ltd
Yanzhou Coal Mining Erdos Energy Chemical Co ltd
Yanzhou Coal Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Anke Technology Co ltd, Yanzhou Coal Mining Erdos Energy Chemical Co ltd, Yanzhou Coal Mining Co Ltd filed Critical Beijing Anke Technology Co ltd
Priority to CN201910298257.2A priority Critical patent/CN110043317B/en
Publication of CN110043317A publication Critical patent/CN110043317A/en
Application granted granted Critical
Publication of CN110043317B publication Critical patent/CN110043317B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Alarm Systems (AREA)
  • Emergency Alarm Devices (AREA)

Abstract

The invention relates to the field of dynamic disaster monitoring and early warning of mines, and aims to provide a multi-parameter local dangerous area judging and early warning method for mine disasters, which can accurately judge and identify the position and the danger level of a local dangerous area, can pertinently guide mines to perform disaster protection and can meet the field requirements of various mines. The early warning method comprises the following steps of 1, carrying out space positioning on mine disaster monitoring points; step 2, obtaining the initial risk index I of each monitoring pointSingle point initialization(0≤ISingle point initializationLess than or equal to 1); step 3, retrieving the conditions of other monitoring points around each monitoring point; step 4, correcting the initial risk index of the monitoring point; and 5, acquiring the position and the danger level of the local danger area. The invention solves the problems that the position and the danger level of a local dangerous area cannot be accurately judged and identified by the conventional early warning method, and the mine cannot be pertinently guided to carry out disaster protection.

Description

Mine disaster multi-parameter local danger area judgment and early warning method
Technical Field
The invention relates to the technical field of monitoring and early warning of mine dynamic disasters, in particular to a multi-parameter local dangerous area identification early warning method for mine disasters.
Background
Mine dynamic disasters are one of main factors influencing the safe and healthy development of mining industry in the world, have the characteristics of strong burst property, multiple influencing factors, strong contingency and the like, have extremely strong destructiveness, and once the disasters occur, the disasters cause great loss of lives and properties of mine personnel. Therefore, early monitoring and early warning of the mine dynamic disaster are important measures for preventing major mine dynamic disaster accidents. The mine dynamic disasters comprise rock burst, coal and gas outburst, roof caving, water inrush and the like caused by mine mining and underground engineering activities, the occurrence mechanism of the dynamic disasters such as the rock burst is complex, and the stress field is greatly influenced by factors such as roof drainage, surface subsidence and the like, so that the complexity of the occurrence mechanism of the dynamic disasters and the treatment difficulty are increased.
The rock burst is one of the common dynamic disaster damage phenomena in the construction process of deep-buried underground engineering, and at present, for monitoring and early warning of the rock burst disaster, various methods such as a drilling cutting monitoring method, a coal body stress monitoring method, an electromagnetic radiation monitoring method, a ground sound and microseismic monitoring method and the like have been proposed at home and abroad. Due to the complex types of dynamic disasters of mines, many types of monitoring and early warning systems are installed in the current situation of many mines, but the early warning methods of all the monitoring systems are relatively independent, the joint early warning efficiency is low, the condition that the early warning results of various monitoring systems are not uniform often occurs, the early warning accuracy is poor, and the field requirements cannot be met.
Therefore, a multi-parameter monitoring and early warning method appears in the prior art, for example, a multi-parameter comprehensive monitoring and early warning method for a heading face is disclosed in chinese patent document CN105257339A, and includes: step 1: monitoring the tunneling working face in a subarea manner; step 2: installing at least two monitoring systems of coal body stress, ground sound and micro-vibration, anchor rod and anchor cable stress monitoring systems in a driving tunnel; and step 3: acquiring each monitoring early warning index; and 4, step 4: and respectively giving certain weight to each monitoring early warning index and accumulating to obtain a comprehensive early warning index. The method realizes multi-parameter combined early warning of the partitioned excavation working face by specifying the arrangement scheme of the multi-parameter monitoring points of the excavation working face partitioned rock burst. However, the method is only limited to the tunneling working face, and only the multi-parameter early warning index of the static partition of the tunneling working face can be obtained, and the position and the danger level of a specific dangerous area cannot be obtained. In the aspect of identifying the position of a local dangerous area, currently, a single-parameter and single-measuring-point judgment method is adopted, for example, a coal seam stress monitoring system and a bolt cable supporting force monitoring system trigger early warning according to the fact that a measuring point reaches the upper limit of a stress value, the position of the early warning measuring point is the local dangerous area, but when a plurality of measuring points reach early warning or the positions of the dangerous area indicated by the coal seam stress system and the bolt cable supporting force system are inconsistent, accurate prevention and control of mine disasters cannot be achieved.
In conclusion, the mine disaster early warning method in the prior art cannot accurately judge and identify the position and the danger level of the local dangerous area, has poor early warning effect, and cannot pertinently guide the mine to perform disaster protection.
Disclosure of Invention
Therefore, the invention aims to solve the technical problems that the mine dynamic disaster monitoring and early warning method in the prior art cannot accurately judge and identify the position and the danger level of a local dangerous area, has poor early warning effect, and cannot pertinently guide a mine to perform disaster protection, and provides the mine disaster multi-parameter local dangerous area judgment and early warning method which can accurately judge and identify the position and the danger level of the local dangerous area, has good early warning effect, can pertinently guide the mine to perform disaster protection, and can meet the field requirements of various mines.
In order to solve the technical problems, the technical scheme adopted by the invention is as follows:
a mine disaster multi-parameter local danger area judgment and early warning method comprises the following steps:
step 1, spatial positioning of mine disaster monitoring points
In the same coordinate system, carrying out space positioning on each monitoring point of each monitoring and early warning system;
step 2, obtaining the initial risk index I of each monitoring pointSingle point initialization(0≤ISingle point initialization≤1);
Step 3, retrieving the conditions of other monitoring points around each monitoring point
Obtaining the condition that other monitoring points are searched within the sphere area with the radius r by taking each monitoring point as a central measuring point;
step 4, correcting initial danger index of monitoring point
According to the range of the sphere area with the radius r of each central measuring point, the initial risk index I of the monitoring point is retrievedSingle point initializationInitial hazard index I for each central stationSingle point initializationCorrecting to obtain corrected danger index I of each central measuring pointSingle point correction
Step 5, obtaining the position and the danger level of the local danger area
Selecting a modified risk index ISingle point correctionThe central measuring point with the maximum value, the sphere area with the radius r of the central measuring point is judged as a local danger area, and the corrected danger index I of the central measuring pointSingle point correctionThe risk level of the local risk zone.
Preferably, in the step 4, a correction coefficient k is assigned to each retrieved monitoring pointiInitial risk index I of the retrieved monitoring pointSingle point initializationThe higher the correction factor k it is assigned toiThe larger the value of (A);
modified hazard index I for each center measurement pointSingle point correction=ISingle point initialization*k1*k2*……*ki
Wherein, I in the above formulaSingle point initializationIs the initial danger index of the central measuring point, I is the number of the monitoring points to be retrieved, and when I is obtained by calculationSingle point correctionWhen the ratio is more than 1, take ISingle point correctionEqual to 1.
Preferably, the correction coefficient kiThe values of (A) are as follows:
Figure GDA0002448917660000031
Figure GDA0002448917660000041
preferably, step 2 is to provide corresponding monitoring data danger judgment threshold values for the monitoring data of different monitoring and early warning systems, and perform danger level assessment on each monitoring point according to the monitoring data danger judgment threshold values to obtain normalized initial danger index I of each monitoring pointSingle point initialization
Preferably, the initial risk index I of each monitoring point in the step 3Single point initializationAnd obtaining the conditions of other monitoring points searched in the sphere area range with each monitoring point as a central measuring point and the radius of r from large to small.
Preferably, the radius r in step 3 is 50 meters.
Preferably, each monitoring and early warning system in the step 1 comprises a coal seam stress monitoring system, a microseismic monitoring system, a drilling cutting method monitoring system and a hydrological monitoring system.
Compared with the prior art, the technical scheme of the invention has the following advantages:
(1) the mine disaster multi-parameter local dangerous area judgment and early warning method provided by the invention is based on the existing single-parameter mine disaster monitoring method, can accurately judge and recognize the position and the dangerous grade of the local dangerous area by utilizing the monitoring data obtained by the existing various monitoring and early warning systems through operation and analysis, has good early warning effect, can pertinently guide the mine to carry out disaster protection, and can meet the field requirements of various mines.
(2) According to the mine disaster multi-parameter local dangerous area judgment and early warning method provided by the invention, the initial dangerous index of each monitoring point is corrected, so that the accuracy and reliability of judging and recognizing the position and the dangerous level of the local dangerous area are greatly improved.
Drawings
In order that the present disclosure may be more readily and clearly understood, reference is now made to the following detailed description of the embodiments of the present disclosure taken in conjunction with the accompanying drawings, in which
Fig. 1 is a general architecture diagram of the comprehensive monitoring and early warning method for the mine combined dynamic disaster.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1, the invention is a preferred embodiment of a multi-parameter local danger area judgment and early warning method for mine disasters. The mine disaster multi-parameter local danger area identification early warning method comprises the following steps:
step 1, spatial positioning of mine disaster monitoring points
And carrying out space positioning on each monitoring point of each monitoring and early warning system in the same coordinate system. Specifically, because the existing most mine disaster monitoring and early warning systems are not configured with coordinate information of monitoring points, the early warning method of the invention firstly needs to perform spatial positioning on each monitoring point of each monitoring and early warning system in the same coordinate system (for example, a 1980 national geodetic coordinate system commonly used in mines) according to the installation position (or the occurrence position of a microseismic event) of each monitoring point.
And (3) carrying out the following coordinate positioning on each monitoring point of each monitoring and early warning system:
Figure GDA0002448917660000051
Figure GDA0002448917660000061
note: the types of mine disaster monitoring data and the number of monitoring points in the above table can be expanded, which is not limited by the invention.
The invention utilizes various existing monitoring and early warning systems to carry out operation analysis, and the common monitoring and early warning systems comprise a coal seam stress monitoring system, a microseism monitoring system, a drilling cutting method monitoring system, a hydrological monitoring system and the like. The present embodiment only takes the partial monitoring data type as an example.
For example, the coordinates of two measuring points of stress monitoring "stress measuring point 1", "stress measuring point 2", microseismic monitoring "microseismic event 1", "microseismic event 2", drilling cutting method monitoring "construction hole 1" and "construction hole 2" are as follows:
Figure GDA0002448917660000062
step 2, obtaining the initial risk index I of each monitoring pointSingle point initialization
Providing corresponding monitoring data danger judgment threshold values aiming at monitoring data of different monitoring and early warning systems, and carrying out danger grade evaluation on each monitoring point according to the monitoring data danger judgment threshold values to obtain normalized initial danger index I of each monitoring pointSingle point initialization(0≤ISingle point initialization≤1)。
Because the monitoring data are more in types and the types can be expanded, the following description only takes the coal bed stress monitoring, the microseismic monitoring and the drilling cutting method monitoring as examples:
1. initial danger index (I) of coal body stress monitoring pointStress single point initiation)
(1) Calculating stress value index (I) of single measuring pointY)
Stress value index (I)Y) Giving four-level values according to the real-time stress value of the measuring point, wherein the depth hole value intervals are different, and the value markThe parameters are quasi adjustable and take the following values:
grade Blue color Yellow colour Orange colour Red colour
Default (MPa) shallow hole [0,8) [8,10) [10,13) [13,+∞)
Default value (MPa) deep hole [0,9) [9,12) [12,15) [15,+∞)
Stress value index (I)Y) 0 0.33 0.66 1
Note: the parameter values and parameter intervals in the above table can be reset according to practical application, which is not limited in the present invention.
For example, the stress values of the two shallow hole stress measuring points "stress measuring point 1" and "stress measuring point 2" are 10Mpa and 11Mpa respectively, the stress value index of "stress measuring point 1" is 0.66, and the stress value index of "stress measuring point 2" is 0.33.
(2) Calculating stress amplitude index (I) of single measuring pointI)
Increase value index (I)I) The standard is used for representing the increase amplitude between the current stress value and the initial installation value, the larger the increase amplitude is, the higher the represented danger level is, and the values are as follows:
the growth coefficient is [ (current stress value-initial stress value)/initial stress value ]. 100%
Grade Blue color Yellow colour Orange colour Red colour
Coefficient of growth [-∞,50%) [50%,80%) [80%,100%) [100,+∞)
Stress increase value index (I)I) 0 0.33 0.66 1
Note: the parameter values and parameter intervals in the above table can be reset according to practical application, which is not limited in the present invention.
For example, the initial stress values of the two shallow hole stress measuring points "stress measuring point 1" and "stress measuring point 2" are both 7Mpa, the stress increase coefficients of the two measuring points are 42.9% and 57.1%, the amplitude index of the "stress measuring point 1" is 0, and the amplitude index of the "stress measuring point 2" is 0.33.
(3) Calculating the stress acceleration value index (I) of the single measuring pointG)
Single-point stress acceleration index (I)G) The method is a standard for representing the rapid increase degree of the stress value in a short time, the faster the increase speed is, the higher the represented danger level is, and the calculation process is as follows:
① first, in order to avoid the influence of oil filling operation at the ground stress measuring point, it is judged whether the current stress is larger than the critical value YCritical increase of(default is 6MPa, adjustable parameter) when being less than YCritical increase ofIn time, the measurement point does not perform the acceleration index calculation.
② calculating the growth rate
Suppose that the current time is t2 and the stress value is Yt2T1 at some time before, and Y as the stress valuet1The speed increasing rate:
rate of increase of 100% (Y)t2-Yt1)/(Yt1(t2-t1))
In the formula: the default time interval is 1 hour (i.e., 1 hour from t2-t 1), which may be adjusted
③ acceleration value index (I)G) The default values and calculation method are as follows:
grade Blue color Yellow colour Orange colour Red colour
Rate of growth [-∞,10%) [10%,15%) [15%,30%) [30%,+∞)
Index of acceleration value (I)G) 0 0.33 0.66 1
Note: the parameter values and parameter intervals in the above table can be reset according to practical application, which is not limited in the present invention.
For example, when the default values of t2-t1 are 1 hour, the stress values of the two shallow hole stress measuring points "stress measuring point 1" and "stress measuring point 2" before 1 hour are respectively 9.5Mpa and 9Mpa, the growth speeds of the two measuring points are respectively 5.3% and 22.2%, the acceleration value index of "stress measuring point 1" is 0, and the amplification value index of "stress measuring point 2" is 0.66.
(4) Calculating the initial danger index (I) of the coal body stress monitoring pointStress single point initiation)
Calculating the initial danger index (I) of the coal body stress monitoring pointStress single point initiation) Calculating three indexes of stress value, amplification and acceleration of the stress single-measuring point in real time, and defining weight coefficients K of the three indexes according to the region display characteristicsStress1~KStress 3(∑KStress i1, adjustable parameter), the calculation process is as follows:
Istress single point initiation=KStress 1*IY+KStress 2*II+KStress 3*IG
In the formula: i isYSingle point stress value index, KStress 1Default value 0.5; i isI-a single-point stress increase value indicator,
Kstress 2Default value 0.2; i isGSingle point stress acceleration value index, KStress 3Default value 0.3
For example, KStress 1~KStress 3Taking default values, and initial danger indexes (I) of two shallow hole stress measuring points ' stress measuring point 1 ' and ' stress measuring point 2Stress single point initiation):
IStress single point initiation 1=0.5*0.66+0.2*0+0.3*0=0.33
IStress single point initiation 2=0.5*0.33+0.2*0.33+0.3*0.66=0.43
2. Microseismic event monitoring point initial risk index (I)Microseismic single point initiation)
The early warning of a local dangerous area has certain requirements on the timeliness of microseism monitoring data, microseism events rolling for 24 hours (adjustable parameters) at the current moment are taken as basic data participating in local early warning, and the danger index (I) of each microseism event monitoring point is determined according to the energy of each microseism event in the current time periodMicroseismic single point initiation) The value method is as follows: (energy less than 10)3J microseismic events do not participate in the calculation)
Index/grade Blue color Yellow colour Orange colour Red colour
Energy interval/J [103,104) [104,105) [105,106) [106,+∞)
Microseismic event monitoring point hazard index (I)Microseismic single point initiation) 0 0.33 0.66 1
Note: the parameter values and parameter intervals in the above table can be reset according to practical application, which is not limited in the present invention.
For example, a "microseismic event 1" energy of 1.2 × 10 within 24 hours4J, its initial hazard index IMicroseismic single point initiation 1The table above is taken to be 0.33 (yellow) and the "microseismic event 2" energy occurring within 24 hours is 1.2 × 103J, the hazard index I thereofMicroseismic single point initiation 2The table is taken 0 (blue) for the control.
3. Initial danger index (I) of drill cuttings monitoring pointsSingle point initiation of drill cuttings)
Taking the drilling inspection result which rolls for 24 hours (adjustable parameters) at the current moment as basic data participating in local early warning, and judging the initial danger index (I) of each drilling cutting monitoring point according to whether the drilling inspection data has dynamic display and exceeds the standard or notSingle point initiation of drill cuttings) The values of (A) are as follows:
Figure GDA0002448917660000091
Figure GDA0002448917660000101
note: the parameter values and parameter intervals in the above table can be reset according to practical application, which is not limited in the present invention.
For example, within 24 hours, the situation that the power is shown and the coal powder is not overproof occurs in a construction hole 1 of a certain chip method monitoring point, and the initial danger index I of the monitoring point is judgedSingle point initiation of drill cuttings 1Is 0.66. The situation that 'no power display and no standard exceeding of coal powder' occur in 'construction hole 2' of another chip method monitoring point is judged, and the initial danger index I of the monitoring point is judgedSingle point initiation of cuttings 2Is 0.
Step 3, retrieving the conditions of other monitoring points around each monitoring point
And obtaining the condition that other monitoring points are searched in the sphere area range with the radius r by taking each monitoring point as a central measuring point.
In the specific retrieval process, the initial risk index I of each monitoring point can be usedSingle point initializationAnd searching in the order from big to small to prevent missing detection, or preferably searching by using monitoring points with larger initial danger indexes after sequencing. The radius r is an empirical value, and in this embodiment, the radius r takes the value of 50 meters.
For example, the initial risk index for each monitoring point is ranked as:
the stress measuring point 2, the drilling cuttings construction hole 1, the stress measuring point 1, the microseismic measuring point 2 and the drilling cuttings construction hole 2.
According to the sequencing result, each monitoring point is sequentially taken as a central measuring point, and the condition results of other monitoring points are retrieved as follows:
Figure GDA0002448917660000102
Figure GDA0002448917660000111
step 4, correcting initial danger index of monitoring point
According to the range of the sphere area with the radius r of each central measuring point, the initial risk index I of the monitoring point is retrievedSingle point initializationInitial hazard index I for each central stationSingle point initializationCorrecting to obtain corrected danger index I of each central measuring pointSingle point correction
Specifically, a correction coefficient k is assigned to each retrieved monitoring pointiInitial risk index I of the retrieved monitoring pointSingle point initializationThe higher the correction factor k it is assigned toiThe larger the value of (A); the correction coefficient kiThe values of (A) are as follows:
Figure GDA0002448917660000112
note: the parameter values and parameter intervals in the above table can be reset according to practical application, which is not limited in the present invention.
Modified hazard index I for each center measurement pointSingle point correction=ISingle point initialization*k1*k2*……*ki
Wherein, I in the above formulaSingle point initializationIs the initial danger index of the central measuring point, I is the number of the monitoring points to be retrieved, and when I is obtained by calculationSingle point correctionWhen the ratio is more than 1, take ISingle point correctionEqual to 1.
For example, the corrected danger index I of each center pointSingle point correctionThe results were:
Figure GDA0002448917660000113
Figure GDA0002448917660000121
step 5, obtaining the position and the danger level of the local danger area
According to the corrected danger index I of each central measuring pointSingle point correctionAnd judging the local danger area and the danger level.
Specifically, a modified risk index I is selectedSingle point correctionThe central measuring point with the maximum value, the sphere area with the radius r of the central measuring point is judged as a local danger area, and the corrected danger index I of the central measuring pointSingle point correctionThe risk level of the local risk zone. For a clearer and more intuitive determination, the corrected risk index I of all central measuring points can be determined firstSingle point correctionThe risk levels of the local dangerous areas are judged according to the following table in a descending order.
Hazard class Blue color Yellow colour Orange colour Red colour
Modified hazard index ISingle point correction [0,0.3) [0.3,0.5) [0.5,0.8) [0.8,1]
Note: the parameter values and parameter intervals in the above table can be reset according to practical application, which is not limited in the present invention.
For example, the modified risk index I for each monitoring pointSingle point correctionThe results were ranked as follows:
Figure GDA0002448917660000122
the sphere area within the radius range of 50m of the central measuring point stress measuring point 1 with the maximum corrected danger index is judged as a local danger area from the table, the danger index of the local danger area is 0.74, and the sphere area has an orange danger level.
In the present invention, the "adjustable parameter" means that each parameter and parameter range shown in the embodiment of the present invention can be reset according to the actual application, and the present invention does not limit these specific values and ranges.
In other embodiments, the type of the monitored data according to which the warning method of the present invention is based can be increased, decreased, or re-formulated according to the actual application.
It should be understood that the above examples are only for clarity of illustration and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And obvious variations or modifications therefrom are within the scope of the invention.

Claims (7)

1. A mine disaster multi-parameter local danger area identification early warning method is characterized by comprising the following steps:
step 1, spatial positioning of mine disaster monitoring points
In the same coordinate system, carrying out space positioning on each monitoring point of each monitoring and early warning system;
step 2, obtaining the initial risk index I of each monitoring pointSingle point initialization(0≤ISingle point initialization≤1);
Step 3, retrieving the conditions of other monitoring points around each monitoring point
Obtaining the condition that other monitoring points are searched within the sphere area with the radius r by taking each monitoring point as a central measuring point;
step 4, correcting initial danger index of monitoring point
According to the range of the sphere area with the radius r of each central measuring point, the initial risk index I of the monitoring point is retrievedSingle point initializationInitial hazard index I for each central stationSingle point initializationCorrecting to obtain corrected danger index I of each central measuring pointSingle point correction
Step 5, obtaining the position and the danger level of the local danger area
Selecting a modified risk index ISingle point correctionThe central measuring point with the maximum value, the sphere area with the radius r of the central measuring point is judged as a local danger area, and the corrected danger index I of the central measuring pointSingle point correctionThe risk level of the local risk zone.
2. The mine disaster multi-parameter local danger area identification and early warning method according to claim 1, wherein in the step 4, each retrieved monitoring point is assigned with a correction coefficient kiInitial risk index I of the retrieved monitoring pointSingle point initializationThe higher the correction factor k it is assigned toiThe larger the value of (A);
modified hazard index I for each center measurement pointSingle point correction=ISingle point initialization*k1*k2*……*ki
Wherein, I in the above formulaSingle point initializationIs the initial danger index of the central measuring point, I is the number of the monitoring points to be retrieved, and when I is obtained by calculationSingle point correctionWhen the ratio is more than 1, take ISingle point correctionEqual to 1.
3. The mine disaster multi-parameter local danger area identification and early warning method according to claim 2, wherein the correction coefficient k isiThe values of (A) are as follows:
Figure FDA0002448917650000021
4. the mine disaster multi-parameter local danger area judgment and early warning method according to claim 3, wherein the step 2 is to provide corresponding monitoring data danger judgment threshold values for monitoring data of different monitoring and early warning systems, and to evaluate the danger level of each monitoring point according to the monitoring data danger judgment threshold values to obtain the normalized initial danger index I of each monitoring pointSingle point initialization
5. The mining disaster multi-parameter local danger area identification and early warning method as claimed in claim 4, wherein in the step 3, the initial danger index I is determined according to each monitoring pointSingle point initializationAnd obtaining the conditions of other monitoring points searched in the sphere area range with each monitoring point as a central measuring point and the radius of r from large to small.
6. The mine disaster multi-parameter local danger area judgment and early warning method according to claim 5, wherein the radius r in the step 3 is 50 m.
7. The mine disaster multi-parameter local danger area identification and early warning method according to any one of claims 1 to 6, wherein each monitoring and early warning system in the step 1 comprises a coal seam stress monitoring system, a micro-seismic monitoring system, a drilling cutting method monitoring system and a hydrological monitoring system.
CN201910298257.2A 2019-04-15 2019-04-15 Mine disaster multi-parameter local danger area judgment and early warning method Active CN110043317B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910298257.2A CN110043317B (en) 2019-04-15 2019-04-15 Mine disaster multi-parameter local danger area judgment and early warning method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910298257.2A CN110043317B (en) 2019-04-15 2019-04-15 Mine disaster multi-parameter local danger area judgment and early warning method

Publications (2)

Publication Number Publication Date
CN110043317A CN110043317A (en) 2019-07-23
CN110043317B true CN110043317B (en) 2020-07-21

Family

ID=67277103

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910298257.2A Active CN110043317B (en) 2019-04-15 2019-04-15 Mine disaster multi-parameter local danger area judgment and early warning method

Country Status (1)

Country Link
CN (1) CN110043317B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113759097B (en) * 2021-09-07 2023-06-16 重庆大学 Stress state analysis method based on coal mine roadway surrounding rock stress on-line monitoring system
CN114233386B (en) * 2021-12-09 2024-01-16 北京安科兴业矿山安全技术研究院有限公司 Coal mine disaster early warning method based on multi-parameter risk judgment database

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010142029A1 (en) * 2009-06-09 2010-12-16 Tca Technologies Inc. Systems and methods for monitoring rollers for conveyors
CN202866883U (en) * 2012-10-27 2013-04-10 西安科技大学 Multi-parameter networked emergency rescue system for mine
CN103104291A (en) * 2012-11-07 2013-05-15 中国矿业大学(北京) Multi-parameter aggregative indicator forecasting method of coal petrography dynamic disaster
CN203296821U (en) * 2013-06-21 2013-11-20 北京微赛思技术有限公司 Mine disaster multi-factor micro-seismic monitoring system
CN103711523A (en) * 2013-12-24 2014-04-09 华北科技学院 Method for predicating gas concentration in real time based on local decomposition-evolution neural network
CN104153814A (en) * 2014-06-23 2014-11-19 中国矿业大学 Micro-seismic multi-parameter early warning method for rock burst
CN106840843A (en) * 2017-01-19 2017-06-13 中国矿业大学(北京) A kind of Rock burst proneness based on bayesian theory differentiates and method for early warning
US9739147B2 (en) * 2013-08-30 2017-08-22 Joy Mm Delaware, Inc. Proximity detection systems and methods
CN107764323A (en) * 2017-10-09 2018-03-06 北京科技大学 A kind of multi-parameter enclosed area danger Monitoring and forecasting system in real-time method
CN109447837A (en) * 2018-11-15 2019-03-08 国家能源投资集团有限责任公司 A kind of risk assessment method of mining area bump
CN109555563A (en) * 2018-02-26 2019-04-02 北京科技大学 A kind of electromagnetic radiation of coal rock dynamic disaster danger and monitoring ground sound method for early warning
CN109611143A (en) * 2018-12-13 2019-04-12 煤炭科学技术研究院有限公司 The multi-parameter integrated monitoring system of top plate hydrofracturing and fracturing effect method of discrimination

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010142029A1 (en) * 2009-06-09 2010-12-16 Tca Technologies Inc. Systems and methods for monitoring rollers for conveyors
CN202866883U (en) * 2012-10-27 2013-04-10 西安科技大学 Multi-parameter networked emergency rescue system for mine
CN103104291A (en) * 2012-11-07 2013-05-15 中国矿业大学(北京) Multi-parameter aggregative indicator forecasting method of coal petrography dynamic disaster
CN203296821U (en) * 2013-06-21 2013-11-20 北京微赛思技术有限公司 Mine disaster multi-factor micro-seismic monitoring system
US9739147B2 (en) * 2013-08-30 2017-08-22 Joy Mm Delaware, Inc. Proximity detection systems and methods
CN103711523A (en) * 2013-12-24 2014-04-09 华北科技学院 Method for predicating gas concentration in real time based on local decomposition-evolution neural network
CN104153814A (en) * 2014-06-23 2014-11-19 中国矿业大学 Micro-seismic multi-parameter early warning method for rock burst
CN106840843A (en) * 2017-01-19 2017-06-13 中国矿业大学(北京) A kind of Rock burst proneness based on bayesian theory differentiates and method for early warning
CN107764323A (en) * 2017-10-09 2018-03-06 北京科技大学 A kind of multi-parameter enclosed area danger Monitoring and forecasting system in real-time method
CN109555563A (en) * 2018-02-26 2019-04-02 北京科技大学 A kind of electromagnetic radiation of coal rock dynamic disaster danger and monitoring ground sound method for early warning
CN109447837A (en) * 2018-11-15 2019-03-08 国家能源投资集团有限责任公司 A kind of risk assessment method of mining area bump
CN109611143A (en) * 2018-12-13 2019-04-12 煤炭科学技术研究院有限公司 The multi-parameter integrated monitoring system of top plate hydrofracturing and fracturing effect method of discrimination

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《基于云计算的煤矿冲击地压监控预警技术研究》;姜福兴等;《煤炭科学技术》;20180131;第46卷(第1期);第199-205页 *
《煤矿冲击地压多参量监测预警平台研究》;王永等;《煤炭工程》;20180420;第50卷(第4期);第19-21页 *

Also Published As

Publication number Publication date
CN110043317A (en) 2019-07-23

Similar Documents

Publication Publication Date Title
CN107605536B (en) Coal and gas prominent real-time early warning device and method based on Multi-source Information Fusion
CN105257339B (en) The multi-parameter integrated monitoring and pre-alarming method of driving face
CN110043317B (en) Mine disaster multi-parameter local danger area judgment and early warning method
CN113673119B (en) Coal mine rock burst danger dynamic and static coupling evaluation method based on Bayesian method
CN103244187B (en) Coal and gas prominent breeds evolution early warning comprehensive index system
CN108594295B (en) Method for evaluating coal bed blasting pressure relief effect
CN113294143B (en) Method for evaluating investigation treatment effect of advanced ground area of limestone water damage of coal seam floor
CN115423213A (en) Intelligent analysis and early warning system for safety risks of smart mine based on data analysis
CN111027129B (en) Design method of extruded surrounding rock tunnel structure
CN110043316A (en) A kind of mine combined dynamic disaster comprehensive monitoring method for early warning
CN112610277B (en) Method for rapidly predicting geological disaster risk of water-rich weak surrounding rock tunnel
CN110837701A (en) Mining area bottom plate fault water inrush quantitative evaluation method based on full-coupling analysis
CN107784437B (en) Stress concentration-based coal roadway driving face outburst danger identification method
CN110985129B (en) Coal and gas outburst catastrophe identification method for coal mining working face
CN113375753A (en) Method for monitoring and analyzing influence of coal mine fully mechanized mining face mining on underground water
CN108169449A (en) A kind of coal and gas prominent danger local prediction index sensibility determines method
CN112241835B (en) Multi-source information evaluation method for flood disaster in deep shaft engineering
CN114352357A (en) Hydrological monitoring method and system
CN115492639A (en) Coal roadway driving working face coal and gas outburst early warning method
CN114991870A (en) Multi-index double-channel comprehensive early warning method for coal mine water regime monitoring early warning system
CN112360562A (en) Method for finely judging and identifying potential of coal and gas outburst dangerous area of driving face
CN114320268A (en) Large-diameter drilling pressure relief effect evaluation method based on drilling stress monitoring
CN114233386B (en) Coal mine disaster early warning method based on multi-parameter risk judgment database
CN112734162A (en) Method for evaluating influence degree of coal mining face on shallow groundwater
CN108223010B (en) Mine dynamic disaster integrated early warning method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 273500 No. 949, Fushan South Road, Zoucheng City, Jining City, Shandong Province

Patentee after: Yankuang Energy Group Co.,Ltd.

Patentee after: Yankuang Energy (Ordos) Co.,Ltd.

Patentee after: BEIJING ANKE TECHNOLOGY Co.,Ltd.

Address before: 273500 Shandong city of Jining province Zoucheng City Fushan Road No. 298

Patentee before: YANZHOU COAL MINING Co.,Ltd.

Patentee before: YANZHOU COAL MINING ERDOS ENERGY CHEMICAL CO.,LTD.

Patentee before: BEIJING ANKE TECHNOLOGY Co.,Ltd.