CN109014011A - The forging technology of automobile engine oil supply system common rail pipe - Google Patents

The forging technology of automobile engine oil supply system common rail pipe Download PDF

Info

Publication number
CN109014011A
CN109014011A CN201810757045.1A CN201810757045A CN109014011A CN 109014011 A CN109014011 A CN 109014011A CN 201810757045 A CN201810757045 A CN 201810757045A CN 109014011 A CN109014011 A CN 109014011A
Authority
CN
China
Prior art keywords
rail pipe
forging
common rail
raw material
supply system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810757045.1A
Other languages
Chinese (zh)
Inventor
杨晓军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Fengle Precision Forging Co Ltd
Original Assignee
Changzhou Fengle Precision Forging Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Fengle Precision Forging Co Ltd filed Critical Changzhou Fengle Precision Forging Co Ltd
Priority to CN201810757045.1A priority Critical patent/CN109014011A/en
Publication of CN109014011A publication Critical patent/CN109014011A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K1/00Making machine elements
    • B21K1/14Making machine elements fittings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Forging (AREA)

Abstract

The invention discloses the forging technologies of automobile engine oil supply system common rail pipe, comprising the following steps: chooses 42 round steel of model as raw material, required size and weight are sawn by circular saw;High-pressure common-rail pipe blank is placed in intermediate frequency furnace and is heated.There are two the molds of common rail tubular cavity using tool by the present invention, two products can be produced every time, improve production efficiency, but also material can be saved, secondly raw material is after intermediate frequency furnace is heated at high temperature, on its surface to form one layer of iron scale, it is not drawn off before forging, it will affect the surface quality of product, it is most effective that removing iron scale is removed using the mechanical impact force of high pressure water, solve in the market the product only with the type chamber of a common rail pipe, therefore a common rail pipe can only be produced every time, reduce production efficiency, waste a large amount of raw material, serious loss is caused to the economy of production plant, the problem of being unfavorable for the sustainable development of factory.

Description

The forging technology of automobile engine oil supply system common rail pipe
Technical field
The present invention relates to common rail system technical fields, the specially forging technology of automobile engine oil supply system common rail pipe.
Background technique
High-pressure common rail electric jet technology refers to closing in high-pressure oil pump, pressure sensor and electronic control unit (ECU) composition In loop system, by the generation and course of injection of spraying pressure a kind of fuel system completely separate from each other, logical excess volume is total to The high pressure fuel accumulation that rail pipe exports oil pump together, offsets the pressure oscillation in fuel oil with this, forms constant high compression ignition Oil, and then reallocate and be sent to each fuel injector, unlatching and closed procedure are carried out using the high-speed electromagnetic valve on fuel injector, is realized The oil mass of timing and quantitative control burning chamber of diesel engine, to realize the best fuel-oil atmozation of diesel engine, most efficient burning Rate, and most accurate firing node and energy guarantee least exhaust gas discharge.
With the exacerbation of world energy sources crisis and environmental pollution, for energy saving, reduction discharge, Diesel Engine Electronic Control Injection Technology has obtained development at full speed, in the fuel-economy performance of summary mound DID engine brilliance, meets again increasingly strict Emission regulation in the case where, high pressure co-rail electric control fuel injection technology application played huge power, not only further Fuel consumption is reduced, power performance is enhanced, meets stringenter emission regulation, and there is higher injection pressure With more flexible injection mode, common rail pipe is the core part of common rail system, and the product is only with a common rail pipe in the market Type chamber, therefore a common rail pipe can only be produced every time, reduce production efficiency, waste a large amount of raw material, give production work The economy of factory causes serious loss, is unfavorable for the sustainable development of factory.
Summary of the invention
The purpose of the present invention is to provide the forging technologies of automobile engine oil supply system common rail pipe, have high production efficiency The advantages of, it solves the product in the market only with the type chamber of a common rail pipe, therefore a common rail pipe can only be produced every time, drops Low production efficiency, wastes a large amount of raw material, causes serious loss to the economy of production plant, be unfavorable for the length of factory Long the problem of development.
1. to achieve the above object, the invention provides the following technical scheme: the forging of automobile engine oil supply system common rail pipe Make technique, comprising the following steps:
Step 1: blanking: choosing 42 round steel of model as raw material, required size and weight are sawn by circular saw;
Step 2: heating: high-pressure common-rail pipe blank being placed in intermediate frequency furnace and is heated;
Step 3: accurate hot die forming: carrying out pre-forging forming to the high-pressure common-rail pipe blank after heating using pre-forging mold, Size needed for making its shape and size meet next step finish forge carries out precision forging to pre- forging using smart forging mold, makes Size needed for its shape and size meets fine forge piece;
Step 4: trimming: using straight tube deburring machine, and the distance of two round brush is adjusted by the length dimension of high-pressure common-rail pipe blank, Excision operation is carried out to the overlap at high-pressure common-rail pipe both ends;
Step 5: temperature control is cooling: first being heated using oxy-acetylene, when raw material are heated to 1200 DEG C, stops heating and to it It is kept the temperature, multiple blowers are arranged in side on a moving belt, carry out to the forging on conveyer belt air-cooled;
Step 6: using high pressure water the raw material of required length water dephosphorization: being removed with the iron scale on surface;
Step 7: cleaning: polishing finishing finally being carried out to the surface of raw material, automobile engine oil supply system common rail can be obtained Pipe.
Preferably, described to be heated in step 2, temperature in 1150 DEG C -1200 DEG C (can be extended to 1100 DEG C - 1200 DEG C).
Preferably, described also to be needed before carrying out step 3 by using forging roll to preform on high-pressure common-rail pipe blank It is the biggish position roll forging of cross-sectional area on the high-pressure common-rail pipe at high voltage package, oil return packet and lug into particle size, other positions Roll forging is at thin footpath.
Preferably, there are two the type chambers of common rail pipe for the forging mold tool used in step 3.
Preferably, it is described need to use fly press in step 3 processed, rule of thumb formula P=KS/q calculate The projected area calculated result of equipment tonnage out, common rail pipe is 36250mm2, and COEFFICIENT K is taken as 80kN/cm according to hot finish forge experience 2, deformation coefficient q takes 1.3, is computed, nominal pressure 22308kN, therefore former selects the fly press of 3000t.
Compared with prior art, the beneficial effects of the present invention are: the present invention uses the mold having there are two common rail tubular cavity, Two products can be produced every time, improve production efficiency, but also can save material, and secondly raw material is through intermediate frequency furnace high temperature After heating, on its surface to form one layer of iron scale, it is not drawn off before forging, will affect the surface quality of product, benefit Removed with the mechanical impact force of high pressure water removing iron scale be it is most effective, solve in the market the product only with a common rail The type chamber of pipe, therefore a common rail pipe can only be produced every time, production efficiency is reduced, a large amount of raw material are wasted, to production The problem of economy of factory causes serious loss, is unfavorable for the sustainable development of factory.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical scheme in the embodiment of the invention is clearly and completely described, Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based in the present invention Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts, all Belong to the scope of protection of the invention.
The present invention provides a kind of technical solution, the forging technology of automobile engine oil supply system common rail pipe, including following step It is rapid:
Step 1: blanking: choosing 42 round steel of model as raw material, required size and weight are sawn by circular saw;
Step 2: heating: high-pressure common-rail pipe blank being placed in intermediate frequency furnace and is heated;
Step 3: accurate hot die forming: carrying out pre-forging forming to the high-pressure common-rail pipe blank after heating using pre-forging mold, Size needed for making its shape and size meet next step finish forge carries out precision forging to pre- forging using smart forging mold, makes Size needed for its shape and size meets fine forge piece;
Step 4: trimming: using straight tube deburring machine, and the distance of two round brush is adjusted by the length dimension of high-pressure common-rail pipe blank, Excision operation is carried out to the overlap at high-pressure common-rail pipe both ends;
Step 5: temperature control is cooling: first being heated using oxy-acetylene, when raw material are heated to 1200 DEG C, stops heating and to it It is kept the temperature, multiple blowers are arranged in side on a moving belt, carry out to the forging on conveyer belt air-cooled;
Step 6: using high pressure water the raw material of required length water dephosphorization: being removed with the iron scale on surface;
Step 7: cleaning: polishing finishing finally being carried out to the surface of raw material, automobile engine oil supply system common rail can be obtained Pipe.
Embodiment one:
Blanking: 42 round steel of model is chosen as raw material, required size and weight are sawn by circular saw;Heating: will be high Pressure common rail pipe blank, which is placed in intermediate frequency furnace, to be heated;Accurate hot die forming: using pre-forging mold to heating High-pressure common-rail pipe blank afterwards carries out pre-forging forming, and size needed for making its shape and size meet next step finish forge uses Smart forging mold carries out precision forging, size needed for making its shape and size meet fine forge piece to pre- forging;Trimming: using straight Pipe deburring machine is adjusted the distance of two round brush by the length dimension of high-pressure common-rail pipe blank, flown to high-pressure common-rail pipe both ends While carrying out excision operation;Temperature control is cooling: first being heated using oxy-acetylene, when raw material are heated to 1200 DEG C, stops heating And it is kept the temperature, multiple blowers are arranged in side on a moving belt, carry out to the forging on conveyer belt air-cooled;Water dephosphorization: it uses High pressure water removes the iron scale on surface to the raw material of required length;Cleaning: polishing essence finally is carried out to the surface of raw material It is whole, automobile engine oil supply system common rail pipe can be obtained.
Embodiment two:
In example 1, following processes are added:
It is heated in step 2, temperature (can be extended to 1100 DEG C -1200 DEG C) in 1150 DEG C -1200 DEG C.
Blanking: 42 round steel of model is chosen as raw material, required size and weight are sawn by circular saw;Heating: High-pressure common-rail pipe blank is placed in intermediate frequency furnace and is heated;Accurate hot die forming: pre-forging mold pair is used High-pressure common-rail pipe blank progress pre-forging forming after heating, size needed for making its shape and size meet next step finish forge, Precision forging, size needed for making its shape and size meet fine forge piece are carried out to pre- forging using smart forging mold;Trimming: make With straight tube deburring machine, the distance of two round brush is adjusted by the length dimension of high-pressure common-rail pipe blank, to high-pressure common-rail pipe both ends Overlap carry out excision operation;Temperature control is cooling: first being heated using oxy-acetylene, when raw material are heated to 1200 DEG C, is stopped It heats and it is kept the temperature, multiple blowers are arranged in side on a moving belt, carry out to the forging on conveyer belt air-cooled;Water dephosphorization: Using high pressure water the raw material of required length are removed with the iron scale on surface;Cleaning: finally the surface of raw material is beaten Finishing is ground, automobile engine oil supply system common rail pipe can be obtained.
Embodiment three:
In example 2, following processes are added:
It is also needed before carrying out step 3 by using forging roll to being pre-formed into high voltage package, oil return packet on high-pressure common-rail pipe blank With the biggish position roll forging of cross-sectional area on the high-pressure common-rail pipe at lug at particle size, other position roll forging are at thin footpath.
Blanking: 42 round steel of model is chosen as raw material, required size and weight are sawn by circular saw;Heating: High-pressure common-rail pipe blank is placed in intermediate frequency furnace and is heated;Accurate hot die forming: pre-forging mold pair is used High-pressure common-rail pipe blank progress pre-forging forming after heating, size needed for making its shape and size meet next step finish forge, Precision forging, size needed for making its shape and size meet fine forge piece are carried out to pre- forging using smart forging mold;Trimming: make With straight tube deburring machine, the distance of two round brush is adjusted by the length dimension of high-pressure common-rail pipe blank, to high-pressure common-rail pipe both ends Overlap carry out excision operation;Temperature control is cooling: first being heated using oxy-acetylene, when raw material are heated to 1200 DEG C, is stopped It heats and it is kept the temperature, multiple blowers are arranged in side on a moving belt, carry out to the forging on conveyer belt air-cooled;Water dephosphorization: Using high pressure water the raw material of required length are removed with the iron scale on surface;Cleaning: finally the surface of raw material is beaten Finishing is ground, automobile engine oil supply system common rail pipe can be obtained.
Example IV:
In the third embodiment, following processes are added:
There are two the type chambers of common rail pipe for the forging mold tool used in step 3.
Blanking: 42 round steel of model is chosen as raw material, required size and weight are sawn by circular saw;Heating: High-pressure common-rail pipe blank is placed in intermediate frequency furnace and is heated;Accurate hot die forming: pre-forging mold pair is used High-pressure common-rail pipe blank progress pre-forging forming after heating, size needed for making its shape and size meet next step finish forge, Precision forging, size needed for making its shape and size meet fine forge piece are carried out to pre- forging using smart forging mold;Trimming: make With straight tube deburring machine, the distance of two round brush is adjusted by the length dimension of high-pressure common-rail pipe blank, to high-pressure common-rail pipe both ends Overlap carry out excision operation;Temperature control is cooling: first being heated using oxy-acetylene, when raw material are heated to 1200 DEG C, is stopped It heats and it is kept the temperature, multiple blowers are arranged in side on a moving belt, carry out to the forging on conveyer belt air-cooled;Water dephosphorization: Using high pressure water the raw material of required length are removed with the iron scale on surface;Cleaning: finally the surface of raw material is beaten Finishing is ground, automobile engine oil supply system common rail pipe can be obtained.
Embodiment five:
In example IV, following processes are added:
It needs to use fly press in step 3 and be processed, rule of thumb formula P=KS/q calculates equipment tonnage, common rail The projected area calculated result of pipe is 36250mm2, and COEFFICIENT K is taken as 80kN/cm2 according to hot finish forge experience, and deformation coefficient q takes 1.3, it is computed, nominal pressure 22308kN, therefore former selects the fly press of 3000t.
Blanking: 42 round steel of model is chosen as raw material, required size and weight are sawn by circular saw;Heating: High-pressure common-rail pipe blank is placed in intermediate frequency furnace and is heated;Accurate hot die forming: pre-forging mold pair is used High-pressure common-rail pipe blank progress pre-forging forming after heating, size needed for making its shape and size meet next step finish forge, Precision forging, size needed for making its shape and size meet fine forge piece are carried out to pre- forging using smart forging mold;Trimming: make With straight tube deburring machine, the distance of two round brush is adjusted by the length dimension of high-pressure common-rail pipe blank, to high-pressure common-rail pipe both ends Overlap carry out excision operation;Temperature control is cooling: first being heated using oxy-acetylene, when raw material are heated to 1200 DEG C, is stopped It heats and it is kept the temperature, multiple blowers are arranged in side on a moving belt, carry out to the forging on conveyer belt air-cooled;Water dephosphorization: Using high pressure water the raw material of required length are removed with the iron scale on surface;Cleaning: finally the surface of raw material is beaten Finishing is ground, automobile engine oil supply system common rail pipe can be obtained.
In summary: the forging technology of the automobile engine oil supply system common rail pipe, by using tool, there are two common rail pipes The mold of type chamber can produce two products every time, improve production efficiency, but also can save material, secondly in raw material warp After frequency induction furnace high-temperature heating, on its surface to form one layer of iron scale, it is not drawn off before forging, will affect product Surface quality, removed using the mechanical impact force of high pressure water removing iron scale be it is most effective, solve in the market the product only Using the type chamber of a common rail pipe, therefore a common rail pipe can only be produced every time, reduce production efficiency, waste a large amount of original Material, the problem of causing serious loss to the economy of production plant, be unfavorable for the sustainable development of factory.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (5)

1. the forging technology of automobile engine oil supply system common rail pipe, it is characterised in that: the following steps are included:
Step 1: blanking: choosing 42 round steel of model as raw material, required size and weight are sawn by circular saw;
Step 2: heating: high-pressure common-rail pipe blank being placed in intermediate frequency furnace and is heated;
Step 3: accurate hot die forming: carrying out pre-forging forming to the high-pressure common-rail pipe blank after heating using pre-forging mold, Size needed for making its shape and size meet next step finish forge carries out precision forging to pre- forging using smart forging mold, makes Size needed for its shape and size meets fine forge piece;
Step 4: trimming: using straight tube deburring machine, and the distance of two round brush is adjusted by the length dimension of high-pressure common-rail pipe blank, Excision operation is carried out to the overlap at high-pressure common-rail pipe both ends;
Step 5: temperature control is cooling: first being heated using oxy-acetylene, when raw material are heated to 1200 DEG C, stops heating and to it It is kept the temperature, multiple blowers are arranged in side on a moving belt, carry out to the forging on conveyer belt air-cooled;
Step 6: using high pressure water the raw material of required length water dephosphorization: being removed with the iron scale on surface;
Step 7: cleaning: polishing finishing finally being carried out to the surface of raw material, automobile engine oil supply system common rail can be obtained Pipe.
2. the forging technology of automobile engine oil supply system common rail pipe according to claim 1, it is characterised in that: it is described It is heated in step 2, temperature (can be extended to 1100 DEG C -1200 DEG C) in 1150 DEG C -1200 DEG C.
3. the forging technology of automobile engine oil supply system common rail pipe according to claim 1, it is characterised in that: it is described It also needs by using forging roll before carrying out step 3 to being pre-formed into high voltage package, oil return packet and lug on high-pressure common-rail pipe blank The biggish position roll forging of cross-sectional area is at particle size on the high-pressure common-rail pipe at place, other position roll forging are at thin footpath.
4. the forging technology of automobile engine oil supply system common rail pipe according to claim 1, it is characterised in that: it is described There are two the type chambers of common rail pipe for the tool of forging mold used in step 3.
5. the forging technology of automobile engine oil supply system common rail pipe according to claim 1, it is characterised in that: it is described It needs to use fly press in step 3 and be processed, rule of thumb formula P=KS/q calculates equipment tonnage, the throwing of common rail pipe Shadow areal calculation result is 36250mm2, and COEFFICIENT K is taken as 80kN/cm2 according to hot finish forge experience, and deformation coefficient q takes 1.3, through counting It calculates, nominal pressure 22308kN, therefore former selects the fly press of 3000t.
CN201810757045.1A 2018-07-11 2018-07-11 The forging technology of automobile engine oil supply system common rail pipe Pending CN109014011A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810757045.1A CN109014011A (en) 2018-07-11 2018-07-11 The forging technology of automobile engine oil supply system common rail pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810757045.1A CN109014011A (en) 2018-07-11 2018-07-11 The forging technology of automobile engine oil supply system common rail pipe

Publications (1)

Publication Number Publication Date
CN109014011A true CN109014011A (en) 2018-12-18

Family

ID=64641872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810757045.1A Pending CN109014011A (en) 2018-07-11 2018-07-11 The forging technology of automobile engine oil supply system common rail pipe

Country Status (1)

Country Link
CN (1) CN109014011A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110479791A (en) * 2019-09-23 2019-11-22 长春市阿尔科达科技有限公司 A kind of molding processing method of high pressure oil rail necking down
CN110586827A (en) * 2019-09-16 2019-12-20 江苏理研科技股份有限公司 Forging process of fuel common rail
CN114833529A (en) * 2022-04-14 2022-08-02 力野精密工业(深圳)有限公司 Production process of automobile control arm

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201231300Y (en) * 2008-07-21 2009-05-06 万向集团公司 Brake-arm forging die
CN201410638Y (en) * 2009-04-23 2010-02-24 王先登 Mechanized deburring machine
CN204396764U (en) * 2014-12-03 2015-06-17 上海运良企业发展有限公司 A kind of forging mold structure
CN205020713U (en) * 2015-08-13 2016-02-10 江苏龙城精锻有限公司 High -pressure common -rail pipe's forging mould
CN106695249A (en) * 2015-08-13 2017-05-24 江苏龙城精锻有限公司 Forging forming process for high-pressure common-rail tube

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201231300Y (en) * 2008-07-21 2009-05-06 万向集团公司 Brake-arm forging die
CN201410638Y (en) * 2009-04-23 2010-02-24 王先登 Mechanized deburring machine
CN204396764U (en) * 2014-12-03 2015-06-17 上海运良企业发展有限公司 A kind of forging mold structure
CN205020713U (en) * 2015-08-13 2016-02-10 江苏龙城精锻有限公司 High -pressure common -rail pipe's forging mould
CN106695249A (en) * 2015-08-13 2017-05-24 江苏龙城精锻有限公司 Forging forming process for high-pressure common-rail tube

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张波等: "车用发动机共轨管精密成形工艺与试验研究", 《精密成形工程》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110586827A (en) * 2019-09-16 2019-12-20 江苏理研科技股份有限公司 Forging process of fuel common rail
CN110479791A (en) * 2019-09-23 2019-11-22 长春市阿尔科达科技有限公司 A kind of molding processing method of high pressure oil rail necking down
CN114833529A (en) * 2022-04-14 2022-08-02 力野精密工业(深圳)有限公司 Production process of automobile control arm

Similar Documents

Publication Publication Date Title
CN109014011A (en) The forging technology of automobile engine oil supply system common rail pipe
CN102154609B (en) Preparation method of high-precision roller wear-resistant coating
CN101580940B (en) Quick energy-saving gas soft nitriding method for automobile tire mould
CN106541546B (en) A kind of fast temperature adjusting method of temperature control injection mold
CN102029695B (en) Sharp quenching and sharp heating highlight molding technology of die
CN106695249A (en) Forging forming process for high-pressure common-rail tube
CN102205594A (en) Steam type highlight and traceless injection-molding and forming process for complex precise product
CN108889952A (en) Using the method for metal powder injection molding preparation metal gear
CN104388887A (en) Composite gradient coating on surface of heavy load gear and method for preparing composite gradient coating on surface of heavy load gear
CN104907778A (en) Environment-friendly manufacturing technique for special cylinder body and cylinder cover for natural gas engine
CN107597962A (en) A kind of drop stamping and the integrated technique of die trimming
CN102825187B (en) The forging method of generation Ⅲ nuclear power station steam generator ellipsoidal head ring forging
CN104260377A (en) Processing technology capable of synchronously eliminating stress mark and buckling deformation of plastic parts
CN103071751A (en) Forging method for six throw crankshaft
CN104762460A (en) Rolling and deep-processing short-process integrated manufacturing method of high-strength steel automobile sheet
CN203960316U (en) A kind of injection and spraying method are prepared composite material device
CN110814030A (en) Heat-resistant composite stainless steel and hot rolling production process thereof
CN205473354U (en) Curved surface glass processing device
CN108914050B (en) Method for preparing composite nitriding layer on surface of die steel
CN112359310A (en) Method for coating surface of roll shaft
CN108150304B (en) Internal combustion engine and utilization method of high-temperature waste gas thereof
CN100571925C (en) A kind of adding at the metal stock heat temperature forging, reduce the method that the warm forging oxide scale film generates man-hour
CN106607560A (en) Eco-friendly manufacturing technology of diesel engine cover
CN100355515C (en) Method and equipment of laser impact explosion formation
CN108326264A (en) A kind of method that cold-box makes forming graphite chill

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218

RJ01 Rejection of invention patent application after publication