CN108907607A - A kind of triamine device replacement bobbin carriage method - Google Patents

A kind of triamine device replacement bobbin carriage method Download PDF

Info

Publication number
CN108907607A
CN108907607A CN201810553544.9A CN201810553544A CN108907607A CN 108907607 A CN108907607 A CN 108907607A CN 201810553544 A CN201810553544 A CN 201810553544A CN 108907607 A CN108907607 A CN 108907607A
Authority
CN
China
Prior art keywords
tube sheet
bobbin carriage
tubulation
outer barrel
fused salt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810553544.9A
Other languages
Chinese (zh)
Inventor
毋喜变
张洪杰
范运林
马忠品
高伟丽
王卫民
尹旭涛
汪文波
何亚民
刘爱华
汪志宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONG YUAN DAHUA GROUP Ltd OF HENAN PROVINCE
Original Assignee
ZHONG YUAN DAHUA GROUP Ltd OF HENAN PROVINCE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONG YUAN DAHUA GROUP Ltd OF HENAN PROVINCE filed Critical ZHONG YUAN DAHUA GROUP Ltd OF HENAN PROVINCE
Priority to CN201810553544.9A priority Critical patent/CN108907607A/en
Publication of CN108907607A publication Critical patent/CN108907607A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P11/00Connecting or disconnecting metal parts or objects by metal-working techniques not otherwise provided for 

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

A kind of triamine device replacement bobbin carriage method is triamine chemical production technology renovation technique, it solves the problems, such as that bobbin carriage leakage causes reactor to be scrapped, it includes the production of new tube sheet and inner cylinder;The attachment weld of processing removal tube sheet and tubulation, removes old bobbin carriage;The processing of the inside and outside cylinder of bobbin carriage, outer barrel bevel end surface build-up welding and heat treatment;The group of new tube sheet and tubulation and inside and outside cylinder to and welding;Related check work.

Description

A kind of triamine device replacement bobbin carriage method
Technical field
The present invention relates to triamine chemical production technology renovation technique, especially a kind of triamine device replaces bobbin carriage method.
Background technique
Triamine device is the core equipment in melamine plant, and operating pressure is 8.0MPa, and operation temperature is 380 ℃.Triamine device is heterogeneous, complete mixing flow formula reactor, and structure is complicated, manufacture difficulty is big.Bayonet tube is by inside and outside heat transfer tube group At pipe one end is fixed on bobbin carriage, and the other end can adapt to the occasion that the temperature difference is big, pressure is high with free extension.Bayonet tube is adopted With vertical structure, be conducive to Natural Circulation.Triamine device is always external monopolization technology, and all triamine devices are all to rely on Import, the order cycle time is long, holds at high price, and the price of whole reactor is up to 60,000,000 yuan, and internals tube bank price also reaches 14000000 yuan.Fused salt bobbin carriage is located at the bottom of reactor tube bank, and operation temperature is higher, often more first occurs leakage than tubulation and leads Entire tube bank is caused to scrap.
Summary of the invention
The purpose of the present invention is to provide investing a kind of less, quick triamine device to replace bobbin carriage method, solve The problem of bobbin carriage leakage causes reactor to be scrapped, the object of the present invention is achieved like this, it includes new tube sheet and inner cylinder Production;The attachment weld of processing removal tube sheet and tubulation, removes old bobbin carriage;The processing of the inside and outside cylinder of bobbin carriage, outer barrel groove End face built-up welding and heat treatment;The group of new tube sheet and tubulation and inside and outside cylinder to and welding;Related check work.
Meaning of the present invention is that this method is suitable for triamine device after in a few years running, and the failure of fused salt bobbin carriage is let out Leakage and tubulation performance it is also relatively good in the case where, replacement bobbin carriage makes entire reactor restore function, reaches and reduces equipment investment Purpose;Accordingly extend the service life of triamine device;After triamine device replaces bobbin carriage, through operation after a period of time, equipment Stable, indices all in the range of requiring, can satisfy production needs, work well.
Detailed description of the invention
Fig. 1 is the schematic diagram that triamine device replaces bobbin carriage, 1, outer barrel 2, inner cylinder 3, new tube sheet 4, column in figure Pipe.
Specific embodiment
Fused salt bobbin carriage includes outer barrel 1, inner cylinder 2, new tube sheet 3, tubulation 4, top closure in the present invention, new tube sheet 3 with Tubulation 4 is welded using intensity, and the material of tubulation 4 is nickel-base alloy, and material trademark is 622 UNS N10276 of SB;New tube sheet 3 and The material of inner cylinder 2 is nickel-base alloy, and material trademark is SB575 UNS N10276, and 1 material of outer barrel is chrome-molybdenum steel, material The trade mark is 387 GR12 CL2 of SA;Replacement fused salt bobbin carriage is realized by the method for the tube sheet and inner cylinder of replacing fused salt bobbin carriage.
Its specific method and step is that the first step works out the technologies such as arrangement and method for construction, Construction Network Planning, quality control planning Property file.
The production of the buying of second step raw material, tube sheet and inner cylinder;After tubulation processing is shortened, the installation site of new tube sheet It moving down therewith, the connection type of new tube sheet and outer barrel is changed to butt weld by intrinsic fillet weld, it meets the requirements of the standard, It is simultaneously the type of attachment for meeting new tube sheet and outer barrel, the outer diameter of new tube sheet increases 60mm, to improve tubesheet intensity, new tube sheet Thickness is changed to 38.1mm by intrinsic 35mm.
Third step machining, removes the attachment weld of tube sheet and tubulation, removes fused salt bobbin carriage;It is removed using machining The attachment weld of tubulation and fused salt bobbin carriage internal tube plate, working depth about 5mm, it is desirable that tubulation is loosened with tube sheet connecting portion.Weld seam After loosening, it is detached from fused salt bobbin carriage and tubulation using hydraulic device, this process must not damage the outer barrel of tubulation and fused salt bobbin carriage, During meat is welded in the connection for processing tubulation and tube sheet, the end of tubulation can be also processed simultaneously, and the tube sheet installation that look for novelty Before, the pipe end of all tubulations is concordant, i.e., former tubulation can shorten, and shorten length and determined according to the actual state scene of equipment, right The pipe end of tubulation is processed, it is desirable that as far as possible in one plane, difference in height is less than 1mm to the tubulation pipe end after processing.
4th step removes the old tube sheet of fused salt bobbin carriage, carries out polishing and retaining wall on slope, outer barrel to fused salt bobbin carriage outer barrel Bevel end surface build-up welding and hidden lino removal, and inner cylinder and former flange group pair and welding;Using plasma cut or carbon arc Gouge removes the old tube sheet of fused salt bobbin carriage, the outer barrel of fused salt bobbin carriage must not be damaged in cutting process;Polishing removal outer barrel with The connection weldering meat of old tube sheet simultaneously carries out coherence check, confirms that it meets requirement;The outer barrel of fused salt bobbin carriage is carried out mechanical Processing, outer barrel lower end 65mm range inside surfacing thickness 3mm nickel-base material reprocess out about 15 ° of single grooves, end face heap Nickel-base material is welded, heap postwelding polish groove, and groove surfacing part carries out local stress believing heat treatment, prevents outer barrel Modification.
The 5th new tube sheet of step and bobbin carriage inner cylinder group to and welding, it is desirable that new cylinder is overlapped with flange heart line;Welding process It is middle that welding stress is reduced using percussion measure;100%RT is carried out to weld seam, criterion of acceptability is by II grade of NB/T47013.2-2015 conjunction Lattice.
The 6th new tube sheet of step and tubulation group to and welding, the pipe end position of all tubulations guide head is installed after cleaning out, Tube sheet and coupled inner cylinder be installed, new tube sheet is adjusted to suitable position, the laggard ranks pipe of pipe end protruded tube plate face 2mm with The welding of new tube sheet, face of weld 100%PT;New tube sheet is measured in welding process, the deflection of new tube sheet is recorded, Seek at least four orientation of measurement.
7th step outer barrel and new tube sheet group to and welding, measure and record outer barrel reference line variation feelings in welding process Condition controls the modification amount of outer barrel, fixes before weldering to new tube sheet, taps the weldering to reduce welding stress to weld seam in welding process Seam surface 100%PT.
8th step on-site hoisting, including floor tool, equipment and prefabricated component being hung to where equipment, construction knot Tool, equipment are hung to ground by Shu Houzai.
The work of 9th step related check, new tube sheet and inside and outside cylinder attachment weld and new tube sheet and tubulation attachment weld into Row 100%PT is examined, and by I grade of qualification of NB/T47013.5-2015,100%RT is carried out to the new weld seam of inner cylinder, by NB/ I grade of qualification of T47013.2-2015 standard;Compressive resistance 8kg/cm is carried out to fused salt bobbin carriage2The water pressure test, ammonia permeate 5kg/cm2, Items detection must be qualified;Each nozzle orientation of fused salt bobbin carriage and former design after reparation is consistent.
Establishment, audit and the submission of tenth step completion information.

Claims (3)

1. a kind of triamine device replaces fused salt bobbin carriage method, it is characterized in that:Fused salt bobbin carriage includes outer barrel (1), inner cylinder (2), new tube sheet (3), tubulation (4), top closure, new tube sheet (3) and tubulation (4) are welded using intensity, and the material of tubulation (4) is nickel Based alloy, material trademark are 622 UNS N10276 of SB;The material of new tube sheet (3) and inner cylinder (2) is nickel-base alloy, material The material trade mark is SB575 UNS N10276, and outer barrel (1) material is chrome-molybdenum steel, and material trademark is 387 GR12 CL2 of SA;It is logical The method of the tube sheet and inner cylinder of crossing replacement fused salt bobbin carriage realizes replacement fused salt bobbin carriage.
2. a kind of triamine device described in claim 1 replaces fused salt bobbin carriage method, it is characterized in that:The first step works out construction party The technical file such as case, Construction Network Planning, quality control planning;
The production of the buying of second step raw material, tube sheet and inner cylinder;After tubulation processing is shortened, the installation site of new tube sheet is therewith It moves down, the connection type of new tube sheet and outer barrel is changed to butt weld by intrinsic fillet weld, meets the requirements of the standard, simultaneously Outer diameter for the type of attachment for meeting new tube sheet and outer barrel, new tube sheet increases 60mm, to improve tubesheet intensity, new tube plate thickness 38.1mm is changed to by intrinsic 35mm;
Third step machining, removes the attachment weld of tube sheet and tubulation, removes fused salt bobbin carriage;Tubulation is removed using machining With the attachment weld of fused salt bobbin carriage internal tube plate, working depth about 5mm, it is desirable that tubulation is loosened with tube sheet connecting portion.
3. after weld seam loosens, being detached from fused salt bobbin carriage and tubulation using hydraulic device, this process must not damage tubulation and fused salt pipe The outer barrel of case, during meat is welded in the connection for processing tubulation and tube sheet, the end of tubulation can be also processed simultaneously, and be required Before new tube sheet installation, the pipe end of all tubulations is concordant, i.e., former tubulation can shorten, and it is existing according to the actual state of equipment to shorten length Field determines, processes to the pipe end of tubulation, it is desirable that as far as possible in one plane, difference in height is less than the tubulation pipe end after processing 1mm;
4th step removes the old tube sheet of fused salt bobbin carriage, carries out polishing and retaining wall on slope, outer barrel groove to fused salt bobbin carriage outer barrel End face built-up welding and hidden lino removal, and inner cylinder and former flange group pair and welding;Using plasma cut or carbon arc air gouging, The old tube sheet of fused salt bobbin carriage is removed, the outer barrel of fused salt bobbin carriage must not be damaged in cutting process;Polishing removal outer barrel and old pipe The connection weldering meat of plate simultaneously carries out coherence check, confirms that it meets requirement;The outer barrel of fused salt bobbin carriage is machined, Outer barrel lower end 65mm range inside surfacing thickness 3mm nickel-base material, reprocesses out about 15 ° of single grooves, end face built-up welding nickel Sill, heap postwelding polish groove, and groove surfacing part carries out local stress believing heat treatment, prevents outer barrel from becoming Type;
The 5th new tube sheet of step and bobbin carriage inner cylinder group to and welding, it is desirable that new cylinder is overlapped with flange heart line;It is adopted in welding process Reduce welding stress with the measure of percussion;100%RT is carried out to weld seam, criterion of acceptability presses II grade of qualification of NB/T47013.2-2015;
The 6th new tube sheet of step and tubulation group to and welding, the pipe end position of all tubulations guide head is installed after cleaning out, install Tube sheet and coupled inner cylinder, new tube sheet are adjusted to suitable position, the laggard ranks Guan Yuxin pipe of pipe end protruded tube plate face 2mm The welding of plate, face of weld 100%PT;New tube sheet is measured in welding process, records the deflection of new tube sheet, it is desirable that extremely Four orientation are measured less;
7th step outer barrel and new tube sheet group to and welding, measure and record outer barrel reference line situation of change in welding process, The modification amount of outer barrel is controlled, new tube sheet is fixed before weldering, weld seam is tapped to reduce welding stress, weld seam table in welding process Face 100%PT;
8th step on-site hoisting, including floor tool, equipment and prefabricated component being hung to where equipment, after construction Tool, equipment are hung to ground again;
The work of 9th step related check, new tube sheet and inside and outside cylinder attachment weld and new tube sheet and tubulation attachment weld carry out 100%PT is examined, and by I grade of qualification of NB/T47013.5-2015,100%RT is carried out to the new weld seam of inner cylinder, by NB/T47013.2- 2015 I grade of standard qualifications;Compressive resistance 8kg/cm is carried out to fused salt bobbin carriage2The water pressure test, ammonia permeate 5kg/cm2, items detection must It must be qualified;Each nozzle orientation of fused salt bobbin carriage and former design after reparation is consistent;
Establishment, audit and the submission of tenth step completion information.
CN201810553544.9A 2018-06-01 2018-06-01 A kind of triamine device replacement bobbin carriage method Pending CN108907607A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810553544.9A CN108907607A (en) 2018-06-01 2018-06-01 A kind of triamine device replacement bobbin carriage method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810553544.9A CN108907607A (en) 2018-06-01 2018-06-01 A kind of triamine device replacement bobbin carriage method

Publications (1)

Publication Number Publication Date
CN108907607A true CN108907607A (en) 2018-11-30

Family

ID=64419968

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810553544.9A Pending CN108907607A (en) 2018-06-01 2018-06-01 A kind of triamine device replacement bobbin carriage method

Country Status (1)

Country Link
CN (1) CN108907607A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109974506A (en) * 2019-03-12 2019-07-05 哈电集团(秦皇岛)重型装备有限公司 A kind of removal component and tube bundle assembly take Guan Huanguan method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4727635A (en) * 1986-04-26 1988-03-01 Balcke-Durr Aktiengesellschaft Method of securing tubes between tube sheets
US5101559A (en) * 1989-09-27 1992-04-07 Framatome Method for repairing a steam generator tube

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4727635A (en) * 1986-04-26 1988-03-01 Balcke-Durr Aktiengesellschaft Method of securing tubes between tube sheets
US5101559A (en) * 1989-09-27 1992-04-07 Framatome Method for repairing a steam generator tube

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘真云;杨运李;: "换热器管箱筒体与管板锁底接头泄漏分析及返修", 化工管理, no. 23, pages 1 - 4 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109974506A (en) * 2019-03-12 2019-07-05 哈电集团(秦皇岛)重型装备有限公司 A kind of removal component and tube bundle assembly take Guan Huanguan method

Similar Documents

Publication Publication Date Title
CN107498262B (en) Threaded hole welding repair process
CN102837107B (en) Welding technology for pipe head of 300MW and above high-voltage heater
CN103862146A (en) Method for manufacturing inner barrel of combustor of gas turbine and fixture
CN108907607A (en) A kind of triamine device replacement bobbin carriage method
CN107825077A (en) It is a kind of to rise self-propulsion type platform leg building technology certainly
CN109396770A (en) A kind of replacing options and special right angle boring cutter of expanded joint bulge U-shaped heat exchanger tube
CN112276293A (en) Tubular pile circumferential weld welding method
CN101949656A (en) Method for repairing shell and tube graphite heat exchanger
CN106552959A (en) A kind of valve body boring grab and valve body production technology
CN109262205A (en) Monocline roll system adapter tube manufacturing method
CN106112378A (en) A kind of method repairing tubular heat exchanger titanium tube sheet
CN105499803A (en) Technology used for assembling and welding irradiating supervision pipe
CN110542611A (en) Equipment pressure test adapter tube and pressure test method
JPS613090A (en) Method and device for exchanging split pin aggregate of guide pipe
CN102107305B (en) Underwater high-precision hole forming method based on electrical discharge machining
WO2021120873A1 (en) Hook claw manufacturing material capable of improving machining efficiency and product quality and manufacturing method
CN211102098U (en) Deep sea pipeline plasma vibration material disk normal position repair equipment
CN209363998U (en) It is a kind of for replacing the special right angle boring cutter of expanded joint bulge U-shaped heat exchanger tube
CN201823424U (en) Pipe plate for filter
CN209466214U (en) A kind of pipeline engineering penstock installation frame
CN106624292B (en) The welding procedure of chunking and module chemical plant node cover board
CN109590671A (en) A kind of non-solder renovation technique of casting crack
CN213053178U (en) Deep cavity cladding equipment
CN220250386U (en) Carbonization tower heat exchange section structure for soda industry
CN209802869U (en) destructive test press machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181130