CN108695974B - Method for judging power failure of 10 KV line trunk line - Google Patents

Method for judging power failure of 10 KV line trunk line Download PDF

Info

Publication number
CN108695974B
CN108695974B CN201810360867.6A CN201810360867A CN108695974B CN 108695974 B CN108695974 B CN 108695974B CN 201810360867 A CN201810360867 A CN 201810360867A CN 108695974 B CN108695974 B CN 108695974B
Authority
CN
China
Prior art keywords
power failure
line
time
distribution transformer
public distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810360867.6A
Other languages
Chinese (zh)
Other versions
CN108695974A (en
Inventor
陈鹏
张立中
王菊红
马玉玲
秦发宪
王波
李锦�
段红伟
王亮
赵彦
童彦雄
侯小娥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Ningxia Electric Power Co Wuzhong Power Supply Co
Original Assignee
State Grid Ningxia Electric Power Co Wuzhong Power Supply Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Ningxia Electric Power Co Wuzhong Power Supply Co filed Critical State Grid Ningxia Electric Power Co Wuzhong Power Supply Co
Priority to CN201810360867.6A priority Critical patent/CN108695974B/en
Publication of CN108695974A publication Critical patent/CN108695974A/en
Application granted granted Critical
Publication of CN108695974B publication Critical patent/CN108695974B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • H02J13/0006

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

In order to solve the technical problems of time consumption, labor consumption and low efficiency in a mode of manually analyzing a fault common distribution transformer to judge whether a 10 kV line main line is powered off in the prior art, the invention provides a method for judging the power failure of the 10 kV line main line by adopting a management system. The method comprises the following steps: s1: acquiring the number M of all power-off public distribution transformers and the number N of all public distribution transformers on a 10 kV line in a set period; s2: when it is determined that M is equal to or greater than 50% of N, continue to step S3; s4: acquiring the starting time and the ending time of zero meter current of a gateway meter at the outlet side of the 10 kV line transformer substation, and the power failure time and the power restoration time of a power failure public distribution transformer; s6: and when the starting time of judging that the current of the gateway meter is zero is matched with the power failure time of the power failure common distribution transformer, and the ending time of judging that the current is zero is matched with the power restoration time of the power failure common distribution transformer, judging that the main line of the 10 kilovolt line has power failure. Compared with the prior art, the invention improves the efficiency and saves the resources.

Description

Method for judging power failure of 10 KV line trunk line
Technical Field
The invention relates to the technical field of power grid fault analysis, in particular to a method for judging power failure of a main line of a 10-kilovolt line.
Background
With the continuous development of the company power grid monitoring informatization and automation technology, the existing dispatching automation and distribution network automation system realizes the function of monitoring the power grid operation in the important urban area, however, for suburbs, villages and towns and wide rural areas which cannot be covered by the distribution network automation, more power failure faults on a 10 kV line still need to be reported and repaired by a user, emergency repair personnel can be dispatched to carry out the treatment, and the common treatment mode is only the common distribution transformer aiming at the fault of the bottommost layer, namely, the public distribution transformer, and the public distribution transformer is distributed in different places, so that it is difficult to find out whether the power failure fault of the public distribution transformer is caused by the fault of the main line of the public distribution transformer by a field inspection method, and the failure correlation and the most fundamental failure reason existing between single failure distribution transformers are difficult to find out due to the lack of effective monitoring analysis on the failure influence range and law. Therefore, even if the correlation between the fault distribution transformers is found by manually performing on-site investigation directly or manually performing data analysis, huge manpower and time are consumed due to wide distribution of the distribution transformers and huge grid data, and the efficiency is low. Therefore, it is urgently needed that a management system adopts an automatic method to analyze the relationship between the power failure fault distribution transformers, and finds whether the power failure of the distribution transformer on a 10-kilovolt line is caused by the power failure of a main line, so as to provide a basis for fundamentally solving the problem of the fault.
Disclosure of Invention
In order to solve the technical problems of time consumption, labor consumption and low efficiency in a mode of manually analyzing a fault common distribution transformer to judge whether a main line of a 10 kilovolt line has a power failure in the prior art, the invention provides a method for judging the power failure of the main line of the 10 kilovolt line by adopting a management system.
In order to solve the technical problem, the invention provides a method for judging the power failure of a main line of a 10 kilovolt line, which comprises the following steps:
s1: in a set period, the management system automatically acquires the public distribution transformer quantity M of all power failures on a 10 kV line;
s2: the management system calls a production management system to automatically acquire all public distribution transformer quantity N on the 10 kV line;
s3: the management system judges whether the number M of the blackout public distribution transformers is greater than or equal to 50% of the number N of all the public distribution transformers, and continues to step S4 when judging that the number M of the blackout public distribution transformers is greater than or equal to 50% of the number N of all the public distribution transformers;
s4: the management system calls an electricity information acquisition system to automatically acquire the starting time and the ending time when the meter current of the gateway meter at the outlet side of the 10 kV line substation is zero;
s5: the management system calls an electricity information acquisition system to automatically acquire the power failure time and the power restoration time of the 10 kV line power failure public distribution transformer;
s6: and the management system judges whether the starting time of the meter current of the gateway meter at the outlet side of the 10 kV line transformer substation is zero is matched with the power failure time of the power failure public distribution transformer or not, and the ending time of the current is zero is matched with the power restoration time of the power failure public distribution transformer or not, and judges that the main line of the 10 kV line is powered off when the starting time of the meter current of the outlet side of the 10 kV line transformer substation is judged to be zero to be matched with the power failure time of the power failure public distribution transformer, and the ending time of the current is zero to be matched with the power restoration time of the power failure public distribution transformer or not.
When the method of the invention judges that the main line of the 10 kilovolt line has power failure, the occurrence of the power failure event of the public distribution transformer on the 10 kilovolt line is basically caused by the fault of the main line where the public distribution transformer is located, therefore, if the public distribution transformer is only overhauled and the main line is not overhauled, the public distribution transformer with the power failure event can frequently have power failure in a short time. Therefore, by adopting the management system and the management method, whether the power failure fault of the public distribution transformer is caused by the fault of the trunk line can be quickly found, the invention is specified for fault maintenance, and the operation and maintenance management capability is improved.
Preferably, in step S1, before obtaining the number M of public distribution transformers with power failure on the 10 kv line, determining whether each public distribution transformer on the 10 kv line has power failure, the following steps are taken:
s01: the management system calls an electricity utilization information acquisition system to acquire the power failure time and the electricity restoration time recorded by the public distribution transformer acquisition terminal;
s02: the management system calls an electricity utilization information acquisition system to acquire voltage loss starting time and voltage loss ending time of the public distribution transformer gateway meter;
s03: the management system judges whether the power failure time recorded by the acquisition terminal is matched with the voltage loss starting time of the gateway meter or not and whether the power restoration time recorded by the acquisition terminal is matched with the voltage loss ending time of the gateway meter or not, and judges that the public distribution transformer has power failure when the power failure time recorded by the acquisition terminal is matched with the voltage loss starting time of the gateway meter or when the power restoration time recorded by the acquisition terminal is matched with the voltage loss ending time of the gateway meter.
The collecting terminal installed at the outlet side of the public distribution transformer has the phenomena of inaccuracy and incompleteness in recording of power failure and power restoration events probably due to the influences of factors such as battery aging, external interference and equipment quality, and the completeness rate can reach 70% through field testing; the voltage data acquisition of the gateway meter installed on the outlet side of the public distribution transformer also has data loss of acquisition failure and abnormal transmission communication, and the accuracy rate can reach 98% through field test. The collection terminal and the gateway meter are used as two independent devices, and abnormal and unreliable data recorded by the collection terminal and the gateway meter can be filtered by judging whether the power failure and power restoration time recorded by the collection terminal is matched with the voltage loss time recorded by the gateway meter.
And when the difference between the power restoration time recorded by the acquisition terminal and the voltage loss ending time of the gateway meter is judged to be within 5 minutes, namely the power restoration time recorded by the acquisition terminal is judged to be matched with the voltage loss ending time of the gateway meter.
Preferably, in the statistical period obtained by calling the electricity information acquisition system by the management system, when the management system determines that the power failure frequency of the 10 kv line trunk line is greater than 2 times, it determines that the 10 kv line trunk line has frequent power failure.
Preferably, the management system calls an electricity information acquisition system to acquire the power failure time of each power failure event of the public distribution transformer and the occurrence frequency of the power failure event in a statistical period, and when the power failure time of the public distribution transformer is judged to exceed 2 hours and the power failure frequency is larger than or equal to 3 times, the public distribution transformer area is judged to have frequent power failure. When the public distribution transformer is judged to have frequent power failure, the public distribution transformer needs to be subjected to key maintenance, and the direction is indicated for maintenance.
Preferably, the statistical period duration is less than or equal to one month.
In the existing power grid information system, a power grid GIS system topology model displays the topological relation of equipment on a power grid line, and whether public distribution transformers belong to the same branch line or not is determined by calling data; the production management system is an equipment operation and maintenance lean management system, and acquires the quantity information of the public distribution transformers on the line by calling the data of the system; the power utilization information acquisition system records the outage and restoration time of the public distribution transformer through an acquisition terminal arranged on the outlet side of the public distribution transformer, and records the output voltage value of the public distribution transformer through a gateway meter arranged on the outlet side of the public distribution transformer.
When the public distribution transformer has power failure, the collection terminal installed on the outlet side records the power failure event and the occurrence time when the three-phase input voltage is lower than 60% of the rated voltage and lasts for one minute, and records the power restoration event when the input voltage of the collection terminal recovers and is higher than 80% of the rated voltage. Meanwhile, when the public distribution transformer has power failure, the collection of the three-phase voltage is null value every 15 minutes, namely the voltage loss time by a gateway meter arranged on the outlet side of the public distribution transformer. Data recorded by an acquisition terminal at the outlet side of the public distribution transformer and a gateway meter are automatically uploaded to a power utilization information acquisition system; in the step of judging the power failure of the main line of the 10 kilovolt line, the management system calls the electricity utilization information acquisition system and the production management system as required to acquire related information and carries out the judgment according to a judgment method.
The beneficial effects of the invention include:
compared with the mode that whether the main line of the 10 kV line has power failure or not is judged by manually analyzing the fault distribution transformer in the prior art, the power utilization information acquisition system and the production management system are automatically called by the management system to acquire related information, and whether the main line of the 10 kV line has power failure or not is judged by automatically analyzing the data of the fault distribution transformer, so that the efficiency is improved, and the resources are saved.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention. In the drawings:
FIG. 1 illustrates the steps of a method of determining a power outage in a 10 kV line trunk line according to the present invention;
FIG. 2 is a method for determining a power failure in a utility transformer according to the present invention.
Detailed Description
The method provided by the invention is described in detail with specific embodiments in conjunction with the accompanying drawings.
Referring to fig. 1, the method for determining the power failure of the main line of the 10 kv line provided by the invention comprises the following steps:
s1: within a set period of 24h, automatically acquiring the number M of public distribution transformers of all power failures on a 10 kV line by a management system;
s2: the management system calls a production management system to automatically acquire all public distribution transformer quantity N on the 10 kV line;
s3: the management system judges whether the number M of the blackout public distribution transformers is greater than or equal to 50% of the number N of all the public distribution transformers, and continues to step S4 when judging that the number M of the blackout public distribution transformers is greater than or equal to 50% of the number N of all the public distribution transformers;
s4: the management system calls an electricity information acquisition system to automatically acquire the starting time and the ending time when the meter current of the gateway meter at the outlet side of the 10 kV line substation is zero;
s5: the management system calls a production management system to automatically acquire the power failure time and the power restoration time of the power failure public distribution transformer on the 10 kV line;
s6: and the management system judges whether the starting time of the meter current of the gateway meter at the outlet side of the 10 kV line transformer substation is zero is matched with the power failure time of the power failure public distribution transformer or not, and the ending time of the current is zero is matched with the power restoration time of the power failure public distribution transformer or not, and judges that the main line of the 10 kV line is powered off when the starting time of the meter current of the outlet side of the 10 kV line transformer substation is judged to be zero to be matched with the power failure time of the power failure public distribution transformer, and the ending time of the current is zero to be matched with the power restoration time of the power failure public distribution transformer or not.
Referring to fig. 2, preferably, in step S1, before obtaining the number M of the public distribution transformers with power failure on the 10 kv line, it is determined whether each public distribution transformer on the 10 kv line has power failure, and the following steps are taken:
s01: the management system calls the power utilization information acquisition system to acquire the power failure time and the power restoration time recorded by the public distribution transformer acquisition terminal;
s02: the management system calls an electricity utilization information acquisition system to obtain the voltage loss starting time and the voltage loss ending time of the gateway meter at the outlet side of the public distribution transformer;
s03: the management system judges whether the power failure time recorded by the acquisition terminal is matched with the voltage loss starting time of the gateway meter or not and whether the power restoration time recorded by the acquisition terminal is matched with the voltage loss ending time of the gateway meter or not, and judges that the public distribution transformer has power failure when the power failure time recorded by the acquisition terminal is matched with the voltage loss starting time of the gateway meter or when the power restoration time recorded by the acquisition terminal is matched with the voltage loss ending time of the gateway meter.
Preferably, in the statistical period obtained by the management system calling the electricity consumption information acquisition system, when the management system judges that the power failure frequency of the 10 kv line trunk line is greater than 2 times, the management system judges that the 10 kv line trunk line has frequent power failure.
Preferably, the management system calls the power utilization information acquisition system to acquire the power failure time of each power failure event of the public distribution transformer and the occurrence frequency of the power failure event in the statistical period, and when the power failure time of the public distribution transformer is judged to exceed 2 hours and the power failure frequency is larger than or equal to 3 times, the public distribution transformer area is judged to have frequent power failure.
Preferably, the statistical period duration is less than or equal to one month.
In summary, compared with the mode that whether the main line of the 10 kv line has power failure or not is judged by manually analyzing the public distribution transformer of the fault in the prior art, the management system automatically calls the power utilization information acquisition system and the production management system to acquire related information, and judges whether the main line of the 10 kv line has power failure or not by automatically analyzing the data of the public distribution transformer of the fault, so that the efficiency is improved, and the resources are saved.
It will be apparent to those skilled in the art that various changes and modifications may be made in the present invention without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (4)

1. A method for judging power failure of a main line of a 10 kV line is characterized by comprising the following steps:
s1: acquiring the number M of public distribution transformers with power failure on a 10 kV line in a set period;
s2: acquiring all the public distribution transformer quantity N on the 10 kilovolt line;
s3: judging whether the number M of the power failure common distribution transformers is more than or equal to 50% of the number N of all the common distribution transformers, and continuing to step S4 when the number M of the power failure common distribution transformers is judged to be more than or equal to 50% of the number N of all the common distribution transformers;
s4: acquiring the starting time and the ending time when the meter current of the gateway meter on the outlet side of the 10 kV line transformer substation is zero;
s5: acquiring the power failure time and the power restoration time of the power failure public distribution transformer on the 10 kV line;
s6: and judging whether the starting time of the metering current of the gateway meter at the outlet side of the 10 kV line transformer substation is zero is matched with the power failure time of the power failure public distribution transformer or not, and whether the ending time of the metering current of the outlet side of the 10 kV line transformer substation is matched with the power failure time of the power failure public distribution transformer or not, and judging that the main line of the 10 kV line is powered off when judging that the starting time of the metering current of the outlet side of the 10 kV line transformer substation is zero is matched with the power failure time of the power failure public distribution transformer, and the ending time of the metering current of the outlet side of the 10 kV line transformer substation is matched with.
2. The method of claim 1, wherein in step S1, before obtaining the number M of distribution transformers with power failure on the 10 kv line, determining whether each distribution transformer on the 10 kv line has power failure, the following steps are taken:
s01: acquiring power failure time and power restoration time recorded by a public distribution transformer acquisition terminal;
s02: acquiring voltage loss starting time and voltage loss ending time of the gateway meter at the outlet side of the public distribution transformer;
s03: and judging whether the power failure time recorded by the acquisition terminal is matched with the voltage loss starting time of the gateway meter or not and whether the power restoration time recorded by the acquisition terminal is matched with the voltage loss ending time of the gateway meter or not, and judging that the public distribution transformer has power failure when judging that the power failure time recorded by the acquisition terminal is matched with the voltage loss starting time of the gateway meter and when the power restoration time recorded by the acquisition terminal is matched with the voltage loss ending time of the gateway meter.
3. The method of claim 1, wherein the 10 kv line trunk is determined to be out of service frequently when the number of times the 10 kv line trunk is determined to be out of service is greater than 2 times during the statistical period.
4. The method of claim 3, wherein the statistical period duration is less than or equal to one month.
CN201810360867.6A 2018-04-20 2018-04-20 Method for judging power failure of 10 KV line trunk line Active CN108695974B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810360867.6A CN108695974B (en) 2018-04-20 2018-04-20 Method for judging power failure of 10 KV line trunk line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810360867.6A CN108695974B (en) 2018-04-20 2018-04-20 Method for judging power failure of 10 KV line trunk line

Publications (2)

Publication Number Publication Date
CN108695974A CN108695974A (en) 2018-10-23
CN108695974B true CN108695974B (en) 2021-05-28

Family

ID=63845790

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810360867.6A Active CN108695974B (en) 2018-04-20 2018-04-20 Method for judging power failure of 10 KV line trunk line

Country Status (1)

Country Link
CN (1) CN108695974B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110196366A (en) * 2019-06-04 2019-09-03 鼎信信息科技有限责任公司 Route stops send a telegram in reply state identification method, device, computer equipment and storage medium
CN111813825B (en) * 2020-06-02 2023-03-14 国网江西省电力有限公司电力科学研究院 Distribution transformer outlet power failure event missing report automatic detection method and system
CN112766636B (en) * 2020-12-23 2022-11-15 国网河南省电力公司电力科学研究院 Distribution transformer power failure judgment method based on electric quantity information acquired by power consumption information acquisition terminal

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104810921A (en) * 2015-03-30 2015-07-29 深圳市康拓普信息技术有限公司 Feeder line disconnection power outage range identifying system and method based on distribution transformer terminal information
CN106646057A (en) * 2016-12-29 2017-05-10 国网浙江省电力公司湖州供电公司 Power-off and power-on active judgment method
CN107015121A (en) * 2017-05-23 2017-08-04 国网江西省电力公司电力科学研究院 A kind of distribution transforming stoppage in transit method for rapidly positioning
CN107045088A (en) * 2016-12-30 2017-08-15 国网天津武清供电有限公司 A kind of supply line's power failure point determination methods

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101023366B (en) * 2004-06-04 2011-01-19 Fmc技术有限公司 A method of monitoring line faults in a medium voltage network

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104810921A (en) * 2015-03-30 2015-07-29 深圳市康拓普信息技术有限公司 Feeder line disconnection power outage range identifying system and method based on distribution transformer terminal information
CN106646057A (en) * 2016-12-29 2017-05-10 国网浙江省电力公司湖州供电公司 Power-off and power-on active judgment method
CN107045088A (en) * 2016-12-30 2017-08-15 国网天津武清供电有限公司 A kind of supply line's power failure point determination methods
CN107015121A (en) * 2017-05-23 2017-08-04 国网江西省电力公司电力科学研究院 A kind of distribution transforming stoppage in transit method for rapidly positioning

Also Published As

Publication number Publication date
CN108695974A (en) 2018-10-23

Similar Documents

Publication Publication Date Title
CN108053151B (en) GIS space service-based distribution network power supply capacity real-time analysis method
CN105915398B (en) Rural power grid fault based rapid detection and power restoration system and concentrator detection method thereof
CN106872856B (en) Power distribution network fault active first-aid repair system and method based on multi-element fault collection
WO2021109524A1 (en) Transformer area power failure fault real-time locating method based on electric power collection terminal
KR102680347B1 (en) Apparatus for testing performance of energy storage system and method thereof
CN104635198B (en) Remote monitoring and diagnosing method for electric energy metering device with timely fault finding function
CN108695974B (en) Method for judging power failure of 10 KV line trunk line
CN113659723A (en) Intelligent user fault studying and judging system and implementation method
CN104821789A (en) Method for detecting reliability of photovoltaic power generation system
CN113063997A (en) Distribution transformer area line loss abnormity problem monitoring method
CN112165398A (en) System based on 5G wisdom lamp pole is measurement along separate routes
CN104714206B (en) Remote monitoring and diagnosing method for electric energy metering device capable of finding faults timely
CN116566043A (en) Power distribution terminal monitoring system and monitoring method
CN108683176B (en) Method for judging power failure of 10 kV line branch line
CN114660381A (en) Power line branch monitoring terminal and impedance analysis method thereof
CN112766636B (en) Distribution transformer power failure judgment method based on electric quantity information acquired by power consumption information acquisition terminal
CN107453481B (en) Method for rapidly discovering power failure of low-voltage transformer area
CN114140266A (en) Intelligent low-voltage power grid fault studying and judging algorithm
CN104656050A (en) Manpower-saving remote monitoring and diagnosing method for electric energy metering device
CN112561727A (en) Comprehensive management system for operation analysis and health assessment of power distribution network
CN111367970A (en) Low-voltage diagnosis system based on data acquired by intelligent electric meter
CN111062825A (en) Low-voltage fault diagnosis and rapid power restoration method based on mobile App
CN117559635A (en) Power grid situation awareness fault studying and judging method, system, equipment and storage medium
CN104614700A (en) Remote monitoring and diagnosing method for electric energy metering device with good real-time performance
CN104656052B (en) Remote monitoring and diagnosing method for loss-reducing and efficiency-improving electric energy metering device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant