CN108560450A - A kind of drilling piling construction method of highway barrier - Google Patents

A kind of drilling piling construction method of highway barrier Download PDF

Info

Publication number
CN108560450A
CN108560450A CN201810392323.8A CN201810392323A CN108560450A CN 108560450 A CN108560450 A CN 108560450A CN 201810392323 A CN201810392323 A CN 201810392323A CN 108560450 A CN108560450 A CN 108560450A
Authority
CN
China
Prior art keywords
drilling
construction
piling
machine
highway barrier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810392323.8A
Other languages
Chinese (zh)
Inventor
陈传洪
李群峰
钟宣阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Hong Gong Engineering Machinery Co Ltd
Original Assignee
Chongqing Hong Gong Engineering Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Hong Gong Engineering Machinery Co Ltd filed Critical Chongqing Hong Gong Engineering Machinery Co Ltd
Priority to CN201810392323.8A priority Critical patent/CN108560450A/en
Publication of CN108560450A publication Critical patent/CN108560450A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F15/00Safety arrangements for slowing, redirecting or stopping errant vehicles, e.g. guard posts or bollards; Arrangements for reducing damage to roadside structures due to vehicular impact
    • E01F15/02Continuous barriers extending along roads or between traffic lanes

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of drilling piling construction methods of highway barrier,The hole on the basis of first hole,The walking mechanism of drilling machine is set to walk along Systems of Red Line in Planning Based,Utilize infrared distance measuring principle,Pre-designed walking spacing,According to the spacing in the hole of setting,The operating range of automatic Detection & Controling walking mechanism,Then drilling-machine operator directly puts down drilling rod,Complete a series of drilling piling,It is automatic to realize drilling piling at equal intervals,It avoids needing manual measurement pitch of holes when construction,Greatly improve construction efficiency,Stringent control construction procedure,Construction personnel utilizes yellow demarcartion line by construction site enclosure,And insert warning sign,Guarding against pedestrian must not be close to construction area,Construction personnel needs that protective fence is arranged on eyelet periphery,Reduce the security risk of construction site,And the Sign Board identified with serial number is inserted at eyelet,Construction personnel is facilitated to count,It is especially suitable for the drilling piling construction of the highway barrier on highway.

Description

A kind of drilling piling construction method of highway barrier
Technical field
The invention belongs to highway barrier technical fields, and more specifically more particularly to a kind of drilling of highway barrier is driven piles Construction method.
Background technology
Highway barrier is most important traffic infrastructure, and China's highway grows up from the eighties, highway Guardrail plays important influence to the development of national economy and society.It is that the important maintenance of highway and safety guarantee are set It applies.
Highway barrier needs use equipment of drilling, and application No. is a kind of crawler types disclosed in CN201720698275.6 to beat Bore all-in-one machine, including vehicle body, chassis and the high pressure centrifugal wind turbine dust collecting system on vehicle body, the high pressure centrifugal wind turbine Dust collecting system includes dust excluding hood, which is connected by the plastic conduit on its side wall with wind turbine;The chassis is crawler type Chassis;Further include the taper cone barrel of both ends open, the taper of the taper cone barrel is identical as the taper of dust excluding hood, the small end of taper cone barrel from except The open end of dust hood is screwed into the dust excluding hood, and the one end and the end touched with ground when the big end of taper cone barrel is as drilling are also Coaxially it is fixed with annulus made of soft rubber.Existing rubber-tyred is moved, crawler-type mobile is changed to, substantially increases vehicle The rotatably mounted flexibility of body, to substantially increase the freedom of movement flexibility ratio of drill bit (drilling rod), this is for all-in-one machine of drilling Working performance is promoted significant.While crawler belt is arranged as mobile mechanism, since drilling rod can be transferred to the two of crawler belt Side, the i.e. dust excluding hood of dust collecting system can have farther spacing distance relative to all-in-one machine fuselage, therefore, in original dedusting A pitch circle cone cylinder has been screwed in the open end of cover, is equivalent to and further increases dust excluding hood, to adapt to the probing of more macropore, and The enveloped space of bigger improves the cage cigarette effect of dust excluding hood;Between taper cone barrel and dust excluding hood even using screw-in (thread connection) It connects, while easy to disassemble, easily facilitate and adjust the length that taper cone barrel stretches out dust excluding hood, flexible modulation cage cigarette space size, with Adapt to different drilling needs.Again, the annulus made of the soft rubber of taper cone barrel being equipped with one end of ground, can be with It is preferably bonded with rugged ground, ensures to drill under complicated landform and also more preferably realize the collection of flue dust.Tradition Drilling piling construction scheme be required to manual measurement pitch of holes, determine and drill again after punch position, especially in pen It constructs on straight highway, construction efficiency can be seriously affected, now lack a kind of drilling piling construction method of highway barrier to solve The above problem.
Invention content
The purpose of the present invention is to solve disadvantages existing in the prior art, and a kind of drilling of the highway barrier proposed Piling construction method.
To achieve the above object, the present invention provides the following technical solutions:A kind of drilling of highway barrier provided by the invention Piling construction method specifically includes following construction procedure:
S1:Site clearing:
a:Construction personnel utilizes yellow demarcartion line by construction site enclosure, and inserts warning sign, and warning pedestrian must not be close Construction area;
b:Construction personnel clears up construction site, the rubble of construction site, sundries is cleaned up, after avoiding influence Continuous construction;
S2:Prepare before construction:
a:Construction personnel selects the stake machine of suitable types according to the drilling depth and bore diameter of actual requirement;
b:The Systems of Red Line in Planning Based that survey crew provides according to planning, according to stake bit plan measuring stake on the spot position, and determines First boring point;
c:Using first boring point as datum mark, then datum mark mark is inserted in the datum mark;
S3:Stake machine is in place, and pile top is located at the surface for the boring point for being inserted with datum mark mark, makes in pile top align piles position The heart, and apex point Open valve is closed, it is ensured that not into soil in valve;
S4:After drill bit alignment fiducials point, when the plummet of positive side is placed in the middle on boring tower, illustrate that boring tower vertically conforms to It asks, after construction personnel installs fixes sleeve, commanding commands to bore under drilling-machine operator;Speed is wanted when starting drilling Slowly, in drilling process, drilling rod generally must not be inverted or be promoted, drilling rod ground should be promoted if you need to promote drilling rod or back-drilling, to boring Point opens door and is cleaned, debugged, sealed;
S5:In step S4 drilling-machine operator's work progress, speed must not exceed 20cm/min when control is crept into, and creep into In the process, it generally must not invert or be promoted drilling rod so that drilling via formations are good, extend drilling life of drill pipe;
S6:After first datum mark drilling is completed, drilling-machine operator promotes drilling rod, and the hole on the basis of first hole makes The walking mechanism of drilling machine is walked along Systems of Red Line in Planning Based, using infrared distance measuring principle, pre-designed walking spacing, according to setting Hole spacing, the operating range of automatic Detection & Controling walking mechanism, then drilling-machine operator directly drilling rod is put down, repeat A series of drilling piling is completed in the operation of step S4-S5, automatic to realize drilling piling at equal intervals, avoids needing people when construction Work measures pitch of holes, greatly improves construction efficiency.
As advanced optimizing for the technical program, a kind of drilling piling construction method of highway barrier of the present invention is described The warning sign inserted in step S1 is Amber Alerts board, and warning sign is with " construction important place!It is dangerous!" printed words warning Board.
As advanced optimizing for the technical program, a kind of drilling piling construction method of highway barrier of the present invention is described The stake machine rotated in step S2 is crawler type bored pile machine, and walking is more flexible, conveniently.
As advanced optimizing for the technical program, a kind of drilling piling construction method of highway barrier of the present invention is described In step S3, pile top is not greater than 1cm with the offset of stake point, ensures construction precision.
As advanced optimizing for the technical program, a kind of drilling piling construction method of highway barrier of the present invention is described In step S4, depth is pierced according to drilling machine and empty spray size requirement, construction personnel make visible marking on drilling machine shelf, so as to Observe whether the depth of drilling reaches design requirement in construction personnel.
As advanced optimizing for the technical program, a kind of drilling piling construction method of highway barrier of the present invention is described After the completion of step S5 and S6 drilling, construction personnel needs that protective fence is arranged on eyelet periphery, and the safety for reducing construction site is hidden Suffer from, and inserts the Sign Board identified with serial number at eyelet.
As advanced optimizing for the technical program, a kind of drilling piling construction method of highway barrier of the present invention, drilling After the completion, point-blank, and eyelet equidistantly distributes all eyelets.
The technique effect and advantage of the present invention:A kind of drilling piling construction method of highway barrier of the present invention, changes tradition Drilling piling construction method, after the drilling of first datum mark is completed, drilling-machine operator promotes drilling rod, with first Kong Weiji Quasi- hole makes the walking mechanism of drilling machine walk along Systems of Red Line in Planning Based, using infrared distance measuring principle, pre-designed walking spacing, According to the spacing in the hole of setting, the operating range of automatic Detection & Controling walking mechanism, then drilling-machine operator is directly by drilling rod It puts down, completes a series of drilling piling, it is automatic to realize drilling piling at equal intervals, it avoids needing when constructing between manual measurement hole Away from, greatly improve construction efficiency, strictly control construction procedure, construction personnel using yellow demarcartion line by construction site enclosure, And warning sign is inserted, warning pedestrian close to construction area, construction personnel must not need that protective fence is arranged on eyelet periphery, reduce The security risk of construction site, and the Sign Board identified with serial number is inserted at eyelet, facilitate construction personnel to count, it is especially suitable Close the drilling piling construction of the highway barrier on highway.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, below in conjunction with specific embodiment, to this Invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, not For limiting the present invention.Based on the embodiments of the present invention, those of ordinary skill in the art are not before making creative work The every other embodiment obtained is put, shall fall within the protection scope of the present invention.
A kind of drilling piling construction method of highway barrier provided by the invention, specifically includes following construction procedure:
S1:Site clearing:
a:Construction personnel utilizes yellow demarcartion line by construction site enclosure, and inserts warning sign, and warning pedestrian must not be close Construction area;
b:Construction personnel clears up construction site, the rubble of construction site, sundries is cleaned up, after avoiding influence Continuous construction;
S2:Prepare before construction:
a:Construction personnel selects the stake machine of suitable types according to the drilling depth and bore diameter of actual requirement;
b:The Systems of Red Line in Planning Based that survey crew provides according to planning, according to stake bit plan measuring stake on the spot position, and determines First boring point;
c:Using first boring point as datum mark, then datum mark mark is inserted in the datum mark;
S3:Stake machine is in place, and pile top is located at the surface for the boring point for being inserted with datum mark mark, makes in pile top align piles position The heart, and apex point Open valve is closed, it is ensured that not into soil in valve;
S4:After drill bit alignment fiducials point, when the plummet of positive side is placed in the middle on boring tower, illustrate that boring tower vertically conforms to It asks, after construction personnel installs fixes sleeve, commanding commands to bore under drilling-machine operator;Speed is wanted when starting drilling Slowly, in drilling process, drilling rod generally must not be inverted or be promoted, drilling rod ground should be promoted if you need to promote drilling rod or back-drilling, to boring Point opens door and is cleaned, debugged, sealed;
S5:In step S4 drilling-machine operator's work progress, speed must not exceed 20cm/min when control is crept into, and creep into In the process, it generally must not invert or be promoted drilling rod so that drilling via formations are good, extend drilling life of drill pipe;
S6:After first datum mark drilling is completed, drilling-machine operator promotes drilling rod, and the hole on the basis of first hole makes The walking mechanism of drilling machine is walked along Systems of Red Line in Planning Based, using infrared distance measuring principle, pre-designed walking spacing, according to setting Hole spacing, the operating range of automatic Detection & Controling walking mechanism, then drilling-machine operator directly drilling rod is put down, repeat A series of drilling piling is completed in the operation of step S4-S5, automatic to realize drilling piling at equal intervals, avoids needing people when construction Work measures pitch of holes, greatly improves construction efficiency.
Specifically, the warning sign inserted in the step S1 is Amber Alerts board, and warning sign is with " construction weight Ground!It is dangerous!" printed words warning sign, improve security warning performance.
Specifically, the stake machine rotated in the step S2 is crawler type bored pile machine, walking is more flexible, conveniently.
As advanced optimizing for the technical program, a kind of drilling piling construction method of highway barrier of the present invention is described In step S3, pile top is not greater than 1cm with the offset of stake point, ensures construction precision.
Specifically, in the step S4, depth and empty spray size requirement are pierced according to drilling machine, construction personnel is in drilling machine shelf On make visible marking, in order to which construction personnel observes whether the depth of drilling reaches design requirement.
Specifically, after the completion of the step S5 and S6 drillings, construction personnel needs that protective fence is arranged on eyelet periphery, subtracts The security risk of few construction site, and the Sign Board identified with serial number is inserted at eyelet.
Specifically, after the completion of drilling, point-blank, and eyelet equidistantly distributes all eyelets.
In summary:A kind of drilling piling construction method of highway barrier of the present invention, changes traditional drilling piling construction Method, after first datum mark drilling is completed, drilling-machine operator promotes drilling rod, and the hole on the basis of first hole makes drilling machine Walking mechanism is walked along Systems of Red Line in Planning Based, using infrared distance measuring principle, pre-designed walking spacing, according to the hole of setting Spacing, the operating range of automatic Detection & Controling walking mechanism, then drilling-machine operator directly drilling rod is put down, complete it is a succession of Drilling piling, it is automatic to realize drilling piling at equal intervals, avoid needing manual measurement pitch of holes when construction, greatly improve construction Efficiency strictly controls construction procedure, and construction personnel utilizes yellow demarcartion line by construction site enclosure, and inserts warning sign, guards against Pedestrian close to construction area, construction personnel must not need that protective fence is arranged on eyelet periphery, and the safety for reducing construction site is hidden Suffer from, and insert the Sign Board identified with serial number at eyelet, construction personnel is facilitated to count, the public affairs being especially suitable on highway The drilling piling construction of road guardrail.
Finally it should be noted that:The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used With technical scheme described in the above embodiments is modified or equivalent replacement of some of the technical features, All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in the present invention's Within protection domain.

Claims (7)

1. a kind of drilling piling construction method of highway barrier, it is characterised in that:Specifically include following construction procedure:
S1:Site clearing:
a:Construction personnel utilizes yellow demarcartion line by construction site enclosure, and inserts warning sign, and warning pedestrian must not be close to construction Region;
b:Construction personnel clears up construction site, and the rubble of construction site, sundries are cleaned up, and avoids influencing subsequent Construction;
S2:Prepare before construction:
a:Construction personnel selects the stake machine of suitable types according to the drilling depth and bore diameter of actual requirement;
b:The Systems of Red Line in Planning Based that survey crew provides according to planning, according to stake bit plan measuring stake on the spot position, and determines first A boring point;
c:Using first boring point as datum mark, then datum mark mark is inserted in the datum mark;
S3:Stake machine is in place, and pile top is located at the surface for the boring point for being inserted with datum mark mark, makes pile top align piles position center, and Apex point Open valve is closed, it is ensured that not into soil in valve;
S4:After drill bit alignment fiducials point, when the plummet of positive side is placed in the middle on boring tower, illustrates that boring tower vertically meets the requirements, apply After worker person installs fixes sleeve, commanding commands to bore under drilling-machine operator;It is slow to start speed when drilling, drilling In the process, drilling rod generally must not be inverted or be promoted, drilling rod ground should be promoted if you need to promote drilling rod or back-drilling, door is opened to apex point It cleaned, debugged, sealed;
S5:In step S4 drilling-machine operator's work progress, speed must not exceed 20cm/min, drilling process when control is crept into In, it generally must not invert or be promoted drilling rod so that drilling via formations are good, extend drilling life of drill pipe;
S6:After first datum mark drilling is completed, drilling-machine operator promotes drilling rod, and the hole on the basis of first hole makes drilling machine Walking mechanism walk along Systems of Red Line in Planning Based, using infrared distance measuring principle, pre-designed walking spacing, according to the hole of setting Spacing, the operating range of automatic Detection & Controling walking mechanism, then drilling-machine operator directly drilling rod is put down, repeat step A series of drilling piling is completed in the operation of S4-S5, automatic to realize drilling piling at equal intervals, avoids manually surveying when construction Metering-orifice spacing, greatly improves construction efficiency.
2. a kind of drilling piling construction method of highway barrier according to claim 1, it is characterised in that:The step S1 In the warning sign that inserts be Amber Alerts board, and warning sign is with " construction important place!It is dangerous!" printed words warning sign.
3. a kind of drilling piling construction method of highway barrier according to claim 1, it is characterised in that:The step S2 The stake machine of middle rotation is crawler type bored pile machine, and walking is more flexible, conveniently.
4. a kind of drilling piling construction method of highway barrier according to claim 1, it is characterised in that:The step S3 In, pile top is not greater than 1cm with the offset of stake point, ensures construction precision.
5. a kind of drilling piling construction method of highway barrier according to claim 1, it is characterised in that:The step S4 In, depth and empty spray size requirement are pierced according to drilling machine, construction personnel makes visible marking on drilling machine shelf, in order to construct Whether the depth of personal observations to drilling reaches design requirement.
6. a kind of drilling piling construction method of highway barrier according to claim 1, it is characterised in that:The step S5 After the completion of drilling with S6, construction personnel needs that protective fence is arranged on eyelet periphery, reduces the security risk of construction site, and The Sign Board identified with serial number is inserted at eyelet.
7. a kind of drilling piling construction method of highway barrier according to claim 1, it is characterised in that:Drilling is completed Afterwards, point-blank, and eyelet equidistantly distributes all eyelets.
CN201810392323.8A 2018-04-27 2018-04-27 A kind of drilling piling construction method of highway barrier Pending CN108560450A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810392323.8A CN108560450A (en) 2018-04-27 2018-04-27 A kind of drilling piling construction method of highway barrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810392323.8A CN108560450A (en) 2018-04-27 2018-04-27 A kind of drilling piling construction method of highway barrier

Publications (1)

Publication Number Publication Date
CN108560450A true CN108560450A (en) 2018-09-21

Family

ID=63537080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810392323.8A Pending CN108560450A (en) 2018-04-27 2018-04-27 A kind of drilling piling construction method of highway barrier

Country Status (1)

Country Link
CN (1) CN108560450A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113431430A (en) * 2021-08-09 2021-09-24 山西省交通规划勘察设计院有限公司 Construction of narrow distance median separates fender and vehicle warning structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203296046U (en) * 2013-05-13 2013-11-20 威海力达扭矩技术有限公司 Crawler type swiveling pile driver
US9551127B1 (en) * 2011-06-23 2017-01-24 Bernard J. Gochis Rotary drive tip system for installation of piles or other foundation members into the ground
WO2017083903A1 (en) * 2015-11-21 2017-05-26 Bfre Pty Ltd As Trustee Improvements in slab on ground formwork design and installation
CN107130592A (en) * 2017-04-10 2017-09-05 贾茂来 A kind of long screw auger and impact drill two-shipper is combined pore-creating filling pile construction
CN206903584U (en) * 2017-06-15 2018-01-19 重庆宏工工程机械有限责任公司 A kind of crawler type is drilled all-in-one
CN207092969U (en) * 2017-07-21 2018-03-13 大成科创基础建设股份有限公司 Rotary drilling rig with high accuracy positioning

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9551127B1 (en) * 2011-06-23 2017-01-24 Bernard J. Gochis Rotary drive tip system for installation of piles or other foundation members into the ground
CN203296046U (en) * 2013-05-13 2013-11-20 威海力达扭矩技术有限公司 Crawler type swiveling pile driver
WO2017083903A1 (en) * 2015-11-21 2017-05-26 Bfre Pty Ltd As Trustee Improvements in slab on ground formwork design and installation
CN107130592A (en) * 2017-04-10 2017-09-05 贾茂来 A kind of long screw auger and impact drill two-shipper is combined pore-creating filling pile construction
CN206903584U (en) * 2017-06-15 2018-01-19 重庆宏工工程机械有限责任公司 A kind of crawler type is drilled all-in-one
CN207092969U (en) * 2017-07-21 2018-03-13 大成科创基础建设股份有限公司 Rotary drilling rig with high accuracy positioning

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
北京土木建筑学会: "《地基与基础工程施工技术图解》", 31 January 2008, 冶金工业出版社 *
张晓彤等: "《无线传感器网络与人工生命》", 30 June 2008, 国防工业出版社 *
编委: "《水利水电工程施工放线快学快用》", 31 October 2012, 中国建材工业出版社 *
马庆禄等: "《车辆定位与导航系统》", 31 October 2014, 中南大学出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113431430A (en) * 2021-08-09 2021-09-24 山西省交通规划勘察设计院有限公司 Construction of narrow distance median separates fender and vehicle warning structure

Similar Documents

Publication Publication Date Title
CN102364048B (en) Comprehensive mechanized rock roadway tunneling machine
CN104747193B (en) A kind of shallow bore hole driling explosion driving chassis
CN110656883A (en) Road construction is with pile drilling all-in-one
CN104929517B (en) Full-hydraulic drill type pressure relieving equipment with double drill bits and pressure relieving method
CN102900360B (en) Combined type digging drill machine
CN209604007U (en) IV grade of tunnel country rock loopful excavates three arm rock drilling jumbos of drillhole blasting
CN110295934A (en) Portal frame Anchor Care device
CN108560450A (en) A kind of drilling piling construction method of highway barrier
CN106908047A (en) To the accurate laying out apparatus of fan shape cloth hole and its application method in one kind
CN210738468U (en) Positioning and guiding device of rotary drilling rig
CN106593438B (en) Drilling hole hydraulic mining down-hole mining robot
CN110094162A (en) A kind of drilling equipment and boring method of the pack hole for mine capital construction construction
CN112796660A (en) Construction method of double-parallel-branch horizontal communication well
CN108266125A (en) For the directional drilling method in goaf of crossing the border
CN203978304U (en) Novel angle adjustable guide rail electric rock drill support
CN107288536B (en) Debris slope water content sensor pore-forming deployment device and pore-forming lay method
CN110004953A (en) A kind of side slope or retaining wall construction trolley
CN205908259U (en) Anti-sticking drill rod of down-the-hole hammer drilling tool and anti-sticking drill down-the-hole hammer drilling tool
CN206360643U (en) A kind of integral engineering driller of crawler type tower crane
CN205506820U (en) Tunnelling experimental apparatus is cut entirely in circular tunnel
CN201176876Y (en) Shield tunneling type coal mine gate road dig-anchor machine set
CN102003169B (en) Method for repairing accident well of coal bed methane multi-branch horizontal well
CN106522837A (en) crawler-type tower crane integrated engineering driller
CN207123400U (en) A kind of highway subgrade soil layer sampler
CN207633177U (en) A kind of multi-angle leveling earth shoulder slip-form machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 405200 1 groups of Taihe community in Lianggui County, Liangping County, Chongqing

Applicant after: Chongqing Hong Gong Construction Machinery Limited by Share Ltd

Address before: 405200 1 groups of Taihe community in Lianggui County, Liangping County, Chongqing

Applicant before: Chongqing Hong Gong engineering machinery Co., Ltd

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20180921

RJ01 Rejection of invention patent application after publication