CN108517733A CN201810585297.0A CN201810585297A CN108517733A CN 108517733 A CN108517733 A CN 108517733A CN 201810585297 A CN201810585297 A CN 201810585297A CN 108517733 A CN108517733 A CN 108517733A
Authority
CN
China
Prior art keywords
permeable
pavement structure
urban road
surface layer
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810585297.0A
Other languages
Chinese (zh)
Inventor
王火明
刘燕燕
吕国军
伍杰
徐周聪
陈飞
王祺
唐智伦
徐霈
陈天泉
李海波
苗超杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Original Assignee
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Merchants Chongqing Communications Research and Design Institute Co Ltd filed Critical China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority to CN201810585297.0A priority Critical patent/CN108517733A/en
Publication of CN108517733A publication Critical patent/CN108517733A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/24Methods or arrangements for preventing slipperiness or protecting against influences of the weather
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention provides a kind of pavement structure of urban road and urban roads, it is related to the technical field of building, the pavement structure of the urban road includes face layer, screed-coat, base, bed course and the soil matrix from top to bottom set gradually, wherein, face layer includes with the water-permeable brick for intercepting sundries function, screed-coat includes dry cement mortar, and base includes pervious concrete, and bed course is graded broken stone layer.The urban road is provided with the pavement structure of above-mentioned urban road.The pavement structure and urban road of the urban road are alleviated using cement macrovoid porous pavement, and rainwater penetrates into base by the macrovoid and big piece on road surface, are susceptible to pavement structure blocking, the problem for causing the permeable time limit of pavement structure shorter.

Description

The pavement structure and urban road of urban road
Technical field
The present invention relates to technical field of buildings, more particularly, to the pavement structure and urban road of a kind of urban road.
Background technology
Urban road refers to the road in city, is used for communications and transportation in city and pedestrian, can be the life of resident Living, work and cultural and recreational activity provide prodigious facility.Sponge city is then new generation of city storm water man- agement concept, refers to city The natural calamity etc. that city is brought in adaptation environmental change and reply rainwater has good " elasticity ", absorbs water, stores when raining Water, infiltration, water purification by the water stored " release " and are used when needing.The road of urban road in the system in sponge city Face structure plays an important role.
In the prior art, the pavement structure of urban road uses cement macrovoid porous pavement, rainwater to pass through road surface The shortcomings that macrovoid and big piece penetrate into base, such pavement structure is:Hole is big, easily blocks, causes pavement structure The permeable time limit it is shorter, need frequently renovate, invest repeatedly, serious waste of resources.
It would therefore be highly desirable to design a kind of new pavement structure to improve above-mentioned technical problem.
Invention content
First of the present invention is designed to provide a kind of pavement structure of urban road, is existed in the prior art with alleviating Urban road pavement structure use cement macrovoid porous pavement, rainwater pass through the macrovoid on road surface and big piece infiltration Into base, it is susceptible to pavement structure blocking, the technical problem for causing the permeable time limit of pavement structure shorter.
The pavement structure of urban road provided by the invention include the face layer from top to bottom set gradually, screed-coat, base, Bed course and soil matrix, wherein the face layer includes with the water-permeable brick for intercepting sundries function, and the screed-coat includes permeable dry Sand or permeable dry cement stabilizing coarse sand, the base include pervious concrete in cement stabilizing, and the bed course is grading Metalling.
Further, the thickness of the water-permeable brick is 5cm to 7cm, and the coefficient of permeability of the water-permeable brick is more than or equal to 0.2mm/s。
Further, the thickness of the screed-coat is 3cm to 5cm.
Further, the pervious concrete is C25 pervious concretes, and the thickness of the base is 14cm to 18cm, institute The coefficient of permeability for stating base is more than or equal to 0.5mm/s.
Further, the thickness of the bed course is 18cm to 22cm, and the voidage of the bed course is 20%.
Further, antiseepage film is equipped on the soil matrix, the bed course is set in the antiseepage film.
Further, the bottom end of the bed course is embedded with Permeable blind pipe, the length direction of the Permeable blind pipe and the city The width direction of the pavement structure of city's road is parallel;
The both ends of the Permeable blind pipe, which are arranged with, picks out pipe, and the end of the Permeable blind pipe described is picked out by corresponding Pipe is connected to corresponding catch-basin in the pavement structure of the urban road.
Further, the both ends in the pavement structure width direction of the urban road are additionally provided with reinforcing body, two institutes It states reinforcing body to be symmetrical arranged, cross sectional shape is right-angled trapezium, and upper table of the upper bottom of the right-angled trapezium apart from the base The bottom of face 30mm, the right-angled trapezium are concordant with the lower surface of the bed course, and the bevel edge of the right-angled trapezium is towards the city The inside of the pavement structure of city's road.
Further, the water-permeable brick includes porous base course and the permeable surface layer that is set on the porous base course, described The rubble that porous base course is matched by single-stage is made up of binder bonding, the permeable surface layer by intermediate permeable surface layer middle layer and It encloses the permeable surface layer peripheral tier set on the permeable surface layer middle layer periphery to constitute, the permeable surface layer middle layer and described permeable Surface layer peripheral tier is made up of rubble of binder bonding;
The ballast grain sizes of the porous base course are more than the ballast grain sizes of the permeable surface layer middle layer, in the permeable surface layer The ballast grain sizes of interbed are more than the ballast grain sizes of the permeable surface layer peripheral tier, and empty between the rubble of the permeable surface layer peripheral tier Gap is not more than 0.5mm, and gap is not more than 1mm between the rubble of the permeable surface layer middle layer.
The pavement structure of urban road provided by the invention having the beneficial effect that compared with prior art:
The pavement structure of urban road provided by the invention include the face layer from top to bottom set gradually, screed-coat, base, Bed course and soil matrix, wherein face layer includes with the water-permeable brick for intercepting sundries function, and screed-coat includes permeable dry cement stabilizing Middle sand or permeable dry cement stabilizing coarse sand, base include pervious concrete, and bed course is graded broken stone layer.Pass through face layer Water-permeable brick can intercept the sundries in rainwater, can alleviate or even avoid that cement macrovoid porous pavement, rainwater is used to pass through The macrovoid on road surface and big piece penetrate into base, are susceptible to the problem of pavement structure blocks, and are conducive to extend road surface knot The permeable time limit of structure reduces the renovation number of pavement structure, reduces the waste of resource.
Second object of the present invention is to provide a kind of urban road, to alleviate urban road existing in the prior art Pavement structure use cement macrovoid porous pavement, rainwater penetrates into base by the macrovoid and big piece on road surface, It is susceptible to pavement structure blocking, the technical problem for causing the permeable time limit of pavement structure shorter.
Urban road provided by the invention is provided with the pavement structure of the urban road described in the above.
Urban road provided by the invention having the beneficial effect that compared with prior art:
Urban road provided by the invention is provided with the pavement structure of above-mentioned urban road, the pavement structure of the urban road Including face layer, screed-coat, base, bed course and the soil matrix from top to bottom set gradually, wherein face layer includes having to intercept sundries work( The water-permeable brick of energy, screed-coat include sand or permeable dry cement stabilizing coarse sand in permeable dry cement stabilizing, base's packet Pervious concrete is included, bed course is graded broken stone layer.The sundries in rainwater can be intercepted by the water-permeable brick of face layer, can be alleviated very To avoiding using cement macrovoid porous pavement, rainwater penetrates into base by the macrovoid and big piece on road surface, is easy There is the problem of pavement structure blocks, is conducive to extend the permeable time limit of pavement structure, reduces the renovation number of pavement structure, subtract The waste of few resource.
Description of the drawings
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, in being described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, other drawings may also be obtained based on these drawings.
Fig. 1 is the cross-section diagram of the pavement structure for the urban road that the embodiment of the present invention one provides;
Fig. 2 is enlarged drawing at the A of the pavement structure of urban road shown in FIG. 1;
Fig. 3 is the cross-section diagram of the pavement structure for another urban road that the embodiment of the present invention one provides;
The structural schematic diagram of water-permeable brick in the pavement structure for the urban road that Fig. 4 provides for the embodiment of the present invention one.
Icon:The faces 1- layer;2- screed-coats;3- bases;4- bed courses;5- soil matrixs;6- antiseepage films;7- Permeable blind pipes; 8- picks out pipe;9- reinforcing bodies;100- water-permeable bricks;101- porous base courses;The permeable surface layers 102-;In the permeable surface layers 1021- Interbed;The permeable surface layer peripheral tiers of 1022-.
Specific implementation mode
Technical scheme of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill The every other embodiment that personnel are obtained without making creative work, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that term "center", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for the description present invention and simplify description, do not indicate or imply the indicated device or element must have a particular orientation, With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ", " third " is used for description purposes only, and is not understood to indicate or imply relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can Can also be electrical connection to be mechanical connection;It can be directly connected, can also indirectly connected through an intermediary, Ke Yishi Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
Embodiment one
As shown in figures 1 and 3, the pavement structure of urban road provided in this embodiment includes from top to bottom setting gradually Face layer 1, screed-coat 2, base 3, bed course 4 and soil matrix 5, wherein face layer 1 includes being looked for the water-permeable brick 100 for intercepting sundries function Flat bed 2 includes sand or permeable dry cement stabilizing coarse sand in permeable dry cement stabilizing, and base 3 includes permeable coagulation Soil, bed course 4 are graded broken stone layer.
The pavement structure of urban road provided in this embodiment include from top to bottom set gradually face layer 1, screed-coat 2, Base 3, bed course 4 and soil matrix 5, wherein face layer 1 includes with the water-permeable brick 100 for intercepting sundries function, and screed-coat 2 includes permeable Sand or permeable dry cement stabilizing coarse sand in dry cement stabilizing, base 3 include pervious concrete, and bed course 4 is grading Metalling.The sundries in rainwater can be intercepted by the water-permeable brick 100 of face layer 1, can alleviate or even is avoided big using cement system Hole porous pavement, rainwater penetrate into base 3 by the macrovoid and big piece on road surface, are susceptible to pavement structure blocking Problem is conducive to extend the permeable time limit of pavement structure, reduces the renovation number of pavement structure, reduces the waste of resource.
Specifically, face layer 1 includes with the water-permeable brick 100 for intercepting sundries function, i.e., face layer 1 is by having the function of interception sundries Water-permeable brick 100 be laid with.As it can be seen that the water-permeable brick 100 mentioned in the present embodiment can either ensure rainwater on road surface can in time from The pavement structure of urban road is discharged, and is conducive to alleviate and pavement structure is even avoided to be easy to block up because of the sundries being mixed in rainwater The problem of plug.
Screed-coat 2 includes sand or permeable dry cement stabilizing coarse sand in permeable dry cement stabilizing, dry water Mud can be permeable by controlling porosity realization.
Alternatively screed-coat 2 or dry cement mortar.
In the present embodiment, the thickness of water-permeable brick 100 can be 5cm to 7cm, and the coefficient of permeability of water-permeable brick 100 is more than or equal to 0.2mm/s。
Preferably, as a kind of specific embodiment, the thickness of above-mentioned water-permeable brick 100 can be 6cm.
In the present embodiment, the thickness of screed-coat 2 can be 3cm to 5cm.
Screed-coat 2 can be that face layer 1 provides a smooth support, ensure the flatness of face layer 1 and exercise comfort.
Preferably, as a kind of specific embodiment, the thickness of above-mentioned screed-coat 2 can be 3cm.
In the present embodiment, pervious concrete can be C25 pervious concretes, and the thickness of base 3 can be 14cm to 18cm, The coefficient of permeability of base 3 is more than or equal to 0.5mm/s.
3 one side of base preferably can transmit the load of coming by bearing plane layer 1, on the other hand again being capable of preferably permeable face The water that oozes under layer 1, play infiltration, water conservation temperature reduction function.
Preferably, as a kind of specific embodiment, the thickness of above-mentioned base 3 can be 15cm.
In the present embodiment, the thickness of bed course 4 can be 18cm to 22cm, and the voidage of bed course 4 is 20%.
Bed course 4 is the graded broken stone layer of 18cm to 22cm, and voidage is controlled 20%, and the water temperature that can improve base 3 is steady It is qualitative.
Preferably, as a kind of specific embodiment, the thickness of above-mentioned bed course 4 can be 20cm.
As depicted in figs. 1 and 2, in the present embodiment, antiseepage film 6 can be equipped on soil matrix 5, bed course 4 is set to antiseepage film 6 On.
Antiseepage film 6 is set on 5 upper berth of soil matrix, rainwater infiltration can be prevented to soil matrix 5, advantageously ensure that the stability of soil matrix 5.
Further, the thickness of antiseepage film 6 can be 1mm.
As shown in figures 1 and 3, in the present embodiment, the bottom end of bed course 4 can be embedded with Permeable blind pipe 7, Permeable blind pipe 7 Length direction is parallel with the width direction of the pavement structure of urban road.
The both ends of Permeable blind pipe 7, which are arranged with, picks out pipe 8, and the end of Permeable blind pipe 7 is connected to by the corresponding pipe 8 that picks out Corresponding catch-basin in the pavement structure of urban road.
The setting length direction Permeable blind pipe parallel with the width direction of the pavement structure of urban road in the bottom of bed course 4 7, then be arranged respectively at the both ends of Permeable blind pipe 7 and pick out pipe 8, the both ends of Permeable blind pipe 7 are respectively communicated to by respectively picking out pipe 8 Corresponding catch-basin in the pavement structure of urban road, enables the rainwater in the pavement structure of infiltration urban road smoothly to arrange Go out to each catch-basin, a large amount of rainwater can be avoided to be stranded in the pavement structure of urban road, is easy to go out the case where endangering soil matrix 5 It is existing.
Obviously, the setting of Permeable blind pipe 7 is corresponding with the setting of catch-basin in urban road.
Specifically, it can be U-tube to pick out pipe 8, one end of U-tube is connected to Permeable blind pipe 7, and the other end stretches into corresponding In catch-basin, it is connected to catch-basin.
The diameter of Permeable blind pipe 7 can be 80mm.
The diameter for picking out pipe 8 can be 100mm.
In the present embodiment, the both ends in the pavement structure width direction of urban road are also provided with reinforcing body 9, two Reinforcing body 9 is symmetrical arranged, and cross sectional shape is right-angled trapezium, and upper surface 30mm of the upper bottom of right-angled trapezium apart from base 3, directly The trapezoidal bottom in angle is concordant with the lower surface of bed course 4, and the bevel edge of right-angled trapezium is towards the inside of the pavement structure of urban road.
Both ends in the pavement structure width direction of urban road are symmetrical arranged reinforcing body 9, are ensureing urban road While pavement structure lateral stability, it can ensure water in the pavement structure of urban road not horizontal infiltration.Reinforcing body 9 Cross sectional shape is right-angled trapezium, and upper surface 30mm of the upper bottom of right-angled trapezium apart from base 3, the bottom of right-angled trapezium and bed course 4 lower surface is concordant, and the bevel edge of right-angled trapezium is towards the inside of the pavement structure of urban road so that reinforcing body 9 is to city road The effect that the pavement structure on road is reinforced is even more ideal.
Specifically, reinforcing body 9 can be made of C15 concrete, bottom width can be 100mm thereon, and lower bottom width can be 200mm。
As shown in figure 4, in the present embodiment, water-permeable brick 100 may include porous base course 101 and be set to porous base course 101 On permeable surface layer 102, the rubble that porous base course 101 is matched by single-stage by binder bonding be made, permeable surface layer 102 is by centre Permeable surface layer middle layer 1021 and enclose set on permeable 1021 periphery of surface layer middle layer permeable surface layer peripheral tier 1022 composition, thoroughly Surface layer of water middle layer 1021 and permeable surface layer peripheral tier 1022 are made up of rubble of binder bonding.
The ballast grain sizes of porous base course 101 are more than the ballast grain sizes of permeable surface layer middle layer 1021, permeable surface layer middle layer 1021 ballast grain sizes are more than the ballast grain sizes of permeable surface layer peripheral tier 1022, and empty between the rubble of permeable surface layer peripheral tier 1022 Gap is not more than 0.5mm, and gap is not more than 1mm between the rubble of permeable surface layer middle layer 1021.
Porous base course 101 can enhance the integral strength of water-permeable brick 100, and durability is good;Due to the hole of porous base course 101 Rate is larger, can accelerate permeable speed, promotes water-holding capacity and backwater ability;Due to gap between the rubble of porous base course 101 Bigger than permeable surface layer 102,102 sand grains of permeable surface layer can be embedded in 101 gap of porous base course, it is ensured that permeable surface layer 102 when compacting With the bond integrity of porous base course 101.
Mainly realize that function is in permeable surface layer 102:It is permeable, due to micron order hole between sand grains, and and porous base course 101 porosity has differences, may be implemented filtering rainwater in impurity, the effect to purify water, can also realize water storage and The function of backwater;It is adjusted by natural sand different colours or toner, different pattern can be designed, colour-fast, non-discolouring, ecological beauty It sees.
The ballast grain sizes of permeable surface layer peripheral tier 1022 are smaller, had differences with the crushed stone material grain size of porous base course 101, Therefore, the rubble of permeable surface layer peripheral tier 1022 can be embedded in the gap of porous base course 101, it is ensured that permeable surface layer 102 when compacting With the bond integrity of porous base course 101, and 100 surface surrounding indent Forming Quality of water-permeable brick is ensured.
Permeable surface layer middle layer 1021 can increase by 100 Surface Anti-slide of water-permeable brick;More permeable surface layer peripheral tier 1022 Porosity bigger, can accelerate permeable speed, improve water-holding capacity and backwater ability.
The water-permeable brick 100 mentioned in this implementation includes but not limited to the water-permeable brick 100 of above structure, every to be set to On screed-coat 2, and the sundries in rainwater is intercepted, while structure permeable downwards can be as the water-permeable brick mentioned in this implementation 100。
The pavement structure of urban road provided in this embodiment has the characteristics that and advantageous effect:
1. permeable speed is fast, 0.22mm/s can be reached, be not easy to plug, and have the function of filtration, purification, the permeable time limit extends 3-5;
2. intensity is high, quality is good, and flexural strength can reach 5.5MPa, and compression strength reaches 45MPa;
3. skid resistance is good, surface has certain elasticity, improves walking comfort level, and the pendulum value that BPN portable pendulum testers measure is more than Standard value 60;
4. water conservation can reduce surface temperature, alleviate tropical island effect, average detemperature rate reaches 3-5 degrees Celsius;
5. having sqouynd absorption lowering noise effect, city noise pollution is reduced.
6. maintaining sponge urban construction is mating ooze, is stagnant, store, is net, use, function of drainage system, the feelings of repeated construction are avoided Condition reaches sponge urban construction requirement.
7. sexual valence is relatively high, the price reduction 30% or so compared with granite and ceramics mat formation brick.
Embodiment two
Urban road provided in this embodiment is provided with the pavement structure of the urban road of the offer of embodiment one.
Urban road provided in this embodiment is provided with the pavement structure of the urban road of the offer of embodiment one, the city road The pavement structure on road includes the face floor 1 from top to bottom set gradually, screed-coat 2, base 3, bed course 4 and soil matrix 5, wherein face layer 1 Include with the water-permeable brick 100 for intercepting sundries function, screed-coat 2 includes sand or permeable stiff in permeable dry cement stabilizing Property cement stabilizing coarse sand, base 3 include pervious concrete, bed course 4 be graded broken stone layer.It can by the water-permeable brick 100 of face layer 1 The sundries in rainwater is intercepted, can alleviate or even avoids using cement macrovoid porous pavement, the macropore that rainwater passes through road surface Gap and big piece penetrate into base 3, are susceptible to the problem of pavement structure blocks, are conducive to extend the permeable year of pavement structure Limit, reduces the renovation number of pavement structure, reduces the waste of resource.
Finally it should be noted that:The above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Present invention has been described in detail with reference to the aforementioned embodiments for pipe, it will be understood by those of ordinary skill in the art that:Its according to So can with technical scheme described in the above embodiments is modified, either to which part or all technical features into Row equivalent replacement;And these modifications or replacements, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (10)

1. a kind of pavement structure of urban road, which is characterized in that including face layer (1), the screed-coat from top to bottom set gradually (2), base (3), bed course (4) and soil matrix (5), wherein the face layer (1) includes with the water-permeable brick for intercepting sundries function (100), the screed-coat (2) includes sand or permeable dry cement stabilizing coarse sand in permeable dry cement stabilizing, described Base (3) includes pervious concrete, and the bed course (4) is graded broken stone layer.
2. the pavement structure of urban road according to claim 1, which is characterized in that the thickness of the water-permeable brick (100) Coefficient of permeability for 5cm to 7cm, the water-permeable brick (100) is more than or equal to 0.2mm/s.
3. the pavement structure of urban road according to claim 1, which is characterized in that the thickness of the screed-coat (2) is 3cm to 5cm.
4. the pavement structure of urban road according to claim 1, which is characterized in that the pervious concrete is that C25 is saturating The thickness of water coagulation soil, the base (3) is 14cm to 18cm, and the coefficient of permeability of the base (3) is more than or equal to 0.5mm/s.
5. the pavement structure of urban road according to claim 1, which is characterized in that the thickness of the bed course (4) is The voidage of 18cm to 22cm, the bed course (4) are 20%.
6. according to the pavement structure of claim 1-5 any one of them urban roads, which is characterized in that on the soil matrix (5) It is equipped with antiseepage film (6), the bed course (4) is set in the antiseepage film (6).
7. the pavement structure of urban road according to claim 6, which is characterized in that the bottom end of the bed course (4) is embedded There are Permeable blind pipe (7), the length direction of the Permeable blind pipe (7) and the width direction of the pavement structure of the urban road flat Row;
The both ends of the Permeable blind pipe (7), which are arranged with, picks out pipe (8), and the end of the Permeable blind pipe (7) passes through corresponding institute It states and picks out pipe (8) and be connected to corresponding catch-basin in the pavement structure of the urban road.
8. according to the pavement structure of claim 1-5 any one of them urban roads, which is characterized in that the urban road Pavement structure width direction on both ends be additionally provided with reinforcing body (9), two reinforcing bodies (9) are symmetrical arranged, section shape Shape is right-angled trapezium, and upper surface 30mm of the upper bottom of the right-angled trapezium apart from the base (3), the right-angled trapezium Bottom is concordant with the lower surface of the bed course (4), the pavement structure of the bevel edge of the right-angled trapezium towards the urban road It is internal.
9. according to the pavement structure of claim 1-5 any one of them urban roads, which is characterized in that the water-permeable brick (100) include porous base course (101) and the permeable surface layer (102) being set on the porous base course (101), the porous base course (101) rubble matched by single-stage is made up of binder bonding, and the permeable surface layer (102) is by intermediate permeable surface layer middle layer (1021) and enclose set on permeable surface layer middle layer (1021) periphery permeable surface layer peripheral tier (1022) composition, it is described permeable Surface layer middle layer (1021) and the permeable surface layer peripheral tier (1022) are made up of rubble of binder bonding;
The ballast grain sizes of the porous base course (101) are more than the ballast grain sizes of the permeable surface layer middle layer (1021), described The ballast grain sizes of surface layer of water middle layer (1021) are more than the ballast grain sizes of the permeable surface layer peripheral tier (1022), and described permeable Gap is not more than 0.5mm between the rubble of surface layer peripheral tier (1022), gap between the rubble of the permeable surface layer middle layer (1021) No more than 1mm.
10. a kind of urban road, which is characterized in that be provided with the road surface knot of claim 1-9 any one of them urban roads Structure.
CN201810585297.0A 2018-06-07 2018-06-07 The pavement structure and urban road of urban road Pending CN108517733A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810585297.0A CN108517733A (en) 2018-06-07 2018-06-07 The pavement structure and urban road of urban road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810585297.0A CN108517733A (en) 2018-06-07 2018-06-07 The pavement structure and urban road of urban road

Publications (1)

Publication Number Publication Date
CN108517733A true CN108517733A (en) 2018-09-11

Family

ID=63427291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810585297.0A Pending CN108517733A (en) 2018-06-07 2018-06-07 The pavement structure and urban road of urban road

Country Status (1)

Country Link
CN (1) CN108517733A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797623A (en) * 2019-01-28 2019-05-24 中国矿业大学 A kind of porous pavement and its construction method containing semi-rigid permeable bed course
CN110055861A (en) * 2019-05-15 2019-07-26 长江勘测规划设计研究有限责任公司 A kind of pavement permeable pavement structure of urban road reconstruction project
CN110853483A (en) * 2019-11-05 2020-02-28 西安科技大学 Sponge city infiltration road function demonstration model
CN110880270A (en) * 2019-11-05 2020-03-13 西安科技大学 Sponge city brick function demonstration model of mating formation that permeates water
CN111472230A (en) * 2020-04-21 2020-07-31 朱立明 Method for paving sponge landscape road
CN111560813A (en) * 2020-05-29 2020-08-21 中北大学 Concrete pavement slab system and pavement slab rainwater collection system permeate water
CN111593627A (en) * 2020-05-29 2020-08-28 中北大学 Permeable concrete brick pavement system based on solid waste material and paving method thereof
CN112064449A (en) * 2020-09-13 2020-12-11 武汉市汉阳市政建设集团有限公司 Ecological gallery sponge green channel circulating system and construction method thereof

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201485768U (en) * 2009-09-07 2010-05-26 北京仁创科技集团有限公司 Road drainage system
CN203593925U (en) * 2013-11-05 2014-05-14 湖南大学设计研究院有限公司 Dam-type pavement framework
CN104480829A (en) * 2014-11-13 2015-04-01 长安大学 Pavement structure internal draining system for eliminating road surface water seepage
CN204251985U (en) * 2014-11-16 2015-04-08 丁莉 A kind of platform of car jump between high road bed and bridge that prevents is carried on the back
CN204475100U (en) * 2015-02-13 2015-07-15 许勇 A kind of permeable urban road
CN205420946U (en) * 2016-03-01 2016-08-03 山东科技大学 Novel ecology that prevents surface gathered water road structure of permeating water
CN205653679U (en) * 2016-04-27 2016-10-19 贵州省交通规划勘察设计研究院股份有限公司 People moving walkways that permeates water structure of mating formation
CN205711619U (en) * 2016-02-05 2016-11-23 重庆路投科技有限公司 A kind of water-permeable brick
CN106567303A (en) * 2016-11-21 2017-04-19 康颖 Road bed structure of road
CN206800124U (en) * 2017-06-13 2017-12-26 重庆中设工程设计股份有限公司 High-performance permeable pavement paving structure
CN208293331U (en) * 2018-06-07 2018-12-28 招商局重庆交通科研设计院有限公司 The pavement structure and urban road of urban road

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201485768U (en) * 2009-09-07 2010-05-26 北京仁创科技集团有限公司 Road drainage system
CN203593925U (en) * 2013-11-05 2014-05-14 湖南大学设计研究院有限公司 Dam-type pavement framework
CN104480829A (en) * 2014-11-13 2015-04-01 长安大学 Pavement structure internal draining system for eliminating road surface water seepage
CN204251985U (en) * 2014-11-16 2015-04-08 丁莉 A kind of platform of car jump between high road bed and bridge that prevents is carried on the back
CN204475100U (en) * 2015-02-13 2015-07-15 许勇 A kind of permeable urban road
CN205711619U (en) * 2016-02-05 2016-11-23 重庆路投科技有限公司 A kind of water-permeable brick
CN205420946U (en) * 2016-03-01 2016-08-03 山东科技大学 Novel ecology that prevents surface gathered water road structure of permeating water
CN205653679U (en) * 2016-04-27 2016-10-19 贵州省交通规划勘察设计研究院股份有限公司 People moving walkways that permeates water structure of mating formation
CN106567303A (en) * 2016-11-21 2017-04-19 康颖 Road bed structure of road
CN206800124U (en) * 2017-06-13 2017-12-26 重庆中设工程设计股份有限公司 High-performance permeable pavement paving structure
CN208293331U (en) * 2018-06-07 2018-12-28 招商局重庆交通科研设计院有限公司 The pavement structure and urban road of urban road

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797623A (en) * 2019-01-28 2019-05-24 中国矿业大学 A kind of porous pavement and its construction method containing semi-rigid permeable bed course
CN110055861A (en) * 2019-05-15 2019-07-26 长江勘测规划设计研究有限责任公司 A kind of pavement permeable pavement structure of urban road reconstruction project
CN110853483A (en) * 2019-11-05 2020-02-28 西安科技大学 Sponge city infiltration road function demonstration model
CN110880270A (en) * 2019-11-05 2020-03-13 西安科技大学 Sponge city brick function demonstration model of mating formation that permeates water
CN111472230A (en) * 2020-04-21 2020-07-31 朱立明 Method for paving sponge landscape road
CN111560813A (en) * 2020-05-29 2020-08-21 中北大学 Concrete pavement slab system and pavement slab rainwater collection system permeate water
CN111593627A (en) * 2020-05-29 2020-08-28 中北大学 Permeable concrete brick pavement system based on solid waste material and paving method thereof
CN112064449A (en) * 2020-09-13 2020-12-11 武汉市汉阳市政建设集团有限公司 Ecological gallery sponge green channel circulating system and construction method thereof
CN112064449B (en) * 2020-09-13 2022-02-11 武汉市汉阳市政建设集团有限公司 Ecological gallery sponge green channel circulating system and construction method thereof

Similar Documents

Publication Publication Date Title
CN108517733A (en) The pavement structure and urban road of urban road
CN202031001U (en) Compound water-permeable road structure
CN209741599U (en) can improve road surface structure of basic unit intensity of permeating water
CN109371775B (en) Road traffic lane permeable pavement structure and paving method thereof
CN208857626U (en) A kind of permeable and water storage pavement structure
CN201620327U (en) Anti-block pervious concrete road surface brick
CN205368926U (en) Garden way supercrust structure that water permeability is strong
CN208293331U (en) The pavement structure and urban road of urban road
CN205975247U (en) What permeate water concrete prevents blocking structure
CN208685390U (en) Sponge city paved road structure
CN109487651A (en) Conducive to permeable city trees and shrubs road pavement structure
CN211256535U (en) A concrete road surface structure that permeates water for heavy-duty traffic
CN105421189B (en) Road structure with permeable barricade
CN210341528U (en) Gardens brick road surface structure that permeates water
CN105484125B (en) A kind of step of Collection utilization rainwater
CN203049399U (en) Water filter brick
CN106758651B (en) A kind of saturating drainage pavement structure of rigid-flexible composite
CN107881874A (en) A kind of ecological permeable concrete structure road surface with holes
CN211621043U (en) Ceramic thick plate permeable paving system
CN206090204U (en) Height ecological road surface structure of permeating water
CN210916845U (en) Cold region improved clay roadbed with water drainage structure added at edge of pavement cushion layer
CN205259025U (en) Road structure with barricade permeates water
CN107354843A (en) A kind of porous pavement and its laying method
CN109056455A (en) A kind of sponge urban construction permeable side walk slab and method for paving
CN207525570U (en) A kind of ecological permeable concrete structure road surface with holes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180911