CN107916935A - A kind of soil body composite reinforcing structure and construction method of the existing subway of weak soil shield crossing - Google Patents

A kind of soil body composite reinforcing structure and construction method of the existing subway of weak soil shield crossing Download PDF

Info

Publication number
CN107916935A
CN107916935A CN201711116073.7A CN201711116073A CN107916935A CN 107916935 A CN107916935 A CN 107916935A CN 201711116073 A CN201711116073 A CN 201711116073A CN 107916935 A CN107916935 A CN 107916935A
Authority
CN
China
Prior art keywords
pipe
steel pipe
boron steel
angle
jet grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711116073.7A
Other languages
Chinese (zh)
Other versions
CN107916935B (en
Inventor
丁智
费豪
张霄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University City College ZUCC
Original Assignee
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University City College ZUCC filed Critical Zhejiang University City College ZUCC
Priority to CN201711116073.7A priority Critical patent/CN107916935B/en
Publication of CN107916935A publication Critical patent/CN107916935A/en
Application granted granted Critical
Publication of CN107916935B publication Critical patent/CN107916935B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/003Linings or provisions thereon, specially adapted for traffic tunnels, e.g. with built-in cleaning devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention relates to a kind of soil body composite reinforcing structure of the existing subway of weak soil shield crossing, including:Shield tunnel contour line, angle adjustable pipe canopy and horizontal jet grouting stake;It is described that row's angle adjustable pipe canopy is equipped with the outside of shield tunnel contour line to be dug, the angle adjustable pipe canopy includes pipe boron steel pipe, horizontal jet grouting stake is equipped between the adjacent tubes boron steel pipe, the horizontal jet grouting stake is engaged and overlaps by angle adjustable pipe canopy parcel and with adjacent horizontal jet grouting stake;The horizontal jet grouting stake includes churning drilling rod and drilling rod overcoat, alternate connection between the pipe boron steel pipe and churning drilling rod.The beneficial effects of the invention are as follows:Angle adjustable pipe canopy and horizontal jet grouting is used in combination in the present invention, couple hardness with softness, use both hard and soft tactics, both the characteristics of respective has been given full play to, it can well cooperate again, achieve good integer support effect, soft clay area environment can be well adapted to, soil mass consolidation, can control the deformation of existing subway well.

Description

A kind of soil body composite reinforcing structure and construction method of the existing subway of weak soil shield crossing
Technical field
The present invention relates to the soil body composite consolidation construction field of the existing subway of Soft Soil Area shield crossing, and in particular to Soft Soil Area The soil body composite reinforcing structure and construction method of the existing subway of shield crossing.
Background technology
Continuous with urbanization process promotes, and Urban Underground track traffic seems ever more important, to build up completely Iron net, be just bound to crossing there is subway line.In subway tunnel shield construction, the existing fortune of shield driven tunnel crossing is created The situation for seeking subway tunnel is growing day by day.New built shield tunnel can produce the subway tunnel runed many adverse effects, all Such as Segment cracking, connector opens, bolt failure, the harm such as longitudinal differential settlement and horizontal displacement are excessive, particularly Soft Soil Area Existing tunnel is more easy to deform and segment damage, influences the comfort level of locomotive operation, flatness, and aggravation train is worn, seriously It will cause the major accidents such as locomotive derailing.So, it is necessary to be reinforced to the soil body in the range of existing operated subway before passing through Processing, strengthens the ability of existing subway resistance to deformation, ensures the normal operation of existing subway.
The content of the invention
The purpose of the present invention is overcome deficiency of the prior art, there is provided a kind of soil body of the existing subway of weak soil shield crossing Composite reinforcing structure and construction method.
It is a further object to provide a kind of soil body composite reinforcing structure of the existing subway of weak soil shield crossing.This The purpose of invention is achieved through the following technical solutions:
The soil body composite reinforcing structure of this existing subway of weak soil shield crossing, including:Shield tunnel contour line, adjustable angle Spend pipe canopy and horizontal jet grouting stake;It is described to be equipped with row's angle adjustable pipe canopy on the outside of shield tunnel contour line to be dug, it is described adjustable Angle pipe canopy includes pipe boron steel pipe, is equipped with horizontal jet grouting stake between the adjacent tubes boron steel pipe, the horizontal jet grouting stake will be adjustable Angle pipe canopy parcel and and adjacent horizontal jet grouting stake occlusion overlap joint;The horizontal jet grouting stake is included outside churning drilling rod and drilling rod Set, alternate connection between the pipe boron steel pipe and churning drilling rod, the pipe boron steel pipe outside are equipped with limit track, and the churning is bored Rod outer surface is equipped with drilling rod overcoat, and the limit track forms overall arch shell with drilling rod overcoat by spacing welding.
As preferred:The angle adjustable pipe canopy divides multiple segments from the front to the back along tunnel Longitudinal extending direction.
As preferred:The pipe boron steel pipe pricks seamless steel pipe using heat, and the equal preprocessing in pipe boron steel pipe both ends is into male thread.
As preferred:Make two tangent lines of existing subway tunnel, angle folded by two tangent lines by the center of circle of shield tunnel For α, the center of circle and 8 two edges angulation of angle adjustable pipe canopy by shield tunnel are β, the α of β=2.
A kind of construction method of the soil body composite reinforcing structure of the existing subway of weak soil shield crossing, comprises the following steps:
S1, screw conveyor angle adjustable pipe canopy vault supporting;
S1.1, set up drilling platform, horizontal jet grouting construction common platform;
S1.2, rigging up, after angle adjustable pipe roof construction, drilling machine continues horizontal jet grouting construction;
S1.3, the plain concrete barrier for abolishing face and stratum entrance:Face structural wall uses high speed water drilling By design position perforate, blowing angle is crept into according to angle adjustable pipe canopy design and construction angle;Opened using down-hole hammer along face Plain concrete barrier of the hole drill into broken formation entrance;
S1.4, penetrate screw conveyor drilling tool in the pipe boron steel pipe processed, pipe boron steel pipe both ends male and female screw thread, auger Have termination installation reaming auger wedging bit, drilling tool inside setting angle detection instrument;
S1.5, pipe boron steel tube top first check drilling machine mechanical condition and Instrument working state into preceding;When drilling machine applies brill in place, bore Machine is fixed with face;Pipe boron steel tube top measures pipe boron steel tube angulation change of burying into startup drilling machine rotation after soil layer;
S1.6, first pipe boron steel tube top rig down and angle adjustable pipe canopy connector after, original are retracted along guide rail Position, manually loads second pipe boron steel pipe, installs auger in pipe boron steel pipe, carry out button with first pipe boron steel pipe and connect into one Body, jacking rotation are unearthed;
S1.7, when pipe boron steel tube angulation occur inclination deviation when, start correction program, stop drilling tool rotation, by design side Method operates jacking tube boron steel pipe:Pipe boron steel pipe reduces pipe boron steel pipe inclination angle, adjusts the auger wedge-shaped drill brilliance downwards to the upper deviation Spend position;The downward deviation of pipe boron steel pipe, adjusts upward pipe boron steel pipe inclination angle, is adjusted up auger wedging bit angle position; Pipe boron steel pipe to the left and right deflection when, clapboard is adjusted into correction orientation with reference to inclination angle regulation method, jacking tube boron steel pipe entangled Inclined operation;
Pipe boron steel pipe in S1.8, construction must hole-specifically be numbered by root in a pre-installation, in order of numbers adapter jacking;
S1.9, angle adjustable tube shed grouting:Pipeline and mechanical condition are first checked before slip casting, mud jacking reality is done after confirming normally Test, determine rational grouting parameter;Check aperture, adjacent hole, the relatively thin position of coating whether there is grout leaking phenomenon during slip casting at any time; Slip casting process sends special messenger to be responsible for, the data such as record slip casting time, slurry consumption amount and grouting pressure;To pumping and managing after slip casting Road carries out borehole cleaning, completes the construction technology of angle adjustable pipe canopy;
S2, the improvement of horizontal jet grouting injection soil stabilization;
S2.1, installation churning drilling tool and limit track;
S2.2, drilling:Perforate, prepares loop slurry, and drilling is set;
S2.3, high-pressure rotary-spray:Check high-pressure injection pump, pump pressure starts to whitewash when reaching design requirement;Check and bore before whitewashing The leakproofness of equipment, pressurization are whitewashed after reaching design load;Special messenger's operation and observation pump pressure change are arranged in high-pressure mortar spraying;Drilling rod revolves It is sprayed onto design borehole bottom location and stops slip casting, and pipeline is rinsed well with clear-water high-pressure;
S2.4, sealing of hole:After whitewashing to design borehole bottom location, stop whitewashing, extract drilling rod and drill bit, using woven bag or Staple carries out port closing;
S2.5, Cleaning pipes and equipment, complete the construction technology of horizontal jet grouting.
The beneficial effects of the invention are as follows:Angle adjustable pipe canopy and horizontal jet grouting is used in combination in the present invention, couples hardness with softness, soft or hard It is simultaneous to apply, not only give full play to the characteristics of respective, but also can cooperate well, good integer support effect is achieved, can be very Good adaptation soft clay area environment, soil mass consolidation, can control the deformation of existing subway well.
Brief description of the drawings
Fig. 1 is screw conveyor angle adjustable pipe roof construction process flow chart;
Fig. 2 is horizontal jet grouting construction flow chart;
Fig. 3 is to wear Line 1 plan under No. 2 lines of Hangzhou Subway;
Fig. 4 is angle adjustable pipe roof construction layout drawing;
Fig. 5 is horizontal jet grouting stake and angle adjustable pipe canopy layout drawing;
Fig. 6 is steel pipe to wedging bit direction schematic diagram during the upper deviation;
Fig. 7 for steel pipe downward deviation when wedging bit direction schematic diagram;
Fig. 8 is wedging bit position view when steel pipe angle is normal;
Fig. 9 is horizontal jet grouting construction plan;
Description of reference numerals:No. 2 line downlinks 1 of Hangzhou Subway, No. 2 line uplinks 2 of Hangzhou Subway, Hangzhou Subway Line 1 Uplink 3, Hangzhou Subway Line 1 downlink 4, No. 2 Xian Fengqi way stations 5 of Hangzhou Subway, Hangzhou Subway Line 1 Feng Qi way stations 6, shield Structure tunnel contour line 7, angle adjustable pipe canopy 8, horizontal jet grouting stake 9, face 10, auger wedging bit 11, pipe boron steel pipe 12, Spacing welding 13, churning drilling rod 14, drilling rod overcoat 15, limit track 16.
Embodiment
The present invention is described further with reference to embodiment.The explanation of following embodiments is only intended to help and understands this Invention.It should be pointed out that for those skilled in the art, without departing from the principle of the present invention, also Some improvement and modification can be carried out to the present invention, these are improved and modification also falls into the protection domain of the claims in the present invention It is interior.
As shown in Figures 1 to 9, the soil body composite reinforcing structure of the existing subway of weak soil shield crossing can be effective The sedimentation and section of jurisdiction damage of existing subway are controlled, so that shield makes smooth advances.The soil of the existing subway of weak soil shield crossing Bluk recombination ruggedized construction includes:No. 2 No. 2 line downlinks 1 of Hangzhou Subway, Hangzhou Subway line uplinks 2, on Hangzhou Subway Line 1 Line 3, Hangzhou Subway Line 1 downlink 4, No. 2 Xian Fengqi way stations 5 of Hangzhou Subway, Hangzhou Subway Line 1 Feng Qi way stations 6, shield Tunnel contour line 7, angle adjustable pipe canopy 8, horizontal jet grouting stake 9, face 10, auger wedging bit 11, pipe boron steel pipe 12, limit Position welding 13, churning drilling rod 14, drilling rod overcoat 15 and limit track 16.
As shown in figure 3, No. 2 line downlinks 1 of Hangzhou Subway and Hangzhou at described No. 2 Xian Fengqi way stations 5 of Hangzhou Subway No. 2 line uplinks 2 of iron pass through the Hangzhou Subway Line 1 uplink 3 and Hangzhou Subway 1 at Hangzhou Subway Line 1 Feng Qi way stations 6 Line downlink 4.As shown in figure 4, in wearing existing subway tunnel Line 1 under new No. 2 lines of built shield tunnel, it is described in shield to be dug The outside of tunnel contour line 7 sets row's advance support angle adjustable pipe canopy 8, divides from the front to the back along tunnel Longitudinal extending direction multiple Segment carries out the shield crossing existing subway soil body 8 advance support of angle adjustable pipe canopy and constructs, the angle adjustable pipe of multiple segments 8 advanced supporting construction method all same of canopy.As shown in Fig. 5,9, the angle adjustable pipe canopy 8 includes pipe boron steel pipe 12, the phase Horizontal jet grouting stake 9 is equipped between adjacent pipe boron steel pipe 12, the horizontal jet grouting stake 9 wraps up angle adjustable pipe canopy 8 simultaneously and adjacent The occlusion overlap joint of horizontal jet grouting stake 9, forms the supporting construction with compared with high-mechanic and curtain partition effect, and common carrying is exterior negative Lotus.The spacing of adjacent level rotary churning pile 9 is 300mm, and adjacent level rotary churning pile 9 is mutually twisted 200mm, 9 diameter of horizontal jet grouting stake For 500mm, single construction length is 45m.As shown in figure 9, the horizontal jet grouting stake 9 includes churning drilling rod 14 and drilling rod overcoat 15, alternate connection between the pipe boron steel pipe 12 and churning drilling rod 14, the outside of pipe boron steel pipe 12 is equipped with limit track 16, institute State 14 outer surface of churning drilling rod and be equipped with drilling rod overcoat 15, the limit track 16 is formed with drilling rod overcoat 15 by spacing welding 13 Overall arch shell.The pipe boron steel pipe 12 pricks seamless steel pipe using heat, and outside diameter 159mm, wall thickness 8mm, often save length of steel pipe 6m, both ends Equal preprocessing is into male thread.The angle adjustable pipe canopy 8 and 9 collective effect soil mass consolidation of horizontal jet grouting stake, reach prevent it is existing Subway produces sedimentation or other purposes destroyed.
In the existing subway tunnel of Soft Soil Area shield driven tunnel crossing, the clear distance between two tunnel outer edges is less than (being equal to) The operating mode of 12m.The scope that the angle adjustable pipe canopy 8 is constructed is determined that clear distance is bigger by the clear distance between two tunnel outer edges, The scope constructed is smaller, and clear distance is smaller, and the scope constructed is bigger.As shown in Figure 4,5, made both by the center of circle of shield tunnel Have two tangent lines of subway tunnel, at an angle alpha, the field angle that the angle adjustable pipe canopy 8 is constructed is β to shape, make β= 2 α, β are exactly the working scope of the institute of angle adjustable pipe canopy 8.
Subway Line 1 section, which is worn, under the newly-built interim river way station of No. 2 lines one of Hangzhou Subway~Feng Qi way stations section shield uses " spiral shell Back-out Tu Dingxiangguanpeng is skeleton, the partition of horizontal jet grouting stake curtain parcel " technique, engineering construction is broadly divided into two parts:Spiral shell Screw out native pipe canopy vault supporting, the improvement of horizontal jet grouting injection soil stabilization.
(1) screw conveyor pipe canopy vault supporting
" screw conveyor oriented tube canopy " uses diameter 159mm pipe boron steels pipe 12 as outer tube, manages interior installation spiral drill, peace Pipe boron steel pipe 12 after dress measurement probe is buried with push pipe drilling machine jacking, while rotates clockwise spiral drill, will be entered in pipe The soil body crush conveying outlet pipe outside;When 12 angle of pipe boron steel pipe deflects, according to probe measurement and surface subsidence monitoring profit The clapboard installed with drilling tool end carries out angle modification.During angle adjustable pipe canopy 8 is constructed, setting for angle adjustable pipe canopy 8 will Carried out completely under the monitoring of guide instrument, and need to carry out optical measurement, ensure that angle adjustable pipe canopy 8 cannot invade lower section shield Structure and it is maintained in scope of design.The construction of horizontal jet grouting stake 9 need to carry out under the monitoring of guide instrument, it is ensured that certain is consistent Property so as to forming arch retaining structure.Installation LED measurement lamps in pipe canopy spiral drill, LED light is measured by theodolite from the mouth of pipe The absolute altitude and angle of point, coordinate probe apparatus measures data, the common track for calculating outlet pipe boron steel pipe 12.Pipe boron steel pipe 12 uses Heat pricks seamless steel pipe, and outside diameter 159mm, wall thickness 8mm, often save 12 length 6m of pipe boron steel pipe, the equal preprocessing in both ends is adjustable into male thread The circumferential spacing 350mm of angle pipe canopy 8, for arc to arrangement 25, single construction length is 45m, common 1260m.Outer limb 1.5%- 2%, measured using 0.1% precision probe, injecting paste material is P.O42.5 cement, the ratio of mud 0.8:1, grouting pressure for 0.5~ 1.0MPa.The grouting amount of single pipe boron steel pipe 12 is estimated as the following formula:Q=π Rk 2L η ξ, R in formulakFor grout spreading range, R is takenk= 1.2r, r are steel pipe radius;L grows for steel pipe;ξ takes 0.85, is slip casting repletion coefficient;η is voidage (%).
1. the construction point of angle adjustable pipe canopy 8:
(1) pipe boron steel pipe 12 does not set the small presbyopia of slip casting, and the injected hole that 4cm or so diameters are opened at every meter makees slip casting and water The relief hole of flat churning is used;
(2) hole construction is jumped at the interval of angle adjustable pipe canopy 8, avoids continuous construction disturbance scope excessive;
(3) 8 entrance of angle adjustable pipe canopy has included plain concrete construction because of stratum, first crushes pore-forming with down-hole hammer, complete Into rear feeding pipe boron steel pipe 12, using screw conveyor construction technology;
(4) the actual amount of being unearthed of pipe inside spin should be less than theoretical amount of being unearthed, and avoid unearthed excess from causing sedimentation;
(5) construction of angle adjustable pipe canopy 8 should be planned or be adjusted according to monitoring and measurement data, and no data is forbidden to construct.
2. screw conveyor pipe roof construction process flow chart is as shown in Figure 1, specific implementation is as follows:
(1) drilling platform, horizontal jet grouting construction common platform are set up;
(2) rigging up, after angle adjustable pipe canopy 8 is constructed, drilling machine continues horizontal jet grouting construction;
(3) the plain concrete barrier of face 10 and stratum entrance is abolished:
1. 10 structural wall of face presses design position perforate using high speed water drilling, bore dia 180mm, blowing angle is according to can The design and construction angle drilling of hue angle pipe canopy 8;
2. apart from face 10 to have plain concrete barrier in 6~10m stratum, using Φ 170mm down-hole hammers along area Face 10 perforate drilling is broken.
(4) Φ 138mm screw conveyor drilling tools are penetrated in the pipe boron steel pipe 12 processed, 12 both ends male and female silk of pipe boron steel pipe Button, spiral drill termination installation reaming wedging bit 11, drilling tool inside setting angle detection instrument;
(5) it is preceding before 12 jacking of pipe boron steel pipe first to check drilling machine mechanical condition and Instrument working state;
(6) when drilling machine applies brill in place, drilling machine is fixed with face 10, improves construction precision;12 jacking soil layer of pipe boron steel pipe Start drilling machine rotation after interior 1m, measure 12 angle change of pipe boron steel pipe of burying;
After (7) first 12 jackings of pipe boron steel pipe, rig down and 8 connector of angle adjustable pipe canopy, retracted along guide rail Original position, manually loads second pipe boron steel pipe 12, installs auger in pipe boron steel pipe 12, detained with first pipe boron steel pipe 12 Link into an integrated entity, jacking rotation is unearthed;
(8) when inclination deviation occurs for 12 angle of pipe boron steel pipe, when deviation exceedes design load ± 0.5%, startup correction journey Sequence, stops drilling tool rotation, by design method operation jacking tube boron steel pipe 12:
1. pipe boron steel pipe 12 to the upper deviation, it is necessary to reduce by 12 inclination angle of pipe boron steel pipe, adjusts downwards auger wedging bit 11 Angle position, the direction as shown in Fig. 6 wedging bits 11.
2. 12 downward deviation of pipe boron steel pipe, it is necessary to adjust upward 12 inclination angle of pipe boron steel pipe, is adjusted up auger wedge-shaped drill First 11 angle position, the direction as shown in Fig. 7 wedging bits 11.
3. pipe boron steel 12 angles of pipe are normal, without adjusting, as shown in Figure 8.
4. pipe boron steel pipe 12 to the left and right deflection when, with reference to inclination angle regulation method, clapboard is adjusted into correction orientation, jacking tube Boron steel pipe 12 carries out correction operation.
(9) the pipe boron steel pipe 12 in constructing must hole-specifically be numbered by root in a pre-installation, in order of numbers adapter jacking;
(10) 8 slip casting of angle adjustable pipe canopy:
1. first checking pipeline and mechanical condition before slip casting, mud jacking experiment is done after confirming normally, determines rational grouting parameter, Side can construct;
2. checking aperture, adjacent hole, the relatively thin position of coating whether there is grout leaking phenomenon during slip casting at any time, take add if necessary The rapid hardening measure such as waterglass;Pressure such as rise suddenly during slip casting, it may occur however that plugging, answers shutdown inspection;
3. grouting pressure reaches design pressure value;
4. slip casting process should send special messenger to be responsible for, the data such as slip casting time, slurry consumption amount and grouting pressure are recorded in detail;
5. after slip casting, borehole cleaning is carried out to pump and pipeline;
6. grouting sequence:From below to up, hole slip casting is jumped.
(2) horizontal jet grouting injection soil stabilization is improved
" partition of horizontal jet grouting stake curtain parcel " refers to the construction level rotary churning pile 9 between neighboring tunable angle pipe canopy 8, profit With the hyperpressure cutting and stirring of cement grout, the soil disturbance around angle adjustable pipe canopy 8 is consolidated, will after churning pile The parcel of angle adjustable pipe canopy 8 is simultaneously overlapped with adjacent horizontal jet grouting stake 9 occlusion, and being formed has compared with high-mechanic and curtain partition effect Supporting construction.The limit track that the construction of horizontal jet grouting stake 9 is arranged using the outside of pipe boron steel pipe 12 of existing angle adjustable pipe canopy 8 16 realize construction precision by spacing welding 13.Horizontal jet grouting stake 9 is arranged in the shield tunnel profile of 170mm on the outside of shield steel loop The upside of line 7,9 spacing of adjacent level rotary churning pile are 300mm, 9 a diameter of 500mm of horizontal jet grouting stake, and adjacent level rotary churning pile 9 is mutual 200mm is engaged, the single construction length of horizontal jet grouting stake 9 is 45m, and 9 cementing material of horizontal jet grouting stake selects P.O42.5 cement, water Gray scale is 1:1;The track of constructing of horizontal jet grouting stake 9 is identical with neighboring tunable angle pipe canopy 8, it is general require construction rotating speed be 5~ 15r/min, it is 15~25cm/min to return and pull out speed.
1. 9 technical requirements of horizontal jet grouting stake:
(1) horizontal jet grouting stake 9 takes alloy bit to coordinate circulation fluid drilling control silt loss, sets length and combines scene Actual conditions, which are taken, disposable sets that to complete predetermined stake long;
(2) level sets precision and is consistent by spacing and 8 track of angle adjustable pipe canopy on drill bit, according to tunnel Road angle and construction experience determine suitable limiting device by test pile construction;
(3) horizontal jet grouting stake 9 uses cement single slurry, and the control of the grouting serous fluid ratio of mud is 1:1;
(4) it is 3~5MPa into the pressure of the drill power, moving back the control of the pressure of the drill power need to control in 35MPa ± 5MPa, whitewashing and return slurry amount and arch Portion settles;Flow rate of grouting is 80L/min~90L/min;
(5) 9 position deviation of horizontal jet grouting stake is ± 50mm;Inclination angle is ± 1% with design error;
(6) length of horizontal jet grouting stake 9 is not less than designing pile length;28 days unconfined compressive strengths of soil cement induration are more than 3MPa, pile body is it is ensured that continuously, uniformly reach supporting effect;
(7) following record is done from drilling to pile to every horizontal jet grouting stake 9:Commencement date, the time of spudding in, at the end of Between, churning pressure, churning lifting speed, stake be long, grouting amount;
(8) pile body work progress is continuous, it is impossible to is interrupted, prevents broken pile, stub phenomenon.Such as because mechanical breakdown or its Its reason is shut down in 30~120min, should repeat churning 1m, more than 2 when small, by broken pile treatment, answer redrilling piling.
2. horizontal jet grouting construction flow chart is as shown in Fig. 2, specific implementation is as follows:
(1) churning drilling tool and limit track are installed;
(2) creep into:
1. perforate;
2. prepare loop slurry;
3. drilling is set.
(3) high-pressure rotary-spray:
1. checking high-pressure injection pump, pump pressure could start to whitewash when reaching design requirement;
2. checking the leakproofness of drilling machine tool before whitewashing, slowly pressurization stablizes whitewashing after reaching design load;
3. arranging special messenger's operation and observation pump pressure change in high-pressure mortar spraying, notice in time of pinpointing the problems solves;
4. drilling rod churning stops slip casting to borehole bottom location is designed, and rinses pipeline well with clear-water high-pressure;
5. in strict accordance with design requirement operation pressure and grout coordinate ratio.
(4) sealing of hole:
After whitewashing to design borehole bottom location, stop whitewashing, it is quick to extract drilling rod and drill bit, using woven bag or staple into Row port closing.
(5) Cleaning pipes and equipment.
Timely clear-water high-pressure flushing pipe and equipment after construction, after move to next position.

Claims (5)

  1. A kind of 1. soil body composite reinforcing structure of the existing subway of weak soil shield crossing, it is characterised in that including:Shield tunnel profile Line (7), angle adjustable pipe canopy (8) and horizontal jet grouting stake (9);It is described to be equipped with a row on the outside of shield tunnel contour line (7) to be dug Angle adjustable pipe canopy (8), the angle adjustable pipe canopy (8) include pipe boron steel pipe (12), between the adjacent tubes boron steel pipe (12) Equipped with horizontal jet grouting stake (9), the horizontal jet grouting stake (9) is by angle adjustable pipe canopy (8) parcel and and adjacent horizontal jet grouting stake (9) occlusion overlap joint;The horizontal jet grouting stake (9) includes churning drilling rod (14) and drilling rod overcoat (15), the pipe boron steel pipe (12) The alternate connection between churning drilling rod (14), pipe boron steel pipe (12) outside are equipped with limit track (16), the churning drilling rod (14) outer surface is equipped with drilling rod overcoat (15), and the limit track (16) is formed with drilling rod overcoat (15) by spacing welding (13) Overall arch shell.
  2. 2. the soil body composite reinforcing structure of the existing subway of weak soil shield crossing according to claim 1, it is characterised in that:Institute State angle adjustable pipe canopy (8) and divide multiple segments from the front to the back along tunnel Longitudinal extending direction.
  3. 3. the soil body composite reinforcing structure of the existing subway of weak soil shield crossing according to claim 1, it is characterised in that:Institute State pipe boron steel pipe (12) and prick seamless steel pipe using heat, the equal preprocessing in pipe boron steel pipe (12) both ends is into male thread.
  4. 4. the soil body composite reinforcing structure of the existing subway of weak soil shield crossing according to claim 1, it is characterised in that:It is logical Two tangent lines of existing subway tunnel are made in the center of circle for crossing shield tunnel, and angle is α folded by two tangent lines, passes through the circle of shield tunnel The heart and angle adjustable pipe canopy (8) two edges angulation are β, the α of β=2.
  5. 5. a kind of construction method of the soil body composite reinforcing structure of the existing subway of weak soil shield crossing as claimed in claim 1, It is characterised in that it includes following steps:
    S1, screw conveyor angle adjustable pipe canopy (8) vault supporting;
    S1.1, set up drilling platform, horizontal jet grouting construction common platform;
    S1.2, rigging up, after angle adjustable pipe canopy (8) is constructed, drilling machine continues horizontal jet grouting construction;
    S1.3, the plain concrete barrier for abolishing face (10) and stratum entrance:Face (10) structural wall is using at a high speed Water drilling presses design position perforate, and blowing angle is crept into according to angle adjustable pipe canopy (8) design and construction angle;Slapped using down-hole hammer edge The plain concrete barrier of sub- face (10) perforate drilling broken formation entrance;
    S1.4, penetrate screw conveyor drilling tool in the pipe boron steel pipe (12) processed, pipe boron steel pipe (12) both ends male and female screw thread, spiral shell Turning and drilling tool termination installation reaming auger wedging bit (11), drilling tool inside setting angle detection instrument;
    Drilling machine mechanical condition and Instrument working state are first checked before S1.5, pipe boron steel pipe (12) jacking;When drilling machine applies brill in place, bore Machine is fixed with face (10);Start drilling machine rotation after pipe boron steel pipe (12) jacking soil layer, measure pipe boron steel pipe (12) angle of burying Degree change;
    After S1.6, first pipe boron steel pipe (12) jacking, rig down and angle adjustable pipe canopy (8) connector, moved back along guide rail Original position is gone back to, manually loads second pipe boron steel pipe (12), the interior installation auger of pipe boron steel pipe (12), with first pipe boron steel pipe (12) carry out button to link into an integrated entity, jacking rotation is unearthed;
    S1.7, when pipe boron steel pipe (12) angle occur inclination deviation when, start correction program, stop drilling tool rotation, by design side Method operation jacking tube boron steel pipe (12):Pipe boron steel pipe (12) reduces pipe boron steel pipe (12) inclination angle, adjusts downwards spiral to the upper deviation Bore wedging bit (11) angle position;Pipe boron steel pipe (12) downward deviation, adjusts upward pipe boron steel pipe (12) inclination angle, is adjusted up Auger wedging bit (11) angle position;Pipe boron steel pipe (12) to the left and right deflection when, with reference to inclination angle regulation method by clapboard Adjustment correction orientation, jacking tube boron steel pipe (12) carry out correction operation;
    Pipe boron steel pipe (12) in S1.8, construction must hole-specifically be numbered by root in a pre-installation, in order of numbers adapter jacking;
    S1.9, angle adjustable pipe canopy (8) slip casting:Pipeline and mechanical condition are first checked before slip casting, mud jacking experiment is done after confirming normally, Determine rational grouting parameter;Check aperture, adjacent hole and the relatively thin position of coating whether there is grout leaking phenomenon during slip casting at any time;Note Slurry process sends special messenger to be responsible for, the data such as record slip casting time, slurry consumption amount and grouting pressure;To pump and pipeline after slip casting Borehole cleaning is carried out, completes the construction technology of angle adjustable pipe canopy (8);
    S2, the improvement of horizontal jet grouting injection soil stabilization;
    S2.1, installation churning drilling tool and limit track;
    S2.2, drilling:Perforate, prepares loop slurry, and drilling is set;
    S2.3, high-pressure rotary-spray:Check high-pressure injection pump, pump pressure starts to whitewash when reaching design requirement;Drilling machine tool is checked before whitewashing Leakproofness, pressurization reach design load after whitewash;Special messenger's operation and observation pump pressure change are arranged in high-pressure mortar spraying;Drilling rod churning is extremely Design borehole bottom location and stop slip casting, and pipeline is rinsed well with clear-water high-pressure;
    S2.4, sealing of hole:After whitewashing to design borehole bottom location, stop whitewashing, drilling rod and drill bit are extracted, using woven bag or staple Carry out port closing;
    S2.5, Cleaning pipes and equipment, complete the construction technology of horizontal jet grouting.
CN201711116073.7A 2017-11-13 2017-11-13 Soil body composite reinforcement structure for soft soil shield to penetrate existing subway and construction method Active CN107916935B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711116073.7A CN107916935B (en) 2017-11-13 2017-11-13 Soil body composite reinforcement structure for soft soil shield to penetrate existing subway and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711116073.7A CN107916935B (en) 2017-11-13 2017-11-13 Soil body composite reinforcement structure for soft soil shield to penetrate existing subway and construction method

Publications (2)

Publication Number Publication Date
CN107916935A true CN107916935A (en) 2018-04-17
CN107916935B CN107916935B (en) 2024-01-23

Family

ID=61895438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711116073.7A Active CN107916935B (en) 2017-11-13 2017-11-13 Soil body composite reinforcement structure for soft soil shield to penetrate existing subway and construction method

Country Status (1)

Country Link
CN (1) CN107916935B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678666A (en) * 2018-07-28 2018-10-19 徐工集团工程机械有限公司 A kind of multifunctional drill and pipe canopy mounting device
CN108952765A (en) * 2018-07-18 2018-12-07 中铁十二局集团第二工程有限公司 Construction method of the super steel tube shed in water-rich sand layer advance support
CN109538256A (en) * 2018-08-28 2019-03-29 北京瑞威世纪铁道工程有限公司 Tunnel pipe shed construction method and device
CN109723454A (en) * 2019-01-09 2019-05-07 中水电四局武汉轨道交通工程有限公司 A kind of bored tunnel advance support is with pipe canopy with the accurate drilling construction method of pipe
CN109723443A (en) * 2018-12-30 2019-05-07 中铁十四局集团有限公司 Method for tunnel construction
CN109869156A (en) * 2019-04-02 2019-06-11 北京首尔工程技术有限公司 The jacking tube row of the unearthed amount of control for the construction of pipe comb curtain and its jacking method
CN109869154A (en) * 2019-02-26 2019-06-11 朔黄铁路发展有限责任公司 Under wear existing railway technique and lower penetrating device
CN110578536A (en) * 2019-10-15 2019-12-17 中铁十二局集团有限公司 Excavation support reinforcing method for underground excavation section of subway to penetrate existing street crossing channel
CN111379571A (en) * 2018-12-30 2020-07-07 中铁十四局集团有限公司 Pipeline, pipe shed structure and pipe shed construction method with same
CN112857223A (en) * 2021-01-19 2021-05-28 吉力此且 Optical fiber gyroscope positioning device and method for subway pipe shed positioning measurement
CN113279693A (en) * 2021-05-09 2021-08-20 苏州中车建设工程有限公司 Structure for newly-built subway tunnel in soft soil area to traverse existing tunnel and construction method thereof
CN114780907A (en) * 2022-06-22 2022-07-22 中国铁路设计集团有限公司 Method for determining surface subsidence limit value of underground tunnel passing through road in subway section

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05112929A (en) * 1991-10-24 1993-05-07 Nippon Steel Corp Steel pipe pile column construction method
KR20070002328A (en) * 2005-06-30 2007-01-05 한미기초개발주식회사 Construction method of pipe roof structures
KR100825074B1 (en) * 2007-08-31 2008-04-24 윤인병 Pipe roof structures and construction method of piperoof structures
CN101215969A (en) * 2008-01-17 2008-07-09 上海交通大学 Large diameter tunneling close range down-traversing small diameter subway tunnel distortion control method
KR20090060608A (en) * 2007-12-10 2009-06-15 한미기초개발주식회사 Pipe roof structure and construction method thereof
CN202441393U (en) * 2012-02-10 2012-09-19 中南大学 Forepoling structure of horizontal rotary jet grouting and big pipe shed combined tunnel
CN202690065U (en) * 2012-05-25 2013-01-23 中铁四局集团有限公司 Reinforced structure formed by advanced treatment of weathering ball of impact drill in tunneling range of shield tunneling machine
CN204753606U (en) * 2015-07-06 2015-11-11 济南轨道交通集团有限公司 Modular curtain
CN205117357U (en) * 2015-11-21 2016-03-30 中铁二十局集团第二工程有限公司 Weak surrounding rock tunnel advance support structure based on self -drilling spiral pipe canopy
CN205172598U (en) * 2015-12-16 2016-04-20 海南大学 Pipe curtain spouts a supporting construction soon
CN205260041U (en) * 2015-12-26 2016-05-25 海南大学 Method of freezing supporting construction is spouted soon to level
WO2016095630A1 (en) * 2014-12-15 2016-06-23 中铁第四勘察设计院集团有限公司 Method for constructing extra-large variable cross section tunnel
CN105781573A (en) * 2016-03-18 2016-07-20 中铁九局集团第六工程有限公司 Railway down-traversing highway tunnel double-layer casing pipe reinforcement double-pipe shed follow-pipe drilling construction method
CN105781557A (en) * 2016-03-25 2016-07-20 广东水电二局股份有限公司 Method for constructing underground excavated tunnel by adopting chemical grouting for sand layer consolidation
CN105909259A (en) * 2016-06-12 2016-08-31 中铁十九局集团轨道交通工程有限公司 Pipe curtain construction settlement control system and method for close-range underpassing of existing shield tunnel
CN205936640U (en) * 2016-05-09 2017-02-08 铁道第三勘察设计院集团有限公司 Interior tub leading deep pre -reinforcing secant pile supporting construction in tunnel of canopy core that establishes
CN206158753U (en) * 2016-09-30 2017-05-10 中铁第一勘察设计院集团有限公司 Shield constructs well end bassoon canopy system of consolidating based on major structure
KR20170087786A (en) * 2016-01-21 2017-07-31 이평우 Reinforcement method of Tunnel
CN207620794U (en) * 2017-11-13 2018-07-17 浙江大学城市学院 The soil body composite reinforcing structure of the existing subway of weak soil shield crossing

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05112929A (en) * 1991-10-24 1993-05-07 Nippon Steel Corp Steel pipe pile column construction method
KR20070002328A (en) * 2005-06-30 2007-01-05 한미기초개발주식회사 Construction method of pipe roof structures
KR100825074B1 (en) * 2007-08-31 2008-04-24 윤인병 Pipe roof structures and construction method of piperoof structures
KR20090060608A (en) * 2007-12-10 2009-06-15 한미기초개발주식회사 Pipe roof structure and construction method thereof
CN101215969A (en) * 2008-01-17 2008-07-09 上海交通大学 Large diameter tunneling close range down-traversing small diameter subway tunnel distortion control method
CN202441393U (en) * 2012-02-10 2012-09-19 中南大学 Forepoling structure of horizontal rotary jet grouting and big pipe shed combined tunnel
CN202690065U (en) * 2012-05-25 2013-01-23 中铁四局集团有限公司 Reinforced structure formed by advanced treatment of weathering ball of impact drill in tunneling range of shield tunneling machine
WO2016095630A1 (en) * 2014-12-15 2016-06-23 中铁第四勘察设计院集团有限公司 Method for constructing extra-large variable cross section tunnel
CN204753606U (en) * 2015-07-06 2015-11-11 济南轨道交通集团有限公司 Modular curtain
CN205117357U (en) * 2015-11-21 2016-03-30 中铁二十局集团第二工程有限公司 Weak surrounding rock tunnel advance support structure based on self -drilling spiral pipe canopy
CN205172598U (en) * 2015-12-16 2016-04-20 海南大学 Pipe curtain spouts a supporting construction soon
CN205260041U (en) * 2015-12-26 2016-05-25 海南大学 Method of freezing supporting construction is spouted soon to level
KR20170087786A (en) * 2016-01-21 2017-07-31 이평우 Reinforcement method of Tunnel
CN105781573A (en) * 2016-03-18 2016-07-20 中铁九局集团第六工程有限公司 Railway down-traversing highway tunnel double-layer casing pipe reinforcement double-pipe shed follow-pipe drilling construction method
CN105781557A (en) * 2016-03-25 2016-07-20 广东水电二局股份有限公司 Method for constructing underground excavated tunnel by adopting chemical grouting for sand layer consolidation
CN205936640U (en) * 2016-05-09 2017-02-08 铁道第三勘察设计院集团有限公司 Interior tub leading deep pre -reinforcing secant pile supporting construction in tunnel of canopy core that establishes
CN105909259A (en) * 2016-06-12 2016-08-31 中铁十九局集团轨道交通工程有限公司 Pipe curtain construction settlement control system and method for close-range underpassing of existing shield tunnel
CN206158753U (en) * 2016-09-30 2017-05-10 中铁第一勘察设计院集团有限公司 Shield constructs well end bassoon canopy system of consolidating based on major structure
CN207620794U (en) * 2017-11-13 2018-07-17 浙江大学城市学院 The soil body composite reinforcing structure of the existing subway of weak soil shield crossing

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
中铁二局股份有限公司: "土木工程施工工艺.隧道及地铁工程", vol. 1, 北京:中国铁道出版社, pages: 177 - 184 *
刘斌: "软弱围岩隧道洞口段预加固技术研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》, vol. 1, no. 3, pages 177 - 184 *
李建平等: "长距离管棚加固技术在盾构下穿既有运营地铁线路中的应用", 施工技术, vol. 46, no. 1, pages 782 - 784 *
石钰锋等: "富水软弱地层隧道水平旋喷与大管棚预支护研究及应用", 岩土工程学报, vol. 37, no. 2, pages 101 - 106 *
陈伟庚: "富水软弱围岩铁路隧道预加固技术", 铁道建筑, no. 5, pages 104 - 106 *
马骏: "城市地铁硬岩隧道下穿既有隧道施工控制技术", 国防交通工程与技术, vol. 14, no. 1, pages 49 - 52 *

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108952765A (en) * 2018-07-18 2018-12-07 中铁十二局集团第二工程有限公司 Construction method of the super steel tube shed in water-rich sand layer advance support
CN108678666A (en) * 2018-07-28 2018-10-19 徐工集团工程机械有限公司 A kind of multifunctional drill and pipe canopy mounting device
CN108678666B (en) * 2018-07-28 2024-02-02 江苏徐工工程机械研究院有限公司 Multifunctional drilling machine and pipe shed mounting device
CN109538256A (en) * 2018-08-28 2019-03-29 北京瑞威世纪铁道工程有限公司 Tunnel pipe shed construction method and device
CN111379571A (en) * 2018-12-30 2020-07-07 中铁十四局集团有限公司 Pipeline, pipe shed structure and pipe shed construction method with same
CN109723443B (en) * 2018-12-30 2021-07-20 中铁十四局集团有限公司 Tunnel construction method
CN109723443A (en) * 2018-12-30 2019-05-07 中铁十四局集团有限公司 Method for tunnel construction
CN109723454A (en) * 2019-01-09 2019-05-07 中水电四局武汉轨道交通工程有限公司 A kind of bored tunnel advance support is with pipe canopy with the accurate drilling construction method of pipe
CN109869154A (en) * 2019-02-26 2019-06-11 朔黄铁路发展有限责任公司 Under wear existing railway technique and lower penetrating device
CN109869154B (en) * 2019-02-26 2020-08-11 朔黄铁路发展有限责任公司 Underpass device for existing railway
CN109869156A (en) * 2019-04-02 2019-06-11 北京首尔工程技术有限公司 The jacking tube row of the unearthed amount of control for the construction of pipe comb curtain and its jacking method
CN109869156B (en) * 2019-04-02 2024-04-26 北京首尔工程技术有限公司 Jacking pipe row for controlling soil discharge amount for pipe row pipe curtain construction and jacking method thereof
CN110578536A (en) * 2019-10-15 2019-12-17 中铁十二局集团有限公司 Excavation support reinforcing method for underground excavation section of subway to penetrate existing street crossing channel
CN112857223A (en) * 2021-01-19 2021-05-28 吉力此且 Optical fiber gyroscope positioning device and method for subway pipe shed positioning measurement
CN113279693A (en) * 2021-05-09 2021-08-20 苏州中车建设工程有限公司 Structure for newly-built subway tunnel in soft soil area to traverse existing tunnel and construction method thereof
CN113279693B (en) * 2021-05-09 2022-05-03 苏州中车建设工程有限公司 Structure for enabling newly built subway tunnel in soft soil body area to transversely penetrate existing tunnel and construction method of structure
CN114780907A (en) * 2022-06-22 2022-07-22 中国铁路设计集团有限公司 Method for determining surface subsidence limit value of underground tunnel passing through road in subway section
CN114780907B (en) * 2022-06-22 2022-09-02 中国铁路设计集团有限公司 Method for determining surface settlement limit value of underpass road of subway interval tunnel

Also Published As

Publication number Publication date
CN107916935B (en) 2024-01-23

Similar Documents

Publication Publication Date Title
CN107916935A (en) A kind of soil body composite reinforcing structure and construction method of the existing subway of weak soil shield crossing
CN101737060B (en) Beneath-soil through-tunnel superlarge diameter pipe curtain construction method
CN110056369B (en) Construction method for entrance and exit hole of tunnel
CN107642360A (en) Tunneling boring front pre-grouting construction method
CN109723443B (en) Tunnel construction method
CN103306687A (en) Construction method for deformation control via horizontal whirling jet grouting of long cantilever in soft-rock tunnel
CN110735653A (en) deep-hole retreating type grouting water plugging construction method for igneous rock water-rich fault
CN111075478A (en) Pre-grouting reinforcement process for ground construction of broken belt of excavation working face structure
WO2020259059A1 (en) Tbm parallel heading tunnel trunk construction method
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN108590706A (en) One kind being used for speciality single-track railway tunnel drifter with booms Construction Techniques of Grouting in Heavy Curtain
CN108265706A (en) Engineering pile in karst cave geology and pile forming process
CN110005439A (en) A kind of construction method in the nearly excessively leading tunnel of spacing of shield
WO2021082843A1 (en) Weak stratum-based reinforcement method for shield tunnel covered by shallow soil
CN108547644A (en) A kind of Tunnel Passing crushed zone canopy protection structure and method for protecting support
CN108952727B (en) A kind of grouting water blocking method of the vertical creviced formation of high inclination-angle
CN207620794U (en) The soil body composite reinforcing structure of the existing subway of weak soil shield crossing
CN107060779A (en) A kind of anti-cut construction method of narrow regions ultra-deep passage inclined shaft
CN109139018A (en) The method for tunnel construction and system that deep hole sleeve valve barrel grouting is combined with horizontal jet grouting
CN106758759B (en) A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN112012746A (en) Construction method of railway tunnel deep and large vertical shaft under condition of thick-layer water-rich broken zone
CN112942441B (en) Pre-grouting water-stopping construction method for water-rich powder sand stratum
CN103147435A (en) Method for treating construction engineering foundation in gob
CN114233374A (en) Ground grouting construction method for reinforcing collapsed cavity area of inclined shaft after mud burst and water burst
CN115387383B (en) Novel reinforcement treatment method for interlayer of subway station close to existing line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant