CN107314549A - Water heater and its control method and server - Google Patents

Water heater and its control method and server Download PDF

Info

Publication number
CN107314549A
CN107314549A CN201610265922.4A CN201610265922A CN107314549A CN 107314549 A CN107314549 A CN 107314549A CN 201610265922 A CN201610265922 A CN 201610265922A CN 107314549 A CN107314549 A CN 107314549A
Authority
CN
China
Prior art keywords
reservation
water heater
server
time
soaking time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610265922.4A
Other languages
Chinese (zh)
Inventor
冒鹏程
潘志伟
史卫超
刘润寰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BSH Electrical Appliances Jiangsu Co Ltd
BSH Home Appliances Co Ltd
BSH Hausgeraete GmbH
Original Assignee
BSH Electrical Appliances Jiangsu Co Ltd
BSH Bosch und Siemens Hausgeraete GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BSH Electrical Appliances Jiangsu Co Ltd, BSH Bosch und Siemens Hausgeraete GmbH filed Critical BSH Electrical Appliances Jiangsu Co Ltd
Priority to CN201610265922.4A priority Critical patent/CN107314549A/en
Publication of CN107314549A publication Critical patent/CN107314549A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/18Water-storage heaters
    • F24H1/20Water-storage heaters with immersed heating elements, e.g. electric elements or furnace tubes
    • F24H1/201Water-storage heaters with immersed heating elements, e.g. electric elements or furnace tubes using electric energy supply
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters
    • F24H9/2014Arrangement or mounting of control or safety devices for water heaters using electrical energy supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The invention discloses a kind of water heater and its control method and server, the control method is applied to server end, including:Obtain reservation informations all in a cycle that reservation apparatus is sent;Obtain the current work information of water heater;The operating schedule of water heater and corresponding work order are calculated according to reservation information and work information;Corresponding work order is sent to water heater according to operating schedule, so that water heater performs relevant work according to work order;When wherein reservation information and/or work information change, server obtains the information after changing and designated firing duration table and corresponding work order again in real time.Water heater in the prior art is solved by the present invention to undertake excessive evaluation work because of the book setting changes in demand of user and cause the problem of cost uprises and be complicated, evaluation work is completed by server, water heater only needs execute instruction, evaluation work need not be undertaken, hardware cost is reduced, structure is simplified.

Description

Water heater and its control method and server
【Technical field】
The present invention relates to equipment control field, more particularly to a kind of water heater and its control method and server.
【Background technology】
Water heater gives people life as daily household electrical appliance and brings facility, while people make to water heater Higher requirement is proposed with the intellectuality and hommization of comfortableness, the convenience of manipulation and control.In recent years Come, the reservation heating function and remote control and regulation function that water heater gradually develops are more and more diversified, such as in hot water Increase communication module, processor and memory cell on device to realize the intelligence control such as remote reserved to water heater System, facilitates the life of people.
But be due to user reservation set often change, the working condition of water heater also can be because of various shapes Condition is changed, therefore water heater is needed when such as multiple precontract tasks or precontract task change for execution Recalculate running parameter so that water heater assume responsibility for excessive evaluation work, this needs higher hardware Configuration and software go to support evaluation work, and this undoubtedly increases water heater cost and structure becomes complicated.
Excessive evaluation work is undertaken for water heater in the prior art because of the book setting changes in demand of user to lead The problem of cost uprises and be complicated is caused, more effective solution is not yet proposed at present.
【The content of the invention】
The present invention provides a kind of water heater and its control method and server, hot in the prior art at least to solve Hydrophone, which undertakes excessive evaluation work because of the book setting changes in demand of user, causes that cost is uprised and structure is multiple Miscellaneous the problem of.
In order to realize purpose, one aspect of the present invention is applied to there is provided a kind of control method of water heater Server end, the server is communicated to connect with the water heater and reservation apparatus, and wherein the server is Cloud Server, is connected by internet with water heater and reserved communication equipment, can control multiple water heater works Make.
The control method includes:Obtain reservation informations all in a cycle that the reservation apparatus is sent; Obtain the current work information of the water heater;Institute is calculated according to the reservation information and the work information State the operating schedule of water heater and corresponding work order;According to the operating schedule to the hot water Device sends corresponding work order, so that the water heater performs relevant work according to the work order;Its Described in reservation information and/or the work information when changing, the server is obtained after change in real time Information and recalculate the operating schedule and the corresponding work order.Connect by using server The reservation information of user and the work information of water heater are received, the optimization of water heater is calculated in server end Operating schedule and corresponding work order, work order is sent to hot water according to the time of operating schedule Device, water heater only needs to perform relevant work, such as heating and thermal insulation, without being counted again according to work order Calculate.When the work information of user's setting or water heater changes, server is after new information is obtained Operating schedule and corresponding work order will be recalculated, it is enterprising that all calculating tasks are all placed on server OK, water heater need to only receive and perform relevant work instruction, and this causes water heater need not be configured higher Hardware go support evaluation work.
Preferably, the reservation apparatus is the end communicated to connect respectively with the server and the water heater End.The reservation apparatus can be remote control or computer etc., also may be provided on water heater, be used as the one of water heater Part.
Preferably, the reservation apparatus is the mobile terminal being connected with the server communication.By mobile whole End, such as mobile phone, flat board realization communicate with being realized between server and water heater, can carry out reservation and set It is fixed, and various feedback of the information, such as water heater work condition state, recommendation information etc..
Preferably, the reservation information includes subscription time and reservation temperature;The work information includes current Heating power and current water temperature;The operating schedule includes preheating time, subscription time and soaking time; The work order includes the control parameter of control water heater working;Wherein, the server is in the pre-add The hot time sends the work order to the water heater when reaching, so that the water heater is in the reservation Between the current water temperature is heated to the reservation temperature when reaching.Preheating time is calculated by server, So that water heater is begun to warm up in preheating time, when reaching subscription time, water temperature reaches the reservation of user Temperature, is on the one hand avoided when subscription time is reached, the water temperature in water heater stills need heating and can be only achieved Temperature is preengage, period of reservation of number is saved.On the other hand, it also avoid heating water temperature too early, cause The waste of electric energy.
Preferably, the soaking time includes the first soaking time and the second soaking time;Wherein described first Soaking time is set as that the water heater is heated to keep the time of the reservation temperature after the reservation temperature; Second soaking time is set as that after first soaking time terminates the water heater enters holding state Time.Water heater is heated to after reservation is stable that temperature, time setting can be preengage with this in subscription time Such as one hour, operationally between in table, if it find that the interval between a upper reservation and next reservation surpasses Cross the first soaking time, can after the first soaking time terminates, into holding state, operationally between table The second soaking time of middle insertion setting is incubated.
Preferably, the setting value of first soaking time is 1 hour.
Preferably, the temperature of the holding state is set as 45 degrees Celsius.Design temperature can voluntarily be set, When user there are multiple book settings, 45 degrees Celsius are typically chosen as standby temperature.
Preferably, judge the preheating time of next reservation whether in upper one the first soaking time preengage Setting value in;When judged result is to be, when the preheating time of next reservation is reached, knot First soaking time of the upper reservation of Shu Suoshu;When judged result for it is no when, on described one reservation After first soaking time end of run, the second soaking time is set in the operating schedule, wherein described Second soaking time terminates before the preheating time of next reservation reaches.
Preferably, after reservation informations all in a cycle that reservation apparatus is sent are obtained, the service Behind the installation region of device identification water heater, the Weather information inquired about in a cycle in the installation region is simultaneously Propose that reservation suggestion feeds back to the reservation apparatus.Server can read the weather temperature in the setting cycle, Optimizing Suggestions can be provided during user's setting reservation or after reservation according to current weather conditions.
Another aspect of the present invention is set there is provided a kind of server, the server with water heater and reservation Standby communication connection, the server includes:First acquisition module, sends for obtaining the reservation apparatus All reservation informations in a cycle;Second acquisition module, the operating mode current for obtaining the water heater Information;Computing module, for calculating the water heater according to the reservation information and the work information Operating schedule and corresponding work order;Sending module, for according to the operating schedule to described Water heater sends corresponding work order, so that the water heater performs relevant work according to the work order; When wherein described reservation information and the work information change, the server is obtained after change in real time Information and recalculate the operating schedule and the corresponding work order.The server is by receiving The reservation information of user and the work information of water heater, calculate water heater optimization operating schedule with And corresponding work order, work order is sent to water heater according to the time of operating schedule, even if user When the work information of setting or water heater changes, server can still be obtained after new information and will counted again Operating schedule and corresponding work order are calculated, water heater only needs to perform relevant work according to work order, Heating and thermal insulation etc., without being calculated again, all calculating tasks are all placed on server and carried out.
Preferably, the reservation information includes subscription time and reservation temperature;The work information includes current Heating power and current water temperature;The operating schedule includes preheating time, subscription time and soaking time; The work order includes the control parameter of control water heater working;Wherein, the server is in preheating Between reach when send the work order to the water heater so that the water heater reaches in the subscription time The current water temperature is then heated to the reservation temperature.
Preferably, the soaking time includes the first soaking time and the second soaking time;Wherein described first Soaking time is set as that the water heater is heated to keep the time of the reservation temperature after the reservation temperature; Second soaking time is set as that after first soaking time terminates the water heater enters holding state Time.
Preferably, the setting value of first soaking time is 1 hour.
Preferably, the temperature of the holding state is set as 45 degrees Celsius.
Preferably, when above-mentioned server also includes judging unit, preheating for judging next reservation Between whether upper one reservation the first soaking time setting value in;When judged result is to be, described When the preheating time of next reservation is reached, terminate the first soaking time of a upper reservation;When sentencing When disconnected result is no, on described after first soaking time end of run of a reservation, in the work Between set the second soaking time in table, wherein preheating time of second soaking time in next reservation Reach preceding end.
Preferably, after reservation informations all in a cycle that reservation apparatus is sent are obtained, the clothes It is engaged in behind the installation region of device identification water heater, the Weather information inquired about in a cycle in the installation region And propose that reservation suggestion feeds back to the reservation apparatus.
Present invention also offers a kind of water heater, including:Communication module, for being set up with above-mentioned server Communication connection, sends the current work information of the water heater to the server, and receive the service The work order that device is sent;Control module, is connected with the communication module, for performing the work order.
By the present invention, solve solve in the prior art in the prior art water heater because the book setting of user is needed Ask and change and undertaking excessive evaluation work causes the problem of cost uprises and be complicated, by the pre- of water heater The information about set is put to be calculated and manages as a whole on the server, and server sets demand according to user and sent Operating instruction to water heater, water heater only needs execute instruction, without undertaking evaluation work, reduce hardware into This, simplifies structure.
【Brief description of the drawings】
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, The schematic description and description of the present invention is used to explain the present invention, does not constitute the improper limit to the present invention It is fixed.In the accompanying drawings:
Fig. 1 is the flow chart of water heater control method;
Fig. 2 is the schematic diagram of water heater control method;
Fig. 3 is the module diagram of server;
Fig. 4 is the preferred module schematic diagram of server;
Fig. 5 is the module diagram of water heater.
【Embodiment】
Describe the present invention in detail below with reference to accompanying drawing and in conjunction with the embodiments.It should be noted that not rushing In the case of prominent, the feature in embodiment and embodiment in the application can be mutually combined.
The embodiment provides a kind of control method of water heater, applied to server end, server with Water heater and reservation apparatus communication connection, the wherein server can be Cloud Server, pass through internet and heat Hydrophone and the connection of reserved communication equipment, can control multiple water heater workings.
Above-mentioned reservation apparatus is the terminal communicated to connect respectively with server and water heater.The reservation apparatus can be Remote control or computer etc., also may be provided on water heater, be used as a part for water heater.
Preferably, above-mentioned reservation apparatus is the mobile terminal being connected with server communication.By mobile terminal, Telecommunication such as is realized between mobile phone, flat board realization and server and water heater, reservation can be carried out and set It is fixed, and various feedback of the information, such as water heater work condition state, recommendation information etc..
Fig. 1 is the flow chart of water heater control method, and Fig. 2 is the schematic diagram of water heater control method, such as Fig. 1 With shown in Fig. 2, the control method includes:
Step S102, obtains reservation informations all in a cycle that reservation apparatus is sent;
Wherein, it is optimal using the time of one week as a cycle, after user can set according to daily demand, energy Enough realize that all reservations are automatic weekly to repeat.Preferably, institute in a cycle that reservation apparatus is sent is being obtained After some reservation informations, behind the installation region of server identification water heater, the week in inquiry installation region Weather information in phase simultaneously proposes that reservation suggestion feeds back to reservation apparatus.Server is by reading in the setting cycle Weather temperature, according to current weather conditions can provide optimization when user sets and preengage or after reservation It is recommended that.
Step S104, obtains the current work information of water heater;
Wherein, step S102 and step S104 order can be exchanged, and can also be operated simultaneously, step Between without continuous relationship.
Step S106, the operating schedule and correspondingly of water heater is calculated according to reservation information and work information Work order;
Step S108, sends corresponding work order, so that water heater root according to operating schedule to water heater Relevant work is performed according to work order;
When wherein reservation information and/or the work information change, server is obtained after change in real time Information simultaneously recalculates the operating schedule and corresponding work order.
The reservation information of user and the work information of water heater are received by using server, is calculated in server end Go out the operating schedule of the optimization of water heater and corresponding work order, according to the time of operating schedule Work order is sent to water heater, water heater is only needed to perform relevant work according to work order, and such as heating is protected Temperature etc., without being calculated again.
Specifically, above-mentioned reservation information includes subscription time and reservation temperature;Above-mentioned work information includes current Heating power and current water temperature;Above-mentioned operating schedule includes preheating time, subscription time and soaking time; Above-mentioned work order includes the control parameter of control water heater working;Wherein, server is arrived in preheating time Up to when send work order to the water heater so that water heater adds current water temperature when subscription time reaches Heat extremely reservation temperature.
For example, user is set as 7 points of all a whole night with water, 60 DEG C of water temperature, server operationally between in table Subscription time is set as at 7 points in afternoon, water temperature is 60 DEG C, and preheating time is calculated according to current power and be Thirty in the afternoon six.In the afternoon during six thirty, work order is issued water heater by server, and water heater is according to this Work order completes heating in 7 points of arrivals of subscription time, reaches 60 DEG C of the water temperature of user's setting.
Preheating time is calculated by server so that water heater is begun to warm up in preheating time, reached During subscription time, water temperature reaches the reservation temperature of user.On the one hand avoid when subscription time is reached, heat Water temperature in hydrophone stills need heating and can be only achieved reservation temperature, saves period of reservation of number.Another side Face, it also avoid heating water temperature too early, result in the waste of electric energy.
In addition, when the work information of user's setting or water heater changes, server is obtaining new letter Operating schedule and corresponding work order will be recalculated after breath.In such as above-mentioned example, original working time The preheating time of table be thirty in the afternoon six, but in the afternoon 6 when, the power of water heater changes, clothes Business device is got after the change information, recalculates operating schedule, drawing needs to heat in advance, and according to Preheating time in result of calculation operating schedule makes afternoon six point into 20 minutes.Therefore, all calculate is appointed Business can all be placed on server and carry out, and generate operating schedule, and water heater only need on time receive and perform phase Work order is answered, this causes water heater to be calculated, branch is gone without configuring higher software and hardware Hold calculating or store.
Preferably, soaking time includes the first soaking time and the second soaking time;Wherein the first soaking time It is set as that water heater is heated to preengage the time that reservation temperature is kept after temperature;Second soaking time is set as First soaking time terminates the time that rear water heater enters holding state.Water heater is heated to pre- in subscription time Temperature can be preengage with this after about stablizing.In general, the setting value of the first soaking time is 1 hour. Between operationally in table, if it find that the interval between a upper reservation and next reservation is more than the first insulation Time, can after the first soaking time terminates, into holding state, operationally between set second in table Soaking time is incubated.Design temperature can voluntarily be set, when user has multiple book settings, generally The temperature of holding state is set as 45 DEG C.
Further, judge the preheating time of next reservation whether when the first of upper one reservation is incubated Between setting value in;When judged result is to be, when the preheating time of next reservation is reached, terminate First soaking time of a upper reservation;When judged result is no, first in upper one reservation protects After warm time end of run, operationally between set the second soaking time in table, wherein the second soaking time exists The preheating time of next reservation reaches preceding end.
As described above, when the soaking time (such as 7 points to 8 points are the first soaking time) of upper one reservation Interval time between the preheating time (such as seven thirty) of next reservation was less than in 1 hour, then Seven thirty then, terminate the first soaking time of a upper reservation, notify water heater to perform next reservation Preheating.
When upper one reservation the first soaking time setting value of soaking time (such as 7 points to 8 points be) and Interval time between the preheating time (such as eight thirty) of next reservation was more than in 1 hour, then existed 8 points then, and the first soaking time of a upper reservation terminates, and increase setting second is incubated in operating schedule Time, water heater is notified to perform the second soaking time, until terminate during eight thirty, now next reservation Preheating time starts.
The embodiment of the present invention additionally provides a kind of server, corresponding with the control method in above-described embodiment, clothes Business device is communicated to connect with water heater and reservation apparatus, and wherein the server can be Cloud Server, pass through internet It is connected with water heater and reserved communication equipment, can control multiple water heater workings.
Above-mentioned reservation apparatus is the terminal communicated to connect respectively with server and water heater.The reservation apparatus can be Remote control or computer etc., may be provided on water heater, be used as a part for water heater.In addition, above-mentioned reservation Equipment can be the mobile terminal being connected with server communication.By mobile terminal, such as mobile phone, flat board are realized Telecommunication is realized between server and water heater, book setting can be carried out, and various information are anti- Feedback, such as water heater work condition state, recommendation information etc..
Fig. 3 is the module diagram of server, as shown in figure 3, the server includes:
All reservation informations in first acquisition module 10, a cycle for obtaining reservation apparatus transmission;
Second acquisition module 12, the work information current for obtaining water heater;
Computing module 14, for according to reservation information and work information calculate the operating schedule of water heater with And corresponding work order;
Sending module 16, for sending corresponding work order to water heater according to operating schedule, so that hot Hydrophone performs relevant work according to work order;
When wherein reservation information and work information change, server obtains the information after changing simultaneously in real time Recalculate the operating schedule and corresponding work order.
The server calculates water heater by receiving the reservation information of user and the work information of water heater The operating schedule of optimization and corresponding work order, send work according to the time of operating schedule and refer to Make to water heater, even if the work information of user's setting or water heater changes, server can still be obtained Operating schedule and corresponding work order will be recalculated by taking after new information, water heater is only needed to according to work Make instruction and perform relevant work, heating and thermal insulation etc., without being calculated again, all calculating tasks are all placed on Carried out on server.
Preferably, reservation information includes subscription time and reservation temperature;Work information includes current heating power And current water temperature;Operating schedule includes preheating time, subscription time and soaking time;Work order bag Include the control parameter of control water heater working;Wherein, server sends work when preheating time is reached and referred to Order is to the water heater, so that current water temperature is heated to preengaging temperature by water heater when subscription time reaches.
Preferably, soaking time includes the first soaking time and the second soaking time;Wherein described first insulation Time is set as that water heater is heated to preengage the time that reservation temperature is kept after temperature;Second soaking time is set For time of the water heater into holding state after the first soaking time terminates.
Preferably, the setting value of the first soaking time is 1 hour.
Preferably, the temperature of holding state is set as 45 degrees Celsius.
Preferably, Fig. 4 is the preferred module schematic diagram of server, as shown in figure 4, the meter in the server Calculating module 14 also includes:
Judging unit 140, for judging the preheating time of next reservation whether the first of upper one reservation In the setting value of soaking time;When judged result is to be, when the preheating time of next reservation is reached, Terminate the first soaking time of a upper reservation;When judged result is no, first in upper one reservation protects After warm time end of run, operationally between set the second soaking time in table, wherein the second soaking time exists The preheating time of next reservation reaches preceding end.
Preferably, above-mentioned server is obtaining reservation informations all in a cycle that reservation apparatus is sent Afterwards, server recognizes the installation region of water heater, the weather inquired about in a cycle in the installation region Information simultaneously proposes that reservation suggestion feeds back to the reservation apparatus.
Present invention also offers a kind of water heater, Fig. 5 is the module diagram of water heater, as shown in figure 5, The water heater applies above-mentioned control method and server, except with the basic of electric heater in the prior art Outside function, in addition to:Communication module 22, is communicated to connect for being set up with above-mentioned server, sends water heater Current work information is to server, and the work order that the reception server is sent;Control module 24, with Communication module is connected, for performing work order.
By the present invention, solve solve in the prior art in the prior art water heater because of the book setting of user Changes in demand and undertaking excessive evaluation work causes the problem of cost uprises and be complicated, by water heater The information of book setting is put to be calculated and manages as a whole on the server, and server sets demand according to user and sent out Send operating instruction to water heater, water heater only needs execute instruction, without undertaking evaluation work, reduce hardware Cost, simplifies structure.
Various embodiments described above and shown in the drawings are merely to illustrate the present invention, not originally The whole of invention.In the category of the basic fundamental thought of the present invention, the ordinary skill people of correlative technology field Member is for any type of change of the invention carried out within protection scope of the present invention.

Claims (17)

1. a kind of control method of water heater, applied to server, it is characterised in that the server and the heat Hydrophone and reservation apparatus communication connection, the control method include:
Obtain reservation informations all in a cycle that the reservation apparatus is sent;
Obtain the current work information of the water heater;
The operating schedule of the water heater is calculated and right according to the reservation information and the work information The work order answered;
Corresponding work order is sent to the water heater according to the operating schedule, so that the water heater Relevant work is performed according to the work order;
When wherein described reservation information and/or the work information change, the server is obtained in real time Information after change simultaneously recalculates the operating schedule and the corresponding work order.
2. control method as claimed in claim 1, it is characterised in that:
The reservation apparatus is the terminal communicated to connect respectively with the server and the water heater.
3. control method as claimed in claim 1, it is characterised in that:
The reservation apparatus is the mobile terminal being connected with the server communication.
4. control method as claimed in claim 1, it is characterised in that:
The reservation information includes subscription time and reservation temperature;
The work information includes current heating power and current water temperature;
The operating schedule includes preheating time, subscription time and soaking time;
The work order includes the control parameter of control water heater working;
Wherein, the server sends the work order when the preheating time is reached to the hot water Device, so that the current water temperature is heated to the reservation temperature by the water heater when the subscription time reaches Degree.
5. control method as claimed in claim 4, it is characterised in that:
The soaking time includes the first soaking time and the second soaking time;Wherein
First soaking time is set as that the water heater keeps the reservation after being heated to the reservation temperature The time of temperature;
Second soaking time is set as that after first soaking time terminates the water heater enters standby The time of state.
6. control method as claimed in claim 5, it is characterised in that:
The setting value of first soaking time is 1 hour.
7. control method as claimed in claim 5, it is characterised in that:
The temperature of the holding state is set as 45 degrees Celsius.
8. control method as claimed in claim 5, it is characterised in that also include:
Judge next reservation preheating time whether upper one reservation the first soaking time setting value It is interior;
When judged result is to be, when the preheating time of next reservation is reached, terminate on described First soaking time of one reservation;
When judged result is no, on described after first soaking time end of run of a reservation, in institute State and the second soaking time is set in operating schedule, wherein second soaking time is in the pre- of next reservation Heat time reaches preceding end.
9. control method as claimed in claim 1, it is characterised in that:
After reservation informations all in a cycle that reservation apparatus is sent are obtained, the server identification heat Behind the installation region of hydrophone, the Weather information inquired about in a cycle in the installation region simultaneously proposes reservation It is recommended that feeding back to the reservation apparatus.
10. a kind of server, it is characterised in that the server is communicated to connect with water heater and reservation apparatus, described Server includes:
First acquisition module, for obtaining reservation letters all in a cycle that the reservation apparatus is sent Breath;
Second acquisition module, the work information current for obtaining the water heater;
Computing module, the work for calculating the water heater according to the reservation information and the work information Make timetable and corresponding work order;
Sending module, for sending corresponding work order to the water heater according to the operating schedule, So that the water heater performs relevant work according to the work order;
When wherein described reservation information and the work information change, the server is obtained in real time to be changed Information after change simultaneously recalculates the operating schedule and the corresponding work order.
11. server as claimed in claim 10, it is characterised in that:
The reservation information includes subscription time and reservation temperature;
The work information includes current heating power and current water temperature;
The operating schedule includes preheating time, subscription time and soaking time;
The work order includes the control parameter of control water heater working;
Wherein, the server sends the work order when preheating time is reached to the water heater, So that the current water temperature is heated to the reservation temperature by the water heater when the subscription time reaches.
12. server as claimed in claim 11, it is characterised in that:
The soaking time includes the first soaking time and the second soaking time;Wherein
First soaking time is set as that the water heater keeps described pre- after being heated to the reservation temperature About time of temperature;
Second soaking time is set as that the water heater enters after first soaking time terminates and treated The time of machine state.
13. server as claimed in claim 12, it is characterised in that:
The setting value of first soaking time is 1 hour.
14. server as claimed in claim 12, it is characterised in that:
The temperature of the holding state is set as 45 degrees Celsius.
15. server as claimed in claim 12, it is characterised in that the computing module includes:
Judging unit, for judging the preheating time of next reservation whether the first of upper one reservation In the setting value of soaking time;
When judged result is to be, when the preheating time of next reservation is reached, terminate described First soaking time of a upper reservation;
When judged result is no, on described after first soaking time end of run of a reservation, The second soaking time is set in the operating schedule, wherein second soaking time is in next reservation Preheating time reaches preceding end.
16. server as claimed in claim 10, it is characterised in that:
After reservation informations all in a cycle that reservation apparatus is sent are obtained, the server identification The installation region of water heater, the Weather information inquired about in a cycle in the installation region simultaneously proposes reservation It is recommended that feeding back to the reservation apparatus.
17. a kind of water heater, it is characterised in that including:
Communication module, communicates for being set up with the server as described in any one of claim 10 to 16 Connection, sends the current work information of the water heater to the server, and receive the server The work order of transmission;
Control module, is connected with the communication module, for performing the work order.
CN201610265922.4A 2016-04-26 2016-04-26 Water heater and its control method and server Pending CN107314549A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610265922.4A CN107314549A (en) 2016-04-26 2016-04-26 Water heater and its control method and server

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610265922.4A CN107314549A (en) 2016-04-26 2016-04-26 Water heater and its control method and server

Publications (1)

Publication Number Publication Date
CN107314549A true CN107314549A (en) 2017-11-03

Family

ID=60184850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610265922.4A Pending CN107314549A (en) 2016-04-26 2016-04-26 Water heater and its control method and server

Country Status (1)

Country Link
CN (1) CN107314549A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109373600A (en) * 2018-10-15 2019-02-22 珠海格力电器股份有限公司 Water heater and control method thereof
CN113848740A (en) * 2021-09-26 2021-12-28 海信(广东)厨卫系统股份有限公司 Control method and device for household electrical appliance

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1979053A (en) * 2005-12-01 2007-06-13 祥霖卫浴股份有限公司 Electricity-saving control method and apparatus of electric water heater
CN101004290A (en) * 2006-01-16 2007-07-25 王焱 Energy saving controlling method for electric water heater, and electrically heating system
CN101900419A (en) * 2010-07-29 2010-12-01 宁波奥克斯空调有限公司 Controlling method of air-source water heater
JP2013221717A (en) * 2012-04-19 2013-10-28 Mitsubishi Electric Corp Heat pump water heater
US20140169773A1 (en) * 2012-12-17 2014-06-19 General Electric Company Method and system for operating a water heater appliance
CN104456966A (en) * 2014-11-04 2015-03-25 芜湖美的厨卫电器制造有限公司 Water heater system, water heater, control method of water heater, mobile terminal and server
CN104566998A (en) * 2014-12-23 2015-04-29 广东万和电气有限公司 Reservation control method of water heater, server and system
CN104896733A (en) * 2015-05-25 2015-09-09 广东美的暖通设备有限公司 Control method and device of heat pump water heater and heat pump water heater
CN105135686A (en) * 2015-08-31 2015-12-09 小米科技有限责任公司 Intelligent water heater controlling method and device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1979053A (en) * 2005-12-01 2007-06-13 祥霖卫浴股份有限公司 Electricity-saving control method and apparatus of electric water heater
CN101004290A (en) * 2006-01-16 2007-07-25 王焱 Energy saving controlling method for electric water heater, and electrically heating system
CN101900419A (en) * 2010-07-29 2010-12-01 宁波奥克斯空调有限公司 Controlling method of air-source water heater
JP2013221717A (en) * 2012-04-19 2013-10-28 Mitsubishi Electric Corp Heat pump water heater
US20140169773A1 (en) * 2012-12-17 2014-06-19 General Electric Company Method and system for operating a water heater appliance
CN104456966A (en) * 2014-11-04 2015-03-25 芜湖美的厨卫电器制造有限公司 Water heater system, water heater, control method of water heater, mobile terminal and server
CN104566998A (en) * 2014-12-23 2015-04-29 广东万和电气有限公司 Reservation control method of water heater, server and system
CN104896733A (en) * 2015-05-25 2015-09-09 广东美的暖通设备有限公司 Control method and device of heat pump water heater and heat pump water heater
CN105135686A (en) * 2015-08-31 2015-12-09 小米科技有限责任公司 Intelligent water heater controlling method and device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109373600A (en) * 2018-10-15 2019-02-22 珠海格力电器股份有限公司 Water heater and control method thereof
CN113848740A (en) * 2021-09-26 2021-12-28 海信(广东)厨卫系统股份有限公司 Control method and device for household electrical appliance

Similar Documents

Publication Publication Date Title
CN104566998B (en) A kind of reservation control method of water heater, server and system
CN103982982B (en) The control method of air-conditioner and air-conditioner
CN104456966A (en) Water heater system, water heater, control method of water heater, mobile terminal and server
CN104660714A (en) Remote control method, remote control device and remote control system of terminal equipment
CN104881014A (en) Control method and intelligent household control device
CN104991456A (en) Intelligent electrical appliance control method and device
CN107870571B (en) Method and device for controlling intelligent equipment and intelligent equipment
CN105959185A (en) Household equipment control method, household equipment control system, intelligent router and household equipment
CN104716750A (en) Low-energy-consumption wireless power supply method and relevant device and system
CN104990280A (en) Water heater control method and system based on user intelligent terminal positioning
EP3355439B1 (en) Power control apparatus, power control system, and power control method
CN104566997A (en) Status display method of water heater, server and system
EP2986021A1 (en) Control system, control device, information appliance, and control method
CN103676705B (en) A kind of remote power control method, system and remote control table
CN107314549A (en) Water heater and its control method and server
CN107369976A (en) Wireless network common nun management system and its control device
CN104146584A (en) Control method and system of cooker, cooker and terminal
CN105978761A (en) Smart home reservation adding method and device and terminal
CN106411671A (en) Peak valley power utilization oriented intelligent household electrical appliance control method and gateway
CN108449403A (en) A kind of charge control method
CN108259540A (en) A kind of control method and device
CN206864756U (en) Wireless network common nun management system and its control device
CN108758784A (en) A kind of control method of Electric heater Intelligent wireless network control system
JP4688649B2 (en) Water heater
JP6814975B2 (en) Control systems, control methods and programs

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171103