CN106555399A - A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement and its construction method - Google Patents

A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement and its construction method Download PDF

Info

Publication number
CN106555399A
CN106555399A CN201710058536.2A CN201710058536A CN106555399A CN 106555399 A CN106555399 A CN 106555399A CN 201710058536 A CN201710058536 A CN 201710058536A CN 106555399 A CN106555399 A CN 106555399A
Authority
CN
China
Prior art keywords
anchor rod
slip casting
steel pipe
carbonate rock
rock area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710058536.2A
Other languages
Chinese (zh)
Inventor
沈志平
张建磊
袁江文
孙洪
朱军
陈德茂
吴斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Zhengye Engineering & Investment Inc Ltd
Original Assignee
Guizhou Zhengye Engineering & Investment Inc Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Zhengye Engineering & Investment Inc Ltd filed Critical Guizhou Zhengye Engineering & Investment Inc Ltd
Priority to CN201710058536.2A priority Critical patent/CN106555399A/en
Publication of CN106555399A publication Critical patent/CN106555399A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/10Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
    • E02D31/12Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement and its construction method, including steel pipe and anti-float anchor rod, fix and extend in injected hole side by side by colligation with steel pipe for anti-float anchor rod, and steel pipe extend in injected hole and is provided with sieve aperture on one section.The present invention is tied up in fixed implantation bolt grouting hole by the steel pipe with sieve aperture and Pulling-Resistant Anchor Rod, draining pressure release is carried out by sieve aperture during slip casting, effectively reduce grouting pressure, reduce slip casting difficulty, slip casting is faster, especially secondary grouting effect more preferably, efficiently solves the problems, such as carbonate rock area as hydraulic pressure is high, anti-float anchor rod grouting difficulty, the present invention also have simple structure, low cost, it is easy to operate the characteristics of.

Description

A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement and its construction method
Technical field
The present invention relates to a kind of Pulling-Resistant Anchor Rod slip casting drainage arrangement of carbonate rock area in the case of having artesian head and Its construction method, belongs to bolt grouting technical field.
Background technology
In recent years, with the large-scale development of the underground space, increasing problem along with underground engineering development and Produce, wherein underground structure is because the example that water buoyancy is damaged is no lack of minority.Some engineerings in work progress, due to which The top number of plies is few, and dead load is often insufficiently resistant to the buoyancy of underground water generation, occurs in that basement bottom board is large-area and opens Split, heave;The underground structure of some engineerings integrally floats, and causes serious economic loss.Therefore, anti-floating problem one It is directly the problem of project planner's attention.
For the Anti-floating design of basement bottom board, in engineering, common method for designing has ballast method (as increased base plate thickness Or overlying soil thickness) anti-floating, uplift pile anti-floating, anti-float anchor rod anti-floating etc..When arranging anti-float anchor rod, anchor pole is by high pressure injection Slurry is fixed in basic following ground, is anchored in basis, and the withdrawal resistance under water buoyancy effect is provided to basement, anti-with other Floating measure is compared, fast because having the advantages that low cost, the strong adaptability to site soil layers, speed of application, anti-in basement at present It is widely used in float meter.However, in carbonate rock area, due to special karst landform, underground storage is big The underground water of amount, level of ground water are higher so that as hydraulic pressure is big when anti-float anchor rod slip casting is anchored, and slurries are not yet able to do in time solidification just Lifted by water pressure, it is final to increase the successful difficulty of slip casting, even result in slip casting failure.
The content of the invention
The technical problem to be solved in the present invention is:There is provided a kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement and its Construction method, solves the problems, such as carbonate rock area as hydraulic pressure is high, anti-float anchor rod grouting difficulty.
The technical scheme that the present invention takes is:A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement, including steel pipe With anti-float anchor rod, fix and extend in injected hole side by side by colligation with steel pipe for anti-float anchor rod, and steel pipe is extend into one section in injected hole On be provided with sieve aperture.
Preferably, above-mentioned outer diameter of steel pipes is 20-40 millimeters.
Preferably, above-mentioned sieve aperture spreads all over and stretches into one section of steel pipe pipe shaft of injected hole, screen-aperture 8-10 millimeters.
Preferably, above-mentioned sieve aperture is 300-600 millimeters along length of steel pipe direction pitch of holes.
Preferably, interlaced arrangement between above-mentioned sieve aperture tandem.
A kind of construction method of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement, the method are comprised the following steps:
Step one, after artesian water water level in foundation ditch is evacuated to below the bottom of hole, surveying and locating positions the position of injected hole, and performs Mark;
Step 2, is drilled to injected hole mark downward vertically using rig, is drilled into specified drilling depth;
Step 3, the good steel pipe of colligation side by side and anti-float anchor rod are put in injected hole;
Step 4, carries out high-pressure slip-casting to drilling.
Beneficial effects of the present invention:Compared with prior art, the present invention is tied up by the steel pipe with sieve aperture and Pulling-Resistant Anchor Rod In fixed implantation bolt grouting hole, draining pressure release is carried out by sieve aperture during slip casting, grouting pressure is effectively reduced, slip casting is reduced difficult Degree, faster, especially secondary grouting effect more preferably, efficiently solves carbonate rock area as hydraulic pressure is high, anti-float anchor rod for slip casting The problem of grouting difficulty, the present invention also have simple structure, low cost, it is easy to operate the characteristics of.
Description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the overlooking the structure diagram of Fig. 1;
Fig. 3 is the steel-tube construction schematic diagram of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment is described further to the present invention.
Embodiment 1:As shown in Figure 1-Figure 3, a kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement, including steel pipe 1 With anti-float anchor rod 2, fix and extend in injected hole 4 side by side by steel wire by colligation with steel pipe 1 for anti-float anchor rod 2, and steel pipe 1 extend into Sieve aperture 3 is provided with 4 interior one sections of injected hole.
Preferably, 1 external diameter of above-mentioned steel pipe be 20-40 millimeters, 2 a diameter of 28 millimeters of anti-float anchor rod, disclosure satisfy that pressure release will Ask.
Preferably, above-mentioned sieve aperture 3 spreads all over and stretches into 4 one sections of 1 pipe shafts of steel pipe of injected hole, 3 aperture 8-10 millimeters of sieve aperture, Neng Gouman Sufficient pressure release requires, and avoids grouting serous fluid that the problem that pressure release effect becomes is caused by sieve aperture.
Preferably, above-mentioned sieve aperture 3 is 300-600 millimeters along 1 length direction pitch of holes of steel pipe, disclosure satisfy that pressure release requirement.
Preferably, interlaced arrangement between 3 tandem of above-mentioned sieve aperture, pressure release effect are more preferable.
Embodiment 2:A kind of construction method of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement, the method includes following Step:
Step one, after artesian water water level 6 in foundation ditch is evacuated to below the bottom of hole, surveying and locating positions the position of injected hole 4, and makees It is good to mark;
Step 2, is drilled to 4 mark of injected hole downward vertically using rig, is drilled into designated depth, and aperture is 130mm;
Anti-float anchor rod 2 of 1 pipe of steel of the 25mm side by side of steel wire bundle with a diameter of 28 millimeters is put into injected hole 4 by step 3 It is interior;
Step 4, carries out high-pressure slip-casting to injected hole 4, after the completion of slip casting, does not extract steel pipe, be allowed to together with anti-float anchor rod into Anchor, resists withdrawal resistance jointly.
The above, the only specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, any Those familiar with the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all be contained Cover within protection scope of the present invention, therefore, protection scope of the present invention should be defined by the scope of the claims.

Claims (6)

1. a kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement, it is characterised in that:Including steel pipe(1)With anti-float anchor rod (2), anti-float anchor rod(2)With steel pipe(1)Colligation side by side is fixed and extend into injected hole(4)It is interior, steel pipe(1)It extend into injected hole (4)Sieve aperture is provided with interior one section(3).
2. a kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement according to claim 1, it is characterised in that:Steel pipe (1)External diameter is 20-40 millimeters.
3. a kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement according to claim 2, it is characterised in that:Sieve aperture (3)Spread all over and stretch into one section of steel pipe of injected hole(1)Pipe shaft, sieve aperture(3)Aperture 8-10 millimeters.
4. a kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement according to claim 1, it is characterised in that:Sieve aperture (3)Along steel pipe(1)Length direction pitch of holes is 300-600 millimeters.
5. a kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement according to claim 1, it is characterised in that:Sieve aperture (3)Interlaced arrangement between tandem.
6. the construction party according to a kind of arbitrary described carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement of claim 1-5 Method, it is characterised in that:The method is comprised the following steps:
Step one, after artesian water water level in foundation ditch is evacuated to below the bottom of hole, surveying and locating positions the position of injected hole, and performs Mark;
Step 2, is drilled to injected hole mark downward vertically using rig, is drilled into specified drilling depth;
Step 3, the good steel pipe of colligation side by side and anti-float anchor rod are put in injected hole;
Step 4, carries out high-pressure slip-casting to drilling.
CN201710058536.2A 2017-01-23 2017-01-23 A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement and its construction method Pending CN106555399A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710058536.2A CN106555399A (en) 2017-01-23 2017-01-23 A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710058536.2A CN106555399A (en) 2017-01-23 2017-01-23 A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement and its construction method

Publications (1)

Publication Number Publication Date
CN106555399A true CN106555399A (en) 2017-04-05

Family

ID=58446434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710058536.2A Pending CN106555399A (en) 2017-01-23 2017-01-23 A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement and its construction method

Country Status (1)

Country Link
CN (1) CN106555399A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930294A (en) * 2017-04-26 2017-07-07 辽宁有色基础工程公司 A kind of bedrock fracture artesian area grouting method
CN113445471A (en) * 2021-06-10 2021-09-28 中国水利水电第九工程局有限公司 Dam abutment waterproof curtain consolidation grouting construction process
CN114718643A (en) * 2022-05-10 2022-07-08 山东科技大学 Water diversion method for rock burst mine construction anchor cable grouting hole

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006074145A1 (en) * 2005-01-03 2006-07-13 Geoject, Inc. Grout injecting/structure anchoring system
CN201050062Y (en) * 2007-06-26 2008-04-23 北京建工一建工程建设有限公司 Sand bed soil reinforcing piece
CN201132957Y (en) * 2007-12-05 2008-10-15 中国水电顾问集团中南勘测设计研究院 Roof bolt
CN102660948A (en) * 2012-05-30 2012-09-12 甘肃省建设投资(控股)集团总公司 Steel tube locked anchor rod construction method
CN104805837A (en) * 2014-01-24 2015-07-29 河南理工大学 Tube seam grouting combined anchor rod body
CN206448270U (en) * 2017-01-23 2017-08-29 贵州正业工程技术投资有限公司 A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006074145A1 (en) * 2005-01-03 2006-07-13 Geoject, Inc. Grout injecting/structure anchoring system
CN201050062Y (en) * 2007-06-26 2008-04-23 北京建工一建工程建设有限公司 Sand bed soil reinforcing piece
CN201132957Y (en) * 2007-12-05 2008-10-15 中国水电顾问集团中南勘测设计研究院 Roof bolt
CN102660948A (en) * 2012-05-30 2012-09-12 甘肃省建设投资(控股)集团总公司 Steel tube locked anchor rod construction method
CN104805837A (en) * 2014-01-24 2015-07-29 河南理工大学 Tube seam grouting combined anchor rod body
CN206448270U (en) * 2017-01-23 2017-08-29 贵州正业工程技术投资有限公司 A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930294A (en) * 2017-04-26 2017-07-07 辽宁有色基础工程公司 A kind of bedrock fracture artesian area grouting method
CN113445471A (en) * 2021-06-10 2021-09-28 中国水利水电第九工程局有限公司 Dam abutment waterproof curtain consolidation grouting construction process
CN114718643A (en) * 2022-05-10 2022-07-08 山东科技大学 Water diversion method for rock burst mine construction anchor cable grouting hole
CN114718643B (en) * 2022-05-10 2022-11-04 山东科技大学 Water diversion method for rock burst mine construction anchor cable grouting hole

Similar Documents

Publication Publication Date Title
CN111827274B (en) High-strength grouting method for marine wind power weakly-weathered bedrock single-pile socketed foundation
CN101545462B (en) A steel-concrete combined weight type offshore wind fan foundation structure
CN204370469U (en) A kind of drilled pile long leg jacket offshore wind turbine foundation
CN104389318B (en) Reinforced concrete-steel structure hybrid gravity foundation for offshore wind power and construction method thereof
CN103510528A (en) Blind trench water discharging structure used for underground structure up-floating prevention
CN202039382U (en) Ribbing seabed suction anchor
CN104805854A (en) Method for constructing deep-water ultra-long steel plate pile cofferdam in tide environment
CN201713812U (en) Underwater drilling pile foundation protective cylinder
CN101539118B (en) Passive antiscour base of basic structure of gravity-type offshore wind turbine
CN105780806A (en) Offshore wind turbine foundation for long-leg jacket of drilling piles and construction method of offshore wind turbine foundation
CN102296629B (en) Tower-drum structure suitable for ocean engineering and installation method thereof
CN106555399A (en) A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement and its construction method
CN101701459B (en) Method for processing soft soil foundation of intertidal belt to form construction working face
CN103572770B (en) A kind of stake case hydraulic structures and construction method thereof
CN105862906A (en) Offshore wind power plant draught fan single pile foundation and construction method
CN206448270U (en) A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement
CN105569062A (en) Dewatering method implemented through permeation, weakening and emission reduction
CN201502065U (en) Anchor rod joint excavation compound basis
CN204282390U (en) For the steel concrete-steel structure mixing gravity type foundation of offshore wind farm
CN203977417U (en) Ribs built-in steel casing for a kind of pile of deep water pile foundation
CN102146669B (en) Movable/fixed man-made island cylindrical foundation
CN206015511U (en) One implant post steel pipe column
CN215367226U (en) Well draw reaming body expanding pile of solid reinforcing of back slip casting root
CN209144846U (en) A kind of ultra-deep foundation pit precipitation leakage-resistant device
CN210636421U (en) Underwater hollowing defect repairing device for navigation wall pile foundation of ship lock on gravel layer foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170405