CN106400782A - Construction method for construction of foundation pit support bored secant pile walls with rotary drilling rig - Google Patents
Construction method for construction of foundation pit support bored secant pile walls with rotary drilling rig Download PDFInfo
- Publication number
- CN106400782A CN106400782A CN201610483010.4A CN201610483010A CN106400782A CN 106400782 A CN106400782 A CN 106400782A CN 201610483010 A CN201610483010 A CN 201610483010A CN 106400782 A CN106400782 A CN 106400782A
- Authority
- CN
- China
- Prior art keywords
- stake
- construction
- concrete
- hole
- drilling rig
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/06—Placing concrete under water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610483010.4A CN106400782B (en) | 2016-06-28 | 2016-06-28 | A kind of construction method for going along with sb. to guard him hole-drilling interlocking pile using rotary drilling rig construction foundation pit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610483010.4A CN106400782B (en) | 2016-06-28 | 2016-06-28 | A kind of construction method for going along with sb. to guard him hole-drilling interlocking pile using rotary drilling rig construction foundation pit |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106400782A true CN106400782A (en) | 2017-02-15 |
CN106400782B CN106400782B (en) | 2019-01-04 |
Family
ID=58006813
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610483010.4A Active CN106400782B (en) | 2016-06-28 | 2016-06-28 | A kind of construction method for going along with sb. to guard him hole-drilling interlocking pile using rotary drilling rig construction foundation pit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106400782B (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107975027A (en) * | 2017-11-25 | 2018-05-01 | 北京建材地质工程有限公司 | The construction method that shield launching is reinforced with reaching end soil body |
CN107989032A (en) * | 2017-11-28 | 2018-05-04 | 深圳市工勘岩土技术有限公司 | A kind of construction method of punching interlocking pile |
CN108018849A (en) * | 2017-11-25 | 2018-05-11 | 北京建材地质工程有限公司 | A kind of shield launching and the construction method for reaching end soil body reinforcing |
CN108625369A (en) * | 2018-06-22 | 2018-10-09 | 中铁二局第工程有限公司 | The hard patterning method construction method of interlocking pile in karst area |
CN108797641A (en) * | 2018-07-20 | 2018-11-13 | 中铁十八局集团有限公司 | A kind of structure and its construction method of Underground Subway Station construction period full station sealing |
CN109083178A (en) * | 2018-07-24 | 2018-12-25 | 中交航局第三工程有限公司 | It is a kind of element interlocking pile at cut-pff wall water-stop curtain construction method |
CN109610524A (en) * | 2018-11-29 | 2019-04-12 | 北京地矿工程建设有限责任公司 | The detection of OPT interlocking pile and course control method for use |
CN109948285A (en) * | 2019-03-29 | 2019-06-28 | 贵州正业工程技术投资有限公司 | A kind of large size Karst depression ball crown type mechanism central excavation localization method |
CN110093934A (en) * | 2019-05-20 | 2019-08-06 | 中铁七局集团有限公司 | The nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile |
CN110306561A (en) * | 2019-07-05 | 2019-10-08 | 广州穗岩土木科技股份有限公司 | A kind of foundation pit hardness construction method of interlocking pile |
CN110512597A (en) * | 2019-07-26 | 2019-11-29 | 广东厚普建设工程有限公司 | A kind of rotary digging cast-in-place pile construction method |
CN111305229A (en) * | 2020-03-26 | 2020-06-19 | 中铁隧道集团二处有限公司 | Construction method for constructing sectionwise deep rock drilling secant pile |
CN113866277A (en) * | 2021-09-22 | 2021-12-31 | 合诚工程咨询集团股份有限公司 | Nondestructive testing method for pile forming quality of large-diameter secant pile |
CN114482861A (en) * | 2022-01-13 | 2022-05-13 | 中勘资源勘探科技股份有限公司 | Automatic deviation rectifying method for drill hole in deep hole drilling of coal field drilling |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000001849A (en) * | 1998-06-12 | 2000-01-07 | Geotop Corp | Cast-in-place knot pile |
CN101328712A (en) * | 2008-07-29 | 2008-12-24 | 上海市第二建筑有限公司 | Construction method of interlocking pile for soft soil and soil layer with obstacle |
CN103388333A (en) * | 2013-07-25 | 2013-11-13 | 中铁十六局集团有限公司 | Construction process for carrying out construction on interlocking pile by adopting rotary drilling rig and mud protection wall method |
CN104929136A (en) * | 2015-07-14 | 2015-09-23 | 上海市水利工程集团有限公司 | Urban complex underground obstacle working condition occlusive pile enclosure construction method |
-
2016
- 2016-06-28 CN CN201610483010.4A patent/CN106400782B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000001849A (en) * | 1998-06-12 | 2000-01-07 | Geotop Corp | Cast-in-place knot pile |
CN101328712A (en) * | 2008-07-29 | 2008-12-24 | 上海市第二建筑有限公司 | Construction method of interlocking pile for soft soil and soil layer with obstacle |
CN103388333A (en) * | 2013-07-25 | 2013-11-13 | 中铁十六局集团有限公司 | Construction process for carrying out construction on interlocking pile by adopting rotary drilling rig and mud protection wall method |
CN104929136A (en) * | 2015-07-14 | 2015-09-23 | 上海市水利工程集团有限公司 | Urban complex underground obstacle working condition occlusive pile enclosure construction method |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107975027A (en) * | 2017-11-25 | 2018-05-01 | 北京建材地质工程有限公司 | The construction method that shield launching is reinforced with reaching end soil body |
CN108018849A (en) * | 2017-11-25 | 2018-05-11 | 北京建材地质工程有限公司 | A kind of shield launching and the construction method for reaching end soil body reinforcing |
CN107989032A (en) * | 2017-11-28 | 2018-05-04 | 深圳市工勘岩土技术有限公司 | A kind of construction method of punching interlocking pile |
CN108625369A (en) * | 2018-06-22 | 2018-10-09 | 中铁二局第工程有限公司 | The hard patterning method construction method of interlocking pile in karst area |
CN108797641A (en) * | 2018-07-20 | 2018-11-13 | 中铁十八局集团有限公司 | A kind of structure and its construction method of Underground Subway Station construction period full station sealing |
CN109083178A (en) * | 2018-07-24 | 2018-12-25 | 中交航局第三工程有限公司 | It is a kind of element interlocking pile at cut-pff wall water-stop curtain construction method |
CN109610524A (en) * | 2018-11-29 | 2019-04-12 | 北京地矿工程建设有限责任公司 | The detection of OPT interlocking pile and course control method for use |
CN109948285A (en) * | 2019-03-29 | 2019-06-28 | 贵州正业工程技术投资有限公司 | A kind of large size Karst depression ball crown type mechanism central excavation localization method |
CN110093934A (en) * | 2019-05-20 | 2019-08-06 | 中铁七局集团有限公司 | The nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile |
CN110306561A (en) * | 2019-07-05 | 2019-10-08 | 广州穗岩土木科技股份有限公司 | A kind of foundation pit hardness construction method of interlocking pile |
CN110512597A (en) * | 2019-07-26 | 2019-11-29 | 广东厚普建设工程有限公司 | A kind of rotary digging cast-in-place pile construction method |
CN111305229A (en) * | 2020-03-26 | 2020-06-19 | 中铁隧道集团二处有限公司 | Construction method for constructing sectionwise deep rock drilling secant pile |
CN113866277A (en) * | 2021-09-22 | 2021-12-31 | 合诚工程咨询集团股份有限公司 | Nondestructive testing method for pile forming quality of large-diameter secant pile |
CN114482861A (en) * | 2022-01-13 | 2022-05-13 | 中勘资源勘探科技股份有限公司 | Automatic deviation rectifying method for drill hole in deep hole drilling of coal field drilling |
Also Published As
Publication number | Publication date |
---|---|
CN106400782B (en) | 2019-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106400782B (en) | A kind of construction method for going along with sb. to guard him hole-drilling interlocking pile using rotary drilling rig construction foundation pit | |
CN107246006B (en) | The pile-filling method of concrete-pile | |
CN103924586B (en) | Multi section drill grouting pile construction method | |
CN107524142A (en) | A kind of holing with slurry wall protection cast-in-place pile construction method | |
CN113445498A (en) | Construction process of karst hole pile foundation in complex geology | |
CN112392400B (en) | Hole forming construction process for slope protection pile in complex geological environment | |
CN106930276B (en) | The construction method of the deep hole blasting of rotary digging bored concrete pile and conduit rotary digging removing obstacles | |
CN107724383B (en) | Rotary digging cast-in-place pile construction method | |
CN103266599B (en) | The dry construction method of digging drilling pile of soil skerry ground churning driven | |
CN110939303B (en) | Semi-reverse construction method of cyclone pool | |
CN108589707A (en) | A kind of full-sleeve long screw auger and churning driven combined type construction | |
CN110629747A (en) | Full-casing full-rotation construction process for pile foundation under complex geological conditions | |
CN109385992B (en) | Construction method for forming hole in artificial stone-filling layer | |
CN111705786A (en) | Method for vertical combination construction of composite stratum underground continuous wall and cast-in-situ bored pile | |
CN110984133A (en) | Construction method for foundation of deep-water shallow-covering-layer trestle | |
CN113216832B (en) | Construction method for water milling and drilling of pile holes in karst areas | |
CN113089652A (en) | Occlusive pile construction method and reinforced structure | |
CN108179759A (en) | The underwater drill core slotting of driftway is without bottom sealing method | |
CN110847159A (en) | Construction process of in-hole mechanical pile for subway construction | |
CN109113055B (en) | The construction method of composite pile | |
CN209975535U (en) | Supporting-free double-layer arc-shaped drilling and pouring deep foundation pit retaining structure | |
CN113718798B (en) | Construction method for layered construction pore-forming of rock-socketed secant pile in riprap region near sea | |
CN206428718U (en) | Hydrology ultrasonic radar water-level gauge holder combination formula prefabricated section foundation structure | |
CN114232612A (en) | Cast-in-situ bored pile construction method for avoiding empty pile backfilling | |
CN116084388A (en) | Soft sea Liu Jiaohu sea filling geological support pile obstacle clearing and hole fixing structure and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Zhijun Inventor after: Cao Guangyun Inventor after: Kong Xiangyuan Inventor after: Yang Hongyan Inventor after: Luo Cangning Inventor after: Yi Dingda Inventor after: Xing Yonghui Inventor after: Zhang Wei Inventor after: Sun Chao Inventor after: Song Benle Inventor after: Peng Yanfeng Inventor after: Guo Xiaolong Inventor after: Ye Liang Inventor after: Wang Qiulin Inventor after: Dong Xiaolong Inventor after: Dong Jun Inventor after: Zhang Ronghua Inventor after: Lei Mingxing Inventor after: Duan Jiewen Inventor after: Yao Yuan Inventor before: Guo Xiaolong Inventor before: Gao Kun Inventor before: Shi Yong Inventor before: Cui Hailong Inventor before: Wu Kongyong Inventor before: Pi Zhongqiang Inventor before: Cai Xiao Inventor before: Peng Yanfeng Inventor before: Ye Liang Inventor before: Li Chengjiao Inventor before: Kong Xiangyuan Inventor before: Li Zhijun Inventor before: Luo Cangning Inventor before: Xing Yonghui Inventor before: Zhang Wei Inventor before: Sun Chao Inventor before: Liu Wei Inventor before: Yao Yiwen Inventor before: Shao Yang Inventor before: Dong Jun |
|
GR01 | Patent grant | ||
GR01 | Patent grant |