CN106400782A - Construction method for construction of foundation pit support bored secant pile walls with rotary drilling rig - Google Patents

Construction method for construction of foundation pit support bored secant pile walls with rotary drilling rig Download PDF

Info

Publication number
CN106400782A
CN106400782A CN201610483010.4A CN201610483010A CN106400782A CN 106400782 A CN106400782 A CN 106400782A CN 201610483010 A CN201610483010 A CN 201610483010A CN 106400782 A CN106400782 A CN 106400782A
Authority
CN
China
Prior art keywords
stake
construction
concrete
hole
drilling rig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610483010.4A
Other languages
Chinese (zh)
Other versions
CN106400782B (en
Inventor
郭小龙
李志军
邢永辉
张伟
孙超
刘卫
姚怡文
邵阳
董军
高昆
史勇
崔海龙
吴孔勇
邳仲强
蔡肖
彭炎锋
叶亮
李成娇
孔祥远
罗苍宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN201610483010.4A priority Critical patent/CN106400782B/en
Publication of CN106400782A publication Critical patent/CN106400782A/en
Application granted granted Critical
Publication of CN106400782B publication Critical patent/CN106400782B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/06Placing concrete under water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A construction method for construction of foundation pit support bored secant pile walls with a rotary drilling rig comprises the steps of preparation for construction, pile casing embedment, the drilling rig in position, mechanical bore forming, wall brushing, bore cleaning, reinforcement cage machining and hoisting, and concrete pouring. According to the construction method for construction of foundation pit support bored secant pile walls with a rotary drilling rig, all casing drill hole forming is adopted for the bored secant pile walls, and because advanced steel sleeves are used for wall protection all along in the construction process, no slurry is needed for wall protection, the cost of slurry making, using and waste slurry processing is saved, soil which is taken out is natural soil, and civilized construction on a construction site can be done well; and with the method, the construction cost can be reduced, the construction speed can be increased, and the quality of a supporting structure is guaranteed actually.

Description

A kind of construction method going along with sb. to guard him hole-drilling interlocking pile using rotary drilling rig construction foundation pit
Technical field
The present invention relates to a kind of construction method going along with sb. to guard him hole-drilling interlocking pile using rotary drilling rig construction foundation pit.
Background technology
Nanchang City Hong Gu tunnel east bank ring road next-door neighbour Jiangxi east embankment, embankment is Gravity Retaining Wall, and barricade bottom is jackstone stratum.Former foundation pit enclosure structure is SMW engineering method stake, and being affected mixing pile by barricade bottom jackstone cannot construct to rock stratum, and H profile steel cannot be inserted into designed elevation, and foundation pit enclosure structure cannot meet sealing and stress problem.
Content of the invention
The purpose of the present invention is to provide a kind of construction method going along with sb. to guard him hole-drilling interlocking pile using rotary drilling rig construction foundation pit for prior art is not enough with being actually needed.
Construction method technical scheme of the present invention is:
Ring road foundation pit enclosure φ 850@600mmSMW engineering method stake is improved to the hole-drilling interlocking pile of diameter 1000mm, it is A type stake and two sequence stake Type B stakes that described hole-drilling interlocking pile is divided into a sequence stake, and a sequence stake and two sequence stake elevation of bottoms are with SMW engineering method stake elevation of bottom;The concrete of two sequence stakes merges in embedded interlocking pattern and forms continuous, an overall piling structure;One sequence stake is A type stake pile spacing 1500mm, makees plain stake using underwater casting plastic concrete;Two sequence stakes are Type B stake is the deposited reinforced concrete pile of C30P8 boring under water, is engaged 250mm, pile spacing 1500mm with a sequence stake, steel reinforcement cage elevation of bottom is with SMW engineering method stake H profile steel elevation of bottom.
Described construction method step is:
(1)Preparation of construction
According to stake bit plan and live datum mark, measuring stake position squeeze into visible marking it is ensured that stake position unwrapping wire is accurate at the construction field (site), and datum mark is protected;
(2)Embedded casing
Casing internal diameter 0.2m bigger than bore diameter, excavates stake holes to casing bottom, according to stake holes centralized positioning casing, 1.5m below the bottom water level located underground of casing, casing rises out level of ground water 1.5m~2.0m, and casing memory storage mud exceeds more than level of ground water 0.5m;
(3)Rig is in place
When rotary drilling rig is in place, held stationary, not run-off the straight displacement, for accurate keyhole depth, in frame or on machine pipe, make the scale of control, to be observed in construction, to record.
(4)Mechanical hole building
Proportion and the sand factor of slurry coat method is controlled during rotary drilling rig pore-forming, prevent undergauge or collapse hole during drilling, the dregs of rotary drilling rig pore-forming is transported to interim spoir hole using short car of refuting, occlusion pile driving construction is constructed using jumping stake method, every 9 piles are a construction circulation, first construction A type stake is plastic concrete element stake, and constructing when A type stake was through initial set in 7~9 hours, to close on Type B stake be reinforced concrete pile again;
(5)Brush wall, borehole cleaning
Cut a sequence stake plastic concrete during rotary drilling rig construction two sequence stake, cause seam percolating water to prevent mud skin to be attached to cutting face, carry out brush wall using crane suspention drilled pile brush wall device, after the completion of brush wall, carry out borehole cleaning;
After getting into desired depth, change slurry using sand suction pump borehole cleaning, control 1.15 about away from the mud balance at bottom hole 0.5m, for the sandy soils that soil property is poor, after borehole cleaning, the proportion of hole bottom slurry is 1.15~1.20, bottom hole sediment thickness after borehole cleaning is not more than 50mm, repetition measurement sediment thickness before pouring underwater concrete, and sediment exceedes during regulation borehole cleaning again;
(6)Steel reinforcement cage processing and lifting
Steel reinforcement cage machine qualified by inspection after, using whole of crane or segmental hoisting steel reinforcement cage to stake holes;
(7)Concreting
Concreting adopts tremie method concrete placed under water, timely measured hole inner concrete face height, carries out lifting and the dismounting of conduit, the buried depth controlling conduit is in 2~6m.
A)Plastic concrete pours
Plastic concrete before use, checks whether its slump and impression quality meet the requirements, and per car concrete all takes one group of test specimen, monitors its Slow setting time and slump-loss situation, till the B stake of this both sides is fully completed;
B)Normal concrete pours
Concrete surface close to steel reinforcement cage bottom when rate of flooding suitably slow down, after concrete enters steel reinforcement cage bottom 2~3m, conduit lifting is slow, steadily, it is to avoid excessive or hook strip steel reinforcement cage is impacted in discharging, in case rising of steel cage.
Beneficial effects of the present invention:Hole-drilling interlocking pile adopts all casing drill pore-forming, in work progress, has advanced steel thimble retaining wall all the time, so without mud off, thus having saved the expense that mud making, use and useless slurry are processed, the soil of taking-up is original soil, is conducive to doing well the civilized construction in building site;The method can reduce construction costs, improves speed of application, conscientiously ensures supporting construction quality.
Brief description:
Fig. 1 is the step schematic diagram of construction method of the present invention;
In figure:A is plastic concrete element stake for A type stake;B is reinforced concrete pile for Type B stake.
Specific embodiment
According to Fig. 1, it is engaged pile driving construction using jumping the construction of stake method, every 9 piles are a construction circulation, A type stake of first constructing(Plastic concrete element stake), when A type stake initial set(About 7~9 hours)Construct again and close on Type B stake(Reinforced concrete pile), sequence of construction:A1→A3→A5→A2→A4→B1→B2→B3→B4.
Construction method step of the present invention is:
(1)Preparation of construction
According to stake bit plan and live datum mark, measuring stake position squeeze into visible marking it is ensured that stake position unwrapping wire is accurate at the construction field (site), and datum mark is protected;
(2)Embedded casing
Casing internal diameter 0.2m bigger than bore diameter, excavates stake holes to casing bottom, according to stake holes centralized positioning casing, 1.5m below the bottom water level located underground of casing, casing rises out level of ground water 1.5m~2.0m, and casing memory storage mud exceeds more than level of ground water 0.5m;
(3)Rig is in place
When rotary drilling rig is in place, held stationary, not run-off the straight displacement, for accurate keyhole depth, in frame or on machine pipe, make the scale of control, to be observed in construction, to record.
(4)Mechanical hole building
Proportion and the sand factor of slurry coat method is controlled during rotary drilling rig pore-forming, prevent undergauge or collapse hole during drilling, the dregs of rotary drilling rig pore-forming is transported to interim spoir hole using short car of refuting, occlusion pile driving construction is constructed using jumping stake method, every 9 piles are a construction circulation, first construction A type stake is plastic concrete element stake, and constructing when A type stake was through initial set in 7~9 hours, to close on Type B stake be reinforced concrete pile again;
(5)Brush wall, borehole cleaning
Cut a sequence stake plastic concrete during rotary drilling rig construction two sequence stake, cause seam percolating water to prevent mud skin to be attached to cutting face, carry out brush wall using crane suspention drilled pile brush wall device, after the completion of brush wall, carry out borehole cleaning;
After getting into desired depth, change slurry using sand suction pump borehole cleaning, control 1.15 about away from the mud balance at bottom hole 0.5m, for the sandy soils that soil property is poor, after borehole cleaning, the proportion of hole bottom slurry is 1.15~1.20, bottom hole sediment thickness after borehole cleaning is not more than 50mm, repetition measurement sediment thickness before pouring underwater concrete, and sediment exceedes during regulation borehole cleaning again;
(6)Steel reinforcement cage processing and lifting
Steel reinforcement cage machine qualified by inspection after, using whole of crane or segmental hoisting steel reinforcement cage to stake holes;
(7)Concreting
Concreting adopts tremie method concrete placed under water, timely measured hole inner concrete face height, carries out lifting and the dismounting of conduit, the buried depth controlling conduit is in 2~6m.
A)Plastic concrete pours
Plastic concrete before use, checks whether its slump and impression quality meet the requirements, and per car concrete all takes one group of test specimen, monitors its Slow setting time and slump-loss situation, till the B stake of this both sides is fully completed;
B)Normal concrete pours
Concrete surface close to steel reinforcement cage bottom when rate of flooding suitably slow down, after concrete enters steel reinforcement cage bottom 2~3m, conduit lifting is slow, steadily, it is to avoid excessive or hook strip steel reinforcement cage is impacted in discharging, in case rising of steel cage.

Claims (1)

1. a kind of construction method being gone along with sb. to guard him hole-drilling interlocking pile using rotary drilling rig construction foundation pit, be is characterized in that:
Ring road foundation pit enclosure φ 850@600mmSMW engineering method stake is improved to the hole-drilling interlocking pile of diameter 1000mm, it is A type stake and two sequence stake Type B stakes that described hole-drilling interlocking pile is divided into a sequence stake, and a sequence stake and two sequence stake elevation of bottoms are with SMW engineering method stake elevation of bottom;The concrete of two sequence stakes merges in embedded interlocking pattern and forms continuous, an overall piling structure;One sequence stake is A type stake pile spacing 1500mm, makees plain stake using underwater casting plastic concrete;Two sequence stakes are Type B stake is the deposited reinforced concrete pile of C30P8 boring under water, is engaged 250mm, pile spacing 1500mm with a sequence stake, steel reinforcement cage elevation of bottom is with SMW engineering method stake H profile steel elevation of bottom;
Described construction method step is:
(1)Preparation of construction
According to stake bit plan and live datum mark, measuring stake position squeeze into visible marking at the construction field (site), make stake position unwrapping wire accurately, and datum mark is protected;
(2)Embedded casing
Casing internal diameter 0.2m bigger than bore diameter, excavates stake holes to casing bottom, according to stake holes centralized positioning casing, 1.5m below the bottom water level located underground of casing, casing rises out level of ground water 1.5m~2.0m, and casing memory storage mud exceeds more than level of ground water 0.5m;
(3)Rig is in place
When rotary drilling rig is in place, held stationary, not run-off the straight displacement, for accurate keyhole depth, in frame or on machine pipe, make the scale of control, to be observed in construction, to record;
(4)Mechanical hole building
Proportion and the sand factor of slurry coat method is controlled during rotary drilling rig pore-forming, prevent undergauge or collapse hole during drilling, the dregs of rotary drilling rig pore-forming is transported to interim spoir hole using short car of refuting, occlusion pile driving construction is constructed using jumping stake method, every 9 piles are a construction circulation, first construction A type stake is plastic concrete element stake, and constructing when A type stake was through initial set in 7~9 hours, to close on Type B stake be reinforced concrete pile again;
(5)Brush wall, borehole cleaning
Cut a sequence stake plastic concrete during rotary drilling rig construction two sequence stake, cause seam percolating water to prevent mud skin to be attached to cutting face, carry out brush wall using crane suspention drilled pile brush wall device, after the completion of brush wall, carry out borehole cleaning;
After getting into desired depth, change slurry using sand suction pump borehole cleaning, control 1.15 about away from the mud balance at bottom hole 0.5m, for the sandy soils that soil property is poor, after borehole cleaning, the proportion of hole bottom slurry is 1.15~1.20, bottom hole sediment thickness after borehole cleaning is not more than 50mm, repetition measurement sediment thickness before pouring underwater concrete, and sediment exceedes during regulation borehole cleaning again;
(6)Steel reinforcement cage processing and lifting
Steel reinforcement cage machine qualified by inspection after, using whole of crane or segmental hoisting steel reinforcement cage to stake holes;
(7)Concreting
Concreting adopts tremie method concrete placed under water, timely measured hole inner concrete face height, carries out lifting and the dismounting of conduit, the buried depth controlling conduit is in 2~6m;
A)Plastic concrete pours
Plastic concrete before use, checks whether its slump and impression quality meet the requirements, and per car concrete all takes one group of test specimen, monitors its Slow setting time and slump-loss situation, till the B stake of this both sides is fully completed;
B)Normal concrete pours
Concrete surface close to steel reinforcement cage bottom when rate of flooding suitably slow down, after concrete enters steel reinforcement cage bottom 2~3m, conduit lifting is slow, steadily, it is to avoid excessive or hook strip steel reinforcement cage is impacted in discharging, in case rising of steel cage.
CN201610483010.4A 2016-06-28 2016-06-28 A kind of construction method for going along with sb. to guard him hole-drilling interlocking pile using rotary drilling rig construction foundation pit Active CN106400782B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610483010.4A CN106400782B (en) 2016-06-28 2016-06-28 A kind of construction method for going along with sb. to guard him hole-drilling interlocking pile using rotary drilling rig construction foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610483010.4A CN106400782B (en) 2016-06-28 2016-06-28 A kind of construction method for going along with sb. to guard him hole-drilling interlocking pile using rotary drilling rig construction foundation pit

Publications (2)

Publication Number Publication Date
CN106400782A true CN106400782A (en) 2017-02-15
CN106400782B CN106400782B (en) 2019-01-04

Family

ID=58006813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610483010.4A Active CN106400782B (en) 2016-06-28 2016-06-28 A kind of construction method for going along with sb. to guard him hole-drilling interlocking pile using rotary drilling rig construction foundation pit

Country Status (1)

Country Link
CN (1) CN106400782B (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975027A (en) * 2017-11-25 2018-05-01 北京建材地质工程有限公司 The construction method that shield launching is reinforced with reaching end soil body
CN107989032A (en) * 2017-11-28 2018-05-04 深圳市工勘岩土技术有限公司 A kind of construction method of punching interlocking pile
CN108018849A (en) * 2017-11-25 2018-05-11 北京建材地质工程有限公司 A kind of shield launching and the construction method for reaching end soil body reinforcing
CN108625369A (en) * 2018-06-22 2018-10-09 中铁二局第工程有限公司 The hard patterning method construction method of interlocking pile in karst area
CN108797641A (en) * 2018-07-20 2018-11-13 中铁十八局集团有限公司 A kind of structure and its construction method of Underground Subway Station construction period full station sealing
CN109083178A (en) * 2018-07-24 2018-12-25 中交航局第三工程有限公司 It is a kind of element interlocking pile at cut-pff wall water-stop curtain construction method
CN109610524A (en) * 2018-11-29 2019-04-12 北京地矿工程建设有限责任公司 The detection of OPT interlocking pile and course control method for use
CN109948285A (en) * 2019-03-29 2019-06-28 贵州正业工程技术投资有限公司 A kind of large size Karst depression ball crown type mechanism central excavation localization method
CN110093934A (en) * 2019-05-20 2019-08-06 中铁七局集团有限公司 The nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile
CN110306561A (en) * 2019-07-05 2019-10-08 广州穗岩土木科技股份有限公司 A kind of foundation pit hardness construction method of interlocking pile
CN110512597A (en) * 2019-07-26 2019-11-29 广东厚普建设工程有限公司 A kind of rotary digging cast-in-place pile construction method
CN111305229A (en) * 2020-03-26 2020-06-19 中铁隧道集团二处有限公司 Construction method for constructing sectionwise deep rock drilling secant pile
CN113866277A (en) * 2021-09-22 2021-12-31 合诚工程咨询集团股份有限公司 Nondestructive testing method for pile forming quality of large-diameter secant pile
CN114482861A (en) * 2022-01-13 2022-05-13 中勘资源勘探科技股份有限公司 Automatic deviation rectifying method for drill hole in deep hole drilling of coal field drilling

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000001849A (en) * 1998-06-12 2000-01-07 Geotop Corp Cast-in-place knot pile
CN101328712A (en) * 2008-07-29 2008-12-24 上海市第二建筑有限公司 Construction method of interlocking pile for soft soil and soil layer with obstacle
CN103388333A (en) * 2013-07-25 2013-11-13 中铁十六局集团有限公司 Construction process for carrying out construction on interlocking pile by adopting rotary drilling rig and mud protection wall method
CN104929136A (en) * 2015-07-14 2015-09-23 上海市水利工程集团有限公司 Urban complex underground obstacle working condition occlusive pile enclosure construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000001849A (en) * 1998-06-12 2000-01-07 Geotop Corp Cast-in-place knot pile
CN101328712A (en) * 2008-07-29 2008-12-24 上海市第二建筑有限公司 Construction method of interlocking pile for soft soil and soil layer with obstacle
CN103388333A (en) * 2013-07-25 2013-11-13 中铁十六局集团有限公司 Construction process for carrying out construction on interlocking pile by adopting rotary drilling rig and mud protection wall method
CN104929136A (en) * 2015-07-14 2015-09-23 上海市水利工程集团有限公司 Urban complex underground obstacle working condition occlusive pile enclosure construction method

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975027A (en) * 2017-11-25 2018-05-01 北京建材地质工程有限公司 The construction method that shield launching is reinforced with reaching end soil body
CN108018849A (en) * 2017-11-25 2018-05-11 北京建材地质工程有限公司 A kind of shield launching and the construction method for reaching end soil body reinforcing
CN107989032A (en) * 2017-11-28 2018-05-04 深圳市工勘岩土技术有限公司 A kind of construction method of punching interlocking pile
CN108625369A (en) * 2018-06-22 2018-10-09 中铁二局第工程有限公司 The hard patterning method construction method of interlocking pile in karst area
CN108797641A (en) * 2018-07-20 2018-11-13 中铁十八局集团有限公司 A kind of structure and its construction method of Underground Subway Station construction period full station sealing
CN109083178A (en) * 2018-07-24 2018-12-25 中交航局第三工程有限公司 It is a kind of element interlocking pile at cut-pff wall water-stop curtain construction method
CN109610524A (en) * 2018-11-29 2019-04-12 北京地矿工程建设有限责任公司 The detection of OPT interlocking pile and course control method for use
CN109948285A (en) * 2019-03-29 2019-06-28 贵州正业工程技术投资有限公司 A kind of large size Karst depression ball crown type mechanism central excavation localization method
CN110093934A (en) * 2019-05-20 2019-08-06 中铁七局集团有限公司 The nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile
CN110306561A (en) * 2019-07-05 2019-10-08 广州穗岩土木科技股份有限公司 A kind of foundation pit hardness construction method of interlocking pile
CN110512597A (en) * 2019-07-26 2019-11-29 广东厚普建设工程有限公司 A kind of rotary digging cast-in-place pile construction method
CN111305229A (en) * 2020-03-26 2020-06-19 中铁隧道集团二处有限公司 Construction method for constructing sectionwise deep rock drilling secant pile
CN113866277A (en) * 2021-09-22 2021-12-31 合诚工程咨询集团股份有限公司 Nondestructive testing method for pile forming quality of large-diameter secant pile
CN114482861A (en) * 2022-01-13 2022-05-13 中勘资源勘探科技股份有限公司 Automatic deviation rectifying method for drill hole in deep hole drilling of coal field drilling

Also Published As

Publication number Publication date
CN106400782B (en) 2019-01-04

Similar Documents

Publication Publication Date Title
CN106400782B (en) A kind of construction method for going along with sb. to guard him hole-drilling interlocking pile using rotary drilling rig construction foundation pit
CN107246006B (en) The pile-filling method of concrete-pile
CN103924586B (en) Multi section drill grouting pile construction method
CN107524142A (en) A kind of holing with slurry wall protection cast-in-place pile construction method
CN113445498A (en) Construction process of karst hole pile foundation in complex geology
CN112392400B (en) Hole forming construction process for slope protection pile in complex geological environment
CN106930276B (en) The construction method of the deep hole blasting of rotary digging bored concrete pile and conduit rotary digging removing obstacles
CN107724383B (en) Rotary digging cast-in-place pile construction method
CN103266599B (en) The dry construction method of digging drilling pile of soil skerry ground churning driven
CN110939303B (en) Semi-reverse construction method of cyclone pool
CN108589707A (en) A kind of full-sleeve long screw auger and churning driven combined type construction
CN110629747A (en) Full-casing full-rotation construction process for pile foundation under complex geological conditions
CN109385992B (en) Construction method for forming hole in artificial stone-filling layer
CN111705786A (en) Method for vertical combination construction of composite stratum underground continuous wall and cast-in-situ bored pile
CN110984133A (en) Construction method for foundation of deep-water shallow-covering-layer trestle
CN113216832B (en) Construction method for water milling and drilling of pile holes in karst areas
CN113089652A (en) Occlusive pile construction method and reinforced structure
CN108179759A (en) The underwater drill core slotting of driftway is without bottom sealing method
CN110847159A (en) Construction process of in-hole mechanical pile for subway construction
CN109113055B (en) The construction method of composite pile
CN209975535U (en) Supporting-free double-layer arc-shaped drilling and pouring deep foundation pit retaining structure
CN113718798B (en) Construction method for layered construction pore-forming of rock-socketed secant pile in riprap region near sea
CN206428718U (en) Hydrology ultrasonic radar water-level gauge holder combination formula prefabricated section foundation structure
CN114232612A (en) Cast-in-situ bored pile construction method for avoiding empty pile backfilling
CN116084388A (en) Soft sea Liu Jiaohu sea filling geological support pile obstacle clearing and hole fixing structure and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Zhijun

Inventor after: Cao Guangyun

Inventor after: Kong Xiangyuan

Inventor after: Yang Hongyan

Inventor after: Luo Cangning

Inventor after: Yi Dingda

Inventor after: Xing Yonghui

Inventor after: Zhang Wei

Inventor after: Sun Chao

Inventor after: Song Benle

Inventor after: Peng Yanfeng

Inventor after: Guo Xiaolong

Inventor after: Ye Liang

Inventor after: Wang Qiulin

Inventor after: Dong Xiaolong

Inventor after: Dong Jun

Inventor after: Zhang Ronghua

Inventor after: Lei Mingxing

Inventor after: Duan Jiewen

Inventor after: Yao Yuan

Inventor before: Guo Xiaolong

Inventor before: Gao Kun

Inventor before: Shi Yong

Inventor before: Cui Hailong

Inventor before: Wu Kongyong

Inventor before: Pi Zhongqiang

Inventor before: Cai Xiao

Inventor before: Peng Yanfeng

Inventor before: Ye Liang

Inventor before: Li Chengjiao

Inventor before: Kong Xiangyuan

Inventor before: Li Zhijun

Inventor before: Luo Cangning

Inventor before: Xing Yonghui

Inventor before: Zhang Wei

Inventor before: Sun Chao

Inventor before: Liu Wei

Inventor before: Yao Yiwen

Inventor before: Shao Yang

Inventor before: Dong Jun

GR01 Patent grant
GR01 Patent grant