CN106194134A - A kind of note adopts no killing well well head operating procedure and the equipment of integration thermal recovery technology - Google Patents
A kind of note adopts no killing well well head operating procedure and the equipment of integration thermal recovery technology Download PDFInfo
- Publication number
- CN106194134A CN106194134A CN201510227336.6A CN201510227336A CN106194134A CN 106194134 A CN106194134 A CN 106194134A CN 201510227336 A CN201510227336 A CN 201510227336A CN 106194134 A CN106194134 A CN 106194134A
- Authority
- CN
- China
- Prior art keywords
- well
- well head
- preventing device
- thick oil
- hollow stem
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Cleaning By Liquid Or Steam (AREA)
Abstract
The invention discloses a kind of note and adopt no killing well well head operating procedure and the equipment of integration thermal recovery technology, wherein no killing well wellhead equipment, including big four, steam injection well head upper half set, hollow stem hanger, described big four upper end is connected with steam injection well head upper half set by master valve, and described hollow stem hanger is arranged on inside big four.Described hollow stem hanger, when steam injection, makes band pump hollow stem connect a hollow pole socket hanging joint seat and hangs on hollow stem hanger, and hollow stem hanger latus rectum is less than master valve latus rectum.Wherein note adopts the no killing well well head operating procedure of integration thermal recovery technology, and including three steps, step one is the installation of no killing well steam injection well head, and step 2 is to play the installation of lower beam well head after steam injection, and step 3 is the installation of completion well head.The present invention can solve thermal recovery complete note well no killing well well head and play lower beam and can meet again two grades of well control requirements.
Description
Technical field
The present invention relates to oil-field thick-oil thermal production well note and adopt integration thermal recovery technology field of operation, specifically a kind of note adopts one
The no killing well well head operating procedure of body heat-transformation excavating technology and equipment.
Background technology
It is to use note to adopt integration insert pump to combine with supporting tube rod that note adopts integration thermal recovery technology, uses one-trip string real
Existing steam injection and two technical processs of oil recovery, it may be assumed that turn-week, turn and take out the most motionless steam injection string.Note adopts integration thermal recovery at present
There are two problems in technique: one is to realize snubbing serving completely.Current note adopts integration thermal recovery technology band pump
Steam injection shaft collar is from bottom to top (as shown in Figure 1): big four x1, gate x31, hollow stem hanger x2, lock
Door x32, steam injection well head upper half set x4.During steam injection, hollow stem (band pump) connects a hollow pole socket hanging joint seat and hangs over sky
On core bar hanger, steam injection needs after boiling in a covered pot over a slow fire well to remove hollow stem hanger and above wellhead component thereof, and carries out removing sky
Core bar completion.It can not be made to close owing to hollow stem runs through gate x31, and wellheadpressure.Therefore, tear well head open and take out with turning
Needing to carry out steam injection string liquid filling kill-job before removing hollow stem and meet one-level well control requirement, stratum can be caused cold by low temperature working fluid
But injure;For the well that pressure after stewing well open flow is high, the stewing well time need to be extended, affect oil production efficiency, even carry out whole well
Cylinder kill-job, causes stratum cold damage;Two is not have two grades of well control measures.Blowout thing is once there is during removing hollow stem
Therefore by uncontrollable, it is impossible to meet well control requirement.For solving problem above, design has been invented note and has been adopted integration thermal recovery technology
No killing well well head operating procedure.
Through retrieval, do not have to find the open source literature as the present invention.
Summary of the invention
It is an object of the invention to provide a kind of note and adopt no killing well well head operating procedure and the equipment of integration thermal recovery technology, both
Thermal recovery complete note well no killing well well head can be solved play lower beam and can meet again two grades of well control requirements.
In order to reach above-mentioned purpose, present invention employs following technical scheme, a kind of note adopts not pressing of integration thermal recovery technology
Well steam injection wellhead equipment, including big four, steam injection well head upper half set, hollow stem hanger, described big four upper end is passed through
Master valve is connected with steam injection well head upper half set, and described hollow stem hanger is arranged on inside big four.
Described hollow stem hanger, when steam injection, makes band pump hollow stem connect a hollow pole socket hanging joint seat and hangs over hollow
On bar hanger, hollow stem hanger latus rectum is less than master valve latus rectum.
In order to reach above-mentioned another object, present invention employs following technical scheme, a kind of note adopts integration thermal recovery technology
Remove bar apparatus after no killing well Wellhead steam injection, including big four, also include thick oil thermal extraction hollow rod blowout-preventing device, described greatly
Four-way upper end is connected with band gate threeway by master valve, the thick oil thermal extraction hollow stem above described band gate threeway connection
Preventer, described hollow stem hanger is arranged on inside big four.
Described thick oil thermal extraction hollow rod blowout-preventing device, at least provided with two, connects with conduit each other.
In order to reach above-mentioned another object, present invention employs following technical scheme, a kind of note adopts integration thermal recovery technology
No killing well completion interval of well jaws equipment, including big four, also includes thick oil thermal extraction hollow rod blowout-preventing device, polished rod sealer, institute
Stating big four upper end to be connected with band gate threeway by master valve, the thick oil thermal extraction above described band gate threeway connection is empty
Core bar preventer, described thick oil thermal extraction hollow rod blowout-preventing device upper end connects polished rod sealer, and described hollow stem hanger sets
Put inside big four.
In order to reach above-mentioned another object, present invention employs following technical scheme, a kind of note adopts integration thermal recovery technology
No killing well well head operating procedure, including three steps, step one is the installation of no killing well steam injection well head, and step 2 is steam injection
The rear installation playing lower beam well head, step 3 is the installation of completion well head.
The concrete mounting means of step one is to be sequentially connected with big four, master valve and steam injection well head upper half set from bottom to top,
Hollow stem hanger is arranged on inside big four.
The concrete mounting means of step 2 is, after steam injection boils in a covered pot over a slow fire well, closes master valve and removes steam injection well head upper half set, from bottom to top
Once mounting band gate threeway, lower thick oil thermal extraction hollow rod blowout-preventing device, conduit, upper thick oil thermal extraction hollow rod blowout-preventing device,
The installation of lower beam well head is played after completing steam injection.
The concrete mounting means of step 3 is, lower thick oil thermal extraction hollow rod blowout-preventing device seals polished rod, removes conduit and upper viscous crude
Thermal production well hollow rod blowout-preventing device, installs polished rod sealer, completes completion interval of well in lower thick oil thermal extraction hollow rod blowout-preventing device upper end
The installation of mouth.
After playing the installation of lower beam well head after completing steam injection, playing a lower beam operation measure is: by under hollow stem on master valve, close
Close upper and lower thick oil thermal extraction hollow rod blowout-preventing device and seal hollow stem body and well head annular space, open master valve, lower hollow stem with
Trip out after seat hanging joint make-up, unload a hanging joint;
When hollow stem box cupling or carry hollow pole socket hanging joint to need by thick oil thermal extraction hollow rod blowout-preventing during tripping out
During device, the sealing of well head is by driving lower thick oil thermal extraction hollow rod blowout-preventing device, by hollow stem box cupling or carry hollow pole socket to hang
Joint is placed in conduit, closes lower thick oil thermal extraction hollow rod blowout-preventing device, drives thick oil thermal extraction hollow rod blowout-preventing device and continue
Hollow stem realizes;Lower hollow stem connects roofbolt in well, completes to touch rod-type pump seat in well, seat is hung pump, put forward dead space completion
Operation;
When hollow stem box cupling or carry hollow pole socket hanging joint to need by thick oil thermal extraction hollow rod blowout-preventing during entering under
During device, the sealing of well head is by driving upper thick oil thermal extraction hollow rod blowout-preventing device, by hollow stem box cupling or carry hollow pole socket to hang
Joint is placed in conduit, shuts thick oil thermal extraction hollow rod blowout-preventing device, opens under the continuation of lower thick oil thermal extraction hollow rod blowout-preventing device
Hollow stem realizes.
Compared to prior art, the method have the advantages that
Achieve a kind of note and adopt the no killing well well head operating procedure of integration thermal recovery technology, not only meet note and adopt one heat-transformation
Excavating technology plays two grades of well control requirements during lower beam, and has reached snubbing serving, it is to avoid one-level well control is washed kill-job and made
Becoming hollow stem cooling injury and the purpose of stratum cold damage, economic benefit is huge.
Accompanying drawing explanation
Fig. 1 is that the note of prior art adopts integration thermal recovery technology band infusion vapour well head schematic diagram;
Fig. 2 is the no killing well steam injection well head that a kind of note of the present invention adopts the no killing well well head operation equipment of integration thermal recovery technology
Schematic diagram;
Fig. 3 be the no killing well well head operation equipment that a kind of note of the present invention adopts integration thermal recovery technology steam injection after play lower beam well
Mouth schematic diagram;
Fig. 4 is the completion well head signal that a kind of note of the present invention adopts the no killing well well head operation equipment of integration thermal recovery technology
Figure.
1. big four;2. hollow stem hanger;3. master valve;4. steam injection well head upper half set;5. band gate threeway;6. time
Thick oil thermal extraction hollow rod blowout-preventing device;7. conduit;8. go up thick oil thermal extraction hollow rod blowout-preventing device;9. polished rod sealer.
Detailed description of the invention
Detailed description for the present invention and technology contents, coordinate accompanying drawing to be described as follows, but accompanying drawing only provides reference and says
Bright it is used, is not used for the present invention is any limitation as.
Fig. 2, a kind of note adopts the no killing well steam injection wellhead equipment of integration thermal recovery technology, including big four 1, steam injection well head
Upper half set 4, hollow stem hanger 2, described big four upper end is connected with steam injection well head upper half set by master valve 3, described
Hollow stem hanger is arranged on inside big four.Hollow stem hanger, when steam injection, makes band pump hollow stem connect a sky
Core bar seat mounting headstock hangs on hollow stem hanger, and hollow stem hanger latus rectum is less than master valve latus rectum.
Fig. 3, a kind of note adopt integration thermal recovery technology no killing well Wellhead steam injection after remove bar apparatus, including big four 1,
Also including thick oil thermal extraction hollow rod blowout-preventing device, described big four upper end is connected with band gate threeway by master valve, described
With the thick oil thermal extraction hollow rod blowout-preventing device above gate threeway connection, described hollow stem hanger is arranged on inside big four.
Described thick oil thermal extraction hollow rod blowout-preventing device is at least provided with two, and the present embodiment has two, is respectively lower thick oil thermal extraction empty
Core bar preventer 6 and upper thick oil thermal extraction hollow rod blowout-preventing device 8, connect with conduit 7 each other.
Fig. 4, a kind of note is adopted the no killing well completion interval of well jaws equipment of integration thermal recovery technology, including big four 1, is also included thick
Oil thermal production well hollow rod blowout-preventing device, polished rod sealer 9, described big four upper end is connected with band gate threeway by master valve,
Thick oil thermal extraction hollow rod blowout-preventing device above described band gate threeway connection, on described thick oil thermal extraction hollow rod blowout-preventing device
End connects polished rod sealer, and described hollow stem hanger is arranged on inside big four.
According to Fig. 2-4, a kind of no killing well note is adopted integration thermal recovery technology well head control technique and is mainly completed by three steps:
Step one is the installation of no killing well steam injection well head, and step 2 is to play the installation of lower beam well head after steam injection, and step 3 is completion interval of well
The installation of mouth.
Step 1: complete no killing well steam injection well head as shown in Figure 2 and install, be sequentially connected with big four 1, Zong Zha from bottom to top
Door 3 and steam injection well head upper half set 4, be arranged on hollow stem hanger 2 inside big four.
Step 2: after steam injection boils in a covered pot over a slow fire well, as shown in Figure 3, closes master valve and removes steam injection well head upper half set, depend on from bottom to top
Secondary installation band gate threeway 5, lower thick oil thermal extraction hollow rod blowout-preventing device 6, conduit 7, upper thick oil thermal extraction hollow rod blowout-preventing
Device 8, plays the installation of lower beam well head after completing steam injection.Playing lower beam operation measure is: by under hollow stem on master valve, close
Upper and lower thick oil thermal extraction hollow rod blowout-preventing device 6 and 8 seals hollow stem body and well head annular space, opens master valve, under hollow
Bar trips out after seat hanging joint make-up, unloads a hanging joint.It (or carries hollow pole socket when hollow stem box cupling during tripping out
Hanging joint) when needing by thick oil thermal extraction hollow rod blowout-preventing device, the sealing of well head is hollow by opening lower thick oil thermal extraction
Hollow stem box cupling (or carrying hollow pole socket hanging joint) is placed in conduit by bar preventer 6, closes lower thick oil thermal extraction hollow stem
Preventer 6, leaves thick oil thermal extraction hollow rod blowout-preventing device 8 and has continued what hollow stem realized.Lower hollow stem (polished rod) connects
Roofbolt in well, completes to touch rod-type pump seat in well, seat is hung pump, carried the completion sequences such as dead space.When hollow during entering under it
When bar box cupling (or carrying hollow pole socket hanging joint) needs by thick oil thermal extraction hollow rod blowout-preventing device, the sealing of well head is logical
Cross out thick oil thermal extraction hollow rod blowout-preventing device 8, hollow stem box cupling (or carrying hollow pole socket hanging joint) be placed in conduit,
Shut thick oil thermal extraction hollow rod blowout-preventing device 8, drive lower thick oil thermal extraction hollow rod blowout-preventing device 6 and continue what lower hollow stem realized.
Step 3: as shown in Figure 4, lower thick oil thermal extraction hollow rod blowout-preventing device 6 seals polished rod, removes conduit and upper viscous crude
Thermal production well hollow rod blowout-preventing device 8, installs polished rod sealer, completes the installation of completion well head.
The foregoing is only presently preferred embodiments of the present invention, be not used to limit the scope of the claims of the present invention, other use this
The equivalence change of bright patent spirit, all should all belong to the scope of the claims of the present invention.
Claims (10)
1. a note adopts the no killing well steam injection wellhead equipment of integration thermal recovery technology, including big four, steam injection well head upper half set, hollow stem hanger, it is characterized in that, described big four upper end is connected with steam injection well head upper half set by master valve, and described hollow stem hanger is arranged on inside big four.
A kind of note the most according to claim 1 adopts the no killing well wellhead equipment of integration thermal recovery technology, it is characterized in that, described hollow stem hanger is when steam injection, making band pump hollow stem connect a hollow pole socket hanging joint seat and hang on hollow stem hanger, hollow stem hanger latus rectum is less than master valve latus rectum.
3. a note removes bar apparatus after adopting the no killing well Wellhead steam injection of integration thermal recovery technology, including big four, it is characterized in that, also include thick oil thermal extraction hollow rod blowout-preventing device, described big four upper end is connected with band gate threeway by master valve, thick oil thermal extraction hollow rod blowout-preventing device above described band gate threeway connection, described hollow stem hanger is arranged on inside big four.
A kind of note the most according to claim 3 adopt integration thermal recovery technology no killing well Wellhead steam injection after remove bar apparatus, it is characterised in that described thick oil thermal extraction hollow rod blowout-preventing device, at least provided with two, connects with conduit each other.
5. a note adopts the no killing well completion interval of well jaws equipment of integration thermal recovery technology, including big four, it is characterized in that, also include thick oil thermal extraction hollow rod blowout-preventing device, polished rod sealer, described big four upper end is connected with band gate threeway by master valve, thick oil thermal extraction hollow rod blowout-preventing device above described band gate threeway connection, described thick oil thermal extraction hollow rod blowout-preventing device upper end connects polished rod sealer, and described hollow stem hanger is arranged on inside big four.
6. a note adopts the no killing well well head operating procedure of integration thermal recovery technology, it is characterised in that including three steps, step one is the installation of no killing well steam injection well head, and step 2 is to play the installation of lower beam well head after steam injection, and step 3 is the installation of completion well head.
A kind of note the most according to claim 6 adopts the no killing well well head operating procedure of integration thermal recovery technology, it is characterized in that, the concrete mounting means of step one is to be sequentially connected with big four, master valve and steam injection well head upper half set from bottom to top, hollow stem hanger is arranged on inside big four.
A kind of note the most according to claim 6 adopts the no killing well well head operating procedure of integration thermal recovery technology, it is characterized in that, the concrete mounting means of step 2 is, after steam injection boils in a covered pot over a slow fire well, close master valve and remove steam injection well head upper half set, once mounting band gate threeway from bottom to top, lower thick oil thermal extraction hollow rod blowout-preventing device, conduit, upper thick oil thermal extraction hollow rod blowout-preventing device, play the installation of lower beam well head after completing steam injection.
A kind of note the most according to claim 8 adopts the no killing well well head operating procedure of integration thermal recovery technology, it is characterized in that, after playing the installation of lower beam well head after completing steam injection, playing lower beam operation measure is: by under hollow stem on master valve, close upper and lower thick oil thermal extraction hollow rod blowout-preventing device and seal hollow stem body and well head annular space, opening master valve, lower hollow stem trips out after seat hanging joint make-up, unloads a hanging joint;
When hollow stem box cupling or when carrying hollow pole socket hanging joint to need by thick oil thermal extraction hollow rod blowout-preventing device during tripping out, the sealing of well head is by driving lower thick oil thermal extraction hollow rod blowout-preventing device, by hollow stem box cupling or carry hollow pole socket hanging joint to be placed in conduit, close lower thick oil thermal extraction hollow rod blowout-preventing device, drive thick oil thermal extraction hollow rod blowout-preventing device and continued what hollow stem realized;Lower hollow stem connects roofbolt in well, completes to touch rod-type pump seat in well, seat is hung pump, carried dead space completion sequence;
When hollow stem box cupling or when carrying hollow pole socket hanging joint to need by thick oil thermal extraction hollow rod blowout-preventing device during entering under, the sealing of well head is by driving upper thick oil thermal extraction hollow rod blowout-preventing device, by hollow stem box cupling or carry hollow pole socket hanging joint to be placed in conduit, shut thick oil thermal extraction hollow rod blowout-preventing device, drive lower thick oil thermal extraction hollow rod blowout-preventing device and continue what lower hollow stem realized.
A kind of note the most according to claim 3 adopts the no killing well well head operating procedure of integration thermal recovery technology, it is characterized in that, the concrete mounting means of step 3 is, lower thick oil thermal extraction hollow rod blowout-preventing device seals polished rod, remove conduit and upper thick oil thermal extraction hollow rod blowout-preventing device, polished rod sealer is installed in lower thick oil thermal extraction hollow rod blowout-preventing device upper end, completes the installation of completion well head.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510227336.6A CN106194134A (en) | 2015-05-07 | 2015-05-07 | A kind of note adopts no killing well well head operating procedure and the equipment of integration thermal recovery technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510227336.6A CN106194134A (en) | 2015-05-07 | 2015-05-07 | A kind of note adopts no killing well well head operating procedure and the equipment of integration thermal recovery technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106194134A true CN106194134A (en) | 2016-12-07 |
Family
ID=57459124
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510227336.6A Pending CN106194134A (en) | 2015-05-07 | 2015-05-07 | A kind of note adopts no killing well well head operating procedure and the equipment of integration thermal recovery technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106194134A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109424343A (en) * | 2017-08-31 | 2019-03-05 | 中国石油化工股份有限公司 | It is a kind of with note well head and well head with injecting method |
CN110886588A (en) * | 2018-09-11 | 2020-03-17 | 中国石油天然气股份有限公司 | Simple well mouth plugging tool for coal bed gas well |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4513816A (en) * | 1982-01-08 | 1985-04-30 | Societe Nationale Elf Aquitaine (Production) | Sealing system for a well bore in which a hot fluid is circulated |
US4570673A (en) * | 1984-10-01 | 1986-02-18 | Halliburton Company | Fluid flow delivery system |
CN2688877Y (en) * | 2004-03-31 | 2005-03-30 | 刘国光 | Thermal oil extracting apparatus on well top |
CN2771472Y (en) * | 2004-11-17 | 2006-04-12 | 中国石油天然气股份有限公司 | High-temperature snubbing steam flooding wellhead device |
CN201013288Y (en) * | 2006-09-17 | 2008-01-30 | 杜荣玉 | Steam-injection oil extraction dual-purpose mine mouth device |
CN101525984A (en) * | 2009-04-09 | 2009-09-09 | 胜利油田供应方圆石油装备有限责任公司 | Snubbing serving device of combined type hydraulic oil-water well |
CN201443330U (en) * | 2009-05-20 | 2010-04-28 | 辽河石油勘探局 | Novel wellhead and oil-producing tree |
CN203626681U (en) * | 2013-08-30 | 2014-06-04 | 中国石油天然气集团公司 | Single-tube wellhead device for thermal recovery with pressure |
CN204691753U (en) * | 2015-05-07 | 2015-10-07 | 中国石油化工股份有限公司 | Note adopts the no killing well well head operating equipment of integrated thermal recovery technology |
-
2015
- 2015-05-07 CN CN201510227336.6A patent/CN106194134A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4513816A (en) * | 1982-01-08 | 1985-04-30 | Societe Nationale Elf Aquitaine (Production) | Sealing system for a well bore in which a hot fluid is circulated |
US4570673A (en) * | 1984-10-01 | 1986-02-18 | Halliburton Company | Fluid flow delivery system |
CN2688877Y (en) * | 2004-03-31 | 2005-03-30 | 刘国光 | Thermal oil extracting apparatus on well top |
CN2771472Y (en) * | 2004-11-17 | 2006-04-12 | 中国石油天然气股份有限公司 | High-temperature snubbing steam flooding wellhead device |
CN201013288Y (en) * | 2006-09-17 | 2008-01-30 | 杜荣玉 | Steam-injection oil extraction dual-purpose mine mouth device |
CN101525984A (en) * | 2009-04-09 | 2009-09-09 | 胜利油田供应方圆石油装备有限责任公司 | Snubbing serving device of combined type hydraulic oil-water well |
CN201443330U (en) * | 2009-05-20 | 2010-04-28 | 辽河石油勘探局 | Novel wellhead and oil-producing tree |
CN203626681U (en) * | 2013-08-30 | 2014-06-04 | 中国石油天然气集团公司 | Single-tube wellhead device for thermal recovery with pressure |
CN204691753U (en) * | 2015-05-07 | 2015-10-07 | 中国石油化工股份有限公司 | Note adopts the no killing well well head operating equipment of integrated thermal recovery technology |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109424343A (en) * | 2017-08-31 | 2019-03-05 | 中国石油化工股份有限公司 | It is a kind of with note well head and well head with injecting method |
CN109424343B (en) * | 2017-08-31 | 2024-04-16 | 中国石油化工股份有限公司 | Wellhead and wellhead injection-accompanying method |
CN110886588A (en) * | 2018-09-11 | 2020-03-17 | 中国石油天然气股份有限公司 | Simple well mouth plugging tool for coal bed gas well |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105804680B (en) | A kind of oil gas field workover operation device with pressure and method | |
CN101864904B (en) | Operation device for stripping sucker rod at pressure | |
CN104389544A (en) | Reducing dual tubing oil recovery wellhead casing head | |
CN106194134A (en) | A kind of note adopts no killing well well head operating procedure and the equipment of integration thermal recovery technology | |
CN104963634B (en) | Method for tripping sucker rod | |
CN105715234B (en) | Self-blowing mechanical-production integrated pipe column | |
CN205605156U (en) | Workover device is pressed in oil gas field area | |
CN105019858B (en) | The plug cementing cement head device of hp-ht well three and well cementing operation method | |
CN203452759U (en) | Parallel double-tube steam injection wellhead device | |
CN204691753U (en) | Note adopts the no killing well well head operating equipment of integrated thermal recovery technology | |
CN104879098B (en) | A kind of concentric double pipe gas well liquid loading tubing string | |
CN205117297U (en) | Concentric double -barrelled gas well flow string | |
CN106285544A (en) | A kind of thermal recovery steam injection well head obturator | |
CN202832484U (en) | Well mouth pressure testing device | |
CN105275422A (en) | Thermal recovery casing head | |
CN204212732U (en) | A kind of reducing formula dual tubing oil recovery casing head of well head | |
CN204041064U (en) | The device of a kind of blowout hookup of oil well sealing pressure testing | |
CN202788729U (en) | Multifunctional sucker rod hanging blowout preventer | |
CN106223900B (en) | A kind of electric pump well temporarily blocks up aerial drainage one from lifting casting and dragging free device | |
CN205036340U (en) | Sucker rod antifouling blowout preventer that goes into well | |
CN205638329U (en) | Well head sleeve pipe hangs closure | |
CN110700799A (en) | Lower part feed liquor snubbing tool | |
CN206129214U (en) | Rod hanger and prevent that spraying seat puts ware thereof | |
BR202015019725U2 (en) | single integral wellhead | |
CN206016756U (en) | A kind of down-hole plugging device of sleeve pipe snubbing serving method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161207 |