CN106128531B - A kind of assembly and disassembly methods of fuel assembly base under water - Google Patents

A kind of assembly and disassembly methods of fuel assembly base under water Download PDF

Info

Publication number
CN106128531B
CN106128531B CN201610519456.8A CN201610519456A CN106128531B CN 106128531 B CN106128531 B CN 106128531B CN 201610519456 A CN201610519456 A CN 201610519456A CN 106128531 B CN106128531 B CN 106128531B
Authority
CN
China
Prior art keywords
screw
base
dismantling device
upper base
tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610519456.8A
Other languages
Chinese (zh)
Other versions
CN106128531A (en
Inventor
邝刘伟
任亮
张显鹏
余飞扬
江林志
李国云
熊源源
陈哲
陈军
郑星明
周云
江艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nuclear Power Institute of China
Original Assignee
Nuclear Power Institute of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nuclear Power Institute of China filed Critical Nuclear Power Institute of China
Priority to CN201610519456.8A priority Critical patent/CN106128531B/en
Publication of CN106128531A publication Critical patent/CN106128531A/en
Application granted granted Critical
Publication of CN106128531B publication Critical patent/CN106128531B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C19/00Arrangements for treating, for handling, or for facilitating the handling of, fuel or other materials which are used within the reactor, e.g. within its pressure vessel
    • G21C19/26Arrangements for removing jammed or damaged fuel elements or control elements; Arrangements for moving broken parts thereof
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C19/00Arrangements for treating, for handling, or for facilitating the handling of, fuel or other materials which are used within the reactor, e.g. within its pressure vessel
    • G21C19/19Reactor parts specifically adapted to facilitate handling, e.g. to facilitate charging or discharging of fuel elements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Plasma & Fusion (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Hand Tools For Fitting Together And Separating, Or Other Hand Tools (AREA)

Abstract

The invention discloses a kind of assembly and disassembly methods of fuel assembly base under water, in the hole for inserting the prongs within base;Screw dismantling device is inserted into screw hole, and the pneumatic knob of turn opens gripping apparatus, and the pneumatic knob of turn screw dismantling device closes gripping apparatus, and screw is put into screw storage device by mobile screw dismantling device after upper base fixing screws are screwed out;The pin of upper base installation tool inserts in the hole, and presses the upper base of jettron locking of base installation tool, upper base is removed from crude fuel component;The jettron for pressing base installation tool puts down base, opens jettron, lock-screw;Screw dismantling device is removed, screw crimping tool is inserted in screw crimping processing is carried out to each screw successively.The present invention realizes the quick disintegration and installation of fuel assembly base, and the disintegration and reparation for damaged fuel assembly provide precondition, are the utilization fuel element of economical rationality, improve fuel element utilization rate and provide important technical support.

Description

A kind of assembly and disassembly methods of fuel assembly base under water
Technical field
The invention belongs to nuclear fuel cycle technical field, and in particular to a kind of assembly and disassembly methods of fuel assembly base under water.
Background technology
For the utilization fuel element of economical rationality, fuel original paper utilization rate is improved, the fuel rod to wherein having determined that breakage, It is changed with fresh fuel rod or other standby rods, the damaged fuel assembly of not up to burn-up level is returned heap multiplexing, The economy of nuclear power plant is improved, considerable economic benefit is obtained.In fuel assembly repair process, upper base dismounting is fuel assembly The key link disintegrated and repaired.
The content of the invention
It is an object of the invention to provide a kind of assembly and disassembly methods of fuel assembly base under water, upper pipe seat of fuel component is realized Quick disintegration and installation, disintegration for damaged fuel assembly and repair precondition be provided.
The present invention is achieved through the following technical solutions:
A kind of assembly and disassembly methods of fuel assembly base under water, comprise the following steps:
(1)The surface of the supreme base of base setting tool in movement, the pin of upper base setting tool is slowly inserted In the corresponding hole of upper base, base in the handle of base setting tool, locking is pushed;
(2)Directly over the mobile supreme base of screw dismantling device, it is any that the lower end of screw dismantling device is inserted into base In one screw hole, the pneumatic knob of turn opens the gripping apparatus of screw dismantling device lower end, and slow rotary screw dismantling device makes it It can naturally enter in sleeve and firmly grasp the screw, the compression lock for pressing screw dismantling device closes gripping apparatus, uses torque spanner Rotate screw dismantling device to rotate to same direction, screw dismantling device is moved after upper base fixing screws are screwed out by screw It is put into screw storage device, repeats above-mentioned demounting procedure, is all removed and placed in screw storage device to all screws;
(3)Telescope-srew dismantling device is removed, upper base installation tool is moved to the surface of upper base, upper base peace The pin of expressing of holding tool is slowly inserted in the upper corresponding hole of base, is pressed and is managed in the jettron locking of base installation tool Base installation tool in seat, lifting, upper base is removed from crude fuel component;
(4)The upper base dismantled is moved to the surface of fuel assembly to be installed, passes through upper base installation tool Constantly the upper base position of adjustment, finds the best position of base, the jettron for pressing base installation tool is put down Upper base, then removes upper base installation tool, screw dismantling device is moved to the surface of new screw storage device, spiral shell is used The gripping apparatus of nail dismantling device firmly grasps wherein one screw, and the screw is inserted in corresponding screw, opens screw dismantling device Jettron, lock-screw rotates screw dismantling device with torque spanner and rotated to same direction, repeat above-mentioned installation step Suddenly, until the new screw in all screw holes is all arranged on into upper base screwhole position;
(5)After installation, remove screw dismantling device, will envelope silicon instrument be placed on the screw of mounting screw just on Side, screw crimping tool is inserted in screw and carries out crimping processing to each screw successively.
This programme can realize the dismounting and installation of upper pipe seat of fuel component in pool environment, according to PWR Fuel group Part design feature, devises series of tools and is used, and establishes the fuel assembly technology of base dismounting under water, realizes water Upper pipe seat of fuel component is dismounted in pool environment, and realizes the quick disintegration and installation of fuel assembly base, is burst slug The disintegration and reparation of component provide precondition, are the utilization fuel element of economical rationality, improve fuel element utilization rate and provide Important technical support.
According to base structure on PWR fuel assembly, a kind of upper base setting tool, base regular worker on this are devised Tool includes support bar, and the bottom of support bar, which is fixed with support frame, support frame, is provided with brake and several pins, in support Handle is provided with bar, and handle passes through support bar, the axis of handle and the axis of support bar are vertical, when using that pin is slow In insertion in the corresponding hole of base, the handle of base setting tool is pushed so that brake is inserted into base, lead to The polygon of multiple pins and brake formation is crossed so as to be locked to upper base, upper base spiral shell is avoided by restraining moment Follow closely upper base deformation in disassembly process.
According to upper base bolt structure, a kind of upper base screw dismantling device is devised, the screw dismantling device includes interior Compression lock is installed, the bottom of dismounting bar is provided with gripping apparatus, dismounts the outer wall set of bar at the top of the hollow dismounting bar in portion, dismounting bar Conjunction has rotary handle and cylinder, and rotary handle is arranged between cylinder and compression lock, and cylinder is used with being connected inside dismounting bar When first pass through cylinder open gripping apparatus, slow rotary screw dismantling device can naturally enter sleeve in and promptly the spiral shell Nail, presses compression lock and screw is pressed into screw, the pneumatic knob of turn screw dismantling device closes gripping apparatus, passes through torque spanner Change instrument torque, control moment realizes in underwater environment the dismounting and installation of base screw, it is to avoid screw and screw Hole deforms.
According to base structure on PWR fuel assembly, a kind of upper base installation tool, base erector on this are devised Tool includes mounting rod, and the bottom of mounting rod, which is fixed with to be provided with mounting bracket, mounting bracket, expresses pin and diagonal suspension hook, mounting rod Outer wall on be provided with jettron, by the way that upper base installation tool to be moved to the surface of upper base, upper base when using The pin of installation tool slowly in the upper corresponding hole of base of insertion, is pressed and managed in the jettron locking of base installation tool Base installation tool in seat, lifting, upper base is removed from crude fuel component, by upper base installation tool constantly adjustment Base position, finds the best position of base, and the jettron for pressing base installation tool puts down base, realizes Upper base Fast Installation, it is to avoid upper base deforms.
According to upper base bolt structure, a kind of screw crimping tool is devised, the screw crimping tool includes inner hollow Crimping bar, be provided with stamping machine, stamping machine in the bottom of crimping bar and be provided with weight, be provided with and tighten at the top of crimping bar Screw, is sheathed with control cylinder on the outer wall of crimping bar, and control cylinder is connected with stamping machine, puts envelope silicon instrument when using Put directly over the screw of mounting screw, screw crimping tool is inserted in screw, by controlling cylinder so that in stamping machine Weight movement successively to each screw carry out crimping processing, by changing screw tip shapes, fixed fuel component guide pipe Position.
The torque of torque spanner is preferably 15N.m, according to the size of part in nuclear fuel assembly, when being dismounted, 15N.m torque is fully able to satisfaction and used.
The present invention compared with prior art, has the following advantages and advantages:The present invention establishes a kind of fuel stack The part technology of base dismounting under water, realizes the quick disintegration and installation of fuel assembly base, is the disintegration of damaged fuel assembly and repaiies Precondition is provided again, is the utilization fuel element of economical rationality, fuel element utilization rate is improved and provides important technology branch Hold.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the embodiment of the present invention, constitutes one of the application Point, do not constitute the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is the structural representation of upper base setting tool;
Fig. 2 is the structural representation of upper base screw dismantling device;
Fig. 3 is the partial schematic diagram of upper base screw dismantling device;
Fig. 4 is the structural representation of upper base installation tool;
Fig. 5 is the structural representation of screw crimping tool;
Fig. 6 is the partial schematic diagram of screw crimping tool.
Mark and corresponding parts title in accompanying drawing:
1- pins, 2- brakes, 3- handles, 4- support bars, 5- support frames, 6- rotary handles, 7- cylinders, 8- dismounting bars, 9- gripping apparatus, 10- mounting rods, 11- mounting brackets, the diagonal suspension hooks of 12-, 13- expresses pin, and 14- jettrons, 15- tightens screw, 16- controls cylinder, and 17- crimping bars, 18- stamping machines, 19- weights, 20- compresses lock.
Embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, with reference to embodiment and accompanying drawing, to this Invention is described in further detail, and exemplary embodiment and its explanation of the invention is only used for explaining the present invention, does not make For limitation of the invention.
Embodiment:
As shown in Figures 1 to 6, the assembly and disassembly methods of a kind of fuel assembly base under water, it has used base regular worker Tool, screw dismantling device, upper base installation tool and screw crimping tool, wherein upper base setting tool includes support bar 4, branch The bottom of strut 4 is fixed with support frame 5, support frame 5 and is provided with brake 2 and at least two pin 1, is set on support bar 4 There is handle 3, and handle 3 passes through support bar 4, the axis of handle 3 and the axis of support bar 4 are vertical;Screw dismantling device includes interior The hollow dismounting bar 8 in portion, the top of dismounting bar 8 is provided with compression lock 20, and the bottom of dismounting bar 8 is provided with gripping apparatus 9, dismounts bar 8 Outer wall be sheathed with rotary handle 6 and cylinder 7, and rotary handle 6 is arranged on cylinder 7 and compressed between lock 20, cylinder 7 and dismounting The inside of bar 8 is connected;Upper base installation tool includes mounting rod 10, and the bottom of mounting rod 10 is fixed with mounting bracket 11, mounting bracket 11 On be provided with and express pin 13 and diagonal suspension hook 12, jettron 14 is provided with the outer wall of mounting rod 10, while can also set Put the screw storage barrel for placing screw;Screw crimping tool includes the crimping bar 17 of inner hollow, at the bottom of crimping bar 17 Portion, which is provided with stamping machine 18, stamping machine 18, is provided with weight 19, and the top of crimping bar 17, which is provided with, tightens screw 15, in crimping Control cylinder 16 is sheathed with the outer wall of bar 17, and control cylinder 16 is connected with stamping machine 18.
Screw storage barrel is moved by crane, and is placed on around upper pipe seat of fuel component suitable position, fixing screws storage Deposit bucket;Then moved by crane directly over the upper supreme base of base setting tool, the pin 1 of upper base setting tool is slow In insertion in the corresponding hole of base, the handle 3 of base setting tool is pushed so that brake 2 is inserted into base and locked Upper base;Directly over the supreme base of crane moving sleeve screw dismantling device, and telescope-srew dismantling device and crane it Between connection balancer so that telescope-srew dismantling device is using that will not rock, and the gripping apparatus 9 of screw dismantling device is inserted into pipe In any one screw hole of seat, open and compress 20 turn rotary handles 6 of lock so that cylinder 7 opens grabbing for screw dismantling device lower end Tool 9, slow rotary screw dismantling device can naturally enter in sleeve and firmly grasp the screw, press compression lock 20 to close Gripping apparatus 9 is closed, is rotated with the torque spanner for being set as 15N.m to same direction, mobile spiral shell after upper base fixing screws are screwed out Screw is put into screw storage barrel by nail dismantling device, repeats above-mentioned demounting procedure, spiral shell is all removed and placed in 24 screws Follow closely in storage device;Telescope-srew dismantling device is removed with crane, upper base installation tool is moved to the surface of upper base, The pin 13 of expressing of upper base installation tool is slowly inserted in the upper corresponding hole of base, is pressed the pneumatic of base installation tool and is opened The upper base of 14 lockings is closed, upper base installation tool is lifted with crane, upper base is removed from crude fuel component;With crane by The upper base of dismounting is moved to the surface of fuel assembly to be installed, passes through the upper base position of upper base installation tool constantly adjustment Put, find the best position of base so that the screw on screw and fuel assembly in upper base is corresponded, and is pressed The jettron 14 of upper base installation tool puts down base, then removes upper base installation tool, is dismounted screw with crane Instrument is moved to the surface of new screw storage device, and wherein one screw is firmly grasped with the gripping apparatus of screw dismantling device, and should Screw is inserted in corresponding screw, opens the jettron 14 of screw dismantling device, lock-screw is pulling for 15N.m with torque Hand rotates screw dismantling device and rotated to same direction, repeats above-mentioned installation steps, until 24 new screws are arranged on into upper Base screwhole position;After installation, screw dismantling device is removed with crane, will seal silicon instrument by crane is placed on and has installed Directly over the screw of screw, screw crimping tool is inserted in screw crimping processing is carried out to each screw successively.
The unloading process of the fuel assembly carried out through the above way base under water, it realizes the fast of fuel assembly base Speed is disintegrated and installed, and the disintegration and reparation for damaged fuel assembly provide precondition, are the utilization fuel element of economical rationality, Improve fuel element utilization rate and provide important technical support.
Above-described embodiment, has been carried out further to the purpose of the present invention, technical scheme and beneficial effect Describe in detail, should be understood that the embodiment that the foregoing is only the present invention, be not intended to limit the present invention Protection domain, within the spirit and principles of the invention, any modification, equivalent substitution and improvements done etc. all should be included Within protection scope of the present invention.

Claims (2)

1. the assembly and disassembly methods of a kind of fuel assembly base under water, it is characterised in that comprise the following steps:
(1) in movement the supreme base of base setting tool surface, upper base setting tool include support bar (4), support bar (4) bottom, which is fixed with support frame (5), support frame (5), is provided with brake (2) and several pins (1), in support bar (4) handle (3) is provided with, and handle (3) passes through support bar (4), the axis of handle (3) and the axis of support bar (4) are vertical, By in the upper corresponding hole of base of pin insertion of upper base setting tool, push and managed in the handle of base setting tool, locking Seat;
(2) directly over the mobile supreme base of screw dismantling device, screw dismantling device includes the dismounting bar (8) of inner hollow, torn open Compression lock (20) is installed, the bottom of dismounting bar (8) is provided with gripping apparatus (9), the outer wall set of dismounting bar (8) at the top of dress bar (8) Conjunction has a rotary handle (6) and cylinder (7), and rotary handle (6) is arranged on cylinder (7) and compressed between lock (20), cylinder (7) with Dismount and connected inside bar (8), the lower end of screw dismantling device is inserted into base any one screw hole, turn rotary handle Cylinder is controlled to open the gripping apparatus of screw dismantling device lower end, rotary screw dismantling device naturally can enter in sleeve simultaneously The promptly screw, the compression lock for pressing screw dismantling device closes gripping apparatus, and screw dismantling device is rotated to same with torque spanner Individual direction is rotated, and screw is put into screw storage device by mobile screw dismantling device after upper base fixing screws are screwed out, weight Multiple above-mentioned demounting procedure, is all removed and placed in screw storage device to all screws;
(3) telescope-srew dismantling device is removed, upper base installation tool is moved to the surface of upper base, upper base erector Tool includes mounting rod (10), and the bottom of mounting rod (10), which is fixed with to be provided with mounting bracket (11), mounting bracket (11), expresses pin (13) and diagonal suspension hook (12), it is provided with jettron (14) on the outer wall of mounting rod (10), upper base installation tool is expressed In the upper corresponding hole of base of pin insertion, base peace in the upper base of jettron locking of base installation tool, lifting is pressed Holding tool, upper base is removed from crude fuel component;
(4) the upper base dismantled is moved to the surface of fuel assembly to be installed, it is continuous by upper base installation tool Base position in adjustment, finds the best position of base, and the jettron for pressing base installation tool puts down pipe Seat, then removes upper base installation tool, screw dismantling device is moved to the surface of new screw storage device, torn open with screw The gripping apparatus of holding tool firmly grasps wherein one screw, and the screw is inserted in corresponding screw, opens the gas of screw dismantling device Dynamic switch, lock-screw rotates screw dismantling device with torque spanner and rotated to same direction, repeats above-mentioned installation steps, Until the new screw in all screw holes is all arranged on into upper base screwhole position;
(5) after installation, screw dismantling device is removed, silicon instrument will be sealed and be placed on directly over the screw of mounting screw, will Crimping processing is carried out to each screw successively in screw crimping tool insertion screw, screw crimping tool includes the pressure of inner hollow Extension bar (17), is provided with stamping machine (18), stamping machine (18) in the bottom of crimping bar (17) and is provided with weight (19), crimps bar (17) it is provided with the top of and tightens screw (15), control cylinder (16), and control gas is sheathed with the outer wall of crimping bar (17) Cylinder (16) is connected with stamping machine (18).
2. a kind of assembly and disassembly methods of fuel assembly according to claim 1 base under water, it is characterised in that:The torque is pulled The torque of hand is 15N.m.
CN201610519456.8A 2016-07-05 2016-07-05 A kind of assembly and disassembly methods of fuel assembly base under water Active CN106128531B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610519456.8A CN106128531B (en) 2016-07-05 2016-07-05 A kind of assembly and disassembly methods of fuel assembly base under water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610519456.8A CN106128531B (en) 2016-07-05 2016-07-05 A kind of assembly and disassembly methods of fuel assembly base under water

Publications (2)

Publication Number Publication Date
CN106128531A CN106128531A (en) 2016-11-16
CN106128531B true CN106128531B (en) 2017-10-27

Family

ID=57468353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610519456.8A Active CN106128531B (en) 2016-07-05 2016-07-05 A kind of assembly and disassembly methods of fuel assembly base under water

Country Status (1)

Country Link
CN (1) CN106128531B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106531258B (en) * 2016-12-29 2018-11-02 核动力运行研究所 A kind of removal tool and method of control rod guide tubes and bundles PU cover boards

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2536201B1 (en) * 1982-11-16 1985-07-19 Fragema Framatome & Cogema INSTALLATION FOR THE REPAIR OF NUCLEAR FUEL ASSEMBLIES
JP4490550B2 (en) * 2000-04-14 2010-06-30 株式会社東芝 Modular underwater repair device and repair method
US7239683B2 (en) * 2003-11-17 2007-07-03 Framatome Anp, Inc. Fuel assembly nozzleless handling tool and method
CN202373315U (en) * 2011-10-13 2012-08-08 秦山核电有限公司 Underwater operating device for gripping end fittings of nuclear fuel assembly
CN202307177U (en) * 2011-10-13 2012-07-04 秦山核电有限公司 Underwater operating device for disassembling and assembling nuts of nuclear fuel assembly framework
CN103559923B (en) * 2013-11-06 2016-05-04 国核电站运行服务技术有限公司 The keel operation tool of nuclear fuel assembly reparation use

Also Published As

Publication number Publication date
CN106128531A (en) 2016-11-16

Similar Documents

Publication Publication Date Title
CN204135985U (en) Fume recovery system cartridge removal specific purpose tool
CN106128530B (en) A kind of fuel assembly spike pulling method under water
CN106128531B (en) A kind of assembly and disassembly methods of fuel assembly base under water
CN103029099A (en) Quick dismounting tool for cylinder sleeve of internal combustion engine and realization method thereof
CN109968275A (en) A kind of live dismounting process of upper-part in-reactor component control rod guide tubes and bundles
CN107351020B (en) A kind of dismounting of reusable expansion bolt and restorative procedure
CN106625389B (en) Specific purpose tool and method for the dismounting of high-pressure self-sealing manhole
CN106532558A (en) Disassembly and assembly tool and method of isolation rod
CN206645780U (en) A kind of novel electric power well cover opening device
CN207042589U (en) A kind of breaker of rare earth oxide production
CN206705639U (en) Manhole lifting device
CN209110131U (en) A kind of steel cable lock box device
CN203918942U (en) A kind of specific purpose tool of dismantling grab bucket bearing
CN206117435U (en) Large -scale motor dismouting device
CN102601763A (en) Tool for assembling and disassembling valve of engine cylinder head
CN106451235A (en) Multifunctional spacer bar dismantling tool and dismantling method
CN202657760U (en) Elastic adjusting bolt
CN205363789U (en) Claw hammer
CN220408614U (en) Bearing mounting device
CN216547953U (en) Clamp device for thermal field of single crystal furnace
CN211438092U (en) Plain type is gone up mouth of a river and is changed device hot
CN221346542U (en) Production line guardrail for machining factory
CN221589586U (en) Quick pile pulling device based on civil engineering is used
CN217780516U (en) Lifting appliance for cylindrical component
CN219465964U (en) Maintenance device of plasma rinsing machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant