CN105910271A - Wall-mounted stove - Google Patents

Wall-mounted stove Download PDF

Info

Publication number
CN105910271A
CN105910271A CN201610349322.6A CN201610349322A CN105910271A CN 105910271 A CN105910271 A CN 105910271A CN 201610349322 A CN201610349322 A CN 201610349322A CN 105910271 A CN105910271 A CN 105910271A
Authority
CN
China
Prior art keywords
heat exchanger
pipeline
wall
hung boiler
heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610349322.6A
Other languages
Chinese (zh)
Other versions
CN105910271B (en
Inventor
王磊
何国军
梁桂源
张霞
康道远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201610349322.6A priority Critical patent/CN105910271B/en
Publication of CN105910271A publication Critical patent/CN105910271A/en
Application granted granted Critical
Publication of CN105910271B publication Critical patent/CN105910271B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/10Continuous-flow heaters, i.e. heaters in which heat is generated only while the water is flowing, e.g. with direct contact of the water with the heating medium
    • F24H1/12Continuous-flow heaters, i.e. heaters in which heat is generated only while the water is flowing, e.g. with direct contact of the water with the heating medium in which the water is kept separate from the heating medium
    • F24H1/14Continuous-flow heaters, i.e. heaters in which heat is generated only while the water is flowing, e.g. with direct contact of the water with the heating medium in which the water is kept separate from the heating medium by tubes, e.g. bent in serpentine form
    • F24H1/145Continuous-flow heaters, i.e. heaters in which heat is generated only while the water is flowing, e.g. with direct contact of the water with the heating medium in which the water is kept separate from the heating medium by tubes, e.g. bent in serpentine form using fluid fuel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters
    • F24H9/2035Arrangement or mounting of control or safety devices for water heaters using fluid fuel

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)
  • Instantaneous Water Boilers, Portable Hot-Water Supply Apparatuses, And Control Of Portable Hot-Water Supply Apparatuses (AREA)

Abstract

The invention provides a wall-mounted furnace. The wall-mounted furnace comprises a first heat exchanger, a second heat exchanger and a heat exchange device, wherein the first heat exchanger comprises a first heat exchange channel and a second heat exchange channel; a second heat exchanger; the water inlet pipeline is connected with a water inlet of a fourth heat exchange channel of the second heat exchanger; the water outlet pipeline is connected with a water outlet of a fourth heat exchange channel of the second heat exchanger; the first pipeline is connected with the first heat exchange channel of the first heat exchanger and the third heat exchange channel of the second heat exchanger to form a circulating loop; and the second pipeline is connected with the second heat exchange channel in series, the inlet end of the second pipeline is connected with the water inlet pipeline, and the outlet end of the second pipeline is connected with the water outlet pipeline. In the wall-mounted furnace, the hot water in the water outlet pipeline is formed by mixing the water outlet of the second heat exchanger and the water outlet of the second pipeline, and the water outlet of the second pipeline is directly heated by the second heat exchange channel of the first heat exchanger, so that the temperature rise speed of the water outlet pipeline is higher than that of the water outlet of the second heat exchanger, the temperature rise speed of the whole water outlet pipeline is increased, and the temperature rise time is shortened.

Description

Wall-hung boiler
Technical field
The present invention relates to technical field of electric appliances, in particular to a kind of wall-hung boiler.
Background technology
In prior art, burnt gas wall hanging furnace provide domestic hot-water time, system detect water-flow signal and When meeting entry condition, ignition of starting shooting, begin to warm up domestic water.Domestic water is heated Cheng Zhong, water temperature is increased to design temperature it is generally required to the time of about 30s, due in this heating process The time of the use requirement that water temperature reaches user is longer, and user is often let go a part of cold water, wave Water wasting resource.
Meanwhile, burnt gas wall hanging furnace is during providing domestic hot-water, and opening other faucet may Causing tap water pipe network hydraulic pressure bust, the situation that discharge reduces occurs, the now water temperature of domestic hot-water Can drastically raise.Although wall-hung boiler can automatically adjust according to water temperature situation of change, but regulated Journey has certain hysteresis quality, and the comfortableness of domestic hot-water is deteriorated, and excessive being also possible to of temperature rise scalds user, There is potential safety hazard.
Summary of the invention
It is desirable to provide a kind of wall-hung boiler, to improve leaving water temperature when wall-hung boiler enables, shorten Temperature rising-time.
For achieving the above object, the invention provides a kind of wall-hung boiler and include: First Heat Exchanger, including First heat exchanger channels and the second heat exchanger channels;Second heat exchanger, changes including the 3rd heat exchanger channels and the 4th The passage of heat;Inlet pipeline, is connected with the water inlet of the 4th heat exchanger channels of the second heat exchanger;Outlet pipe Road, is connected with the outlet of the 4th heat exchanger channels of the second heat exchanger;First pipeline, connects first and changes First heat exchanger channels of hot device and the 3rd heat exchanger channels of the second heat exchanger also form closed circuit;And Second pipeline, connects with the second heat exchanger channels, and the entrance point of the second pipeline is connected with inlet pipeline, The port of export of the second pipeline is connected with outlet pipeline.
Further, wall-hung boiler also includes the bypass valve being arranged in series on the second pipeline.
Further, bypass valve is Water flow adjusting valve.
Further, wall-hung boiler also includes that the discharge being arranged on inlet pipeline and/or the second pipeline passes Sensor.
Further, wall-hung boiler also includes the water pump being arranged on the first pipeline.
Further, wall-hung boiler also includes and the expansion tank of the first pipeline connection.
Further, First Heat Exchanger is put in fork arrangement.
Further, wall-hung boiler also includes the burner being arranged on below First Heat Exchanger, the first heat exchange Device includes row's heat exchanger and lower row's heat exchanger;Upper row's heat exchanger includes form the second heat exchanger channels Two heat exchanging pipes and the second heat exchange fin coordinated with the second heat exchanging pipe;Lower row's heat exchanger includes being formed First heat exchanging pipe of the first heat exchanger channels and the first heat exchange fin coordinated with the first heat exchanging pipe.
Further, the second heat exchanger is plate type heat exchanger.
Further, wall-hung boiler also includes that the interface that heats, heating interface include that being arranged on the first heat exchange leads to Heating on first pipeline in downstream, road exports and is arranged on described first heat exchanger channels upstream side Heating import on first pipeline.
In the wall-hung boiler of the present invention, lead to by arranging the second heat exchange in First Heat Exchanger in wall-hung boiler Road, arranges the second pipeline and the series connection of the second heat exchanger channels, and the entrance point of the second pipeline is with inlet pipeline even Connecing, the port of export of the second pipeline is connected with outlet pipeline, and during work, in outlet pipeline, hot water is by second The water outlet of heat exchanger and the water outlet of the second pipeline mix, owing to the water outlet of the second pipeline is changed by first Second heat exchanger channels of hot device directly heats, and its programming rate is higher than the intensification of the water outlet of the second heat exchanger Speed, thus improve the programming rate of whole outlet pipeline, shorten temperature rising-time.
Accompanying drawing explanation
The accompanying drawing of the part constituting the application is used for providing a further understanding of the present invention, the present invention Schematic description and description be used for explaining the present invention, be not intended that inappropriate limitation of the present invention. In the accompanying drawings:
Fig. 1 is the schematic diagram of the wall-hung boiler according to the present invention;
Fig. 2 is the structural representation of the First Heat Exchanger according to the present invention;
Fig. 3 is the right TV structure schematic diagram of First Heat Exchanger shown in Fig. 2.
Wherein, being labeled as in above-mentioned accompanying drawing:
10, First Heat Exchanger;105, the first heat exchanging pipe;107, the second heat exchanging pipe;11, Two heat exchangers;13, inlet pipeline;15, outlet pipeline;17, the first pipeline;19, the second pipeline; 21, Water flow adjusting valve;23, water flow sensor;25, water pump;27, expansion tank;29、 Heating interface;331, burner.
Detailed description of the invention
Describe the present invention below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
As it is shown in figure 1, wall-hung boiler according to embodiments of the present invention includes: First Heat Exchanger 10, first Heat exchanger 10 includes the first heat exchanger channels and the second heat exchanger channels;Second heat exchanger 11, second changes Hot device 11 includes the 3rd heat exchanger channels and the 4th heat exchanger channels;Inlet pipeline 13, with the second heat exchange The water inlet of the 4th heat exchanger channels of device 11 connects;Outlet pipeline 15, with the of the second heat exchanger 11 The outlet of four heat exchanger channels connects;First pipeline 17, connects the first heat exchange of First Heat Exchanger 10 Passage and the 3rd heat exchanger channels of the second heat exchanger 11 also form closed circuit;And second pipeline 19, Connect with the second heat exchanger channels, and the entrance point of the second pipeline 19 is connected with inlet pipeline 13, second The port of export of pipeline 19 is connected with outlet pipeline 15.Thus in the wall-hung boiler of the present invention, by Wall-hung boiler arranges in First Heat Exchanger 10 second heat exchanger channels, the second pipeline 19 is set and changes with second The passage of heat is connected, and the entrance point of the second pipeline 19 is connected with inlet pipeline 13, the second pipeline 19 The port of export is connected with outlet pipeline 15, and during work, in outlet pipeline 15, hot water is by the second heat exchanger 11 Water outlet and the water outlet of the second pipeline 19 mix, owing to the water outlet of the second pipeline 19 is changed by first Second heat exchanger channels of hot device 10 directly heats, and its programming rate is higher than the water outlet of the second heat exchanger 11 Programming rate, thus improve the programming rate of whole outlet pipeline 15, shorten temperature rising-time. On the other hand, after the second pipeline 19 shunting, the water of the second heat exchanger 11 the 4th heat exchanger channels is flowed through Amount reduces, and can improve the hot water temperature after the second heat exchanger 11 heat exchange equally, promote further Mixed leaving water temperature, shortens temperature rising-time, and user can reduce the discharge capacity of cold water in use, Using water wisely.
It should be noted that, at the first heat exchanger channels and the water of the second heat exchanger channels of First Heat Exchanger 10 Heat absorption, in the water heat release of the 3rd heat exchanger channels of the second heat exchange 11, changes in the 4th of the second heat exchange 11 Water in the passage of heat is heated by the water of the 3rd heat exchanger channels.
Specifically, in conjunction with Fig. 2 and Fig. 3, the First Heat Exchanger 10 in the embodiment of the present invention is copper pipe copper Finned heat exchanger, is correspondingly arranged on burner 331, First Heat Exchanger 10 below First Heat Exchanger 10 Put in fork arrangement along flow of flue gas direction, increase flue gas disturbance, enhanced heat exchange.
More specifically, First Heat Exchanger 10 includes row's heat exchanger and lower row's heat exchanger, upper row's heat exchange Device includes the second heat exchanging pipe 107 forming the second heat exchanger channels and coordinates with the second heat exchanging pipe 107 The second heat exchange fin, the second heat exchanging pipe 107 is provided with for being connected with the second pipeline 19 Pipe joint.For the second heat exchanging pipe 107 in upper row's heat exchanger, the second heat exchanging pipe 107 and Two pipelines 19 all could be arranged to parallel flow paths, to shorten the flow process of water, it is achieved rapid hot water output, Improve leaving water temperature when wall-hung boiler enables.Lower row's heat exchanger includes forming the first of the first heat exchanger channels Heat exchanging pipe 105 and the first heat exchange fin coordinated with the first heat exchanging pipe 105, the first heat exchanging pipe The pipe joint for being connected it is again provided with the first heat exchanging pipe 105 on 105.First heat exchange is led to Road is arranged on lower row, and near burner 331, heats is more preferable.And the present invention is embodied as The second heat exchanger 11 in example, the second heat exchanger 11 is plate type heat exchanger.
Preferably, the wall-hung boiler in the embodiment of the present invention also includes being arranged in series on the second pipeline 19 Bypass valve, the bypass valve in the embodiment of the present invention is preferably Water flow adjusting valve 21, passes through discharge Regulation valve 21 controls to flow through the discharge in the second pipeline 19, increases or reduce discharge, Ke Yishi Reveal the control of the temperature of water lines 15 water outlet.
As it is shown in figure 1, wall-hung boiler also includes the water flow sensor 23 being arranged on inlet pipeline 13. Water flow sensor 23 is combined with Water flow adjusting valve 21, thus at tap water pipe network hydraulic pressure bust, When the situation that discharge reduces occurs, can detect that discharge reduces by water flow sensor 23, Thus control Water flow adjusting valve 21 and reduce or cut off the current in the second pipeline 19, reduce water outlet Temperature, it is to avoid temperature rise excessive scald user.Such as, when using domestic hot-water, if discharge is dashed forward So reducing, when water flow sensor 23 detects that discharge declines 20% in 2s, discharge is adjusted Joint valve 21 cuts out, and cold water is no longer pass through heat exchange of the second heat exchanger channels of First Heat Exchanger 10, entirely Portion flows through the second heat exchanger 11 and carries out secondary heat exchange, thus reduces the discharge in the second heat exchanger 11 Fluctuation, reduces the amplitude that secondary heat exchange leaving water temperature raises, in addition without through the second pipeline 19 The mixing of heat exchange high-temperature water, domestic hot-water's leaving water temperature will relatively be stablized, improve domestic hot-water Comfortableness, reduce the excessive generation of temperature rise potential safety hazard.When water flow sensor 23 detects again To discharge in 2s, rise 20% time, Water flow adjusting valve 21 reopens inlet pipeline 13 Shunt, reduce the amplitude that domestic hot-water's leaving water temperature reduces, improve comfortableness.
In another embodiment, inlet pipeline 13 and the second pipeline 19 are provided with discharge sensing Device 23, or only on the second pipeline 19, it is provided with water flow sensor 23, equally detect Hydraulic pressure bust, the corresponding Water flow adjusting valve 21 that controls reduces or cuts off the water in the second pipeline 19 Stream, reduces leaving water temperature, it is achieved water temperature controls, it is to avoid temperature rise excessive scald user.
As it is shown in figure 1, the wall-hung boiler in the embodiment of the present invention also includes being arranged on the first pipeline 17 Water pump 25, water pump 25 can drive the first heat exchange in the first pipeline 17 and First Heat Exchanger 10 Water flowing in the closed circuit that the 3rd heat exchanger channels in passage and the second heat exchanger 11 is constituted, By controlling the flowing velocity of water in this closed circuit, heat exchange can be accelerated, improve leaving water temperature.
Preferably, the wall-hung boiler in the embodiment of the present invention also includes the expansion connected with the first pipeline 17 Water tank 27, for housing and the swell increment of water in compensation cycle loop, prevents from pressing in the first pipeline 17 Power is excessive.
Preferably for the wall-hung boiler in above-described embodiment, wall-hung boiler also includes the interface 29 that heats, Heating interface 29 includes the heating outlet being arranged on first pipeline 17 in the first heat exchanger channels downstream With the heating import on described first pipeline 17 being arranged on the first heat exchanger channels upstream side.Thus this The wall-hung boiler of invention except from outlet pipeline 15 water outlet for the use of domestic hot-water, additionally it is possible to full The demand of foot radiator hot water.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for For those skilled in the art, the present invention can have various modifications and variations.All essences in the present invention Within god and principle, any modification, equivalent substitution and improvement etc. made, should be included in the present invention Protection domain within.

Claims (10)

1. a wall-hung boiler, it is characterised in that including:
First Heat Exchanger (10), including the first heat exchanger channels and the second heat exchanger channels;
Second heat exchanger (11), including the 3rd heat exchanger channels and the 4th heat exchanger channels;
Inlet pipeline (13), with the water inlet of the 4th heat exchanger channels of described second heat exchanger (11) Connect;
Outlet pipeline (15), with the outlet of the 4th heat exchanger channels of described second heat exchanger (11) Connect;
First pipeline (17), connects the first heat exchanger channels of described First Heat Exchanger (10) and described 3rd heat exchanger channels of the second heat exchanger (11) also forms closed circuit;And
Second pipeline (19), connects with described second heat exchanger channels, and described second pipeline (19) Entrance point be connected with described inlet pipeline (13), the port of export of described second pipeline (19) and institute State outlet pipeline (15) to connect.
Wall-hung boiler the most according to claim 1, it is characterised in that described wall-hung boiler also includes string Connection is arranged on the bypass valve on described second pipeline (19).
Wall-hung boiler the most according to claim 2, it is characterised in that described bypass valve is discharge Regulation valve (21).
Wall-hung boiler the most according to claim 3, it is characterised in that described wall-hung boiler also includes setting Put the water flow sensor (23) on described inlet pipeline (13) and/or described second pipeline (19).
Wall-hung boiler the most according to claim 1, it is characterised in that described wall-hung boiler also includes setting Put the water pump (25) on described first pipeline (17).
Wall-hung boiler the most according to claim 5, it is characterised in that described wall-hung boiler also include with The expansion tank (27) that described first pipeline (17) connects.
Wall-hung boiler the most according to claim 1, it is characterised in that described First Heat Exchanger (10) Put in fork arrangement.
Wall-hung boiler the most according to claim 7, it is characterised in that described wall-hung boiler also includes setting Put the burner (331) in described First Heat Exchanger (10) lower section;
Described First Heat Exchanger (10) includes superposed upper row's heat exchanger and is positioned at the lower row of bottom Heat exchanger;
Described upper row's heat exchanger includes the second heat exchanging pipe (107) forming described second heat exchanger channels And the second heat exchange fin coordinated with described second heat exchanging pipe (107);
Described lower row's heat exchanger includes the first heat exchanging pipe (105) forming described first heat exchanger channels And the first heat exchange fin coordinated with described first heat exchanging pipe (105).
Wall-hung boiler the most according to claim 1, it is characterised in that described second heat exchanger (11) For plate type heat exchanger.
Wall-hung boiler the most according to any one of claim 1 to 9, it is characterised in that institute Stating wall-hung boiler and also include the interface (29) that heats, described heating interface (29) includes being arranged on described the Heating on described first pipeline (17) in one heat exchanger channels downstream exports and is arranged on described first Heating import on described first pipeline (17) of heat exchanger channels upstream side.
CN201610349322.6A 2016-05-23 2016-05-23 Wall-mounted boiler Active CN105910271B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610349322.6A CN105910271B (en) 2016-05-23 2016-05-23 Wall-mounted boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610349322.6A CN105910271B (en) 2016-05-23 2016-05-23 Wall-mounted boiler

Publications (2)

Publication Number Publication Date
CN105910271A true CN105910271A (en) 2016-08-31
CN105910271B CN105910271B (en) 2024-03-19

Family

ID=56742283

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610349322.6A Active CN105910271B (en) 2016-05-23 2016-05-23 Wall-mounted boiler

Country Status (1)

Country Link
CN (1) CN105910271B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112361585A (en) * 2020-11-03 2021-02-12 宁波方太厨具有限公司 Water heater and control method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201233054Y (en) * 2008-06-17 2009-05-06 广东万家乐燃气具有限公司 Pre-warming and water supply system for multifunction wall hanging furnace
CN201875806U (en) * 2010-11-22 2011-06-22 盛水祥 Dual-purpose wall-hung furnace for plate-type heat exchanger
US20120305105A1 (en) * 2009-09-28 2012-12-06 Kyungdong Navien Co., Ltd Hot-water supply heat exchanger provided with a mixing valve, and adaptor having a built-in mixing valve
CN205066133U (en) * 2015-09-24 2016-03-02 广州迪森家用锅炉制造有限公司 Wall -mounted gas heating stove
CN205783772U (en) * 2016-05-23 2016-12-07 珠海格力电器股份有限公司 Wall-mounted stove

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201233054Y (en) * 2008-06-17 2009-05-06 广东万家乐燃气具有限公司 Pre-warming and water supply system for multifunction wall hanging furnace
US20120305105A1 (en) * 2009-09-28 2012-12-06 Kyungdong Navien Co., Ltd Hot-water supply heat exchanger provided with a mixing valve, and adaptor having a built-in mixing valve
CN201875806U (en) * 2010-11-22 2011-06-22 盛水祥 Dual-purpose wall-hung furnace for plate-type heat exchanger
CN205066133U (en) * 2015-09-24 2016-03-02 广州迪森家用锅炉制造有限公司 Wall -mounted gas heating stove
CN205783772U (en) * 2016-05-23 2016-12-07 珠海格力电器股份有限公司 Wall-mounted stove

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112361585A (en) * 2020-11-03 2021-02-12 宁波方太厨具有限公司 Water heater and control method thereof

Also Published As

Publication number Publication date
CN105910271B (en) 2024-03-19

Similar Documents

Publication Publication Date Title
CN109489241B (en) Gas water heater and control method thereof
CN106288344B (en) Gas heating water heater and method for simultaneously providing heating hot water and bathroom hot water
CN106595026B (en) Gas wall-mounted boiler, hot water supply system and control method
CN206131425U (en) Gas wall-mounted furnace and hot water supply system with same
CN106369653A (en) Heating hot water device and heating hot water system
CN104006538B (en) Unidirectional closed pipe internal circulation device
EP2664858B1 (en) An adapter capable of being attached to a gas water heater to achieve an additional central heating function
CN206113076U (en) Adopt warm water installation and adopt warm water system
CN205825411U (en) A kind of gas heater of band heating function
CN207515028U (en) A kind of central water heating device integrated for warm domestic hot-water
CN103557548B (en) A kind of electric heating heating dual-purpose wall-hung boiler of bathing
CN208671386U (en) Water heater
WO2012089653A3 (en) Flow heater
CN205783772U (en) Wall-mounted stove
CN105910271A (en) Wall-mounted stove
CN108844220A (en) A kind of gas heater with heating function
CN104930715B (en) Water heater
CN108088070A (en) A kind of Intelligent preheating gas heater and its subsystem and implementation method
CN102853545A (en) Plate-exchange integrated water way of gas heating water heater
CN207455702U (en) A kind of hot-water central heating system wall hung gas boiler
CN206281190U (en) Gas heating water heater
CN208296295U (en) A kind of domestic hot-water's pipeline latter end water temperature-adjusting device
CN203586524U (en) Domestic water heater with gas-electric hybrid heating dual working condition complementary work mode
CN208671340U (en) Water heater
CN106403259A (en) Water heater

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant