CN104612637A - Dump injection process of separate-layer distributional injection oilfield - Google Patents

Dump injection process of separate-layer distributional injection oilfield Download PDF

Info

Publication number
CN104612637A
CN104612637A CN201510083702.5A CN201510083702A CN104612637A CN 104612637 A CN104612637 A CN 104612637A CN 201510083702 A CN201510083702 A CN 201510083702A CN 104612637 A CN104612637 A CN 104612637A
Authority
CN
China
Prior art keywords
water
layer
injection
separate
water source
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510083702.5A
Other languages
Chinese (zh)
Inventor
张成富
牛贵锋
邹信波
王瑶
罗昌华
程心平
马喜超
李建荣
范乐宾
段铮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC Energy Technology and Services Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC Energy Technology and Services Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC Energy Technology and Services Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201510083702.5A priority Critical patent/CN104612637A/en
Publication of CN104612637A publication Critical patent/CN104612637A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/20Displacing by water

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Measuring Volume Flow (AREA)

Abstract

The invention discloses a dump injection process of a separate-layer distributional injection oilfield. The process includes the steps of 1, performing perforating to parts, corresponding to water source layers and absorbent layers, of a casing; 2, setting a packer in the casing; 3, tripping in a separate-layer water distribution string which is provided with a plurality of testing and regulation tubes, in one-to-one correspondence with the water source layers and the absorbent layers, and a cylinder setting tube which is arranged above the uppermost one of the testing and regulation tubes; 4, subjecting the water source layers and the absorbent layers to sealing examination; 5, steplessly adjusting the flow of each testing and regulation tube to finish separate-layer flow testing and distribution of the oilfield; 6, allowing dump injection during the cylinder setting tube sealed. Separate-layer distributional injection of multiple injection layers in the dump injection process is achieved through the separate-layer water distribution string, the injection of each layer is steplessly adjusted, and the need of the oilfield for separate-layer distributional injection is met; permanent-cable separate-layer water distribution string or a concentric testing and regulation type separate-layer water injection string is used, and water distribution is continuously controllable.

Description

Multi-zone flow regulating oil field flood suction technique
Technical field
The present invention relates to a kind of oil field flood suction technique, particularly a kind of multi-zone flow regulating oil field flood suction technique.
Background technology
On stream, stratum energy can decline in oil field, needs to carry out waterflooding extraction to maintain the stable yields in oil field.Current Schlumberger company and Baker company designs have gone out flood suction technique, and tubing string in lower going-into-well, is realized adopting one deck and notes one deck, therefore can only realize individual layer injection allocation together with various instrument, and costly; Its Flow-rate adjustment adopts liquid controling pipe line to regulate, for the level that has of jumping characteristic regulates.The method not only degree of regulation is lower, and can not meet the needs of part oil field layered injection allocation.
Summary of the invention
The present invention provides a kind of multi-zone flow regulating oil field flood suction technique for solving in known technology the technical problem that exists.
The technical scheme that the present invention takes for the technical problem existed in solution known technology is: a kind of multi-zone flow regulating oil field flood suction technique, adopt the following condition of water injection well in oil fields demand fulfillment of this technique: simultaneously containing at least one water source layer and at least two water accepting layers, and the energy of water source layer and the energy demand of water accepting layer meet: the water of the water source layer that energy is minimum can flow automatically and enter the maximum water accepting layer of energy; This technique adopts following steps: one) penetrate out the part that sleeve pipe is corresponding with water source layer and water accepting layer; Two) set packer in sleeve pipe, by water source layer and water accepting layer one by one packing open; Three) layering water distribution tubing string is entered under; Described layering water distribution tubing string is provided with water source layer and water accepting layer several are surveyed and adjust seating nipple and a lock core to be located cylinder one to one, and described lock core is located cylinder and is positioned at and goes up one most and survey the top of adjusting seating nipple; Four) what complete all water sources layer and all water accepting layers tests envelope operation; Five) step-less adjustment is all surveys the flow adjusting seating nipple, completes the allotment of full well stratified flow rate test; Six) under lock core is located the state that cylinder is in shutoff, flood suction is realized.
Described step 3): layering water distribution tubing string adopts cable permanent setting type, before entering under cable permanent setting type layering water distribution tubing string or under enter after, be located in cylinder at described lock core and throw in band lock core plugging device; Described step 5): adopt and forever put all flows surveying tune seating nipple of cable output signal control, adopt and forever put the real-time traffic signal that cable transmission surveys tune seating nipple.
Described step 3): layering water distribution tubing string adopts and surveys mode with one heart; Described step 5): regulate the survey corresponding with each water source layer and each water filling layer to adjust seating nipple by entering measurement and adjustment instrument device under wireline operation, and read its flow in real time, until Flow-rate adjustment is to desired value; Then in oil pipe, each water filling layer corresponding and each water source layer throw in flow meter, are finally located in cylinder at lock core and throw in band lock core blanking plug.
The advantage that the present invention has and good effect are: adopt layering water distribution tubing string to realize the multi-zone flow regulating of the multiple implanted layer of flood suction technique, and each layer water injection rate can step-less adjustment, meets the needs of oil field layered injection allocation.And adopt cable permanent setting type layering water distribution tubing string or survey mode layering water distribution tubing string with one heart, the controlled continuously of water distribution quantity can be realized.
Accompanying drawing explanation
Fig. 1 is schematic flow sheet of the present invention;
Fig. 2 is the schematic flow sheet of the embodiment of the present invention 1;
Fig. 3 is the schematic flow sheet of the embodiment of the present invention 2.
In figure: 1, oil pipe; 2, lock core plugging device is with; 3, lock core is located cylinder; 4, packer; 5, tune seating nipple is surveyed; 6, packer; 7, forever cable is put; 8, cable; 9, measurement and adjustment instrument; 10, sleeve pipe; 11, water source layer; 12, water accepting layer.
Detailed description of the invention
For summary of the invention of the present invention, Characteristic can be understood further, hereby exemplify following examples, and coordinate accompanying drawing to be described in detail as follows:
Refer to Fig. 1, a kind of multi-zone flow regulating oil field flood suction technique, adopt the following condition of water injection well in oil fields demand fulfillment of this technique: simultaneously containing at least one water source layer 11 and at least two water accepting layers 12, and the energy demand of the energy of water source layer 11 and water accepting layer 12 meets: the water of the water source layer 11 that energy is minimum can flow automatically and enter the maximum water accepting layer of energy 12.
This technique adopts following steps:
One) part that sleeve pipe 10 is corresponding with water source layer 11 and water accepting layer 12 is penetrated out;
Two) set packer 4,6 in sleeve pipe 10, by water source layer 11 and water accepting layer 12 one by one packing open;
Three) layering water distribution tubing string is entered under; Described layering water distribution tubing string is provided with water source layer 11 and water accepting layer 12 several are surveyed and adjust seating nipple 5 and a lock core to be located cylinder 3 one to one, and described lock core is located cylinder 3 and is positioned at and goes up one most and survey the top of adjusting seating nipple 5;
Four) what complete all water sources layer 11 and all water accepting layers 12 tests envelope operation;
Five) regulate all flows surveying tune seating nipple 5, complete the allotment of full well stratified flow rate test;
Six) under lock core is located the state that cylinder 3 is in shutoff, flood suction is realized.
Embodiment 1:
Refer to Fig. 2, layering water distribution tubing string adopts cable permanent setting type.The further scheme of above-mentioned technique is: described step 3): layering water distribution tubing string adopts cable permanent setting type, before entering under cable permanent setting type layering water distribution tubing string or under enter after, be located cylinder 3 in throw at described lock core and be with lock core plugging device 2; Described step 5): adopt and forever put the flow that cable 7 outputs signal control all survey tune seating nipples 5, adopt and forever put the real-time traffic signal that cable 7 transmits survey tune seating nipple 5.
Embodiment 2:
Refer to Fig. 3, layering water distribution tubing string adopts and surveys mode with one heart.The further scheme of above-mentioned technique is: described step 3): layering water distribution tubing string adopts and surveys mode with one heart; Described step 5): regulate the survey corresponding with each water source layer 11 and each water filling layer 12 to adjust the flow of seating nipple 5 by entering measurement and adjustment instrument device 9 under wireline operation, and read its flow in real time, until Flow-rate adjustment is to desired value; Measurement and adjustment instrument device 9 adopts cable 8 to provide power and signal transmission.Then in oil pipe 1, each water filling layer 12 corresponding and each water source layer 11 throw in flow meter, and be finally located in cylinder 3 at lock core and throw in band lock core blanking plug 2, isolated water active layer, ensures that nearly wellhead column is with no pressure.
Although be described the preferred embodiments of the present invention by reference to the accompanying drawings above; but the present invention is not limited to above-mentioned detailed description of the invention; above-mentioned detailed description of the invention is only schematic; be not restrictive; those of ordinary skill in the art is under enlightenment of the present invention; do not departing under the ambit that present inventive concept and claim protect, can also make a lot of form, these all belong within protection scope of the present invention.

Claims (3)

1. a multi-zone flow regulating oil field flood suction technique, is characterized in that, adopts the following condition of water injection well in oil fields demand fulfillment of this technique:
Simultaneously containing at least one water source layer and at least two water accepting layers, and the energy of water source layer and the energy demand of water accepting layer meet: the water of the water source layer that energy is minimum can flow automatically and enter the maximum water accepting layer of energy;
This technique adopts following steps:
One) part that sleeve pipe is corresponding with water source layer and water accepting layer is penetrated out;
Two) set packer in sleeve pipe, by water source layer and water accepting layer one by one packing open;
Three) layering water distribution tubing string is entered under; Described layering water distribution tubing string is provided with water source layer and water accepting layer several are surveyed and adjust seating nipple and a lock core to be located cylinder one to one, and described lock core is located cylinder and is positioned at and goes up one most and survey the top of adjusting seating nipple;
Four) what complete all water sources layer and all water accepting layers tests envelope operation;
Five) step-less adjustment is all surveys the flow adjusting seating nipple, completes the allotment of full well stratified flow rate test;
Six) under lock core is located the state that cylinder is in shutoff, flood suction is realized.
2. multi-zone flow regulating oil field according to claim 1 flood suction technique, it is characterized in that, described step 3): layering water distribution tubing string adopts cable permanent setting type, before entering under cable permanent setting type layering water distribution tubing string or under enter after, be located in cylinder at described lock core and throw in band lock core plugging device; Described step 5): adopt and forever put all flows surveying tune seating nipple of cable output signal control, adopt and forever put the real-time traffic signal that cable transmission surveys tune seating nipple.
3. multi-zone flow regulating oil field according to claim 1 flood suction technique, is characterized in that, described step 3): layering water distribution tubing string adopts and surveys mode with one heart; Described step 5): regulate the survey corresponding with each water source layer and each water filling layer to adjust seating nipple by entering measurement and adjustment instrument device under wireline operation, and read its flow in real time, until Flow-rate adjustment is to desired value; Then in oil pipe, each water filling layer corresponding and each water source layer throw in flow meter, are finally located in cylinder at lock core and throw in band lock core blanking plug.
CN201510083702.5A 2015-02-16 2015-02-16 Dump injection process of separate-layer distributional injection oilfield Pending CN104612637A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510083702.5A CN104612637A (en) 2015-02-16 2015-02-16 Dump injection process of separate-layer distributional injection oilfield

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510083702.5A CN104612637A (en) 2015-02-16 2015-02-16 Dump injection process of separate-layer distributional injection oilfield

Publications (1)

Publication Number Publication Date
CN104612637A true CN104612637A (en) 2015-05-13

Family

ID=53147262

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510083702.5A Pending CN104612637A (en) 2015-02-16 2015-02-16 Dump injection process of separate-layer distributional injection oilfield

Country Status (1)

Country Link
CN (1) CN104612637A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105649585A (en) * 2016-01-27 2016-06-08 新疆江汉油田技术服务有限公司 Flood suction integrated pipe column and operating process thereof
CN109882138A (en) * 2017-12-06 2019-06-14 中国石油天然气股份有限公司 Self-flowing water injection oil replacement exploitation device and method
CN111287716A (en) * 2020-02-25 2020-06-16 中国海洋石油集团有限公司 Downhole flow-assisting separate-layer water injection pipe column for offshore oil field
CN111425184A (en) * 2020-03-31 2020-07-17 凯跃(天津)测控技术有限公司 Well completion permanent-placed type layered automatic measuring and regulating water injection oil extraction autonomous measuring system
CN113417614A (en) * 2021-07-05 2021-09-21 湖北茂思晟石油新技术开发有限公司 Underground cable-free throwing and fishing type intelligent water distribution construction process

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040129427A1 (en) * 2001-02-14 2004-07-08 Allan Sharp Downhole pump
CN101956544A (en) * 2009-07-21 2011-01-26 上海石油天然气有限公司 Method for oil extraction in multi-bottom and multi-branch well by artesian injection
US7896079B2 (en) * 2008-02-27 2011-03-01 Schlumberger Technology Corporation System and method for injection into a well zone
CN102418505A (en) * 2011-12-20 2012-04-18 西安思坦仪器股份有限公司 Cable type water injection well allocation device and method
CN102562013A (en) * 2012-02-21 2012-07-11 西安思坦仪器股份有限公司 Automatic modulation and monitoring zonal injection method for water injection well and system thereof
CN102650205A (en) * 2012-04-27 2012-08-29 中国石油天然气股份有限公司 Oil extraction method and oil extraction well system for converting bottom water reservoir oil well into gravity flow water injection well
CN202745838U (en) * 2012-07-04 2013-02-20 中国石油天然气股份有限公司 Same well water production and injection process pipe column

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040129427A1 (en) * 2001-02-14 2004-07-08 Allan Sharp Downhole pump
US7896079B2 (en) * 2008-02-27 2011-03-01 Schlumberger Technology Corporation System and method for injection into a well zone
CN101956544A (en) * 2009-07-21 2011-01-26 上海石油天然气有限公司 Method for oil extraction in multi-bottom and multi-branch well by artesian injection
CN102418505A (en) * 2011-12-20 2012-04-18 西安思坦仪器股份有限公司 Cable type water injection well allocation device and method
CN102562013A (en) * 2012-02-21 2012-07-11 西安思坦仪器股份有限公司 Automatic modulation and monitoring zonal injection method for water injection well and system thereof
CN102650205A (en) * 2012-04-27 2012-08-29 中国石油天然气股份有限公司 Oil extraction method and oil extraction well system for converting bottom water reservoir oil well into gravity flow water injection well
CN202745838U (en) * 2012-07-04 2013-02-20 中国石油天然气股份有限公司 Same well water production and injection process pipe column

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105649585A (en) * 2016-01-27 2016-06-08 新疆江汉油田技术服务有限公司 Flood suction integrated pipe column and operating process thereof
CN109882138A (en) * 2017-12-06 2019-06-14 中国石油天然气股份有限公司 Self-flowing water injection oil replacement exploitation device and method
CN111287716A (en) * 2020-02-25 2020-06-16 中国海洋石油集团有限公司 Downhole flow-assisting separate-layer water injection pipe column for offshore oil field
CN111287716B (en) * 2020-02-25 2022-06-03 中国海洋石油集团有限公司 Downhole flow-assisting separate-layer water injection pipe column for offshore oil field
CN111425184A (en) * 2020-03-31 2020-07-17 凯跃(天津)测控技术有限公司 Well completion permanent-placed type layered automatic measuring and regulating water injection oil extraction autonomous measuring system
CN113417614A (en) * 2021-07-05 2021-09-21 湖北茂思晟石油新技术开发有限公司 Underground cable-free throwing and fishing type intelligent water distribution construction process
CN113417614B (en) * 2021-07-05 2024-03-15 湖北茂思晟石油新技术开发有限公司 Underground cable-free casting-fishing type intelligent water distribution construction process

Similar Documents

Publication Publication Date Title
CN104612637A (en) Dump injection process of separate-layer distributional injection oilfield
CN104989369B (en) A kind of huge discharge downhole oil-water separation annular space measuring and adjusting system
KR102366868B1 (en) Multiple coal bed independent gas-containing system pressure control single pump type drainage gas mining device and drainage gas mining method
CN202531143U (en) Digital underground separate-layer water injection measuring and adjusting process pipe column
CN207676223U (en) Intelligence water injection remote control device
CN207229024U (en) A kind of multi-channel tube and the flood pattern containing it
CN102418505A (en) Cable type water injection well allocation device and method
CN106640060A (en) Simulation experiment method of multi-layer commingling capacity of natural gas reservoir
CN102953716A (en) Parallel double-tube separate layer water injection string
CN104563985A (en) Digital separate injection test allocation system and method
CN202745838U (en) Same well water production and injection process pipe column
CN104453800A (en) Automatic water control device for horizontal well
CN108678716A (en) Intelligent control system and method for layered water injection of composite pipe
CN205477589U (en) Visual simulation experiment device of water pumping gas production in gas well pit shaft of coal seam
CN107542411A (en) A kind of multi-channel tube and the method using its progress seperated layer water injection
CN204899889U (en) Exempt from to throw and drag for real -time observing and controlling water injection system
CN108894767B (en) Upward suspension type underground oil-water separation tubular column
CN203114263U (en) Electric adjustable molecular weight control device for ternary combination flooding and polymer flooding dual well
CN105089648A (en) Device and method for nested layered injection of isotopic tracer
CN205561966U (en) Multi -layer underground water level observing device for hydrogeological borehole
CN201671607U (en) Concentric double-tube separate injection pipe column for ground water distribution of highly-deviated well
CN203239302U (en) Separate-layer water injection pipe column
CN206874260U (en) Single tube post multitube separated-zone water infection oil field device
CN109538179A (en) Underground self-adaptive water injection control device and control method
CN207609411U (en) A kind of offshore oilfield is surveyed with one heart adjusts polymer injector system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150513