CN104097833B - Rack bracing or strutting arrangement - Google Patents

Rack bracing or strutting arrangement Download PDF

Info

Publication number
CN104097833B
CN104097833B CN201410383819.0A CN201410383819A CN104097833B CN 104097833 B CN104097833 B CN 104097833B CN 201410383819 A CN201410383819 A CN 201410383819A CN 104097833 B CN104097833 B CN 104097833B
Authority
CN
China
Prior art keywords
strut
connecting bore
rack
joint face
regulating rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410383819.0A
Other languages
Chinese (zh)
Other versions
CN104097833A (en
Inventor
孙建龙
王庭华
安增军
李妍
王球
周洪伟
高正平
钱宏辉
邹盛
曹程杰
黄峥
凌俊斌
宗炫君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING ELECTRIC POWER ENGINEERING DESIGN Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
NANJING ELECTRIC POWER ENGINEERING DESIGN Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING ELECTRIC POWER ENGINEERING DESIGN Co Ltd, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Jiangsu Electric Power Co Ltd filed Critical NANJING ELECTRIC POWER ENGINEERING DESIGN Co Ltd
Priority to CN201410383819.0A priority Critical patent/CN104097833B/en
Publication of CN104097833A publication Critical patent/CN104097833A/en
Application granted granted Critical
Publication of CN104097833B publication Critical patent/CN104097833B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Assembled Shelves (AREA)

Abstract

The present invention relates to rack bracing or strutting arrangement, be fixed between body of wall (4) in prefabricated storehouse and rack (3), comprise mounting rod (1) and regulating rod (2), regulating rod (2) comprises at least one pair of strut (21); The two ends of the length direction of each strut (21) are respectively equipped with and strut pole face (215) acute angle oblique first joint face (211) and the second joint face (212) of intersecting vertically; Form the length of two struts (21) by two first joint face (212) involutory connections and by regulating the contact surface of involutory connection to regulate regulating rod (2) of a pair strut; Mounting rod (2) connects a strut of described body of wall (4) and described regulating rod (2) corresponding one end respectively, and corresponding another strut (21) of regulating rod (2) other end is connected with rack (3).Apparatus of the present invention make rack in transit obtain one with the abutment face of its laminating, can eliminate and rock, greatly reduce handling loss, simultaneously mounting and adjusting is easy, can quick position.

Description

Rack bracing or strutting arrangement
Technical field
The present invention relates to a kind of for the rack bracing or strutting arrangement in the prefabricated storehouse of intelligent substation.
Background technology
The rack of intelligent substation is loaded in transit in prefabricated storehouse, and general prefabricated warehouse is long-pending comparatively large, is difficult to the cooperation accomplishing the degree of precision had compared with unskilled labourer's difference band, namely enablely accomplishes, also can add the difficulty that senior general's rack is placed in prefabricated storehouse.Rack is fixed in prefabricated storehouse by anchoring bolt by therefore existing method exactly.
In long-distance transportation process, jolt unavoidably and rock, may there is rocking by a relatively large margin in such rack in storehouse, and test shows maximumly to have occurred waving of 2.5cm amplitude.This may cause anchoring bolt to crumble, and even occurs that rack and prefabricated storehouse are collided and cause the situation damaging rack.
Summary of the invention
The object of the present invention is to provide one can prevent rack from producing in transit and rock and a kind of rack bracing or strutting arrangement is easily installed.
To achieve these goals, described rack bracing or strutting arrangement is fixed between body of wall 4 in prefabricated storehouse and rack 3, this device comprises mounting rod 1 and regulating rod 2, the rectangular channel-shaped of cross-sectional plane that described mounting rod 1 is perpendicular with bar length direction, forms the mounting rod pole face 11 be made up of two parallel facess 111 and the interface 112 joined vertical with this two parallel faces; Described regulating rod 2 comprises at least one pair of strut 21; Each strut 21 cross-sectional plane perpendicular with bar length direction is in the form of slot, formed should in the strut pole face 215 of channel-shaped, be respectively equipped with at the two ends of the length direction of strut 21 and strut pole face 215 acute angle oblique first joint face 211 and the second joint face 212 of intersecting vertically, between first and second joint face, be provided with the 3rd joint face 213 that is parallel with the second joint face 212 and that join with the first joint face 211; Form the length of two struts 21 by the involutory connection of two first joint faces 211 and by regulating the contact surface of involutory connection to regulate regulating rod 2 of described a pair strut; Described mounting rod 2 liang of parallel facess 111 connect a strut of described body of wall 4 and the corresponding one end of described regulating rod 2 respectively, and regulating rod 2 other end another strut 21 corresponding is connected with rack 3.
Being interconnected and being connected with the body of wall 4 in prefabricated storehouse and rack 3 respectively for the ease of a pair strut 21, first joint face 211 of described strut 21 and the second joint face 212 and the 3rd joint face 213 are respectively equipped with the first connecting bore 2111 and the second connecting bore 2121 and the 3rd connecting bore 2131, and on strut pole face 215, are provided with four connecting bore 2151 through with the first connecting bore 2111 straight line.
Simultaneously in order to carry out being located by connecting of direction, space three in a pair strut 21, by the 4th connecting bore 2151 of both bolt cross-under and the first connecting bore 2111 and the nut that spins carries out the restriction of two strut width Y-directions, by the 3rd connecting bore 2131 of both bolt cross-under and the nut that spins carries out the restriction of two strut height Z-directions and length X-direction.
Further, described regulating rod 2 one end is connected with described body of wall 4 by the second joint face 212 of a corresponding strut; Described regulating rod 2 other end passes through the bolt on rack 3 described in the second connecting bore 2121 cross-under on the second joint face 212 of another strut corresponding and screws corresponding nut to be connected with rack 3.
Two parallel facess 111 of mounting rod 1 are provided with into not contour plane, so that the installation of mounting rod 1 connects, this neither higher and lower side is respectively equipped with some mounting holes 1111 and some connecting bores 1112 in contour pole face, higher is connected on described body of wall 4 by mounting hole 1111 and bolt and nut, and lower side is connected with described regulating rod 2 with the second connecting bore 2121 on regulating rod and bolt and nut by connecting bore 1112.
In order to make the relative installation adjustable of described mounting rod 1 and described strut 21, mounting hole 1111 on mounting rod 1 and connecting bore 1112 are waist shaped hole, and the first connecting bore 2111, second connecting bore 2121, the 3rd connecting bore 2131 and the 4th connecting bore 2151 on strut 21 are waist shaped hole.
The present invention regulates the length of regulating rod by the involutory connection of the first joint face tilting on a pair strut, rack top is made to obtain a strong point, and the inching of relative position is carried out by the waist shaped hole be arranged on mounting rod and strut, such rack be equivalent to obtain a face against, can eliminate originally because of processing with install to produce and gap causes rocks; Simultaneously bracing or strutting arrangement mounting and adjusting of the present invention is easy, can quick position, substantially reduces rack in transportation owing to rocking the damage of generation.
Accompanying drawing explanation
Fig. 1 is the schematic diagram that rack bracing or strutting arrangement of the present invention is connected between body of wall in prefabricated cabin and rack.
Fig. 2 is the tomograph of mounting rod.
Fig. 3 is the constructional drawing of a perspective direction of strut.
Fig. 4 is the constructional drawing of another perspective direction of strut.
Fig. 5 is the strut of another kind of structure.
Fig. 6 is rack bracing or strutting arrangement connection diagram of the present invention.
Fig. 7 is the connection diagram of two pairs of struts.
Detailed description of the invention
As Fig. 1, rack bracing or strutting arrangement of the present invention forms primarily of mounting rod 1 and the regulating rod 2 comprising a pair strut 21.This rack bracing or strutting arrangement is placed between body of wall 4 in prefabricated storehouse and rack 3.
As Fig. 2, the rectangular channel-shaped of cross-sectional plane that mounting rod 1 itself and bar length direction are perpendicular, formed and form by two parallel facess 111 and the interface 112 joined vertical with this two parallel faces the mounting rod pole face 11 do not closed, be convenient to the installation of mounting rod, two parallel facess 111 are designed to not contour plane simultaneously, higher arranges some mounting holes 1111, lower side arranges some connecting bores 1112, be more conducive to like this mounting rod 1 is fixedly connected on the body of wall 4 in prefabricated storehouse.
As Fig. 3,4, the rectangular channel-shaped of cross-sectional plane that strut 21 itself and bar length direction are perpendicular, forms the strut pole face 215 corresponding to the not enclosing square of this channel-shaped.Be provided with in this strut 21 one end and first joint face 211 of strut pole face 215 in 25 ° of acute angle obliques, be provided with the second joint face 212 intersected vertically with strut pole face 215 at the other end, between first and second joint face, be provided with the 3rd joint face 213 that is parallel with the second joint face 212 and that join with the first joint face 211.This set had both been convenient to the connection between strut 21 and strut 21 and between strut 21 and described body of wall 4 and between strut 21 and rack, turn increased the rigidity of strut 21 simultaneously.Above-mentioned, the first connecting bore 2111, second connecting bore 2121, the 3rd connecting bore 2131 are set respectively on first, second and third joint face, the position of strut pole face 215 corresponding to the first connecting bore 2111 arranges the 4th connecting bore 2151, make it through with the first connecting bore 2111 straight line, simultaneously the first connecting bore 2111 and the second connecting bore 2121 straight line through, can be connected by bolt and nut easily like this.For the ease of adjustment installation site, a preferential scheme is that above-mentioned connecting bore and mounting hole are all designed to waist shaped hole.
Strut of the present invention is not limited to version as shown in Figure 3,4, can also have other version, the cross-sectional plane of semi arch channel-shaped as shown in Figure 5.The strut 21 of certain structure is as shown in Figure 3,4 a kind of preferred structure.
As Fig. 6, the connection of a pair strut of composition regulating rod 2 is connecting incompatible by the first joint face 211 of two struts 21, regulating rod 2 length is regulated by regulating the contact surface of involutory connection, rack 3 is placed in vertical substantially, after length adjustment is determined, position connection by corresponding bolt and nut.By the 3rd connecting bore 2121 on bolt 64 cross-under two strut 21 and the corresponding nut that spins carries out being located by connecting of two strut width Y-directions, again by the 4th connecting bore 2151 of bolt 62 cross-under two strut 21 and the first connecting bore 2111 and the corresponding nut that spins carries out being located by connecting of two strut height Z-directions and length X-direction, therefore the 3rd joint face 213 be divided in two brace member provides the foundation for being located by connecting of Y side, and the first tilting joint face 211 and the 4th joint face 215 provide the foundation for Z-direction and being located by connecting of length X-direction, make regulating rod 2 can carry out regulating and being fixed at three-dimensional.Such rack top is close to, and bottom is connected with prefabricated storehouse by two point of connection, make mechanism obtain an abutment face of fitting with it, the prefabricated storehouse originally produced because of the tolerance on fit of machining tolerance and installation and the gap of rack no longer become the hidden danger of rocking.Therefore, there will not be in transportation with bottom junctions is rocking of standard shaft, and bracing or strutting arrangement Installation and Debugging of the present invention are simultaneously very convenient.
The installation of above-mentioned mounting rod 1 is first by the body of wall 4 of its higher parallel faces 111 horizontal abutment in prefabricated storehouse, body of wall 4 is embedded with screw 60, and the lower end of the position that the mounting hole 1111 of higher parallel faces 111 on mounting rod 1 the is arranged parallel faces 111 lower with front side flushes substantially, this makes screw 60 spin that corresponding nut has through mounting hole 1111 can the space of convenient operation, by screw 60 and corresponding nut, mounting rod 1 is fixed on body of wall 4.Regulating rod one end to be spun corresponding nut and being connected on mounting rod 1 by the second connecting bore 2121 on the strut 21 of bolt 61 cross-under corresponding end and the connecting bore 1112 on mounting rod 1.The other end of regulating rod 2 is connected on rack 3 by the corresponding nut that spins after the second connecting bore 2121 on bolt 63 cross-under corresponding end strut 21, and bolt 63 is also preset on rack 3.
Rack bracing or strutting arrangement of the present invention can effectively be applied to multiple cabinet type, if the distance of body of wall 4 to rack 3 is comparatively large, available more multipair strut, as Fig. 7.

Claims (8)

1. rack bracing or strutting arrangement, be fixed between body of wall (4) in prefabricated storehouse and rack (3), it is characterized in that comprising mounting rod (1) and regulating rod (2), the rectangular channel-shaped of cross-sectional plane that described mounting rod (1) is perpendicular with bar length direction, forms the mounting rod pole face (11) be made up of two parallel facess (111) and the interface (112) joined vertical with this two parallel faces; Described regulating rod (2) comprises at least one pair of strut (21); The perpendicular cross-sectional plane of each strut (21) and bar length direction is in the form of slot, formed should the strut pole face (215) of channel-shaped, be respectively equipped with at the two ends of the length direction of strut (21) and strut pole face (215) acute angle oblique first joint face (211) and the second joint face (212) of intersecting vertically, between first and second joint face, be provided with the 3rd joint face (213) that is parallel with the second joint face (212) and that join with the first joint face (211); Form the length of two struts (21) by two first joint face (211) involutory connections and by regulating the contact surface of involutory connection to regulate regulating rod (2) of described a pair strut; Described mounting rod (1) two parallel faces (111) connects a strut of described body of wall (4) and described regulating rod (2) corresponding one end respectively, and corresponding another strut (21) of regulating rod (2) other end is connected with rack (3).
2. rack bracing or strutting arrangement according to claim 1, it is characterized in that: first joint face (211) of described strut (21) and the second joint face (212) and the 3rd joint face (213) are respectively equipped with the first connecting bore (2111) and the second connecting bore (2121) and the 3rd connecting bore (2131), and on strut pole face (215), are provided with four connecting bore (2151) through with the first connecting bore (2111) straight line.
3. rack bracing or strutting arrangement according to claim 2, it is characterized in that: two struts (21) in described a pair strut are by the 4th connecting bore (2151) of both bolt cross-under and the first connecting bore (2111) and the nut that spins carries out the restriction of two strut width Y-directions, by the 3rd connecting bore (2131) of both bolt cross-under and the nut that spins carries out the restriction of two strut height Z-directions and length X-direction.
4. rack bracing or strutting arrangement according to claim 2, is characterized in that: described regulating rod (2) one end is connected with described body of wall (4) by second joint face (212) of a corresponding strut; Described regulating rod (2) other end is passed through the bolt on rack (3) described in the second connecting bore (2121) cross-under on second joint face (212) of another strut corresponding and is connected on rack (3) by regulating rod (2) the described other end by the corresponding nut that spins.
5. rack bracing or strutting arrangement according to claim 2, it is characterized in that: two parallel facess (111) of described mounting rod (1) are not contour plane, this neither higher and lower side is respectively equipped with some mounting holes (1111) and some connecting bores (1112) in contour plane, higher is connected on described body of wall (4) by mounting hole (1111) and bolt and nut, and lower side is connected with described regulating rod (2) with the second connecting bore (2121) on regulating rod and bolt and nut by connecting bore (1112).
6. the rack bracing or strutting arrangement according to any one of claim 2-5, is characterized in that: the mounting hole (1111) on described mounting rod (1) and connecting bore (1112) are waist shaped hole.
7. the rack bracing or strutting arrangement according to any one of claim 2-5, is characterized in that: the first connecting bore (2111) on described strut (21), the second connecting bore (2121), the 3rd connecting bore (2131) and the 4th connecting bore (2151) are waist shaped hole.
8. the rack bracing or strutting arrangement according to any one of claim 1-5, is characterized in that: described strut (21) cross-sectional plane in the form of slot is rectangle channel-shaped or semicircle channel-shaped.
CN201410383819.0A 2014-08-06 2014-08-06 Rack bracing or strutting arrangement Active CN104097833B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410383819.0A CN104097833B (en) 2014-08-06 2014-08-06 Rack bracing or strutting arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410383819.0A CN104097833B (en) 2014-08-06 2014-08-06 Rack bracing or strutting arrangement

Publications (2)

Publication Number Publication Date
CN104097833A CN104097833A (en) 2014-10-15
CN104097833B true CN104097833B (en) 2016-04-13

Family

ID=51666449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410383819.0A Active CN104097833B (en) 2014-08-06 2014-08-06 Rack bracing or strutting arrangement

Country Status (1)

Country Link
CN (1) CN104097833B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1475136A1 (en) * 1965-05-11 1969-04-30 Guenter Rottschaefer Plastic wedge dowel
FR2672645B1 (en) * 1991-02-13 1994-07-01 Cahors App Elec DEVICE FOR FIXING AN ELEMENT IN AN ADJUSTABLE POSITION AT THE END OF A TUBE.
US6234710B1 (en) * 1996-05-22 2001-05-22 Vesko Ananiev Lockable adjustable length member
CN100537298C (en) * 2005-07-26 2009-09-09 吴煌吉 Apparatus for supporting carried goods
GB0901640D0 (en) * 2009-02-03 2009-03-11 Airbus Uk Ltd Joint
CN204223408U (en) * 2014-08-06 2015-03-25 国家电网公司 Rack bracing or strutting arrangement

Also Published As

Publication number Publication date
CN104097833A (en) 2014-10-15

Similar Documents

Publication Publication Date Title
CN203285078U (en) Supporting frame with adjustable height
CN108150720A (en) A kind of locking antidetonation suspension and support for pipe laying
CN108105472A (en) A kind of locking antidetonation suspension and support for pipe laying
CN204223563U (en) Rack support rod mechanism
CN204223408U (en) Rack bracing or strutting arrangement
CN104097833B (en) Rack bracing or strutting arrangement
CN104458455B (en) Narrow base power transmission steel pipe tower space tower leg structured testing method
CN204082804U (en) A kind of brace member
CN204692772U (en) A kind of combination type supporting device for petroleum pipeline
CN104097877A (en) Cabinet support bar mechanism
CN204385993U (en) Hanging structure is buried in a kind of cell curtain wall side
CN104154078B (en) A kind of brace member
CN204456856U (en) A kind of cast-in-situ concrete beam column template
CN203670380U (en) Guard bar folding device for movable overhaul platform
CN109372164A (en) A kind of unit glass curtain wall hanger system and its mounting process
CN202455709U (en) Shock absorption and seismic-resistant communication cabinet frame
CN204772489U (en) Dish is inserted to finish machining bent axle
CN203257080U (en) Adjustable overhang supporting device for building construction
CN207460688U (en) A kind of computer room cabinet free type braced frame
CN205602391U (en) Place device of group battery
CN206098508U (en) Mechanical equipment's storage battery support device
CN208293837U (en) A kind of connection hanging piece of curtain-wall stand-column and building body
CN206169710U (en) A auxiliary device for machine parts processing and installation
CN205623537U (en) Photovoltaic big -arch shelter
CN206034982U (en) Three -dimensional computer lab

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Sun Jianlong

Inventor after: Cao Chengjie

Inventor after: Huang Zheng

Inventor after: Ling Junbin

Inventor after: Zong Xuanjun

Inventor after: Wang Tinghua

Inventor after: An Zengjun

Inventor after: Li Yan

Inventor after: Wang Qiu

Inventor after: Zhou Hongwei

Inventor after: Gao Zhengping

Inventor after: Qian Honghui

Inventor after: Zou Sheng

Inventor before: Sun Jianlong

Inventor before: Wang Tinghua

Inventor before: Li Yan

Inventor before: Zhou Hongwei

Inventor before: Qian Honghui

Inventor before: Hu Guowei

Inventor before: Zou Sheng

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant