CN104024965B - 用于可变速度泵控制的动态线性控制方法和装置 - Google Patents

用于可变速度泵控制的动态线性控制方法和装置 Download PDF

Info

Publication number
CN104024965B
CN104024965B CN201280061743.9A CN201280061743A CN104024965B CN 104024965 B CN104024965 B CN 104024965B CN 201280061743 A CN201280061743 A CN 201280061743A CN 104024965 B CN104024965 B CN 104024965B
Authority
CN
China
Prior art keywords
mrow
msup
point
msub
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201280061743.9A
Other languages
English (en)
Other versions
CN104024965A (zh
Inventor
成安生
顾晋豪
G·A·斯科特
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fluid Handling LLC
Original Assignee
Fluid Handling LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fluid Handling LLC filed Critical Fluid Handling LLC
Publication of CN104024965A publication Critical patent/CN104024965A/zh
Application granted granted Critical
Publication of CN104024965B publication Critical patent/CN104024965B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D7/00Control of flow
    • G05D7/06Control of flow characterised by the use of electric means
    • G05D7/0617Control of flow characterised by the use of electric means specially adapted for fluid materials
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D15/00Control, e.g. regulation, of pumps, pumping installations or systems
    • F04D15/0066Control, e.g. regulation, of pumps, pumping installations or systems by changing the speed, e.g. of the driving engine
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Control Of Non-Positive-Displacement Pumps (AREA)
  • Feedback Control In General (AREA)
  • Flow Control (AREA)

Abstract

诸如泵控制器的装置以信号处理器为特征,该信号处理器被配置为至少:接收包含与线性设置点控制曲线相关的信息的信令,该线性设置点控制曲线至少部分基于与泵送系统中的泵所泵送的流体相关的自适应设置点控制曲线,并且至少部分基于所接收的信令确定控制设置点。该信号处理器可以被配置为基于所确定的控制设置点而提供包含用于对泵进行控制的信息的控制信号。

Description

用于可变速度泵控制的动态线性控制方法和装置
相关申请的交叉引用
本申请要求于2011年12月16日提交的临时专利申请号61/576737的权益,其通过引用全文结合于此。
技术领域
本发明涉及一种用于对泵的操作进行控制的技术;更具体地,本发明涉及一种用于对泵的速度进行控制的方法和装置,该泵例如用于家用和商用的加热或冷却水系统。
背景技术
图1(a)示出了本领域已知的二级可变速度的泵控制的液体循环加热和冷却系统,并且图1(b)示出了同样是本领域已知的升压水泵系统。近年来,在这样的泵送系统中,有关节能和环保的问题已经显著地得到解决。越来越多的注意力被投向液体循环泵控制应用,其包括用于如图1(a)和(b)中所示的具有其本质上可能是动态和未知的特性的那些家用和商用加热和冷却水泵送或循环系统、升压水泵系统等的泵控制。为了降低能耗和操作成本,已经提出了一些已知的自适应控制方法。
例如,转让予当前专利申请的受让人并且因此通过引用全文结合于此的于2010年12月30日提交的美国专利申请序列号12/982286(文件编号:F-B&G-1001//911-19.001)公开了一种用于与图1(a)和(b)示意性示出的相符的液体循环加热和冷却泵送系统以及用于升压水泵系统的自适应控制方案。图1(c)示出了具有使用已知系统曲线等式所绘制的各种函数的图形,例如包括泵曲线、瞬时系统曲线、恒定控制曲线、等同系统曲线(如所设计的)、自适应控制曲线和分布损失曲线。关于所要求流量Q*的压力设置点P*可以根据等式进行计算和/或确定,其中可以从流动等式连同移动的均值过滤器一起获得自适应控制曲线利用该自适应方法,用于获得压力设置点的自适应控制曲线明显更为接近与图1(c)所示相符的等同系统曲线,后者表示保持所要求的流量所需的最小压力。因此,使用这种自适应方法可以节省泵送系统的操作能量。
发明内容
本发明对以上所提到的美国专利申请序列号12/982286中所给出的自适应机制提供了改进。
根据一些实施例,本发明可以采用诸如泵控制器的装置的形式,其以信号处理器为特征,该信号处理器被配置为至少:
接收包含与线性设置点控制曲线相关的信息的信令,该线性设置点控制曲线至少部分基于与泵送系统中的泵所泵送的流体相关的自适应设置点控制曲线,并且
至少部分基于所接收的信令确定控制设置点。
本发明的实施例还可以包括以下一个或多个特征:
该信号处理器可以被配置为至少部分基于所确定的控制设置点提供包含用于对泵进行控制的信息的控制信号。
该线性设置点控制曲线从自适应设置点控制曲线关于系统流动和压力所得出,包括由信号处理器所得出。
该信号处理器可以被配置为至少部分基于以下等式而确定线性设置点控制曲线:
其中P0是恒定压力设置点,
Q*(t)是所要求的流量,
Qmax是最大系统流量,
是最大自适应流量,并且
b0是压力阈值。
该信号处理器可以被配置为至少部分基于以下等式而将系统流量确定为每个个体分区的流量之和:
其中是分区i处的流量并且n是分区总数。
该信号处理器可以被配置为至少部分基于以下等式在使用分区温度控制参数的情况下确定系统流量
其中Ti *是分区i的温度设置点,
Qi,max是用于获得最大温度的最大流量,
Ti,max针对分区i进行指定,
Toutdoor是户外温度,并且
α是补偿系数。
该信号处理器可以被配置为至少部分基于以下等式而确定所要求的流量Q*(t):
其中r=b0/P0
Cv(t)是瞬时系统曲线,
是自适应设置点控制曲线,
是自适应最大流动,
是相对应的最大系统曲线,并且
P0是恒定压力设置点。
该信号处理器被配置为至少部分基于以下等式而从自适应控制曲线直接确定压力设置点:
该信号处理器可以被配置为确定至少部分基于所要求的流量Q*并且从自适应设置点控制曲线所得出的控制设置点。
该装置可以进一步包括至少一个包括计算机程序代码的存储器;并且该至少一个存储器和计算机程序代码被配置为利用至少一个处理器而使得该装置至少:
接收信令;并且
至少部分基于所接收的信令确定控制设置点。
该装置可以包括泵控制或控制器或者采取泵控制或控制器形式,其包括具有一个信号处理器的PID控制器。
根据一些实施例,本发明可以采取方法的形式,该方法包括步骤:在信号处理器中接收包含与线性设置点控制曲线有关的信息的信令,该线性设置点控制曲线至少部分基于与泵送系统中的泵所泵送的流体相关的自适应设置点控制曲线,并且在该信号处理器中至少部分基于所接收的信令确定控制设置点。
本发明还可以例如采用具有计算机可读介质的计算机程序产品的形式,该计算机可读介质具有嵌入其中的计算机可执行代码,例如当在形成这样的泵控制器的一部分的信令处理设备上运行时,其用于实施该方法。作为示例,该计算机程序产品例如可以采用CD、软盘、记忆棒、存储卡,以及现在已知或者日后研发的可以将这样的计算机可执行代码存储在计算机可读介质上的其它类型或种类的存储器设备。
本发明的一个优势在于其能够对能耗和操作成本的整体降低有所贡献,例如包括图1(a)所示的二级可变速度泵控制液体循环加热和冷却系统以及图1(b)所示的升压水泵系统。
附图说明
附图包括并非依比例绘制的以下示图:
图1包括图1a、1b和1c,其中图1a是本领域已知的二级可变速度泵控制液体循环加热或冷却系统的图;图1b是本领域已知的升压水泵系统的示图;并且图1c是用于基于自适应控制曲线而实施自适应控制技术的有关英尺水头压力(foot head)的流动(GPM)的图形,与本领域已知的相符,其中在流量Q*所节约的液体循环功率=dP*Q*
图2是根据本发明一些实施例的装置的框图。
图3是根据本发明一些实施例的用于基于从自适应和恒定控制曲线所得出的线性设置点曲线而实施自适应控制技术的有关流动(GPM)的系统压力的图形。
图4是根据本发明一些实施例的用于基于确定要求的流动Q*而实施线性自适应控制技术的有关流动(GPM)的系统压力的图形。
具体实施方式
图2以诸如泵控制器的装置10的形式示出了本发明,该装置10的特征在于信号处理器12,其被配置为至少接收包含与线性设置点控制曲线相关的信息的信令,该线性设置点控制曲线至少部分基于与泵送系统中的泵所泵送的流体相关的自适应设置点控制曲线,并且至少部分基于所接收的信令确定控制设置点。信号处理器12还可以被配置为至少部分基于所确定的控制设置点而提供包含用于对泵进行控制的信息的控制信号。装置10可以包括泵控制或控制器或者采取其形式,该泵控制或控制器包括具有信号处理器12的PID控制。
图3
图3示出了具有使用已知系统曲线等式所绘制的各种函数的图形,例如包括泵曲线、恒定控制曲线、动态线性控制曲线、等同系统曲线、自适应控制曲线和分布损失曲线。在根据图3所给出的自适应方法中,控制设置点从线性设置点曲线获得并且至少部分以其为基础,该线性设置点曲线源自于自适应和恒定控制曲线。
在操作中,根据本发明的一些实施例,与图3所示的相符,动态线性控制曲线可以源自关于系统流动和压力的自适应控制曲线。通过使用该自适应方法,可以轻易获得压力设置点P*。最重要地,这使得可针对系统配置而实现自适应泵控制器件而无需专门使得所有的区间流速信号可用。
作为示例,遵循该线性自适应方法,关于任意时间t所要求的流量的设置点曲线可以被写为:
其中P0是恒定压力设置点,Qmax是最大系统流量,是最大自适应流量,b0是压力阈值,并且是自适应控制曲线,这些与美国专利申请序列号12/982286中所给出的相符。可以移动均值过滤器或移动峰值检测器而直接获得,优选地在瞬时系统特性上。
这里的自适应技术可以被用来对任意变化或未知的系统特性进行追踪并且在流量Q*(t)已知时相应地对控制设置点进行设置。在这种情况下,系统流量可以被大致表达为每个个体分区流量之和:
其中是分区i处的流量且n是分区总数。
如果使用分区温度控制参数,则等式(2)可以被重写为:
其中Ti *是分区i的温度设置点,Qi,max是用于获得针对分区i所指定的最大温度Ti,max的最大流量,Toutdoor是室外温度,并且α是补偿系数,分别可以是离开水加热或冷却交换器线圈的水温,或者用于循环器或控制阀信号的恒温器上的温度设置点。
根据本发明的一些实施例,这里所给出的用于液体循环泵送系统的控制曲线和器件可以包括使用图3中的这种动态线性设置点曲线及其等式(1)中分别关于系统流动和压力的相对应表达式。这里,任意时刻t的系统流量可以以等式(2)的分区流量之和或者等式(3)的所要求并已知的分区温度的形式进行表达。
图4
图4示出了具有使用已知系统曲线等式所绘制的各种函数的图形,例如包括泵曲线、恒定控制曲线、线性自适应控制曲线、瞬时系统曲线、等同系统曲线、自适应控制曲线和分布损失曲线。在根据图4所给出的自适应方法中,特别对所要求的流量Q*进行计算或确定。
然而,在许多液体循环系统和应用中,等式(2)和(3)中的分区流量信号或分区温度信号并非始终都能够获得或者获取它们的成本过高。针对这些类型的情况,与图4中示意性示出的相符地给出替换版本的线性自适应控制器件。根据本发明的一些实施例,在该自适应方法中,所要求的系统流量Q*可以从瞬时系统曲线和线性自适应曲线的交点进行计算和/或确定,而压力设置点随后能够相应地基于所要求的流量Q*而从自适应控制曲线获得。
通过遵循该方法,所要求的流量Q*能够被得出为:
并且压力点可以从自适应控制曲线得出为:
其中r=b0/P0,Cv(t)是瞬时系统曲线,是自适应最大流动,并且是相对应的最大系统曲线。这里,自适应控制曲线可以通过流动信息等式上的移动均值过滤器或移动峰值检测器而获得。优选地,可以通过使用移动峰值检测器来获得等式(5)连同等式(4)一起可以被用来在具有主要由控制阀所调节的分区流量的任意液体循环系统中设置控制压力设置点,原因在于该系统特性被用来获得所要求的流量。
为了通过使用流动等式获得瞬时系统曲线Cv(t),瞬时系统压力和流量可能都需要被获知。在许多实际应用中,系统流量可能并非始终都能够获得。为此,可替换地,诸如速度、扭矩、或电流的额定值之类的那些电机操作参数之一可以被用来利用线性近似计算流量。如果能够获得,则也可以使用基于泵和系统校准数据从电机速度和功率产生系统流量和压力的无传感器反向器。
为了在控制系统中应用这里所给出的控制压力设置点模型,可能需要提供一定数量的传感器监视和信号发送、传送以及连线技术。除那些之外,无线传感器信号传输技术或无传感器泵控制技术可以提供一些最佳且更好的解决方案。
实际上,根据本发明的一些实施例,这里所提到的用于液体循环泵送系统的控制曲线和器件可以包括这种使用图4中的动态线性设置点曲线及其分别在等式(4)和(5)中的相对应表达式。这里,当无法获得分区流量或分区温度信号时,可以通过使用等式(4)和(5)来计算和/或确定所要求的系统流量。在系统流量无法获得的情况下,可替换地,可以利用包括速度、扭矩、功率或电流的额定值在内的电机操作参数之一而利用线性近似来计算流量。如果能够获得,则也可以使用基于泵和系统校准数据从电机速度和功率产生系统流量和压力的无传感器反向器。
总体上,通过使用根据本发明的线性自适应控制器件,能够显著节省泵操作能量。该方法简单、可行并且能够轻易集成到包括闭环加热和冷却控制系统以及开环升压水泵系统在内的任意泵控制液体循环系统之中。
装置10
作为示例,装置10的功能可以使用硬件、软件、固件或者其组合来实施。在典型的软件实施方式中,装置10将包括一个或多个基于微处理器的架构,其具有例如至少一个类似信号处理器或微处理器的元件12。本领域技术人员将无需进行实验就能够对这样的基于微控制器(或微处理器)的实施方式进行编程以执行这里所描述的功能。本发明的范围并非意在被局限于使用目前已知或日后研发的技术的任何特定实施例。本发明的范围意在包括将处理器12的功能实施为独立处理器或处理器模块、单独处理器或处理器模块以及它们的一些组合。
该装置还可以包括其它信号处理器电路或组件14,例如包括类似随机访问存储器(RAM)和/或只读存储器(ROM)的元件14,输入/输出设备和控制,以及对其进行连接的数据和地址总线,和/或至少一个输入处理器和至少一个输出处理器。
可能的附加应用
与这里所公开的相符,用于加热或冷却水系统以及升压系统的控制器件可以包括动态线性设置点曲线和器件。利用该新颖的方法,控制曲线明显更为接近系统曲线并且可以显著降低泵控制的操作能量成本。
与这里所公开的相符,这里所提到的液体循环系统可以包括主要泵送系统、次要泵送系统、水循环系统和升压系统。这里所提到的系统还由单个分区或多个分区所组成。
与这里所公开的相符,以上所提到的系统可以包括手动或自动控制阀、手动或自动控制循环器或者它们的组合。
与这里所公开的相符,用于泵控制的输入处理控制信号可以包括系统压力或差分压力、分区压力或差分压力、系统流量或分区流量。其它输入处理信号也可以包括功率、扭矩、电机速度等。
与这里所公开的相符,控制信号生成和监视、传送和连线技术可以包括当前所使用的所有常规传感和传送手段。优选地,无传感器的泵控制技术以及无线传感器信号传输技术可以提供最佳且有利的解决方案。
与这里所公开的相符,这里所提到的用于液体循环泵送系统的泵可以包括单个泵、一组并联联动的泵、一组串联联动的泵或者其它组合形式。
与这里所公开的相符,泵分级/降级以及交替手段可以包括当前所有用的所有常规手段。
自适应控制曲线的示例
与上述美国专利申请序列号12/982286中所给出的相符并且作为示例,本领域技术人员将会意识到并理解的是,自适应控制曲线SAMAt能够以如下以自行校准的方式至少部分基于系统流动等式而通过自适应移动均值过滤器从瞬时压力和流量信号所获得:
其中函数AMAF是自适应移动均值过滤器函数,并且参数Q和ΔP分别是瞬时系统流量和差分压力。
在上述美国专利申请序列号12/982286中,控制压力设置点从自适应控制曲线关于瞬时流量或移动均值流量而获得为:
SPt=MA(Qt)*SAMAt+b, (2)
其中函数MA是移动均值过滤器函数(MA)并且参数b是小幅恒定压力偏移量。注意到,函数AMAF也分别可以被移动均值过滤器函数(MA)或当前已知或日后研发的任意其它的类似自适应过滤器所替代。本发明的范围并非意在被局限于这种类型或种类的过滤器函数。用于家用和商用加热或冷却水系统的泵控制的自适应控制曲线和技术也可以包括在控制曲线的起始处的阈值以便适应最小泵速。
对于其差分压力P(x,t)是具有流量百分比x和时间t的流量Q(x,t)的函数的具有任意分布特性的系统而言,该自适应控制曲线和设置点可以因此被如下改写:
并且
SPx,t=MA(Qx,t)*SAMAx,t+b. (4)
这里,函数AMAF是分别关于瞬时系统流量百分比x和时间t的2D自适应移动均值过滤器。
用于从另一等式得出一个等式的技术
例如从如这里所给出的自适应和恒定控制曲线得出线性设置点曲线的用于从另一等式得出一个等式的技术是本领域已知的,并且本发明的范围并非意在被限制为任何特定类型或方式的技术,或者任何这样做的特定方式,无论其是当前已知的还是日后所研发的。
本发明的范围
应当理解的是,除非这里另外指出,否则这里关于特定实施例所描述的特征、特性、替换或修改也可以随这里所描述的任意其它实施例应用、使用或结合。而且,这里的附图并非依比例绘制。
虽然关于离心泵而通过示例对本发明进行了描述,但是本发明的范围意在包括将其关于目前已知或日后研发的其它类型或种类的泵加以使用。
虽然已经关于其示例性实施例对本发明进行了描述和说明,但是可以在其中并针对其进行以上以及各种其它增加和省略而并不背离本发明的精神和范围。

Claims (24)

1.一种用于加热和冷却水系统的泵控制器,包括:
信号处理器,其被配置为至少:
接收包含关于线性设置点控制曲线的信息的信令,所述线性设置点控制曲线源自与泵送系统中的泵所泵送的流体相关的自适应和恒定设置点控制曲线,并且
至少部分基于所接收的信令,使用从得出的所述线性设置点控制曲线获得控制设置点的自适应控制算法,确定包含关于自适应地控制和改变所述泵送系统中的泵的速度的所述控制设置点的信息的相应信号。
2.根据权利要求1的泵控制器,其中所述信号处理器被配置为至少部分基于所确定的控制设置点提供相应信令作为包含用于对所述泵进行控制的信息的控制信号。
3.根据权利要求1的泵控制器,其中所述线性设置点控制曲线关于系统流量和压力而从所述自适应设置点控制曲线得出,包括由所述信号处理器得出。
4.根据权利要求1的泵控制器,其中
所述信号处理器被配置为至少部分基于以下等式而使用线性设置点控制曲线确定关于所要求的流量Q*(t)的压力设置点P*(t):
<mrow> <msup> <mi>P</mi> <mo>*</mo> </msup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <msub> <mi>P</mi> <mn>0</mn> </msub> <msup> <mi>Q</mi> <mo>*</mo> </msup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>/</mo> <msub> <mover> <mi>Q</mi> <mo>&amp;OverBar;</mo> </mover> <mrow> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msub> <mo>+</mo> <msub> <mi>b</mi> <mn>0</mn> </msub> </mrow>
其中
P*(t)是压力设置点,
P0是恒定压力设置点,
Q*(t)是所要求的流量,
是最大自适应流量,并且
b0是压力阈值。
5.根据权利要求4的泵控制器,其中所述信号处理器被配置为至少部分基于以下等式而将系统流量确定为每个个体分区的流量之和:
<mrow> <msup> <mi>Q</mi> <mo>*</mo> </msup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <munderover> <mi>&amp;Sigma;</mi> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msubsup> <mi>Q</mi> <mi>i</mi> <mo>*</mo> </msubsup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> </mrow>
其中是分区i处的流量并且n是分区总数。
6.根据权利要求5的泵控制器,其中所述信号处理器被配置为至少部分基于以下等式在使用分区温度控制参数的情况下确定所述系统流量
<mrow> <msup> <mi>Q</mi> <mo>*</mo> </msup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <mi>&amp;alpha;</mi> <munderover> <mi>&amp;Sigma;</mi> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msub> <mi>Q</mi> <mrow> <mi>i</mi> <mo>,</mo> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msub> <mrow> <mo>(</mo> <msubsup> <mi>T</mi> <mi>i</mi> <mo>*</mo> </msubsup> <mo>(</mo> <mi>t</mi> <mo>)</mo> <mo>-</mo> <msub> <mi>T</mi> <mrow> <mi>o</mi> <mi>u</mi> <mi>t</mi> <mi>d</mi> <mi>o</mi> <mi>o</mi> <mi>r</mi> </mrow> </msub> <mo>)</mo> </mrow> <mo>/</mo> <mrow> <mo>(</mo> <msub> <mi>T</mi> <mrow> <mi>i</mi> <mo>,</mo> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>T</mi> <mrow> <mi>o</mi> <mi>u</mi> <mi>t</mi> <mi>d</mi> <mi>o</mi> <mi>o</mi> <mi>r</mi> </mrow> </msub> <mo>)</mo> </mrow> </mrow>
其中Ti *是分区i的温度设置点,
Qi,max是用于获得最大温度的最大流量,
Ti,max针对分区i进行指定,
Toutdoor是户外温度,并且
α是补偿系数。
7.根据权利要求1的泵控制器,其中所述信号处理器被配置为至少部分基于以下等式而确定所要求的流量Q*(t):
<mrow> <msup> <mi>Q</mi> <mo>*</mo> </msup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>r</mi> <mo>)</mo> </mrow> <msubsup> <mi>C</mi> <mi>v</mi> <mn>2</mn> </msubsup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>/</mo> <msubsup> <mover> <mi>C</mi> <mo>&amp;OverBar;</mo> </mover> <mi>v</mi> <mi>m</mi> </msubsup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mrow> <mo>(</mo> <mn>1</mn> <mo>+</mo> <msqrt> <mrow> <mn>1</mn> <mo>+</mo> <mn>4</mn> <mi>r</mi> <msup> <mrow> <mo>(</mo> <msub> <mi>C</mi> <mi>v</mi> </msub> <mo>(</mo> <mi>t</mi> <mo>)</mo> <mo>/</mo> <msubsup> <mover> <mi>C</mi> <mo>&amp;OverBar;</mo> </mover> <mi>v</mi> <mi>m</mi> </msubsup> <mo>(</mo> <mi>t</mi> <mo>)</mo> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>/</mo> <msup> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>r</mi> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mrow> </msqrt> <mo>)</mo> </mrow> <msqrt> <msub> <mi>P</mi> <mn>0</mn> </msub> </msqrt> <mo>/</mo> <mn>2</mn> </mrow>
其中r=b0/P0
Cv(t)是瞬时系统曲线,
是相对应的最大系统曲线,并且
P0是恒定压力设置点,
b0是压力阈值。
8.根据权利要求7的泵控制器,其中所述信号处理器被配置为至少部分基于以下等式而从所述自适应控制曲线直接确定压力设置点:
<mrow> <msup> <mi>P</mi> <mo>*</mo> </msup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <msup> <mrow> <mo>(</mo> <msup> <mi>Q</mi> <mo>*</mo> </msup> <mo>(</mo> <mi>t</mi> <mo>)</mo> <mo>/</mo> <msubsup> <mover> <mi>C</mi> <mo>&amp;OverBar;</mo> </mover> <mi>v</mi> <mi>a</mi> </msubsup> <mo>(</mo> <mi>t</mi> <mo>)</mo> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mrow>
其中,P*(t)是压力设置点,
是自适应控制曲线。
9.根据权利要求1的泵控制器,其中所述信号处理器被配置为确定至少部分基于所要求的流量Q*(t)并且从所述自适应设置点控制曲线所得出的控制设置点。
10.根据权利要求1的泵控制器,其中所述泵控制器进一步包括至少一个包括计算机程序代码的存储器;并且所述至少一个存储器和计算机程序代码被配置为利用至少一个处理器而使得所述泵控制器至少:
接收所述信令;并且
至少部分基于所接收的信令确定所述控制设置点。
11.根据权利要求1的泵控制器,其中所述泵控制器可以包括具有信号处理器的泵控制或控制器或者采取所述泵控制或控制器的形式,所述泵控制或控制器包括PID控制。
12.一种使用用于控制加热和冷却水系统的泵控制器的方法,包括:
在具有信号处理器的泵控制器中接收包含关于线性设置点控制曲线的信息的信令,所述线性设置点控制曲线源自与泵送系统中的泵所泵送的流体相关的自适应设置点和恒定控制曲线,并且
在所述泵控制器中至少部分基于所接收的信令,使用从得出的所述线性设置点控制曲线获得控制设置点的自适应控制算法,确定包含关于自适应地控制和改变所述泵送系统中的泵的速度的所述控制设置点的信息的相应信令。
13.根据权利要求12的方法,其中所述方法包括至少部分基于所确定的控制设置点为所述信号处理器提供所述相应信令作为包含用于对所述泵进行控制的信息的控制信号。
14.根据权利要求12的方法,其中所述方法包括利用所述信号处理器至少部分基于包含与所述线性设置点控制曲线和所述自适应设置点控制曲线之间的交点相关的信息的信令来确定所要求的流量Q*,所述交点包括处于最大自适应流量的交点。
15.根据权利要求12的方法,其中所述方法包括利用所述信号处理器至少部分基于以下等式而确定所述线性设置点控制曲线:
<mrow> <msup> <mi>P</mi> <mo>*</mo> </msup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <msub> <mi>P</mi> <mn>0</mn> </msub> <msup> <mi>Q</mi> <mo>*</mo> </msup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>/</mo> <msub> <mover> <mi>Q</mi> <mo>&amp;OverBar;</mo> </mover> <mrow> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msub> <mo>+</mo> <msub> <mi>b</mi> <mn>0</mn> </msub> </mrow>
其中P*(t)是压力设置点,
P0是恒定压力设置点,
Q*(t)是所要求的流量,
是最大自适应流量,并且
b0是压力阈值。
16.根据权利要求15的方法,其中所述方法包括利用所述信号处理器至少部分基于以下等式而将系统流量确定为每个个体分区的流量之和:
<mrow> <msup> <mi>Q</mi> <mo>*</mo> </msup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <munderover> <mi>&amp;Sigma;</mi> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msubsup> <mi>Q</mi> <mi>i</mi> <mo>*</mo> </msubsup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> </mrow>
其中是分区i处的流量并且n是分区总数。
17.根据权利要求16的方法,其中所述方法包括利用所述信号处理器至少部分基于以下等式在使用分区温度控制参数的情况下确定所述系统流量:
<mrow> <msup> <mi>Q</mi> <mo>*</mo> </msup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <mi>&amp;alpha;</mi> <munderover> <mi>&amp;Sigma;</mi> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msub> <mi>Q</mi> <mrow> <mi>i</mi> <mo>,</mo> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msub> <mrow> <mo>(</mo> <msubsup> <mi>T</mi> <mi>i</mi> <mo>*</mo> </msubsup> <mo>(</mo> <mi>t</mi> <mo>)</mo> <mo>-</mo> <msub> <mi>T</mi> <mrow> <mi>o</mi> <mi>u</mi> <mi>t</mi> <mi>d</mi> <mi>o</mi> <mi>o</mi> <mi>r</mi> </mrow> </msub> <mo>)</mo> </mrow> <mo>/</mo> <mrow> <mo>(</mo> <msub> <mi>T</mi> <mrow> <mi>i</mi> <mo>,</mo> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>T</mi> <mrow> <mi>o</mi> <mi>u</mi> <mi>t</mi> <mi>d</mi> <mi>o</mi> <mi>o</mi> <mi>r</mi> </mrow> </msub> <mo>)</mo> </mrow> </mrow>
其中Ti *是分区i的温度设置点,
Qi,max是用于获得最大温度的最大流量,
Ti,max针对分区i进行指定,
Toutdoor是户外温度,并且
α是补偿系数。
18.根据权利要求12的方法,其中所述方法包括利用所述信号处理器至少部分基于以下等式而确定所要求的流量Q*(t):
<mrow> <msup> <mi>Q</mi> <mo>*</mo> </msup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>r</mi> <mo>)</mo> </mrow> <msubsup> <mi>C</mi> <mi>v</mi> <mn>2</mn> </msubsup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>/</mo> <msubsup> <mover> <mi>C</mi> <mo>&amp;OverBar;</mo> </mover> <mi>v</mi> <mi>m</mi> </msubsup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mrow> <mo>(</mo> <mn>1</mn> <mo>+</mo> <msqrt> <mrow> <mn>1</mn> <mo>+</mo> <mn>4</mn> <mi>r</mi> <msup> <mrow> <mo>(</mo> <msub> <mi>C</mi> <mi>v</mi> </msub> <mo>(</mo> <mi>t</mi> <mo>)</mo> <mo>/</mo> <msubsup> <mover> <mi>C</mi> <mo>&amp;OverBar;</mo> </mover> <mi>v</mi> <mi>m</mi> </msubsup> <mo>(</mo> <mi>t</mi> <mo>)</mo> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>/</mo> <msup> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>r</mi> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mrow> </msqrt> <mo>)</mo> </mrow> <msqrt> <msub> <mi>P</mi> <mn>0</mn> </msub> </msqrt> <mo>/</mo> <mn>2</mn> </mrow>
其中r=b0/P0
Cv(t)是瞬时系统曲线,
是相对应的最大系统曲线,
P0是恒定压力设置点,并且
b0是压力阈值。
19.根据权利要求18的方法,其中所述信号处理器被配置为至少部分基于以下等式而从所述自适应控制曲线直接确定压力设置点:
<mrow> <msup> <mi>P</mi> <mo>*</mo> </msup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <msup> <mrow> <mo>(</mo> <msup> <mi>Q</mi> <mo>*</mo> </msup> <mo>(</mo> <mi>t</mi> <mo>)</mo> <mo>/</mo> <msubsup> <mover> <mi>C</mi> <mo>&amp;OverBar;</mo> </mover> <mi>v</mi> <mi>a</mi> </msubsup> <mo>(</mo> <mi>t</mi> <mo>)</mo> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mrow>
其中,P*(t)是压力设置点,
是自适应控制曲线。
20.根据权利要求12的方法,其中所述方法包括利用所述信号处理器确定至少部分基于所要求的流量Q*(t)并且从所述自适应设置点控制曲线所得出的控制设置点。
21.根据权利要求12的方法,其中所述方法包括利用至少一个包括计算机程序代码的存储器对所述信号处理器进行配置;并且使得所述信号处理器以及至少一个存储器至少:
接收所述信令;并且
至少部分基于所接收的信令确定所述控制设置点。
22.一种泵控制器,包括:
用于接收包含关于线性设置点控制曲线的信息的信令的装置,所述线性设置点控制曲线源自与泵送系统中的泵所泵送的流体相关的自适应和恒定设置点控制曲线,和
用于至少部分基于所接收的信令,使用从得出的所述线性设置点控制曲线获得控制设置点的自适应控制算法,确定包含关于自适应地控制和改变所述泵送系统中的泵的速度的所述控制设置点的信息的相应信令的装置。
23.根据权利要求22的泵控制器,其中所述泵控制器进一步包括用于至少部分基于所确定的控制设置点提供相应信令作为包含用于对所述泵进行控制的信息的控制信号的装置。
24.根据权利要求22的泵控制器,其中所述用于确定的装置至少部分基于包含与所述线性设置点控制曲线和所述自适应设置点控制曲线之间的交点相关的信息的信令来确定所要求的流量Q*,所述交点包括处于最大自适应流量的交点。
CN201280061743.9A 2011-12-16 2012-12-17 用于可变速度泵控制的动态线性控制方法和装置 Active CN104024965B (zh)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US201161576737P 2011-12-16 2011-12-16
US61/576,737 2011-12-16
PCT/US2012/070138 WO2013090907A1 (en) 2011-12-16 2012-12-17 Dynamic linear control methods and apparatus for variable speed pump control

Publications (2)

Publication Number Publication Date
CN104024965A CN104024965A (zh) 2014-09-03
CN104024965B true CN104024965B (zh) 2018-02-13

Family

ID=48613272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201280061743.9A Active CN104024965B (zh) 2011-12-16 2012-12-17 用于可变速度泵控制的动态线性控制方法和装置

Country Status (7)

Country Link
US (1) US10048701B2 (zh)
EP (1) EP2791750B1 (zh)
CN (1) CN104024965B (zh)
CA (1) CA2856447C (zh)
IN (1) IN2014CN04206A (zh)
RU (1) RU2611071C2 (zh)
WO (1) WO2013090907A1 (zh)

Families Citing this family (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10119545B2 (en) 2013-03-01 2018-11-06 Fluid Handling Llc 3-D sensorless conversion method and apparatus for pump differential pressure and flow
US9846416B2 (en) * 2011-12-16 2017-12-19 Fluid Handling Llc System and flow adaptive sensorless pumping control apparatus for energy saving pumping applications
US9938970B2 (en) 2011-12-16 2018-04-10 Fluid Handling Llc Best-fit affinity sensorless conversion means or technique for pump differential pressure and flow monitoring
US11022985B2 (en) 2011-12-16 2021-06-01 Fluid Handling Llc Discrete valve flow rate converter
CA2918602C (en) 2013-07-25 2020-04-14 Fluid Handling Llc Sensorless adaptive pump control with self-calibration apparatus for hydronic pumping system
RU2685367C2 (ru) * 2013-11-27 2019-04-17 Флюид Хэндлинг ЭлЭлСи Устройство для трехмерного бессенсорного преобразования дифференциального давления и расхода насоса
MX365293B (es) * 2014-01-07 2019-05-29 Fluid Handling Llc Aplicación de multi-bomba de velocidad variable para proveer ahorro de energía al calcular y compensar la pérdida por fricción usando referencia de velocidad.
MX357724B (es) * 2014-04-08 2018-07-19 Fluid Handling Llc Medio o técnica de conversión sin detectores de afinidad de mejor ajuste para monitoreo de flujo y presión diferencial de bomba.
ES2720608T3 (es) 2014-05-01 2019-07-23 Graco Minnesota Inc Método para la calibración del control de flujo de sistemas altamente transitorios
KR102379148B1 (ko) 2014-05-01 2022-03-25 그라코 미네소타 인크. 폐쇄 시스템 내의 유체 압력 제어 방법
RU2721453C2 (ru) * 2014-12-15 2020-05-19 Флюид Хэндлинг ЭлЭлСи Преобразователь расхода дискретного клапана
US10317894B2 (en) 2015-02-13 2019-06-11 Fluid Handling Llc No flow detection means for sensorless pumping control applications
WO2016197080A1 (en) 2015-06-04 2016-12-08 Fluid Handling Llc Direct numeric affinity pumps sensorless converter
CN108027620B (zh) 2015-07-24 2021-08-06 流体处理有限责任公司 高级实时图形无传感器节能泵控制系统
CN105045303B (zh) * 2015-07-28 2017-11-14 新疆大全新能源有限公司 一种多晶硅生产过程中反应原料流量的控制方法
WO2017210283A1 (en) 2016-05-31 2017-12-07 Fluid Handling Llc Pump control design toolbox technique for variable speed pumping applications
WO2017214257A1 (en) 2016-06-07 2017-12-14 Fluid Handling Llc Direct numeric 3d sensorless converter for pump flow and pressure
SG11201805227SA (en) 2016-06-14 2018-07-30 S A Armstrong Ltd Self-regulating open circuit pump unit
CN110088475B (zh) 2016-09-12 2024-08-27 流体处理有限责任公司 自动自驱动泵
US11339777B2 (en) * 2016-09-12 2022-05-24 Fluid Handling Llc Automatic self-driving pumps
US10933713B2 (en) * 2016-12-27 2021-03-02 Cnh Industrial America Llc Airflow control system of a work vehicle
DE102017203926A1 (de) * 2017-03-09 2018-09-13 KSB SE & Co. KGaA Verfahren zum Betrieb einer Umwälzpumpe in Zwillingsbauweise
WO2018175527A1 (en) * 2017-03-21 2018-09-27 Fluid Handling Llc Adaptive water level controls for water empty or fill applicaitons
US10415760B2 (en) 2017-04-18 2019-09-17 Air Products And Chemicals, Inc. Control system in an industrial gas pipeline network to satisfy energy consumption constraints at production plants
US9890908B1 (en) * 2017-04-18 2018-02-13 Air Products And Chemicals, Inc. Control system in a gas pipeline network to increase capacity factor
US9915399B1 (en) 2017-04-18 2018-03-13 Air Products And Chemicals, Inc. Control system in a gas pipeline network to satisfy demand constraints
US9897259B1 (en) 2017-04-18 2018-02-20 Air Products And Chemicals, Inc. Control system in a gas pipeline network to satisfy pressure constraints
US9897260B1 (en) 2017-04-18 2018-02-20 Air Products And Chemicals, Inc. Control system in an industrial gas pipeline network to satisfy energy consumption constraints at production plants
EP3833870A4 (en) 2018-08-08 2021-10-20 Fluid Handling LLC VARIABLE SPEED PUMPING CONTROL SYSTEM WITH ACTIVE TEMPERATURE AND VIBRATION MONITORING AND CONTROL MEANS
BR112021006351A2 (pt) 2018-10-05 2021-07-06 S A Armstrong Ltd controle de fluxo de alimentação direta de um sistema de transferência de calor
DE102019212325A1 (de) * 2019-08-17 2021-02-18 Ziehl-Abegg Se Verfahren zur quantitativen Bestimmung einer aktuellen betriebszustandsabhängigen Größe eines Ventilators, insbesondere einer Druckänderung oder Druckerhöhung, und Ventilator

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6663349B1 (en) * 2001-03-02 2003-12-16 Reliance Electric Technologies, Llc System and method for controlling pump cavitation and blockage
CN101896871A (zh) * 2007-12-14 2010-11-24 Itt制造企业公司 多泵系统中的同步转矩平衡

Family Cites Families (97)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5696189A (en) 1979-12-28 1981-08-04 Ebara Corp Pump equipment
US4490094A (en) 1982-06-15 1984-12-25 Gibbs Sam G Method for monitoring an oil well pumping unit
DE3586500T2 (de) 1984-11-15 1993-01-28 Baxter Int Anpassungsfaehiges kontrollsystem und -methode fuer die stroemung von filterkonzentrat.
JPS61149583A (ja) 1984-12-21 1986-07-08 Hitachi Ltd 可変速のポンプ水車またはポンプの起動方法
US4897798A (en) 1986-12-08 1990-01-30 American Telephone And Telegraph Company Adaptive environment control system
US5069792A (en) 1990-07-10 1991-12-03 Baxter International Inc. Adaptive filter flow control system and method
US5285414A (en) * 1990-09-26 1994-02-08 Hitachi, Ltd. Semiconductor memory having transistors which drive data lines in accordance with values of write data and column select signal
US5318409A (en) 1993-03-23 1994-06-07 Westinghouse Electric Corp. Rod pump flow rate determination from motor power
US5651264A (en) 1993-06-29 1997-07-29 Siemens Electric Limited Flexible process controller
JPH0777192A (ja) 1993-09-10 1995-03-20 Nikkiso Co Ltd スラストバランス機構を備えた遠心ポンプの性能予測方法
DE19504232A1 (de) * 1995-02-09 1996-08-22 Grundfos As Verfahren zur Leistungsbegrenzung von elektrisch angetriebenen Heizungsumwälzpumpen
US5555749A (en) 1995-04-28 1996-09-17 Air Products And Chemicals, Inc. Use of centrifugal compressors in adsorptive systems
AUPN547895A0 (en) 1995-09-15 1995-10-12 Rescare Limited Flow estimation and compenstion of flow-induced pressure swings cpap treatment
US5817950A (en) 1996-01-04 1998-10-06 Rosemount Inc. Flow measurement compensation technique for use with an averaging pitot tube type primary element
US7032689B2 (en) 1996-03-25 2006-04-25 Halliburton Energy Services, Inc. Method and system for predicting performance of a drilling system of a given formation
US5911238A (en) 1996-10-04 1999-06-15 Emerson Electric Co. Thermal mass flowmeter and mass flow controller, flowmetering system and method
JP3922760B2 (ja) 1997-04-25 2007-05-30 株式会社荏原製作所 流体機械
US5991525A (en) 1997-08-22 1999-11-23 Voyan Technology Method for real-time nonlinear system state estimation and control
US6293901B1 (en) * 1997-11-26 2001-09-25 Vascor, Inc. Magnetically suspended fluid pump and control system
US6280394B1 (en) 1998-03-18 2001-08-28 Sean R. Maloney Apparatus and methods for detecting and processing EMG signals
US5997778A (en) 1998-04-23 1999-12-07 Van Dorn Demag Corporation Auto-tuned, adaptive process controlled, injection molding machine
AU4991899A (en) 1998-07-14 2000-02-07 Schlumberger Technologies, Inc. Apparatus, method and system of liquid-based, wide range, fast response temperature cycling control of electronic devices
DE19831997A1 (de) * 1998-07-16 2000-01-20 Ewald Hennel Verfahren zur Regelung des Drucks eines Fluids
US6787112B1 (en) * 1998-08-13 2004-09-07 Symyx Technologies, Inc. Parallel reactor with internal sensing and method of using same
US6455316B1 (en) * 1998-08-13 2002-09-24 Symyx Technologies, Inc. Parallel reactor with internal sensing and method of using same
US6142228A (en) 1998-09-09 2000-11-07 Baker Hughes Incorporated Downhole motor speed measurement method
US6145228A (en) 1998-11-09 2000-11-14 Lachance; James L. Apparatus for simulating falling snowflakes
US6324490B1 (en) 1999-01-25 2001-11-27 J&L Fiber Services, Inc. Monitoring system and method for a fiber processing apparatus
US6114670A (en) 1999-07-01 2000-09-05 Voyan Technology Nonlinear feedforward control for ramp following and overshoot minimization
EP1085636A3 (en) 1999-09-13 2002-12-18 Hitachi, Ltd. Energy saving service offering method and apparatus therefor
US6241485B1 (en) 1999-12-29 2001-06-05 John W. Warwick Wastewater flow control system
AU2001274989A1 (en) * 2000-05-27 2001-12-11 Georgia Tech Research Corporation Adaptive control system having direct output feedback and related apparatuses and methods
TW516359B (en) 2000-11-06 2003-01-01 Delta Electronics Inc Measuring method for flow characteristics curve of cooling system
US7143016B1 (en) * 2001-03-02 2006-11-28 Rockwell Automation Technologies, Inc. System and method for dynamic multi-objective optimization of pumping system operation and diagnostics
US6850849B1 (en) 2001-06-20 2005-02-01 Curtis Roys Fluid flow monitor and control system
EP1286240B1 (de) 2001-08-22 2004-08-11 Pumpenfabrik Ernst Vogel Gesellschaft m.b.H. Verfahren zur Ermittlung einer Pumpen-Regelkennlinie
EP1286458A1 (de) 2001-08-22 2003-02-26 Pumpenfabrik Ernst Vogel Gesellschaft m.b.H. Verfahren und Vorrichtung zur Regelung von Kreiselarbeitsmaschinen
US6536271B1 (en) * 2001-09-13 2003-03-25 Flowserve Management Company Pump with integral flow monitoring
JP3917835B2 (ja) 2001-09-28 2007-05-23 横河電機株式会社 加圧送水ポンプシステム
US7552033B1 (en) 2001-12-20 2009-06-23 The Texas A&M University System System and method for diagnostically evaluating energy consumption systems and components of a facility
DE10163987A1 (de) * 2001-12-24 2003-07-10 Grundfos As Verfahren zum Steuern einer drehzahlregelbaren Heizungsumwälzpumpe
US7396327B2 (en) 2002-01-07 2008-07-08 Micromed Technology, Inc. Blood pump system and method of operation
US6725167B2 (en) 2002-01-16 2004-04-20 Fisher Controls International Llc Flow measurement module and method
JP4004296B2 (ja) 2002-01-28 2007-11-07 テルモ株式会社 遠心式液体ポンプ装置
US20050125104A1 (en) 2003-12-05 2005-06-09 Wilson Thomas L. Electrical power distribution control systems and processes
AU2003233568A1 (en) 2002-05-20 2003-12-12 Central Sprinkler Corporation System and method for evaluation of fluid flow in a piping system
US6739840B2 (en) 2002-05-22 2004-05-25 Applied Materials Inc Speed control of variable speed pump
JP2004112113A (ja) 2002-09-13 2004-04-08 Matsushita Electric Ind Co Ltd リアルタイム通信の適応制御方法、受信報告パケットの連続消失に対する対策方法、受信報告パケットの送出間隔の動的決定装置、リアルタイム通信の適応制御装置、データ受信装置およびデータ配信装置
US7668694B2 (en) 2002-11-26 2010-02-23 Unico, Inc. Determination and control of wellbore fluid level, output flow, and desired pump operating speed, using a control system for a centrifugal pump disposed within the wellbore
US20040062658A1 (en) 2002-09-27 2004-04-01 Beck Thomas L. Control system for progressing cavity pumps
US6890156B2 (en) * 2002-11-01 2005-05-10 Polyphase Engineered Controls Reciprocating pump control system
WO2004053404A2 (en) 2002-12-09 2004-06-24 Hudson Technologies, Inc. Method and apparatus for optimizing refrigeration systems
US7036559B2 (en) 2003-07-08 2006-05-02 Daniel Stanimirovic Fully articulated and comprehensive air and fluid distribution, metering, and control method and apparatus for primary movers, heat exchangers, and terminal flow devices
US7163380B2 (en) 2003-07-29 2007-01-16 Tokyo Electron Limited Control of fluid flow in the processing of an object with a fluid
US8540493B2 (en) 2003-12-08 2013-09-24 Sta-Rite Industries, Llc Pump control system and method
US7455099B2 (en) 2003-12-19 2008-11-25 General Electric Company Heat exchanger performance monitoring and analysis method and system
FI116253B (fi) 2003-12-22 2005-10-14 Abb Oy Sähkökäytön energiakulutus
DE102004009616A1 (de) 2004-02-27 2005-09-22 Siemens Ag Verfahren und Vorrichtung zur Steuerung des Volumenstroms in einem Kraftstoff-Einspritzsystem einer Brennkraftmaschine
US7630580B1 (en) 2004-05-04 2009-12-08 AgentSheets, Inc. Diffusion-based interactive extrusion of 2D images into 3D models
US7591777B2 (en) 2004-05-25 2009-09-22 Heartware Inc. Sensorless flow estimation for implanted ventricle assist device
CA2571022C (en) 2004-07-02 2014-06-10 University Of Alberta Detection and quantification of stiction
US7845913B2 (en) 2004-08-26 2010-12-07 Pentair Water Pool And Spa, Inc. Flow control
US7600985B2 (en) 2004-10-28 2009-10-13 Ingersoll-Rand Company Pump assembly, suppression apparatus for use with a pump, and method of controlling a pump assembly
US7130721B2 (en) 2004-10-29 2006-10-31 Caterpillar Inc Electrohydraulic control system
NZ554356A (en) 2004-11-04 2010-10-29 Resmed Ltd Using motor speed in a pap device to estimate flow
US7267086B2 (en) 2005-02-23 2007-09-11 Emp Advanced Development, Llc Thermal management system and method for a heat producing system
DE102005023430A1 (de) 2005-03-15 2006-09-21 Fresenius Medical Care Deutschland Gmbh Verfahren und Vorrichtung zur Bestimmung der effektiven Förderrate oder Einstellung der Drehzahl einer peristaltischen Pumpe
US7336168B2 (en) 2005-06-06 2008-02-26 Lawrence Kates System and method for variable threshold sensor
US20070028632A1 (en) 2005-08-03 2007-02-08 Mingsheng Liu Chiller control system and method
JP2009505079A (ja) 2005-08-12 2009-02-05 セレリティ・インコーポレイテッド 気泡検出を用いた流れの測定および制御
CA2629631C (en) 2005-11-18 2012-06-19 Exxonmobil Upstream Research Company Method of drilling and producing hydrocarbons from subsurface formations
US7777435B2 (en) 2006-02-02 2010-08-17 Aguilar Ray A Adjustable frequency pump control system
US7945411B2 (en) 2006-03-08 2011-05-17 Itt Manufacturing Enterprises, Inc Method for determining pump flow without the use of traditional sensors
DE102006027002A1 (de) * 2006-06-08 2007-12-13 Oase Gmbh Pumpemanordnung mit Drehzahlsteuerung
WO2008004592A1 (fr) * 2006-07-04 2008-01-10 Sharp Kabushiki Kaisha Dispositif et appareil de communication, procédé et programme de commande de dispositif de communication, et support d'enregistrement lisible par ordinateur
US8202061B2 (en) 2006-09-26 2012-06-19 Magna Powertrain Inc. Control system and method for pump output pressure control
US7890215B2 (en) * 2006-12-22 2011-02-15 Duncan Scot M Optimized control system for cooling systems
DE102007022348A1 (de) 2007-05-12 2008-11-13 Ksb Aktiengesellschaft Einrichtung und Verfahren zur Störungsüberwachung
US8774972B2 (en) * 2007-05-14 2014-07-08 Flowserve Management Company Intelligent pump system
US20090094173A1 (en) 2007-10-05 2009-04-09 Adaptive Logic Control, Llc Intelligent Power Unit, and Applications Thereof
US8121971B2 (en) 2007-10-30 2012-02-21 Bp Corporation North America Inc. Intelligent drilling advisor
ATE467763T1 (de) 2007-11-16 2010-05-15 Linde Ag Verfahren zum ansteuern einer pumpenanordnung und pumpenanordnung
US20090129935A1 (en) 2007-11-21 2009-05-21 Kunkler Kevin J Pump suction pressure limiting speed control and related pump driver and sprinkler system
US8024161B2 (en) 2008-08-19 2011-09-20 Honeywell International Inc. Method and system for model-based multivariable balancing for distributed hydronic networks
JP2012501621A (ja) 2008-08-29 2012-01-19 ジョンソン,アーネ,エフ 省エネルギーを評価する方法及び装置
US7734441B2 (en) 2008-09-30 2010-06-08 Mohsen Taravat Method and device for measuring and controlling the amount of flow/volume of liquid pumped/transferred by an electro-pump
US8082067B2 (en) 2008-12-09 2011-12-20 General Electric Company Method and system of controlling a hydroelectric plant
US8425200B2 (en) 2009-04-21 2013-04-23 Xylem IP Holdings LLC. Pump controller
US8774978B2 (en) 2009-07-23 2014-07-08 Siemens Industry, Inc. Device and method for optimization of chilled water plant system operation
US8275483B2 (en) * 2009-07-23 2012-09-25 Siemens Industry, Inc. Demand flow pumping
US8045173B2 (en) 2009-08-04 2011-10-25 General Electric Company Adaptive linear filter for real time noise reduction in surface plasmon resonance systems
US9181953B2 (en) * 2009-10-01 2015-11-10 Specific Energy Controlling pumps for improved energy efficiency
US8690820B2 (en) * 2009-10-06 2014-04-08 Illinois Institute Of Technology Automatic insulin pumps using recursive multivariable models and adaptive control algorithms
US8801407B2 (en) 2010-02-24 2014-08-12 Harris Waste Management Group, Inc. Hybrid electro-hydraulic power device
US8346403B2 (en) * 2010-06-04 2013-01-01 Cooper Technologies Company, Inc. In-wall occupancy sensor with mode selection features
US8700221B2 (en) 2010-12-30 2014-04-15 Fluid Handling Llc Method and apparatus for pump control using varying equivalent system characteristic curve, AKA an adaptive control curve
US8833384B2 (en) * 2012-08-06 2014-09-16 Schneider Electric Buildings, Llc Advanced valve actuation system with integral freeze protection

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6663349B1 (en) * 2001-03-02 2003-12-16 Reliance Electric Technologies, Llc System and method for controlling pump cavitation and blockage
CN101896871A (zh) * 2007-12-14 2010-11-24 Itt制造企业公司 多泵系统中的同步转矩平衡

Also Published As

Publication number Publication date
CA2856447A1 (en) 2013-06-20
RU2611071C2 (ru) 2017-02-21
US10048701B2 (en) 2018-08-14
CN104024965A (zh) 2014-09-03
EP2791750A1 (en) 2014-10-22
RU2014121778A (ru) 2016-02-10
IN2014CN04206A (zh) 2015-07-17
EP2791750B1 (en) 2020-05-06
WO2013090907A1 (en) 2013-06-20
EP2791750A4 (en) 2015-10-21
CA2856447C (en) 2019-06-04
US20140005841A1 (en) 2014-01-02

Similar Documents

Publication Publication Date Title
CN104024965B (zh) 用于可变速度泵控制的动态线性控制方法和装置
CN103370538B (zh) 用于使用变动等效系统特性曲线、即自适应控制曲线的泵控制的方法和装置
CN102369398B (zh) 用于分散平衡液体循环加热或冷却网络的系统和方法
CN105518305B (zh) 用于液体循环泵送系统的具有自校准装置的无传感器自适应泵控制
CN104246397B (zh) 一种用于控制排热型热交换器的一个或多个风扇的方法
EP2857761B1 (en) Water heater
JP2015143591A (ja) ポンプ台数制御方法、ポンプ台数制御装置、ポンプシステム、熱源システム及びプログラム
CN108006909A (zh) 多联机系统及其制热模式下的电子膨胀阀控制方法
CN104633929A (zh) 热泵热水器及其控制方法
CN111998528A (zh) 即热式开水器及其控制方法和可读存储介质
KR101965848B1 (ko) 수열원을 이용한 열교환 가변 제어형 히트펌프 시스템
RU2014140165A (ru) Регулирование нагревательного элемента
CN102364265A (zh) 一种变流量循环式热泵热水器
JP2005127586A (ja) 1次ポンプ方式熱源変流量制御システムおよび1次ポンプ最低流量確保方法
US20170343232A1 (en) Proportional dehumidifier control
NL2015238B1 (nl) Verwarmingssysteem, warmte-eenheid en werkwijze.
CN109073273B (zh) 热水供给系统
CN115164300B (zh) 用于空调器回油控制的方法及装置、空调器、存储介质
CN114322251B (zh) 用于控制空调的方法、装置和多联机空调
CN104912645A (zh) 车辆智能冷却系统的控制方法
CN111964229B (zh) 用于空调滤网温度控制的方法、装置及空调器
KR101560511B1 (ko) 온수 가열 시스템 및 제어 장치 및 제어 방법
CN108206521A (zh) 需求响应的控制方法、装置及电力管控平台
CN110469960B (zh) 用于空调除霜的控制方法、装置及空调
CN111566412B (zh) 用于调节循环泵的方法、循环泵和加热系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant