CN103790491A - Structure of detachable wooden door and connection method thereof - Google Patents

Structure of detachable wooden door and connection method thereof Download PDF

Info

Publication number
CN103790491A
CN103790491A CN201310143742.5A CN201310143742A CN103790491A CN 103790491 A CN103790491 A CN 103790491A CN 201310143742 A CN201310143742 A CN 201310143742A CN 103790491 A CN103790491 A CN 103790491A
Authority
CN
China
Prior art keywords
timber
frame
core
core frame
crop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310143742.5A
Other languages
Chinese (zh)
Inventor
邹用军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia runjiah Furniture Co., Ltd.
Original Assignee
INNER MONGOLIA MEIRUN DOOR INDUSTRY LIABILITY Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INNER MONGOLIA MEIRUN DOOR INDUSTRY LIABILITY Ltd Co filed Critical INNER MONGOLIA MEIRUN DOOR INDUSTRY LIABILITY Ltd Co
Priority to CN201310143742.5A priority Critical patent/CN103790491A/en
Publication of CN103790491A publication Critical patent/CN103790491A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a structure of a detachable wooden door and a connection method thereof. Internal connection of a border frame and a core frame of the detachable wooden door is in a four-section three-point mode. Connection components include columnar nuts, studs, double-end internal thread pipes and fastening bolts. Ride fastener grooves on the outer side of a core frame combined double-connection line are fastened on the inner side of the border frame of the wooden door, and mortises on the inner side of the core frame combined double-connection line are used for insertion and fixation of external tenons of the core frame of the wooden door, so that connection between the border frame and the core frame of the wooden door is realized. Ride fastener grooves on the outer side of a core board combined double-connection line are fastened on the inner side of the core frame of the wooden door, inserting grooves on the inner side of the core board combined double-connection line are used for insertion and fixation of external tenons of a core board of the wooden door, so that connection between the core frame and the core board of the wooden door is realized. The core frame combined double-connection line can be also used for connecting the border frame with the core board of the wooden door directly. The mortises and line shape on the inner side of the core frame combined double-connection line can be also used for fixedly inserting and connecting cross supports and vertical supports in the wooden door.

Description

Structure of a kind of dismantled and assembled timber and attaching method thereof
One, technical background
Structure of a kind of dismantled and assembled timber and attaching method thereof, belongs to the wooden door and window design and fabrication of indoor and outdoor field.
Two, background technology
At present, domestic dismantled and assembled timber is all by traditional technological design and making.Structure, be to be formed by frame and central layer, central layer is directly inserted the solid inner side at timber frame.Owing to being subject to the restrictions such as dismounting manufacture craft and syndeton, current dismounting timber cannot effectively be realized frame and be connected by button line with central layer, and the dismounting timber of making so all cannot be obtained larger breakthrough from design and fabrication.
Connected mode, the Men Bianyu door of dismounting timber frame most of method with bolts of begining to crop up.First on the begining to crop up of timber and inwardly make a call to a nut circular hole perpendicular to begining to crop up, in circular hole, bury a bar cylindrical nuts group underground, make a call to two connecting bolt holes in the position that is parallel to corresponding the cylindrical nuts group internal screw thread of begining to crop up, communicate with nut circular hole bottom it.And then the corresponding position of two bolt connecting holes and inwardly make a call to two bolt circular holes perpendicular to door limit of begining to crop up, Wood door limit.Internal screw thread rotation in the bar cylindrical nuts group that fastening bolt is begun to crop up in upper bolt circular hole and nut circular hole through the bolt circular hole on door limit is fastening.
Begin to crop up although above-mentioned bolted-on connection can effectively connect the Men Bianyu of timber, in use its drawback displays gradually.Elaborate with regard to its drawback below, (one) this method connected wood in front of the door must be at Men Bian and the two-way fixed pin holes of beating in the junction of begining to crop up, and inserts steady pin in order to fixed gate limit and begin to crop up in hole, is then using bolton.(2) although Men Bian fixes with the steady pin of having begun to crop up, emit the bar cylindrical nuts group in head nut circular hole often to roll in hole, the fastening bolt on door limit is not easy in the thread of precession bar cylindrical nuts group.(3) what above-mentioned connection adopted is single group screw-tightened, and owing to can sandwiching the foreign material such as wood chip in thread in fastening process, timber has used bolt oxidation and rusting of a specified duration, must make to dismantle timber and become very thorny.
Three, summary of the invention
The invention provides a kind of dismantled and assembled timber.It is to be made up of frame, combination dual link lines, core frame, central layer.The connection of described core frame, its inside of frame adopts the method for attachment of four sections 3.
The present invention is achieved like this.Described combination dual link lines are divided into core frame combination dual link lines, central layer combination dual link lines.Described two kinds of combination dual link lines are that two bottoms of withholding lines of traditional connected wood doorjamb and core frame, core frame and central layer are linked together, and original like this two lines unite two into one becomes combination dual link lines.The combination dual link lines both sides that make like this form respectively one and ride catching groove and a tongue-and-groove.The catching groove of riding in described core frame combination dual link lines outside is ridden the inner side that is buckled in timber frame, and the tongue-and-groove of its inner side is used for plugging in the tenon outer processed of solid timber core frame, thereby realizes being connected between timber frame and core frame.The catching groove of riding in described central layer combination dual link lines outside is ridden the inner side that is buckled in timber core frame, and the tongue-and-groove of its inner side is used for plugging in the tenon outer processed of solid timber central layer, thereby realizes being connected between timber core frame and central layer.
Described core frame combination dual link lines also can directly be used for connecting frame and the central layer of timber.Line style and the tongue-and-groove of described core frame combination dual link lines inner side also can be used to insert the stull and perpendicular support that are solidly connected in timber.
The connection of dismounting timber frame of the present invention, its inside of core frame adopts the method for attachment of four sections 3.Its connecting elements is divided into fiber tube, fastening bolt in bar cylindrical nuts group, stud, double end.Its method of attachment is as follows; (1) first bar cylindrical nuts group is filled in the nut circular hole of timber on begining to crop up, (2) by one end of fiber tube in stud one end precession double end, so just form male and female stud, in the bolt hole of again the male and female stud insertion timber being combined into being begun to crop up, then pass through in the internal screw thread of bolt head precession bar cylindrical nuts group of male and female stud.The internal thread tube head 1/2nd of male and female stud is embedded in begining to crop up of timber, and all the other 1/2nd expose outside begining to crop up, for fixing Wood door limit.(3) begun to crop up and exposed internal thread tube head outside by its fastening bolt holes insertion in Wood door limit, then add fastening bolt to fix.
Four, accompanying drawing explanation
Fig. 1 is the front view of a kind of dismantled and assembled timber provided by the invention.
Fig. 2 is the front view that the invention provides another a kind of dismantled and assembled timber.
Fig. 3 decomposes front view for Fig. 1 provides frame, core frame combination dual link lines, core frame, central layer combination dual link lines, the central layer of dismantled and assembled timber.
Fig. 4 is that traditional not removable timber frame, core frame buckle that line, core frame, central layer are buckled line, central layer cross section connects stereogram.
Fig. 5 makes detailed drawing for Fig. 1 Fig. 2 provides the core frame combination dual link lines of dismantled and assembled timber and central layer combination dual link lines.
Fig. 6 combines dual link lines, central layer three-dimensional exploded view for Fig. 1 provides frame, core frame combination dual link lines, core frame, the central layer of dismantled and assembled timber.
Fig. 7 combines dual link lines, the three-dimensional connection layout of central layer for Fig. 1 provides frame, core frame combination dual link lines, core frame, the central layer of dismantled and assembled timber.
Fig. 8 connects stereogram for Fig. 2 provides frame, core frame combination dual link lines, the stull (perpendicular support) of dismantled and assembled timber.
Fig. 9 connects stereogram for Fig. 2 provides frame, core frame combination dual link lines, the central layer of dismantled and assembled timber.
Figure 10 connects hardware exploded view for the invention provides dismantled and assembled timber.
Figure 11 is for the invention provides the dismantled and assembled timber connecting hole schematic diagram of begining to crop up.
Figure 12 is for the invention provides dismantled and assembled Wood door limit connecting hole schematic diagram
Figure 13 connects hardware and inserts the precession timber schematic diagram of begining to crop up for the invention provides dismantled and assembled timber.
Figure 14 connects hardware connection door limit and begins to crop up fastening rear view for the invention provides dismantled and assembled timber
Figure 15 is connected fastening vertical planing surface figure for the invention provides dismantled and assembled Wood door limit with begining to crop up.
Another part detail
(1) frame, (2) core frame combination dual link lines, (3) core frame, (4) central layer combination dual link lines, (5) central layer, (6) stull, (7) perpendicular support, (8) connect hardware, (1-1) door limit described in frame, (1-11) door limit fastening bolt circular hole, (1-12) line style on door limit, (1-2) described in frame, begin to crop up, (1-21) emit top cylindrical nuts group circular hole, (1-22) the interior fiber tube circular hole of begining to crop up, (1-23) the begin to crop up tenon at two ends, (2-1) catching groove is ridden in core frame combination dual link lines outside, (2-2) side slot in core frame combination dual link lines, (2-3) line style of core frame combination dual link lines inner side, (3-1) core limit described in core frame, (3-2) described in core frame, core is begun to crop up, (3-3) tenon in core frame outside, (4-1) catching groove is ridden in central layer combination dual link lines outside, (4-2) side slot in central layer combination dual link lines, (5-1) tenon in central layer outside, (6-1) tenon of stull, (6-2) line style of stull tenon, (8-1) bar cylindrical nuts group, (8-11) the internal thread hole in bar cylindrical nuts group, (8-2) stud, (8-3) fiber tube in double end, (8-4) fastening bolt, (8-5) male and female stud.
Five, the specific embodiment
Below in conjunction with specific embodiment and accompanying drawing, the present invention is further described, but do not make limitation of the invention.
A utility model patent of Chinese patent announcement on August 27th, 2008, the patent No. is 200720140128.3 for a not removable timber, its structure as shown in Figure 4 central layer (5) is withheld on the inside edge of core frame (3) by two button lines (4), and core frame (3) is buckled line (2) by two core frames and withheld on the inside edge of frame (1).
Combination dual link lines of the present invention are divided into core frame combination dual link lines (2), central layer combination dual link lines (4).Described be core frame combination dual link lines (2), central layer combination dual link lines (4) be by traditional connection timber as shown in Figure 4 two core frames withhold the withholding bottom that lines (2), two central layers withhold lines (4) and link together, original like this two lines shown in Fig. 5 unite two into one becomes combination dual link lines.The core frame combination dual link lines (2) of making like this shown in Fig. 6 and central layer combination dual link lines (4) both sides form respectively rides catching groove (2-1) (4-1) slot (2-2) is (4-2).
The dismantled and assembled timber inner connecting structure of one provided by the invention is as follows;
(1) catching groove (2-1) of riding in its outside of described core frame combination dual link lines (2) shown in Fig. 7 is ridden the inner side that is buckled in timber frame (1), the tongue-and-groove (2-2) of its inner side is for plugging in the tenon outer processed (3-3) of solid timber core frame (3), thereby realizes being connected between dismounting timber frame (1) and core frame (3).The catching groove (4-1) of riding in described central layer combination dual link lines (4) outside is ridden the inner side that is buckled in timber core frame (3), and the tongue-and-groove (4-2) of its inner side is used with the tenon outer processed (5-1) of inserting solid timber central layer (5) and realized being connected between dismounting timber core frame (3) and central layer (5).
(2) frame of core shown in Fig. 8 combination dual link lines (2) also can directly be used for connecting the stull (6) of dismantled and assembled timber, the stull (6) of described dismantled and assembled timber is upper with line style (2-3) with the tongue-and-groove (2-2) that line style (602) is solidly plugged in described core frame combination dual link lines (2) inner side by the tenon (6-1) at its two ends, realizes being connected between dismounting timber core frame combination dual link lines (2) and stull (6).The tongue-and-groove (2-2) of described core frame combination dual link lines (2) inner side and the tenon (6-1) at line style (2-3) and stull (6) two ends and line style (602) completely interlock are convex-concave shape.The frame of core shown in Fig. 2 combination dual link lines (2) are consistent with the connected mode of the stull (6) of dismantled and assembled timber with above-mentioned core frame combination dual link lines (2) as shown in Figure 8 with the method for attachment of the perpendicular support (7) of described dismantled and assembled timber.
(3) frame of core shown in Fig. 9 combination dual link lines (2) also can directly be used for connecting the central layer (5) of dismantled and assembled timber, the tenon (5-1) in described central layer (5) outside is solidly plugged in the tongue-and-groove (2-2) of described core frame combination dual link lines (2) inner side, realizes being connected between dismounting timber core frame combination dual link lines (2) central layers (5).
The perpendicular support of the stull (6) of described dismantled and assembled timber (7) is that tradition is inserted solid with what adopt being connected of described central layer (5), and the present invention be not described in detail.
The connection of its inside of frame of the present invention (1) core frame (3) adopts the method for attachment of four sections 3.It connects hardware (8) and is divided into bar cylindrical nuts group (8-1) and above it, is shaped with fiber tube (8-3), fastening bolt (8-4) in internal screw thread (8-11) stud (8-2), double end as shown in figure 10.
Its dismantled and assembled timber provided by the invention as shown in Figure 3 frame (1) internal construction door limit (1-1) with begin to crop up (1-2), the begin to crop up method of attachment of (3-2) of core frame (3) internal construction core limit (3-1) and core is as follows.
; (1) first dismounting timber is shown in to begin to crop up (1-2) above perpendicular to then fiber tube circular hole (1-22) in parallel its made a call to two double ends of its dozen of bar cylindrical nuts group circular holes (1-21), the straight-through bar cylindrical nuts group circular hole (1-21) in the bottom of fiber tube circular hole (1-22) in double end at door limit (1-1) upper two fastening bolt circular holes (1-11) Figure 11 that makes a call to perpendicular to it as shown in figure 12 by conventional method.
(2) as shown in figure 13 bar cylindrical nuts group (8-1) is filled in the nut circular hole (1-21) that timber begins to crop up on (1-2), by fiber tube (8-3) other end in stud (8-2) one end precession double end, so just form male and female stud (8-5), the male and female stud (8-5) that is combined into being inserted to timber begins to crop up in the interior fiber tube circular hole (1-22) of (1-2), then in the internal screw thread (8-11) of the bolt head precession bar cylindrical nuts group (8-1) of male and female stud (8-5) again.The internal thread tube head (8-3) 1/2nd of male and female stud (8-5) is embedded in begining to crop up in (1-2) of timber, all the other 1/2nd expose begining to crop up outside (1-2), fix Wood door limit (1-1) for inserting.Shown in Figure 13, then Wood door limit (1-1) inserted to begin to crop up (1-2) by its fastening bolt circular hole slotting (1-11) and expose interior fiber tube (8-3) outside, last fastening bolt (8-4) is fixing by rotation in the internal screw thread of door limit (1-1) fastening bolt circular hole (1-11) insertion internal thread tube head (8-3).The begin to crop up method of attachment of (1-2) of the method for attachment of (3-2) and above-mentioned door limit (1-1) of begining to crop up with core of the core limit (3-1) of described core frame (3) is consistent.
In order to strengthen the begin to crop up stable connection of (3-2) of dismounting Wood door limit (1-1) and begin to crop up core limit shown in (1-2), Fig. 3 (3-1) and core.Preferably by described door limit (1-1) with begin to crop up (1-2), the begin to crop up connection processing of (3-2) of core limit (3-1) and core is convex-concave as shown in figure 14, concave (1-23) the completely interlock of the convex line type (1-12) on door limit on begin to crop up (1-2).Described concaveconvex shape can combine with reference to the stull of the timber of dismounting shown in Fig. 8 (6) and core frame the shape of dual link lines (2), no longer does repeat specification here.
The invention provides its advantage of structure of a kind of dismantled and assembled timber and attaching method thereof and technological progress is; (1) between structure has solved dismantled and assembled timber frame and core frame, core frame and central layer, frame and central layer, be not easy to realize and buckle the technical problem that lines are connected, again the proposition of innovation button line can connect the new concept of inserting stull and perpendicular support in solid timber, and can in timber is made, effectively implement.(2) proposition of novelty the connection of dismounting timber frame, its inside of core frame adopt the method for attachment of four sections 3.Fully solved original dismounting timber link technique in assembling timber process because bar cylindrical nuts group is not easy to aim at the fastening drawback of its internal screw thread at the interior rolling fastening bolt of begining to crop up, can in dismounting timber assembly and connection process, save again and first will use steady pin fixed gate limit and the loaded down with trivial details operation of begining to crop up.
Above so that content of the present invention has been done to detailed explanation, for persons skilled in the art, any apparent change of under the prerequisite that does not deviate from the principle of the invention, it being done, can not exceed the protection domain of the application's claims.

Claims (7)

1. structure of a dismantled and assembled timber and attaching method thereof, comprises that the structures such as frame, core frame, central layer is characterized in that; Described frame interior door limit and the method for attachment of begining to crop up, core frame inner core limit and core are begun to crop up four sections 3 of employings, its hardware-joint comprises 8-1) fiber tube, (8-4) fastening bolt in bar cylindrical nuts group, (8-2) stud, (8-3) double end, its spy is also; In syndeton, two lines of original not removable timber being united two into one becomes combination dual link lines it comprises core frame combination dual link lines (2) and central layer combination dual link lines (4), for in being connected between dismounting timber frame and core frame, between core frame and central layer, between frame and central layer, the proposition of novelty combination dual link lines can directly connect the stull of inserting solid timber and support with perpendicular.
2. structure of a kind of dismantled and assembled timber according to claim 1 and attaching method thereof, is characterized in that, the catching groove (2-1) of riding in its outside of described core frame combination dual link lines (2) is ridden the inner side that is buckled in timber frame (1), the tongue-and-groove (2-2) of its inner side is for plugging in the tenon outer processed (3-3) of solid timber core frame (3), thereby realize being connected between dismounting timber frame (1) and core frame (3), the catching groove (4-1) of riding in described central layer combination dual link lines (4) outside is ridden the inner side that is buckled in timber core frame (3), the tongue-and-groove (4-2) of its inner side is used with the tenon outer processed (5-1) of inserting solid timber central layer (5) and is realized being connected between dismounting timber core frame (3) and central layer (5).
3. structure of a kind of dismantled and assembled timber according to claim 1 and attaching method thereof, is characterized in that; The stull (6) of described dismantled and assembled timber is solidly plugged on the tongue-and-groove (2-2) and line style (2-3) of described core frame combination dual link lines (2) inner side with line style (602) by the tenon (6-1) at its two ends, realize being connected between dismounting timber core frame combination dual link lines (2) stulls (6), the tongue-and-groove (2-2) that described core frame combines dual link lines (2) inner side is convex-concave shape with line style (2-3) and the tenon (6-1) at stull (6) two ends with the complete interlock of line style (602).
4. structure of a kind of dismantled and assembled timber according to claim 1 and attaching method thereof, is characterized in that; Being connected between the perpendicular support of described core frame combination dual link lines (2) and timber (7) is consistent with the claims 3.
5. structure of a kind of dismantled and assembled timber according to claim 1 and attaching method thereof, is characterized in that; The tenon (5-1) in described central layer (5) outside is solidly plugged in the tongue-and-groove (2-2) of described core frame combination dual link lines (2) inner side, realizes being connected between dismounting timber core frame combination dual link lines (2) central layers (5).
6. structure of a kind of dismantled and assembled timber according to claim 1 and attaching method thereof, the method for attachment of four sections 3 that the Men Bianyu of its frame begins to crop up, the core limit of core frame and core are begun to crop up is as follows; (1) first dismounting timber is shown in to begin to crop up (1-2) above perpendicular to then fiber tube circular hole (1-22) in parallel its made a call to two double ends of its dozen of bar cylindrical nuts group circular holes (1-21) at door limit (1-1) upper two fastening bolt circular holes (1-11) Figure 11 that makes a call to perpendicular to it as shown in figure 12, the straight-through bar cylindrical nuts group circular hole (1-21) in the bottom of fiber tube circular hole (1-22) in double end, (2) as shown in figure 13 bar cylindrical nuts group (8-1) is filled in the nut circular hole (1-21) that timber begins to crop up on (1-2), by fiber tube (8-3) one end in stud (8-2) one end precession double end, so just form male and female stud (8-5), the male and female stud (8-5) that is combined into being inserted to timber begins to crop up in the interior fiber tube circular hole (1-22) of (1-2) again, then in the internal screw thread (8-11) of the bolt head precession bar cylindrical nuts group (8-1) of male and female stud (8-5), the internal thread tube head (8-3) 1/2nd of male and female stud (8-5) is embedded in begining to crop up in (1-2) of timber, all the other 1/2nd expose begining to crop up outside (1-2), fix Wood door limit (1-1) for inserting, shown in Figure 14, then Wood door limit (1-1) inserted to begin to crop up (1-2) by its fastening bolt circular hole slotting (1-11) and expose interior fiber tube (8-3) outside, the interior rotation of internal screw thread that last fastening bolt (8-4) inserts internal thread tube head (8-3) by door limit (1-1) fastening bolt circular hole (1-11) is fixing.
7. structure of a kind of dismantled and assembled timber according to claim 1 and attaching method thereof, is characterized in that; Preferably by described door limit (1-1) with begin to crop up (1-2), the begin to crop up connection processing of (3-2) of core limit (3-1) and core is convex-concave as shown in figure 15, concave (1-23) the completely interlock of the convex line type (1-12) on door limit on begin to crop up (1-2).
CN201310143742.5A 2013-04-08 2013-04-08 Structure of detachable wooden door and connection method thereof Pending CN103790491A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310143742.5A CN103790491A (en) 2013-04-08 2013-04-08 Structure of detachable wooden door and connection method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310143742.5A CN103790491A (en) 2013-04-08 2013-04-08 Structure of detachable wooden door and connection method thereof

Publications (1)

Publication Number Publication Date
CN103790491A true CN103790491A (en) 2014-05-14

Family

ID=50666505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310143742.5A Pending CN103790491A (en) 2013-04-08 2013-04-08 Structure of detachable wooden door and connection method thereof

Country Status (1)

Country Link
CN (1) CN103790491A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105003177A (en) * 2015-08-14 2015-10-28 浙江新伍鑫耐火材料有限公司 Convenient-to-mount panel door
CN105003176A (en) * 2015-08-14 2015-10-28 浙江新伍鑫耐火材料有限公司 Clamping strip for panel door
CN105019788A (en) * 2015-08-14 2015-11-04 浙江新伍鑫耐火材料有限公司 Panel door with spliced and assembled door frame
CN106088968A (en) * 2016-07-22 2016-11-09 济南天金淼门业有限公司 A kind of Solid Door of the deformation that is difficult to get loose
CN106150295A (en) * 2015-04-24 2016-11-23 内蒙古润佳家具有限责任公司 A kind of connected mode of dismantled and assembled timber
CN109505491A (en) * 2019-01-23 2019-03-22 江慧 Removable timber door leaf and its installation method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4509294A (en) * 1980-07-04 1985-04-09 Fernand Flamand Ltee Door frame assembly
CN2804337Y (en) * 2005-05-27 2006-08-09 荣绍纯 Joining structure of door angle
CN201034000Y (en) * 2007-04-13 2008-03-12 杨玉昌 Wood door
CN201106378Y (en) * 2007-04-03 2008-08-27 邹用军 Wood frame inner dual-line attaching core frame central plate Europe style door

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4509294A (en) * 1980-07-04 1985-04-09 Fernand Flamand Ltee Door frame assembly
CN2804337Y (en) * 2005-05-27 2006-08-09 荣绍纯 Joining structure of door angle
CN201106378Y (en) * 2007-04-03 2008-08-27 邹用军 Wood frame inner dual-line attaching core frame central plate Europe style door
CN201034000Y (en) * 2007-04-13 2008-03-12 杨玉昌 Wood door

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150295A (en) * 2015-04-24 2016-11-23 内蒙古润佳家具有限责任公司 A kind of connected mode of dismantled and assembled timber
CN105003177A (en) * 2015-08-14 2015-10-28 浙江新伍鑫耐火材料有限公司 Convenient-to-mount panel door
CN105003176A (en) * 2015-08-14 2015-10-28 浙江新伍鑫耐火材料有限公司 Clamping strip for panel door
CN105019788A (en) * 2015-08-14 2015-11-04 浙江新伍鑫耐火材料有限公司 Panel door with spliced and assembled door frame
CN106088968A (en) * 2016-07-22 2016-11-09 济南天金淼门业有限公司 A kind of Solid Door of the deformation that is difficult to get loose
CN109505491A (en) * 2019-01-23 2019-03-22 江慧 Removable timber door leaf and its installation method
CN109505491B (en) * 2019-01-23 2023-11-24 江慧 Detachable wooden door leaf and installation method thereof

Similar Documents

Publication Publication Date Title
CN103790491A (en) Structure of detachable wooden door and connection method thereof
JP3150892U (en) Multipurpose combination unit
WO2016054878A1 (en) Manual assemble building column-beam connecting component and assembled frame structure thereof
CN203452187U (en) Gable top structural assembly of wooden house
CN104350967A (en) Splicing type plastic and wood flower box
CN203669646U (en) Detachable wooden door and structure thereof
EP3153070B1 (en) Double-layer bedstead
CN206754086U (en) A kind of bamboo and wood concrete frame joint construction
CN208202655U (en) A kind of bilayer integrated house
CN202227943U (en) Rail of balcony guardrail and built-in connection structure of ornaments
CN205758049U (en) It is easy to the furniture cabinet frame structure of production and assembly
CN203168373U (en) Combined table frame and table leg structure
CN201474372U (en) Fence structure
CN203669651U (en) Detachable wooden door and connecting piece thereof
CN203121712U (en) Corner sofa with detachable backrest
CN205907824U (en) Connecting piece and floorbar subassembly
TWI526173B (en) The structure of the connector of the modular shelves (2)
CN204169339U (en) Modular combined cabinet and supporting construction thereof
CN105901997B (en) Structure improved furniture cabinet
CN209083742U (en) A kind of mortise-tenon joint structure
CN202718461U (en) Three-rod handle lock
KR200468276Y1 (en) Assembly Pillar
CN202164869U (en) Baffle connection device
CN203280102U (en) Backrest chair with arc backrest frame
CN209354499U (en) A kind of furniture connecting component

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: INNER MONGOLIA RUNJIA FURNITURE CO., LTD.

Free format text: FORMER OWNER: INNER MONGOLIA MEIRUN DOOR INDUSTRY CO., LTD.

Effective date: 20140711

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20140711

Address after: 021400, room 3, unit 402, building 14, port home, Manchuria, the Inner Mongolia Autonomous Region, Hulun Buir

Applicant after: Inner Mongolia runjiah Furniture Co., Ltd.

Address before: South s economic cooperation zone four Road East Lu five North Street 021400 the Inner Mongolia Autonomous Region Manchuria City

Applicant before: INNER MONGOLIA MEIRUN DOOR INDUSTRY LIABILITY LIMITED COMPANY

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140514