CN102888847A - Construction method free from lowering water level for local deep foundation pit of elevator shaft - Google Patents

Construction method free from lowering water level for local deep foundation pit of elevator shaft Download PDF

Info

Publication number
CN102888847A
CN102888847A CN2012103987209A CN201210398720A CN102888847A CN 102888847 A CN102888847 A CN 102888847A CN 2012103987209 A CN2012103987209 A CN 2012103987209A CN 201210398720 A CN201210398720 A CN 201210398720A CN 102888847 A CN102888847 A CN 102888847A
Authority
CN
China
Prior art keywords
steel
form device
steel form
construction method
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103987209A
Other languages
Chinese (zh)
Other versions
CN102888847B (en
Inventor
孙健
张振山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201210398720.9A priority Critical patent/CN102888847B/en
Publication of CN102888847A publication Critical patent/CN102888847A/en
Application granted granted Critical
Publication of CN102888847B publication Critical patent/CN102888847B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention relates to a construction method for a local deep foundation pit of an elevator shaft, in particular to a construction method free from lowering water level for the local deep foundation pit of the elevator shaft. The method comprises the following steps: preparing a trapezoid box-type steel molding plate device with a bottom but without a cover by welding profile steel, angle iron and steel plates; performing water-proof treatment in the steel molding plate device, tying steel bars, and excavating the elevator foundation pit in the way of pumping water and excavating at the same time; after the elevator foundation pit is excavated, hoisting and installing the steel molding plate device at a measuring benchmark position by a crane; casting raft concrete to interior and exterior of the steel molding plate device to meet the requirements of underground water buoyance force and side pressing force; after the interior concrete reaches certain strength, cutting off the profile steel and the angle iron inside the steel molding plate device; and then performing the next step construction procedure of main building raft. The construction method is simple in operation, the steel molding plate device is good in anti-buoyance force effect, the water-proof and steel bar constructions are convenient; and after a foundation trench is excavated, when the underground water level is close to the elevation of the trench bottom, the local deep foundation pit of the elevator shaft is possible to be free from lowering the water level.

Description

The local deep foundation ditch of elevator shaft is exempted from dewatering construction method
Technical field
The present invention relates to the local construction method of deep foundation ditch of elevator shaft, specifically the local deep foundation ditch of a kind of elevator shaft is exempted from dewatering construction method.
Background technology
Behind the excavating foundation trench, groundwater table and bottom land absolute altitude near the time, the local deep foundation ditch of elevator shaft is general to adopt following job practices:
1, well-points dewatering construction.Well-points dewatering is a kind of method of artificial dewatering.Before excavation of foundation pit, around foundation ditch, bury the filter pipe (well) of some underground, to utilize pumping equipment to draw water and make the soil that digs remain the method for dry state, the lasting cycle of this job practices is long, and cost is high, and incurs loss through delay the duration.
2, open caisson construction.Open caisson is the concrete pit shaft of a bottomless uncovered, generally partly is comprised of sword pin, the borehole wall, partition wall etc.In open caisson, cut the earth and make its sinking, reach design elevation after, carry out the concrete back cover, fill out the heart, build top cover, consist of open caisson foundation.This job practices pit shaft is longer from being fabricated into life cycle, and difficulty is large in basil construction, the open caisson deadweight is larger, and sword foot section area is little, center of gravity is higher, easily cause causing open caisson cracking or toppling over because of land subsidence, in the well sinking process as run into large gravel, trunk or shaft bottom rock layer surface and tilt when excessive, also will bring larger difficulty to construction.The most important thing is that the bottom is a difficult point without mouth waterproof when having built concrete, it can not guarantee and satisfy waterproof and reach designing requirement.
Vertical the above, the problem that the local construction method of deep foundation ditch of existing elevator shaft exists is: construct loaded down with trivial details, speed of application is slow, the cycle is long, cost is high.
Summary of the invention
The present invention is intended to solve the problems referred to above that the local construction method of deep foundation ditch of existing elevator shaft exists, and provides a kind of behind excavating foundation trench, groundwater table and bottom land absolute altitude near the time, elevator shaft part deep foundation ditch can adopt the job practices of exempting from precipitation.
The technical solution used in the present invention is:
The local deep foundation ditch of a kind of elevator shaft is exempted from dewatering construction method, carries out as follows:
A. made without being stamped the trapezoidal box steel form device at the end by shaped steel, angle steel, Plate Welding;
B. do waterproofing work in described steel form device, the good reinforcing bar of colligation adopts the mode of the excavation while drawing water to excavate the elevator foundation ditch simultaneously;
C. after the elevator foundation ditch scrapes out, with crane described steel form device lifting is mounted to the measuring basis position;
D. inside and outside described steel form device, build simultaneously the raft board concrete to satisfy buoyancy force of underground water and lateral pressure requirement, when treating that inner concrete reaches some strength, again the inner shaped steel of steel form device and angle steel are cut away, carry out afterwards next step main building raft plate working procedure.
Steps d can also be: in described steel form device injected water, outside described steel form device concreting, to satisfy buoyancy force of underground water and lateral pressure requirement, when treating that outside concrete reaches some strength, water in the steel form device is drained, then build the raft board concrete, when treating that inner concrete reaches some strength, the more inner shaped steel of steel form device and angle steel are cut away, carry out afterwards next step main building raft plate working procedure.
Compared with prior art, the outstanding feature of technique scheme of the present invention is: constructing operation is easy, and steel form device anti-floating power is effective, be convenient to the construction of waterproof and reinforcing bar, after making excavating foundation trench, groundwater table and bottom land absolute altitude near the time, the local deep foundation ditch of elevator shaft is exempted from precipitation becomes possibility.
Description of drawings:
Fig. 1 is trapezoidal box steel form device plane structure schematic diagram of the present invention.
Fig. 2 is A-A cross-sectional view among Fig. 1.
Fig. 3 is B-B cross-sectional view among Fig. 1.
Fig. 4 is the peripheral reinforcing bar anchor fluke of trapezoidal box steel form device of the present invention arrangement diagram.
Fig. 5 is C-C cross-sectional view among Fig. 4.
Among the figure: 1-casing, 2-angle steel support member, 3-angle steel, 4-i iron, 5-steel plate, 6-reinforcing bar anchor fluke.
The specific embodiment
The invention will be further described below in conjunction with embodiment, and purpose only is to understand better content of the present invention.Therefore, the cited case does not limit protection scope of the present invention.
Referring to accompanying drawing, the local deep foundation ditch of the elevator shaft that the present embodiment provides is exempted from dewatering construction method and is:
At first, adopt angle steel support member 2, angle steel 3, i iron 4, steel plate 5 welding productions without the steel form device that is stamped the end, this steel form device one side box body 1 is oblique (see figure 2) and consists of trapezoidal case structure, welded reinforcement anchor fluke 6(sees Fig. 4, Fig. 5 on the casing 1 peripheral angle steel 3), angle steel 3 is the L63 angle steel, reinforcing bar anchor fluke 6 is 25 screw-thread steels, and reinforcing bar anchor fluke 6 spacings are 500MM, and length also is 500MM.
After making, does in the steel form device the good reinforcing bar of waterproofing work and colligation within it.
Secondly, after the elevator foundation ditch adopts the method for the excavation while drawing water to scrape out, arrange crane hanging component steel form device to the measuring basis position, then build simultaneously the raft board concrete to satisfy buoyancy force of underground water and lateral pressure requirement outward within it, when treating that inner concrete reaches some strength, establishment officer cuts away its inner shaped steel and angle steel, just can normally carry out next step main building raft plate working procedure afterwards.
Perhaps, lift to the measuring basis position at the steel form device, in the steel form device outside injected water, the steel form device concreting to satisfy buoyancy force of underground water and lateral pressure requirement, when treating that outside concrete reaches some strength, water in the steel form device is drained, and then concreting, when treating that inner concrete reaches some strength, establishment officer cuts away the inner shaped steel of steel form device and angle steel, carries out afterwards the construction of main building raft plate.

Claims (2)

1. the local deep foundation ditch of elevator shaft is exempted from dewatering construction method, it is characterized in that, it carries out as follows:
A. made without being stamped the trapezoidal box steel form device at the end by shaped steel, angle steel, Plate Welding;
B. do waterproofing work in described steel form device, the good reinforcing bar of colligation adopts the mode of the excavation while drawing water to excavate the elevator foundation ditch simultaneously;
C. after the elevator foundation ditch scrapes out, with crane described steel form device lifting is mounted to the measuring basis position;
D. inside and outside described steel form device, build simultaneously the raft board concrete, to satisfy buoyancy force of underground water and lateral pressure requirement, when treating that inner concrete reaches some strength, the more inner shaped steel of steel form device and angle steel are cut away, carry out afterwards next step main building raft plate working procedure.
2. the local deep foundation ditch of elevator shaft according to claim 1 is exempted from dewatering construction method, it is characterized in that, steps d can also be: in described steel form device injected water, outside described steel form device concreting, to satisfy buoyancy force of underground water and lateral pressure requirement, when treating that outside concrete reaches some strength, water in the steel form device is drained, then build the raft board concrete, when treating that inner concrete reaches some strength, again the inner shaped steel of steel form device and angle steel are cut away, carry out afterwards next step main building raft plate working procedure.
CN201210398720.9A 2012-10-19 2012-10-19 Construction method free from lowering water level for local deep foundation pit of elevator shaft Active CN102888847B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210398720.9A CN102888847B (en) 2012-10-19 2012-10-19 Construction method free from lowering water level for local deep foundation pit of elevator shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210398720.9A CN102888847B (en) 2012-10-19 2012-10-19 Construction method free from lowering water level for local deep foundation pit of elevator shaft

Publications (2)

Publication Number Publication Date
CN102888847A true CN102888847A (en) 2013-01-23
CN102888847B CN102888847B (en) 2014-12-24

Family

ID=47532514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210398720.9A Active CN102888847B (en) 2012-10-19 2012-10-19 Construction method free from lowering water level for local deep foundation pit of elevator shaft

Country Status (1)

Country Link
CN (1) CN102888847B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103774698A (en) * 2014-02-14 2014-05-07 中国十九冶集团有限公司 Drainage-free construction method for soil engineering
CN104975607A (en) * 2015-07-22 2015-10-14 中建八局第二建设有限公司 Offshore area local deep foundation pit stanching pit construction method
CN105133619A (en) * 2015-08-07 2015-12-09 中国一冶集团有限公司 Construction method for deep foundation pit of elevator shaft
CN106498951A (en) * 2016-11-30 2017-03-15 上海市机械施工集团有限公司 A kind of shaft excavation construction method
CN107938681A (en) * 2017-11-26 2018-04-20 上海宝冶集团有限公司 Way after concrete sump
CN112464353A (en) * 2020-12-18 2021-03-09 中国二十冶集团有限公司 BIM-based modeling method and system for special-shaped wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03199531A (en) * 1989-12-27 1991-08-30 Hazama Gumi Ltd Construction of underground body and mold frame thereof
CN101457528A (en) * 2007-12-14 2009-06-17 卢锡雷 Seamless joint pipe caisson pouring row pile construction technique
CN101481910A (en) * 2009-01-09 2009-07-15 江苏省华建建设股份有限公司 Construction method of foundation pit slope supported independent pile tower crane foundation
CN101538868A (en) * 2009-02-06 2009-09-23 青海省电力设计院 Everfrost and saline soil region transmission line pole glass fiber reinforced plastic foundation construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03199531A (en) * 1989-12-27 1991-08-30 Hazama Gumi Ltd Construction of underground body and mold frame thereof
CN101457528A (en) * 2007-12-14 2009-06-17 卢锡雷 Seamless joint pipe caisson pouring row pile construction technique
CN101481910A (en) * 2009-01-09 2009-07-15 江苏省华建建设股份有限公司 Construction method of foundation pit slope supported independent pile tower crane foundation
CN101538868A (en) * 2009-02-06 2009-09-23 青海省电力设计院 Everfrost and saline soil region transmission line pole glass fiber reinforced plastic foundation construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
徐冬雪等: "地铁深基坑高模架单侧模板施工设计分析", 《现代城市轨道交通》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103774698A (en) * 2014-02-14 2014-05-07 中国十九冶集团有限公司 Drainage-free construction method for soil engineering
CN103774698B (en) * 2014-02-14 2015-05-06 中国十九冶集团有限公司 Drainage-free construction method for soil engineering
CN104975607A (en) * 2015-07-22 2015-10-14 中建八局第二建设有限公司 Offshore area local deep foundation pit stanching pit construction method
CN105133619A (en) * 2015-08-07 2015-12-09 中国一冶集团有限公司 Construction method for deep foundation pit of elevator shaft
CN105133619B (en) * 2015-08-07 2017-07-21 中国一冶集团有限公司 Elevator construction method of deep foundation ditch
CN106498951A (en) * 2016-11-30 2017-03-15 上海市机械施工集团有限公司 A kind of shaft excavation construction method
CN107938681A (en) * 2017-11-26 2018-04-20 上海宝冶集团有限公司 Way after concrete sump
CN112464353A (en) * 2020-12-18 2021-03-09 中国二十冶集团有限公司 BIM-based modeling method and system for special-shaped wall

Also Published As

Publication number Publication date
CN102888847B (en) 2014-12-24

Similar Documents

Publication Publication Date Title
CN103967031B (en) A kind of caisson of consolidated subsoil and stake combination foundation and construction method thereof
CN102888847B (en) Construction method free from lowering water level for local deep foundation pit of elevator shaft
CN103015456B (en) Rapid pit-in-pit form erecting method in foundation slab of buried concrete structure
CN108914931A (en) A kind of ring-like foundation pile of the vertical shield of assembled and construction method
KR20100115019A (en) Panel joint for construction for underground diaphragm well and underground diaphragm well constructing method using the same
CN103321246B (en) Underground diaphragm wall based foundation pit construction method
CN203213136U (en) Caisson and pile combined foundation of consolidated subsoil
CN108086328A (en) A kind of dynamic sealing, assembled building enclosure and its construction method from recharge
CN103882881A (en) Underwater construction method for bearing platform deeply embedded in rock
CN108457282A (en) Deep water hard rock is without back cover steel sheet pile cofferdam construction method
CN105239578B (en) Water-rich sand layer deep foundation pit underwater construction method
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN108798775A (en) A kind of jacking construction active well
KR20130013287A (en) Wet-type constructing method of pier foundation
CN103866787B (en) A kind of spacious reverse masonry method concrete cut that digs builds construction technology
CN101319501B (en) Construction method of deep foundation ditch
CN212641468U (en) Pit-in-pit rapid construction structure
CN104499489B (en) Foundation pit construction method
KR100931918B1 (en) Underwater tunnelling method for using inner and outer water pressure of structure
CN105155421B (en) Complete embedding circular construction method in a kind of single pile Single column pier river course shallow water
CN208473930U (en) A kind of jacking construction active well
CN104846837B (en) The construction method of ultra-deep well in a kind of bright draining foundation ditch
CN207143965U (en) Steel plate concrete combined type anti-floating water sealing structure
CN203049588U (en) Pit-in-pit cylindrical mould
CN206090593U (en) Concrete cofferdam and steel sheet piling cofferdam combination formula cofferdam structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant