CN102373825B - Method for installing steel structure quadruplet pipe chimney - Google Patents

Method for installing steel structure quadruplet pipe chimney Download PDF

Info

Publication number
CN102373825B
CN102373825B CN 201010257345 CN201010257345A CN102373825B CN 102373825 B CN102373825 B CN 102373825B CN 201010257345 CN201010257345 CN 201010257345 CN 201010257345 A CN201010257345 A CN 201010257345A CN 102373825 B CN102373825 B CN 102373825B
Authority
CN
China
Prior art keywords
steel pipe
pipe chimney
chimney
peripheral
center
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201010257345
Other languages
Chinese (zh)
Other versions
CN102373825A (en
Inventor
常敬东
付永生
侯秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN 201010257345 priority Critical patent/CN102373825B/en
Publication of CN102373825A publication Critical patent/CN102373825A/en
Application granted granted Critical
Publication of CN102373825B publication Critical patent/CN102373825B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention relates to a method for installing a steel structure quadruplet pipe chimney, which comprises four steel pipe chimneys, wherein three peripheral steel pipe chimneys are respectively arranged on three endpoints of an equilateral triangle, and the other central steel pipe chimney is arranged on a central point of the equilateral triangle. The installing method comprises the following steps: 1, segmenting the peripheral steel pipe chimneys and the central steel pipe chimney; 2, adjusting the peripheral steel pipe chimneys and the central steel pipe chimney; 3, forming a peripheral steel pipe chimney unit; 4, forming combination of a first segment of peripheral steel pipe chimney and a first segment of central steel pipe chimney; and 5, integrally forming the peripheral steel pipe chimneys and the central steel pipe chimney. The installing method provided by the invention is simple and easy, the safety of construction is improved, and the quality and the progress of construction can be effectively ensured.

Description

Method for installing steel structure quadruplet pipe chimney
Technical field
The invention belongs to chimney installing area, especially a kind of method for installing steel structure quadruplet pipe chimney.
Background technology
Steel stack is widely used in metallurgy and chemical industry, is main mainly with single tube.Along with the expansion of scope of the enterprise, enterprise needs to build simultaneously the identical equipment of many covers sometimes, in order to satisfy technological requirement, just needs to build tetrad pipe chimney.Under normal conditions, steel stack is generally in well directly lifting later on of floor manufacture, this method generally is applicable to single pipe style chimney and installs, if tetrad pipe chimney is aloft installed while assembling, the wayward outside three tube angulations and relative position, and there is the low shortcoming of high-altitude working safety hidden danger and effect, is difficult for ensuring the quality of products and the duration.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, a kind of method for installing steel structure quadruplet pipe chimney is provided, this kind mounting method is simple, has improved the safety of construction, quality and progress that can the effective guarantee construction.
The present invention solves its technical problem and is achieved through the following technical solutions:
A kind of method for installing steel structure quadruplet pipe chimney, comprise four steel pipe chimneys, wherein three peripheral steel pipe chimneys are separately positioned on three end points of equilateral triangle, and another root center steel pipe chimney is arranged on the central point of equilateral triangle, and the step of its this mounting method is:
⑴. the segmentation of peripheral steel pipe chimney and center steel pipe chimney: carry out segment processing according to the height of peripheral steel pipe chimney and center steel pipe chimney, three in the sustained height section peripheral steel pipe chimneys as one section peripheral steel pipe chimney unit, from the peripheral steel pipe chimney unit of first paragraph until the peripheral steel pipe chimney of final stage unit;
⑵. the adjustment of peripheral steel pipe chimney and center steel pipe chimney: set up peripheral steel pipe chimney unit operations platform, make the central point of peripheral steel pipe chimney and center steel pipe chimney on operating platform, peripheral steel pipe chimney and center steel pipe chimney are lifted to operating platform, at first adjust the verticality of center steel pipe chimney, then adjust the gradient of peripheral steel pipe chimney;
⑶. the moulding of peripheral steel pipe chimney unit: the long truss of welding respectively between three that adjust peripheral steel pipe chimneys makes three peripheral steel pipe chimneys form peripheral steel pipe chimney unit;
⑷. the combination forming of the peripheral steel pipe chimney of first paragraph and first paragraph center steel pipe chimney: the rear spot welding in place of the peripheral steel pipe chimney unit lifting of first paragraph is fixed, lift again first paragraph center steel pipe chimney, and adjust the verticality of center steel pipe chimney, the top mark of center steel pipe that remains on same section is high than the low 200mm of peripheral steel pipe chimney top absolute altitude, the center steel pipe chimney of same section is welded and fixed by the long truss between short truss and peripheral steel pipe chimney, then on peripheral steel pipe chimney unit, steel ladder is installed, the soldering group synthesis type of the peripheral steel pipe chimney of first paragraph and center steel pipe chimney is complete,
⑸. with peripheral steel pipe chimney and center steel pipe chimney global formation: the weldering of the peripheral steel pipe chimney of lifting second segment unit spot is fixed on the peripheral steel pipe chimney of first paragraph, lift again second segment center steel pipe chimney, the top mark of center steel pipe that remains on same section is high than the low 200mm of peripheral steel pipe chimney top absolute altitude, welded truss between the peripheral steel pipe chimney of same section and center steel pipe chimney, and be fixedly mounted with steel ladder on peripheral steel pipe chimney unit, in like manner construction is until the peripheral steel pipe chimney of final stage and center steel pipe chimney, it is complete that this steel work tetrad pipe chimney is installed global formation.
And, the described steel half space that is fixedly mounted with between the outside of three peripheral steel pipe chimneys.
Advantage of the present invention and beneficial effect are:
1, this method for installing steel structure quadruplet pipe chimney adopts the segmentation of peripheral steel pipe chimney and center steel pipe chimney; The adjustment of peripheral steel pipe chimney and center steel pipe chimney; The moulding of peripheral steel pipe chimney unit; The combination forming of the peripheral steel pipe chimney of first paragraph and first paragraph center steel pipe chimney; The step of peripheral steel pipe chimney and center steel pipe chimney global formation is constructed, construction quality and the progress of engineering have not only been guaranteed, especially reduced the potential safety hazard of construction, effective guarantee the safety of construction, obtained good economic and social benefit.
2, mounting method of the present invention is simple, has improved the safety of construction, quality and progress that can the effective guarantee construction.
Description of drawings
Fig. 1 is the structural representation that steel work tetrad pipe chimney of the present invention installs;
Fig. 2 is that the A-A of Fig. 1 is to cutaway view Amplified image.
The specific embodiment
The invention will be further described below by specific embodiment, and following examples are descriptive, is not determinate, can not limit protection scope of the present invention with this.
A kind of method for installing steel structure quadruplet pipe chimney, comprise four steel pipe chimneys, wherein three peripheral steel pipe chimneys 1 are separately positioned on three end points of equilateral triangle, and another root center steel pipe chimney 3 is arranged on the central point of equilateral triangle, and it is characterized in that: the step of this mounting method is:
⑴. the segmentation of peripheral steel pipe chimney and center steel pipe chimney: carry out segment processing according to the height of peripheral steel pipe chimney and center steel pipe chimney, three in the sustained height section peripheral steel pipe chimneys as one section peripheral steel pipe chimney unit, from the peripheral steel pipe chimney unit of first paragraph until the peripheral steel pipe chimney of final stage unit;
⑵. the adjustment of peripheral steel pipe chimney and center steel pipe chimney: set up peripheral steel pipe chimney unit operations platform, make the central point of peripheral steel pipe chimney and center steel pipe chimney on operating platform, peripheral steel pipe chimney and center steel pipe chimney are lifted to operating platform, at first adjust the verticality of center steel pipe chimney, then adjust the gradient of peripheral steel pipe chimney;
⑶. the moulding of peripheral steel pipe chimney unit: the long truss 2 of welding respectively between three that adjust peripheral steel pipe chimneys, described long truss can be connected between three peripheral steel pipe chimneys by other accessory plate, and other accessory plate can be support ring plate and backplate.
Make three peripheral steel pipe chimneys form peripheral steel pipe chimney unit; Can be fixedly mounted with steel half space 5 when the peripheral steel pipe chimney of assembling unit between the outside of peripheral steel pipe chimney, this steel half space can weld together when peripheral steel pipe chimney unit formation, then carries out next step assembling.
⑷. the combination forming of the peripheral steel pipe chimney of first paragraph and first paragraph center steel pipe chimney: the rear spot welding in place of the peripheral steel pipe chimney unit lifting of first paragraph is fixed, lift again first paragraph center steel pipe chimney, and adjust the verticality of center steel pipe chimney, the top mark of center steel pipe that remains on same section is high than the low 200mm of peripheral steel pipe chimney top absolute altitude, the center steel pipe chimney of same section is welded and fixed by the long truss between short truss 6 and peripheral steel pipe chimney, then steel ladder 4 is installed on peripheral steel pipe chimney unit, the soldering group synthesis type of the peripheral steel pipe chimney of first paragraph and center steel pipe chimney is complete,
⑸. with peripheral steel pipe chimney and center steel pipe chimney global formation: the weldering of the peripheral steel pipe chimney of lifting second segment unit spot is fixed on the peripheral steel pipe chimney of first paragraph, lift again second segment center steel pipe chimney, the top mark of center steel pipe that remains on same section is high than the low 200mm of peripheral steel pipe chimney top absolute altitude, welded truss between the peripheral steel pipe chimney of same section and center steel pipe chimney, and be fixedly mounted with steel ladder on peripheral steel pipe chimney unit, in like manner construction is until the peripheral steel pipe chimney of final stage and center steel pipe chimney, it is complete that this steel work tetrad pipe chimney is installed global formation.

Claims (2)

1. method for installing steel structure quadruplet pipe chimney, comprise four steel pipe chimneys, wherein three peripheral steel pipe chimneys are separately positioned on three end points of equilateral triangle, and another root center steel pipe chimney is arranged on the central point of equilateral triangle, and it is characterized in that: the step of this mounting method is:
⑴. the segmentation of peripheral steel pipe chimney and center steel pipe chimney: carry out segment processing according to the height of peripheral steel pipe chimney and center steel pipe chimney, three in the sustained height section peripheral steel pipe chimneys as one section peripheral steel pipe chimney unit, from the peripheral steel pipe chimney unit of first paragraph until the peripheral steel pipe chimney of final stage unit;
⑵. the adjustment of peripheral steel pipe chimney and center steel pipe chimney: set up peripheral steel pipe chimney unit operations platform, make the central point of peripheral steel pipe chimney and center steel pipe chimney on operating platform, peripheral steel pipe chimney and center steel pipe chimney are lifted to operating platform, at first adjust the verticality of center steel pipe chimney, then adjust the gradient of peripheral steel pipe chimney;
⑶. the moulding of peripheral steel pipe chimney unit: the long truss of welding respectively between three that adjust peripheral steel pipe chimneys makes three peripheral steel pipe chimneys form peripheral steel pipe chimney unit;
⑷. the combination forming of the peripheral steel pipe chimney of first paragraph and first paragraph center steel pipe chimney: the rear spot welding in place of the peripheral steel pipe chimney unit lifting of first paragraph is fixed, lift again first paragraph center steel pipe chimney, and adjust the verticality of center steel pipe chimney, the top mark of center steel pipe that remains on same section is high than the low 200mm of peripheral steel pipe chimney top absolute altitude, the center steel pipe chimney of same section is welded and fixed by the long truss between short truss and peripheral steel pipe chimney, then on peripheral steel pipe chimney unit, steel ladder is installed, the soldering group synthesis type of the peripheral steel pipe chimney of first paragraph and center steel pipe chimney is complete,
⑸. with peripheral steel pipe chimney and center steel pipe chimney global formation: the weldering of the peripheral steel pipe chimney of lifting second segment unit spot is fixed on the peripheral steel pipe chimney of first paragraph, lift again second segment center steel pipe chimney, the top mark of center steel pipe that remains on same section is high than the low 200mm of peripheral steel pipe chimney top absolute altitude, welded truss between the peripheral steel pipe chimney of same section and center steel pipe chimney, and be fixedly mounted with steel ladder on peripheral steel pipe chimney unit, in like manner construction is until the peripheral steel pipe chimney of final stage and center steel pipe chimney, it is complete that this steel work tetrad pipe chimney is installed global formation.
2. method for installing steel structure quadruplet pipe chimney according to claim 1, is characterized in that: be fixedly mounted with the steel half space between the outside of described three peripheral steel pipe chimneys.
CN 201010257345 2010-08-19 2010-08-19 Method for installing steel structure quadruplet pipe chimney Active CN102373825B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010257345 CN102373825B (en) 2010-08-19 2010-08-19 Method for installing steel structure quadruplet pipe chimney

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010257345 CN102373825B (en) 2010-08-19 2010-08-19 Method for installing steel structure quadruplet pipe chimney

Publications (2)

Publication Number Publication Date
CN102373825A CN102373825A (en) 2012-03-14
CN102373825B true CN102373825B (en) 2013-06-12

Family

ID=45792997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010257345 Active CN102373825B (en) 2010-08-19 2010-08-19 Method for installing steel structure quadruplet pipe chimney

Country Status (1)

Country Link
CN (1) CN102373825B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677943B (en) * 2012-06-04 2014-04-09 四川电力设计咨询有限责任公司 Mounting structure for three-tube tube-in-tube chimney
CN108204164A (en) * 2018-01-22 2018-06-26 南昌大学 The three pipe chimneys with external triangular shaped sleeve equipped with circumscribed linking beam

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1162856A (en) * 1967-02-02 1969-08-27 Richard Edward Lawrence Improvements in Smokestacks and/or Breechings
CN201050211Y (en) * 2007-05-23 2008-04-23 中国电力工程顾问集团华东电力设计院 Gradual change type chimney
CN201172986Y (en) * 2008-02-03 2008-12-31 中国电力工程顾问集团中南电力设计院 Four-tube self-supporting steel chimney for power generating plant
CN201261959Y (en) * 2008-09-22 2009-06-24 浙江天地环保工程有限公司 Integrally detachable desulfuration chimney

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1162856A (en) * 1967-02-02 1969-08-27 Richard Edward Lawrence Improvements in Smokestacks and/or Breechings
CN201050211Y (en) * 2007-05-23 2008-04-23 中国电力工程顾问集团华东电力设计院 Gradual change type chimney
CN201172986Y (en) * 2008-02-03 2008-12-31 中国电力工程顾问集团中南电力设计院 Four-tube self-supporting steel chimney for power generating plant
CN201261959Y (en) * 2008-09-22 2009-06-24 浙江天地环保工程有限公司 Integrally detachable desulfuration chimney

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
三角形烟囱的有限元分析;陈颖洁;《低温建筑技术》;20080630(第6期);第84-86页 *
陈颖洁.三角形烟囱的有限元分析.《低温建筑技术》.2008,(第6期),84-85.

Also Published As

Publication number Publication date
CN102373825A (en) 2012-03-14

Similar Documents

Publication Publication Date Title
CN103470018B (en) Detachable converter tooling platform
WO2018218834A1 (en) Propeller flow-guiding pipe mounting device
CN104099871A (en) Arching structure of high large-span bridge bailey beams and construction method thereof
CN102373825B (en) Method for installing steel structure quadruplet pipe chimney
CN103173582A (en) Method for integral in-position mounting of blast-furnace five-way ball and eduction tubes thereof aloft
CN104895335A (en) Method for mounting hanging pillar
CN104314009B (en) Big sections hoisting mechanism and using method
CN203247868U (en) Large-span steel structure construction temporary supporting frame
CN206156567U (en) Thin cylinder body hoist
CN103883117A (en) Split mounting type staircase used for scaffold
CN101838986A (en) Disassembling tool type lattice column and construction method thereof
CN204266124U (en) The pre-assembled moulding bed of large sections steel box-girder
CN103333973B (en) Preferential locating installation method of blast furnace five-way ball
CN109629812A (en) The fast assembling-disassembling method of super high-rise steel pipe column operating platform
CN103541574B (en) Steel-making diffusing tower installation construction in narrow regions
CN204530492U (en) A kind of hydraulic climbing mould construction platform
CN203923918U (en) The one-tenth arch structure of high Longspan Bridge Bailey beam
CN203345978U (en) Bottom chord of tower crane boom
CN210549018U (en) Eccentric arc-shaped ring corridor section high-altitude lifting tool
CN204530491U (en) A kind of high pier hydraulic climbing mould construction frame
CN204530490U (en) A kind of hydraulic climbing mould construction frame
CN204057772U (en) Tower crane service platform
CN204778118U (en) High security elevator cab rail guard
CN112160608A (en) Lifting and mounting method for high-altitude full-transparent steel ring gallery
CN104675140A (en) Newly-added bearing column mounting and roof truss load transferring method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant