CN101936037B - Large-diameter steel bay zoning-manufacture reverse-order lifting installation construction method - Google Patents

Large-diameter steel bay zoning-manufacture reverse-order lifting installation construction method Download PDF

Info

Publication number
CN101936037B
CN101936037B CN 201010242368 CN201010242368A CN101936037B CN 101936037 B CN101936037 B CN 101936037B CN 201010242368 CN201010242368 CN 201010242368 CN 201010242368 A CN201010242368 A CN 201010242368A CN 101936037 B CN101936037 B CN 101936037B
Authority
CN
China
Prior art keywords
diameter steel
major diameter
steel storehouse
storehouse
straight section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201010242368
Other languages
Chinese (zh)
Other versions
CN101936037A (en
Inventor
李静
张锐
谢木才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN 201010242368 priority Critical patent/CN101936037B/en
Publication of CN101936037A publication Critical patent/CN101936037A/en
Application granted granted Critical
Publication of CN101936037B publication Critical patent/CN101936037B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a large-diameter steel bay zoning-manufacture reverse-order lifting installation construction method which belongs to the technical field of architectural installation. The method comprises the following steps according to the construction sequence: erecting a large-diameter steel bay conical jig on a concrete platform and manufacturing a large-diameter steel bay conical part; lifting the major diameter steel bay conical part by using a steel column, a chain block and a lifting steel plate of the lifting system; and after lifting the large-diameter steel bay conical part by the height of one straight section plate strip, manufacturing the straight section part of a large-diameter steel bay at the lower part of the large-diameter steel bay conical part in a zoning mode, and orderly manufacturing and lifting the steel bay from top to bottom until the whole construction is finished. Compared with the traditional construction method by using integral manufacture and hoisting, the construction method of the invention has the advantages of simple procedure and easy operation; the invention does not use large-scale hoisting or conveying machinery, thereby saving the construction cost; the manufacture and installation can be carried out simultaneously, thereby accelerating the construction progress; and the manufacture and installation are carried out at the large-diameter steel bay, thereby being free from the restriction of the construction site.

Description

Major diameter steel storehouse divides band to make the job practices that the inverted order jacking is installed
Technical field
The invention belongs to the construction and installation technical field, particularly a kind of major diameter steel storehouse divides band to make the job practices that the inverted order jacking is installed, and is applicable to that various steel warehouses are as the industry that stores body and the construction of public works.
Background technology
Major diameter steel storehouse (diameter 〉=6m ,≤30m) in various industrial projects, be widely used as finished product or raw material storage equipment, in other crops store, use is arranged also.
The characteristics in major diameter steel storehouse are that component volume is big, Heavy Weight.Conventional job practices is generally integral manufacturing, installation.Need take very big processing place in the conventional job practices manufacturing process; Transportation and installation need enough big lifting and haulage device; For preventing deformation of members in lifting, the transportation, need during making a large amount of reinforcement measure members such as steel plate bar to be set in warehouse inside, increased lifting, hauled weight again for this reason.Therefore the construction of conventional method major diameter steel storehouse needs to drop into great amount of manpower and material resources and plant equipment.
To take construction area big in order to solve conventional job practices, drops into problems such as plant equipment is many, and the spy develops major diameter steel storehouse and divides band to make, the job practices that the inverted order jacking is installed.This job practices has been done to describe in detail to job practicess such as the making in major diameter steel storehouse, radian control, warehouse connection, jacking installations and has been set forth, and has formed reasonable, the feasible construction technology of a cover.
Summary of the invention
The object of the present invention is to provide a kind of major diameter steel storehouse to divide band to make, the job practices that the inverted order jacking is installed.Adopt and divide band to make, solved the making of major diameter steel storehouse and taken the construction plant, the problem of large-scale lifting, Transport Machinery is used in transportation; The problem that has solved installation process use large-scale hoisting machinery is installed in the inverted order jacking; Solved radian centering when dividing the band assembly unit simultaneously, cone construction, the problems such as processing of integral jacking node.
The method applied in the present invention is as follows:
1, major diameter steel storehouse is made of major diameter steel storehouse straight section part and major diameter steel storehouse conical section.According to the width of used steel plate major diameter steel storehouse straight section part and major diameter steel storehouse conical section level being divided into strip makes.
2, set up moulding bed with Φ 48mm steel pipe on concrete platform, major diameter steel storehouse conical section divides band making, assembly unit on moulding bed.
3, major diameter steel silo wall installed inside jack-up system on concrete platform.Jack-up system constitutes by supporting steel column, 1# jack and jacking steel plate.Jacking is supported to adopt and is supported steel column, and jacking power adopts the 1# jack.Support steel column by built-in fitting and concrete platform welding.
4, major diameter steel storehouse conical section is made and finished, and is behind the height of jack-up system with a major diameter steel of major diameter steel storehouse conical section jacking storehouse straight section strip, with interim support that major diameter steel storehouse conical section is temporary fixed.
5, behind the height of a straight section strip of major diameter steel storehouse cone jacking, on concrete platform top, major diameter steel storehouse conical section lower space is divided band assembly unit major diameter steel storehouse straight section strip.During major diameter steel storehouse straight section strip assembly unit, utilize predetermined fixed on concrete platform to look for arc chock control steel storehouse radian be 180 °.The straight section strip assembly unit of major diameter steel storehouse is to utilize the butt joint steel plate locking of 2# jack with major diameter steel storehouse straight section strip two joint ends, cooperates jack-up system and look for the arc chock to be assembled into cylindric.
6, straight section strip assembly unit in major diameter steel storehouse finishes, and the angle steel of usefulness straight section strip top, major diameter steel storehouse welding and reinforcing bar anchor head carry out major diameter steel storehouse conical section and major diameter steel storehouse straight section strip temporary fixed as auxiliary part.After major diameter steel storehouse straight section part and the major diameter steel storehouse conical section firm welding, utilize jack-up system once more, the good major diameter steel of jacking assembly unit storehouse straight section part and major diameter steel storehouse conical section.
7, other major diameter steel storehouse straight section strip job practicess are with step 6, up to intact last band straight section strip of jacking.
8, at last the bolt hole on the base of major diameter steel storehouse is aimed at pre-buried major diameter steel storehouse anchoring bolt, placed bottom, major diameter steel storehouse base, with base and major diameter steel storehouse firm welding, the major diameter steel storehouse anchoring bolt of fastening good base.
Major diameter steel of the present invention storehouse is adopted to divide and is with preparation method, and the installation of major diameter steel storehouse is to utilize jack-up system employing inverted order mounting method from top to bottom.
The invention has the advantages that:
The finished bin job practices is compared with the finished bin job practices of routine, and working procedure is simple, adopts common construction machinery construction, ubiquity on the construction tool market; Do not use large-scale lifting, Transport Machinery, save construction cost; Make and install and to carry out simultaneously, increase construction speed; Make, be installed in major diameter steel bin location and not limited by the construction plant; Reduce a large amount of work high above the ground simultaneously, reduced the generation of site safety accident.
Description of drawings
Fig. 1 is a major diameter steel chamber structure schematic diagram.Wherein, concrete platform 1, major diameter steel storehouse 2, major diameter steel storehouse straight section strip 3, major diameter steel storehouse cone strip 4, major diameter steel storehouse anchor bolt 5.
Fig. 2 is major diameter steel storehouse and jack-up system vertical view.Wherein, concrete platform 1, major diameter steel storehouse straight section strip 3, major diameter steel storehouse anchor bolt 5, support steel column 6.
Fig. 3 is a major diameter steel storehouse jack-up system detail drawing.Wherein, concrete platform 1, major diameter steel storehouse straight section strip 3, support steel column 6,1# jack 7, jacking steel plate 8.
Fig. 4 is a major diameter steel storehouse construction diagrams.Wherein, concrete platform 1, major diameter steel storehouse straight section strip 3, look for arc chock 9, butt joint steel plate 10,2# jack 13.
Fig. 5 is a shape schematic diagram of looking for the arc chock.Wherein, look for arc chock 9.
Fig. 6 is that major diameter steel storehouse cone is connected detail drawing with straight section.Wherein, major diameter steel storehouse straight section strip 3, angle steel support 11, reinforcing bar anchor head 12.
The specific embodiment
Embodiment 1:
(1) major diameter steel storehouse cone strip 4 is made on concrete platform 1 and is finished.
(2) utilize jack-up system with the conical section jacking of major diameter steel storehouse.
(3) assembly unit major diameter steel storehouse straight section strip 3 on concrete platform 1.Earlier straight section strip 3 each joint in major diameter steel storehouse are placed on to look for during major diameter steel storehouse straight section strip 3 assembly units and are assembled into two semicircles on the arc chock 9, then with butt joint steel plate 10 on the 2# jack 13 locking major diameter steel storehouse straight section strips 3, major diameter steel storehouse cone strip 4 is stuck in the reinforcing bar anchor head 12 that annular is provided with on the major diameter steel storehouse straight section strip 3, with jack-up system jacking major diameter steel storehouse straight section strip part and major diameter steel storehouse conical section.Two semicircles of major diameter steel storehouse straight section strip 3 are stuck in looks for arc chock 9 inside.Two perps of welding major diameter steel storehouse straight section strip 3 and the horizontal joint of major diameter steel storehouse straight section strip 3 and major diameter steel storehouse cone strip 4.
(4) other strips of assembly unit successively, jacking major diameter steel storehouse straight section strip 3 are until the making of finishing major diameter steel storehouse 2.

Claims (7)

1. a major diameter steel storehouse divides band to make inverted order jacking construction method of installation, it is characterized in that, may further comprise the steps:
A. major diameter steel storehouse (2) are made of major diameter steel storehouse straight section part and major diameter steel storehouse conical section, according to the width of used steel plate with major diameter steel storehouse straight section partly and major diameter steel storehouse conical section level be divided into strip;
B. go up at concrete platform (1) and set up moulding bed with Φ 48mm steel pipe, major diameter steel storehouse conical section divides band making, assembly unit on moulding bed;
C. go up major diameter steel storehouse (2) bulkhead installed inside jack-up system at concrete platform (1);
D. major diameter steel storehouse conical section is made and is finished, with jack-up system with major diameter steel storehouse conical section jacking major diameter steel storehouse straight section strip (3) highly;
E. behind the straight section strip height of a major diameter steel of major diameter steel storehouse conical section jacking storehouse, on concrete platform (1) top, major diameter steel storehouse conical section lower space is divided band assembly unit major diameter steel storehouse straight section strip (3);
F. the assembly unit of major diameter steel storehouse straight section part strip finishes, with major diameter steel storehouse conical section and major diameter steel storehouse straight section strip (3) firm welding; Utilize jack-up system jacking assembly unit good major diameter steel storehouse straight section part and major diameter steel storehouse conical section again;
G. other major diameter steel storehouse straight section part strip job practicess are with step f, up to the intact the last item straight section strip of jacking;
H. the bolt hole on the base of major diameter steel storehouse (2) is aimed at pre-buried major diameter steel storehouse anchoring bolt (5), with base and major diameter steel storehouse (2) firm welding, the major diameter steel storehouse anchoring bolt (5) of fastening good base.
2. method according to claim 1 is characterized in that: the jack-up system among the described step c constitutes by supporting steel column (6), first jack (7) and jacking steel plate (8), and jack-up system supports to adopt and supports steel column (6), and power adopts first jack (7).
3. jack-up system according to claim 2 is characterized in that: described support steel column (6) is welded to connect by built-in fitting and concrete platform (1).
4. method according to claim 1 is characterized in that: utilizing during major diameter steel storehouse straight section strip (3) assembly unit among the described step e and looking for arc chock (9) control major diameter steel storehouse straight section strip (3) radian is 180 °.
5. method according to claim 1, it is characterized in that: major diameter steel storehouse straight section strip (3) assembly unit is to utilize butt joint steel plate (10) locking of 2# jack (13) with major diameter steel storehouse straight section strip (3) two joint ends among the described step e, cooperates jack-up system and looks for arc chock (9) to be assembled into cylindric.
6. method according to claim 1, it is characterized in that: major diameter steel storehouse straight section strip (3) assembly unit finishes among the described step f, support (11) and reinforcing bar anchor head (12) as auxiliary part with the angle steel of major diameter steel storehouse straight section strip (3) top welding, carry out major diameter steel storehouse conical section and major diameter steel storehouse straight section strip (3) temporary fixed.
7. method according to claim 1 is characterized in that: install in described major diameter steel storehouse (2) is to utilize jack-up system employing inverted order mounting method from top to bottom.
CN 201010242368 2010-08-02 2010-08-02 Large-diameter steel bay zoning-manufacture reverse-order lifting installation construction method Expired - Fee Related CN101936037B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010242368 CN101936037B (en) 2010-08-02 2010-08-02 Large-diameter steel bay zoning-manufacture reverse-order lifting installation construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010242368 CN101936037B (en) 2010-08-02 2010-08-02 Large-diameter steel bay zoning-manufacture reverse-order lifting installation construction method

Publications (2)

Publication Number Publication Date
CN101936037A CN101936037A (en) 2011-01-05
CN101936037B true CN101936037B (en) 2011-11-23

Family

ID=43389589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010242368 Expired - Fee Related CN101936037B (en) 2010-08-02 2010-08-02 Large-diameter steel bay zoning-manufacture reverse-order lifting installation construction method

Country Status (1)

Country Link
CN (1) CN101936037B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108033415A (en) * 2017-11-21 2018-05-15 中冶天工集团天津有限公司 A kind of installation method in sintered material storehouse
CN108547494B (en) * 2018-04-25 2020-02-07 重庆钢铁集团建设工程有限公司 Circular stock bin construction method
CN111730235A (en) * 2020-07-15 2020-10-02 中国二十冶集团有限公司 Modular installation method for large steel funnel in limited space

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN88202118U (en) * 1988-03-29 1988-11-09 北京市粮食局设计室 Spiral curl steel plate storehouse
EP0347489A2 (en) * 1988-06-24 1989-12-27 Carsten Prof. Dr.-Ing. Langlie Offshore fishfarm for breeding and keeping of fishes and suchlike aquatic animals
CN1799954A (en) * 2005-12-16 2006-07-12 贵阳铝镁设计研究院 Connecting structure for upper and lower layer of double-layer steel warehouse
CN201103246Y (en) * 2007-09-29 2008-08-20 沈阳铝镁设计研究院 Node structure for connecting steel silo wall and concrete barrel wall
CN201334792Y (en) * 2008-12-11 2009-10-28 贵阳铝镁设计研究院 Large diameter double-layer steel storehouse
CN101633431A (en) * 2008-07-23 2010-01-27 沈阳铝镁设计研究院 Stiffening rib structure for bulk steel silo

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3204629B2 (en) * 1997-08-22 2001-09-04 生物系特定産業技術研究推進機構 Cold storage device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN88202118U (en) * 1988-03-29 1988-11-09 北京市粮食局设计室 Spiral curl steel plate storehouse
EP0347489A2 (en) * 1988-06-24 1989-12-27 Carsten Prof. Dr.-Ing. Langlie Offshore fishfarm for breeding and keeping of fishes and suchlike aquatic animals
CN1799954A (en) * 2005-12-16 2006-07-12 贵阳铝镁设计研究院 Connecting structure for upper and lower layer of double-layer steel warehouse
CN201103246Y (en) * 2007-09-29 2008-08-20 沈阳铝镁设计研究院 Node structure for connecting steel silo wall and concrete barrel wall
CN101633431A (en) * 2008-07-23 2010-01-27 沈阳铝镁设计研究院 Stiffening rib structure for bulk steel silo
CN201334792Y (en) * 2008-12-11 2009-10-28 贵阳铝镁设计研究院 Large diameter double-layer steel storehouse

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开平11-63764A 1999.03.05

Also Published As

Publication number Publication date
CN101936037A (en) 2011-01-05

Similar Documents

Publication Publication Date Title
CN102296858B (en) Cement production line clinker storage warehouse roof steel structure and construction method thereof
CN201148730Y (en) Super large diameter cylindrical silo hydraulic slip mold construction operating platform
CN109184189B (en) Construction method for conical shell silo top structure of large-diameter silo
US9863144B2 (en) Dome-shaped roof construction method and dome-shaped roof intermediate structure
CN201665684U (en) Suspending tool arranged at top of blast furnace and used for suspending furnace shell and cooling wall
CN102913137B (en) Sinking tubular steel derrick and mounting method of same
CN103243961A (en) Titanium plate steel inner tank reversed construction device for chimney of thermal power station
CN209873846U (en) Can have enough to meet need construction elevator basis and return reinforcing apparatus
CN101936037B (en) Large-diameter steel bay zoning-manufacture reverse-order lifting installation construction method
CN111502222A (en) Attached triangular support platform and construction method thereof
CN210483094U (en) Inverted triangular pipe truss lifting device
CN107355003B (en) Modular construction method of large-span ultra-wide overweight truss
CN109441101B (en) Construction platform for high-altitude operation concrete circular roof
CN110939473A (en) Prefabricated framework pillar for underground coal mine
CN216239820U (en) Component uninstalling buttress device for construction
CN202055501U (en) Construction platform for connecting central silo and conic silo of cement storage
CN205743035U (en) Assembled anchorage joint structure for spherical steel net frame integral hoisting
CN204098493U (en) The dismantled and assembled input and output material movable platform of a kind of modular for building
CN210683047U (en) Loading and unloading vehicle device suitable for large-scale component
CN213204913U (en) Modular prefabricated staircase operation platform
CN110748155B (en) Support device for large-diameter silo conical hopper concrete construction template and construction method thereof
CN103867016A (en) Super-large building-block reinforced concrete silo structure and mounting process
CN203160729U (en) Steel pallet supporting power transmission system
CN203531347U (en) Detachable converter tooling platform
CN113847070A (en) Stacking type support for high-ground-pressure support and support method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111123

Termination date: 20210802