CN101914906A - Method for assembling rubber dam in slope-shaped river channel - Google Patents
Method for assembling rubber dam in slope-shaped river channel Download PDFInfo
- Publication number
- CN101914906A CN101914906A CN 201010215398 CN201010215398A CN101914906A CN 101914906 A CN101914906 A CN 101914906A CN 201010215398 CN201010215398 CN 201010215398 CN 201010215398 A CN201010215398 A CN 201010215398A CN 101914906 A CN101914906 A CN 101914906A
- Authority
- CN
- China
- Prior art keywords
- dam
- bag
- downstream
- anchor slot
- upstream
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Revetment (AREA)
- Barrages (AREA)
Abstract
The invention relates to a method for assembling a rubber dam in a slope-shaped river channel. The method solves the long-existing problem of water leaking at the design height of the conventional slope-shaped rubber dam at present, improves unreasonable stress of dam bags and improves appearance of dam shapes. The method comprises the following steps of: 1) opening an upstream anchoring tank, a downstream anchoring tank and a top anchoring tank; 2) installing the bag edges of a downstream dam of the dam bag of the rubber dam; 3) installing the bag edges of an upstream dam of the dam bag of the rubber dam; 4) sealing both ends of the dam bag of the rubber dam, flatly overlaying ports on both ends of the dam bag, and placing the ports into the top anchoring tank; and 5) injecting water to the dam bag of the rubber dam from a water injection port to install the rubber dam. The method changes the structural form in the river channel after the rubber dam is installed, the slope part of the dam bag of the rubber dam extends downstream, cockles are formed at the positions of the horizontal section of the dam bottom and the slope section after the dam bag is aerated, and the cockles exist in downstream instead of the top of the dam bag in the conventional structure (the cockles are formed in the vertical direction).
Description
Technical field
The present invention relates to the mounting method of rubber dam, particularly the method for assembling rubber dam in the slope shape river course.
Background technology
Year surplus rubber dam is applied to modern 40 from China, rubber dam divides from dam bag and base arrangement pattern, mainly be divided into pillow formula (also being plug formula or non-headwall anchoring type) and ramp type (also being sloping core formula or headwall anchoring type), wherein traditional ramp type rubber dam at slope section anchor line arrangement form is: downstream anchor line upright projection is for to distribute with floor level Duan Weiyi straight line, the upstream anchor solidus is inflated to 45 ° of tangent lines of design height horizontal projection on slope for the dam bag, and the extension of floor level section anchor line connects to form, after the main shortcoming of this structure is the 9 water filling inflations of existing dam bag, one darker end face wrinkle 10 are arranged at the bag top, dam of corresponding river course planar base surface and junction, slope, as Fig. 5, shown in 6, upper pond level is higher when the dam, during near design height, end face wrinkle 10 positions all can some leak in various degree, make rubber dam can not really reach the purpose of design water storage level, make actual interception waterline 11 well below design interception height of water level.In addition, traditional anchor line form of structure, its floor level section is extended longer on slope, dam bag discontinuity, dam shape is not attractive in appearance yet, and transverse horizontal anchorage length in top is longer in addition, also influences visual effect.
Summary of the invention
Task of the present invention is to solve the design height seepy question that present traditional ramp type rubber dam exists always, and improves the stressed unreasonable situation of dam bag and improve the dam shape method of assembling rubber dam in slope-shaped river channel attractive in appearance.
Method of the present invention is to carry out according to the following steps:
1), offers upstream and downstream anchor slot and top anchor slot; In the bottom, river course, 2.1-11m offers the upstream and downstream anchor slot in transversal river course at interval; Wherein upstream anchor slot downstream turnover after surpassing the river course to play sloping line 0.4-0.5m, turning angle is 40-50 °; The downstream turnover after surpassing the river course to play sloping line 0.4-0.5m of downstream anchor slot, turning angle guarantees that less than the turning angle of upstream anchor slot two grooves leave level in the upper edge, river course, length is the top anchor slot of 1-1.8m;
2), the bag limit on dam, assembling rubber dam dam bag downstream; With glue in the dam bag upwards, aliging with the downstream anchor slot in the bag limit on dam, bag downstream, dam, redundance is cut, until match bag limit, dam, anchoring downstream, sealing off and covering anchorage with the downstream anchor slot;
3), the bag limit on dam, assembling rubber dam dam bag upstream; The dam bag that fixes bag limit, dam, downstream is upstream dug, behind the bag water filling space, Liuba, another side is alignd with the upstream anchor slot, redundance is cut, until match bag limit, dam, anchoring upstream, sealing off and covering anchorage with the upstream anchor slot;
4), the sealing of rubber dam bag two ends, the two side ends port of dam bag is flat folded, insert the top anchor slot; Earlier the fixing edge of updrift side port applies pulling force from the downstream direction port edge again, tightens port, and the unnecessary amount of the downstream direction port of generation is towards downstream direction, sealing off and covering anchorage;
5), by water-filling nozzle water filling in rubber dam bag, make.
The joining of described downstream anchor slot and top anchor slot is the slump point, and described top anchor slot extends 0.2-0.4m along described slump point downstream, to hold described unnecessary amount.
After rubber dam of the present invention was installed, the form of structure in the river course had had change, and the downstream is stretched at position, rubber dam bag slope, make the dam bag after inflation, the wrinkle that horizontal segment and slope fragment position form at the bottom of the dam from the bag top, dam of traditional structure, are changed into and are appeared at downstream (forming the vertical direction wrinkle).Because recessed wrinkle have been eliminated at bag top, dam, then rubber dam the situation of leaking can not occur after being inflated to design height.Spacing is less between section two anchor line of bag slope, dam, and " tall and thin shape " design all has in various degree dam bag, bottom spacer consumption and saves; Anchor structure in the rubber dam bag downstream is subjected to the force direction basically identical when making the operation of dam bag installation direction and dam bag, has reduced the dam bag and has subdued and the concentrated situation of stress.Rubber dam bag of the present invention, the horizontal direction projection is arch, with respect to the in-line structure, has higher bearing strength.
Description of drawings
Fig. 1 is a structural representation of the present invention
1 is the dam bag among the figure, the 2nd, and the side wrinkle;
Fig. 2 is the vertical view of Fig. 1
3 is river courses among the figure, the 4th, and the top anchor slot, the 5th, play sloping line;
Fig. 3 is an A-A place cutaway view Amplified image among Fig. 2
6 is river bed among the figure, the 7th, and downstream anchor slot, the 8th, upstream anchor slot;
Fig. 4 be among Fig. 2 B to enlarged drawing
Fig. 5 is a background technology reference diagram of the present invention
9 is existing dam bags among the figure, the 10th, and end face wrinkle, the 11st, actual interception waterline.
Fig. 6 is the vertical view of Fig. 5
The specific embodiment
Embodiment one
Be applied to reservoir impoundment power generation construction occasion.90 meters of river widths; Play between the sloping line 5 70 meters of width, 5 meters of design interception heights of water level.Shown in Fig. 1-4.
1), offers upstream and downstream anchor slot and top anchor slot 4; 3 bottoms in the river course (river bed 6), 11m offers the upstream and downstream anchor slot in transversal river course 3 at interval; Wherein upstream anchor slot 8 downstream turnover after surpassing the 0.5m that plays sloping line 5 in the river course, turning angle are 40 ° (keep on the slope the degree of depth of groove constant); Downstream anchor slot 7 is the downstream turnover after surpassing the 0.5m that plays sloping line 5 in the river course, turning angle guarantees that less than the turning angle of upstream anchor slot 7 (keep on the slope the degree of depth of groove constant) 3 upper edges (the above 0.5-0.6 rice of design interception height of water level) leaves level to two grooves in the river course, length is the top anchor slot 4 of 1.8m; The upstream and downstream anchor slot comprises the groove section of river bed 6 and groove section on the slope, and the groove section upper end on the slope is communicated with top anchor slot 4
2), the bag limit on dam, assembling rubber dam dam bag 1 downstream; With glue in the dam bag 1 upwards, aliging with downstream anchor slot 7 in the bag limit on dam, dam bag 1 downstream, redundance is cut, until match bag limit, dam, anchoring downstream, sealing off and covering anchorage with downstream anchor slot 7.
3), the bag limit on dam, assembling rubber dam dam bag 1 upstream; The dam bag 1 that fixes bag limit, dam, downstream is upstream dug, behind the bag water filling space, Liuba, another side is alignd with upstream anchor slot 8, redundance is cut, until match bag limit, dam, anchoring upstream, sealing off and covering anchorage with upstream anchor slot 8.
4), the sealing of rubber dam bag 1 two ends, the two side ends port of dam bag 1 is flat folded, insert top anchor slot 4; Earlier the fixing edge of updrift side port applies pulling force from the downstream direction port edge again, tightens port, and the unnecessary amount of the downstream direction port of generation is towards downstream direction, sealing off and covering anchorage.Downstream anchor slot 7 is a slump point 40 with the joining of top anchor slot 4, and described top anchor slot 4 is put 40 downstream along described slump and extended 0.4m, to hold described unnecessary amount.
5), by water-filling nozzle water filling in rubber dam bag, make.
Finally, when the dam bag normally moved, the dam bag was because under the thrust of self shape and upper water, the wrinkle 2 that play the formation of sloping line 5 positions concentrate on the side in downstream, and the top is non-wrinkle, can effectively improve actual interception water level.
Embodiment two
Be applied to relatively large agricultural irrigation retaining occasion.12 meters of river widths; Play between the sloping line 59 meters of width, 1.5 meters of design interception heights of water level.Shown in Fig. 1-4.
1), offers upstream and downstream anchor slot and top anchor slot 4; 3 bottoms in the river course (river bed 6), 2.1m offers the upstream and downstream anchor slot in transversal river course 3 at interval; Wherein upstream anchor slot 8 downstream turnover after surpassing the 0.4m that plays sloping line 5 in the river course, turning angle are 50 ° (keep on the slope the degree of depth of groove constant); Downstream anchor slot 7 is the downstream turnover after surpassing the 0.4m that plays sloping line 5 in the river course, turning angle guarantees that less than the turning angle of upstream anchor slot 7 (keep on the slope the degree of depth of groove constant) 3 upper edges (the above 0.2-0.3 rice of design interception height of water level) leaves level to two grooves in the river course, length is the top anchor slot 4 of 1m; The upstream and downstream anchor slot comprises the groove section of river bed 6 and groove section on the slope, and the groove section upper end on the slope is communicated with top anchor slot 4
2), the bag limit on dam, assembling rubber dam dam bag 1 downstream; With glue in the dam bag 1 upwards, aliging with downstream anchor slot 7 in the bag limit on dam, dam bag 1 downstream, redundance is cut, until match bag limit, dam, anchoring downstream, sealing off and covering anchorage with downstream anchor slot 7.
3), the bag limit on dam, assembling rubber dam dam bag 1 upstream; The dam bag 1 that fixes bag limit, dam, downstream is upstream dug, behind the bag water filling space, Liuba, another side is alignd with upstream anchor slot 8, redundance is cut, until match bag limit, dam, anchoring upstream, sealing off and covering anchorage with upstream anchor slot 8.
4), the sealing of rubber dam bag 1 two ends, the two side ends port of dam bag 1 is flat folded, insert top anchor slot 4; Earlier the fixing edge of updrift side port applies pulling force from the downstream direction port edge again, tightens port, and the unnecessary amount of the downstream direction port of generation is towards downstream direction, sealing off and covering anchorage.Downstream anchor slot 7 is a slump point 40 with the joining of top anchor slot 4, and described top anchor slot 4 is put 40 downstream along described slump and extended 0.2m, to hold described unnecessary amount.
5), by water-filling nozzle water filling in rubber dam bag, make.
Finally, when the dam bag normally moved, the dam bag was because under the thrust of self shape and upper water, the wrinkle 2 that play the formation of sloping line 5 positions concentrate on the side in downstream, and the top is non-wrinkle, can effectively improve actual interception water level.
Embodiment three
Be applied to urban beautification retaining occasion.120 meters of river widths; Play between the sloping line 5 100 meters of width, 4.0 meters of design interception heights of water level.Shown in Fig. 1-4.
1), offers upstream and downstream anchor slot and top anchor slot 4; 3 bottoms in the river course (river bed 6), 7.5m offers the upstream and downstream anchor slot in transversal river course 3 at interval; Wherein upstream anchor slot 8 downstream turnover after surpassing the 0.4m that plays sloping line 5 in the river course, turning angle are 45 ° (keep on the slope the degree of depth of groove constant); Downstream anchor slot 7 is the downstream turnover after surpassing the 0.4m that plays sloping line 5 in the river course, turning angle guarantees that less than the turning angle of upstream anchor slot 7 (keep on the slope the degree of depth of groove constant) 3 upper edges (the above 0.5-0.8 rice of design interception height of water level) leaves level to two grooves in the river course, length is the top anchor slot 4 of 1.5m; The upstream and downstream anchor slot comprises the groove section of river bed 6 and groove section on the slope, and the groove section upper end on the slope is communicated with top anchor slot 4
2), the bag limit on dam, assembling rubber dam dam bag 1 downstream; With glue in the dam bag 1 upwards, aliging with downstream anchor slot 7 in the bag limit on dam, dam bag 1 downstream, redundance is cut, until match bag limit, dam, anchoring downstream, sealing off and covering anchorage with downstream anchor slot 7.
3), the bag limit on dam, assembling rubber dam dam bag 1 upstream; The dam bag 1 that fixes bag limit, dam, downstream is upstream dug, behind the bag water filling space, Liuba, another side is alignd with upstream anchor slot 8, redundance is cut, until match bag limit, dam, anchoring upstream, sealing off and covering anchorage with upstream anchor slot 8.
4), the sealing of rubber dam bag 1 two ends, the two side ends port of dam bag 1 is flat folded, insert top anchor slot 4; Earlier the fixing edge of updrift side port applies pulling force from the downstream direction port edge again, tightens port, and the unnecessary amount of the downstream direction port of generation is towards downstream direction, sealing off and covering anchorage.Downstream anchor slot 7 is a slump point 40 with the joining of top anchor slot 4, and described top anchor slot 4 is put 40 downstream along described slump and extended 0.3m, to hold described unnecessary amount.
5), by water-filling nozzle water filling in rubber dam bag, make.
Finally, when the dam bag normally moved, the dam bag was because under the thrust of self shape and upper water, the wrinkle 2 that play the formation of sloping line 5 positions concentrate on the side in downstream, and the top is non-wrinkle, can effectively improve actual interception water level.
Claims (2)
1. the method for an assembling rubber dam in slope-shaped river channel is characterized in that, carries out according to the following steps:
1), offers upstream and downstream anchor slot and top anchor slot; In the bottom, river course, 2.1-11m offers the upstream and downstream anchor slot in transversal river course at interval; Wherein upstream anchor slot downstream turnover after surpassing the river course to play sloping line 0.4-0.5m, turning angle is 40-50 °; The downstream turnover after surpassing the river course to play sloping line 0.4-0.5m of downstream anchor slot, turning angle guarantees that less than the turning angle of upstream anchor slot two grooves leave level in the upper edge, river course, length is the top anchor slot of 1-1.8m;
2), the bag limit on dam, assembling rubber dam dam bag downstream; With glue in the dam bag upwards, aliging with the downstream anchor slot in the bag limit on dam, bag downstream, dam, redundance is cut, until match bag limit, dam, anchoring downstream, sealing off and covering anchorage with the downstream anchor slot;
3), the bag limit on dam, assembling rubber dam dam bag upstream; The dam bag that fixes bag limit, dam, downstream is upstream dug, behind the bag water filling space, Liuba, another side is alignd with the upstream anchor slot, redundance is cut, until match bag limit, dam, anchoring upstream, sealing off and covering anchorage with the upstream anchor slot;
4), the sealing of rubber dam bag two ends, the two side ends port of dam bag is flat folded, insert the top anchor slot; Earlier the fixing edge of updrift side port applies pulling force from the downstream direction port edge again, tightens port, and the unnecessary amount of the downstream direction port of generation is towards downstream direction, sealing off and covering anchorage;
5), by water-filling nozzle water filling in rubber dam bag, make.
2. according to claim 1 a kind of in slope-shaped river channel the method for assembling rubber dam, it is characterized in that, the joining of described downstream anchor slot and top anchor slot is the slump point, and described top anchor slot extends 0.2-0.4m along described slump point downstream, to hold described unnecessary amount.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010215398 CN101914906A (en) | 2010-06-30 | 2010-06-30 | Method for assembling rubber dam in slope-shaped river channel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010215398 CN101914906A (en) | 2010-06-30 | 2010-06-30 | Method for assembling rubber dam in slope-shaped river channel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101914906A true CN101914906A (en) | 2010-12-15 |
Family
ID=43322530
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010215398 Pending CN101914906A (en) | 2010-06-30 | 2010-06-30 | Method for assembling rubber dam in slope-shaped river channel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101914906A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102086636A (en) * | 2010-12-20 | 2011-06-08 | 江苏扬州合力橡胶制品有限公司 | Method for installing rubber dam bag as well as bag body of rubber dam bag |
CN103953010A (en) * | 2014-03-18 | 2014-07-30 | 北京工业大学 | Dam bag mounting construction method for inclined wall type rubber dam |
CN108104059A (en) * | 2018-01-09 | 2018-06-01 | 高祎轩 | A kind of barrage |
CN108221841A (en) * | 2017-12-29 | 2018-06-29 | 华北水利水电大学 | A kind of cellular dam slope safeguard structure |
CN109252492A (en) * | 2017-07-14 | 2019-01-22 | 陈迪 | Environmental and ecological landscape movable dam |
CN111581688A (en) * | 2020-03-26 | 2020-08-25 | 辽宁省水利水电科学研究院有限责任公司 | Inflatable rubber dam bag reconstruction design method |
CN112609639A (en) * | 2020-12-17 | 2021-04-06 | 邢台襄禹水利勘测设计有限公司 | Inflatable rubber dam |
CN118025825A (en) * | 2024-04-11 | 2024-05-14 | 四川公路桥梁建设集团有限公司 | Stacking mechanism, plant-growing bag stacking system and stacking method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3246474A (en) * | 1960-10-20 | 1966-04-19 | Mesnager Jacques Jean Emile | Flexible, vertically-adjustable dam |
JPS58164812A (en) * | 1982-03-19 | 1983-09-29 | Sumitomo Electric Ind Ltd | Flexible film falling dam |
FR2747136A1 (en) * | 1996-04-09 | 1997-10-10 | Leviel Christian | Inflatable barrage for rivers attached at each end to anchor points |
EP0936313A2 (en) * | 1998-01-14 | 1999-08-18 | Bridgestone Corporation | Flexible film weir |
JP2000290973A (en) * | 1999-04-05 | 2000-10-17 | Bridgestone Corp | Fixture and flexible film weir |
CN1553981A (en) * | 2001-07-09 | 2004-12-08 | ����K��ŷ��÷�� | Water control valve and actuator therefor |
-
2010
- 2010-06-30 CN CN 201010215398 patent/CN101914906A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3246474A (en) * | 1960-10-20 | 1966-04-19 | Mesnager Jacques Jean Emile | Flexible, vertically-adjustable dam |
JPS58164812A (en) * | 1982-03-19 | 1983-09-29 | Sumitomo Electric Ind Ltd | Flexible film falling dam |
FR2747136A1 (en) * | 1996-04-09 | 1997-10-10 | Leviel Christian | Inflatable barrage for rivers attached at each end to anchor points |
EP0936313A2 (en) * | 1998-01-14 | 1999-08-18 | Bridgestone Corporation | Flexible film weir |
JP2000290973A (en) * | 1999-04-05 | 2000-10-17 | Bridgestone Corp | Fixture and flexible film weir |
CN1553981A (en) * | 2001-07-09 | 2004-12-08 | ����K��ŷ��÷�� | Water control valve and actuator therefor |
Non-Patent Citations (1)
Title |
---|
《中国水运》 20080131 沙迪等 黑河东风场区斜坡式无褶皱橡胶坝工程设计 , 2 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102086636A (en) * | 2010-12-20 | 2011-06-08 | 江苏扬州合力橡胶制品有限公司 | Method for installing rubber dam bag as well as bag body of rubber dam bag |
CN102086636B (en) * | 2010-12-20 | 2012-07-25 | 江苏扬州合力橡胶制品有限公司 | Method for installing rubber dam bag as well as bag body of rubber dam bag |
CN103953010A (en) * | 2014-03-18 | 2014-07-30 | 北京工业大学 | Dam bag mounting construction method for inclined wall type rubber dam |
CN109252492A (en) * | 2017-07-14 | 2019-01-22 | 陈迪 | Environmental and ecological landscape movable dam |
CN108221841A (en) * | 2017-12-29 | 2018-06-29 | 华北水利水电大学 | A kind of cellular dam slope safeguard structure |
CN108221841B (en) * | 2017-12-29 | 2020-12-22 | 华北水利水电大学 | Honeycomb type dam slope protection structure |
CN108104059A (en) * | 2018-01-09 | 2018-06-01 | 高祎轩 | A kind of barrage |
CN111581688A (en) * | 2020-03-26 | 2020-08-25 | 辽宁省水利水电科学研究院有限责任公司 | Inflatable rubber dam bag reconstruction design method |
CN112609639A (en) * | 2020-12-17 | 2021-04-06 | 邢台襄禹水利勘测设计有限公司 | Inflatable rubber dam |
CN112609639B (en) * | 2020-12-17 | 2022-07-26 | 邢台襄禹水利勘测设计有限公司 | Inflatable rubber dam |
CN118025825A (en) * | 2024-04-11 | 2024-05-14 | 四川公路桥梁建设集团有限公司 | Stacking mechanism, plant-growing bag stacking system and stacking method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101914906A (en) | Method for assembling rubber dam in slope-shaped river channel | |
CN204238177U (en) | The ecological earth structure of a few font of a kind of combined type building block | |
CN108486977A (en) | A kind of tunnel cement concrete pavement structure | |
CN202954377U (en) | Cover-plate dam foundation triangle-region curtain structure | |
CN203768760U (en) | Novel highway kerb | |
CN202250109U (en) | Back-pasting type drainage water stop | |
CN208701768U (en) | A kind of float Structure of shallow embedding open cut of subway station or Subway Tunnel | |
CN206681198U (en) | One kind set box structure and filling system | |
CN202299176U (en) | Hui style eave structure | |
CN202969339U (en) | Building block for dry piled retaining wall | |
CN205576683U (en) | Curbstone with drainage function | |
CN206829087U (en) | Imitation wood bank protection structure for dredging waterway | |
CN203782960U (en) | Decorative ceiling structure | |
CN205348640U (en) | Prevention of seepage external wall insulation decorates production board | |
CN102086636B (en) | Method for installing rubber dam bag as well as bag body of rubber dam bag | |
CN107859274A (en) | A kind of waterproof skirting | |
CN203846638U (en) | Bonding structure of building bricks | |
CN209368614U (en) | A kind of road shoulder brick | |
CN202064527U (en) | Tile covering top of house | |
CN207267994U (en) | Corrugated sheet steel formula retaining wall | |
CN221237283U (en) | Downpipe support mounting structure | |
CN206800893U (en) | Floor board mounting structure | |
CN205399619U (en) | Town road is with arranging water stand | |
CN206090458U (en) | Rubber dam dam head anchor groove structure | |
CN204611322U (en) | A kind of combined type section bar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20101215 |