CN101184323B - Direct signaling connection rebuilding method - Google Patents
Direct signaling connection rebuilding method Download PDFInfo
- Publication number
- CN101184323B CN101184323B CN200610145720A CN200610145720A CN101184323B CN 101184323 B CN101184323 B CN 101184323B CN 200610145720 A CN200610145720 A CN 200610145720A CN 200610145720 A CN200610145720 A CN 200610145720A CN 101184323 B CN101184323 B CN 101184323B
- Authority
- CN
- China
- Prior art keywords
- network controller
- subscriber equipment
- message
- radio resource
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
The invention discloses a reconstruction method for the direct signal connection, which is characterized in that a user equipment is used to send cell-update/URA-update massage to a drift radio network controller; after receiving the cell-update/URA-update massage, the drift radio network controller is used to send a radio resource connection release message and indicate the reason of radio resource connection release message to be the direct signal reconstruction; after the radio resource connection release message is received by the user equipment, a request of reconstructing the radio resource connection is made to the drifting radio network controller, which serves as a new service radio network controller. The invention has the advantages that the rapid and normal operation of the direct signal connection reconstruction procedure of the UE equipment is ensured; the normal operation of the various subsequent corresponding services of the UE equipment is guaranteed; the operation load of RNC equipment is lowered; the operation performance of the whole 3G system is improved.
Description
Technical field
The present invention relates to mobile communication technology, relate in particular to a kind of direct signaling connection reconstruction method.
Background technology
In the 3-G (Generation Three mobile communication system), comprise WCDMA (Wideband CodeDivision Multiple Access, Wideband Code Division Multiple Access (WCDMA)) system, and TD-SCDMA (Time Division-Synchronous Code Division Multiple Access, TD SDMA) system etc.With WCDMA system related protocol is example, carries out case study according to cell update flow process between UE (UserEquipment, subscriber equipment) equipment initiation RNC (Radio Network Controller, radio network controller).
In 3-G (Generation Three mobile communication system) WCDMA system, as shown in Figure 1, UE equipment is initiated RNC equipment room cell update flow process and is described below:
UE equipment resides among the service wireless network controller SRNC (Serving RadioNetwork Controller);
Along with moving of UE equipment, UE equipment sends cell update (Cell Update) message to floating radio network controller DRNC (Drift Radio Network Controller);
DRNC equipment sends up signaling transmission indication (UplinkSignalling Transfer Indication) message to SRNC equipment, and notice SRNC equipment UE equipment has been initiated the cell update request;
SRNC equipment is by sending downlink signaling transmission request (Downlink Signalling Transfer Request) message to DRNC equipment, notice DRNC equipment discharges the original Radio Resource of UE equipment and connects, and indicates that to discharge the reason that Radio Resource connects be the direct signaling connection reconstruction;
UE equipment rebulids Radio Resource to the DRNC device request and connects, and with this RNC equipment as new SRNC equipment;
After the Radio Resource connection was set up successfully, (triggering CN equipment discharged with the Iu of original SRNC equipment and is connected UE equipment for CN, CoreNetwork) equipment initiation Routing Area Update request flow process to core net;
Route district flow process is normally finished;
UE equipment and new SRNC equipment room are set up RAB, and UE equipment returns to original state, and business recovery is normal.So far direct signaling connection reconstruction flow process finishes.
Describe as can be seen from above-mentioned flow process, in direct signaling connection reconstruction flow process, after DRNC equipment is received the cell update message of UE equipment, must notify SRNC equipment, and by SRNC equipment structure Radio Resource connection release message, again by DRNC equipment notice UE equipment.Each equipment room interactive messages is a lot of in the whole flow process, can cause the failure of UE equipment direct signaling connection reconstruction flow process under certain condition:
If the signaling link transmission bearer of the DRNC equipment of triggering and SRNC equipment room breaks down, DRNC equipment can't send up signaling transmission indicating information to SRNC equipment, causes whole direct signaling connection reconstruction flow process failure;
Triggering two, DRNC and SRNC equipment are in whole direct signaling connection reconstruction flow process, and any one processing module occurs unusual, send failure such as message, apply for the failure of allocation process resource, all can cause whole direct signaling connection reconstruction flow process failure.
The result of above-mentioned two kinds of triggerings can make UE equipment direct signaling connection reconstruction flow process fail.UE equipment can't be learnt next step operation, causes the state of UE not confirmed, can't set up Radio Resource with RNC equipment for a long time and be connected, user's service disconnection.
Do not consider the problems referred to above in the 3G system related protocol at present, do not have effective clear and definite mechanism to avoid the generation of the problems referred to above.When above-mentioned situation took place, the failure of UE equipment direct signaling connection reconstruction directly caused UE equipment current business to be interrupted at once, and can't in time initiate various follow-up business, influences the network operation performance and the access performance of system greatly.Further, because the failure of UE equipment direct signaling connection reconstruction flow process may cause this UE equipment constantly to initiate the cell update flow process, influence the overall operation performance of system.
Therefore, need a kind of direct signaling connection reconstruction solution, can effectively reduce the probability of occurrence that causes the failure of UE equipment direct signaling connection reconstruction flow process.
Summary of the invention
Main purpose of the present invention is to provide a kind of direct signaling connection reconstruction method, be used to provide a kind of technology of direct signaling connection reconstruction of simplification, guarantee that UE equipment can carry out direct signaling connection reconstruction flow process rapidly normally, make with the follow-up relevant miscellaneous service flow process of UE equipment and normally carry out, guarantee the overall operation performance of 3G system.
To achieve these goals, according to a first aspect of the invention, the invention provides a kind of direct signaling connection reconstruction method.Direct signaling connection reconstruction method may further comprise the steps:
Step S102, subscriber equipment sends cell update message to floating radio network controller;
After step S104, floating radio network controller receive cell update message, send the Radio Resource connection release message, and indicate in the Radio Resource connection release message that to discharge the reason that Radio Resource connects be the direct signaling connection reconstruction to subscriber equipment;
After step S106, subscriber equipment receive the Radio Resource connection release message, rebulid Radio Resource to the floating radio network controller request and connect, and with floating radio network controller as new service wireless network controller.
In step S104, after floating radio network controller is received cell update message, the former service wireless network controller to subscriber equipment does not send up signaling transmission indicating information, thereby does not notify former service wireless network controller subscriber equipment to initiate cell update before rebuliding the Radio Resource connection.
After step S106, further comprising the steps of:
Step S108, new service wireless network controller sends the Radio Resource connection to subscriber equipment and sets up message;
Step S110, subscriber equipment sends the Radio Resource connection to new service wireless network controller and finishes message;
Step S112, subscriber equipment is initiated the Routing Area Update request message to core net;
Step S114, core net sends Iu connection release command to the former service wireless network controller of subscriber equipment;
Step S116, former service wireless network controller discharge all resources relevant with subscriber equipment, and respond Iu connection Release complete to core net;
Step S118, core net sends Routing Area Update to subscriber equipment and receives message;
Step S120, subscriber equipment is responded Routing Area Update to core net and is finished message.
This direct signaling connection reconstruction can be applied to broadband CDMA system or TDS-CDMA system.
To achieve these goals, according to a second aspect of the invention, the invention provides a kind of direct signaling connection reconstruction method.Direct signaling connection reconstruction method may further comprise the steps:
Step S102, subscriber equipment sends the URA updating message to floating radio network controller;
After step S104, floating radio network controller receive the URA updating message, send the Radio Resource connection release message, and indicate in the Radio Resource connection release message that to discharge the reason that Radio Resource connects be the direct signaling connection reconstruction to subscriber equipment;
After step S106, subscriber equipment receive the Radio Resource release message, rebulid Radio Resource to the floating radio network controller request and connect, and with floating radio network controller as new service wireless network controller.
In step S104, after floating radio network controller is received the URA updating message, the former service wireless network controller to subscriber equipment does not send up signaling transmission indicating information, does not upgrade thereby do not notify former service wireless network controller subscriber equipment to initiate URA before rebuliding the Radio Resource connection.
After step S106, further comprising the steps of:
Step S108, new service wireless network controller sends the Radio Resource connection to subscriber equipment and sets up message;
Step S110, subscriber equipment sends the Radio Resource connection to new service wireless network controller and finishes message;
Step S112, subscriber equipment is initiated the Routing Area Update request message to core net;
Step S114, core net sends Iu connection release command to the former service wireless network controller of subscriber equipment;
Step S116, former service wireless network controller discharge all resources relevant with subscriber equipment, and respond Iu connection Release complete to core net;
Step S118, core net sends Routing Area Update to subscriber equipment and receives message;
Step S120, subscriber equipment is responded Routing Area Update to core net and is finished message.
This direct signaling connection reconstruction can be applied to broadband CDMA system or TDS-CDMA system.
Pass through technique scheme, the present invention is directed to UE equipment and carry out Failure Causes Analysis in the cell updating course at the RNC equipment room, a kind of direct signaling connection reconstruction technology of simplification is provided, guarantee that UE equipment can carry out direct signaling connection reconstruction flow process rapidly normally, guarantee that the follow-up relevant miscellaneous service flow process of UE equipment normally carries out, reduce RNC equipment operation load, promoted the overall operation performance of 3G system.
Description of drawings
Accompanying drawing described herein is used to provide further understanding of the present invention, constitutes the application's a part, and illustrative examples of the present invention and explanation thereof are used to explain the present invention, do not constitute improper qualification of the present invention.In the accompanying drawings:
Fig. 1 is that UE equipment is initiated the basic flow sheet that the cell update flow process is carried out the direct signaling connection reconstruction at the RNC equipment room in the present WCDMA system;
Fig. 2 is the flow chart according to direct signaling connection reconstruction method of the present invention;
Fig. 3 initiates the basic flow sheet that the cell update flow process is carried out the direct signaling connection reconstruction according to the UE equipment of the embodiment of the invention at the RNC equipment room; And
Fig. 4 be according to the UE equipment of the embodiment of the invention the RNC equipment room initiate URA more new technological process carry out the basic flow sheet of direct signaling connection reconstruction.
Embodiment
Describe the present invention below with reference to the accompanying drawings in detail.
With reference to Fig. 2, direct signaling connection reconstruction method according to the present invention may further comprise the steps:
Step S102, subscriber equipment sends cell update message to floating radio network controller;
After step S104, floating radio network controller receive cell update message, send the Radio Resource connection release message, and indicate in the Radio Resource connection release message that to discharge the reason that Radio Resource connects be the direct signaling connection reconstruction to subscriber equipment;
After step S106, subscriber equipment receive the Radio Resource connection release message, rebulid Radio Resource to the floating radio network controller request and connect, and with floating radio network controller as new service wireless network controller.
In step S104, after floating radio network controller is received cell update message, the former service wireless network controller to subscriber equipment does not send up signaling transmission indicating information, thereby does not notify former service wireless network controller subscriber equipment to initiate cell update before rebuliding the Radio Resource connection.
After step S106, further comprising the steps of:
Step S108, new service wireless network controller sends the Radio Resource connection to subscriber equipment and sets up message;
Step S110, subscriber equipment sends the Radio Resource connection to new service wireless network controller and finishes message;
Step S112, subscriber equipment is initiated the Routing Area Update request message to core net;
Step S114, core net sends Iu connection release command to the former service wireless network controller of subscriber equipment;
Step S116, former service wireless network controller discharge all resources relevant with subscriber equipment, and respond Iu connection Release complete to core net;
Step S118, core net sends Routing Area Update to subscriber equipment and receives message;
Step S120, subscriber equipment is responded Routing Area Update to core net and is finished message.
This direct signaling connection reconstruction can be applied to broadband CDMA system or TDS-CDMA system.
As shown in Figure 2, the present invention is for URA (UTRAN (UMTS (UniversalMobile Telecommunications System, universal mobile telecommunications system) TerritorialRadio Access Network, UMTS Terrestrial radio access network) Registration Area, UTRAN Acceditation Area) upgrade suitable equally.
The present invention is applicable in the 3-G (Generation Three mobile communication system), when UE equipment is initiated the cell update of RNC equipment room/URA renewal process, provide a kind of direct signaling connection reconstruction DSCR (Directed Signalling Connection Re-establishment) technology of simplification.This strategy can shorten the time of implementation of direct signaling connection reconstruction flow process, the response speed of the UE of quickening, and the system loading of reduction RNC equipment improves the call successful rate of UE business and the runnability of whole communication system.
The invention is characterized in: the direct signaling connection reconstruction technology of taking a kind of simplification, receive the cell update message of UE equipment when DRNC equipment after, no longer send up signaling transmission indication to SRNC equipment, but directly construct the Radio Resource connection release message, and the reason that indicates the connection of release Radio Resource in the Radio Resource connection release message is the direct signaling connection reconstruction, and the Radio Resource connection release message directly is handed down to UE equipment at once, trigger UE equipment and rebulid Radio Resource to the DRNC device request fast and connect.Guaranteed that in this way the follow-up relevant miscellaneous service flow process of UE equipment normally carries out, reduced RNC equipment operation load, promoted the overall operation performance of 3G system.
The present invention includes following steps:
Step 1: DRNC equipment is received the cell update message of UE equipment;
Step 2: DRNC equipment directly sends the Radio Resource connection release message to UE equipment, and indicates in the Radio Resource connection release message that to discharge the reason that Radio Resource connects be the direct signaling connection reconstruction;
Step 3: UE equipment rebulids Radio Resource to the DRNC device request and connects, and with this RNC equipment as SRNC equipment.
Above-mentioned steps is initiated RNC equipment room URA for UE equipment, and more new technological process is suitable equally, and the method for handling is identical.
[first embodiment]
Present embodiment is in the WCDMA system, and behind employing the present invention, UE equipment is initiated cell update at the RNC equipment room, carries out the basic procedure of direct signaling connection reconstruction.With reference to Fig. 3, may further comprise the steps:
Step 110, UE equipment sends cell update message to DRNC equipment;
Step 115, DRNC equipment directly send the Radio Resource connection release message to UE equipment, and indicate in the Radio Resource connection release message that to discharge the reason that Radio Resource connects be the direct signaling connection reconstruction;
Step 120, UE equipment rebulid Radio Resource to the DRNC device request and connect, and with this RNC equipment as new SRNC equipment;
Step 125, new RNC equipment send Radio Resource to UE equipment and connect foundation (RRC CONNECTION SETUP) message;
Step 130, UE equipment sends Radio Resource connection foundation to new RNC equipment and finishes (RRC CONNECTION SETUP COMPLETE) message;
Step 135, UE equipment is initiated the Routing Area Update request message to CN equipment;
Step 140, CN equipment send Iu to original SRNC equipment and connect release command;
Step 145, SRNC equipment originally discharge all resources relevant with this UE equipment, and respond Iu connection Release complete to CN equipment;
Step 150, CN equipment sends Routing Area Update to UE equipment and receives message;
Step 155, UE equipment is responded Routing Area Update to CN equipment and is finished message;
Step 160, UE equipment continues the follow-up business flow process.So far flow process successfully finishes.
[second embodiment]
Present embodiment is in the WCDMA system, and behind employing the present invention, UE equipment is initiated URA at the RNC equipment room and upgraded, and carries out the basic procedure of direct signaling connection reconstruction.With reference to Fig. 4, may further comprise the steps:
Step 210, UE equipment sends the URA updating message to DRNC equipment;
Step 215, DRNC equipment directly send the Radio Resource connection release message to UE equipment, and indicate in the Radio Resource connection release message that to discharge the reason that Radio Resource connects be the direct signaling connection reconstruction;
Step 220, UE equipment rebulid Radio Resource to the DRNC device request and connect, and with this RNC equipment as new SRNC equipment;
Step 225, new RNC equipment send Radio Resource to UE equipment and connect foundation (RRC CONNECTION SETUP) message;
Step 230, UE equipment sends Radio Resource connection foundation to new RNC equipment and finishes (RRC CONNECTION SETUP COMPLETE) message;
Step 235, UE equipment is initiated the Routing Area Update request message to CN equipment;
Step 240, CN equipment send Iu to original SRNC equipment and connect release command;
Step 245, SRNC equipment originally discharge all resources relevant with this UE equipment, and respond Iu connection Release complete to CN equipment;
Step 250, CN equipment sends Routing Area Update to UE equipment and receives message;
Step 255, UE equipment is responded Routing Area Update to CN equipment and is finished message;
Step 260, UE equipment continues the follow-up business flow process.So far flow process successfully finishes.
In sum, the invention provides a kind of direct signaling connection reconstruction technology of simplification, guaranteed that UE equipment can carry out direct signaling connection reconstruction flow process fast, guaranteed that the follow-up relevant miscellaneous service flow process of UE equipment normally carries out, reduce RNC equipment operation load, promoted the overall operation performance of 3G system.
The above is the preferred embodiments of the present invention only, is not limited to the present invention, and for a person skilled in the art, the present invention can have various changes and variation.Within the spirit and principles in the present invention all, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (6)
1. a direct signaling connection reconstruction method is characterized in that, may further comprise the steps:
Step S102, subscriber equipment sends cell update message to floating radio network controller;
Step S104, after described floating radio network controller is received described cell update message, send the Radio Resource connection release message to described subscriber equipment, and indicate in described Radio Resource connection release message that to discharge the reason that Radio Resource connects be the direct signaling connection reconstruction;
After step S106, described subscriber equipment receive described Radio Resource connection release message, rebulid Radio Resource to described floating radio network controller request and connect, and with described floating radio network controller as new service wireless network controller;
Wherein, in step S104, after described floating radio network controller is received described cell update message, the former service wireless network controller to described subscriber equipment does not send up signaling transmission indicating information, thereby does not notify the described subscriber equipment of described former service wireless network controller to initiate cell update before rebuliding the Radio Resource connection.
2. direct signaling connection reconstruction method according to claim 1 is characterized in that, and is after step S106, further comprising the steps of:
Step S108, described new service wireless network controller sends the Radio Resource connection to described subscriber equipment and sets up message;
Step S110, described subscriber equipment sends the Radio Resource connection to described new service wireless network controller and finishes message;
Step S112, described subscriber equipment is initiated the Routing Area Update request message to core net;
Step S114, described core net sends Iu connection release command to the former service wireless network controller of described subscriber equipment;
Step S116, described former service wireless network controller discharge all resources relevant with described subscriber equipment, and respond Iu connection Release complete to described core net;
Step S118, described core net sends Routing Area Update to described subscriber equipment and receives message;
Step S120, described subscriber equipment is responded Routing Area Update to described core net and is finished message.
3. direct signaling connection reconstruction method according to claim 1 and 2 is characterized in that described direct signaling connection reconstruction is applied to broadband CDMA system or TDS-CDMA system.
4. a direct signaling connection reconstruction method is characterized in that, may further comprise the steps:
Step S102, subscriber equipment sends UTRAN Acceditation Area updating message to floating radio network controller;
Step S104, after described floating radio network controller is received described UTRAN Acceditation Area updating message, send the Radio Resource connection release message to described subscriber equipment, and indicate in described Radio Resource connection release message that to discharge the reason that Radio Resource connects be the direct signaling connection reconstruction;
After step S106, described subscriber equipment receive described Radio Resource connection release message, rebulid Radio Resource to described floating radio network controller request and connect, and with described floating radio network controller as new service wireless network controller;
Wherein, in step S104, after described floating radio network controller is received described UTRAN Acceditation Area updating message, the former service wireless network controller to described subscriber equipment does not send up signaling transmission indicating information, does not upgrade thereby do not notify the described subscriber equipment of described former service wireless network controller to initiate the UTRAN Acceditation Area before rebuliding the Radio Resource connection.
5. direct signaling connection reconstruction method according to claim 4 is characterized in that, and is after step S106, further comprising the steps of:
Step S108, described new service wireless network controller sends the Radio Resource connection to described subscriber equipment and sets up message;
Step S110, described subscriber equipment sends the Radio Resource connection to described new service wireless network controller and finishes message;
Step S112, described subscriber equipment is initiated the Routing Area Update request message to core net;
Step S114, described core net sends Iu connection release command to the former service wireless network controller of described subscriber equipment;
Step S116, described former service wireless network controller discharge all resources relevant with described subscriber equipment, and respond Iu connection Release complete to described core net;
Step S118, described core net sends Routing Area Update to described subscriber equipment and receives message;
Step S120, described subscriber equipment is responded Routing Area Update to described core net and is finished message.
6. according to claim 4 or 5 described direct signaling connection reconstruction methods, it is characterized in that described direct signaling connection reconstruction is applied to broadband CDMA system or TDS-CDMA system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200610145720A CN101184323B (en) | 2006-11-14 | 2006-11-14 | Direct signaling connection rebuilding method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200610145720A CN101184323B (en) | 2006-11-14 | 2006-11-14 | Direct signaling connection rebuilding method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101184323A CN101184323A (en) | 2008-05-21 |
CN101184323B true CN101184323B (en) | 2010-05-12 |
Family
ID=39449357
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200610145720A Expired - Fee Related CN101184323B (en) | 2006-11-14 | 2006-11-14 | Direct signaling connection rebuilding method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101184323B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101616489B (en) * | 2008-06-24 | 2011-04-13 | 上海华为技术有限公司 | Method and system for establishing channel and radio network controller |
CN102833879B (en) * | 2009-08-28 | 2015-02-25 | 华为技术有限公司 | Method, device and system for connection release |
CN102006673B (en) * | 2009-08-28 | 2014-01-01 | 华为技术有限公司 | Method, device and system for releasing connection |
CN105744643A (en) * | 2014-12-10 | 2016-07-06 | 联芯科技有限公司 | Method for recovering public data network connection and system, terminals and network side devices thereof |
US10873865B2 (en) | 2017-03-27 | 2020-12-22 | Samsung Electronics Co., Ltd. | Methods and systems for providing call continuity in a user equipment (UE) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1316168A (en) * | 1999-06-28 | 2001-10-03 | 诺基亚网络有限公司 | Location management for cellular system |
EP1209939A2 (en) * | 2000-11-23 | 2002-05-29 | Samsung Electronics Co., Ltd. | Apparatus and method for allocating a common channel in a CDMA mobile communication system |
CN1479538A (en) * | 2002-08-16 | 2004-03-03 | ��������ͨ�ż����о�����˾ | Method setting data connection for MBMS with nucleus network initiated by DRNC |
CN1839655A (en) * | 2003-08-22 | 2006-09-27 | Lg电子株式会社 | Mbms method and apparatus for umts network |
-
2006
- 2006-11-14 CN CN200610145720A patent/CN101184323B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1316168A (en) * | 1999-06-28 | 2001-10-03 | 诺基亚网络有限公司 | Location management for cellular system |
EP1209939A2 (en) * | 2000-11-23 | 2002-05-29 | Samsung Electronics Co., Ltd. | Apparatus and method for allocating a common channel in a CDMA mobile communication system |
CN1479538A (en) * | 2002-08-16 | 2004-03-03 | ��������ͨ�ż����о�����˾ | Method setting data connection for MBMS with nucleus network initiated by DRNC |
CN1839655A (en) * | 2003-08-22 | 2006-09-27 | Lg电子株式会社 | Mbms method and apparatus for umts network |
Also Published As
Publication number | Publication date |
---|---|
CN101184323A (en) | 2008-05-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100372426C (en) | Method for user equipment mobility management and communication system thereof | |
US6246872B1 (en) | Mobile switching centre and method for handling a dropped connection between a mobile station and a basestation transceiver | |
US7606152B2 (en) | Setting a communication channel | |
EP1419666B1 (en) | Methods involving a core network node that is handling a mobile subscriber and initiates a request to a second core network node to handle said mobile subscriber | |
EP2198666B1 (en) | Dynamic ggsn relocation in a gprs network | |
CN102388654B (en) | A kind of service restoration method of cordless communication network, Apparatus and system | |
US6819659B1 (en) | RAU optimization in standby state | |
CN101115292B (en) | Method for paging and connecting terminal and terminal and system for fast activating data transmission | |
US8107951B2 (en) | Collective notification of node reset to subset of connections in radio access network | |
AU744531B2 (en) | RAU optimisation for UMTS URA connected state | |
CN101494884B (en) | Method for processing switch exception | |
CN101370283A (en) | Method and apparatus for processing non-access layer message in switching course of evolution network | |
GB2500723A (en) | Intersystem reselection between radio access networks of different types | |
CN101184323B (en) | Direct signaling connection rebuilding method | |
CN101299882B (en) | Method for recognizing and indicating load bearing types | |
CN101489274B (en) | Wireless link recovery method and system | |
US8364158B2 (en) | Method and system for cell update | |
KR19990016372A (en) | How to Improve Location Registration Processing in Personal Mobile Communication Service System | |
US20080095051A1 (en) | Apparatus and method for saving resources between core network and base station controller in a mobile communication system | |
EP3035770B1 (en) | Call service implementation method and device | |
EP2061264B1 (en) | A method and system for acquiring that sgsn has started single tunnel by ggsn in a packet domain | |
CN101047957B (en) | Method for quickly activating moving platform | |
KR100312319B1 (en) | method for link resource allocation between MSC and BS | |
US20080137607A1 (en) | Method and System For Management of Handover Only Trunk Line Between Mobile Switching Centers For Handover in Mixed Mobile Communication System of an Asynchronous Network and a Synchronous Network | |
CN100407856C (en) | Method for preventing from transmitting accessing message spanning wireless network controller by Iur interface |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100512 Termination date: 20171114 |
|
CF01 | Termination of patent right due to non-payment of annual fee |