Prior art keywords
welding
slip ring
web
plate shell
ring plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CNB2006100484293A
Other languages
Chinese (zh)
Other versions
CN101108443A (en
Inventor
白金生
张升奇
段世新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CITIC Heavy Industries Co Ltd
Original Assignee
CITIC Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CITIC Heavy Industries Co Ltd filed Critical CITIC Heavy Industries Co Ltd
Priority to CNB2006100484293A priority Critical patent/CN100509243C/en
Publication of CN101108443A publication Critical patent/CN101108443A/en
Application granted granted Critical
Publication of CN100509243C publication Critical patent/CN100509243C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Arc Welding In General (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention discloses an assembly welding process method for the inlet and outlet slip ring of a large-sized slider shoe mill cylinder. By strict manufacturing, welding and assembling process for a web plate (2) and a slip ring cylinder section (1), as well as controlling the quality in the weld seams and weld deformation in the inlet and outlet slip ring, the geometrical dimensional accuracy and the product quality of the inlet and outlet slip ring of the slider shoe mill cylinder are effectively ensured, and the form and positional tolerances of the web plate (2) and the slip ring cylinder section (1) are guaranteed, and the design requirements are satisfied. In addition, for the method, the operability is high and the production cost is low.

Description

The assembling and welding process method of large-sized slide grinding cylinder import and export slip ring
Technical field:
The present invention relates to large-sized slide mill cylindrical shell equipment manufacturing technology field, particularly a kind of assembling and welding process method of large-sized slide grinding cylinder import and export slip ring.
Background technology:
At present, the maximum 5.4M of the sliding crawler mill barrel diameter that China produces, cylindrical shell length is between 13M~17M, and its core, emphasis part, the difficult point of promptly manufacturing are exactly the assembling and the welding of import and export slip ring.And the specification requirement height of import and export slip ring, the form and position tolerance that requires welding to guarantee behind the assembly welding is tight, steel plate thickness of slab, bevel for welding are big, welding deformation is wayward, and all weld seams all require the ultrasonic examination inspection, and difficulty is big during making, particularly owing to welding deformation in the manufacturing process is not easy control, often do not reach designing requirement, and repair that to rectify distortion time-consuming, the production cost height.
Summary of the invention:
In order to solve problems of the prior art, the object of the present invention is to provide a kind of assembling and welding process method of large-sized slide grinding cylinder import and export slip ring, it is made erection welding technology, import and export slip ring weldquality and welding deformation is controlled by adopting strict web, slip ring plate shell ring, thereby guarantees the geometric accuracy and the product quality of sliding crawler mill cylindrical shell import and export slip ring effectively.
In order to realize the foregoing invention purpose, the present invention adopts following technical scheme:
The assembling and welding process method of described large-sized slide grinding cylinder import and export slip ring, its concrete making assembly technology flow process is:
1, adopt numerical control method cutting machine that the blank of web is carried out blanking, web is by two splicings, and cylindrical stays 15m allowance during blanking, cuts the mill groove, take out of draw, arc extinguishing board.
2, employing Lincoln weld is welded the web of two splicings, and back root cleaning during welding needs in the welding process repeatedly to overturn, the control welding deformation, and postwelding is corrected, and flatness should be not more than 3mm, and butt welded seam carries out the ultrasonic examination inspection by drawing.
3, the web after the welding is marked datum line, be used for, the seam with slip ring plate shell ring is staggered mutually in the reference of when assembling.
4,, even with the fit-up gap that guarantees web and slip ring plate shell ring to the web processing excircles groove after the welding.
5, two of the length directions of slip ring plate shell ring connect material, every end stays 300mm pressure head amount, on flat board, mark datum line and four center lines, adopt semi-automatic gas cutting processing slip ring plate length of cylindrical shell sections direction two ends bevel for welding, and weld with Lincoln weld, during welding spot welding draw, arc extinguishing board, back root cleaning is noted many upsets in the welding process, the control welding deformation, postwelding is corrected, and the postwelding butt welded seam carries out the ultrasonic examination inspection.
6, the slip ring plate shell ring after the welding is heat-treated, promptly soldered is carried out the far infrared stress relief annealing.
7, the side end face to the slip ring plate shell ring after the welding processes as datum level earlier, and marks the position line of assembling web on lathe.Reserve width dimensions on slip ring plate shell ring, promptly 20mm allowance is stayed in the feeding slip-ring left side, and 15m allowance is stayed in the right side, and 15mm allowance is respectively stayed at discharging slip ring two ends, and holds about marking on the cylinder board.Thereby guarantee the assembly precision of web with respect to slip ring plate shell ring.
8, on the veneer reeling machine to the welding after slip ring plate shell ring carry out pressure head after, and semi-automatic pressure head and the groove of cutting, to carry out round as a ballly again, strict control circularity is not more than 2mm, should check longitudinal seam place circularity especially, carry out the detection at least three places with special cylinder roundness detector.
9, the slip ring plate shell ring that will carry out after round as a ball lies on the mounting plate, requires the mounting plate flatness to be not more than 1m, at least 8 levelling shell rings of cylindrical, and guarantees that perpendicularity is not more than 1mm with curved chi, rechecks the web position line with tosecan.
10, according to web position line spot welding one location-plate on the position line, location-plate guarantees the right angle, and the blanking limit polishes smooth, put into web according to the datum line that marks on the slip ring plate shell ring, check that with curved chi the web perpendicularity is not more than 2mm at cylinder inboard wall, the web peripheral clearance evenly is not more than 2mm, positions weldering then.
11, in the web bottom simultaneously to web and slip ring preheating, the preheating of butt welded seam district is welded more than 100 ℃, the Lincoln weld continuous welding is adopted in welding, if any interruption, should be incubated immediately, temperature must not be lower than 100 ℃.Note repeatedly upset in the welding process, control welding deformation, and stay one section stress release section not weld earlier carries out the defect detecting test weld seam then, heat-treats after qualified, and back repair welding, defect detecting test weld seam are once more returned in heat treatment.
12, both ends of the surface, bevel for welding and the weld seam etc. of the web after the process and assemble, slip ring plate shell ring return then, participate in the dress weldering of other sections shell ring.
The assembling and welding process method of described large-sized slide grinding cylinder import and export slip ring, the control method to the import and export weldquality in its assembling process is:
1, riveter adopts the J506 welding rod when the assembling tack welding, and spot welding position 100m scope domestic demand is carried out preheating, and preheat temperature must be greater than 75 ℃.
2, need and will carry out gas preheating in each 100mm scope of web center line both sides before the electric welding welding, it comprises whole circle welding region, adopts homemade heater, and preheat temperature must be greater than 100 ℃.
3, need to remove oil, rust and other impurity etc. of weld seam periphery before the weldering.
4, used J506 welding rod during the riveter tack welding should carry out the oven dry of 350 ℃ * 1.5h before use, puts into the heat-preservation cylinder ready access upon use after the oven dry.The employed solder flux HJ431 of submerged-arc welding also should carry out the oven dry of 200 ℃ * 1~2h.
5, for guaranteeing the weldquality of web and slip ring plate shell ring junction, narrower at the width of considering slip ring plate shell ring, can't go up under the situation that positioner carries out Lincoln weld, die and submerged arc welding carriage is realized the transformation of rotary feed campaign, to realize the weld seam Lincoln weld of web and slip ring plate shell ring junction.
The assembling and welding process method of described large-sized slide grinding cylinder import and export slip ring, it to the welding deformation control method is:
1, adopts dc reverse connection short arc multi-pass welding, will remove slag, reasonable arc manipulation after weld for every layer, prevent to occur the defective of incomplete fusion, undercut, pore, forbid in weldment surface striking, during welding at the interlayer edge, guarantee sequential welding, superficial layer weld seam postwelding will fill up arc crater.Consider web and the reason that slip ring plate shell ring is thick, constraint (restraint) degree is big, want about 100~150 ℃ of preheatings before the weldering, interlayer temperature is controlled between 100~200 ℃.
Weld procedure specification parameter such as following table:
Figure C200610048429D00081
2, should strictly control welding deformation in the welding process, first face welding deformation need overturn when reaching 10mm, welding will be overturn when anti-deformation protrusion 5mm again behind the back chipping, and later deflection is controlled at 3m and overturns with interior, with its Deformation control within Smith's claimed range.
3, if to have welded the back plane degree overproof for last one weld seam, under the state of riveter Ying Zaire it is repaired, repair qualified after, wait its temperature to reduce to room temperature after, carry out the inspection of butt welded seam again.
4, after the slip ring inspection finishes, before heat-treating, tackle it and do the flatness inspection, and make record, and with the web convex surface up, then it is heat-treated, again slip ring is done the flatness inspection after the heat treatment, if overproof, should guarantee to avoid adopting flame straightening under the prerequisite of repairing as far as possible.
Because adopt as above-mentioned technical scheme, the present invention has following superiority:
The assembling and welding process method of described large-sized slide grinding cylinder import and export slip ring, the form and position tolerance of having guaranteed web and slip ring plate shell ring meets the demands, and has controlled import and export weldquality and welding deformation effectively, has reached designing requirement, and this technology is workable, and production cost is low.
Description of drawings:
Fig. 1 is the part-structure schematic diagram of large-sized slide grinding cylinder import and export slip ring;
Number in the figure: 1-slip ring plate shell ring; 2-web.
The specific embodiment:
As shown in Figure 1, the assembling and welding process method of this large-sized slide grinding cylinder import and export slip ring, its concrete making assembly technology flow process is:
1, adopt numerical control method cutting machine motor vehicle that the blank of web is carried out blanking, web 2 is by two splicings, and cylindrical stays 15mm allowance during blanking, cuts the mill groove, take out of draw, arc extinguishing board.
2, employing Lincoln weld is welded the web 2 of two splicings, and back root cleaning during welding needs in the welding process repeatedly to overturn, the control welding deformation, and postwelding is corrected, and flatness should be not more than 3mm, and butt welded seam carries out the ultrasonic examination inspection by drawing.
3, the web 2 after the welding is marked datum line, be used for, the seam with slip ring plate shell ring 1 is staggered mutually in the reference of when assembling.
4,, even with the fit-up gap of slip ring plate shell ring 1 to guarantee web 2 to the web 2 processing excircles grooves after the welding.
5, two of the length directions of slip ring plate shell ring 1 connect material, every end stays 300m pressure head amount, on flat board, mark datum line and four center lines, adopt semi-automatic gas cutting processing slip ring plate shell ring 1 length direction two ends bevel for welding, and weld with Lincoln weld, during welding spot welding draw, arc extinguishing board, back root cleaning is noted many upsets in the welding process, the control welding deformation, postwelding is corrected, and the postwelding butt welded seam carries out the ultrasonic examination inspection.
6, the slip ring plate shell ring 1 after the welding is heat-treated, promptly soldered is carried out the far infrared stress relief annealing.
7, the side end face to the slip ring plate shell ring 1 after the welding processes as datum level earlier, and marks the position line of assembling web on lathe.Reserve width dimensions on slip ring plate shell ring 1, promptly 20mm allowance is stayed in the feeding slip-ring left side, and 15mm allowance is stayed in the right side, and 15mm allowance is respectively stayed at discharging slip ring two ends, and holds about marking on the cylinder board.Thereby guarantee the assembly precision of web 2 with respect to slip ring plate shell ring 1.
8, on the veneer reeling machine to the welding after slip ring plate shell ring 1 carry out pressure head after, and semi-automatic pressure head and the groove of cutting, to carry out round as a ballly again, strict control circularity is not more than 2mm, should check longitudinal seam place circularity especially, carry out the detection at least three places with special cylinder roundness detector.
9, the slip ring plate shell ring 1 that will carry out after round as a ball lies on the mounting plate, requires the mounting plate flatness to be not more than 1mm, at least 8 levelling shell rings of cylindrical, and guarantees that perpendicularity is not more than 1mm with curved chi, rechecks web 2 positions line with tosecan.
10, according to web 2 positions line spot welding one location-plate on the position line, location-plate guarantees the right angle, and the blanking limit polishes smooth, put into web according to the datum line that marks on the slip ring plate shell ring 1, check that with curved chi web 2 perpendicularity are not more than 2m at cylinder inboard wall, web 2 peripheral clearances evenly are not more than 2mm, position weldering then.
11, in web 2 bottoms simultaneously to web and slip ring preheating, the preheating of butt welded seam district is welded more than 100 ℃, the Lincoln weld continuous welding is adopted in welding, if any interruption, should be incubated immediately, temperature must not be lower than 100 ℃.Note repeatedly upset in the welding process, control welding deformation, and stay one section stress release section not weld earlier carries out the defect detecting test weld seam then, heat-treats after qualified, and back repair welding, defect detecting test weld seam are once more returned in heat treatment.
12, both ends of the surface, bevel for welding and the weld seam etc. of the web after the process and assemble 2, slip ring plate shell ring 1 return then, participate in the dress weldering of other sections shell ring.
Control method to the import and export weldquality in its assembling process is:
1, riveter adopts the J506 welding rod when the assembling tack welding, and spot welding position 100mm scope domestic demand is carried out preheating, and preheat temperature must be greater than 75 ℃.
2, need and will carry out gas preheating in each 100mm scope of web 2 center line both sides before the electric welding welding, it comprises whole circle welding region, adopts homemade heater, and preheat temperature must be greater than 100 ℃.
3, need to remove oil, rust and other impurity etc. of weld seam periphery before the weldering.
4, used J506 welding rod during the riveter tack welding should carry out the oven dry of 350 ℃ * 1.5h before use, puts into the heat-preservation cylinder ready access upon use after the oven dry.The employed solder flux HJ431 of submerged-arc welding also should carry out the oven dry of 200 ℃ * 1~2h.
5, for guaranteeing the weldquality of web 2 and slip ring plate shell ring 1 junction, narrower at the width of considering slip ring plate shell ring 1, can't go up under the situation that positioner carries out Lincoln weld, die and submerged arc welding carriage is realized the transformation of rotary feed campaign, to realize the weld seam Lincoln weld of web 2 and slip ring plate shell ring 1 junction.
It to the welding deformation control method is:
1, adopts dc reverse connection short arc multi-pass welding, will remove slag, reasonable arc manipulation after weld for every layer, prevent to occur the defective of incomplete fusion, undercut, pore, forbid in weldment surface striking, during welding at the interlayer edge, guarantee sequential welding, superficial layer weld seam postwelding will fill up arc crater.Consider the reason that web 2 and slip ring plate shell ring are 1 thick, constraint (restraint) degree is big, want about 100~150 ℃ of preheatings before the weldering, interlayer temperature is controlled between 100~200 ℃.Weld procedure specification parameter such as following table:
Figure C200610048429D00111
2, should strictly control welding deformation in the welding process, first face welding deformation need overturn when reaching 10m, welding will be overturn when anti-deformation protrusion 5mm again behind the back chipping, and later deflection is controlled at 3mm and overturns with interior, with its Deformation control within Smith's claimed range.
3, if to have welded the back plane degree overproof for last one weld seam, under the state of riveter Ying Zaire it is repaired, repair qualified after, wait its temperature to reduce to room temperature after, carry out the inspection of butt welded seam again.
4, after the slip ring inspection finishes, before heat-treating, tackle it and do the flatness inspection, and make record, and with the web convex surface up, then it is heat-treated, again slip ring is done the flatness inspection after the heat treatment, if overproof, should guarantee to avoid adopting flame straightening under the prerequisite of repairing as far as possible.

Claims (2)

1, a kind of assembling and welding process method of large-sized slide grinding cylinder import and export slip ring is characterized in that: its concrete making assembly technology flow process is:
1), adopt numerical control cutting machine that the blank of web is carried out blanking, web (2) is by two splicings, cylindrical stays 15mm allowance during blanking, cuts the mill groove, take out of draw, arc extinguishing board;
2), adopt Lincoln weld that the web (2) of two splicings is welded, back root cleaning during welding needs in the welding process repeatedly to overturn, the control welding deformation, postwelding is corrected, and flatness should be not more than 3mm, and butt welded seam carries out the ultrasonic examination inspection by drawing;
3), the web (2) after the welding is marked datum line, be used for, the seam with slip ring plate shell ring is staggered mutually in the reference of when assembling;
4), to web (2) the processing excircles groove after the welding, even to guarantee web (2) with the fit-up gap of slip ring plate shell ring (1);
5), two of the length directions of slip ring plate shell ring (1) connect material, every end stays 300mm pressure head amount, on flat board, mark datum line and four center lines, adopt semi-automatic gas cutting processing slip ring plate shell ring (1) length direction two ends bevel for welding, and weld with Lincoln weld, during welding spot welding draw, arc extinguishing board, back root cleaning is noted many upsets in the welding process, the control welding deformation, postwelding is corrected, and the postwelding butt welded seam carries out the ultrasonic examination inspection;
6), to the welding after slip ring plate shell ring (1) heat-treat, promptly soldered is carried out the far infrared stress relief annealing;
7), to the side end face processing earlier of the slip ring plate shell ring (1) after the welding as datum level, and on lathe, mark the position line of assembling web (2); On slip ring plate shell ring (1), reserve width dimensions, be that 20mm allowance is stayed in feeding slip-ring plate shell ring (1) left side, 15mm allowance is stayed in the right side, and 15mm allowance is respectively stayed at discharging slip ring plate shell ring (1) two ends, and holds about marking on the slip ring plate shell ring; Thereby guarantee the assembly precision of web (2) with respect to slip ring plate shell ring (1);
8), on the veneer reeling machine to the welding after slip ring plate shell ring (1) carry out pressure head after, and semi-automatic pressure head and the groove of cutting, to carry out round as a ballly again, strict control circularity is not more than 2mm, should check longitudinal seam place circularity, carry out the detection at least three places with special cylinder roundness detector;
9), the slip ring plate shell ring (1) that will carry out after round as a ball lies on the mounting plate, requires the mounting plate flatness to be not more than 1mm, at least 8 levelling shell rings of cylindrical, and guarantees that perpendicularity is not more than 1mm with curved chi, rechecks web (2) position line with tosecan;
10), according to web (2) position line spot welding one location-plate on the position line, location-plate guarantees the right angle, and the blanking limit polishes smooth, put into web (2) according to the datum line that marks on the slip ring plate shell ring (1), check that with curved chi the web perpendicularity is not more than 2mm at cylinder inboard wall, web (2) peripheral clearance evenly is not more than 2mm, positions weldering then;
11), in web (2) bottom simultaneously to web and slip ring plate shell ring (1) preheating, the preheating of butt welded seam district is welded more than 100 ℃, the Lincoln weld continuous welding is adopted in welding, if any interruption, should be incubated immediately, temperature must not be lower than 100 ℃; Note repeatedly upset in the welding process, control welding deformation, and stay one section stress release section not weld earlier carries out the defect detecting test weld seam then, heat-treats after qualified, and back repair welding, defect detecting test weld seam are once more returned in heat treatment;
12), the web (2) after the process and assemble, both ends of the surface, bevel for welding and the weld seam of slip ring plate shell ring (1), return then, participate in the dress weldering of other sections shell ring.
2, the assembling and welding process method of a kind of large-sized slide grinding cylinder import and export slip ring as claimed in claim 1, it is characterized in that: the control method to the import and export weldquality in its assembling process is:
1), riveter adopts the J506 welding rod during tack welding in assembling, spot welding position 100mm scope domestic demand is carried out preheating, preheat temperature must be greater than 75 ℃;
2), need and will carry out gas preheating in each 100mm scope of web (2) center line both sides before the electric welding welding, it comprises whole circle welding region, adopts homemade heater, and preheat temperature must be greater than 100 ℃;
3), need to remove oil, the rust of weld seam periphery before the weldering;
4), used J506 welding rod during the riveter tack welding, should carry out the oven dry of 350 ℃ * 1.5h before use, put into the heat-preservation cylinder ready access upon use after the oven dry; The employed solder flux HJ431 of submerged-arc welding also should carry out the oven dry of 200 ℃ * 1~2h;
5), for guaranteeing the weldquality of web (2) and slip ring plate shell ring (1) junction, narrower at the width of considering slip ring plate shell ring (1), can't go up under the situation that positioner carries out Lincoln weld, die and submerged arc welding carriage is realized the transformation of rotary feed campaign, to realize the weld seam Lincoln weld of web and slip ring plate shell ring junction.
CNB2006100484293A 2006-07-18 2006-07-18 Installing and soldering technique of inlet, outlet slip ring of large-scale sliding crawler mill barrel Active CN100509243C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100484293A CN100509243C (en) 2006-07-18 2006-07-18 Installing and soldering technique of inlet, outlet slip ring of large-scale sliding crawler mill barrel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100484293A CN100509243C (en) 2006-07-18 2006-07-18 Installing and soldering technique of inlet, outlet slip ring of large-scale sliding crawler mill barrel

Publications (2)

Publication Number Publication Date
CN101108443A CN101108443A (en) 2008-01-23
CN100509243C true CN100509243C (en) 2009-07-08

Family

ID=39040812

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100484293A Active CN100509243C (en) 2006-07-18 2006-07-18 Installing and soldering technique of inlet, outlet slip ring of large-scale sliding crawler mill barrel

Country Status (1)

Country Link
CN (1) CN100509243C (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102266936A (en) * 2010-06-02 2011-12-07 鞍钢重型机械有限责任公司 Fabrication method of hot metal ladle
CN101941139B (en) * 2010-09-02 2014-02-12 中信重工机械股份有限公司 Welding and assembling method for huge mining mill barrel
CN102168698B (en) * 2011-04-19 2013-06-19 西安煤矿机械有限公司 Valve plug of height adjustment reversing valve and girth welding process thereof for height adjustment system of coal mining machine
CN102363239B (en) * 2011-09-28 2013-05-08 克里特集团有限公司 Automatic narrow-gap submerged arc welding process for all-welded fixed ball valve with medium and large calibers
CN102729014A (en) * 2012-07-06 2012-10-17 洛阳市双勇机器制造有限公司 Technological method for machining wheel body by using vertical lathe
CN102848141A (en) * 2012-08-23 2013-01-02 哈尔滨电机厂有限责任公司 Method for producing inclined vertical rib structure rotor support frame center body of large-scale vertical generator
CN103273259A (en) * 2012-11-10 2013-09-04 上海中远川崎重工钢结构有限公司 Method for manufacturing large-capacity boiler load-bearing support device
CN103170815B (en) * 2013-04-15 2015-07-08 青岛兰石重型机械设备有限公司 Welding process of boss of hydrogenation reactor
CN103862133B (en) * 2014-04-08 2016-04-27 哈尔滨红光锅炉总厂有限责任公司 A kind of drum welding method
CN104526175B (en) * 2014-12-24 2016-08-31 沈阳航天新星机电有限责任公司 A kind of method controlling welding deformation
CN108188550A (en) * 2018-02-09 2018-06-22 浙江同力重型机械制造有限公司 A kind of large-size cylinder body welding procedure
CN111112795A (en) * 2020-01-20 2020-05-08 中车四方车辆有限公司 Welding method for vertical pipe butt joint annular welding seam
CN111571070A (en) * 2020-05-08 2020-08-25 华新水泥(黄石)装备制造有限公司 Welding method of I-shaped workpiece
CN111822633B (en) * 2020-05-26 2022-09-09 洛阳中重铸锻有限责任公司 Forging method for extra-large annular forging fetal membrane
CN112935233A (en) * 2021-01-28 2021-06-11 中车株洲车辆有限公司 Camber beam, camber beam assembly welding method, frame and frame welding method
CN113664340B (en) * 2021-07-16 2022-10-18 河南北方红阳机电有限公司 Welding method for grooved ring assembly in thin-wall high-strength steel cylindrical shell assembly

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB603340A (en) * 1942-03-28 1948-06-14 Smidth & Co As F L Improvements relating to apparatus incorporating rotary drums
US4697747A (en) * 1984-12-04 1987-10-06 F. L. Smidth & Co. A/S Tube mill
CN2308439Y (en) * 1997-06-10 1999-02-24 武汉工业大学 Diameter variable rotary cylinder circular grinder

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB603340A (en) * 1942-03-28 1948-06-14 Smidth & Co As F L Improvements relating to apparatus incorporating rotary drums
US4697747A (en) * 1984-12-04 1987-10-06 F. L. Smidth & Co. A/S Tube mill
CN2308439Y (en) * 1997-06-10 1999-02-24 武汉工业大学 Diameter variable rotary cylinder circular grinder

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
φ3.8×9m滑履磨筒体加工工艺. 李学起等.矿山机械. 1995 *
双滑履中卸原料磨筒体加工. 张良玺,张春林.技术装备. 2005 *

Also Published As

Publication number Publication date
CN101108443A (en) 2008-01-23

Similar Documents

Publication Publication Date Title
CN100509243C (en) Installing and soldering technique of inlet, outlet slip ring of large-scale sliding crawler mill barrel
CN101941139B (en) Welding and assembling method for huge mining mill barrel
US10155283B2 (en) Method for manufacturing mill roll, mill roll and manufacturing apparatus of mill roll
CN103008898B (en) Tack welding method, and welding method of box beam
US20120153007A1 (en) Method of an apparatus for friction stir spot welding with adapted number of shoulders with respect to thicknesses of plates to be spot welded
CN105081683A (en) Machining technology of straight-seam steel reel pipe
CN103028897A (en) Production method of super-thick steel plate with high cold crack sensitivity
CN103252557A (en) Welding method achieving medium thick plate backing welding without back gouging
JP4757696B2 (en) UOE steel pipe manufacturing method
CN103192236B (en) Wharf ship loader telescoping mechanism rail production process and special rail butt joint tool thereof
CN202804440U (en) Cylindrical surface automatic bead weld device
CN105855685A (en) Method for producing extra-thick plate by vacuum electron beam horizontal hybrid welding
CN102267000B (en) Metal active gas (MAG) welding method for butting quenched low-alloy super-high-strength steel and high-quality carbon structural steel
CN105689896A (en) Coating removing and welding integrated laser processing method for hot-rolled steel plates
CN105945407A (en) Method for welding and winding cylinder by large high-strength steel
CN114769882A (en) Welding equipment and steel plate welding method
CN104801926A (en) Preparation method for blank for producing stainless steel-carbon steel composite sheet
CN112676677B (en) Preparation method of straddle type monorail vehicle framework bottom plate pre-assembly
CN104827241A (en) Manufacturing method of blanks for producing steel-zirconium composite boards
CN103722298B (en) A kind of panel double-side Butt Joint root gap with bonding control method
CN106624411B (en) The method of reinforcement plate is welded between two big workpiece of the heat treatment temperature difference
CN109175903B (en) Method for manufacturing roller bed frame blank of continuous rolling production line
CN222021057U (en) Groove machining system for special-shaped workpiece
CN104227333B (en) The preparation method of high speed grinding machine supporting plate
CN101898271B (en) Solid shaft assembling and welding method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CITIC HEAVY INDUSTRY MACHINERY CO., LTD.

Free format text: FORMER OWNER: ZHONGXIN HEAVY MACHINERY CO.

Effective date: 20080314

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20080314

Address after: Postal code 206, Jianshe Road, Jianxi District, Henan, Luoyang: 471039

Applicant after: Citic Heavy Industries Co., Ltd.

Address before: Postal code 206, Jianshe Road, Jianxi District, Henan, Luoyang: 471039

Applicant before: Zhongxin Heavy Machinery Co.