CA2828163C - Delayed coking of petroleum residue - Google Patents

Delayed coking of petroleum residue Download PDF

Info

Publication number
CA2828163C
CA2828163C CA2828163A CA2828163A CA2828163C CA 2828163 C CA2828163 C CA 2828163C CA 2828163 A CA2828163 A CA 2828163A CA 2828163 A CA2828163 A CA 2828163A CA 2828163 C CA2828163 C CA 2828163C
Authority
CA
Canada
Prior art keywords
products
absorber
coke
cooling
coking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CA2828163A
Other languages
French (fr)
Other versions
CA2828163A1 (en
Inventor
Gennady Georgievich Valyavin
Victor Pavlovich Zaporin
Sergei Vital'evich Sukhov
Mikhail Vladimirovich Mamaev
Igor Victorovich Bidilo
Konstantin Gennad'evich Valyavin
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OBSHHESTVO S OGRANICHENNOI OTVETSTVENNOST'YU "PROMINTEKH"
Original Assignee
OBSHHESTVO S OGRANICHENNOI OTVETSTVENNOST'YU "PROMINTEKH"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OBSHHESTVO S OGRANICHENNOI OTVETSTVENNOST'YU "PROMINTEKH" filed Critical OBSHHESTVO S OGRANICHENNOI OTVETSTVENNOST'YU "PROMINTEKH"
Publication of CA2828163A1 publication Critical patent/CA2828163A1/en
Application granted granted Critical
Publication of CA2828163C publication Critical patent/CA2828163C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B57/00Other carbonising or coking processes; Features of destructive distillation processes in general
    • C10B57/04Other carbonising or coking processes; Features of destructive distillation processes in general using charges of special composition
    • C10B57/045Other carbonising or coking processes; Features of destructive distillation processes in general using charges of special composition containing mineral oils, bitumen, tar or the like or mixtures thereof
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B55/00Coking mineral oils, bitumen, tar, and the like or mixtures thereof with solid carbonaceous material
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B57/00Other carbonising or coking processes; Features of destructive distillation processes in general
    • C10B57/02Multi-step carbonising or coking processes
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10GCRACKING HYDROCARBON OILS; PRODUCTION OF LIQUID HYDROCARBON MIXTURES, e.g. BY DESTRUCTIVE HYDROGENATION, OLIGOMERISATION, POLYMERISATION; RECOVERY OF HYDROCARBON OILS FROM OIL-SHALE, OIL-SAND, OR GASES; REFINING MIXTURES MAINLY CONSISTING OF HYDROCARBONS; REFORMING OF NAPHTHA; MINERAL WAXES
    • C10G21/00Refining of hydrocarbon oils, in the absence of hydrogen, by extraction with selective solvents
    • C10G21/06Refining of hydrocarbon oils, in the absence of hydrogen, by extraction with selective solvents characterised by the solvent used
    • C10G21/12Organic compounds only
    • C10G21/14Hydrocarbons
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10GCRACKING HYDROCARBON OILS; PRODUCTION OF LIQUID HYDROCARBON MIXTURES, e.g. BY DESTRUCTIVE HYDROGENATION, OLIGOMERISATION, POLYMERISATION; RECOVERY OF HYDROCARBON OILS FROM OIL-SHALE, OIL-SAND, OR GASES; REFINING MIXTURES MAINLY CONSISTING OF HYDROCARBONS; REFORMING OF NAPHTHA; MINERAL WAXES
    • C10G55/00Treatment of hydrocarbon oils, in the absence of hydrogen, by at least one refining process and at least one cracking process
    • C10G55/02Treatment of hydrocarbon oils, in the absence of hydrogen, by at least one refining process and at least one cracking process plural serial stages only
    • C10G55/04Treatment of hydrocarbon oils, in the absence of hydrogen, by at least one refining process and at least one cracking process plural serial stages only including at least one thermal cracking step
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10GCRACKING HYDROCARBON OILS; PRODUCTION OF LIQUID HYDROCARBON MIXTURES, e.g. BY DESTRUCTIVE HYDROGENATION, OLIGOMERISATION, POLYMERISATION; RECOVERY OF HYDROCARBON OILS FROM OIL-SHALE, OIL-SAND, OR GASES; REFINING MIXTURES MAINLY CONSISTING OF HYDROCARBONS; REFORMING OF NAPHTHA; MINERAL WAXES
    • C10G9/00Thermal non-catalytic cracking, in the absence of hydrogen, of hydrocarbon oils
    • C10G9/005Coking (in order to produce liquid products mainly)

Landscapes

  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Engineering & Computer Science (AREA)
  • Organic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

This invention relates to petroleum processing, in particular to producing coke with a delayed coking process and to an assembly for trapping the products formed during the coke steaming and cooling processes.
Petroleum coke deposits in delayed coking reaction drums. When one drum fills up, the flow of feed into that drum is switched off. The temperature in the switched off drum rises to 420-450 °C. To remove coke from the drum, the drum needs to be water-cooled to 60-90 °C, but the petroleum vapour products must be removed first and steamed water steam. Low-quality fractionating of the products formed during the steaming and cooling of coke results in losses of petroleum products and in atmospheric pollution.

Description

DELAYED COKING OF PETROLEUM RESIDUE
This invention relates to petroleum processing, in particular to producing coke with a delayed coking process and to an assembly for trapping the products formed during the coke steaming and cooling processes.
Petroleum coke deposits in delayed coking reaction drums. When one drum fills up, the flow of feed into that drum is switched off. The temperature in the switched off drum rises to 420-450 C. To remove coke from the drum, the drum needs to be water-cooled to 60-90 C, but the petroleum vapour products must be removed first and steamed water steam. Low-quality fractionating of the products formed during the steaming and cooling of coke results in losses of petroleum products and in atmospheric pollution.
Table 1 shows a typical composition of the steaming and cooling products of coke produced by delayed-coking.
Table 1.
Steaming and cooling products Flow rate, kg/hour 1. Gaseous products (C1- 04) 300-1000
2. Petroleum products, boiling 1,000-3,000 temperature = 40-350 C, density 650-950 kg/cm3
3. Petroleum products, boiling 500-1,000 temperature >350 C, density >950 kg/ cm3
4. Water steam 5,000-50,000 In existing delayed-coking units, gaseous products are usually transferred ¨
as fuel ¨ to a special burner of technological furnaces. Petroleum products with density under 950 kg/ cm3 separate easily from water by sedimentation and re-enter the technological process. Trapping petroleum products with density > 950 kg/ cm3 is extremely difficult because their density is close or equals that of water. They cannot be separated from water by settling, even using de-emulsifiers.
There exists a method for delayed coking of petroleum residue, consisting of fractionating in an evapouration column the primary coking feedstock mixed with a recirculater into light fractions and heavy residue. The residue undergoes a delayed coking process. The vapour coking products formed in the coking drum undergo fractionating in the rectification column into light fractions and bottoms, a part of which is used as a recirculater (Russian Federation Patent No. 2209826, Class C1OB 55/00, published in 2003).
The drawback of this method is using bottoms gasoil from the bottom of the rectification column. Bottoms gasoil forms as a result of condensation of high-boiling temperature fractions of the coking distillate in the bottom section of the rectification column, which are introduced into the rectification column from the coking drums. The coking distillate may contain particles of coke, which get into the furnace with secondary feedstock. Therefore it can coke up the furnace and increase the frequency of required overhauls for the entire unit.
Another drawback is large losses of petroleum products and pollution of the atmosphere due to the lack of devices for trapping the products of coke steaming and cooling.
The delayed coking method most similar to the present invention is the one that consists of heating the primary feedstock in a pipe still, mixing it with a recirculater, producing the secondary feed by fractionating of the light fractions in an evaporator, heating the secondary feedstock produced in a reaction pipe still, coking it in coking drums, which produces coke and distillates, fractionating the light fractions produced in the evaporator, mixed with coking distillate products, in a rectification column into vapor products, light and heavy gas oils and bottoms. The primary feedstock is heated at 400 C, while water condensate is introduced into the inlet part of the coil of the pipe still to heat the feedstock. (Patent RU No. 2410409, MPK
C01B55/10, published on 27 January 2011.) The drawback of this method is the insufficient yield of coke products:
hydrocarbon gas, benzene, light gas oil and bottoms. There is room for increasing the yield of that unit.
The new method improves the yield of the unit, while simultaneously improving the yield of the products of coking.
To achieve this goals, the new delayed coking method of petroleum residue, which includes the coking of primary feedstock, during which coke deposits in the drum, fractionating of the distillate coking products into vapour products, light and heavy gas oils and heavy bottoms, steaming the coke with water steam, cooling it with water, feeding the products of steaming and cooling into the absorber equipped with mass-exchange devices, fractionating the steaming and cooling products into vapour and liquid phases in the absorber, absorbing the low-volatility petroleum products from the vapour phase by feeding the residue from the bottom section of the absorber into a mass-exchange device, cooling and condensing vapour components in a condenser/refrigerator, and fractionating the products of cooling into a gas, petroleum products, and water. In this invention, the heavy coking gas oil produced is split into several flows, one of which is used as a recirculant and is mixed with the feedstock in the evapouration drum prior to coking, while the other flow is used to dilute the steaming and cooling products prior to feeding them into the absorber. The bottoms are returned from the bottom section of the absorber to the mass-exchange assembly located in the middle part of the absorber (to the third or fourth mass-exchange plate preferably), while the rest of the bottoms is returned into the bottom section of the rectification column.
A wash agent, heavy gasoil produced by coking, is also fed into the condenser/refrigerator.

The figure shows a flow diagram of the unit. This flow diagram illustrates the suggested delayed coking method of petroleum residue.
The unit includes heat exchangers 1 for heating the primary feedstock, evapouration column 2 for producing secondary feedstock 3 by mixing primary feedstock with recirculant 4 (heavy coking gas oil), heating-reaction oven 5 for heating secondary feedstock, secondary feedstock coking drum 6, rectification column 7 for the fractionating of coking distillate products 8 into heavy bottoms 9 and vapour products 10, condenser/refrigerator 11 for cooling vapour products 10, fractionator 12 for the fractionating of the above-mentioned vapour products into a gas, light petroleum products and water, absorber 13, equipped with an assembly for mass exchange, such as valve plates for example, for the absorption of petrol products from the products 14 separated in the process of steaming and then cooling of the coke produced in the coke coking drum, the vapour phase 15 and the bottoms 16, condenser/refrigerator 17 for cooling and condensing of the vapour phase separated in the absorber, fractionator 18 where the condensed products are fractioned into gas, light petroleum products, and water, pump 19 for removing the bottoms 16 from the absorber, refrigerator 20 for cooling the bottoms, pipelines: 21 for returning the bottoms as an absorber to the mass exchange assembly and 22 for feeding the bottoms into the rectification column respectively.
It was experimentally established that mass exchange between the rising vapours and absorbent in the absorber takes place when the number of valve plates equals 10.
Rectification column 7 is equipped in its middle part with a system of pipelines for the removal of light gas oil 23 as a final product and heavy gasoil 24, one flow of which is used as recirculant 4, while the other flow is used to dilute products 14 formed during the steaming and cooling of the coking coke formed in the drum, at the inlet of the absorber where it is introduced via pipeline 25, or it is fed as an absorbent into the top mass-exchanger via pipeline 26, or as the wash agent 27 into condenser/refrigerator 17. Pipeline 28 is used for removing gas oil 24 as a final product.
Light petroleum products are returned from fractionator 18 to the rectification
5 column via pipeline 29. Pipelines 30 and 31 are used for steaming the coke formed in the coking drum and for cooling it with water, respectively.
The method operates in the following fashion.
Primary feedstock for coking is heated in heat-exchanger 1 by the heat of the leaving flows, then directed into evaporator column 2, where it is mixed with recirculant 4 in the form of heavy gas oil, producing secondary feedstock 3.
The secondary feedstock is heated in heating/reaction oven 5, then transferred to coking drum 6 where the forming coke deposits. Coking distillate products 8 are transferred to rectification column 7 for fractionating.
Gaseous products 10, consisting of a gas, benzene and water steam, leave from the top of column 7, are cooled in the condenser/refrigerator 11 and fractioned in fractionator 12 into a gas, light petroleum products and water.
Gas oils ¨ light 23 and heavy 24 ¨ are removed from the middle section of the rectification column. Light gas oil is removed as a final product, while heavy gas oil is split into several flows. One part of it is used as recirculate 4, another part is used as diluent 25 of coke steaming and cooling products 14, while the third part is used as absorbent 26, which is conducted into the upper mass exchanger of absorber 13. Yet another part of heavy gas oil is used as wash product 27 in condenser/refrigerator 17. For this purpose one of the sections of the condenser/ refrigerator is taken off the flows of vapours from the absorber, so that hot heavy gas oil can be pumped through it during that time. All other sections continue their normal operation. When one of the sections has been washed, the next section is switched over to washing. The remaining part of the heavy gas oil is removed from the unit. Bottoms 9 are removed from the bottom of the rectification column. It is either mixed with the heavy gasoil removed from the unit or used as a boiler fuel.
6 When drum 6 is filled with coke, it is steamed with steam introduced through pipeline 30 and cooled with water introduced through pipeline 31. Steaming and cooling products 14 are conducted into absorber 13, equipped with 10 valve-plates. The high viscosity steaming and cooling products are diluted at the inlet of the absorber with heavy gas oil 25. The vapour steaming and cooling products rise into the top part of the absorber, where petroleum products are absorbed on the plates by bottoms 21 transferred from the bottom of the absorber to the fourth plate from the top, and by heavy gasoil 26, introduced onto the top plate of the absorber.
The liquid phase of the steaming and cooling products flows down into the bottom part of the absorber, from where it is removed with pump 19 and, via refrigerator 20, is transferred in the form of two flows: flow 21, as an absorber, is introduced onto the fourth plate of the absorber, while the other flow is conducted into rectification column 7.
Vapour phase 15, consisting of steam, hydrocarbon gases and light petroleum products, enters condenser/refrigerator 17, from where it is sent to fractionator 18. The gases, light petroleum products and water are separated. The gases go to the flare system 38, the light petroleum products 29, mixed with the bottoms from the absorber, are returned into the lower part of rectification column 7, while water is sent to purification.
Diluting coke steaming and cooling products with heavy gasoil prior to their introduction into the absorber reduces concentration of low-volatility bottoms, which are removed from the bottom of the absorber and is introduced as an absorbent. This suggests that the quality of fractionating has improved.
When heavy gas oil is introduced onto the top plate, low-volatility components are diluted and washed off the plates located above the plates to which the absorbent has been introduced from the bottoms part of the absorber. This reduces significantly the quantity of low-volatility components carried out through the top of the absorber.
7 Introducing absorbent to a plate in the middle part of the absorber (the 3rd-4th one from the top, preferably) improves absorption and reduces the quantity of low-volatility components carried out through the top of the absorber. This suggests that the quality of the fractionating of trapped products has improved.
Having the condenser/refrigerator continuously washed with heavy gas oil improves heat exchange. Having a washing sequence of this kind lets the condenser/refrigerator operate for a very long time without requiring to have it closed down for cleaning.
Returning the bottoms from the absorber and the separated petroleum products from the fractionator into the rectification column results better trapping of products, while preliminarily mixing the feedstock with heavy gas oil in the evaporator column, which produces secondary feedstock, keeps the feeding of the feedstock heating oven at a constant rate, while keeping up the high yield of this delayed coking method with an assembly for trapping coke steaming and cooling products. (in comparison, in the method that is our prototype, returning the bottoms from the absorber and the separated petroleum products from the fractionator into the rectification column resulted in keeping the feeding rate of the furnace constant, the yield of the method with respect to the primary feedstock would have to come down by the mass of the trapped products).
Examples Supporting this Explanation Example 1 (using the suggested method) Primary feedstock (West-Siberian tar) was introduced into the evaporator column, where it is mixed with a recirculant to produce secondary feedstock.
Secondary feedstock was heated in the oven and transferred into the coking drum, where coke was produced and deposited. The petroleum products produced in the coking process and steam were removed from the top of the
8 drum and transferred to the rectification column to be fractioned into distillate, light and heavy gas oils and bottoms. Heavy gas oil served as a recirculant.
When coke filled up the coking drum, it was steamed with water steam and water-cooled.
The products of coke steaming and cooling , which include water, gas-phase products, petroleum products boiling at 40-350 C and with density of 650-950 kg/ m3, and petroleum products boiling above 350 C and with density of above 950 kg/ m3 are transferred from the coking drums to the absorber. As they are entering the absorber, they are mixed with heavy coking gas oil with boiling temperature of 250 C. The vapour phase rises into the top part of the absorber and contacts with the absorbent in the mass-exchange devices.
The bottoms from the bottom part of the absorber are used as an absorbent.
The bottoms are introduced onto the 4th valve plate from the top. Heavy gas oil is introduced onto the top plate of the absorber as a reflux. Its temperature is 120-150 C. The vapour phase is transferred to the condenser/refrigerator, cooled and moved to the fractionator for fractionating. Heavy coking gas oil of 200-250 C is introduced as a wash liquid into one of the sections of the condenser/refrigerator, taken off the technological process. Gaseous products are removed through the top of the fractionator, while water and the petroleum product are removed from the bottom. The excess quantity of bottoms in the bottom part of the absorber is returned into the rectification column. The water flushed into the canalisation system.
Example 2 (using the prototype method). The prototype coking method was used on the same feedstock for comparison.
Table 2 shows the material balance of the process and technological conditions of coking, using the method suggested here in comparison with the prototype method.
9 As can be seen from the data in Table 2, the new method of delayed coking of petroleum residues improves the performance of the unit as a whole, while simultaneously increasing the yield of the coking products: carbon dioxide, benzene, light gas oil and bottoms gas oil.
Table 2 Technological Conditions and Material Balance of Coking Characteristics Examples Technological conditions New Patent method 2410409 method 1. Unit performance in relation to primary 150 150 feedstock, T/h 2. Quantity of recirculate (heavy gasoil), T/h 12 12 3. Unit performance in relation to secondary 162 162 feedstock, T/h 4. Feedstock temperature after heating in heat- 250 250 exchanger, C
5. Feedstock temperature when entering the - 250 furnace, C
6. Consumption of water condensate at the inlet of - 1.0 furnace coil, T/h 7. Primary feedstock temperature at furnace - 400 outlet, C
8. Secondary feedstock temperature at furnace 500 500 outlet, C
Material Balance of Coking, T/h Consumed:
- primary feedstock I 150 150 - trapped products of coke steaming and 1 5 5 cooling Produced:
- carbon dioxide calculated on 05 basis 13 12 - benzene (C5 fraction: 180 C) 16.5 15 - light gas oil (180-350 C fraction) 46.5 45 - heavy gas oil (350 C ¨ coking coke) 28.0 28.4 - bottoms gas oil 7.0 5.0 - coke 43.5 43.5 - losses 0.5 1.1 Total involved in coking process, T/h 150+5 150

Claims (3)

Claims Delayed coking of Petroleum Residues
1. A method of delayed coking of petroleum residues, comprising coking a feedstock, having coke deposited in a coke drum, fractionating distillate products in a rectification column into vapour products, light and heavy gas oils and heavy bottoms, steaming coke with water steam, water cooling the coke, introducing the products of coke steaming and cooling into an absorber equipped with mass-exchange assemblies, fractionating the steaming and cooling products into vapour and liquid phases in the absorber, having low-volatility petroleum products from the vapour phase by introducing the bottoms from the bottom part of the absorber into the mass-exchange assembly, cooling and condensing vapour components in a condenser/refrigerator and fractionating the cooling products in a fractionator into gas, petroleum products and water, wherein the produced heavy gas oil is split into several flows, one of which is used as a recirculate and is mixed with the feedstock in the evaporator column to obtain a secondary feedstock, wherein the secondary feedstock is fed into a heating oven at a constant rate prior to coking, the second flow is used to dilute the products of coke steaming and cooling prior to introducing it into the absorber, the third flow is introduced into the top mass-exchange assembly of the absorber, while the bottoms are returned from the bottom part of the absorber into the mass-exchange assembly located in the middle part of the absorber, while the left-over part of the bottoms from the absorber as well as the separated petroleum products from the fractionator are returned into the bottom part of the rectification column.
2. The method as described in claim 1, wherein the heavy gasoil is used as a wash product for the condenser/refrigerator.
3. The method of claim 1, wherein the bottoms are returned from the bottom part of the absorber into the 3rd or 4th plate of the mass-exchange assembly.
CA2828163A 2012-08-29 2012-08-29 Delayed coking of petroleum residue Expired - Fee Related CA2828163C (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/RU2012/000710 WO2014035280A1 (en) 2012-08-29 2012-08-29 Method for the retarded coking of petroleum residues

Publications (2)

Publication Number Publication Date
CA2828163A1 CA2828163A1 (en) 2014-02-28
CA2828163C true CA2828163C (en) 2016-06-21

Family

ID=50180697

Family Applications (1)

Application Number Title Priority Date Filing Date
CA2828163A Expired - Fee Related CA2828163C (en) 2012-08-29 2012-08-29 Delayed coking of petroleum residue

Country Status (8)

Country Link
US (1) US20150144530A1 (en)
EP (1) EP2891697A4 (en)
JP (1) JP2014527572A (en)
KR (1) KR20140095965A (en)
CN (1) CN103814111A (en)
CA (1) CA2828163C (en)
UA (1) UA102510U (en)
WO (1) WO2014035280A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10611971B2 (en) * 2018-03-21 2020-04-07 Honeywell International Inc. Fog computing for raising delayed coker yields
CN111073692B (en) * 2018-10-19 2022-01-04 中国石油化工股份有限公司 Preparation method and system of high-quality petroleum coke
CN109868154B (en) * 2019-04-04 2021-11-09 北京奥博斯工程技术有限公司 Method for reducing heavy oil carrying of emptying tower of delayed coking device
CN112266799B (en) * 2020-09-24 2022-01-18 华南理工大学 Delayed coking method for realizing energy consumption reduction of absorption stabilization system

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1263706A1 (en) * 1982-07-05 1986-10-15 Предприятие П/Я В-2223 Method for heat delayed coking chamber,steaming and cooling coke
US4670133A (en) * 1984-12-12 1987-06-02 Mobil Oil Corporation Heavy oil coking process
US6332975B1 (en) * 1999-11-30 2001-12-25 Kellogg Brown & Root, Inc. Anode grade coke production
RU2209826C1 (en) 2002-08-06 2003-08-10 ГУП "Башгипронефтехим" Petroleum coke production process
RU2256687C1 (en) * 2004-02-02 2005-07-20 Государственное унитарное предприятие "Институт нефтехимпереработки Республики Башкортостан" (ГУП ИНХП РБ) Method of retarding of petroleum residue coking
RU86948U1 (en) * 2009-03-19 2009-09-20 Общество с ограниченной ответственностью "Информ-технология" (ООО "Информ-технология")-Российская Федерация INSTALLATION OF OIL PRODUCT COVERAGE FROM COBING REACTORS
JP2013500973A (en) * 2009-07-28 2013-01-10 エイチ アール ディー コーポレーション High shear production of value-added products from refinery related gases
RU2410409C1 (en) 2009-08-13 2011-01-27 Общество с ограниченной ответственностью "Лукойл-Пермнефтеоргсинтез" Method for obtaining oil coke by slow coking
RU2437915C1 (en) * 2010-06-01 2011-12-27 Общество С Ограниченной Ответственностью "Проминтех" Procedure for production of coke additive by delayed coking
RU2458098C1 (en) * 2011-03-05 2012-08-10 Общество С Ограниченной Ответственностью "Проминтех" Method of delayed carbonisation of oil residues
RU2470064C2 (en) * 2011-03-10 2012-12-20 Общество С Ограниченной Ответственностью "Проминтех" Method of decelerated carbonisation of oil residues
RU2515323C2 (en) * 2012-07-17 2014-05-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Уфимский государственный нефтяной технический университет" Method of delayed coking of oil residues

Also Published As

Publication number Publication date
CA2828163A1 (en) 2014-02-28
WO2014035280A1 (en) 2014-03-06
CN103814111A (en) 2014-05-21
EP2891697A4 (en) 2016-04-27
JP2014527572A (en) 2014-10-16
UA102510U (en) 2015-11-10
EP2891697A1 (en) 2015-07-08
KR20140095965A (en) 2014-08-04
US20150144530A1 (en) 2015-05-28

Similar Documents

Publication Publication Date Title
JP7417579B2 (en) Integrated pyrolysis and hydrocracking unit for crude oil to chemicals
US8377287B2 (en) Methods and systems for producing reduced resid and bottomless products from heavy hydrocarbon feedstocks
RU2663622C1 (en) Raw oils and heavy raw materials thermal cracking for the olefins production in the pyrolysis reactors
Speight Visbreaking: A technology of the past and the future
CA2567124C (en) Apparatus and process for controlling temperature of heated feed directed to a flash drum whose overhead provides feed for cracking
FI85158C (en) Asphalt Coking Process
CN101583697B (en) Process for cracking synthetic crude oil-containing feedstock
Xu et al. Correlation between feedstock SARA components and FCC product yields
JP2009528426A (en) Production of olefins using condensate feedstock
CA2828163C (en) Delayed coking of petroleum residue
Fraser Distillation in refining
US8057663B2 (en) Method and apparatus for recycle of knockout drum bottoms
CN106433740A (en) Delayed coking method and apparatus for heavy oil
US7625480B2 (en) Pyrolysis furnace feed
CN104736677A (en) Coke drum additive injection
SG186168A1 (en) Method for processing hydrocarbon pyrolysis effluent
RU2470064C2 (en) Method of decelerated carbonisation of oil residues
TW201042023A (en) Processing of acid containing hydrocarbons
Elayane et al. Study of the thermal cracking during the vacuum distillation of atmospheric residue of crude oil
RU2548002C1 (en) Method of producing ethylene from hydrocarbon material
US1892452A (en) Process for cracking hydrocarbon oil
CN105505435B (en) A kind of delayed coking system and delay coking process
US1897618A (en) Recovering condensable vapors from incondensable gas
RU2680847C2 (en) Method for fractionating hydrocarbon feedstocks using device including base areas
CN112745942A (en) Crude oil processing method and system

Legal Events

Date Code Title Description
MKLA Lapsed

Effective date: 20180829