BRPI1012813A2 - aparelho e método para modelar projetos de poço e desempenho de poço - Google Patents

aparelho e método para modelar projetos de poço e desempenho de poço

Info

Publication number
BRPI1012813A2
BRPI1012813A2 BRPI1012813A BRPI1012813A BRPI1012813A2 BR PI1012813 A2 BRPI1012813 A2 BR PI1012813A2 BR PI1012813 A BRPI1012813 A BR PI1012813A BR PI1012813 A BRPI1012813 A BR PI1012813A BR PI1012813 A2 BRPI1012813 A2 BR PI1012813A2
Authority
BR
Brazil
Prior art keywords
well
modeling
designs
performance
well performance
Prior art date
Application number
BRPI1012813A
Other languages
English (en)
Inventor
Coull Craig
Constantine Jesse
Sun Kai
Original Assignee
Baker Hughes Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baker Hughes Inc filed Critical Baker Hughes Inc
Publication of BRPI1012813A2 publication Critical patent/BRPI1012813A2/pt

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells

Landscapes

  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Flow Control (AREA)
  • Measuring Fluid Pressure (AREA)
  • Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)
BRPI1012813A 2009-05-22 2010-05-21 aparelho e método para modelar projetos de poço e desempenho de poço BRPI1012813A2 (pt)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US12/470,869 US8463585B2 (en) 2009-05-22 2009-05-22 Apparatus and method for modeling well designs and well performance
PCT/US2010/035758 WO2010135636A2 (en) 2009-05-22 2010-05-21 Apparatus and method for modeling well designs and well performance

Publications (1)

Publication Number Publication Date
BRPI1012813A2 true BRPI1012813A2 (pt) 2018-01-16

Family

ID=43125155

Family Applications (1)

Application Number Title Priority Date Filing Date
BRPI1012813A BRPI1012813A2 (pt) 2009-05-22 2010-05-21 aparelho e método para modelar projetos de poço e desempenho de poço

Country Status (7)

Country Link
US (1) US8463585B2 (pt)
EP (1) EP2432968B1 (pt)
BR (1) BRPI1012813A2 (pt)
CA (1) CA2762975C (pt)
RU (1) RU2531696C2 (pt)
SA (1) SA110310426B1 (pt)
WO (1) WO2010135636A2 (pt)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577923A (zh) * 2018-12-03 2019-04-05 重庆大学 一种用于计量煤层气开采试验时的倒灌量的装置

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120330466A1 (en) * 2011-06-27 2012-12-27 George Joel Rodger Operational logic for pressure control of a wellhead
US9574433B2 (en) * 2011-08-05 2017-02-21 Petrohawk Properties, Lp System and method for quantifying stimulated rock quality in a wellbore
US9261869B2 (en) * 2012-02-13 2016-02-16 Emerson Process Management Power & Water Solutions, Inc. Hybrid sequential and simultaneous process simulation system
CA2808858C (en) * 2012-03-16 2016-01-26 Weatherford/Lamb, Inc. Wellbore real-time monitoring and analysis of fracture contribution
US9470086B2 (en) 2013-12-18 2016-10-18 King Fahd University Of Petroleum And Minerals Inflow performance relationship for horizontal wells producing oil from multi-layered heterogeneous solution gas-drive reservoirs
AU2014379560B2 (en) * 2014-01-24 2017-07-20 Landmark Graphics Corporation Optimized flow control device properties for accumulated gas injection
US20150218939A1 (en) * 2014-02-06 2015-08-06 King Fahd University Of Petroleum And Minerals Graphical method for assisting multi-zones commingling decision
US9471730B2 (en) 2014-02-11 2016-10-18 King Fahd University Of Petroleum And Minerals Generalized inflow performance model for oil wells of any inclined angle and a computer-implemented method thereof
CN104405364B (zh) * 2014-10-23 2017-06-13 中国石油天然气股份有限公司 一种油井生产特性评价方法及装置
US9951581B2 (en) * 2014-11-07 2018-04-24 Baker Hughes Wellbore systems and methods for supplying treatment fluids via more than one path to a formation
US10345764B2 (en) 2015-04-27 2019-07-09 Baker Hughes, A Ge Company, Llc Integrated modeling and monitoring of formation and well performance
US10370941B2 (en) 2015-04-27 2019-08-06 Baker Hughes, A Ge Company, Llc Well performance index method for evaluating well performance
WO2017106513A1 (en) 2015-12-18 2017-06-22 Baker Hughes Incorporated Integrated modeling and simulation of formation and well performance
US10508521B2 (en) 2017-06-05 2019-12-17 Saudi Arabian Oil Company Iterative method for estimating productivity index (PI) values in maximum reservoir contact (MRC) multilateral completions
GB2581446B (en) * 2017-11-13 2022-05-04 Landmark Graphics Corp Simulating fluid production using a reservoir model and a tubing model
CN110608031B (zh) * 2018-06-14 2023-03-17 中国石油化工股份有限公司 一种井下节流器选井方法
US11499423B2 (en) 2019-05-16 2022-11-15 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis including comingled production calibration
US11441395B2 (en) 2019-05-16 2022-09-13 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis including real-time modeling
US11326423B2 (en) 2019-05-16 2022-05-10 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis including recommending changes to downhole settings
CN110593832B (zh) * 2019-10-21 2021-12-28 中国石油化工股份有限公司 一种基于边底水油藏注水外溢的注采比优化方法
US11821289B2 (en) 2019-11-18 2023-11-21 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis
US20210198981A1 (en) * 2019-12-27 2021-07-01 Saudi Arabian Oil Company Intelligent completion control in reservoir modeling

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4442710A (en) * 1982-03-05 1984-04-17 Schlumberger Technology Corporation Method of determining optimum cost-effective free flowing or gas lift well production
CA1277157C (en) * 1985-07-23 1990-12-04 Christine Ehlig-Economides Process for measuring flow and determining the parameters of multilayer hydrocarbon-producing formations
SU1820668A1 (ru) * 1988-04-27 1995-09-20 Самарский инженерно-строительный институт им.А.И.Микояна Способ определения дебита скважины, оборудованной глубинным насосом
RU2067663C1 (ru) * 1992-01-09 1996-10-10 Василий Иванович Тищенко Способ исследования газовых скважин при стационарных режимах фильтрации
RU2087704C1 (ru) * 1992-11-03 1997-08-20 Государственное предприятие по добыче газа "Ямбурггазодобыча" Способ определения дебита действующей газовой скважины
RU2162939C1 (ru) * 1999-06-23 2001-02-10 Предприятие "Надымгазпром" Способ газогидродинамических исследований скважин
US6980940B1 (en) * 2000-02-22 2005-12-27 Schlumberger Technology Corp. Intergrated reservoir optimization
US7725301B2 (en) * 2002-11-04 2010-05-25 Welldynamics, B.V. System and method for estimating multi-phase fluid rates in a subterranean well
US8401832B2 (en) * 2002-11-23 2013-03-19 Schlumberger Technology Corporation Method and system for integrated reservoir and surface facility networks simulations
US7172020B2 (en) * 2004-03-05 2007-02-06 Tseytlin Software Consulting Inc. Oil production optimization and enhanced recovery method and apparatus for oil fields with high gas-to-oil ratio
US8170801B2 (en) * 2007-02-26 2012-05-01 Bp Exploration Operating Company Limited Determining fluid rate and phase information for a hydrocarbon well using predictive models

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577923A (zh) * 2018-12-03 2019-04-05 重庆大学 一种用于计量煤层气开采试验时的倒灌量的装置

Also Published As

Publication number Publication date
RU2531696C2 (ru) 2014-10-27
EP2432968A4 (en) 2015-10-28
EP2432968A2 (en) 2012-03-28
WO2010135636A2 (en) 2010-11-25
CA2762975C (en) 2016-07-05
CA2762975A1 (en) 2010-11-25
WO2010135636A3 (en) 2011-03-03
RU2011152240A (ru) 2013-06-27
US8463585B2 (en) 2013-06-11
SA110310426B1 (ar) 2013-12-29
EP2432968B1 (en) 2017-08-16
US20100299124A1 (en) 2010-11-25

Similar Documents

Publication Publication Date Title
BRPI1012813A2 (pt) aparelho e método para modelar projetos de poço e desempenho de poço
BRPI0907812A2 (pt) Aparelho e método para produzir uréia
BRPI1013624A2 (pt) aparelho de exibição e método para fabricação do aparelho de exibição
BRPI1010670A8 (pt) método e aparelho para sensoriamento óptico
IT1396233B1 (it) Apparato e metodo di taglio
BR112012004707A2 (pt) método
BR112012000624A2 (pt) método
FI20090389A0 (fi) Menetelmä
BRPI0912934A2 (pt) aparelho e método
BRPI1008617A2 (pt) método e aparelho para lipoaspiração
BRPI0910587A2 (pt) método e aparelho para eletrogalvanização
BR112013016969A2 (pt) aparelho e método
BRPI1012148A2 (pt) método e equipamento para preparar dentadura
BR112012011910A2 (pt) dispositivo e método
BRPI0910713A2 (pt) método e aparelhos
BR112012001100A2 (pt) aparelho e método para construções de estrutura e tijolo
BR112012015031A2 (pt) aparelho e método
BR112012028015A2 (pt) aparelho e método
BRPI1012526A2 (pt) método
BRPI0918294A2 (pt) dispositivo e método para produzir explosões
BRPI1008402A2 (pt) método e aparelho para gerenciamento de informação de texto
BRPI1007587A2 (pt) dispositivo de bomba e método para fazê-lo
BRPI1010705A2 (pt) método
BRPI0914120A2 (pt) método e aparelho para determinação estrutural
BR112012008229A2 (pt) método, e aparelho

Legal Events

Date Code Title Description
B08F Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette]

Free format text: REFERENTE A 8A ANUIDADE.

B08K Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette]