Skip to content

Pull requests: ufs-community/ufs-weather-model

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

Add forecast day output for CICE via timestep stream Baseline Updates Current baselines will be updated. Ready for Commit Queue The PR is ready for the Commit Queue. All checkboxes in PR template have been checked.
#2437 by NickSzapiro-NOAA was merged Oct 5, 2024 Loading…
12 of 14 tasks
Update CICE and use EMC/CICE:develop branch from CICE-Consortium:main No Baseline Change No Baseline Change Ready for Commit Queue The PR is ready for the Commit Queue. All checkboxes in PR template have been checked.
#2430 by NickSzapiro-NOAA was merged Sep 19, 2024 Loading…
13 of 14 tasks
Update CMEPS; fix aux history functionality for float variable type; Switch to using Aux history files in atm_ds2s_docn_dice test; Remove IFI tests (was #2417) Baseline Updates Current baselines will be updated. Ready for Commit Queue The PR is ready for the Commit Queue. All checkboxes in PR template have been checked.
#2395 by DeniseWorthen was merged Sep 3, 2024 Loading…
13 of 14 tasks
Unify CDEPS gfs, cfsr, and gefs datm datamodes + Improve error checking in rt.sh (2388) + Add ability to read increment files on native cubed sphere grid (2304) No Baseline Change No Baseline Change Ready for Commit Queue The PR is ready for the Commit Queue. All checkboxes in PR template have been checked.
#2389 by NickSzapiro-NOAA was merged Aug 27, 2024 Loading…
13 of 14 tasks
update MOM6 to its main repository 20231218 commit (disable FPEs) + Add stochastic physics pattern update frequency options within SPP and LNDP ('sppint' and 'lndpint') #2077 + Updates to ufs.configure for use in global applications #2074 + Doc Updates #2030 documentation Improvements or additions to documentation jenkins-ci Jenkins CI: ORT build/test on docker container No Baseline Change No Baseline Change Ready for Commit Queue The PR is ready for the Commit Queue. All checkboxes in PR template have been checked.
#2080 by jiandewang was merged Jan 11, 2024 Loading…
18 of 41 tasks
Updates to ufs.configure for use in global applications
#2074 by aerorahul was closed Jan 11, 2024 Loading…
1 of 41 tasks
ProTip! no:milestone will show everything without a milestone.