The purpose of this project is to suggest a set of the best schedules possible according to a set of rules. The Timeslot composing a schedule can have link between them like dependances between them. For example, the timeslot "Java 3" can depends on another timeslot "JAVA 1"
- Java 7
- Swing/SWT
This Project was done during my 4th year in Telecom Lille (now Institut-Mines-Telecom Lille-Douai) with another student, it's really not complete(and kinda badly done)