This repository contains the code for a process scheduler simulation. The simulation is designed to simulate the behavior of a process scheduler algorithm, which manages the execution of multiple processes on a computer system.
-
Notifications
You must be signed in to change notification settings - Fork 1
process scheduler simulation written in c++. The simulation is designed to simulate the behavior of a process scheduler algorithm, which manages the execution of multiple processes on a computer system.
shehab299/OS-Project-Scheduler
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
Folders and files
Name | Name | Last commit message | Last commit date | |
---|---|---|---|---|
Repository files navigation
About
process scheduler simulation written in c++. The simulation is designed to simulate the behavior of a process scheduler algorithm, which manages the execution of multiple processes on a computer system.
Resources
Stars
Watchers
Forks
Releases
No releases published
Packages 0
No packages published