Skip to content

Commit

Permalink
writeup
Browse files Browse the repository at this point in the history
  • Loading branch information
Praneethsvch committed Sep 7, 2021
1 parent 5f79bbd commit 22ebaca
Showing 1 changed file with 2 additions and 2 deletions.
4 changes: 2 additions & 2 deletions docs/quality-management/quality-control.markdown
Original file line number Diff line number Diff line change
Expand Up @@ -41,13 +41,13 @@ The purpose of this document is to provide Quality Control (QC) guidelines for

#### Objective

To perform initial calibration and validate sensor data after QAP in laboratory conditions.
To perform initial calibration and validation of the raw sensor data in laboratory conditions.

#### Procedure

1. Using measuring tape, fix mount locations at heights h1, h2, h3, h4 from the surface.
2. Miount the sensor at these known heights in order starting from h1 and collect data every 30 seconds for at least 30 minutes, totaling at least 60 measurements.
3. Place a known object on the surface beneath the sensor for the next 30 minutes and record the measurements.
3. Place an object of known height on the surface, beneath the sensor for the next 30 minutes and record the measurements.
4. Remove the object and move the sensor onto the next height and repeat the process until the sensor has been tested and recorded at all the heights h1, h2, h3 and h4.

#### Calibration
Expand Down

0 comments on commit 22ebaca

Please sign in to comment.