Skip to content
This repository has been archived by the owner on Mar 26, 2022. It is now read-only.

Configure Renovate #31

Open
wants to merge 1 commit into
base: master
Choose a base branch
from
Open

Configure Renovate #31

wants to merge 1 commit into from

Conversation

renovate[bot]
Copy link

@renovate renovate bot commented Jun 1, 2018

WhiteSource Renovate

Welcome to Renovate! This is an onboarding PR to help you understand and configure settings before regular Pull Requests begin.

🚦 To activate Renovate, merge this Pull Request. To disable Renovate, simply close this Pull Request unmerged.


Detected Package Files

  • package.json (npm)

Configuration Summary

Based on the default config's presets, Renovate will:

  • Start dependency updates only once this onboarding PR is merged
  • Separate major versions of dependencies into individual branches/PRs
  • Do not separate patch and minor upgrades into separate PRs for the same dependency
  • Upgrade to unstable versions only if the existing version is unstable
  • Raise PRs immediately (after branch is created)
  • If semantic commits detected, use semantic commit type fix for dependencies and chore for all others
  • Keep existing branches updated even when not scheduled
  • Disable automerging feature - wait for humans to merge all PRs
  • Ignore node_modules, bower_components, vendor and various test/tests directories
  • Autodetect whether to pin dependencies or maintain ranges
  • Rate limit PR creation to a maximum of two per hour
  • Limit to maximum 20 open PRs at any time
  • Group known monorepo packages together
  • Use curated list of recommended non-monorepo package groupings
  • Do not upgrade sbt latest.integration
  • Ignore spring cloud 1.x releases

🔡 Would you like to change the way Renovate is upgrading your dependencies? Simply edit the renovate.json in this branch with your custom config and the list of Pull Requests in the "What to Expect" section below will be updated the next time Renovate runs.


What to Expect

With your current configuration, Renovate will create 12 Pull Requests:

Pin dependency eslint-plugin-react to 5.2.2
  • Schedule: ["at any time"]
  • Branch name: renovate/pin-dependencies
  • Merge into: master
  • Pin eslint-plugin-react to 5.2.2
Update dependency async to v2.6.3
  • Schedule: ["at any time"]
  • Branch name: renovate/async-2.x
  • Merge into: master
  • Upgrade async to 2.6.3
Update dependency keystone to v4.2.1
  • Schedule: ["at any time"]
  • Branch name: renovate/keystone-4.x
  • Merge into: master
  • Upgrade keystone to 4.2.1
Update dependency keystone-email to v1.1.0
  • Schedule: ["at any time"]
  • Branch name: renovate/keystone-email-1.x
  • Merge into: master
  • Upgrade keystone-email to 1.1.0
Update dependency lodash to v4.17.19 [SECURITY]
  • Branch name: renovate/npm-lodash-vulnerability
  • Merge into: master
  • Upgrade lodash to 4.17.19
Update dependency pug to v2.0.4
  • Schedule: ["at any time"]
  • Branch name: renovate/pug-2.x
  • Merge into: master
  • Upgrade pug to 2.0.4
Update dependency stylus to v0.54.8
  • Schedule: ["at any time"]
  • Branch name: renovate/stylus-0.x
  • Merge into: master
  • Upgrade stylus to 0.54.8
Update dependency async to v3
  • Schedule: ["at any time"]
  • Branch name: renovate/async-3.x
  • Merge into: master
  • Upgrade async to 3.2.0
Update dependency dotenv to v8
  • Schedule: ["at any time"]
  • Branch name: renovate/dotenv-8.x
  • Merge into: master
  • Upgrade dotenv to 8.2.0
Update dependency eslint to v7
  • Schedule: ["at any time"]
  • Branch name: renovate/eslint-7.x
  • Merge into: master
  • Upgrade eslint to 7.17.0
Update dependency eslint-plugin-react to v7
  • Schedule: ["at any time"]
  • Branch name: renovate/eslint-plugin-react-7.x
  • Merge into: master
  • Upgrade eslint-plugin-react to 7.22.0
Update dependency pug to v3
  • Schedule: ["at any time"]
  • Branch name: renovate/pug-3.x
  • Merge into: master
  • Upgrade pug to 3.0.0

🚸 Branch creation will be limited to maximum 2 per hour, so it doesn't swamp any CI resources or spam the project. See docs for prhourlylimit for details.


❓ Got questions? Check out Renovate's Docs, particularly the Getting Started section.
If you need any further assistance then you can also request help here.


This PR has been generated by WhiteSource Renovate. View repository job log here.

Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.
Labels
None yet
Projects
None yet
Development

Successfully merging this pull request may close these issues.

1 participant