When reviewing sprints, the most popular chart is the burn down chart. This visual shows the time remaining for each day of the sprint
Show the remaining time on each the the days specified between the days.
The target assumes a liniar burndown of time through the sprint.
Shows the possible burn down based on the availability of individuals.
- NodeJS
- React
- Power Platform CPI
- Chart JS
-
Clone the repository
-
Make changes
-
Run build and open in browser
npm run start
-
Clone the repository
-
Run build
npm run build
-
Ensure auth profile has been created and selected
-
publish the component solution to enviromention
pac pcf push --publisher-prefix theppd
Include the control following the Microsoft Documentation
Note: include dates as UTC Text format in the items. Note: include the column mapping in the advanced pannel of the control.