Skip to content

Commit

Permalink
Update GB Capacities (electricitymaps#5534)
Browse files Browse the repository at this point in the history
* Update GB Capacities

* Update GB Data Sources

* Update GB data sources

* Update ELEXON docs link

Old API docs link 404s/is unavailable.

---------

Co-authored-by: Viktor Andersson <[email protected]>
  • Loading branch information
brandongalbraith and VIKTORVAV99 committed Jun 29, 2023
1 parent 18a878e commit e75896e
Show file tree
Hide file tree
Showing 3 changed files with 12 additions and 15 deletions.
6 changes: 2 additions & 4 deletions DATA_SOURCES.md
Original file line number Diff line number Diff line change
Expand Up @@ -49,7 +49,7 @@ Real-time electricity data is obtained using [parsers](https://github.com/electr
- French Polynesia: [EDT](https://www.edt.pf/transition-energetique-innovation)
- Germany: [ENTSOE](https://transparency.entsoe.eu/content/static_content/Static%20content/web%20api/Guide.html)
- Georgia: [Georgian State Electrosystem (GSE)](https://www.gse.com.ge/home)
- Great Britain: [ENTSOE](https://transparency.entsoe.eu/content/static_content/Static%20content/web%20api/Guide.html)
- Great Britain: [Elexon BMRS](https://bscdocs.elexon.co.uk/guidance-notes/bmrs-api-and-data-push-user-guide)
- Great Britain (Orkney Islands): [SSEN](https://www.ssen.co.uk/ANM/)
- Greece: [ENTSOE](https://transparency.entsoe.eu/content/static_content/Static%20content/web%20api/Guide.html)
- Guatemala: [AMM](https://www.amm.org.gt)
Expand Down Expand Up @@ -270,9 +270,7 @@ For many European countries, data is available from [ENTSO-E](https://transparen
- Geothermal and Unknown: [Bundesnetzagentur](https://www.bundesnetzagentur.de/DE/Sachgebiete/ElektrizitaetundGas/Unternehmen_Institutionen/Versorgungssicherheit/Erzeugungskapazitaeten/Kraftwerksliste/kraftwerksliste-node.html)
- Other: [Frauenhofer ISE](https://energy-charts.info/charts/installed_power/chart.htm)
- Georgia: [ENTSO-E](https://transparency.entsoe.eu/generation/r2/installedGenerationCapacityAggregation/show)
- Great Britain:
- Nuclear: [IAEA](https://pris.iaea.org/PRIS/CountryStatistics/CountryDetails.aspx?current=GB)
- Other: [ENTSO-E](https://transparency.entsoe.eu/generation/r2/installedGenerationCapacityAggregation/show)
- Great Britain: [Elexon BMRS](https://www.bmreports.com/bmrs/?q=foregeneration/capacityaggregated)
- Greece: [ENTSO-E](https://transparency.entsoe.eu/generation/r2/installedGenerationCapacityAggregation/show)
- Guatemala: [AMM](https://www.amm.org.gt/pdfs2/2017/Capacidad_Instalada_2017.xls)
- Honduras: [ENEE](https://www.enee.hn/planificacion/2018/boletines/Boletin%20Estadistico%20Mes%20de%20Septiembre%202018%20PDF.pdf)
Expand Down
18 changes: 9 additions & 9 deletions config/zones/GB.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -5,17 +5,17 @@ bounding_box:
- - 2.1533203125
- 61.0795442346
capacity:
biomass: 4528
coal: 5241
gas: 39822
biomass: 4438
coal: 1491
gas: 37047
geothermal: 0
hydro: 1919
hydro storage: 4309
nuclear: 5883
hydro: 2063
hydro storage: 5603
nuclear: 4950
oil: 0
solar: 13378
unknown: 4708
wind: 25097
solar: 14518
unknown: 4775
wind: 26945
contributors:
- corradio
- lorrieq
Expand Down
3 changes: 1 addition & 2 deletions parsers/ELEXON.py
Original file line number Diff line number Diff line change
Expand Up @@ -7,8 +7,7 @@
Exchanges
Documentation:
https://www.elexon.co.uk/wp-content/uploads/2017/06/
bmrs_api_data_push_user_guide_v1.1.pdf
https://bscdocs.elexon.co.uk/guidance-notes/bmrs-api-and-data-push-user-guide
"""

import re
Expand Down

0 comments on commit e75896e

Please sign in to comment.