Skip to content

Commit

Permalink
Added bettery installation detail
Browse files Browse the repository at this point in the history
  • Loading branch information
mattdibi committed Sep 29, 2018
1 parent 524975f commit 3295c7a
Show file tree
Hide file tree
Showing 3 changed files with 8 additions and 1 deletion.
Binary file added img/battery-installation1.jpg
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
Binary file added img/battery-installation2.jpg
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
9 changes: 8 additions & 1 deletion redox-w/README.md
Original file line number Diff line number Diff line change
Expand Up @@ -52,7 +52,7 @@ Assemply steps:
1. Solder the YJ-14015.
2. Solder 1N4148 diodes.
3. Solder slider switches.
4. Solder the battery holders.
4. Solder the battery holders. *Note*: Some solder is needed on the ground pad to contact properly with the battery. See [picture below]().
5. Solder the programming headers.
- Fit the PCBs inside their cases.
- Add the switches to the plate.
Expand Down Expand Up @@ -91,6 +91,13 @@ Assemply steps:
<img src="../img/pcb-w-assembly5.jpg" alt="Diode installation detail" width="600"/>
</p>

##### Battery holder installation detail:

<p align="center">
<img src="../img/battery-installation1.jpg" alt="Battery holder installation detail. Ground pad." width="300"/>
<img src="../img/battery-installation2.jpg" alt="Battery holder installation detail. Assembled." width="300"/>
</p>

##### Left and right hand completed assembly:

<p align="center">
Expand Down

0 comments on commit 3295c7a

Please sign in to comment.