Work Report and Progress Piping H80069-PR-00

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 330

Project : H80069-PR-00

Date : 12/24/2023

No. No. Drawing System

1 P2 Tank Vent and Sounding


2 P3 Bilge and Ballast System
3 P4 Fireman And Deckwash System
4 P5 Fuel Oil System
5 P6 SW and FW Cooling System
6 P7 Domestic FW and SW System
7 P-044 External Deck Scupper Arg.
8 P8 Soil and Drain System
9 P9 Oily Bilge and Dirty Oil System
10 P10 Engines Exhaust System
11 P12 Quick Closing Valve System
12 P0 Hydraulic System
13 P0 CO2 System
14 VSE/Q858-043 Compressed Air System
15 VSE/Q858-030 Lubricating Oil System
Resume:
Progress present month
Progress previous month
Achievement
PROG
FABRICATION INSTALL
Progress Realization (%) Progress Rea
Total Spool
45%
Fit Up Welding Fit Up
Inspect.
45% 35%
40% 50% 10% 40%
76 100% 100% 100% 97%
132 95% 83% 83% 83%
29 72% 72% 72% 72%
196 89% 68% 68% 4%
100 93% 69% 69% 44%
40 100% 100% 100% 80%
8 100% 100% 100% 0%
75 81% 3% 3% 3%
64 59% 0% 0% 0%
13 0% 0% 0% 0%
35 0% 0% 0% 0%
25 0% 0% 0% 0%
20 0% 0% 0% 0%
65 100% 100% 100% 91%
20 0% 0% 0% 0%
898 59% 46% 46% 32%
42.91% %
41.40% %
1.50% %
PROGRESS PIPING H80069-PR-00
INSTALLATION REINSTATEMENT
Progress Realization (%) Progress Realization (%)
35%
Welding Fit Up Welding
Inspect.
35% 10%
45% 15% 35% 50%
97% 97% 50% 50%
83% 0% 50% 50%
72% 0% 50% 50%
1% 1% 0% 0%
44% 0% 0% 0%
80% 0% 50% 50%
0% 0% 0% 0%
3% 0% 0% 0%
0% 0% 0% 0%
0% 0% 0% 0%
0% 0% 0% 0%
0% 0% 0% 0%
0% 0% 0% 0%
91% 0% 50% 50%
0% 0% 0% 0%
31% 7% 17% 17%
ATEMENT TESTING & FINISHING
alization (%) Progress Realization (%)
10% FINAL INSPECTION 10%
Inspect. Hydrotest Finishing
% 10%
15% 80% 20%
50% 97% 0%
50% 83% 0%
50% 72% 0%
0% 44% 0%
0% 44% 0%
50% 80% 0%
0% 0% 0%
0% 0% 0%
0% 0% 0%
0% 0% 0%
0% 0% 0%
0% 0% 0%
0% 0% 0%
50% 100% 0%
0% 0% 0%
17% 35% 0%
Physical Progress
Total Project
Project Realization Realization Last Month
42.91% 41.40%

93.8% 93.8%
85.1% 80.0%
70.2% 70.2%
45.8% 43.5%
61.7% 61.7%
86.0% 86.0%
45.0% 45.0%
37.5% 37.5%
26.7% 11.6%
0.0% 0.0%
0.0% 0.0%
0.0% 0.0%
0.0% 0.0%
91.8% 91.8%
0.0% 0.0%
ress
Project's
Progress This Week
1.50%

0.0%
5.1%
0.0%
2.3%
0.0%
0.0%
0.0%
0.0%
15.1%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
FITTING

NO DESCRIPTION MATERIAL QUALITY ND(mm)

JIS Flat Face Flange SS400 40A


1
JIS Flat Face Flange SS400 40A

JIS Flat Face Flange SS400 50A


2
JIS Flat Face Flange SS400 50A

JIS Flat Face Flange SS400 65A


3 JIS Flat Face Flange SS400 65A

JIS Flat Face Flange SS400 65A


4 JIS Flat Face Flange SS400 80A
5 JIS Flat Face Flange SS400 100A

JIS Flat Face Flange SS400 200A

PIPE

NO DESCRIPTION MATERIAL QUALITY ND(mm)

1 Pipe Seamless API 5L 40A


2 Pipe Seamless API 5L 50A
3 Pipe Seamless API 5L 25A

Air Vent and Sounding System


PIPE

NO DESCRIPTION MATERIAL QUALITY ND(inch)

1 Pipe Seamless API 5L 1 1/2


2 Pipe Seamless API 5L 2
3 Pipe Seamless API 5L 2 1/2
4 Pipe Seamless API 5L 4
5 Pipe S/S 316L 1 1/2
6 Pipe S/S 316L 2 1/2

FITTING

NO DESCRIPTION MATERIAL QUALITY ND(inch)

1 JIS Flat Face Flange SS400 1 1/2


2 JIS Flat Face Flange SS400 2
3 JIS Flat Face Flange SS400 2
4 JIS Flat Face Flange SS400 2 1/2
5 JIS Flat Face Flange SS400 4

6 S/S Flange S/S 316L 1 1/2

7 S/S Flange S/S 316L 2 1/2


8 S/S Flange S/S 316L 2 1/2
9 Elbow 45° - LR Carbon Steel 2 1/2

10 Elbow 90° - LR Mild Steel 2 1/2

11 Elbow 45° - LR Carbon Steel 4


12 Bolt and Nut (M12x 45 mm) S/S 316L
Bolt and Nut (M16x 60 mm) Galvd
Gasket Non-Asbestos 1 1/2
Gasket Non-Asbestos 4

1 Angle Bar 50x50x6 mm

2 Angle Bar 75x75x7 mm

Bilge System
PIPE

NO DESCRIPTION MATERIAL QUALITY ND(inch)

1 Pipe CuNi (Copper Nickel) 1 1/4


2 Pipe CuNi (Copper Nickel) 1 1/2
3 Pipe CuNi (Copper Nickel) 2
4 Pipe CuNi (Copper Nickel) 2 1/2
5 Pipe CuNi (Copper Nickel) 3
6 Pipe CuNi (Copper Nickel) 4
7 Pipe CuNi (Copper Nickel) 8

FITTING

NO DESCRIPTION MATERIAL QUALITY ND(inch)

Composite Flange_Cuni + SS400 Cuni + SS400 1 1/2


Composite Flange_Cuni + SS400 Cuni + SS400 2
Composite Flange_Cuni + SS400 Cuni + SS400 2 1/2
Composite Flange_Cuni + SS400 Cuni + SS400 3
Composite Flange_Cuni + SS400 Cuni + SS400 1

Composite Flange_Cuni + SS400 Cuni + SS400 1 1/4


Composite Flange_Cuni + SS400 Cuni + SS400 1 1/2
Composite Flange_Cuni + SS400 Cuni + SS400 2
Composite Flange_Cuni + SS400 Cuni + SS400 2 1/2
Composite Flange_Cuni + SS400 Cuni + SS400 3
Flange Cuni CuNi 8
Flange SS400 1 1/4

Flange SS400 2

Flange SS400 2 1/2

Elbow 90° - LR Carbon Steel 2

Elbow 45° - LR CuNi 1 1/4


Elbow 45° - LR CuNi 1 1/2

Elbow 45° - LR CuNi 2

Elbow 45° - LR CuNi 2 1/2


Elbow 45° - LR CuNi 3
Elbow 90° - LR CuNi 1 1/4
Elbow 90° - LR CuNi 1 1/2

Elbow 90° - LR CuNi 2

Elbow 90° - LR CuNi 2 1/2


Elbow 90° - LR CuNi 3
Elbow 45° - SR CuNi 2
Elbow 45° - SR CuNi 2 1/2
Elbow 45° - SR CuNi 3
Elbow 45° - SR CuNi 4
Conc. Reducer CuNi 2 x 1 1/2
Conc. Reducer CuNi 4x3
Conc. Reducer CuNi 4 x 2 1/2
Conc. Reducer CuNi 1 1/4 x 1 1/2
Conc. Reducer CuNi 1 1/4 x 2
Conc. Reducer CuNi 2 x 2 1/2
Bolt and Nut (M12 x 50 mm) Galvanized
Gasket Teflon 2
Gasket Teflon 2 1/2

Fresh Water System

NO DESCRIPTION MATERIAL QUALITY ND(inch)


NO DESCRIPTION MATERIAL QUALITY ND(inch)

1 Pipe S/S 316L 1/2

2 Pipe S/S 316L 3/4

3 Pipe S/S 316L 1

4 Pipe S/S 316L 2


5 Pipe S/S 316L 2 1/2

FITTING

NO DESCRIPTION MATERIAL QUALITY ND(inch)

1 TEE S/S 316L 3000# 3/4 x 1/2


2 Flange S/S 316L 3/4
3 Flange S/S 316L 1

4 Flange S/S 316L 1/2

5 Flange S/S 316L 1 1/4

6 Flange S/S 316L 2

7 Elbow S/S 316L 1/2


8 Elbow S/S 316L 3/4
9 Elbow S/S 316L 1
10 Elbow S/S 316L 2
11 Reducer S/S 316L 1 x 3/4

12 Reducer S/S 316L 1/2 x 3/4

Air Compressed System


PIPE

NO DESCRIPTION MATERIAL QUALITY ND(inch)

Pipe Seamless API 5L 1/2

Pipe Seamless API 5L 3/4

Pipe Seamless API 5L 1

FITTING
NO DESCRIPTION MATERIAL QUALITY ND(inch)

1 Flange SS400 1/2

2 Flange SS400 3/4

3 Flange SS400 1

Gasket Non Asbestos 1 1/2


Gasket Non Asbestos 2
Gasket Non Asbestos 2 1/2
Gasket Non Asbestos 4

Galv. Bolt and Nut M12x45 mm Galvanized

Galv. Bolt and Nut M16x60 mm Galvanized


Galv. U-Bolt (M10 x 2inch) Galvanized

Firemain and Deckwash System


PIPE

NO DESCRIPTION MATERIAL QUALITY ND(inch)

1 Pipe CuNi (Copper Nickel) 1 1/4


2 Pipe CuNi (Copper Nickel) 2 1/2

FITTING

NO DESCRIPTION MATERIAL QUALITY ND(inch)

1 Composite Flange_Cuni + SS400 Cuni + SS400 1 1/4


2 Composite Flange_Cuni + SS400 Cuni + SS400 1 1/2
3 Composite Flange_Cuni + SS400 Cuni + SS400 2
4 Composite Flange_Cuni + SS400 Cuni + SS400 2 1/2
5 Composite Flange_Cuni + SS400 Cuni + SS400 2 1/2
6 Elbow 45° - LR CuNi 2 1/2

7 Elbow 90° - LR CuNi 2 1/2

8 Elbow 90° - LR CuNi 3


9 Conc. Reducer CuNi 3 x 2 1/2
C02 System
PIPE

NO DESCRIPTION MATERIAL QUALITY ND(inch)

Pipe SUS 304 1

Cooling System
PIPE

NO DESCRIPTION MATERIAL QUALITY ND(inch)

1 Pipe CuNi (Copper Nickel) 3/4


2 Pipe CuNi (Copper Nickel) 1
3 Pipe CuNi (Copper Nickel) 1 1/4
4 Pipe CuNi (Copper Nickel) 1 1/2
5 Pipe CuNi (Copper Nickel) 2
6 Pipe CuNi (Copper Nickel) 2 1/2
7 Pipe CuNi (Copper Nickel) 3

FITTING

NO DESCRIPTION MATERIAL QUALITY ND(inch)

1 Composite Flange_Cuni + SS400 Cuni + SS400 3/4


2 Composite Flange_Cuni + SS400 Cuni + SS400 1
3 Composite Flange_Cuni + SS400 Cuni + SS400 1 1/4
4 Composite Flange_Cuni + SS400 Cuni + SS400 2
5 Composite Flange_Cuni + SS400 Cuni + SS400 2 1/2
6 Composite Flange_Cuni + SS400 Cuni + SS400 3
7 Elbow 90° - LR CuNi 3/4
8 Elbow 45° - LR CuNi 3/4
9 Elbow 90° - LR CuNi 1
10 Elbow 45° - LR CuNi 1
11 Elbow 90° - LR CuNi 1 1/4
12 Elbow 45° - LR CuNi 1 1/4
13 Elbow 90° - LR CuNi 1 1/2
14 Elbow 45° - LR CuNi 1 1/2
15 Elbow 90° - LR CuNi 2
16 Elbow 45° - LR CuNi 2
17 Elbow 90° - LR CuNi 2 1/2
18 Elbow 45° - LR CuNi 2 1/2
19 Elbow 45° - LR CuNi 3
20 Elbow 90° - SR CuNi 2 1/2
21 Conc. Reducer CuNi 2x1
22 Conc. Reducer CuNi 2 1/2 x 1
23 Conc. Reducer CuNi 2 1/2 x 2
24 Conc. Reducer CuNi 2 x 1 1/2
25 Conc. Reducer CuNi 2 1/2 x 1 1/2
26 Conc. Reducer CuNi 3x2
27 Conc. Reducer CuNi 3 x 2 1/2

External Deck Scupper System


FITTING

NO DESCRIPTION MATERIAL QUALITY ND(inch)

1 Elbow 90° - LR Carbon Steel 3

2 Reducer Carbon Steel 3x5

Fuel Oil System


FITTING

NO DESCRIPTION MATERIAL QUALITY ND(inch)

Pipe Seamless API 5L 1/2


Pipe Seamless API 5L 3/4
Pipe Seamless API 5L 1
Pipe Seamless API 5L 1 1/2
Pipe Seamless API 5L 2
Pipe Seamless API 5L 3
PRESSURE/ LENGTH RECEIVED
DATE REQUESTED REQUEST QTY
SCH (mm) QTY UOM
5K 24-Dec-22 20
140 Pcs
5K 6-Jan-23 5
5K 26-Dec-22 5
Pcs
5K 13-Jan-23 2
5K 15 Pcs 6-Dec-22 15
5K 20 Pcs 24-Dec-22 20
5K 2 Pcs 6-Jan-23 2
5K
5K 10 Pcs 26-Dec-22 10
10K 3 Pcs 19-Jan-23 3

PRESSURE/ LENGTH RECEIVED


DATE REQUESTED REQUEST QTY
SCH (mm) QTY UOM
SCH 80 12000 2 LGHT 28-Dec-22 2
SCH 160 6000 1 LGHT 29-Dec-22 3
SCH 80 6000 1 LGHT 11-Feb-23 1

PRESSURE/ LENGTH RECEIVED


QTY DATE REQUESTED REQUEST QTY
SCH (mm) QTY UOM
SCH 80 30000 5 5 LGTH 21-Feb-23 5
SCH 80 12000 2 2 LGTH 21-Feb-23 2
SCH 80 24000 4 4 LGTH 21-Feb-23 4
SCH 80 12000 2 2 LGTH 21-Feb-23 2
SCH 80 12000 2 2 LGTH 27-Feb-23 2
SCH 80 6000 1 1 LGTH 27-Feb-23 1

PRESSURE/ LENGTH RECEIVED


SCH (mm)
QTY DATE REQUESTED REQUEST QTY
QTY UOM

5K 17 17 Pcs 21-Feb-23 17
5K 13 13 Pcs 21-Feb-23 13
10K 2 2 Pcs 21-Feb-23 2
5K 42 42 Pcs 21-Feb-23 42
5K 34 34 Pcs 21-Feb-23 34
10 10 Pcs 27-Feb-23 10
5K
2 2 Pcs 1-Mar-23 2
5K 12 12 Pcs 27-Feb-23 12
5K 4 4 Pcs 13-Mar-23 4
SCH 80 16 16 Pcs 21-Feb-23 16
4 4 Pcs 21-Feb-23 4
SCH 80
1 1 Pcs 25-Mar-23 1
SCH 80 2 2 Pcs 21-Feb-23 2

100 Pcs 8-May-23 100


5K 4 4 Pcs 3-Apr-23 4
5K 10 10 Pcs 3-Apr-23 10

5 LGTH 7-Mar-23 5
10 LGTH 3-Apr-23 10
5 LGTH 7-Mar-23 5

PRESSURE/ LENGTH RECEIVED


QTY DATE REQUESTED REQUEST QTY
SCH (mm) QTY UOM
24000 4 4 LGTH 2-Mar-23 4
12000 2 1 LGTH 2-Mar-23 2
66000 11 11 LGTH 2-Mar-23 11
18000 3 3 LGTH 2-Mar-23 3
18000 3 3 LGTH 2-Mar-23 3
6000 1 1 LGTH 2-Mar-23 1
6000 1 1 LGTH 2-Mar-23 1

PRESSURE/ LENGTH RECEIVED


SCH (mm)
QTY DATE REQUESTED REQUEST QTY
QTY UOM
10K 1
10K 1
10K 1
10K 2
5K 1 1 Pcs 2-Mar-23 1

39 Pcs 2-Mar-23 39
5K 39
6 Pcs 15-Apr-23 6
5K 12 12 Pcs 2-Mar-23 12
5K 80 80 Pcs 2-Mar-23 80
5K 37 37 Pcs 2-Mar-23 37
5K 43 43 Pcs 2-Mar-23 43
10K 2 2 Pcs 2-Mar-23 2
5K 4 4 Pcs 9-Mar-23 4

40 Pcs 4-Apr-23 40
5K 56
16 Pcs 4-Apr-23 16

6 Pcs 4-Apr-23 6
5K
6 Pcs 5-Apr-23
2 Pcs 4-Apr-23 2
SCH 80 8
6 Pcs 3-Apr-23 6
Pcs 2-Mar-23 9
Pcs 2-Mar-23 2
Pcs 2-Mar-23 22
5K
2 2 Pcs 9-Mar-23 2
Pcs 2-Mar-23 9
Pcs 2-Mar-23 11

17 Pcs 2-Mar-23 17

10 Pcs 2-Mar-23 10

37 Pcs 2-Mar-23 37

2 Pcs 9-Mar-23 2

20 Pcs 2-Mar-23 20

12 Pcs 2-Mar-23 12
1 Pcs
4 Pcs
24 Pcs
2 Pcs
2 1 Pcs 2-Mar-23 1
6 1 Pcs 2-Mar-23 1
1 1 Pcs 9-Mar-23 1
1 Pcs
1 Pcs
3 Pcs

110 Pcs 4-Apr-23 110


5K 33 Pcs 4-Apr-23 33
5K 28 Pcs 4-Apr-23 28

PRESSURE/ LENGTH RECEIVED


QTY DATE REQUESTED REQUEST QTY
SCH (mm)
PRESSURE/ LENGTH
QTY DATE REQUESTED REQUEST QTY
SCH (mm) QTY UOM
SCH 80 60000 11 10 LGTH 21-Mar-23 10
SCH 40 30000 5 LGTH 8-May-23 5
SCH 80 60000 10 10 LGTH 21-Mar-23 10
SCH 80 30000 10 5 LGTH 21-Mar-23 5
SCH 40 30000 5 LGTH 12-May-23 5
SCH 80 6000 5 1 LGTH 29-Mar-23 1
SCH 80 0 1

PRESSURE/ LENGTH RECEIVED


SCH (mm)
QTY DATE REQUESTED REQUEST QTY
QTY UOM
3000# 20 Pcs 11-Mar-23 20
5K 25 Pcs 11-Mar-23 25
5K 30 Pcs 11-Mar-23 30
30 Pcs 11-Mar-23 30
5K
30 Pcs 27-Mar-23 30
5K 2 Pcs 30-Mar-23 2
20 Pcs 29-Mar-23 20
5K
4 Pcs 1-Apr-23 4
3000# 30 Pcs 21-Mar-23 30
3000# 10 Pcs 21-Mar-23 10
3000# 10 Pcs 21-Mar-23 10
3000# 4 Pcs 29-Mar-23 4
3000# 3 Pcs 22-Mar-23 3
3 Pcs 23-Mar-23 3
3000#
2 Pcs 1-Apr-23 2

PRESSURE/ LENGTH RECEIVED


QTY DATE REQUESTED REQUEST QTY
SCH (mm) QTY UOM
5 LGTH 24-Apr-23
SCH 80 10 LGTH 4-May-23
6 LGTH 8-May-23
5 LGTH 24-Apr-23
SCH 80
5 LGTH 4-May-23
SCH 80 3 LGTH 29-Apr-23
PRESSURE/ LENGTH RECEIVED
SCH (mm)
QTY DATE REQUESTED REQUEST QTY
QTY UOM

11 Pcs 13-Mar-23 11
10K 20 Pcs 24-Apr-23 20
20 Pcs 4-May-23 20
2 Pcs 13-Mar-23 2
10K 30 Pcs 24-Apr-23 30
20 Pcs 4-May-23 20
1 Pcs 13-Mar-23 1
10K
20 Pcs 29-Apr-23 20
5K 10 Pcs 4-May-23 10
10K 4 Pcs 4-May-23 4
5K 26 Pcs 4-May-23 26
5K 20 Pcs 4-May-23 20
200 Pcs 29-Apr-23 200
110 Pcs 4-May-23 110
84 Pcs 4-May-23 84
20 Pcs 24-Apr-23 20

PRESSURE/ LENGTH RECEIVED


QTY DATE REQUESTED REQUEST QTY
SCH (mm) QTY UOM
10 Bar 6000 1 LGTH 17-Mar-23 1
10 Bar 42000 7 LGTH 17-Mar-23 7

PRESSURE/ LENGTH RECEIVED


SCH (mm)
QTY DATE REQUESTED REQUEST QTY
QTY UOM
5K 2 2 Pcs 17-Mar-23 2
5K 1 1 Pcs 18-Mar-23 1
5K 3 3 Pcs 18-Mar-23 3
5K 41 41 Pcs 18-Mar-23 41
10K 6
17 17 Pcs 18-Mar-23 25
25 25 Pcs 17-Mar-23 25
1 1 Pcs 3-Apr-23 1
1 1 Pcs 17-Mar-23 1

1 1 Pcs 17-Mar-23 1
PRESSURE/ LENGTH RECEIVED
QTY DATE REQUESTED REQUEST QTY
SCH (mm) QTY UOM
SCH 80 2 LGTH 8-Apr-23 2

PRESSURE/ LENGTH RECEIVED


QTY DATE REQUESTED REQUEST QTY
SCH (mm) QTY UOM
12000 2 LGTH 26-Apr-23 2
12000 2 LGTH 26-Apr-23 2
6000 1 LGTH 26-Apr-23 1
6000 1 LGTH 26-Apr-23 1
60000 10 LGTH 26-Apr-23 10
12000 2 LGTH 26-Apr-23 2
6000 1 LGTH 26-Apr-23 1

PRESSURE/ LENGTH RECEIVED


QTY DATE REQUESTED REQUEST QTY
SCH (mm) QTY UOM
5K 13 Pcs 26-Apr-23 13
5K 18 Pcs 26-Apr-23 18
5K 2 Pcs 26-Apr-23 2
5K 90 Pcs 26-Apr-23 90
5K 30 Pcs 26-Apr-23 30
5K 3 Pcs 26-Apr-23 3
15 Pcs 26-Apr-23 15
4 Pcs 26-Apr-23 4
19 Pcs 26-Apr-23 19
9 Pcs 26-Apr-23 9
2 Pcs 26-Apr-23 2
1 Pcs 26-Apr-23 1

4 Pcs 26-Apr-23 4

1 Pcs 26-Apr-23 1

8 Pcs 26-Apr-23 8

6 Pcs 26-Apr-23 6

5 Pcs 26-Apr-23 5

6 Pcs 26-Apr-23 6

1 Pcs 26-Apr-23 1
8 Pcs 26-Apr-23 8

2 Pcs 26-Apr-23 2

1 Pcs 26-Apr-23 1

3 Pcs 26-Apr-23 3

4 Pcs 26-Apr-23 4

1 Pcs 26-Apr-23 1

2 Pcs 26-Apr-23 2

1 Pcs 26-Apr-23 1

PRESSURE/ LENGTH RECEIVED


QTY DATE REQUESTED REQUEST QTY
SCH (mm) QTY UOM
1 Pcs 5-May-23 1
SCH 80
7 Pcs 8-May-23 7
SCH 80 8 Pcs 5-May-23 8

PRESSURE/ LENGTH RECEIVED


QTY DATE REQUESTED REQUEST QTY
SCH (mm) QTY UOM
SCH 40 3 LGTH 5/16/2023 3
SCH 40 5 LGTH 5/16/2023 5
SCH 40 8 LGTH 5/16/2023 8
SCH 40 12 LGTH 5/16/2023 12
SCH 40 2 LGTH 5/16/2023 2
SCH 40 2 LGTH 5/16/2023 2
ITEM USE/SYSTEM

Air Vent System


Air Vent System
O/B SW Cooling
Air Vent System
SW Cooling
Air Vent System
Air Vent System

Air Vent, Sounding


Sonar System

ITEM USE/SYSTEM

Sounding
Air Vent System
Air Vent System

PURCHASE
REMARKS
ORDER

Transfer from VSE220072


Transfer from VSE220072
Transfer from VSE220072
Transfer from VSE220072

PURCHASE
REMARKS
ORDER

Transfer from VSE220072


Transfer from VSE220072
Transfer from VSE220072
Transfer from VSE220072
Transfer from VSE220072

Transfer from VSE220072


Transfer from VSE220072

Transfer from VSE220072

Transfer from VSE220072

Transfer from VSE220072

PURCHASE
REMARKS
ORDER

PURCHASE
REMARKS
ORDER

1
1
1
2
Transfer From VSE22073

1
4
24
2
1
5

1
1
3

Transfer From VSE22072

PURCHASE
REMARKS
ORDER
PURCHASE
REMARKS
ORDER

Transfer From VSE22072

5
Transfer From VSE22073
4

PURCHASE
REMARKS
ORDER

PURCHASE
REMARKS
ORDER

Transfer From VSE220072


Transfer From VSE220073
Transfer From VSE220072
Transfer From VSE220072
Transfer From VSE220072
Transfer From VSE220073
PURCHASE
REMARKS
ORDER

Transfer From VSE220072


Transfer From VSE220072
Transfer From VSE220072
Transfer From VSE220072
Transfer From VSE220072
Transfer From VSE220072
Transfer From VSE220072
Transfer From VSE220072
Transfer From VSE220072
Transfer From VSE220072
Transfer From VSE220072
Transfer From VSE220072
Transfer From VSE220072
Transfer From VSE220072
Transfer From VSE220072
Transfer From VSE220072

PURCHASE
REMARKS
ORDER

PURCHASE
REMARKS
ORDER
PURCHASE
REMARKS
ORDER

Transfer From VSE220072

PURCHASE
REMARKS
ORDER

PURCHASE
REMARKS
ORDER
PURCHASE
REMARKS
ORDER

Transfer from VSE220072

PURCHASE
REMARKS
ORDER

Transfer from H80067


Transfer from H80067
Transfer from H80067
Transfer from H80067
Transfer from H80067
Transfer from H80067
TANK VENT AND SOUNDING SYSTEM

TOTAL SPOOL LINE : 76

NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL

1 H80069 BMD P2 V01 1 1


2 H80069 BMD P2 V01 1 2
3 H80069 BMD P2 V01 1 3
4 H80069 BMD P2 V02 2 4
5 H80069 BMD P2 V02 2 5
6 H80069 BMD P2 V02 2 6
7 H80069 BMD P2 V03 3 7
8 H80069 BMD P2 V03 3 8
9 H80069 BMD P2 V03 3 9
10 H80069 BMD P2 V04 4 10
11 H80069 BMD P2 V04 4 11
12 H80069 BMD P2 V04 4 12
13 H80069 BMD P2 V05 5 13
14 H80069 BMD P2 V05 5 14
15 H80069 BMD P2 V05 5 15
16 H80069 BMD P2 V06 6 16
17 H80069 BMD P2 V06 7 17
18 H80069 BMD P2 V07 8 18
19 H80069 BMD P2 V07 9 19
20 H80069 BMD P2 V08 10 20
21 H80069 BMD P2 V09 11 21
22 H80069 BMD P2 V09 11 22
23 H80069 BMD P2 V09 11 23
24 H80069 BMD P2 V10 12 24
25 H80069 BMD P2 V10 12 25
26 H80069 BMD P2 V10 12 26
27 H80069 BMD P2 V11 13 27
28 H80069 BMD P2 V11 13 28
29 H80069 BMD P2 V11 13 29
30 H80069 BMD P2 V12 14 30
31 H80069 BMD P2 V12 15 31
32 H80069 BMD P2 V12 15 32
33 H80069 BMD P2 V17 16 33
34 H80069 BMD P2 V17 16 34
35 H80069 BMD P2 V18 17 35
36 H80069 BMD P2 V18 17 36
37 H80069 BMD P2 S01 18 37
38 H80069 BMD P2 S01 18 38
39 H80069 BMD P2 S02 19 39
40 H80069 BMD P2 S02 19 40
41 H80069 BMD P2 S02 19 41

42 H80069 BMD P2 S03 20 42

43 H80069 BMD P2 S03 20 43

44 H80069 BMD P2 S03 20 44

45 H80069 BMD P2 S04 21 45

46 H80069 BMD P2 S04 21 46

47 H80069 BMD P2 S04 21 47


48 H80069 BMD P2 S05 22 48
49 H80069 BMD P2 S09 23 49
50 H80069 BMD P2 S10 24 50
51 H80069 BMD P2 S11 25 51
52 H80069 BMD P2 S13 26 52
53 H80069 BMD P2 S14 27 53
54 H80069 BMD P2 S15 28 54
55 H80069 BMD P2 S16 29 55
56 H80069 AMD P2 V01 1 1
57 H80069 AMD P2 V02 2 2
58 H80069 AMD P2 V03 3 3
59 H80069 AMD P2 V04 4 4
60 H80069 AMD P2 V05 5 5
61 H80069 AMD P2 V06 6 6
62 H80069 AMD P2 V07 7 7
63 H80069 AMD P2 V08 8 8
64 H80069 AMD P2 V09 9 9
65 H80069 AMD P2 V10 10 10
66 H80069 AMD P2 V11 11 11
67 H80069 AMD P2 V12 12 12
68 H80069 AMD P2 V13 13 13
69 H80069 AMD P2 V13 13 14
70 H80069 AMD P2 V14 14 15
71 H80069 AMD P2 V14 14 16
72 H80069 AMD P2 V17 15 17
73 H80069 AMD P2 V18 16 18
74 H80069 AMD P2 S02 17 19
75 H80069 AMD P2 S03 18 20
76 H80069 AMD P2 S04 19 21
SPOOL CALCULATE ON SITE

76 76 76 74 74 74

FABRICATION INSTALLATION

WEIGHT (Kg) Fit Up Welding Inspect. Fit Up Welding Testing

20% 25% 5% 14% 16% 5%


8.9 100% 100% 100% 100% 100% 100%
51 100% 100% 100% 100% 100% 100%
5.5 100% 100% 100% 100% 100% 100%
5.2 100% 100% 100% 100% 100% 100%
38.5 100% 100% 100% 100% 100% 100%
3.1 100% 100% 100% 100% 100% 100%
5.2 100% 100% 50% 100% 100% 100%
38.5 100% 100% 100% 100% 100% 100%
3.1 100% 100% 50% 100% 100% 100%
9.2 100% 100% 100% 100% 100% 100%
56.2 100% 100% 100% 100% 100% 100%
5.5 100% 100% 100% 100% 100% 100%
7.7 100% 100% 100% 100% 100% 100%
41.1 100% 100% 100% 100% 100% 100%
4.6 100% 100% 100% 100% 100% 100%

2.6 100% 100% 100% 100% 100% 100%

4.3 100% 100% 100% 100% 100% 100%

2.6 100% 100% 100% 100% 100% 100%

4.3 100% 100% 100% 100% 100% 100%

4.3 100% 100% 100% 100% 100% 100%

6.4 100% 100% 100% 100% 100% 100%


30 100% 100% 100% 100% 100% 100%
3 100% 100% 100% 100% 100% 100%
5.2 100% 100% 100% 100% 100% 100%
28.8 100% 100% 100% 100% 100% 100%
2.7 100% 100% 100% 100% 100% 100%
8.6 100% 100% 100% 100% 100% 100%
51.9 100% 100% 100% 100% 100% 100%
5.5 100% 100% 100% 100% 100% 100%
6.3 100% 100% 100% 100% 100% 100%
27.7 100% 100% 100% 100% 100% 100%
2.9 100% 100% 100% 100% 100% 100%
5.2 100% 100% 100% 100% 100% 100%
27.4 100% 100% 100% 100% 100% 100%
5.2 100% 100% 100% 100% 100% 100%
27.7 100% 100% 100% 100% 100% 100%
2.2 100% 100% 100%
8.6 100% 100% 100%
2.7 100% 100% 100% 100% 100% 100%
14.2 100% 100% 100% 100% 100% 100%
6.9 100% 100% 100% 100% 100% 100%

2.7 100% 100% 100% 100% 100% 100%

14.2 100% 100% 100% 100% 100% 100%

6.9 100% 100% 100% 100% 100% 100%

2.7 100% 100% 100% 100% 100% 100%

14.1 100% 100% 100% 100% 100% 100%

6.2 100% 100% 100% 100% 100% 100%

6.7 100% 100% 100% 100% 100% 100%

8.3 100% 100% 100% 100% 100% 100%

9 100% 100% 100% 100% 100% 100%

8.9 100% 100% 100% 100% 100% 100%

15.3 100% 100% 100% 100% 100% 100%

15.3 100% 100% 100% 100% 100% 100%

29.6 100% 100% 100% 100% 100% 100%

29.6 100% 100% 100% 100% 100% 100%

8.3 100% 100% 100% 100% 100% 100%

5.3 100% 100% 100% 100% 100% 100%

5.3 100% 100% 100% 100% 100% 100%

15.2 100% 100% 100% 100% 100% 100%

12.4 100% 100% 100% 100% 100% 100%

8 100% 100% 100% 100% 100% 100%

8 100% 100% 100% 100% 100% 100%

7.9 100% 100% 100% 100% 100% 100%

8.9 100% 100% 100% 100% 100% 100%

9.1 100% 100% 100% 100% 100% 100%

12.4 100% 100% 100% 100% 100% 100%

9.1 100% 100% 100% 100% 100% 100%

15 100% 100% 100% 100% 100% 100%

5.6 100% 100% 100% 100% 100% 100%

15 100% 100% 100% 100% 100% 100%

5.6 100% 100% 100% 100% 100% 100%

11.9 100% 100% 100% 100% 100% 100%

11.9 100% 100% 100% 100% 100% 100%

2.3 100% 100% 100% 100% 100% 100%


2.3 100% 100% 100% 100% 100% 100%

2.5 100% 100% 100% 100% 100% 100%


Progress Overall'!A1

932
74 0

FINAL INSPECTION
REMARK
Hydrotest Finishing PERCENTAGE (%)

12% 3% Fit up Welding


100% 97% Penetration
100% 97% 21-Feb-23 27-Feb-23
100% 97% Penetration
100% 97% 1-Mar-23 6-Mar-23
100% 97% 28-Feb-23 6-Mar-23
100% 97% 1-Mar-23 6-Mar-23
100% 95% 1-Mar-23 4-Mar-23
100% 97% 28-Feb-23 6-Mar-23
100% 95% 1-Mar-23 4-Mar-23
100% 97% Penetration
100% 97% 22-Feb-23 27-Feb-23
100% 97% Penetration
100% 97% Penetration
100% 97% 22-Feb-23 27-Feb-23
100% 97% Penetration
100% 97% 24-Feb-23 2-Mar-23
100% 97% 24-Feb-23 2-Mar-23
100% 97% 24-Feb-23 4-Mar-23
100% 97% 24-Feb-23 2-Mar-23
100% 97% 24-Feb-23 2-Mar-23
100% 97% 23-Feb-23 2-Mar-23
100% 97% 22-Feb-23 2-Mar-23
100% 97% Penetration
100% 97% Penetration
100% 97% 23-Feb-23 2-Mar-23
100% 97% 23-Feb-23 4-Mar-23
100% 97% Penetration
100% 97% 23-Feb-23 2-Mar-23
100% 97% Penetration
100% 97% Penetration
100% 97% 23-Feb-23 4-Mar-23
100% 97% Penetration
100% 97% Penetration
100% 97% 23-Feb-23 2-Mar-23
100% 97% Penetration
100% 97% 23-Feb-23 2-Mar-23
50% 23-Feb-23 6-Mar-23
50% 24-Feb-23 4-Mar-23
100% 97% 1-Mar-23 6-Mar-23
100% 97% 28-Feb-23 4-Mar-23
100% 97% 28-Feb-23 4-Mar-23

100% 97% 1-Mar-23 6-Mar-23

100% 97% 28-Feb-23 4-Mar-23

100% 97% 28-Feb-23 6-Mar-23

100% 97% Penetration

100% 97% 23-Feb-23 2-Mar-23

100% 97% 23-Feb-23 2-Mar-23


100% 97% Sounding Tap
100% 97% Sounding Tap
100% 97% 24-Feb-23 6-Mar-23
100% 97% Sounding Tap
100% 97% 24-Feb-23 2-Mar-23
100% 97% 24-Feb-23 2-Mar-23
100% 97% Sounding Tap
100% 97% Sounding Tap
100% 97% 21-Feb-23 27-Feb-23
100% 97% 21-Feb-23 27-Feb-23
100% 97% 21-Feb-23 27-Feb-23
100% 97% 21-Feb-23 27-Feb-23
100% 97% 21-Feb-23 27-Feb-23
100% 97% 22-Feb-23 27-Feb-23
100% 97% 22-Feb-23 27-Feb-23
100% 97% 22-Feb-23 27-Feb-23
100% 97% 22-Feb-23 27-Feb-23
100% 97% 22-Feb-23 27-Feb-23
100% 97% 21-Feb-23 27-Feb-23
100% 97% 22-Feb-23 27-Feb-23
100% 97% 21-Feb-23 27-Feb-23
100% 97% Penetration
100% 97% 21-Feb-23 27-Feb-23
100% 97% Penetration
100% 97% 21-Feb-23 27-Feb-23
100% 97% 21-Feb-23 27-Feb-23
100% 97% 28-Feb-23 4-Mar-23
100% 97% 28-Feb-23 4-Mar-23
100% 97% 22-Feb-23 27-Feb-23
TANK VENT AND SOUNDING SYS
FABRICATION INSTALLATION

Fit Up Welding Inspect. Fit Up Welding

100% 100% 100% 97% 97%

PLANNING

FABRICATION INSTALLATION

START
FINISH
DAYS 0 0
ACTUAL

FABRICATION INSTALLATION

START
FINISH
DAYS 0 0
VARIATION/DELAY

FABRICATION INSTALLATION

START 0 0
FINISH 0 0

WEIGHT CALCULATED
Date Weigth (Kg)
10-Mar-23 33.5
10-Mar-23 59
10-Mar-23 58
12-Mar-23 74
14-Mar-23 46.5 Support Air Vent
16-Mar-23 76
17-Mar-23 5.5
17-Mar-23 10.5
18-Mar-23 73.5
29-Mar-23 32
31-Mar-23 41.5
4-May-23 744
AND SOUNDING SYSTEM PROGRESS (%)
STALLATION FINAL INSPECTION
TOTAL TONNAGE TOTAL PROGRESS
Testing Hydrotest Finishing

97% 97% 0% 296.768421052632 32%

STALLATION FINAL INSPECTION

STALLATION FINAL INSPECTION

0
ELAY

STALLATION FINAL INSPECTION

0
0
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month FEBRUARY (2023)
Week Week 8
Day/Date 19 20 21 22

Fabrication
SPV
Foreman/Asst. 1 1
Fitter 3 3
M
P A
Helper 3 3

N Welder/Grinder 3 3
L P Installation and Testing
A O SPV
N W Foreman/Asst.
E Fitter
N R
Helper
I Welder/Grinder
N Total Manpower
0 0 10 10
G 50
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7
M
A Man Hours (Basic) Saturday (5 Hours)
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14
R 0 0 0 70
S Total Man Hours
280

Month FEBRUARY (2023)


Week Week 8
Day/Date 19 20 21 22
Fabrication
SPV
Foreman/Asst. 1 2
Fitter 8 9
M
Helper
A
N Welder/Grinder 2 4
P Installation and Testing
O SPV
A W Foreman/Asst.
E
C R
T
U
N
P
O
A W
E
C R
Fitter
T Helper
Welder/Grinder
U 0 0 11 15
A Total Manpower
66
L Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7

M Man Hours (Basic) Saturday (5 Hours)


A
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5
H
O Man Hours (OT) Saturday (13.00 - 15.00)
U
R
Man Hours (OT) Sunday (07.00 - 15.00) 14
S
0 0 0 105
Total Man Hours
388.5

Month FEBRUARY (2023)


Week Week 8
Day/Date 19 20 21 22

Fabrication
A
Fit up 12 13
C
Welding
T S Inspection (Fit up)
U P Inspection (Visual/Welding)
A O
O Installation and Testing
L L Fit up
Welding
Inspection (Fit up)
Inspection (Welding)
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
FEBRUARY (2023) MARCH (2023)
Week 8 Week 9 Week 10 Week 11
23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3

1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
10 10 10 10 17 17 17 17 7 7 7 7 7 7 0 0 0 0 0 0 0 0 0 0
50 92 28 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5 3.5
14 14 14
105 105 0 0 179 0 119 179 73.5 0 0 73.5 73.5 73.5 0 0 0 0 0 0 0 0 0 0
280 549.5 220.5 0

DAILY MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)


FEBRUARY (2023) MARCH (2023)
Week 8 Week 9 Week 10 Week 11
23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

2 2 2 1 1
9 7 7 3 2

3 4 4 4
14 13 13 0 4 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
66 11 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7

5 5 5 5

3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5

3.5 3.5 3.5 3.5

14 14 14

147 137 0 0 42 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
388.5 42 0 0

FEBRUARY (2023) MARCH (2023)


Week 8 Week 9 Week 10 Week 11
23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

10 9 2 8
12 16 4 8 10 4
12 13 10 9 8
20 14 11

14 5 5 2 6
2
16 3 7
G (H80069-PR-00)
CH (2023) A
Week 12 Week 13 Week 14 Week 15
19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

L (H80069-PR-00)
CH (2023) A
Week 12 Week 13 Week 14 Week 15
19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7

5 5 5

3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5

3.5 3.5 3.5

14 14 14 14

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

DAILY WORKING SPOOL ACTUAL (H8


H (2023) AP
Week 12 Week 13 Week 14 Week 15
19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11

1 2 2 3 1 2 1 2 2 1
6
19
DAILY WORK MANPOWER AND MAN HOURS ACTUAL (H80
APRIL (2023)
Week 15 Week 16 Week 17 Week 18
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 14 0 0 0 0 0 0 0 0 0 0 0 0
0 0 14 0

DAILY WORK MANPOWER AND MAN HOURS ACTUAL (H80


APRIL (2023)
Week 15 Week 16 Week 17 Week 18
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7

5 5 5

3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5

3.5 3.5 3.5

14 14 14

0 0 0 0 0 0 0 0 0 0 0 14 0 0 0 0 0 0 0 0 0 0 0 0
0 0 14 0

POOL ACTUAL (H80069-PR-00)


APRIL (2023)
Week 15 Week 16 Week 17 Week 18
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5

12 8
OURS ACTUAL (H80069-PR-00)
MAY (2023)
ek 18 Week 19 Week 20 Week 21 Week 22
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5 3.5
14 14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0

OURS ACTUAL (H80069-PR-00)


MAY (2023)
ek 18 Week 19 Week 20 Week 21 Week 22
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7

5 5 5 5

3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5

3.5 3.5 3.5 3.5

14 14 14 14

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0

MAY (2023)
ek 18 Week 19 Week 20 Week 21 Week 22
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

2
Week 22
30 31

0 0
0
7 7

3.5 3.5

0 0
0

Week 22
30 31
0 0
0
7 7

3.5 3.5

0 0
0

Week 22 Total Spool


30 31

76
76
76
76

74
74
74
74
BILGE AND BALLAST SYSTEM

TOTAL SPOOL LINE : 132

NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL

1 H80069 BMD P3 001 1 1


2 H80069 BMD P3 001 1 2
3 H80069 BMD P3 001 1 3
4 H80069 BMD P3 001 2 4
5 H80069 BMD P3 001 3 5
6 H80069 BMD P3 001 3 6
7 H80069 BMD P3 001 3 7
8 H80069 BMD P3 002 4 8
9 H80069 BMD P3 003 5 9
10 H80069 BMD P3 004 6 10
11 H80069 BMD P3 005 7 11
12 H80069 BMD P3 006 8 12
13 H80069 BMD P3 007 9 13
14 H80069 BMD P3 008 10 14
15 H80069 BMD P3 008 10 15
16 H80069 BMD P3 008 10 16

17 H80069 BMD P3 008 11 17

18 H80069 BMD P3 008 11 18

19 H80069 BMD P3 008 11 19


20 H80069 BMD P3 009 12 20
21 H80069 BMD P3 009 12 21
22 H80069 BMD P3 009 13 22
23 H80069 BMD P3 009 13 23
24 H80069 BMD P3 009 13 24
25 H80069 BMD P3 010 14 25
26 H80069 BMD P3 011 15 26
27 H80069 BMD P3 012 16 27
28 H80069 BMD P3 012 16 28
29 H80069 BMD P3 012 17 29
30 H80069 BMD P3 012 17 30
31 H80069 BMD P3 012 17 31
32 H80069 BMD P3 012 18 32
33 H80069 BMD P3 012 18 33
34 H80069 BMD P3 012 18 34
35 H80069 BMD P3 012 18 35
36 H80069 BMD P3 012 19 36
37 H80069 BMD P3 012 19 37
38 H80069 BMD P3 012 19 38
39 H80069 BMD P3 012 19 39
40 H80069 BMD P3 013 20 40
41 H80069 BMD P3 013 20 41
42 H80069 BMD P3 013 20 42
43 H80069 BMD P3 013 21 43
44 H80069 BMD P3 013 21 44
45 H80069 BMD P3 013 21 45
46 H80069 BMD P3 013 21 46
47 H80069 BMD P3 013 21 47
48 H80069 BMD P3 013 22 48
49 H80069 BMD P3 013 22 49
50 H80069 BMD P3 013 22 50
51 H80069 BMD P3 013 22 51
52 H80069 BMD P3 014 23 52
53 H80069 BMD P3 014 23 53
54 H80069 BMD P3 014 23 54
55 H80069 BMD P3 014 23 55
56 H80069 BMD P3 015 24 56
57 H80069 BMD P3 015 24 57
58 H80069 BMD P3 016 25 58
59 H80069 BMD P3 016 25 59
60 H80069 BMD P3 017 26 60
61 H80069 BMD P3 017 26 61
62 H80069 BMD P3 017 26 62
63 H80069 BMD P3 017 27 63
64 H80069 BMD P3 017 27 64
65 H80069 BMD P3 017 27 65
66 H80069 BMD P3 017 27 66
67 H80069 BMD P3 017 28 67
68 H80069 BMD P3 017 28 68
69 H80069 BMD P3 018 29 69
70 H80069 BMD P3 019 30 70
71 H80069 BMD P3 019 30 71
72 H80069 BMD P3 019 30 72
73 H80069 BMD P3 019 30 73
74 H80069 BMD P3 020 31 74
75 H80069 BMD P3 020 31 75
76 H80069 BMD P3 020 32 76
77 H80069 BMD P3 020 32 77
78 H80069 BMD P3 020 32 78
79 H80069 BMD P3 012 17 79
80 H80069 BMD P3 021 33 80
81 H80069 BMD P3 021 33 81
82 H80069 BMD P3 021 33 82
83 H80069 BMD P3 021 34 83
84 H80069 BMD P3 021 34 84
85 H80069 BMD P3 021 34 85
86 H80069 BMD P3 021 34 86
87 H80069 BMD P3 021 35 87
88 H80069 BMD P3 021 35 88
89 H80069 BMD P3 021 35 89
90 H80069 BMD P3 022 36 90
91 H80069 BMD P3 022 36 91
92 H80069 BMD P3 022 36 92
93 H80069 BMD P3 022 36 93
94 H80069 BMD P3 023 37 94
95 H80069 BMD P3 023 37 95
96 H80069 BMD P3 023 37 96
97 H80069 BMD P3 023 38 97
98 H80069 BMD P3 023 38 98
99 H80069 BMD P3 023 38 99
100 H80069 BMD P3 024 39 100
101 H80069 BMD P3 024 39 101
102 H80069 BMD P3 024 39 102
103 H80069 BMD P3 024 39 103
104 H80069 BMD P3 025 40 104
105 H80069 BMD P3 026 41 105
106 H80069 BMD P3 026 41 106
107 H80069 BMD P3 027 42 107
108 H80069 BMD P3 027 42 108
109 H80069 BMD P3 027 42 109
110 H80069 BMD P3 028 43 110
111 H80069 BMD P3 028 43 111
112 H80069 BMD P3 028 43 112
113 H80069 BMD P3 028 43 113
114 H80069 BMD P3 028 43 114
115 H80069 BMD P3 029 44 115
116 H80069 BMD P3 029 44 116
117 H80069 BMD P3 029 44 117
118 H80069 BMD P3 030 45 118
119 H80069 BMD P3 030 45 119
120 H80069 BMD P3 030 45 120
121 H80069 BMD P3 030 45 121
122 H80069 BMD P3 031 46 122
123 H80069 BMD P3 031 46 123
124 H80069 BMD P3 031 47 124
125 H80069 BMD P3 031 47 125
126 H80069 BMD P3 032 48 126
127 H80069 BMD P3 032 48 127
128 H80069 BMD P3 032 48 128
129 H80069 BMD P3 032 48 129
130 H80069 BMD P3 033 49 130
131 H80069 BMD P3 034 50 131
132 H80069 BMD P3 035 51 132
133 H80069 BMD P3 035 52 -
134 H80069 BMD P3 035 53 -
135 H80069 BMD P3 035 54 -
136 H80069 BMD P3 035 55 -
137 H80069 BMD P3 035 56 -
SPOOL CALCULATE ON SITE

126 110 110 109 109 0

FABRICATION INSTALLATION

WEIGHT (Kg) Fit Up Welding Inspect. Fit Up Welding Testing

20% 25% 5% 14% 16% 5%


35.6 100% 100% 100% 100% 100%
26.4 100%
20.1 100%
64.8 100%
20.1 100%
26.4 100%
35.6 100% 100% 100% 100% 100%
25.6 100% 100% 100% 100% 100%
20.4 100% 100% 100% 100% 100%
5.3 100% 100% 100% 100% 100%

29.8 100% 100% 100% 100% 100%

11.4
11.4
18.1 100%

6.5 100%

11.3 100%

12.4 100% 100% 100% 100% 100%

13.8 100% 100% 100% 100% 100%

4.7 100% 100% 100% 100% 100%

26.8 100%

12.2 100%
12.5 100% 100% 100% 100% 100%
12.6 100% 100% 100% 100% 100%
4.7 100% 100% 100% 100% 100%
16.1 100%
15.5 100%
4.9 100% 100% 100% 100% 100%
9.9 100% 100% 100% 100% 100%
3.2 100% 100% 100% 100% 100%
5.6 100% 100% 100% 100% 100%
7.4 100% 100% 100% 100% 100%
8.6 100% 100% 100% 100% 100%
9.6 100% 100% 100% 100% 100%
7.8 100% 100% 100% 100% 100%
3.2 100% 100% 100% 100% 100%
7.4 100% 100% 100% 100% 100%
8.3 100% 100% 100% 100% 100%
3.8 100% 100% 100% 100% 100%
3.7 100% 100% 100% 100% 100%
4.9 100% 100% 100% 100% 100%
9.9 100% 100% 100% 100% 100%
3.5 100% 100% 100% 100% 100%

4.9 100% 100% 100% 100% 100%

6.1 100% 100% 100% 100% 100%

3.5 100% 100% 100% 100% 100%

9.3 100% 100% 100% 100% 100%

9.7 100% 100% 100% 100% 100%

7.7 100% 100% 100% 100% 100%


3.5 100% 100% 100% 100% 100%
9.2 100% 100% 100% 100% 100%
3.9 100%
6 100% 100% 100% 100% 100%
9.9 100% 100% 100% 100% 100%
3.5 100% 100% 100% 100% 100%
2.1 100% 100% 100% 100% 100%
9.1 100% 100% 100% 100% 100%
2.1 100% 100% 100% 100% 100%
7.6 100% 100% 100%
7.5 100% 100% 100% 100% 100%
10.9 100% 100% 100% 100% 100%
12 100% 100% 100% 100% 100%
13 100% 100% 100% 100% 100%
11.1 100% 100% 100% 100% 100%
9 100% 100% 100% 100% 100%
18.3 100% 100% 100% 100% 100%
2.7 100% 100% 100% 100% 100%
14.8 100% 100% 100% 100% 100%
5.2 100% 100% 100% 100% 100%
3.9 100% 100% 100% 100% 100%
4.1 100% 100% 100% 100% 100%
6.9 100% 100% 100% 100% 100%
7.7
6.4 100% 100% 100% 100% 100%
5.5 100% 100% 100% 100% 100%
7.6 100% 100% 100% 100% 100%
3.8 100% 100% 100% 100% 100%
2.7 100% 100% 100% 100% 100%
2.2 100% 100% 100% 100% 100%
3.5 100% 100% 100% 100% 100%
6.3 100% 100% 100% 100% 100%
9.9 100% 100% 100% 100% 100%
3.5 100% 100% 100% 100% 100%
5.5 100% 100% 100% 100% 100%
3.2 100% 100% 100% 100% 100%
10.8 100% 100% 100% 100% 100%
13 100% 100% 100% 100% 100%
8.6 100% 100% 100% 100% 100%
3.8 100% 100% 100% 100% 100%
8.7 100% 100% 100% 100% 100%
4.6 100% 100% 100% 100% 100%
3.4 100% 100% 100% 100% 100%
5 100% 100% 100% 100% 100%
5.2
2.2 100% 100% 100% 100% 100%
3.8 100% 100% 100% 100% 100%
5.3 100%
4.8
3.5 100% 100% 100% 100% 100%
4.5
13 100% 100% 100% 100% 100%
2.6 100% 100% 100% 100% 100%
7.6 100% 100% 100% 100% 100%
8.1
13.6 100% 100% 100% 100% 100%
12.3
5.1
4.2 100%
4.8 100% 100% 100% 100% 100%
4 100% 100% 100% 100% 100%
4 100%
8.1 100% 100% 100% 100% 100%
2.7 100% 100% 100% 100% 100%
3.3 100% 100% 100% 100% 100%
2.7 100% 100% 100% 100% 100%
3.1 100% 100% 100% 100% 100%
4.2
2.1 100% 100% 100% 100% 100%
1.9 100% 100% 100% 100% 100%
4.7 100% 100% 100% 100% 100%
4.4
2.1 100% 100% 100% 100% 100%
3.4 100% 100% 100% 100% 100%
7.4 100% 100% 100% 100% 100%
5.6 100% 100% 100% 100% 100%
5.6 100% 100% 100% 100% 100%
4.8 100% 100% 100% 100% 100%
5.9 100% 100% 100% 100% 100%
3.1 100% 100% 100% 100% 100%
4 100% 100% 100% 100% 100%
11.7 100% 100% 100% 100% 100%
8.1 100% 100% 100% 100% 100%
8.5 100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
Progress Overall'!A1

1161
109 0

FINAL INSPECTION
FABRICATION
Hydrotest Finishing PERCENTAGE (%) REMARK

12% 3% Fit up Welding


50% 86%
20% 26-Jun-23
20% 26-Jun-23
20% 26-Jun-23
20% 26-Jun-23
20% 26-Jun-23
50% 86%
50% 86%
50% 86%
50% 86%
50% 86% Manifold 6-Mar-23 5-Apr-23
0%
0%
20% 24-Jun-23
20% 24-Jun-23
20% 24-Jun-23

50% 86% 4-Mar-23 9-Mar-23

50% 86% 7-Mar-23 24-Mar-23

50% 86% Penetration Overboard


20% 24-Jun-23
20% 24-Jun-23
50% 86% 4-Mar-23 9-Mar-23
50% 86% 7-Mar-23 9-Mar-23
50% 86% Penetration Overboard
20% 24-Jun-23
20% 24-Jun-23
50% 86%
50% 86% 4-Mar-23 7-Apr-23
50% 86% 7-Apr-23
50% 86% 4-Mar-23 30-Mar-23
50% 86% 4-Mar-23 9-Mar-23
50% 86% 4-Mar-23
50% 86% 6-Mar-23 record
50% 86% 6-Mar-23 record
50% 86% Penetration
50% 86% 4-Mar-23 7-Apr-23
50% 86% 4-Mar-23 24-Mar-23
50% 86% 7-Apr-23
50% 86% 7-Mar-23
50% 86% 8-Mar-23 31-Mar-23
50% 86% 4-Mar-23 7-Apr-23
50% 86% 7-Apr-23
50% 86% 4-Mar-23 31-Mar-23
50% 86% 6-Mar-23 10-Mar-23
50% 86% 7-Apr-23
50% 86% 4-Mar-23 7-Mar-23
50% 86% 6-Mar-23 7-Mar-23
50% 86% 10-Mar-23 record
50% 86% Penetration
50% 86% 4-Mar-23 record
20%
50% 86% 8-Mar-23 24-Mar-23
50% 86% 4-Mar-23 7-Mar-23
50% 86% Penetration
50% 86% 7-Mar-23 5-Apr-23
50% 86% 8-Mar-23 30-Mar-23
50% 86% 4-Mar-23 5-Apr-23
50% 7-Mar-23
50% 86% 4-Mar-23 24-Mar-23
50% 86% 9-Mar-23 24-Mar-23
50% 86% 4-Mar-23 7-Mar-23
50% 86% 4-Mar-23 record
50% 86% 4-Mar-23 7-Mar-23
50% 86% 4-Mar-23 8-Mar-23
50% 86% Throught F.O Tank 19-Jun-23 6-Jul-23
50% 86% Throught F.O Tank 19-Jun-23 6-Jul-23
50% 86% 7-Mar-23 16-Mar-23
50% 86% 4-Mar-23 7-Mar-23
50% 86% 4-Mar-23 7-Mar-23
50% 86% Penetration Overboard
50% 86% 6-Mar-23 30-Mar-23
0%
50% 86% 4-Mar-23 7-Mar-23
50% 86% 9-Mar-23 31-Mar-23
50% 86% 7-Mar-23 31-Mar-23
50% 86% 6-Mar-23 31-Mar-23
50% 86% Penetration
50% 86% 6-Mar-23 5-Apr-23
50% 86% 7-Apr-23
50% 86% 7-Mar-23 30-Mar-23
50% 86% 6-Mar-23 30-Mar-23
50% 86% Penetration
50% 86% 30-Mar-23
50% 86% Penetration
50% 86% 6-Mar-23 30-Mar-23
50% 86% 6-Mar-23 24-Mar-23
50% 86% 7-Mar-23 24-Mar-23
50% 86% Penetration
50% 86% 6-Mar-23 30-Mar-23
50% 86% 6-Mar-23 31-Mar-23
50% 86% 7-Mar-23 5-Apr-23
50% 86%
0% Penetration Suction Tank B.H
50% 86% Penetration
50% 86% 7-Mar-23 31-Mar-23
20% 8-Jul-23
0% 26-Jun-23
50% 86% 6-Mar-23
0% Spool Last Connection Pump
50% 86% 7-Mar-23
50% 86% 6-Mar-23 5-Apr-23
50% 86% 7-Mar-23
0% Penetration Suction Tank B.H
50% 86% 6-Mar-23 24-Mar-23
0% On Hold (Ref. O/B Bilge Well)
0% On Hold (Ref. O/B Bilge Well)
20% 5-Jul-23
50% 86% 7-Mar-23 5-Apr-23
50% 86% Penetration Overboard
20% 5-Jul-23
50% 86% 6-Mar-23 24-Mar-23
50% 86% Penetration
50% 86% 7-Mar-23 5-Apr-23
50% 86% Penetration
50% 86% 6-Mar-23 5-Apr-23
0% 26-Jun-23
50% 86% Penetration
50% 86% 6-Mar-23 5-Apr-23
50% 86% 5-Apr-23
0% 26-Jun-23
50% 86% Penetration
50% 86% 6-Mar-23 5-Apr-23
50% 86% 6-Mar-23 8-Mar-23
50% 86% 6-Mar-23 30-Mar-23
50% 86% 5-Apr-23
50% 86% 6-Mar-23 24-Mar-23
50% 86% 6-Mar-23 30-Mar-23
50% 86% 6-Mar-23 5-Apr-23
50% 86% 6-Mar-23 24-Mar-23
50% 86% 7-Mar-23 30-Mar-23
50% 86% 6-Mar-23 30-Mar-23
50% 86% 6-Mar-23 30-Mar-23
50% 86% Overboard Penetration
50% 86% Overboard Penetration
50% 86% Overboard Penetration
50% 86% Overboard Penetration
50% 86% Overboard Penetration
INSTALLATION

Fit up Welding

START
FINISH
DAYS

START
FINISH
DAYS

15-Apr-23 START

15-Apr-23 FINISH

15-Apr-23
15-Apr-23

15-Apr-23
15-Apr-23
15-Apr-23
15-Apr-23
15-Apr-23

15-Apr-23
15-Apr-23

15-Apr-23
15-Apr-23

15-Apr-23

15-Apr-23
15-Apr-23
15-Apr-23

15-Apr-23
15-Apr-23

15-Apr-23
15-Apr-23

15-Apr-23
15-Apr-23
BILGE AND BALLAST SYSTEM PROGRESS (%)
FABRICATION INSTALLATION

Fit Up Welding Inspect. Fit Up Welding Testing

95% 83% 83% 83% 83% 0%

PLANNING

FABRICATION INSTALLATION

0 0
ACTUAL

FABRICATION INSTALLATION

0 0
VARIATION/DELAY

FABRICATION INSTALLATION

0 0

0 0

WEIGHT CALCULATED
Date Weigth (Kg)
11-Mar-23 58
25-Mar-23 155.5
26-Mar-23 37.5
11-Mar-23 58
11-Mar-23 58
11-Mar-23 58
11-Apr-23 48
28-Apr-23 138.5
YSTEM PROGRESS (%) DAILY MANPOWER AND MA
FINAL INSPECTION
TOTAL TONNAGE TOTAL PROGRESS
Hydrotest Finishing

83% 0% 585.381477272728 50%

FINAL INSPECTION

P
L
A
FINAL INSPECTION N
N
I
N
G
FINAL INSPECTION

DAILY MANPOWER AND

A
C
T
U
A
A
C
T
U
A
L

A
C
T
U
A
L
ILY MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00) DAILY WORK
Month
Week Week 22 Week 23
Day/Date 1 2 3 4 5 6 7 8

Fabrication
SPV
Foreman/Asst.
Fitter
M Helper
A
Welder/Grinder
N
P Installation and Testing
O SPV
W Foreman/Asst.
E Fitter
R
Helper
Welder/Grinder
0 0 0 0 0 0 0 0
Total Manpower
0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7
M Man Hours (Basic) Saturday (5 Hours) 5
A
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00) 3.5
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14
R
0 0 0 0 0 0 0 0
S Total Man Hours
0 0
3455

DAILY MANPOWER AND MAN HOURS ACTUAL (H80069- DAILY WORK


Month
Week Week 22 Week 23
Day/Date 1 2 3 4 5 6 7 8
Fabrication
SPV
Foreman/Asst.
Fitter
M
Helper
A
N Welder/Grinder
P Installation and Testing
O SPV
W
E
R
A
N
P
O
W Foreman/Asst.
E Fitter
R
Helper
Welder/Grinder
0 0 0 0 0 0 0 0
Total Manpower
0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7
M
A Man Hours (Basic) Saturday (5 Hours) 5
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00) 3.5
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14
R 0 0 0 0 0 0 0 0
S Total Man Hours
0 0

Month
Week Week 22 Week 23
Day/Date 1 2 3 4 5 6 7 8
Fabrication
Fit up
Welding
S Inspection (Fit up)
P Inspection (Visual/Welding)
O
Installation and Testing
O
L Fit up
Welding
Inspection (Fit up)
Testing (Line Check)
DAILY WORK MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)
JUNE (2023)
Week 23 Week 24 Week 25 Week 26
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5

3.5 3.5 3.5

14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

DAILY WORK MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)


JUNE (2023)
Week 23 Week 24 Week 25 Week 26
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

DAILY WORK
JUNE (2023)
Week 23 Week 24 Week 25 Week 26
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

3 2 7
3 2
3 2 7
5
Week 26
28 29 30 31

0 0 0 0
0
7 7 7
5
3.5 3.5 3.5

3.5

0 0 0 0
0

Week 26
28 29 30 31
0 0 0 0
0
7 7 7
5
3.5 3.5 3.5
3.5

0 0 0 0
0

DAILY WORKING SPOOL ACTUAL (H80069-PR-00)


JULY(2023)
Week 27 Week 28
28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

2 1
2 1
2
2 1
JULY(2023)
Week 29 Week 30 Total Spool
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

126
110
126
110

105
105
23
0
FIRE MAIN AND DECK WASH SYSTEM
SPOOL CALCULATE ON SITE
TOTAL SPOOL LINE : 29 0
21 21 21 21 21 0 21 0

FABRICATION INSTALLATION FINAL INSPECTION

NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL WEIGHT (Kg) Fit Up Welding Inspect. Fit Up Welding Testing Hydrotest Finishing PERCENTAGE (%)

20% 25% 5% 14% 16% 5% 12% 3%


1 H80069 BMD P4 002 1 1 0%
2 H80069 BMD P4 002 1 2 100% 100% 100% 100% 100% 50% 86%
3 H80069 BMD P4 002 1 3 0%
4 H80069 BMD P4 002 1 4 100% 100% 100% 100% 100% 50% 86%
5 H80069 BMD P4 002 2 5 0%
6 H80069 BMD P4 002 2 6 100% 100% 100% 100% 100% 50% 86%
7 H80069 BMD P4 002 2 7 0%
8 H80069 BMD P4 002 3 8 100% 100% 100% 100% 100% 50% 86%
9 H80069 BMD P4 002 3 9 100% 100% 100% 100% 100% 50% 86%
10 H80069 BMD P4 002 3 10 100% 100% 100% 100% 100% 50% 86%
11 H80069 BMD P4 003 4 11 100% 100% 100% 100% 100% 50% 86%
12 H80069 BMD P4 004 5 12 100% 100% 100% 100% 100% 50% 86%
13 H80069 BMD P4 004 5 13 0%
14 H80069 BMD P4 005 6 14 100% 100% 100% 100% 100% 50% 86%
15 H80069 BMD P4 005 6 15 100% 100% 100% 100% 100% 50% 86%

16 H80069 BMD P4 006 7 16 100% 100% 100% 100% 100% 50% 86%

17 H80069 BMD P4 006 7 17 100% 100% 100% 100% 100% 50% 86%

18 H80069 BMD P4 006 7 18 100% 100% 100% 100% 100% 50% 86%

19 H80069 BMD P4 006 7 19 0%

20 H80069 BMD P4 007 8 20 100% 100% 100% 100% 100% 50% 86%

21 H80069 AMD P4 001 1 1 0%


22 H80069 AMD P4 001 1 2 0%
23 H80069 AMD P4 002 2 3 100% 100% 100% 100% 100% 50% 86%
24 H80069 AMD P4 002 2 4 100% 100% 100% 100% 100% 50% 86%
25 H80069 AMD P4 002 2 5 100% 100% 100% 100% 100% 50% 86%
26 H80069 AMD P4 004 3 6 100% 100% 100% 100% 100% 50% 86%
27 H80069 AMD P4 005 4 7 100% 100% 100% 100% 100% 50% 86%
28 H80069 AMD P4 005 4 8 100% 100% 100% 100% 100% 50% 86%
29 H80069 AMD P4 005 5 9 100% 100% 100% 100% 100% 50% 86%
Progress Overall'!A1

REMARK
FIRE MAIN AND DECK WASH SYSTEM PROGRESS (%)
FABRICATION INSTALLATION FINAL INSPECTION
FABRICATION INSTALLATION TOTAL TONNAGE TOTAL PROGRESS
Fit Up Welding Inspect. Fit Up Welding Testing Hydrotest Finishing

Fit up Welding Fit up Welding


72% 72% 72% 72% 72% 0% 72% 0% 0 62%

20-Mar-23 PLANNING

FABRICATION INSTALLATION FINAL INSPECTION


20-Mar-23 8-Apr-23
START
20-Mar-23 8-Apr-23 FINISH
DAYS
20-Mar-23 8-Apr-23 ACTUAL
20-Mar-23 8-Apr-23
FABRICATION INSTALLATION FINAL INSPECTION
10-Jun-23
20-Mar-23 8-Apr-23 START
20-Mar-23 8-Apr-23 FINISH
DAYS
20-Mar-23 VARIATION/DELAY
10-Jun-23
FABRICATION INSTALLATION FINAL INSPECTION
20-Mar-23 8-Apr-23
20-Mar-23 8-Apr-23 START 0 0
20-Mar-23 8-Apr-23 FINISH 0 0

20-Mar-23 8-Apr-23

20-Mar-23 8-Apr-23
20-Mar-23 8-Apr-23
20-Mar-23 8-Apr-23
20-Mar-23 8-Apr-23
20-Mar-23 8-Apr-23
20-Mar-23 8-Apr-23
20-Mar-23
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month MARCH (2023)
Week Week 11 Week 12 Week 13 Week 14
Day/Date 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2

Fabrication
SPV
Foreman/Asst.
Fitter
M
P A
Helper
N Welder/Grinder
L P Installation and Testing
A O SPV
N W Foreman/Asst.
E Fitter
N R
Helper
I Welder/Grinder
N Total Manpower
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
G 0 0 0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7 7 7 7 7
M
A Man Hours (Basic) Saturday (5 Hours) 5 5 5
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00) 3.5 3.5 3.5
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14 14 14
R 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
S Total Man Hours
0 0 0 0

DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)


DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month MARCH (2023)
Week Week 11 Week 12 Week 13 Week 14
Day/Date 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2
Fabrication
SPV
Foreman/Asst.
Fitter
M
Helper
A
N Welder/Grinder
A P Installation and Testing
C O
W
SPV
Foreman/Asst.
T E Fitter
U R
Helper
A
L
M
A
N
A P
C O
W
T E
U R

A Welder/Grinder
L Total Manpower
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7 7 7 7 7
M
A Man Hours (Basic) Saturday (5 Hours) 5 5 5
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00) 3.5 3.5 3.5
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14 14 14
R 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
S Total Man Hours
0 0 0 0

Month MARCH (2023)


Week Week 11 Week 12 Week 13 Week 14
Day/Date 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2
A Fabrication
C Fit up 6 6 4 4 1
Welding
T S Inspection (Fit up) 16 5
U P Inspection (Visual/Welding)
O
A O Installation and Testing
L L Fit up
Welding
Inspection (Fit up)
Testing (Line Check)
FUEL OIL SYSTEM

TOTAL SPOOL LINE : 196

NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL

1 H80069 BMD P5 001 1 1


2 H80069 BMD P5 001 1 2
3 H80069 BMD P5 001 1 3
4 H80069 BMD P5 001 1 4
5 H80069 BMD P5 001 1 5
6 H80069 BMD P5 001 2 6
7 H80069 BMD P5 001 2 7
8 H80069 BMD P5 001 2 8
9 H80069 BMD P5 001 2 9
10 H80069 BMD P5 001 2 10
11 H80069 BMD P5 002 3 11
12 H80069 BMD P5 002 3 12
13 H80069 BMD P5 002 3 13
14 H80069 BMD P5 003 4 14
15 H80069 BMD P5 003 5 20
16 H80069 BMD P5 003 6 19
17 H80069 BMD P5 003 6 18
18 H80069 BMD P5 003 8 17
19 H80069 BMD P5 003 9 16
20 H80069 BMD P5 003 10 15

21 H80069 BMD P5 004 11 21

22 H80069 BMD P5 004 11 22


23 H80069 BMD P5 004 11 23
24 H80069 BMD P5 004 11 24
25 H80069 BMD P5 004 12 25
26 H80069 BMD P5 004 12 26
27 H80069 BMD P5 005 13 27
28 H80069 BMD P5 005 13 28
29 H80069 BMD P5 005 14 29
30 H80069 BMD P5 005 14 30
31 H80069 BMD P5 005 14 31
32 H80069 BMD P5 005 15 32
33 H80069 BMD P5 005 15 33
34 H80069 BMD P5 005 15 34
35 H80069 BMD P5 005 16 35
36 H80069 BMD P5 005 16 36
37 H80069 BMD P5 005 16 37
38 H80069 BMD P5 006 17 38
39 H80069 BMD P5 006 17 39
40 H80069 BMD P5 006 17 40
41 H80069 BMD P5 006 17 41
42 H80069 BMD P5 006 18 42
43 H80069 BMD P5 006 18 43
44 H80069 BMD P5 007 19 44
45 H80069 BMD P5 007 19 45
46 H80069 BMD P5 007 19 46
47 H80069 BMD P5 007 20 47
48 H80069 BMD P5 007 20 48
49 H80069 BMD P5 008 21 49
50 H80069 BMD P5 008 21 50
51 H80069 BMD P5 008 21 51
52 H80069 BMD P5 008 21 52
53 H80069 BMD P5 008 21 53
54 H80069 BMD P5 008 22 54
55 H80069 BMD P5 008 22 55
56 H80069 BMD P5 008 22 56
57 H80069 BMD P5 008 23 57
58 H80069 BMD P5 008 23 58
59 H80069 BMD P5 008 23 59
60 H80069 BMD P5 008 24 60
61 H80069 BMD P5 008 24 61
62 H80069 BMD P5 008 24 62
63 H80069 BMD P5 009 25 63
64 H80069 BMD P5 009 25 64
65 H80069 BMD P5 009 25 65
66 H80069 BMD P5 009 25 66
67 H80069 BMD P5 009 25 67
68 H80069 BMD P5 009 26 68
69 H80069 BMD P5 009 26 69
70 H80069 BMD P5 009 27 70
71 H80069 BMD P5 009 27 71
72 H80069 BMD P5 009 27 72
73 H80069 BMD P5 010 28 73
74 H80069 BMD P5 011 29 74
75 H80069 BMD P5 011 29 75
76 H80069 BMD P5 011 29 76
77 H80069 BMD P5 011 29 77
78 H80069 BMD P5 011 30 78
79 H80069 BMD P5 011 30 79
80 H80069 BMD P5 011 30 80
81 H80069 BMD P5 011 30 81
82 H80069 BMD P5 011 30 82
83 H80069 BMD P5 012 31 83
84 H80069 BMD P5 012 31 84
85 H80069 BMD P5 012 31 85
86 H80069 BMD P5 012 31 86
87 H80069 BMD P5 012 32 87
88 H80069 BMD P5 012 32 88
89 H80069 BMD P5 012 32 89
90 H80069 BMD P5 013 33 90
91 H80069 BMD P5 013 33 91
92 H80069 BMD P5 013 33 92
93 H80069 BMD P5 013 34 93
94 H80069 BMD P5 013 34 94
95 H80069 BMD P5 013 34 95
96 H80069 BMD P5 014 35 96
97 H80069 BMD P5 014 35 97
98 H80069 BMD P5 014 35 98
99 H80069 BMD P5 014 36 99
100 H80069 BMD P5 014 36 100
101 H80069 BMD P5 015 37 101
102 H80069 BMD P5 015 37 102
103 H80069 BMD P5 015 37 103

104 H80069 BMD P5 015 37 104

105 H80069 BMD P5 015 38 105

106 H80069 BMD P5 015 38 106

107 H80069 BMD P5 015 39 107

108 H80069 BMD P5 015 39 108

109 H80069 BMD P5 015 39 109

110 H80069 BMD P5 016 40 110

111 H80069 BMD P5 017 41 111

112 H80069 BMD P5 017 41 112

113 H80069 BMD P5 017 41 113

114 H80069 BMD P5 018 42 114

115 H80069 BMD P5 018 42 115

116 H80069 BMD P5 018 42 116

117 H80069 BMD P5 018 43 117

118 H80069 BMD P5 018 43 118

119 H80069 BMD P5 018 43 119

120 H80069 BMD P5 018 44 120

121 H80069 BMD P5 018 45 121

122 H80069 BMD P5 018 45 122


123 H80069 BMD P5 018 45 123

124 H80069 BMD P5 019 46 124

125 H80069 BMD P5 019 46 125

126 H80069 BMD P5 019 46 126

127 H80069 BMD P5 019 47 127

128 H80069 BMD P5 019 47 128

129 H80069 BMD P5 019 47 129

130 H80069 BMD P5 019 48 130

131 H80069 BMD P5 019 49 131

132 H80069 BMD P5 019 49 132

133 H80069 BMD P5 020 50 133

134 H80069 BMD P5 020 50 134

135 H80069 BMD P5 021 51 135

136 H80069 BMD P5 021 51 136

137 H80069 BMD P5 021 51 137

138 H80069 BMD P5 021 51 138

139 H80069 BMD P5 021 51 139

140 H80069 BMD P5 022 52 140

141 H80069 BMD P5 023 53 141

142 H80069 BMD P5 023 53 142

143 H80069 BMD P5 023 53 143

144 H80069 BMD P5 023 53 144

145 H80069 BMD P5 023 53 145

146 H80069 BMD P5 023 53 146

147 H80069 BMD P5 024 54 147

148 H80069 BMD P5 024 54 148

149 H80069 BMD P5 024 54 149

150 H80069 BMD P5 024 55 150

151 H80069 BMD P5 024 55 151

152 H80069 BMD P5 024 55 152

153 H80069 BMD P5 025 56 153

154 H80069 BMD P5 025 56 154

155 H80069 BMD P5 025 56 155

156 H80069 BMD P5 025 56 156

157 H80069 BMD P5 025 56 157

158 H80069 BMD P5 025 56 158

159 H80069 BMD P5 025 56 159


160 H80069 BMD P5 026 57 160

161 H80069 BMD P5 026 57 161

162 H80069 BMD P5 026 57 162

163 H80069 BMD P5 026 58 163

164 H80069 BMD P5 026 58 164

165 H80069 BMD P5 026 58 165

166 H80069 BMD P5 027 59 166

167 H80069 BMD P5 027 59 167

168 H80069 BMD P5 027 59 168

169 H80069 BMD P5 027 59 169

170 H80069 BMD P5 027 59 170

171 H80069 BMD P5 027 59 171

172 H80069 BMD P5 027 59 172

173 H80069 BMD P5 028 60 173

174 H80069 BMD P5 030 61 174

175 H80069 BMD P5 030 62 175

176 H80069 BMD P5 031 63 176

177 H80069 BMD P5 031 63 177

178 H80069 BMD P5 031 63 178

179 H80069 BMD P5 031 64 179

180 H80069 BMD P5 031 64 180

181 H80069 BMD P5 032 65 181

182 H80069 BMD P5 032 65 182

183 H80069 BMD P5 032 65 183

184 H80069 BMD P5 032 65 184

185 H80069 BMD P5 032 65 185

186 H80069 BMD P5 032 66 186

187 H80069 BMD P5 032 66 187

188 H80069 BMD P5 032 66 188

189 H80069 BMD P5 032 67 189

190 H80069 BMD P5 032 67 190

191 H80069 BMD P5 033 68 191

192 H80069 BMD P5 033 68 192

193 H80069 AMD P5 001 01 01

194 H80069 AMD P5 001 01 02

195 H80069 AMD P5 001 02 03

196 H80069 AMD P5 001 02 04


SPOOL CALCULATE ON SITE

175 134 134 7 1 1

FABRICATION INSTALLATION

WEIGHT (Kg) Fit Up Welding Inspect. Fit Up Welding Testing

20% 25% 5% 14% 16% 5%

100%
100% 100% 100%

100%
100% 100% 100%
100% 100% 100%
100%
100%

100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%

100%

100% 100% 100%


100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100%
100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%

100% 100% 100%


100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%

100% 100% 100%


100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%

100% 100% 100%


100%
100% 100% 100% 100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%

100% 100% 100%


100% 100% 100%

100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100%
100%
100% 100% 100%
100%
100% 100% 100%
100% 100% 100%
100%
100% 100% 100%
100%

100% 100% 100%


100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%

100% 100% 100%

100% 100% 100%

100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100%

100%

100% 100% 100%

100% 100% 100%

100%

100% 100% 100%

100% 100% 100%

100% 100% 100%


100%

100%

100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100%

100% 100% 100%

100%

100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100%

100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100%

100% 100% 100%

100% 100% 100%

100%

100%

100% 100% 100%

100%

100% 100% 100%

100%

100% 100% 100%

100% 100% 100%

100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100% 100% 100%


100% 100% 100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100%

100% 100% 100%

100% 100% 100%

100%

100% 100% 100%

100% 100% 100%

100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100% 100% 100%

100%

100% 100% 100%

100%
Progress Overall'!A1

0
86 0

FINAL INSPECTION
FABRICATION
Hydrotest Finishing PERCENTAGE (%) REMARK

12% 3% Fit up Welding


0%
0%
20% 21-May-23
50% 56% 21-May-23 14-Jun-23
0%
20% 21-May-23
50% 56% 21-May-23 14-Jun-23
50% 56% 21-May-23 14-Jun-23
20% 21-May-23
20% 21-May-23
0%
0%
20% 21-May-23
50% 21-May-23 20-Jun-23
50% 56% 21-May-23 14-Jun-23
50% 56% 30-Jun-23
50% 56% 30-Jun-23
50% 56% 21-May-23 30-Jun-23
50% 56% 30-Jun-23
50% 56% 30-Jun-23

20% 21-May-23

50% 56% 21-May-23 14-Jun-23


50% 56% 21-May-23 14-Jun-23
50% 56% 21-May-23 14-Jun-23
50% 56% 21-May-23 14-Jun-23
50% 24-May-23 26-Jun-23
50% 3-Jun-23 26-Jun-23
50% 56% 21-May-23 26-Jun-23
50% 56% 24-May-23 26-Jun-23
50% 56% 21-May-23 14-Jun-23
50% 56% 21-May-23 30-Jun-23
50% 56% 24-May-23 30-Jun-23
50% 56% 24-May-23 14-Jun-23
50% 56% 24-May-23 14-Jun-23
50% 56% 29-May-23 14-Jun-23
50% 56% 29-May-23 20-Jun-23
20% 27-May-23
20% 27-May-23
50% 56% 27-May-23 26-Jun-23
50% 27-May-23 20-Jun-23
50% 29-May-23 20-Jun-23
20% 24-May-23
50% 56% 27-May-23 14-Jun-23
50% 56% 27-May-23 14-Jun-23
50% 21-May-23 20-Jun-23
50% 56% 27-May-23 16-Jun-23
50% 21-May-23 20-Jun-23
50% 56% 21-May-23 16-Jun-23
50% 30-Jun-23
0%
50% 56% 29-May-23 30-Jun-23
20% 29-May-23
50% 56% 29-May-23 16-Jun-23
50% 14-Jun-23
50% 56% 14-Jun-23
50% 56% 21-May-23 14-Jun-23
0%
50% 21-May-23 20-Jun-23
50% 70%
50% 70%
50% 70%
0%
50% 30-Jun-23
20% 29-May-23
50% 91% 29-May-23 30-Jun-23
50% 56% 29-May-23 14-Jun-23
50% 21-May-23 20-Jun-23
50% 56% 21-May-23 30-Jun-23
50% 70%
50% 70%
50% 70%
0%
50% 56% 21-May-23 14-Jun-23
50% 30-Jun-23
0%
20% 24-May-23
50% 24-May-23 20-Jun-23
50% 56% 24-May-23 16-Jun-23
50% 24-May-23 14-Jun-23
50% 56% 30-Jun-23
0%
50% 30-Jun-23
20% 27-May-23
20% 27-May-23
50% 56% 27-May-23 16-Jun-23
20% 27-May-23
50% 56% 29-May-23 20-Jun-23
50% 56% 27-May-23 26-Jun-23
20% 27-May-23
50% 24-May-23 3-Jul-23
20% 24-May-23
0%
0%
50% 24-May-23 20-Jun-23
50% 56% 24-May-23 16-Jun-23
50% 56% 24-May-23 16-Jun-23
50% 56% 24-May-23 16-Jun-23
50% 56% 24-May-23 30-Jun-23
50% 56% 24-May-23 16-Jun-23
50% 27-May-23 16-Jun-23
50% 30-Jun-23
50% 24-May-23 3-Jul-23
50% 56% 24-May-23 16-Jun-23

50% 56% 24-May-23 16-Jun-23

50% 56% 27-May-23 16-Jun-23

20% 24-May-23

50% 56% 24-May-23 16-Jun-23

50% 56% 24-May-23 16-Jun-23

50% 24-May-23 20-Jun-23

50% 56% 24-May-23 14-Jun-23

50% 56% 26-Jun-23

50% 24-May-23 3-Jul-23

50% 56% 24-May-23 16-Jun-23

50% 30-Jun-23

20% 27-May-23

20% 27-May-23

50% 56% 27-May-23 30-Jun-23

50% 56% 24-May-23 26-Jun-23

20% 24-May-23

50% 56% 27-May-23 16-Jun-23

50% 27-May-23 3-Jul-23

50% 56% 24-May-23 16-Jun-23


20% 27-May-23

20% 27-May-23

20% 3-Jun-23

50% 27-May-23 3-Jul-23

50% 56% 27-May-23 16-Jun-23

50% 56% 27-May-23 16-Jun-23

20% 27-May-23

50% 27-May-23 20-Jun-23

20% 27-May-23

20% 27-May-23

50% 56% 3-Jun-23 26-Jun-23

50% 56% 3-Jun-23 30-Jun-23

50% 30-Jun-23

20% 3-Jun-23

20% 3-Jun-23

50% 56% 3-Jun-23 16-Jun-23

50% 3-Jun-23 26-Jun-23

50% 3-Jun-23 26-Jun-23

0%

20% 3-Jun-23

50% 56% 3-Jun-23 30-Jun-23

50% 56% 3-Jun-23 30-Jun-23

20% 24-May-23

0%

20% 3-Jun-23

50% 56% 3-Jun-23 16-Jun-23

20% 3-Jun-23

50% 56% 3-Jun-23 30-Jun-23

20% 3-Jun-23

50% 3-Jun-23 26-Jun-23

50% 30-Jun-23

20% 3-Jun-23

50% 56% 3-Jun-23 30-Jun-23

50% 56% 3-Jun-23 26-Jun-23

50% 56% 3-Jun-23 26-Jun-23

50% 56% 3-Jun-23 16-Jun-23

50% 3-Jun-23 16-Jun-23


50% 56% 3-Jun-23 26-Jun-23

50% 56% 26-Jun-23

50% 56% 3-Jun-23 16-Jun-23

50% 56% 3-Jun-23 26-Jun-23

50% 56% 3-Jun-23 26-Jun-23

50% 3-Jun-23 14-Jun-23

50% 30-Jun-23

0%

50% 56% 3-Jun-23 30-Jun-23

50% 3-Jun-23 26-Jun-23

0%

50% 56% 3-Jun-23 16-Jun-23

50% 3-Jun-23 3-Jul-23

20% 3-Jun-23

0%

0%

50% 30-Jun-23

50% 29-May-23 30-Jun-23

50% 29-May-23 26-Jun-23

50% 29-May-23 20-Jun-23

50% 20-Jun-23

20% 3-Jun-23

50% 29-May-23 26-Jun-23

50% 29-May-23 20-Jun-23

20% 29-May-23

50% 56% 29-May-23 16-Jun-23

50% 29-May-23 26-Jun-23

20% 29-May-23

50% 29-May-23 20-Jun-23

50% 56% 21-May-23 14-Jun-23

50% 56% 21-May-23 16-Jun-23

0%

0%

50% 7-Jun-23 30-Jun-23

20% 7-Jun-23

50% 7-Jun-23 30-Jun-23

20% 7-Jun-23
FUEL
FABRICATION
INSTALLATION
Fit Up Welding Inspect.

Fit up Welding
89% 68% 68%

PLANNING

FABRICATION

START
FINISH
DAYS 0
ACTUAL

FABRICATION

START
FINISH
DAYS 0
VARIATION/DEL

FABRICATION

START 0
FINISH 0
FUEL OIL SYSTEM PROGRESS (%)
INSTALLATION FINAL INSPECTION
TOTAL TONNAGE
Fit Up Welding Testing Hydrotest Finishing

4% 1% 1% 44% 0% 0

PLANNING

INSTALLATION FINAL INSPECTION

0
ACTUAL

INSTALLATION FINAL INSPECTION

0
VARIATION/DELAY

INSTALLATION FINAL INSPECTION

0
0
DAILY WORK MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month
TOTAL PROGRESS
Week
Day/Date
24%
Fabrication
SPV
Foreman/Asst.
Fitter
M
P A
Helper
N Welder/Grinder
L P Installation and Testing
A O SPV
N W Foreman/Asst.
E Fitter
N R
Helper
I Welder/Grinder
N Total Manpower
G
Man Hours (Basic) Mon-Fri (7 Hours)
M
Man Hours (Basic) Saturday (5 Hours)
A
N Man Hours (OT) Mon-Fri (15.00 - 17.00)
H Man Hours (OT) Saturday (13.00 - 15.00)
O Man Hours (OT) Sunday (07.00 - 15.00)
U
R Total Man Hours
S
2600

Month
Week
Day/Date
Fabrication
SPV
Foreman/Asst.
Fitter
M
Helper
A
N Welder/Grinder
A P Installation and Testing
C O
W
SPV
Foreman/Asst.
T E
U R

A
N
A P
C O
W
T E Fitter
U R
Helper
A Welder/Grinder
L Total Manpower

Man Hours (Basic) Mon-Fri (7 Hours)


M
A Man Hours (Basic) Saturday (5 Hours)
N Man Hours (OT) Mon-Fri (15.00 - 17.00)
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00)
R
S Total Man Hours

Month
Week
Day/Date
A Fabrication
C Fit up
Welding
T S Inspection (Fit up)
U P Inspection (Visual/Welding)
O
A O Installation and Testing
L L Fit up
Welding
Inspection (Fit up)
Inspection (Welding)
DAILY WORK MANPOWER AND MA
MAY (2023)
Week 20 Week 21 Week 22
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

DAILY WORK MANPOWER AND MAN HOURS A


MAY (2023)
Week 20 Week 21 Week 22
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1

1 1 1 1 1 1 1 1 1 1
2 5 6 6 4 4 4 2 4 5
2 4 5 5 3 3 4 3 5 6
1 1 1 1 1 1

1 1 1
3 5 5
3 5 4

0 0 6 10 0 13 13 9 8 9 13 22 23 0 0 0 0 0 0
42 84 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 0 63 105 0 0 0 0 84 94.5 136.5 231 0 0 0 0 0 0 0
168 546 0

MAY(2023)
Week 20 Week 21 Week 22
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1

7 8 6 8 8 8 8 8 9 9 9 8 8 8 8 8 8

30 32 29 20
ANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)
JUNE (2023)
eek 22 Week 23 Week 24 Week 25 Week 26
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5 3.5
14 14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0

AND MAN HOURS ACTUAL (H80069-PR-00) - FUEL OIL SYSTEM


JUNE (2023)
eek 22 Week 23 Week 24 Week 25 Week 26
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5 3.5
14 14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0

DAILY WORKING SPOOL ACTUAL (H80069-PR-00)


JUNE(2023)
eek 22 Week 23 Week 24 Week 25 Week 26
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

8 7 6 6 6 4 2
6 8 8 8 5 5 7 8 6 6 8 6 4 6 4 3 4 6 6 6 7
35 27 2
24 26 18
Week 26
26 27 28 29 30

0 0 0 0 0
0
7 7 7 7 7

3.5 3.5 3.5 3.5 3.5

0 0 0 0 0

Week 26
26 27 28 29 30
0 0 0 0 0
0
7 7 7 7 7

3.5 3.5 3.5 3.5 3.5

0 0 0 0 0
0

JULY(2023)
Week 26 Week 27 Week 28
26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 2 2 2

22 32 6
Total Spool

175
134
175
134

0
0
0
0
SW AND FW COOLING SYSTEM

TOTAL SPOOL LINE : 100

NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL

1 H80069 BMD P6 - -
2 H80069 BMD P6 - -
3 H80069 BMD P6 - -
4 H80069 BMD P6 - -
5 H80069 BMD P6 - -
6 H80069 BMD P6 - -
7 H80069 BMD P6 - -
8 H80069 BMD P6 002 3 6
9 H80069 BMD P6 002 4 7
10 H80069 BMD P6 002 4 8
11 H80069 BMD P6 003 5 9
12 H80069 BMD P6 003 5 10
13 H80069 BMD P6 003 5 11
14 H80069 BMD P6 003 5 12
15 H80069 BMD P6 003 6 13
16 H80069 BMD P6 003 6 14
17 H80069 BMD P6 004 7 15
18 H80069 BMD P6 005 8 17
19 H80069 BMD P6 005 8 18
20 H80069 BMD P6 005 9 19
21 H80069 BMD P6 005 9 20
22 H80069 BMD P6 006 10 21
23 H80069 BMD P6 006 10 22
24 H80069 BMD P6 006 10 23
25 H80069 BMD P6 006 10 24
26 H80069 BMD P6 007 11 25
27 H80069 BMD P6 007 11 26
28 H80069 BMD P6 007 11 27
29 H80069 BMD P6 007 11 28
30 H80069 BMD P6 008 12 29
31 H80069 BMD P6 008 12 30
32 H80069 BMD P6 008 13 31
33 H80069 BMD P6 009 14 32
34 H80069 BMD P6 009 14 33
35 H80069 BMD P6 010 15 34
36 H80069 BMD P6 010 15 35
37 H80069 BMD P6 010 15 36
38 H80069 BMD P6 010 15 37
39 H80069 BMD P6 011 16 38
40 H80069 BMD P6 011 16 39
41 H80069 BMD P6 012 17 40
42 H80069 BMD P6 012 17 41
43 H80069 BMD P6 013 18 42
44 H80069 BMD P6 014 19 43
45 H80069 BMD P6 014 19 44
46 H80069 BMD P6 014 19 45
47 H80069 BMD P6 015 20 48
48 H80069 BMD P6 015 20 49
49 H80069 BMD P6 015 21 46
50 H80069 BMD P6 015 21 47
51 H80069 BMD P6 016 22 50
52 H80069 BMD P6 016 22 51
53 H80069 BMD P6 016 22 52
54 H80069 BMD P6 017 23 55
55 H80069 BMD P6 017 24 53
56 H80069 BMD P6 017 24 54
57 H80069 BMD P6 018 25 56
58 H80069 BMD P6 018 25 57
59 H80069 BMD P6 019 26 58
60 H80069 BMD P6 020 27 59
61 H80069 BMD P6 020 27 60
62 H80069 BMD P6 020 27 61
63 H80069 BMD P6 020 28 62
64 H80069 BMD P6 020 29 63
65 H80069 BMD P6 023 32 68
66 H80069 BMD P6 024 33 69
67 H80069 BMD P6 024 33 100
68 H80069 BMD P6 024 33 101
69 H80069 BMD P6 024 33 102
70 H80069 BMD P6 024 33 103
71 H80069 BMD P6 025 34 70
72 H80069 BMD P6 025 34 71
73 H80069 BMD P6 025 34 72
74 H80069 BMD P6 025 35 73
75 H80069 BMD P6 025 35 74
76 H80069 BMD P6 025 35 75
77 H80069 BMD P6 025 35 76
78 H80069 BMD P6 025 35 77
79 H80069 BMD P6 025 36 78
80 H80069 BMD P6 025 36 79
81 H80069 BMD P6 025 36 80
82 H80069 BMD P6 025 36 81
83 H80069 BMD P6 025 37 82
84 H80069 BMD P6 025 37 83
85 H80069 BMD P6 025 37 84
86 H80069 BMD P6 025 37 85
87 H80069 BMD P6 025 38 86
88 H80069 BMD P6 025 38 87
89 H80069 BMD P6 026 39 88
90 H80069 BMD P6 026 39 89
91 H80069 BMD P6 026 40 90
92 H80069 BMD P6 026 40 91
93 H80069 BMD P6 026 41 92
94 H80069 BMD P6 026 41 93
95 H80069 BMD P6 027 42 94
96 H80069 BMD P6 027 42 95
97 H80069 BMD P6 028 43 96
98 H80069 BMD P6 029 44 97
99 H80069 BMD P6 029 44 98
100 H80069 BMD P6 029 44 99
SPOOL CALCULATE ON SITE

93 69 69 44 44 0

FABRICATION INSTALLATION
WEIGHT (Kg) Fit Up Welding Inspect. Fit Up Welding Testing
20% 25% 5% 14% 16% 5%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
8.8 100% 100% 100% 100% 100%
8.2 100%
9.7 100%
6 100%
6.3 100% 100% 100% 100% 100%
6.3 100% 100% 100% 100% 100%
5.4 100%
9 100%

4.3 100%

10 100%

7 100%

6.9 100%

6.6 100% 100% 100% 100% 100%

8.3 100%
3.1 100% 100% 100% 100% 100%
6.6 100% 100% 100% 100% 100%
11 100% 100% 100% 100% 100%
9 100% 100% 100% 100% 100%
3.1 100% 100% 100% 100% 100%
6.8 100% 100% 100% 100% 100%
8.1 100% 100% 100% 100% 100%
8.4 100% 100% 100% 100% 100%
7 100% 100% 100% 100% 100%
4.2 100% 100% 100% 100% 100%
8.1 100% 100% 100% 100% 100%
11.2 100% 100% 100% 100% 100%
6.1 100% 100% 100% 100% 100%
3.1 100% 100% 100% 100% 100%
7.5 100% 100% 100% 100% 100%
4.9 100% 100% 100% 100% 100%
12.4 100%
3.1 100% 100% 100% 100% 100%
4.3 100%
3.1 100% 100% 100% 100% 100%
3.3 100%

8.8 100%

5 100%

4.8 100%

5.5 100%

4.4 100%

3.2 100% 100% 100% 100% 100%

5.1 100%

4 100%
3.6 100%
4.8 100%
4.2 100%
4.4 100% 100% 100% 100% 100%
5.9 100% 100% 100% 100% 100%
4 100% 100% 100%
3.3 100% 100% 100%
3 100% 100% 100%
3.9 100% 100% 100% 100% 100%
0.8 100% 100% 100%
1.9 100% 100% 100%
1.5 100% 100% 100%
25.8 100% 100% 100%
1.4 100% 100% 100%
5 100% 100% 100%

2.3 100% 100% 100%


6.6 100% 100% 100%
2.6 100% 100% 100%
3.6 100% 100% 100%
4.3 100% 100% 100%
7.7 100% 100% 100%
4.8 100% 100% 100%
7.7 100% 100% 100%
6.5 100% 100% 100%
9.8 100% 100% 100%
3.2 100% 100% 100% 100% 100%
6.2 100% 100% 100%
4.7 100% 100% 100%
3.2 100% 100% 100% 100% 100%
9.5 100% 100% 100%
9.7 100% 100% 100%
7.7 100% 100% 100%
3.2 100% 100% 100% 100% 100%
8 100% 100% 100%
5.4 100% 100% 100%
3.2 100% 100% 100% 100% 100%
6.8 100% 100% 100% 100% 100%
3.4 100% 100% 100%
3.1 100% 100% 100%
2.2 100% 100% 100% 100% 100%
3.3 100% 100% 100% 100% 100%
10.1 100% 100% 100% 100% 100%
3.2 100% 100% 100% 100% 100%
5.6 100% 100% 100%
5.2 100%
3.1 100% 100% 100% 100% 100%
2.3 100% 100% 100%
2 100% 100% 100%
3.5 100% 100% 100%
3.1 100% 100% 100% 100% 100%
Progress Overall'!A1

286.4
44 0

FINAL INSPECTION
FABRICATION
Hydrotest Finishing PERCENTAGE (%) REMARK

12% 3% Fit up Welding


50% 86% Overboard Penetration
50% 86% Overboard Penetration
50% 86% Overboard Penetration
50% 86% Overboard Penetration
50% 86% Overboard Penetration
50% 86% Overboard Penetration
50% 86% Overboard Penetration
50% 86% 14-Jun-23 4-Jun-23
20% 14-Jun-23
20% 14-Jun-23
20% 14-Jun-23
50% 86% 14-Jun-23 7-Jun-23
50% 86% 14-Jun-23 7-Jun-23
20% 14-Jun-23
20% 14-Jun-23
20% 3-Jul-23
20% 3-Jul-23
20% 3-Jul-23
20% 3-Jul-23
50% 86% 14-Jun-23 7-Jun-23
20% 3-Jul-23
50% 86% Overboard Penetration
50% 86% 14-Jun-23 12-Jun-23
50% 86% 14-Jun-23 7-Jun-23
50% 86% 14-Jun-23 12-Jun-23
50% 86% Overboard Penetration
50% 86% 14-Jun-23 12-Jun-23
50% 86% 14-Jun-23 12-Jun-23
50% 86% 14-Jun-23 7-Jun-23
50% 86% 14-Jun-23 7-Jun-23
50% 86% 14-Jun-23 12-Jun-23
50% 86% 14-Jun-23 12-Jun-23
50% 86% 14-Jun-23 4-Jun-23
50% 86% 14-Jun-23 4-Jun-23
50% 86% Overboard Penetration
50% 86% 14-Jun-23 7-Jun-23
50% 86% 14-Jun-23 7-Jun-23
20% 3-Jul-23
50% 86% Overboard Penetration
20% 3-Jul-23
50% 86% Overboard Penetration
20% 3-Jul-23
20% 3-Jul-23
20% 3-Jul-23
20% 14-Jun-23
20% 3-Jul-23
20% 3-Jul-23
50% 86% 14-Jun-23 7-Jun-23
20% 3-Jul-23
20% 3-Jul-23
20% 3-Jul-23
20% 3-Jul-23
20% 3-Jul-23
50% 86% 13-Jun-23 4-Jun-23
50% 86% 13-Jun-23 4-Jun-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 86% 13-Jun-23 7-Jun-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 86% Penetration 13-Jun-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 86% Penetration
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 86% Penetration
50%
50% 13-Jun-23 31-May-23
50% 86% Penetration
50% 86% 14-Jun-23 12-Jun-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 86% 14-Jun-23 12-Jun-23
50% 86% Penetration
50% 86% 14-Jun-23 12-Jun-23
50% 86% Penetration
50% 13-Jun-23 31-May-23
20% 3-Jul-23
50% 86% Overboard Penetration
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 13-Jun-23 31-May-23
50% 86% Overboard Penetration
SW AND FW CO
FABRICATION
INSTALLATION
Fit Up Welding Inspect.
Fit up Welding
93% 69% 69%

PLANNING

FABRICATION

START
FINISH
DAYS 0
ACTUAL

FABRICATION

START
FINISH
DAYS 0
VARIATION/DELAY

FABRICATION

START 0
FINISH 0
SW AND FW COOLING SYSTEM PROGRESS (%)
INSTALLATION FINAL INSPECTION
TOTAL TONNAGE
Fit Up Welding Testing Hydrotest Finishing

44% 44% 0% 44% 0% 167.62992

PLANNING

INSTALLATION FINAL INSPECTION

0
ACTUAL

INSTALLATION FINAL INSPECTION

0
VARIATION/DELAY

INSTALLATION FINAL INSPECTION

0
0
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month
TOTAL PROGRESS
Week
Day/Date
59%
Fabrication
SPV
Foreman/Asst.
Fitter
M
Helper
P A
Welder/Grinder
N
L P Installation and Testing
A O SPV
W
N E
Foreman/Asst.
Fitter
N R
Helper
I Welder/Grinder
N Total Manpower
G
Man Hours (Basic) Mon-Fri (7 Hours)
M
A Man Hours (Basic) Saturday (5 Hours)
N Man Hours (OT) Mon-Fri (15.00 - 17.00)
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00)
R
S Total Man Hours

3510

DAILY MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)


Month
Week
Day/Date
Fabrication
SPV
Foreman/Asst.
Fitter
M
Helper
A
N Welder/Grinder
A P Installation and Testing
C O
W
SPV
Foreman/Asst.
T E
U R

A
N
A P
C O
W
T E Fitter
U R
Helper
A Welder/Grinder
L Total Manpower

Man Hours (Basic) Mon-Fri (7 Hours)


M
A Man Hours (Basic) Saturday (5 Hours)
N Man Hours (OT) Mon-Fri (15.00 - 17.00)
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00)
R
S Total Man Hours

Month
Week
Day/Date
A Fabrication
C Fit up
Welding
T S Inspection (Fit up)
U P Inspection (Visual/Welding)
O
A O Installation and Testing
L L Fit up
Welding
Inspection (Fit up)
Testing (Line Check)
DAILY MANPO
MAY (2023)
Week 18 Week 19 Week 20
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

DAILY MANPO
MAY (2023)
Week 18 Week 19 Week 20
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 1 1 1
3 3 3 3 3 3 3 3 2 2 2
1 1 1 1 1 1 1 1 1 1 1
0 0 0 0 8 8 8 8 0 0 8 8 8 8 4 4 0 4 0
8 40 28
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 84 84 0 0 0 0 0 84 42 42 0 0 0
0 168 168

DAILY WO
MAY(2023)
Week 18 Week 19 Week 20
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

7 6 6 8 6 4 4 6 6 4 4 4 4 4
7 6 6 6 4 6 6
29
14

7
7
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
JUNE (2023)
Week 21 Week 22 Week 23 Week 24 Week 2
21 22 23 24 25 26 27 1 5 6 7 12 13 14 15 16 17 18 19

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0

DAILY MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)


JUNE (2023)
Week 21 Week 22 Week 23 Week 24 Week 2
21 22 23 24 25 26 27 1 5 6 7 12 13 14 15 16 17 18 19
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0

DAILY WORKING SPOOL ACTUAL (H80069-PR-00)


JUNE(2023
20 Week 21 Week 22 Week 23 Week 24 W
20 21 22 23 24 25 26 31 4 5 6 11 12 13 14 15 16 17 18

2
3 6 4 6 2 1
28
31 5 10 9

2 6 7 6 8 8
2 6 7 6 8 8
3 6 4 6 6 8 4
JUNE (2023)
Week 25 Week 26
20 21 22 23 24 25 26 27 28 29 30 31

0 0 0 0 0 0 0 0 0 0 0 0
0 0
7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14
0 0 0 0 0 0 0 0 0 0 0 0
0 0

JUNE (2023)
Week 25 Week 26
20 21 22 23 24 25 26 27 28 29 30 31
0 0 0 0 0 0 0 0 0 0 0 0
0 0
7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14
0 0 0 0 0 0 0 0 0 0 0 0
0 0

JUNE(2023) JULY(2023)
Week 25 Week 26 Week 27
19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6

18

2 2 3
(2023)
Week 27 Total Spool
7 8

93
69
93
69

44
44
44
0
DOMESTIC FW AND SW SYSTEM

TOTAL SPOOL LINE : 40

NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL

1 H80069 BMD P7 001 1


2 H80069 BMD P7 001 2
3 H80069 BMD P7 001 3
4 H80069 BMD P7 001 4
5 H80069 BMD P7 001 5
6 H80069 BMD P7 001 6
7 H80069 BMD P7 001 7
8 H80069 BMD P7 001 8
9 H80069 BMD P7 001 9
10 H80069 BMD P7 001 10
11 H80069 BMD P7 001 11
12 H80069 BMD P7 001 12
13 H80069 BMD P7 001 13
14 H80069 BMD P7 001 14
15 H80069 BMD P7 001 15
16 H80069 BMD P7 001 16
17 H80069 BMD P7 001 17
18 H80069 BMD P7 001 18
19 H80069 AMD P7 002 1
20 H80069 AMD P7 002 2
21 H80069 AMD P7 002 3
22 H80069 AMD P7 002 4
23 H80069 AMD P7 002 5
24 H80069 AMD P7 002 6
25 H80069 AMD P7 002 7
26 H80069 AMD P7 002 8
27 H80069 AMD P7 002 9
28 H80069 AMD P7 002 10
29 H80069 AMD P7 002 11
30 H80069 AMD P7 002 12
31 H80069 AMD P7 002 13
32 H80069 AMD P7 002 14
33 H80069 AMD P7 002 15
34 H80069 AMD P7 002 16
35 H80069 AMD P7 002 17
36 H80069 AMD P7 002 18
37 H80069 AMD P7 002 19
38 H80069 AMD P7 002 20
39 H80069 AMD P7 002 21
40 H80069 AMD P7 002 22
SPOOL CALCULATE ON SITE

40 40 40 40 40 0

FABRICATION INSTALLATION

WEIGHT (Kg) Fit Up Welding Inspect. Fit Up Welding Testing

20% 25% 5% 14% 16% 5%


100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
Progress Overall'!A1

0
40 0

FINAL INSPECTION

Hydrotest Finishing PERCENTAGE (%) REMARK

12% 3%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86% START
50% 86% FINISH
50% 86% DAYS
50% 86%
50% 86%
50% 86%
50% 86% START
50% 86% FINISH
50% 86% DAYS
50% 86%
50% 86%
50% 86%
50% 86% START
50% 86% FINISH
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
DOMESTIC FW AND SW SYSTEM PROGRESS (%)
FABRICATION INSTALLATION FINAL INSPECTION
Fit Up Welding Inspect. Fit Up Welding Testing Hydrotest

100% 100% 100% 80% 80% 0% 80%

PLANNING

FABRICATION INSTALLATION FINAL INSPECTION

0 0
ACTUAL

FABRICATION INSTALLATION FINAL INSPECTION

0 0
VARIATION/DELAY

FABRICATION INSTALLATION FINAL INSPECTION


PROGRESS (%) DAILY MANPOWER AND MAN HOURS PLA
FINAL INSPECTION Month
TOTAL TONNAGE TOTAL PROGRESS
Finishing Week
Day/Date
0% 0 86%

FINAL INSPECTION
M
P A
L N
P
A O
N W
FINAL INSPECTION E
N R
I
N
G
FINAL INSPECTION M
A
N
H
O
U
R
S

DAILY MANPOWER AND MAN HOURS AC


Month
Week
Day/Date

M
A
N
A P
C O
W
T E
U R

A
N
A P
C O
W
T E
U R

A
L
M
A
N
H
O
U
R
S

Month
Week
Day/Date
A
C
T S
U P
O
A O
L L
OWER AND MAN HOURS PLANNING (H80069-PR-00)
Month MARCH (2023)
Week Week 12 Week 13
Day/Date 20 21 22 23 24 25 26 27 28 29 30

Fabrication
SPV
Foreman/Asst.
Fitter
Helper
Welder/Grinder
Installation and Testing
SPV
Foreman/Asst.
Fitter
Helper
Welder/Grinder
0 0 0 0 0 0 0 0 0 0 0
Total Manpower
0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7 7 7 7
Man Hours (Basic) Saturday (5 Hours) 5
Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
Man Hours (OT) Saturday (13.00 - 15.00) 3.5
Man Hours (OT) Sunday (07.00 - 15.00) 14
0 0 0 0 0 0 0 0 0 0 0
Total Man Hours
0 0
1064 \

POWER AND MAN HOURS ACTUAL (H80069-PR-00)


DAILY MANPOWER AND MAN HOURS ACTUAL (H80069-
Month MARCH (2023)
Week Week 12 Week 13
Day/Date 20 21 22 23 24 25 26 27 28 29 30
Fabrication
SPV
Foreman/Asst.
Fitter
Helper
Welder/Grinder
Installation and Testing
SPV
Foreman/Asst.
Fitter
Helper
Welder/Grinder
0 0 0 0 0 0 0 0 0 0 0
Total Manpower
0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7 7 7 7
Man Hours (Basic) Saturday (5 Hours) 5
Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
Man Hours (OT) Saturday (13.00 - 15.00) 3.5
Man Hours (OT) Sunday (07.00 - 15.00) 14
0 0 0 0 0 0 0 0 0 0 0
Total Man Hours
0 0

DELAY
(No Drawing)

Month MARCH (2023)


Week Week 12 Week 13
Day/Date 20 21 22 23 24 25 26 27 28 29 30
Fabrication
Fit up 6 5 8 6 7 4
Welding
Inspection (Fit up)
Inspection (Visual/Welding)
Installation and Testing
Fit up
Welding
Inspection (Fit up)
Testing (Line Check)
APRIL (2023)
k 13 Week 14 Week 15 Week 16
31 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

S ACTUAL (H80069-PR-00) DAILY MANPOWER AND MAN HOURS


APRIL (2023)
k 13 Week 14 Week 15 Week 16
31 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

DAILY WORKING SPOOL ACTUAL (H800


APRIL (2023)
Week 13 Week 14 Week 15 Week 16
31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

4
8 12 16 4
40
40

12 20
12 20
12
DAILY MANPOWER AND MAN HOURS PLANNING (H800
MAY (2023)
Week 16 Week 17 Week 18 Week 1
20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

AND MAN HOURS ACTUAL (H80069-PR-00)


MAY (2023)
Week 16 Week 17 Week 18 Week 1
20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

OOL ACTUAL (H80069-PR-00)


3) MAY (2023)
Week 16 Week 17 Week 18 W
19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7

6 6 8

8
8
20 8
RS PLANNING (H80069-PR-00)
MAY (2023) JUNE(2023)
Week 19 Week 20 Week 22 Week 23 Week 24
9 10 11 12 13 14 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0

DAILY MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)


MAY (2023) JUNE (2023)
Week 19 Week 20 Week 22 Week 23 Week 24
9 10 11 12 13 14 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0

MAY (2023)
Week 19 Total Spool
8 9 10 11 12 13

6 5 4 75
40
40
40

40
40
40
0

38
JUNE(2023)
Week 24 Week 25 Week 26
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

TUAL (H80069-PR-00)
JUNE (2023)
Week 24 Week 25 Week 26
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
EXTERNAL DECK SCUPPER SYSTEM

TOTAL SPOOL LINE : 8

NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL

1 H80069 AMD P044 001 1 1


2 H80069 AMD P044 002 2 2
3 H80069 AMD P044 003 3 3
4 H80069 AMD P044 004 4 4
5 H80069 AMD P044 005 5 5
6 H80069 AMD P044 006 6 6
7 H80069 AMD P044 007 7 7
8 H80069 AMD P044 008 8 8
SPOOL CALCULATE ON SITE

8 8 8 0 0 0

FABRICATION INSTALLATION

WEIGHT (Kg) Fit Up Welding Inspect. Fit Up Welding Testing

20% 25% 5% 14% 16% 5%


10.3 100% 100% 100%
10.3 100% 100% 100%
10.3 100% 100% 100%
10.3 100% 100% 100%
10.3 100% 100% 100%
10.3 100% 100% 100%
8.8 100% 100% 100%
8.8 100% 100% 100%
Progress Overall'!A1

79.4
0 0

FINAL INSPECTION

Hydrotest Finishing PERCENTAGE (%) REMARK

12% 3%
50%
50%
50%
50%
50%
50%
50%
50%
EXTERNAL DECK SCUPPER SYSTEM P
FABRICATION INSTALLATION

Fit Up Welding Inspect. Fit Up Welding

100% 100% 100% 0% 0%

PLANNING

FABRICATION INSTALLATION

START
FINISH
DAYS 0 0
ACTUAL

FABRICATION INSTALLATION

START
FINISH
DAYS 0 0
VARIATION/DELAY

FABRICATION INSTALLATION

START 0 0
FINISH 0 0
L DECK SCUPPER SYSTEM PROGRESS (%)
STALLATION FINAL INSPECTION
TOTAL TONNAGE TOTAL PROGRESS
Testing Hydrotest Finishing

0% 0% 0% 39.7 50%

ING

STALLATION FINAL INSPECTION

0
AL

STALLATION FINAL INSPECTION

0
/DELAY

STALLATION FINAL INSPECTION

0
0
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month
Week Week 18
Day/Date 1 2 3 4 5

Fabrication
SPV
Foreman/Asst.
Fitter
M
P A
Helper
N Welder/Grinder
L P Installation and Testing
A O SPV
N W Foreman/Asst.
E Fitter
N R
Helper
I Welder/Grinder
N Total Manpower
0 0 0 0 0
G 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7
M
A Man Hours (Basic) Saturday (5 Hours)
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00)
R 0 0 0 0 0
S Total Man Hours
0
1050

DAILY MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)


Month
Week Week 18
Day/Date 1 2 3 4 5
Fabrication
SPV
Foreman/Asst.
Fitter
M
Helper
A
N Welder/Grinder
A P Installation and Testing
C O
W
SPV
Foreman/Asst.
T E
U R

A
N
A P
C O
W
T E Fitter
U R
Helper
A Welder/Grinder
L Total Manpower
0 0 0 0 0
0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7
M
A Man Hours (Basic) Saturday (5 Hours)
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00)
R 0 0 0 0 0
S Total Man Hours
0

DELAY
(No Drawing)

Month
Week Week 18
Day/Date 1 2 3 4 5
A Fabrication
C Fit up
Welding
T S Inspection (Fit up)
U P Inspection (Visual/Welding)
O
A O Installation and Testing
L L Fit up
Welding
Inspection (Fit up)
Inspection (Welding)
DAILY WORK MANPOWER
MAY (2023)
k 18 Week 19 Week 20 Week 21
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

DAILY WORK MANPOWER


MAY (2023)
k 18 Week 19 Week 20 Week 21
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

DAILY WORK
MAY(2023)
k 18 Week 19 Week 20 Week 21
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

4 3

7
ORK MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)
JUNE (2023)
Week 21 Week 22 Week 23 Week 24
25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

ORK MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)


JUNE (2023)
Week 21 Week 22 Week 23 Week 24
25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

DAILY WORKING SPOOL ACTUAL (H80069-PR-00)


JUNE(2023)
Week 21 Week 22 Week 23 Week 24
25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

3 4

7
JUNE (2023)
Week 24 Week 25 Week 26
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

JUNE (2023)
Week 24 Week 25 Week 26
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

JUNE(2023)
Week 24 Week 25 Week 26 Total Spool
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 8
7
7
7

0
0
0
0
OILY BILGE AND DIRTY SYSTEM

TOTAL SPOOL LINE : 64

NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL

1 H80069 BMD P9 001 01 1


2 H80069 BMD P9 001 01 2
3 H80069 BMD P9 001 01 3
4 H80069 BMD P9 001 02 4
5 H80069 BMD P9 001 02 5
6 H80069 BMD P9 001 02 6
7 H80069 BMD P9 002 03 7
8 H80069 BMD P9 002 03 8
9 H80069 BMD P9 003 04 9
10 H80069 BMD P9 003 04 10
11 H80069 BMD P9 003 04 11
12 H80069 BMD P9 003 04 12
13 H80069 BMD P9 003 04 13
14 H80069 BMD P9 003 04 14
15 H80069 BMD P9 003 05 15
16 H80069 BMD P9 003 05 16
17 H80069 BMD P9 003 05 17
18 H80069 BMD P9 003 06 18
19 H80069 BMD P9 003 06 19
20 H80069 BMD P9 003 06 20
21 H80069 BMD P9 003 06 21
22 H80069 BMD P9 004 07 22
23 H80069 BMD P9 004 07 23
24 H80069 BMD P9 005 08 24
25 H80069 BMD P9 005 08 25
26 H80069 BMD P9 005 08 26

27 H80069 BMD P9 005 08 27

28 H80069 BMD P9 006 09 28

29 H80069 BMD P9 006 09 29

30 H80069 BMD P9 006 09 30

31 H80069 BMD P9 007 10 31

32 H80069 BMD P9 007 10 32

33 H80069 BMD P9 007 10 33

34 H80069 BMD P9 008 11 34


35 H80069 BMD P9 008 11 35

36 H80069 BMD P9 008 11 36

37 H80069 BMD P9 008 11 37

38 H80069 BMD P9 008 12 38

39 H80069 BMD P9 008 12 39

40 H80069 BMD P9 008 12 40

41 H80069 BMD P9 008 12 41

42 H80069 BMD P9 009 13 42

43 H80069 BMD P9 009 13 43

44 H80069 BMD P9 009 14 44

45 H80069 BMD P9 009 14 45

46 H80069 BMD P9 009 14 46

47 H80069 BMD P9 009 15 47

48 H80069 BMD P9 009 15 48

49 H80069 BMD P9 009 15 49

50 H80069 BMD P9 009 15 50

51 H80069 BMD P9 010 16 51

52 H80069 BMD P9 010 16 52

53 H80069 BMD P9 010 16 53

54 H80069 BMD P9 010 16 54

55 H80069 BMD P9 010 16 55

56 H80069 BMD P9 010 16 56

57 H80069 BMD P9 010 17 57

58 H80069 BMD P9 010 17 58

59 H80069 BMD P9 010 18 59

60 H80069 BMD P9 010 18 60

61 H80069 BMD P9 001 01 1

62 H80069 BMD P9 001 02 2

63 H80069 AMD P9 001 01 1

64 H80069 AMD P9 001 02 2


SPOOL CALCULATE ON SITE

38 0 0 0 0 0

FABRICATION INSTALLATION

WEIGHT (Kg) Fit Up Welding Inspect. Fit Up Welding Testing

20% 25% 5% 14% 16% 5%

100%
100%
100%
100%

100%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

100%
100%

100%
100%

100%

100%

100%
100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%
Progress Overall'!A1

0
0 0

FINAL INSPECTION
FABRICATION
Hydrotest Finishing PERCENTAGE (%) REMARK

12% 3% Fit up
0%
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
0%
0%
20% 30-Jun-23
0%
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
0%
20% 5-Jul-23
20% 5-Jul-23
0%
20% 5-Jul-23
20% 5-Jul-23

20% 5-Jul-23

0%

20% 5-Jul-23

0%

0%

20% 5-Jul-23

0%

0%
0%

0%

0%

0%

0%

0%

0%

0%

20% 5-Jul-23

20% 5-Jul-23

20% 5-Jul-23

20% 5-Jul-23

20% 5-Jul-23

20% 5-Jul-23

20% 5-Jul-23

0%

20% 5-Jul-23

0%

20% 5-Jul-23

20% 5-Jul-23

20% 5-Jul-23

20% 5-Jul-23

20% 5-Jul-23

20% 5-Jul-23

20% 5-Jul-23

0%

0%

0%

0%

0%
FABRICATION
FABRICATION INSTALLATION
Fit Up Welding

Welding Fit up Welding


59% 0%

FABRICATION

START
FINISH
DAYS 0

FABRICATION

START
FINISH
DAYS 0

FABRICATION

START 0
FINISH 0
OILY BILGE AND DIRTY SYSTEM PROGRESS (%)
BRICATION INSTALLATION FINAL INSPECTION
Inspect. Fit Up Welding Testing Hydrotest Finishing

0% 0% 0% 0% 0% 0%

PLANNING

BRICATION INSTALLATION FINAL INSPECTION

0 0
ACTUAL

BRICATION INSTALLATION FINAL INSPECTION

0 0
VARIATION/DELAY

BRICATION INSTALLATION FINAL INSPECTION

0 0
0 0
(%) DAILY MANPOWER AND MAN HOURS PLANNING (H800
Month
TOTAL TONNAGE TOTAL PROGRESS
Week
Day/Date
0 12%

M
P A
L N
P
A O
N W
E
N R
I
N
G
M
A
N
H
O
U
R
S

DAILY MANPOWER AND MAN HOURS ACTUAL (H8006


Month

A
C
T
U M
A A
L N
H
O
U
R
U M
A A
L N
H
O
U
R
S

Month
Week
Day/Date

A
C
T
S
U P
A O
O
L L
OWER AND MAN HOURS PLANNING (H80069-PR-00) DAILY WORK MANPOW
Month
Week Week 22 Week 23 W
Day/Date 1 2 3 4 5 6 7 8 9 10 11

Fabrication
SPV
Foreman/Asst.
Fitter
Helper
Welder/Grinder
Installation and Testing
SPV
Foreman/Asst.
Fitter
Helper
Welder/Grinder
0 0 0 0 0 0 0 0 0 0 0
Total Manpower
0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7 7
Man Hours (Basic) Saturday (5 Hours) 5 5
Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5 3.5
Man Hours (OT) Saturday (13.00 - 15.00) 3.5 3.5
Man Hours (OT) Sunday (07.00 - 15.00) 14 14
0 0 0 0 0 0 0 0 0 0 0
Total Man Hours
0 0
1025.5

POWER AND MAN HOURS ACTUAL (H80069-PR-00) DAILY WORK MANPOW


Month
Foreman/Asst.
Fitter
Helper
Welder/Grinder
0 0 0 0 0 0 0 0 0 0 0
Total Manpower
0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7 7
Man Hours (Basic) Saturday (5 Hours) 5 5
Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5 3.5
Man Hours (OT) Saturday (13.00 - 15.00) 3.5 3.5
Man Hours (OT) Sunday (07.00 - 15.00) 14 14
0 0 0 0 0 0 0 0 0 0 0
Total Man Hours
0 0

Month
Week Week 22 Week 23 W
Day/Date 1 2 3 4 5 6 7 8 9 10 11

Fabrication
Fit up
Welding
Inspection (Fit up)
Inspection (Visual/Welding)
Installation and Testing
Fit up
Welding
Inspection (Fit up)
Testing (Line Check)
Y WORK MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)
JUNE (2023)
Week 24 Week 25 Week 26
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

Y WORK MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)


JUNE (2023)

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

DAILY WORKING SPOOL ACTUAL (H80069-PR-00)


JUNE(2023)
Week 24 Week 25 Week 26
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

6 6 6 2
26
31

3.5

5
3.5

H80069-PR-00)
JULY(2023)
26 Week 27 Week 28 Week 29
31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

6 6 6

18 20
3)
Week 29 Week 30 Total Spool

19 20 21 22 23 24 25 26 27 28 29 30

38
0
38
0

0
0
0
0
SOIL AND DRAIN SYSTEM

TOTAL SPOOL LINE : 75

NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL

1 H80069 BMD P8 001 01 1


2 H80069 BMD P8 002 02 2
3 H80069 BMD P8 002 02 3
4 H80069 BMD P8 002 02 4
5 H80069 BMD P8 002 03 5
6 H80069 BMD P8 002 03 6
7 H80069 BMD P8 002 03 7
8 H80069 BMD P8 003 04 8
9 H80069 BMD P8 003 04 9
10 H80069 BMD P8 003 04 10
11 H80069 BMD P8 004 05 11
12 H80069 BMD P8 005 06 12
13 H80069 BMD P8 005 06 13
14 H80069 BMD P8 006 07 14
15 H80069 BMD P8 006 07 15
16 H80069 BMD P8 006 08 16
17 H80069 BMD P8 006 08 17
18 H80069 BMD P8 007 09 18
19 H80069 BMD P8 008 10 19
20 H80069 BMD P8 008 10 20
21 H80069 BMD P8 009 11 21
22 H80069 BMD P8 009 11 22
23 H80069 BMD P8 009 11 23
24 H80069 BMD P8 009 11 24
25 H80069 BMD P8 014 17 45
26 H80069 BMD P8 014 17 46
27 H80069 BMD P8 014 17 47
28 H80069 BMD P8 015 18 48
29 H80069 BMD P8 015 18 49
30 H80069 BMD P8 016 19 50
31 H80069 BMD P8 016 19 51
32 H80069 BMD P8 017 20 52
33 H80069 BMD P8 017 20 53
34 H80069 BMD P8 017 21 54
35 H80069 BMD P8 017 21 55
36 H80069 BMD P8 017 21 56
37 H80069 BMD P8 017 21 57
38 H80069 BMD P8 017 21 58
39 H80069 BMD P8 018 22 59
40 H80069 BMD P8 018 22 60
41 H80069 BMD P8 019 23 61
42 H80069 BMD P8 019 23 62
43 H80069 BMD P8 020 24 63
44 H80069 BMD P8 020 24 64
45 H80069 BMD P8 021 25 65
46 H80069 BMD P8 021 25 66
47 H80069 BMD P8 022 26 67
48 H80069 BMD P8 022 26 68
49 H80069 BMD P8 023 27 69
50 H80069 BMD P8 023 27 70
51 H80069 BMD P8 023 27 71
52 H80069 BMD P8 023 27 72
53 H80069 BMD P8 024 28 73
54 H80069 BMD P8 024 28 74
55 H80069 BMD P8 024 28 75
56 H80069 BMD P8 024 28 76
57 H80069 BMD P8 025 29 77
58 H80069 BMD P8 025 29 78
59 H80069 BMD P8 025 29 79
60 H80069 BMD P8 025 29 80
61 H80069 BMD P8 026 30 81
62 H80069 BMD P8 027 31 82
63 H80069 BMD P8 027 31 83
64 H80069 BMD P8 027 32 84
65 H80069 BMD P8 027 32 85
66 H80069 BMD P8 028 33 86
67 H80069 BMD P8 028 33 87
68 H80069 AMD P8 001 01 1
69 H80069 AMD P8 001 01 2
70 H80069 AMD P8 001 01 3
71 H80069 AMD P8 001 01 4
72 H80069 AMD P8 002 02 6
73 H80069 AMD P8 002 03 5
74 H80069 AMD P8 029 04 7
75 H80069 AMD P8 030 05 8
SPOOL CALCULATE ON SITE

61 2 2 2 2 0

FABRICATION INSTALLATION

WEIGHT (Kg) Fit Up Welding Inspect. Fit Up Welding Testing

20% 25% 5% 14% 16% 5%


100%
100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

100%
100%
100%
100%

100%

100%
100%
100%
100%
100%
100%
100% 100% 100% 100% 100%
100%
100%

100%
100%
100%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100% 100% 100% 100% 100%
100%
100%
100%
100%
100%
100%
100%
Progress Overall'!A1

0
0 0

FINAL INSPECTION
FABRICATION
Hydrotest Finishing PERCENTAGE (%) REMARK

12% 3% Fit up Welding


20% 19-Jun-23
20% 21-Jun-23
20% 21-Jun-23
20% 19-Jun-23
20% 21-Jun-23
20% 21-Jun-23
0% Penetration
20% 19-Jun-23
20% 14-Jun-23
20% 14-Jun-23
20% 14-Jun-23
20% 19-Jun-23
20% 14-Jun-23
20% 14-Jun-23
20% 14-Jun-23
20% 14-Jun-23
20% 14-Jun-23
20% 14-Jun-23
20% 14-Jun-23
20% 21-Jun-23
20% 21-Jun-23
20% 19-Jun-23
20% 14-Jun-23
0% Penetration
20% 19-Jun-23
20% 21-Jun-23
20% 19-Jun-23
20% 21-Jun-23
0%
20% 21-Jun-23
0%
20% 21-Jun-23
20% 19-Jun-23
20% 19-Jun-23
20% 19-Jun-23
20% 19-Jun-23
20% 19-Jun-23
80% Overboard
20% 21-Jun-23
20% 21-Jun-23
0%
20% 21-Jun-23
20% 19-Jun-23
20% 19-Jun-23
0%
20% 19-Jun-23
20% 19-Jun-23
20% 21-Jun-23
20% 21-Jun-23
20% 21-Jun-23
20% 21-Jun-23
20% 21-Jun-23
20% 21-Jun-23
20% 19-Jun-23
20% 21-Jun-23
20% 19-Jun-23
20% 21-Jun-23
20% 21-Jun-23
20% 19-Jun-23
80% Overboard
20% 21-Jun-23
20% 21-Jun-23
20% 21-Jun-23
20% 21-Jun-23
20% 21-Jun-23
20% 19-Jun-23
20% 19-Jun-23
0%
0%
0%
0%
0%
0%
0%
0%
SOIL AND
FABRICATION
INSTALLATION
Fit Up Welding Inspect.

Fit up Welding
81% 3% 3%

PLANNING

FABRICATION

START
FINISH
DAYS 0
ACTUAL

FABRICATION

START
FINISH
DAYS 0
VARIATION/DEL

FABRICATION

START 0
FINISH 0
SOIL AND DRAIN SYSTEM PROGRESS (%)
INSTALLATION FINAL INSPECTION
TOTAL TONNAGE
Fit Up Welding Testing Hydrotest Finishing

3% 3% 0% 0% 0% 0

PLANNING

INSTALLATION FINAL INSPECTION

0
ACTUAL

INSTALLATION FINAL INSPECTION

0
VARIATION/DELAY

INSTALLATION FINAL INSPECTION

0
0
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month
TOTAL PROGRESS
Week
Day/Date
18%
Fabrication
SPV
Foreman/Asst.
Fitter
M
P A
Helper
N Welder/Grinder
L P Installation and Testing
A O SPV
N W Foreman/Asst.
E Fitter
N R
Helper
I Welder/Grinder
N Total Manpower
G
Man Hours (Basic) Mon-Fri (7 Hours)
M
A Man Hours (Basic) Saturday (5 Hours)
N Man Hours (OT) Mon-Fri (15.00 - 17.00)
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00)
R
S Total Man Hours

882

DAILY MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)


Month
Week
Day/Date
Fabrication
SPV
Foreman/Asst.
Fitter
M
Helper
A
N Welder/Grinder
A P Installation and Testing
C O
W
SPV
Foreman/Asst.
T E
U R

A
N
A P
C O
W
T E Fitter
U R
Helper
A Welder/Grinder
L Total Manpower

Man Hours (Basic) Mon-Fri (7 Hours)


M
A Man Hours (Basic) Saturday (5 Hours)
N Man Hours (OT) Mon-Fri (15.00 - 17.00)
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00)
R
S Total Man Hours

Month
Week
Day/Date
A Fabrication
C Fit up
Welding
T S Inspection (Fit up)
U P Inspection (Visual/Welding)
O
A O Installation and Testing
L L Fit up
Welding
Inspection (Fit up)
Inspection (Welding)
MAY (2023)
Week 18 Week 19 Week 20
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

MAY (2023)
Week 18 Week 19 Week 20
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

MAY(2023)
Week 18 Week 19 Week 20
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
DAILY WORK MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)

20 Week 21 Week 22 Week 23


20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

DAILY WORK MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)

20 Week 21 Week 22 Week 23


20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

DAILY WORKING SP

20 Week 21 Week 22 Week 23


20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7
H80069-PR-00)
JUNE (2023)
Week 23 Week 24 Week 25 Week 2
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

H80069-PR-00)
JUNE (2023)
Week 23 Week 24 Week 25 Week 2
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

AILY WORKING SPOOL ACTUAL (H80069-PR-00)


JUNE(2023)
Week 23 Week 24 Week 25 Week 2
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

3 2 3 3 6 5 6 7 7 7 6 6

13 21 27
Week 26
27 28 29 30 31

0 0 0 0 0
0
7 7 7 7
5
3.5 3.5 3.5 3.5
3.5

0 0 0 0 0
0

Week 26
27 28 29 30 31
0 0 0 0 0
0
7 7 7 7
5
3.5 3.5 3.5 3.5
3.5

0 0 0 0 0
0

JULY(2023
Week 26 Week 27 Week 28
27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14
JULY(2023)
28 Week 29 Week 30 Total Spool
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

61
0
61
0

0
0
0
0
ENGINE EXHAUST SYSTEM

TOTAL SPOOL LINE : 13

NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL

1 H80069 BMD P10 001 01 01

2 H80069 BMD P10 001 02 02

3 H80069 BMD P10 002 04 04

4 H80069 BMD P10 002 04 05

5 H80069 BMD P10 003 05 06

6 H80069 BMD P10 003 06 07

7 H80069 BMD P10 004 07 08

8 H80069 BMD P10 004 07 09

9 H80069 BMD P10 004 08 10

10 H80069 AMD P10 001 01 01

11 H80069 AMD P10 002 02 02

12 H80069 AMD P10 003 03 03

13 H80069 AMD P10 004 04 04


SPOOL CALCULATE ON SITE

0 0 0 0 0 0
FABRICATION INSTALLATION

WEIGHT (Kg) Fit Up Welding Inspect. Fit Up Welding Testing

20% 25% 5% 14% 16% 5%


Progress Overall'!A1

0
0 0
FINAL INSPECTION

Hydrotest Finishing PERCENTAGE (%) REMARK

12% 3%
0%

0%

0%

0%

0% START

0% FINISH

0% DAYS

0%

0%

0%

0% START

0% FINISH

0% DAYS
ENGINE EXHAUST SYSTEM PROGRESS
FABRICATION INSTALLATION

Fit Up Welding Inspect. Fit Up Welding

0% 0% 0% 0% 0%

PLANNING

FABRICATION INSTALLATION

0 0

ACTUAL

FABRICATION INSTALLATION

0 0
E EXHAUST SYSTEM PROGRESS (%)
TALLATION FINAL INSPECTION
TOTAL TONNAGE TOTAL PROGRESS
Testing Hydrotest Finishing

0% 0% 0% 0 0%

TALLATION FINAL INSPECTION

TALLATION FINAL INSPECTION

0
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month DECEMBER (2022)
Week Week 52
Day/Date 25 26 27 28

Fabrication
SPV
Foreman/Asst.
P Fitter
L Helper
A M Welder/Grinder
N A
Installation and Testing
N
N P SPV
I O
W
N E Foreman/Asst.

G R
Fitter

Helper

Welder/Grinder

Total Manpower 0 0 0 0
#REF!

DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)


Month DECEMBER (2022)
Week Week 52
Day/Date 25 26 27 28

Fabrication
SPV
Foreman/Asst.
Fitter
M Helper
A Welder/Grinder
N
A P Installation and Testing
C O
W
T E
U R
M
A
N
A P
C O
W
SPV
T E Foreman/Asst.

U R Fitter

A Helper

L Welder/Grinder
0 0 0 0
Total Manpower
0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7
M
Man Hours (Basic) Saturday (5 Hours)
A
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14
R 0 0 0 0
S Total Man Hours
0

Month DECEMBER (2022)


Week Week 52
Day/Date 25 26 27 28

Fabrication
A Fit up
C Welding
T Inspection (Fit up)
S
U P Inspection (Visual/Welding)
A O
Installation and Testing
O
L L Fit up
Welding
Inspection (Fit up)
Inspection (Welding)
80069-PR-00)
ECEMBER (2022) JANUARY (2023)
Week 52 Week 1 Week 2 Week 3
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#REF! #REF! #REF! #REF!

80069-PR-00)
ECEMBER (2022) JANUARY (2023)
Week 52 Week 1 Week 2 Week 3
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

ECEMBER (2022) JANUARY (2023)


Week 52 Week 1 Week 2 Week 3
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
ANUARY (2023)
Week 3 Week 4 Week 5
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4

1 1 1
2 2 2
2 2 2
2 2 2

1 1

1 1

1 1

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 10 10
#REF! #REF! #REF!

ANUARY (2023)
Week 3 Week 4 Week 5
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4

1 1 1
2 2 2
2 2 2
2 2 2
1 1
1 1
1 1
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 10 10
0 0 27
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 73.5 105 0
0 0 178.5

ANUARY (2023)
Week 3 Week 4 Week 5
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
FEBRUARY (2023)
Week 6 Week 7 Week 8
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2

1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1

10 10 10 10 10 10 10 10 10 10 10 3 0 0 0 0 0 0 0
#REF! #REF! #REF!

DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)


FEBRUARY (2023)
Week 6 Week 7 Week 8
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1
10 10 10 10 10 10 10 10 10 10 10 3 0 0 0 0 0 0 0
70 43 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 105 0 70 105 105 0 0 105 0 70 31.5 0 0 0 0 0 0 0
385 206.5 0

FEBRUARY (2023)
Week 6 Week 7 Week 8
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
-00)
MARCH
Week 8 Week 9 Week 10 Week 11
24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#REF! #REF! #REF! #REF!

-00)
MARCH
Week 8 Week 9 Week 10 Week 11
24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

MARCH (2
Week 8 Week 9 Week 10 Week 11
24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14
MARCH (2023)
Week 11 Week 12 Week 13 W
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#REF! #REF! #REF! #

MARCH (2023)
Week 11 Week 12 Week 13 W
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

DAILY WO
MARCH (2023)
Week 11 Week 12 Week 13 W
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2
APRIL (2023)
Week 14 Week 15 Week 16
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#REF! #REF! #REF!

APRIL (2023)
Week 14 Week 15 Week 16
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

DAILY WORKING SPOOL ACTUAL (H80069-PR-00)


APRIL (2023)
Week 14 Week 15 Week 16
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
DAILY WORK MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)

16 Week 17 Week 18 Week 19


22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#REF! #REF! #REF!

DAILY WORK MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)

16 Week 17 Week 18 Week 19


22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
14 0 0

16 Week 17 Week 18 Week 19


22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10
-00)
MAY (2023)
Week 19 Week 20 Week 21 Week 22
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#REF! #REF! #REF! #REF!

-00)
MAY (2023)
Week 19 Week 20 Week 21 Week 22
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

MAY(2023)
Week 19 Week 20 Week 21 Week 2
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Week 22
30 31

0 0
#REF!

Week 22
30 31
0 0
0
7 7

3.5 3.5

0 0
0

JUNE(2023)
Week 22 Week 23 Week 24
30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
NE(2023)
Week 25 Week 26 Week 27
18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5
JULY(2023)
Week 27 Week 28 Week 29 Week 3
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Week 30 Total Spool

25 26 27 28 29 30

0
0
0
0

0
0
0
0
QUICK CLOSING VALVE SYSTEM
35
TOTAL SPOOL LINE :

NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL

1 H80069 P12

2 H80069 P12

3 H80069 P12

4 H80069 P12

5 H80069 P12

6 H80069 P12

7 H80069 P12

8 H80069 P12

9 H80069 P12

10 H80069 P12

11 H80069 P12

12 H80069 P12

13 H80069 P12

14 H80069 P12

15 H80069 P12

16 H80069 P12

17 H80069 P12

18 H80069 P12

19 H80069 P12

20 H80069 P12

21 H80069 P12

22 H80069 P12

23 H80069 P12

24 H80069 P12

25 H80069 P12

26 H80069 P12

27 H80069 P12
28 H80069 P12

29 H80069 P12

30 H80069 P12

31 H80069 P12

32 H80069 P12

33 H80069 P12

34 H80069 P12

35 H80069 P12
SPOOL CALCULATE ON SITE

0 0 0 0 0 0
FABRICATION INSTALLATION

WEIGHT (Kg) Fit Up Welding Inspect. Fit Up Welding Testing

20% 25% 5% 14% 16% 5%


Progress Overall'!A1

0
0 0
FINAL INSPECTION

Hydrotest Finishing PERCENTAGE (%) REMARK

12% 3%
0%

0%

0%

0%

0% START

0% FINISH

0% DAYS

0%

0%

0%

0% START

0% FINISH

0% DAYS

0%

0%

0%

0% START

0% FINISH

0%

0%

0%

0%

0%

0%

0%

0%

0%
0%

0%

0%

0%

0%

0%

0%

0%
QUICK CLOSING VALVE SYSTEM PROGRES
FABRICATION INSTALLATION

Fit Up Welding Inspect. Fit Up Welding

0% 0% 0% 0% 0%

PLANNING

FABRICATION INSTALLATION

0 0

ACTUAL

FABRICATION INSTALLATION

0 0

VARIATION/DELAY

FABRICATION INSTALLATION

0 0

0 0
OSING VALVE SYSTEM PROGRESS (%)
TALLATION FINAL INSPECTION
TOTAL TONNAGE TOTAL PROGRESS
Testing Hydrotest Finishing

0% 0% 0% 0 0%

TALLATION FINAL INSPECTION

TALLATION FINAL INSPECTION

ELAY

TALLATION FINAL INSPECTION

0
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month DECEMBER (2022)
Week Week 52
Day/Date 25 26 27 28

Fabrication
SPV
Foreman/Asst.
Fitter
Helper
Welder/Grinder
M
Installation and Testing
P A
N
L P SPV
A O
W Foreman/Asst.
N E
N R Fitter

I Helper
N
G Welder/Grinder

0 0 0 0
Total Manpower
0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7
M
Man Hours (Basic) Saturday (5 Hours)
A
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14
R 0 0 0 0
S Total Man Hours
0
154

DAILY MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)


Month DECEMBER (2022)
Week Week 52
Day/Date 25 26 27 28
Fabrication
SPV
Foreman/Asst.
Fitter
M Helper
A Welder/Grinder
N
A P Installation and Testing
C O
W
SPV
T E Foreman/Asst.

U R Fitter

A Helper

L Welder/Grinder
0 0 0 0
Total Manpower
0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7
M
Man Hours (Basic) Saturday (5 Hours)
A
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14
R 0 0 0 0
S Total Man Hours
0

DELAY

(No Drawing)
0069-PR-00)
ECEMBER (2022) JANUARY (2023)
Week 52 Week 1 Week 2 Week 3
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

069-PR-00) DAILY MANPOWER AND MAN HOURS ACT


ECEMBER (2022) JANUARY (2023)
Week 52 Week 1 Week 2 Week 3
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
ANUARY (2023)
Week 3 Week 4 Week 5
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

D MAN HOURS ACTUAL (H80069-PR-00)


ANUARY (2023)
Week 3 Week 4 Week 5
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
FEBRUARY (2023)
Week 6 Week 7 Week 8
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1

0 0 4 4 4 4 4 4 4 4 0 0 0 0 0 0 0 0 0
20 12 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 0 0 28 42 42 0 0 42 0 0 0 0 0 0 0 0 0 0
112 42 0

FEBRUARY (2023)
Week 6 Week 7 Week 8
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
0)
MARCH (2
Week 8 Week 9 Week 10 Week 11
24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

MARCH (2
Week 8 Week 9 Week 10 Week 11
24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
MARCH (2023)
Week 11 Week 12 Week 13
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

MARCH (2023)
Week 11 Week 12 Week 13
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
HYDRAULIC MACHINERY SYSTEM
25
TOTAL SPOOL LINE :

NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL

1 H80069 P0
2 H80069 P0
3 H80069 P0
4 H80069 P0
5 H80069 P0
6 H80069 P0
7 H80069 P0
8 H80069 P0
9 H80069 P0
10 H80069 P0
11 H80069 P0
12 H80069 P0
13 H80069 P0
14 H80069 P0
15 H80069 P0
16 H80069 P0
17 H80069 P0
18 H80069 P0
19 H80069 P0
20 H80069 P0
21 H80069 P0
22 H80069 P0
23 H80069 P0
24 H80069 P0
25 H80069 P0
SPOOL CALCULATE ON SITE

0 0 0 0 0 0
FABRICATION INSTALLATION

WEIGHT (Kg) Fit Up Welding Inspect. Fit Up Welding Testing

20% 25% 5% 14% 16% 5%


Progress Overall'!A1

0
0 0
FINAL INSPECTION

Hydrotest Finishing PERCENTAGE (%) REMARK

12% 3%
0%
0%
0%
0%
0% START
0% FINISH
0% DAYS
0%
0%
0%
0% START
0% FINISH
0% DAYS
0%
0%
0%
0% START
0% FINISH
0%
0%
0%
0%
0%
0%
0%
HYDRAULIC MACHINERY SYSTEM PROGRES
FABRICATION INSTALLATION

Fit Up Welding Inspect. Fit Up Welding Testing

0% 0% 0% 0% 0% 0%

PLANNING

FABRICATION INSTALLATION

0 0

ACTUAL

FABRICATION INSTALLATION

0 0

VARIATION/DELAY

FABRICATION INSTALLATION

0 0
0 0
SYSTEM PROGRESS (%) DAILY MAN
FINAL INSPECTION
TOTAL TONNAGE TOTAL PROGRESS
Hydrotest Finishing

0% 0% 0 0%

FINAL INSPECTION

P
L
A
N
FINAL INSPECTION
N
I
N
G

FINAL INSPECTION

DAILY MA

A
C
A
C
T
U
A
L
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month DECEMBER (2022)
Week Week 52 Week 1
Day/Date 25 26 27 28 29 30 31 1 2

Fabrication
SPV
Foreman/Asst.
Fitter
M Helper
A Welder/Grinder
N
P Installation and Testing
O SPV
W
Foreman/Asst.
E
R Fitter
Helper
Welder/Grinder
0 0 0 0 0 0 0 0 0
Total Manpower
0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7
M
A Man Hours (Basic) Saturday (5 Hours) 5
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00) 3.5
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14 14
R 0 0 0 0 0 0 0 0 0
S Total Man Hours
0 0
507.5

DAILY MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)


Month DECEMBER (2022)
Week Week 52 Week 1
Day/Date 25 26 27 28 29 30 31 1 2

Fabrication
SPV
Foreman/Asst.
Fitter
M Helper
A
N
P
O
W
M
A Welder/Grinder
N
P Installation and Testing
O SPV
W
Foreman/Asst.
E
R Fitter
Helper
Welder/Grinder
0 0 0 0 0 0 0 0 0
Total Manpower
0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7
M
A Man Hours (Basic) Saturday (5 Hours) 5
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00) 3.5
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14 14
R 0 0 0 0 0 0 0 0 0
S Total Man Hours
0 0

DELAY
(No Drawing)
JANUARY (2023)
Week 1 Week 2 Week 3
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

DAILY MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)


JANUARY (2023)
Week 1 Week 2 Week 3
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
DAILY MANPOWER

Week 4 Week 5 Week 6


22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

L (H80069-PR-00)

Week 4 Week 5 Week 6


22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
FEBRUARY (2023)
Week 6 Week 7 Week 8 Week 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

1 1 1 1 1 1 1
2 2 2 2 1 1 1
2 2 2 2 1 1 1
2 2 2 2 1 1 1

1 1 1 1 1
2 2 2 2 2
2 2 2 2 2
2 2 2 2 2
0 0 0 0 0 0 0 0 0 0 7 7 7 7 11 11 11 7 7
0 0 50 39
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 73.5 0 49 73.5 115.5 0 0 73.5 0
0 0 311.5 196

FEBRUARY (2023)
Week 6 Week 7 Week 8 Week 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
MARCH (2023)
Week 9 Week 10 Week 11 W
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

1 1
2 2
2 2
2 2
7 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
39 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
49 73.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
196 0 0

MARCH (2023)
Week 9 Week 10 Week 11 W
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
)
Week 12 Week 13
20 21 22 23 24 25 26 27 28 29 30 31

0 0 0 0 0 0 0 0 0 0 0 0
0 0
7 7 7 7 7 7 7 7 7 7
5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5
14
0 0 0 0 0 0 0 0 0 0 0 0
0 0

)
Week 12 Week 13
20 21 22 23 24 25 26 27 28 29 30 31
0 0 0 0 0 0 0 0 0 0 0 0
0 0
7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14
0 0 0 0 0 0 0 0 0 0 0 0
0 0
CO2 SYSTEM

TOTAL SPOOL LINE : 20

NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL

1 H80069 P0
2 H80069 P0
3 H80069 P0
4 H80069 P0
5 H80069 P0
6 H80069 P0
7 H80069 P0
8 H80069 P0
9 H80069 P0
10 H80069 P0
11 H80069 P0
12 H80069 P0
13 H80069 P0
14 H80069 P0
15 H80069 P0
16 H80069 P0
17 H80069 P0
18 H80069 P0
19 H80069 P0
20 H80069 P0
SPOOL CALCULATE ON SITE

0 0 0 0 0 0
FABRICATION INSTALLATION

WEIGHT (Kg) Fit Up Welding Inspect. Fit Up Welding Testing

20% 25% 5% 14% 16% 5%


Progress Overall'!A1

0
0 0
FINAL INSPECTION

Hydrotest Finishing PERCENTAGE (%) REMARK

12% 3%
0%
0%
0%
0%
0% START
0% FINISH
0% DAYS
0%
0%
0%
0% START
0% FINISH
0% DAYS
0%
0%
0%
0% START
0% FINISH
0%
0%
CO2 SYSTEM PROGRESS (%)
FABRICATION INSTALLATION

Fit Up Welding Inspect. Fit Up Welding

0% 0% 0% 0% 0%

PLANNING

FABRICATION INSTALLATION

0 0

ACTUAL

FABRICATION INSTALLATION

0 0

VARIATION/DELAY

FABRICATION INSTALLATION

0 0
0 0
CO2 SYSTEM PROGRESS (%)
TALLATION FINAL INSPECTION
TOTAL TONNAGE TOTAL PROGRESS
Testing Hydrotest Finishing

0% 0% 0% 0 0%

TALLATION FINAL INSPECTION

TALLATION FINAL INSPECTION

ELAY

TALLATION FINAL INSPECTION

0
0
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month DECEMBER (2022)
Week Week 52
Day/Date 25 26 27 28

Fabrication
SPV
Foreman/Asst.
Fitter
M Helper
P A Welder/Grinder
L N
P Installation and Testing
A O SPV
N W
Foreman/Asst.
E
N R Fitter
I Helper

N Welder/Grinder
0 0 0 0
G Total Manpower
0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7
M
A Man Hours (Basic) Saturday (5 Hours)
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14
R 0 0 0 0
S Total Man Hours
0
532

DAILY MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)


Month DECEMBER (2022)
Week Week 52
Day/Date 25 26 27 28

Fabrication
SPV
Foreman/Asst.
Fitter
M Helper
A
N
A P
C O
W
M
A Welder/Grinder
N
A P Installation and Testing
C O SPV
W
T E
Foreman/Asst.
U R Fitter

A Helper
Welder/Grinder
L
0 0 0 0
Total Manpower
0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7
M
A Man Hours (Basic) Saturday (5 Hours)
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14
R 0 0 0 0
S Total Man Hours
0

DELAY
(No Drawing)
80069-PR-00)
ECEMBER (2022) JANUARY (2023)
Week 52 Week 1 Week 2 Week 3
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

069-PR-00) DAILY MANPOWER AND MAN HOURS ACT


ECEMBER (2022) JANUARY (2023)
Week 52 Week 1 Week 2 Week 3
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
ANUARY (2023)
Week 3 Week 4 Week 5
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

D MAN HOURS ACTUAL (H80069-PR-00)


ANUARY (2023)
Week 3 Week 4 Week 5
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
FEBRUARY (2023)
Week 6 Week 7 Week 8
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

FEBRUARY (2023)
Week 6 Week 7 Week 8
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
0)
MARCH (2
Week 8 Week 9 Week 10 Week 11
24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 1 1 1 1 1 1
2 2 2 2 1 1 1
2 2 2 2 1 1 1
2 2 2 2 1 1 1

1 1 1 1 1 1 1
2 2 2 2 2 2 2
2 2 2 2 2 2 2
2 2 2 2 2 2 2
0 0 0 0 7 7 7 7 11 11 11 7 7 7 7 0 0 0 0
0 39 50 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 49 73.5 73.5 0 0 115.5 73.5 73.5 73.5 0 0 0 0 0
0 196 336 0

MARCH (2
Week 8 Week 9 Week 10 Week 11
24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
MARCH (2023)
Week 11 Week 12 Week 13
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

MARCH (2023)
Week 11 Week 12 Week 13
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
COMPRESSED AIR SYSTEM

TOTAL SPOOL LINE : 65

NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL

1 H80069 BMD 043 1


2 H80069 BMD 043 2
3 H80069 BMD 043 3
4 H80069 BMD 043 4
5 H80069 BMD 043 5
6 H80069 BMD 043 6
7 H80069 BMD 043 7
8 H80069 BMD 043 8
9 H80069 BMD 043 9
10 H80069 BMD 043 10
11 H80069 BMD 043 11
12 H80069 BMD 043 12
13 H80069 BMD 043 13
14 H80069 BMD 043 14
15 H80069 BMD 043 15
16 H80069 BMD 043 16
17 H80069 BMD 043 17
18 H80069 BMD 043 18
19 H80069 BMD 043 19
20 H80069 BMD 043 20
21 H80069 BMD 043 21
22 H80069 BMD 043 22
23 H80069 BMD 043 23
24 H80069 BMD 043 24
25 H80069 BMD 043 25
26 H80069 BMD 043 26
27 H80069 BMD 043 27
28 H80069 BMD 043 28
29 H80069 BMD 043 29
30 H80069 BMD 043 30
31 H80069 BMD 043 31
32 H80069 BMD 043 32
33 H80069 BMD 043 33
34 H80069 BMD 043 34
35 H80069 BMD 043 35
36 H80069 BMD 043 36
37 H80069 BMD 043 37
38 H80069 BMD 043 38
39 H80069 BMD 043 39
40 H80069 BMD 043 40
41 H80069 BMD 043 41
42 H80069 BMD 043 42
43 H80069 BMD 043 43
44 H80069 BMD 043 44
45 H80069 BMD 043 45
46 H80069 BMD 043 46
47 H80069 BMD 043 47
48 H80069 BMD 043 48
49 H80069 BMD 043 49
50 H80069 BMD 043 50
51 H80069 BMD 043 51
52 H80069 BMD 043 52
53 H80069 BMD 043 53
54 H80069 BMD 043 54
55 H80069 BMD 043 55
56 H80069 BMD 043 56
57 H80069 BMD 043 57
58 H80069 BMD 043 58
59 H80069 BMD 043 59
60 H80069 AMD 043 1
61 H80069 AMD 043 2
62 H80069 AMD 043 3
63 H80069 AMD 043 4
64 H80069 AMD 043 5
65 H80069 AMD 043 6
SPOOL CALCULATE ON SITE

65 65 65 59 59 0 65

FABRICATION INSTALLATION FINAL INSPECTION

Fit Up Welding Inspect. Fit Up Welding Testing Hydrotest

20% 25% 5% 14% 16% 5% 12%


100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 100% 100% 50%
100% 100% 100% 50%
100% 100% 100% 50%
100% 100% 100% 50%
100% 100% 100% 50%
100% 100% 100% 50%
100% 100% 100% 50%
Progress Overall'!A1

0
0

FINAL INSPECTION FABRICATION

Finishing PERCENTAGE (%) REMARK Fit Up

3% 100%
86%
86%
86%
FABRICATION
86%
86% START
86% FINISH
86% DAYS 0
86%
86%
FABRICATION
86%
86% START
86% FINISH
86% DAYS 0
86%
86%
FABRICATION
86%
86% START
86% FINISH
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
56%
56%
56%
56%
56%
56%
DOMESTIC FW AND SW SYSTEM PROGRESS (%)
FABRICATION INSTALLATION FINAL INSPECTION
Welding Inspect. Fit Up Welding Testing Hydrotest Finishing

100% 100% 91% 91% 0% 100% 0%

PLANNING

FABRICATION INSTALLATION FINAL INSPECTION

0 0
ACTUAL

FABRICATION INSTALLATION FINAL INSPECTION

0 0
VARIATION/DELAY

FABRICATION INSTALLATION FINAL INSPECTION


%) DAILY MANPOWER AND MAN HOURS PLANNING (H800
Month
TOTAL TONNAGE TOTAL PROGRESS
Week
Day/Date
0 83%

M
P A
L N
P
A O
N W
E
N R
I
N
G
M
A
N
H
O
U
R
S

DAILY MANPOWER AND MAN HOURS ACTUAL (H8006


Month
Week
Day/Date

M
A
N
A P
C O
W
T E
U R

A
N
A P
C O
W
T E
U R

A
L
M
A
N
H
O
U
R
S

Month
Week
Day/Date
A
C
T S
U P
O
A O
L L
OWER AND MAN HOURS PLANNING (H80069-PR-00)
Month MARCH (2023)
Week Week 12 Week 13
Day/Date 19 20 21 22 23 24 25 26 27 28 29

Fabrication
SPV
Foreman/Asst.
Fitter
Helper
Welder/Grinder
Installation and Testing
SPV
Foreman/Asst.
Fitter
Helper
Welder/Grinder
0 0 0 0 0 0 0 0 0 0 0
Total Manpower
0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7 7 7
Man Hours (Basic) Saturday (5 Hours) 5
Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
Man Hours (OT) Saturday (13.00 - 15.00) 3.5
Man Hours (OT) Sunday (07.00 - 15.00) 14 14
0 0 0 0 0 0 0 0 0 0 0
Total Man Hours
0 0
1064 \

POWER AND MAN HOURS ACTUAL (H80069-PR-00)DAILY MANPOWER AND MAN HOURS ACTUAL (H8006
Month MARCH (2023)
Week Week 12 Week 13
Day/Date 19 20 21 22 23 24 25 26 27 28 29
Fabrication
SPV
Foreman/Asst.
Fitter
Helper
Welder/Grinder
Installation and Testing
SPV
Foreman/Asst.
Fitter
Helper
Welder/Grinder
0 0 0 0 0 0 0 0 0 0 0
Total Manpower
0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7 7 7 7
Man Hours (Basic) Saturday (5 Hours) 5
Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
Man Hours (OT) Saturday (13.00 - 15.00) 3.5
Man Hours (OT) Sunday (07.00 - 15.00) 14
0 0 0 0 0 0 0 0 0 0 0
Total Man Hours
0 0

DELAY
(No Drawing)

Month MARCH (2023)


Week Week 12 Week 13
Day/Date 19 20 21 22 23 24 25 26 27 28 29
Fabrication
Fit up 6 5 6 6 6
Welding
Inspection (Fit up)
Inspection (Visual/Welding)
Installation and Testing
Fit up
Welding
Inspection (Fit up)
Testing (Line Check)
APRIL (2023)
Week 13 Week 14 Week 15 Week 16
30 31 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

RS ACTUAL (H80069-PR-00) DAILY MANPOWER AND MAN HO


APRIL (2023)
Week 13 Week 14 Week 15 Week 16
30 31 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

DAILY WORKING SPO


APRIL (2023)
Week 13 Week 14 Week 15 Week 1
30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

4 4
8 12 16 4
40
40

12
12
DAILY MANPOWER AND MAN HOU
023)
Week 16 Week 17 Week 18 W
19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

WER AND MAN HOURS ACTUAL (H80069-PR-00)


023)
Week 16 Week 17 Week 18 W
19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0

LY WORKING SPOOL ACTUAL (H80069-PR-00)


(2023)
Week 16 Week 17 Week 18
18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6

6 6

20 8
20 8
WER AND MAN HOURS PLANNING (H80069-PR-00)
MAY (2023)
Week 19 Week 20 Week 21 Week 22 Week 23
8 9 10 11 12 13 14 15 16 17 18 19 20 21 2 3 4 5

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0

DAILY MANPOWER AND MAN HOURS ACT


MAY (2023)
Week 19 Week 20 Week 21 Week 22 Week 23
8 9 10 11 12 13 14 15 16 17 18 19 20 21 2 3 4 5
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 25 0 0
7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 220.5 0 0

MAY (2023)
Week 19 Week 20 Total Spool
7 8 9 10 11 12 13 14 15 16 17 18 19 20

6 6 2 2 65
12 13 65
25 65
25 65

40
40
0
0
JUNE(2023)
Week 23 Week 24 Week 25 Week 26
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0

ND MAN HOURS ACTUAL (H80069-PR-00)


JUNE (2023)
Week 23 Week 24 Week 25 Week 26
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
Week 26
30 31

0 0
0
7
5
3.5
3.5

0 0
0

Week 26
30 31
0 0
0
7
5
3.5
3.5

0 0
0
No. No. Drawing System

1 P2 Tank Vent and Sounding


2 P3 Bilge and Ballast System
3 P4 Fireman And Deckwash System
4 P5 Fuel Oil System
5 P6 SW and FW Cooling System
6 P7 Domestic FW and SW System
7 P-044 External Deck Scupper Arg.
8 P8 Soil and Drain System
9 P9 Oily Bilge and Dirty Oil System
10 P10 Engines Exhaust System
11 P12 Quick Closing Valve System
12 P0 Hydraulic System
13 P0 CO2 System
14 VSE/Q858-043 Compressed Air System
15 VSE/Q858-030 Lubricating Oil System
CALCULATED PROGRESS TOTAL SPOOL ON SITE
FABRICATION INSTALLATION
Progress Realization Spool Progress Realization Spool
Total Spool
Fit Up Welding Inspect. Fit Up Welding

76 76 76 76 74 74
132 126 110 110 109 109
29 21 21 21 21 21
196 175 134 134 7 1
100 93 69 69 44 44
40 40 40 40 40 40
8 8 8 8 0 0
75 8 8 8 0 0
64 38 0 0 0 0
13 0 0 0 0 0
35 0 0 0 0 0
25 0 0 0 0 0
20 0 0 0 0 0
65 65 65 65 59 59
0 0 0 0 0 0
N SITE
LLATION REINSTATEMENT TESTING & FINISHING
ealization Spool Progress Realization Spool Progress Realization (%)
FINAL INSPECTION
Inspect. Fit Up Welding Inspect.
Hydrotest

74 74 74 74 74
0 109 109 0 109
0 21 21 0 21
1 7 1 1 7
0 44 44 0 44
0 40 40 0 40
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 59 59 0 59
0 0 0 0 0
G & FINISHING
Realization (%)
Finishing

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
TANK VENT SOUNDING SYSTEM OVERBOARD PENETRATION
WEIGHT CALCULATED WEIGHT CALCULATED
Date Weigth (Kg) 25-May-23 218
10-Mar-23 33.5
10-Mar-23 59
10-Mar-23 58
12-Mar-23 74
16-Mar-23 76
17-Mar-23 5.5
17-Mar-23 10.5
18-Mar-23 73.5
29-Mar-23 32
31-Mar-23 41.5
4-May-23 744
Total 1207.5

BILGE SYSTEM
WEIGHT CALCULATED
Date Weigth (Kg)
11-Mar-23 58
25-Mar-23 155.5
26-Mar-23 37.5
11-Mar-23 58
11-Mar-23 58
11-Mar-23 58
11-Apr-23 48
9-Jun-23 85
Total 558

FW/SW SYSTEM
WEIGHT CALCULATED
23-May-23 110.5

AIR COMPRESSED SYSTEM


WEIGHT CALCULATED

FIREMAIN AND DECKWASH SYSTEM


WEIGHT CALCULATED
9-Jun-23 115