Work Report and Progress Piping H80069-PR-00
Work Report and Progress Piping H80069-PR-00
Work Report and Progress Piping H80069-PR-00
Date : 12/24/2023
93.8% 93.8%
85.1% 80.0%
70.2% 70.2%
45.8% 43.5%
61.7% 61.7%
86.0% 86.0%
45.0% 45.0%
37.5% 37.5%
26.7% 11.6%
0.0% 0.0%
0.0% 0.0%
0.0% 0.0%
0.0% 0.0%
91.8% 91.8%
0.0% 0.0%
ress
Project's
Progress This Week
1.50%
0.0%
5.1%
0.0%
2.3%
0.0%
0.0%
0.0%
0.0%
15.1%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
FITTING
PIPE
FITTING
Bilge System
PIPE
FITTING
Flange SS400 2
FITTING
FITTING
NO DESCRIPTION MATERIAL QUALITY ND(inch)
3 Flange SS400 1
FITTING
Cooling System
PIPE
FITTING
5K 17 17 Pcs 21-Feb-23 17
5K 13 13 Pcs 21-Feb-23 13
10K 2 2 Pcs 21-Feb-23 2
5K 42 42 Pcs 21-Feb-23 42
5K 34 34 Pcs 21-Feb-23 34
10 10 Pcs 27-Feb-23 10
5K
2 2 Pcs 1-Mar-23 2
5K 12 12 Pcs 27-Feb-23 12
5K 4 4 Pcs 13-Mar-23 4
SCH 80 16 16 Pcs 21-Feb-23 16
4 4 Pcs 21-Feb-23 4
SCH 80
1 1 Pcs 25-Mar-23 1
SCH 80 2 2 Pcs 21-Feb-23 2
5 LGTH 7-Mar-23 5
10 LGTH 3-Apr-23 10
5 LGTH 7-Mar-23 5
39 Pcs 2-Mar-23 39
5K 39
6 Pcs 15-Apr-23 6
5K 12 12 Pcs 2-Mar-23 12
5K 80 80 Pcs 2-Mar-23 80
5K 37 37 Pcs 2-Mar-23 37
5K 43 43 Pcs 2-Mar-23 43
10K 2 2 Pcs 2-Mar-23 2
5K 4 4 Pcs 9-Mar-23 4
40 Pcs 4-Apr-23 40
5K 56
16 Pcs 4-Apr-23 16
6 Pcs 4-Apr-23 6
5K
6 Pcs 5-Apr-23
2 Pcs 4-Apr-23 2
SCH 80 8
6 Pcs 3-Apr-23 6
Pcs 2-Mar-23 9
Pcs 2-Mar-23 2
Pcs 2-Mar-23 22
5K
2 2 Pcs 9-Mar-23 2
Pcs 2-Mar-23 9
Pcs 2-Mar-23 11
17 Pcs 2-Mar-23 17
10 Pcs 2-Mar-23 10
37 Pcs 2-Mar-23 37
2 Pcs 9-Mar-23 2
20 Pcs 2-Mar-23 20
12 Pcs 2-Mar-23 12
1 Pcs
4 Pcs
24 Pcs
2 Pcs
2 1 Pcs 2-Mar-23 1
6 1 Pcs 2-Mar-23 1
1 1 Pcs 9-Mar-23 1
1 Pcs
1 Pcs
3 Pcs
11 Pcs 13-Mar-23 11
10K 20 Pcs 24-Apr-23 20
20 Pcs 4-May-23 20
2 Pcs 13-Mar-23 2
10K 30 Pcs 24-Apr-23 30
20 Pcs 4-May-23 20
1 Pcs 13-Mar-23 1
10K
20 Pcs 29-Apr-23 20
5K 10 Pcs 4-May-23 10
10K 4 Pcs 4-May-23 4
5K 26 Pcs 4-May-23 26
5K 20 Pcs 4-May-23 20
200 Pcs 29-Apr-23 200
110 Pcs 4-May-23 110
84 Pcs 4-May-23 84
20 Pcs 24-Apr-23 20
1 1 Pcs 17-Mar-23 1
PRESSURE/ LENGTH RECEIVED
QTY DATE REQUESTED REQUEST QTY
SCH (mm) QTY UOM
SCH 80 2 LGTH 8-Apr-23 2
4 Pcs 26-Apr-23 4
1 Pcs 26-Apr-23 1
8 Pcs 26-Apr-23 8
6 Pcs 26-Apr-23 6
5 Pcs 26-Apr-23 5
6 Pcs 26-Apr-23 6
1 Pcs 26-Apr-23 1
8 Pcs 26-Apr-23 8
2 Pcs 26-Apr-23 2
1 Pcs 26-Apr-23 1
3 Pcs 26-Apr-23 3
4 Pcs 26-Apr-23 4
1 Pcs 26-Apr-23 1
2 Pcs 26-Apr-23 2
1 Pcs 26-Apr-23 1
ITEM USE/SYSTEM
Sounding
Air Vent System
Air Vent System
PURCHASE
REMARKS
ORDER
PURCHASE
REMARKS
ORDER
PURCHASE
REMARKS
ORDER
PURCHASE
REMARKS
ORDER
1
1
1
2
Transfer From VSE22073
1
4
24
2
1
5
1
1
3
PURCHASE
REMARKS
ORDER
PURCHASE
REMARKS
ORDER
5
Transfer From VSE22073
4
PURCHASE
REMARKS
ORDER
PURCHASE
REMARKS
ORDER
PURCHASE
REMARKS
ORDER
PURCHASE
REMARKS
ORDER
PURCHASE
REMARKS
ORDER
PURCHASE
REMARKS
ORDER
PURCHASE
REMARKS
ORDER
PURCHASE
REMARKS
ORDER
PURCHASE
REMARKS
ORDER
NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL
76 76 76 74 74 74
FABRICATION INSTALLATION
932
74 0
FINAL INSPECTION
REMARK
Hydrotest Finishing PERCENTAGE (%)
PLANNING
FABRICATION INSTALLATION
START
FINISH
DAYS 0 0
ACTUAL
FABRICATION INSTALLATION
START
FINISH
DAYS 0 0
VARIATION/DELAY
FABRICATION INSTALLATION
START 0 0
FINISH 0 0
WEIGHT CALCULATED
Date Weigth (Kg)
10-Mar-23 33.5
10-Mar-23 59
10-Mar-23 58
12-Mar-23 74
14-Mar-23 46.5 Support Air Vent
16-Mar-23 76
17-Mar-23 5.5
17-Mar-23 10.5
18-Mar-23 73.5
29-Mar-23 32
31-Mar-23 41.5
4-May-23 744
AND SOUNDING SYSTEM PROGRESS (%)
STALLATION FINAL INSPECTION
TOTAL TONNAGE TOTAL PROGRESS
Testing Hydrotest Finishing
0
ELAY
0
0
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month FEBRUARY (2023)
Week Week 8
Day/Date 19 20 21 22
Fabrication
SPV
Foreman/Asst. 1 1
Fitter 3 3
M
P A
Helper 3 3
N Welder/Grinder 3 3
L P Installation and Testing
A O SPV
N W Foreman/Asst.
E Fitter
N R
Helper
I Welder/Grinder
N Total Manpower
0 0 10 10
G 50
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7
M
A Man Hours (Basic) Saturday (5 Hours)
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14
R 0 0 0 70
S Total Man Hours
280
Fabrication
A
Fit up 12 13
C
Welding
T S Inspection (Fit up)
U P Inspection (Visual/Welding)
A O
O Installation and Testing
L L Fit up
Welding
Inspection (Fit up)
Inspection (Welding)
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
FEBRUARY (2023) MARCH (2023)
Week 8 Week 9 Week 10 Week 11
23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
10 10 10 10 17 17 17 17 7 7 7 7 7 7 0 0 0 0 0 0 0 0 0 0
50 92 28 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5 3.5
14 14 14
105 105 0 0 179 0 119 179 73.5 0 0 73.5 73.5 73.5 0 0 0 0 0 0 0 0 0 0
280 549.5 220.5 0
2 2 2 1 1
9 7 7 3 2
3 4 4 4
14 13 13 0 4 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
66 11 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
14 14 14
147 137 0 0 42 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
388.5 42 0 0
10 9 2 8
12 16 4 8 10 4
12 13 10 9 8
20 14 11
14 5 5 2 6
2
16 3 7
G (H80069-PR-00)
CH (2023) A
Week 12 Week 13 Week 14 Week 15
19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
L (H80069-PR-00)
CH (2023) A
Week 12 Week 13 Week 14 Week 15
19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
14 14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
1 2 2 3 1 2 1 2 2 1
6
19
DAILY WORK MANPOWER AND MAN HOURS ACTUAL (H80
APRIL (2023)
Week 15 Week 16 Week 17 Week 18
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 14 0 0 0 0 0 0 0 0 0 0 0 0
0 0 14 0
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 14 0 0 0 0 0 0 0 0 0 0 0 0
0 0 14 0
12 8
OURS ACTUAL (H80069-PR-00)
MAY (2023)
ek 18 Week 19 Week 20 Week 21 Week 22
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5 3.5
14 14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
5 5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
14 14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
MAY (2023)
ek 18 Week 19 Week 20 Week 21 Week 22
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
2
Week 22
30 31
0 0
0
7 7
3.5 3.5
0 0
0
Week 22
30 31
0 0
0
7 7
3.5 3.5
0 0
0
76
76
76
76
74
74
74
74
BILGE AND BALLAST SYSTEM
NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL
FABRICATION INSTALLATION
11.4
11.4
18.1 100%
6.5 100%
11.3 100%
26.8 100%
12.2 100%
12.5 100% 100% 100% 100% 100%
12.6 100% 100% 100% 100% 100%
4.7 100% 100% 100% 100% 100%
16.1 100%
15.5 100%
4.9 100% 100% 100% 100% 100%
9.9 100% 100% 100% 100% 100%
3.2 100% 100% 100% 100% 100%
5.6 100% 100% 100% 100% 100%
7.4 100% 100% 100% 100% 100%
8.6 100% 100% 100% 100% 100%
9.6 100% 100% 100% 100% 100%
7.8 100% 100% 100% 100% 100%
3.2 100% 100% 100% 100% 100%
7.4 100% 100% 100% 100% 100%
8.3 100% 100% 100% 100% 100%
3.8 100% 100% 100% 100% 100%
3.7 100% 100% 100% 100% 100%
4.9 100% 100% 100% 100% 100%
9.9 100% 100% 100% 100% 100%
3.5 100% 100% 100% 100% 100%
1161
109 0
FINAL INSPECTION
FABRICATION
Hydrotest Finishing PERCENTAGE (%) REMARK
Fit up Welding
START
FINISH
DAYS
START
FINISH
DAYS
15-Apr-23 START
15-Apr-23 FINISH
15-Apr-23
15-Apr-23
15-Apr-23
15-Apr-23
15-Apr-23
15-Apr-23
15-Apr-23
15-Apr-23
15-Apr-23
15-Apr-23
15-Apr-23
15-Apr-23
15-Apr-23
15-Apr-23
15-Apr-23
15-Apr-23
15-Apr-23
15-Apr-23
15-Apr-23
15-Apr-23
15-Apr-23
BILGE AND BALLAST SYSTEM PROGRESS (%)
FABRICATION INSTALLATION
PLANNING
FABRICATION INSTALLATION
0 0
ACTUAL
FABRICATION INSTALLATION
0 0
VARIATION/DELAY
FABRICATION INSTALLATION
0 0
0 0
WEIGHT CALCULATED
Date Weigth (Kg)
11-Mar-23 58
25-Mar-23 155.5
26-Mar-23 37.5
11-Mar-23 58
11-Mar-23 58
11-Mar-23 58
11-Apr-23 48
28-Apr-23 138.5
YSTEM PROGRESS (%) DAILY MANPOWER AND MA
FINAL INSPECTION
TOTAL TONNAGE TOTAL PROGRESS
Hydrotest Finishing
FINAL INSPECTION
P
L
A
FINAL INSPECTION N
N
I
N
G
FINAL INSPECTION
A
C
T
U
A
A
C
T
U
A
L
A
C
T
U
A
L
ILY MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00) DAILY WORK
Month
Week Week 22 Week 23
Day/Date 1 2 3 4 5 6 7 8
Fabrication
SPV
Foreman/Asst.
Fitter
M Helper
A
Welder/Grinder
N
P Installation and Testing
O SPV
W Foreman/Asst.
E Fitter
R
Helper
Welder/Grinder
0 0 0 0 0 0 0 0
Total Manpower
0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7
M Man Hours (Basic) Saturday (5 Hours) 5
A
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00) 3.5
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14
R
0 0 0 0 0 0 0 0
S Total Man Hours
0 0
3455
Month
Week Week 22 Week 23
Day/Date 1 2 3 4 5 6 7 8
Fabrication
Fit up
Welding
S Inspection (Fit up)
P Inspection (Visual/Welding)
O
Installation and Testing
O
L Fit up
Welding
Inspection (Fit up)
Testing (Line Check)
DAILY WORK MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)
JUNE (2023)
Week 23 Week 24 Week 25 Week 26
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
DAILY WORK
JUNE (2023)
Week 23 Week 24 Week 25 Week 26
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
3 2 7
3 2
3 2 7
5
Week 26
28 29 30 31
0 0 0 0
0
7 7 7
5
3.5 3.5 3.5
3.5
0 0 0 0
0
Week 26
28 29 30 31
0 0 0 0
0
7 7 7
5
3.5 3.5 3.5
3.5
0 0 0 0
0
2 1
2 1
2
2 1
JULY(2023)
Week 29 Week 30 Total Spool
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
126
110
126
110
105
105
23
0
FIRE MAIN AND DECK WASH SYSTEM
SPOOL CALCULATE ON SITE
TOTAL SPOOL LINE : 29 0
21 21 21 21 21 0 21 0
NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL WEIGHT (Kg) Fit Up Welding Inspect. Fit Up Welding Testing Hydrotest Finishing PERCENTAGE (%)
16 H80069 BMD P4 006 7 16 100% 100% 100% 100% 100% 50% 86%
17 H80069 BMD P4 006 7 17 100% 100% 100% 100% 100% 50% 86%
18 H80069 BMD P4 006 7 18 100% 100% 100% 100% 100% 50% 86%
20 H80069 BMD P4 007 8 20 100% 100% 100% 100% 100% 50% 86%
REMARK
FIRE MAIN AND DECK WASH SYSTEM PROGRESS (%)
FABRICATION INSTALLATION FINAL INSPECTION
FABRICATION INSTALLATION TOTAL TONNAGE TOTAL PROGRESS
Fit Up Welding Inspect. Fit Up Welding Testing Hydrotest Finishing
20-Mar-23 PLANNING
20-Mar-23 8-Apr-23
20-Mar-23 8-Apr-23
20-Mar-23 8-Apr-23
20-Mar-23 8-Apr-23
20-Mar-23 8-Apr-23
20-Mar-23 8-Apr-23
20-Mar-23 8-Apr-23
20-Mar-23
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month MARCH (2023)
Week Week 11 Week 12 Week 13 Week 14
Day/Date 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2
Fabrication
SPV
Foreman/Asst.
Fitter
M
P A
Helper
N Welder/Grinder
L P Installation and Testing
A O SPV
N W Foreman/Asst.
E Fitter
N R
Helper
I Welder/Grinder
N Total Manpower
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
G 0 0 0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7 7 7 7 7
M
A Man Hours (Basic) Saturday (5 Hours) 5 5 5
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00) 3.5 3.5 3.5
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14 14 14
R 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
S Total Man Hours
0 0 0 0
A Welder/Grinder
L Total Manpower
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7 7 7 7 7
M
A Man Hours (Basic) Saturday (5 Hours) 5 5 5
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00) 3.5 3.5 3.5
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14 14 14
R 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
S Total Man Hours
0 0 0 0
NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL
FABRICATION INSTALLATION
100%
100% 100% 100%
100%
100% 100% 100%
100% 100% 100%
100%
100%
100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100%
100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100%
100%
100% 100% 100%
100%
100% 100% 100%
100% 100% 100%
100%
100% 100% 100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Progress Overall'!A1
0
86 0
FINAL INSPECTION
FABRICATION
Hydrotest Finishing PERCENTAGE (%) REMARK
20% 21-May-23
20% 24-May-23
50% 30-Jun-23
20% 27-May-23
20% 27-May-23
20% 24-May-23
20% 27-May-23
20% 3-Jun-23
20% 27-May-23
20% 27-May-23
20% 27-May-23
50% 30-Jun-23
20% 3-Jun-23
20% 3-Jun-23
0%
20% 3-Jun-23
20% 24-May-23
0%
20% 3-Jun-23
20% 3-Jun-23
20% 3-Jun-23
50% 30-Jun-23
20% 3-Jun-23
50% 30-Jun-23
0%
0%
20% 3-Jun-23
0%
0%
50% 30-Jun-23
50% 20-Jun-23
20% 3-Jun-23
20% 29-May-23
20% 29-May-23
0%
0%
20% 7-Jun-23
20% 7-Jun-23
FUEL
FABRICATION
INSTALLATION
Fit Up Welding Inspect.
Fit up Welding
89% 68% 68%
PLANNING
FABRICATION
START
FINISH
DAYS 0
ACTUAL
FABRICATION
START
FINISH
DAYS 0
VARIATION/DEL
FABRICATION
START 0
FINISH 0
FUEL OIL SYSTEM PROGRESS (%)
INSTALLATION FINAL INSPECTION
TOTAL TONNAGE
Fit Up Welding Testing Hydrotest Finishing
4% 1% 1% 44% 0% 0
PLANNING
0
ACTUAL
0
VARIATION/DELAY
0
0
DAILY WORK MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month
TOTAL PROGRESS
Week
Day/Date
24%
Fabrication
SPV
Foreman/Asst.
Fitter
M
P A
Helper
N Welder/Grinder
L P Installation and Testing
A O SPV
N W Foreman/Asst.
E Fitter
N R
Helper
I Welder/Grinder
N Total Manpower
G
Man Hours (Basic) Mon-Fri (7 Hours)
M
Man Hours (Basic) Saturday (5 Hours)
A
N Man Hours (OT) Mon-Fri (15.00 - 17.00)
H Man Hours (OT) Saturday (13.00 - 15.00)
O Man Hours (OT) Sunday (07.00 - 15.00)
U
R Total Man Hours
S
2600
Month
Week
Day/Date
Fabrication
SPV
Foreman/Asst.
Fitter
M
Helper
A
N Welder/Grinder
A P Installation and Testing
C O
W
SPV
Foreman/Asst.
T E
U R
A
N
A P
C O
W
T E Fitter
U R
Helper
A Welder/Grinder
L Total Manpower
Month
Week
Day/Date
A Fabrication
C Fit up
Welding
T S Inspection (Fit up)
U P Inspection (Visual/Welding)
O
A O Installation and Testing
L L Fit up
Welding
Inspection (Fit up)
Inspection (Welding)
DAILY WORK MANPOWER AND MA
MAY (2023)
Week 20 Week 21 Week 22
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
1 1 1 1 1 1 1 1 1 1
2 5 6 6 4 4 4 2 4 5
2 4 5 5 3 3 4 3 5 6
1 1 1 1 1 1
1 1 1
3 5 5
3 5 4
0 0 6 10 0 13 13 9 8 9 13 22 23 0 0 0 0 0 0
42 84 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 0 63 105 0 0 0 0 84 94.5 136.5 231 0 0 0 0 0 0 0
168 546 0
MAY(2023)
Week 20 Week 21 Week 22
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1
7 8 6 8 8 8 8 8 9 9 9 8 8 8 8 8 8
30 32 29 20
ANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)
JUNE (2023)
eek 22 Week 23 Week 24 Week 25 Week 26
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5 3.5
14 14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
8 7 6 6 6 4 2
6 8 8 8 5 5 7 8 6 6 8 6 4 6 4 3 4 6 6 6 7
35 27 2
24 26 18
Week 26
26 27 28 29 30
0 0 0 0 0
0
7 7 7 7 7
0 0 0 0 0
Week 26
26 27 28 29 30
0 0 0 0 0
0
7 7 7 7 7
0 0 0 0 0
0
JULY(2023)
Week 26 Week 27 Week 28
26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 2 2 2
22 32 6
Total Spool
175
134
175
134
0
0
0
0
SW AND FW COOLING SYSTEM
NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL
1 H80069 BMD P6 - -
2 H80069 BMD P6 - -
3 H80069 BMD P6 - -
4 H80069 BMD P6 - -
5 H80069 BMD P6 - -
6 H80069 BMD P6 - -
7 H80069 BMD P6 - -
8 H80069 BMD P6 002 3 6
9 H80069 BMD P6 002 4 7
10 H80069 BMD P6 002 4 8
11 H80069 BMD P6 003 5 9
12 H80069 BMD P6 003 5 10
13 H80069 BMD P6 003 5 11
14 H80069 BMD P6 003 5 12
15 H80069 BMD P6 003 6 13
16 H80069 BMD P6 003 6 14
17 H80069 BMD P6 004 7 15
18 H80069 BMD P6 005 8 17
19 H80069 BMD P6 005 8 18
20 H80069 BMD P6 005 9 19
21 H80069 BMD P6 005 9 20
22 H80069 BMD P6 006 10 21
23 H80069 BMD P6 006 10 22
24 H80069 BMD P6 006 10 23
25 H80069 BMD P6 006 10 24
26 H80069 BMD P6 007 11 25
27 H80069 BMD P6 007 11 26
28 H80069 BMD P6 007 11 27
29 H80069 BMD P6 007 11 28
30 H80069 BMD P6 008 12 29
31 H80069 BMD P6 008 12 30
32 H80069 BMD P6 008 13 31
33 H80069 BMD P6 009 14 32
34 H80069 BMD P6 009 14 33
35 H80069 BMD P6 010 15 34
36 H80069 BMD P6 010 15 35
37 H80069 BMD P6 010 15 36
38 H80069 BMD P6 010 15 37
39 H80069 BMD P6 011 16 38
40 H80069 BMD P6 011 16 39
41 H80069 BMD P6 012 17 40
42 H80069 BMD P6 012 17 41
43 H80069 BMD P6 013 18 42
44 H80069 BMD P6 014 19 43
45 H80069 BMD P6 014 19 44
46 H80069 BMD P6 014 19 45
47 H80069 BMD P6 015 20 48
48 H80069 BMD P6 015 20 49
49 H80069 BMD P6 015 21 46
50 H80069 BMD P6 015 21 47
51 H80069 BMD P6 016 22 50
52 H80069 BMD P6 016 22 51
53 H80069 BMD P6 016 22 52
54 H80069 BMD P6 017 23 55
55 H80069 BMD P6 017 24 53
56 H80069 BMD P6 017 24 54
57 H80069 BMD P6 018 25 56
58 H80069 BMD P6 018 25 57
59 H80069 BMD P6 019 26 58
60 H80069 BMD P6 020 27 59
61 H80069 BMD P6 020 27 60
62 H80069 BMD P6 020 27 61
63 H80069 BMD P6 020 28 62
64 H80069 BMD P6 020 29 63
65 H80069 BMD P6 023 32 68
66 H80069 BMD P6 024 33 69
67 H80069 BMD P6 024 33 100
68 H80069 BMD P6 024 33 101
69 H80069 BMD P6 024 33 102
70 H80069 BMD P6 024 33 103
71 H80069 BMD P6 025 34 70
72 H80069 BMD P6 025 34 71
73 H80069 BMD P6 025 34 72
74 H80069 BMD P6 025 35 73
75 H80069 BMD P6 025 35 74
76 H80069 BMD P6 025 35 75
77 H80069 BMD P6 025 35 76
78 H80069 BMD P6 025 35 77
79 H80069 BMD P6 025 36 78
80 H80069 BMD P6 025 36 79
81 H80069 BMD P6 025 36 80
82 H80069 BMD P6 025 36 81
83 H80069 BMD P6 025 37 82
84 H80069 BMD P6 025 37 83
85 H80069 BMD P6 025 37 84
86 H80069 BMD P6 025 37 85
87 H80069 BMD P6 025 38 86
88 H80069 BMD P6 025 38 87
89 H80069 BMD P6 026 39 88
90 H80069 BMD P6 026 39 89
91 H80069 BMD P6 026 40 90
92 H80069 BMD P6 026 40 91
93 H80069 BMD P6 026 41 92
94 H80069 BMD P6 026 41 93
95 H80069 BMD P6 027 42 94
96 H80069 BMD P6 027 42 95
97 H80069 BMD P6 028 43 96
98 H80069 BMD P6 029 44 97
99 H80069 BMD P6 029 44 98
100 H80069 BMD P6 029 44 99
SPOOL CALCULATE ON SITE
93 69 69 44 44 0
FABRICATION INSTALLATION
WEIGHT (Kg) Fit Up Welding Inspect. Fit Up Welding Testing
20% 25% 5% 14% 16% 5%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
100% 100% 100% 100% 100%
8.8 100% 100% 100% 100% 100%
8.2 100%
9.7 100%
6 100%
6.3 100% 100% 100% 100% 100%
6.3 100% 100% 100% 100% 100%
5.4 100%
9 100%
4.3 100%
10 100%
7 100%
6.9 100%
8.3 100%
3.1 100% 100% 100% 100% 100%
6.6 100% 100% 100% 100% 100%
11 100% 100% 100% 100% 100%
9 100% 100% 100% 100% 100%
3.1 100% 100% 100% 100% 100%
6.8 100% 100% 100% 100% 100%
8.1 100% 100% 100% 100% 100%
8.4 100% 100% 100% 100% 100%
7 100% 100% 100% 100% 100%
4.2 100% 100% 100% 100% 100%
8.1 100% 100% 100% 100% 100%
11.2 100% 100% 100% 100% 100%
6.1 100% 100% 100% 100% 100%
3.1 100% 100% 100% 100% 100%
7.5 100% 100% 100% 100% 100%
4.9 100% 100% 100% 100% 100%
12.4 100%
3.1 100% 100% 100% 100% 100%
4.3 100%
3.1 100% 100% 100% 100% 100%
3.3 100%
8.8 100%
5 100%
4.8 100%
5.5 100%
4.4 100%
5.1 100%
4 100%
3.6 100%
4.8 100%
4.2 100%
4.4 100% 100% 100% 100% 100%
5.9 100% 100% 100% 100% 100%
4 100% 100% 100%
3.3 100% 100% 100%
3 100% 100% 100%
3.9 100% 100% 100% 100% 100%
0.8 100% 100% 100%
1.9 100% 100% 100%
1.5 100% 100% 100%
25.8 100% 100% 100%
1.4 100% 100% 100%
5 100% 100% 100%
286.4
44 0
FINAL INSPECTION
FABRICATION
Hydrotest Finishing PERCENTAGE (%) REMARK
PLANNING
FABRICATION
START
FINISH
DAYS 0
ACTUAL
FABRICATION
START
FINISH
DAYS 0
VARIATION/DELAY
FABRICATION
START 0
FINISH 0
SW AND FW COOLING SYSTEM PROGRESS (%)
INSTALLATION FINAL INSPECTION
TOTAL TONNAGE
Fit Up Welding Testing Hydrotest Finishing
PLANNING
0
ACTUAL
0
VARIATION/DELAY
0
0
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month
TOTAL PROGRESS
Week
Day/Date
59%
Fabrication
SPV
Foreman/Asst.
Fitter
M
Helper
P A
Welder/Grinder
N
L P Installation and Testing
A O SPV
W
N E
Foreman/Asst.
Fitter
N R
Helper
I Welder/Grinder
N Total Manpower
G
Man Hours (Basic) Mon-Fri (7 Hours)
M
A Man Hours (Basic) Saturday (5 Hours)
N Man Hours (OT) Mon-Fri (15.00 - 17.00)
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00)
R
S Total Man Hours
3510
A
N
A P
C O
W
T E Fitter
U R
Helper
A Welder/Grinder
L Total Manpower
Month
Week
Day/Date
A Fabrication
C Fit up
Welding
T S Inspection (Fit up)
U P Inspection (Visual/Welding)
O
A O Installation and Testing
L L Fit up
Welding
Inspection (Fit up)
Testing (Line Check)
DAILY MANPO
MAY (2023)
Week 18 Week 19 Week 20
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
DAILY MANPO
MAY (2023)
Week 18 Week 19 Week 20
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 1 1 1
3 3 3 3 3 3 3 3 2 2 2
1 1 1 1 1 1 1 1 1 1 1
0 0 0 0 8 8 8 8 0 0 8 8 8 8 4 4 0 4 0
8 40 28
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 84 84 0 0 0 0 0 84 42 42 0 0 0
0 168 168
DAILY WO
MAY(2023)
Week 18 Week 19 Week 20
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
7 6 6 8 6 4 4 6 6 4 4 4 4 4
7 6 6 6 4 6 6
29
14
7
7
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
JUNE (2023)
Week 21 Week 22 Week 23 Week 24 Week 2
21 22 23 24 25 26 27 1 5 6 7 12 13 14 15 16 17 18 19
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
2
3 6 4 6 2 1
28
31 5 10 9
2 6 7 6 8 8
2 6 7 6 8 8
3 6 4 6 6 8 4
JUNE (2023)
Week 25 Week 26
20 21 22 23 24 25 26 27 28 29 30 31
0 0 0 0 0 0 0 0 0 0 0 0
0 0
7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14
0 0 0 0 0 0 0 0 0 0 0 0
0 0
JUNE (2023)
Week 25 Week 26
20 21 22 23 24 25 26 27 28 29 30 31
0 0 0 0 0 0 0 0 0 0 0 0
0 0
7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14
0 0 0 0 0 0 0 0 0 0 0 0
0 0
JUNE(2023) JULY(2023)
Week 25 Week 26 Week 27
19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6
18
2 2 3
(2023)
Week 27 Total Spool
7 8
93
69
93
69
44
44
44
0
DOMESTIC FW AND SW SYSTEM
NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL
40 40 40 40 40 0
FABRICATION INSTALLATION
0
40 0
FINAL INSPECTION
12% 3%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86% START
50% 86% FINISH
50% 86% DAYS
50% 86%
50% 86%
50% 86%
50% 86% START
50% 86% FINISH
50% 86% DAYS
50% 86%
50% 86%
50% 86%
50% 86% START
50% 86% FINISH
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
50% 86%
DOMESTIC FW AND SW SYSTEM PROGRESS (%)
FABRICATION INSTALLATION FINAL INSPECTION
Fit Up Welding Inspect. Fit Up Welding Testing Hydrotest
PLANNING
0 0
ACTUAL
0 0
VARIATION/DELAY
FINAL INSPECTION
M
P A
L N
P
A O
N W
FINAL INSPECTION E
N R
I
N
G
FINAL INSPECTION M
A
N
H
O
U
R
S
M
A
N
A P
C O
W
T E
U R
A
N
A P
C O
W
T E
U R
A
L
M
A
N
H
O
U
R
S
Month
Week
Day/Date
A
C
T S
U P
O
A O
L L
OWER AND MAN HOURS PLANNING (H80069-PR-00)
Month MARCH (2023)
Week Week 12 Week 13
Day/Date 20 21 22 23 24 25 26 27 28 29 30
Fabrication
SPV
Foreman/Asst.
Fitter
Helper
Welder/Grinder
Installation and Testing
SPV
Foreman/Asst.
Fitter
Helper
Welder/Grinder
0 0 0 0 0 0 0 0 0 0 0
Total Manpower
0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7 7 7 7
Man Hours (Basic) Saturday (5 Hours) 5
Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
Man Hours (OT) Saturday (13.00 - 15.00) 3.5
Man Hours (OT) Sunday (07.00 - 15.00) 14
0 0 0 0 0 0 0 0 0 0 0
Total Man Hours
0 0
1064 \
DELAY
(No Drawing)
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
4
8 12 16 4
40
40
12 20
12 20
12
DAILY MANPOWER AND MAN HOURS PLANNING (H800
MAY (2023)
Week 16 Week 17 Week 18 Week 1
20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
6 6 8
8
8
20 8
RS PLANNING (H80069-PR-00)
MAY (2023) JUNE(2023)
Week 19 Week 20 Week 22 Week 23 Week 24
9 10 11 12 13 14 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
MAY (2023)
Week 19 Total Spool
8 9 10 11 12 13
6 5 4 75
40
40
40
40
40
40
0
38
JUNE(2023)
Week 24 Week 25 Week 26
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
TUAL (H80069-PR-00)
JUNE (2023)
Week 24 Week 25 Week 26
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
EXTERNAL DECK SCUPPER SYSTEM
NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL
8 8 8 0 0 0
FABRICATION INSTALLATION
79.4
0 0
FINAL INSPECTION
12% 3%
50%
50%
50%
50%
50%
50%
50%
50%
EXTERNAL DECK SCUPPER SYSTEM P
FABRICATION INSTALLATION
PLANNING
FABRICATION INSTALLATION
START
FINISH
DAYS 0 0
ACTUAL
FABRICATION INSTALLATION
START
FINISH
DAYS 0 0
VARIATION/DELAY
FABRICATION INSTALLATION
START 0 0
FINISH 0 0
L DECK SCUPPER SYSTEM PROGRESS (%)
STALLATION FINAL INSPECTION
TOTAL TONNAGE TOTAL PROGRESS
Testing Hydrotest Finishing
0% 0% 0% 39.7 50%
ING
0
AL
0
/DELAY
0
0
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month
Week Week 18
Day/Date 1 2 3 4 5
Fabrication
SPV
Foreman/Asst.
Fitter
M
P A
Helper
N Welder/Grinder
L P Installation and Testing
A O SPV
N W Foreman/Asst.
E Fitter
N R
Helper
I Welder/Grinder
N Total Manpower
0 0 0 0 0
G 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7
M
A Man Hours (Basic) Saturday (5 Hours)
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00)
R 0 0 0 0 0
S Total Man Hours
0
1050
A
N
A P
C O
W
T E Fitter
U R
Helper
A Welder/Grinder
L Total Manpower
0 0 0 0 0
0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7
M
A Man Hours (Basic) Saturday (5 Hours)
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00)
R 0 0 0 0 0
S Total Man Hours
0
DELAY
(No Drawing)
Month
Week Week 18
Day/Date 1 2 3 4 5
A Fabrication
C Fit up
Welding
T S Inspection (Fit up)
U P Inspection (Visual/Welding)
O
A O Installation and Testing
L L Fit up
Welding
Inspection (Fit up)
Inspection (Welding)
DAILY WORK MANPOWER
MAY (2023)
k 18 Week 19 Week 20 Week 21
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
DAILY WORK
MAY(2023)
k 18 Week 19 Week 20 Week 21
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
4 3
7
ORK MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)
JUNE (2023)
Week 21 Week 22 Week 23 Week 24
25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
3 4
7
JUNE (2023)
Week 24 Week 25 Week 26
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
JUNE (2023)
Week 24 Week 25 Week 26
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
JUNE(2023)
Week 24 Week 25 Week 26 Total Spool
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 8
7
7
7
0
0
0
0
OILY BILGE AND DIRTY SYSTEM
NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL
38 0 0 0 0 0
FABRICATION INSTALLATION
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Progress Overall'!A1
0
0 0
FINAL INSPECTION
FABRICATION
Hydrotest Finishing PERCENTAGE (%) REMARK
12% 3% Fit up
0%
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
0%
0%
20% 30-Jun-23
0%
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
20% 30-Jun-23
0%
20% 5-Jul-23
20% 5-Jul-23
0%
20% 5-Jul-23
20% 5-Jul-23
20% 5-Jul-23
0%
20% 5-Jul-23
0%
0%
20% 5-Jul-23
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
20% 5-Jul-23
20% 5-Jul-23
20% 5-Jul-23
20% 5-Jul-23
20% 5-Jul-23
20% 5-Jul-23
20% 5-Jul-23
0%
20% 5-Jul-23
0%
20% 5-Jul-23
20% 5-Jul-23
20% 5-Jul-23
20% 5-Jul-23
20% 5-Jul-23
20% 5-Jul-23
20% 5-Jul-23
0%
0%
0%
0%
0%
FABRICATION
FABRICATION INSTALLATION
Fit Up Welding
FABRICATION
START
FINISH
DAYS 0
FABRICATION
START
FINISH
DAYS 0
FABRICATION
START 0
FINISH 0
OILY BILGE AND DIRTY SYSTEM PROGRESS (%)
BRICATION INSTALLATION FINAL INSPECTION
Inspect. Fit Up Welding Testing Hydrotest Finishing
0% 0% 0% 0% 0% 0%
PLANNING
0 0
ACTUAL
0 0
VARIATION/DELAY
0 0
0 0
(%) DAILY MANPOWER AND MAN HOURS PLANNING (H800
Month
TOTAL TONNAGE TOTAL PROGRESS
Week
Day/Date
0 12%
M
P A
L N
P
A O
N W
E
N R
I
N
G
M
A
N
H
O
U
R
S
A
C
T
U M
A A
L N
H
O
U
R
U M
A A
L N
H
O
U
R
S
Month
Week
Day/Date
A
C
T
S
U P
A O
O
L L
OWER AND MAN HOURS PLANNING (H80069-PR-00) DAILY WORK MANPOW
Month
Week Week 22 Week 23 W
Day/Date 1 2 3 4 5 6 7 8 9 10 11
Fabrication
SPV
Foreman/Asst.
Fitter
Helper
Welder/Grinder
Installation and Testing
SPV
Foreman/Asst.
Fitter
Helper
Welder/Grinder
0 0 0 0 0 0 0 0 0 0 0
Total Manpower
0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7 7
Man Hours (Basic) Saturday (5 Hours) 5 5
Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5 3.5
Man Hours (OT) Saturday (13.00 - 15.00) 3.5 3.5
Man Hours (OT) Sunday (07.00 - 15.00) 14 14
0 0 0 0 0 0 0 0 0 0 0
Total Man Hours
0 0
1025.5
Month
Week Week 22 Week 23 W
Day/Date 1 2 3 4 5 6 7 8 9 10 11
Fabrication
Fit up
Welding
Inspection (Fit up)
Inspection (Visual/Welding)
Installation and Testing
Fit up
Welding
Inspection (Fit up)
Testing (Line Check)
Y WORK MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)
JUNE (2023)
Week 24 Week 25 Week 26
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
6 6 6 2
26
31
3.5
5
3.5
H80069-PR-00)
JULY(2023)
26 Week 27 Week 28 Week 29
31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
6 6 6
18 20
3)
Week 29 Week 30 Total Spool
19 20 21 22 23 24 25 26 27 28 29 30
38
0
38
0
0
0
0
0
SOIL AND DRAIN SYSTEM
NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL
61 2 2 2 2 0
FABRICATION INSTALLATION
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100% 100% 100% 100% 100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100% 100% 100% 100% 100%
100%
100%
100%
100%
100%
100%
100%
Progress Overall'!A1
0
0 0
FINAL INSPECTION
FABRICATION
Hydrotest Finishing PERCENTAGE (%) REMARK
Fit up Welding
81% 3% 3%
PLANNING
FABRICATION
START
FINISH
DAYS 0
ACTUAL
FABRICATION
START
FINISH
DAYS 0
VARIATION/DEL
FABRICATION
START 0
FINISH 0
SOIL AND DRAIN SYSTEM PROGRESS (%)
INSTALLATION FINAL INSPECTION
TOTAL TONNAGE
Fit Up Welding Testing Hydrotest Finishing
3% 3% 0% 0% 0% 0
PLANNING
0
ACTUAL
0
VARIATION/DELAY
0
0
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month
TOTAL PROGRESS
Week
Day/Date
18%
Fabrication
SPV
Foreman/Asst.
Fitter
M
P A
Helper
N Welder/Grinder
L P Installation and Testing
A O SPV
N W Foreman/Asst.
E Fitter
N R
Helper
I Welder/Grinder
N Total Manpower
G
Man Hours (Basic) Mon-Fri (7 Hours)
M
A Man Hours (Basic) Saturday (5 Hours)
N Man Hours (OT) Mon-Fri (15.00 - 17.00)
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00)
R
S Total Man Hours
882
A
N
A P
C O
W
T E Fitter
U R
Helper
A Welder/Grinder
L Total Manpower
Month
Week
Day/Date
A Fabrication
C Fit up
Welding
T S Inspection (Fit up)
U P Inspection (Visual/Welding)
O
A O Installation and Testing
L L Fit up
Welding
Inspection (Fit up)
Inspection (Welding)
MAY (2023)
Week 18 Week 19 Week 20
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
MAY (2023)
Week 18 Week 19 Week 20
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
MAY(2023)
Week 18 Week 19 Week 20
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
DAILY WORK MANPOWER AND MAN HOURS ACTUAL (H80069-PR-00)
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
DAILY WORKING SP
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
H80069-PR-00)
JUNE (2023)
Week 23 Week 24 Week 25 Week 2
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
3 2 3 3 6 5 6 7 7 7 6 6
13 21 27
Week 26
27 28 29 30 31
0 0 0 0 0
0
7 7 7 7
5
3.5 3.5 3.5 3.5
3.5
0 0 0 0 0
0
Week 26
27 28 29 30 31
0 0 0 0 0
0
7 7 7 7
5
3.5 3.5 3.5 3.5
3.5
0 0 0 0 0
0
JULY(2023
Week 26 Week 27 Week 28
27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14
JULY(2023)
28 Week 29 Week 30 Total Spool
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
61
0
61
0
0
0
0
0
ENGINE EXHAUST SYSTEM
NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL
0 0 0 0 0 0
FABRICATION INSTALLATION
0
0 0
FINAL INSPECTION
12% 3%
0%
0%
0%
0%
0% START
0% FINISH
0% DAYS
0%
0%
0%
0% START
0% FINISH
0% DAYS
ENGINE EXHAUST SYSTEM PROGRESS
FABRICATION INSTALLATION
0% 0% 0% 0% 0%
PLANNING
FABRICATION INSTALLATION
0 0
ACTUAL
FABRICATION INSTALLATION
0 0
E EXHAUST SYSTEM PROGRESS (%)
TALLATION FINAL INSPECTION
TOTAL TONNAGE TOTAL PROGRESS
Testing Hydrotest Finishing
0% 0% 0% 0 0%
0
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month DECEMBER (2022)
Week Week 52
Day/Date 25 26 27 28
Fabrication
SPV
Foreman/Asst.
P Fitter
L Helper
A M Welder/Grinder
N A
Installation and Testing
N
N P SPV
I O
W
N E Foreman/Asst.
G R
Fitter
Helper
Welder/Grinder
Total Manpower 0 0 0 0
#REF!
Fabrication
SPV
Foreman/Asst.
Fitter
M Helper
A Welder/Grinder
N
A P Installation and Testing
C O
W
T E
U R
M
A
N
A P
C O
W
SPV
T E Foreman/Asst.
U R Fitter
A Helper
L Welder/Grinder
0 0 0 0
Total Manpower
0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7
M
Man Hours (Basic) Saturday (5 Hours)
A
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14
R 0 0 0 0
S Total Man Hours
0
Fabrication
A Fit up
C Welding
T Inspection (Fit up)
S
U P Inspection (Visual/Welding)
A O
Installation and Testing
O
L L Fit up
Welding
Inspection (Fit up)
Inspection (Welding)
80069-PR-00)
ECEMBER (2022) JANUARY (2023)
Week 52 Week 1 Week 2 Week 3
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#REF! #REF! #REF! #REF!
80069-PR-00)
ECEMBER (2022) JANUARY (2023)
Week 52 Week 1 Week 2 Week 3
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
1 1 1
2 2 2
2 2 2
2 2 2
1 1
1 1
1 1
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 10 10
#REF! #REF! #REF!
ANUARY (2023)
Week 3 Week 4 Week 5
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4
1 1 1
2 2 2
2 2 2
2 2 2
1 1
1 1
1 1
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 10 10
0 0 27
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 73.5 105 0
0 0 178.5
ANUARY (2023)
Week 3 Week 4 Week 5
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
FEBRUARY (2023)
Week 6 Week 7 Week 8
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1
10 10 10 10 10 10 10 10 10 10 10 3 0 0 0 0 0 0 0
#REF! #REF! #REF!
1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1
10 10 10 10 10 10 10 10 10 10 10 3 0 0 0 0 0 0 0
70 43 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 105 0 70 105 105 0 0 105 0 70 31.5 0 0 0 0 0 0 0
385 206.5 0
FEBRUARY (2023)
Week 6 Week 7 Week 8
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
-00)
MARCH
Week 8 Week 9 Week 10 Week 11
24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#REF! #REF! #REF! #REF!
-00)
MARCH
Week 8 Week 9 Week 10 Week 11
24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
MARCH (2
Week 8 Week 9 Week 10 Week 11
24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14
MARCH (2023)
Week 11 Week 12 Week 13 W
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#REF! #REF! #REF! #
MARCH (2023)
Week 11 Week 12 Week 13 W
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
DAILY WO
MARCH (2023)
Week 11 Week 12 Week 13 W
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2
APRIL (2023)
Week 14 Week 15 Week 16
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#REF! #REF! #REF!
APRIL (2023)
Week 14 Week 15 Week 16
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#REF! #REF! #REF!
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#REF! #REF! #REF! #REF!
-00)
MAY (2023)
Week 19 Week 20 Week 21 Week 22
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
MAY(2023)
Week 19 Week 20 Week 21 Week 2
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Week 22
30 31
0 0
#REF!
Week 22
30 31
0 0
0
7 7
3.5 3.5
0 0
0
JUNE(2023)
Week 22 Week 23 Week 24
30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
NE(2023)
Week 25 Week 26 Week 27
18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5
JULY(2023)
Week 27 Week 28 Week 29 Week 3
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Week 30 Total Spool
25 26 27 28 29 30
0
0
0
0
0
0
0
0
QUICK CLOSING VALVE SYSTEM
35
TOTAL SPOOL LINE :
NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL
1 H80069 P12
2 H80069 P12
3 H80069 P12
4 H80069 P12
5 H80069 P12
6 H80069 P12
7 H80069 P12
8 H80069 P12
9 H80069 P12
10 H80069 P12
11 H80069 P12
12 H80069 P12
13 H80069 P12
14 H80069 P12
15 H80069 P12
16 H80069 P12
17 H80069 P12
18 H80069 P12
19 H80069 P12
20 H80069 P12
21 H80069 P12
22 H80069 P12
23 H80069 P12
24 H80069 P12
25 H80069 P12
26 H80069 P12
27 H80069 P12
28 H80069 P12
29 H80069 P12
30 H80069 P12
31 H80069 P12
32 H80069 P12
33 H80069 P12
34 H80069 P12
35 H80069 P12
SPOOL CALCULATE ON SITE
0 0 0 0 0 0
FABRICATION INSTALLATION
0
0 0
FINAL INSPECTION
12% 3%
0%
0%
0%
0%
0% START
0% FINISH
0% DAYS
0%
0%
0%
0% START
0% FINISH
0% DAYS
0%
0%
0%
0% START
0% FINISH
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
QUICK CLOSING VALVE SYSTEM PROGRES
FABRICATION INSTALLATION
0% 0% 0% 0% 0%
PLANNING
FABRICATION INSTALLATION
0 0
ACTUAL
FABRICATION INSTALLATION
0 0
VARIATION/DELAY
FABRICATION INSTALLATION
0 0
0 0
OSING VALVE SYSTEM PROGRESS (%)
TALLATION FINAL INSPECTION
TOTAL TONNAGE TOTAL PROGRESS
Testing Hydrotest Finishing
0% 0% 0% 0 0%
ELAY
0
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month DECEMBER (2022)
Week Week 52
Day/Date 25 26 27 28
Fabrication
SPV
Foreman/Asst.
Fitter
Helper
Welder/Grinder
M
Installation and Testing
P A
N
L P SPV
A O
W Foreman/Asst.
N E
N R Fitter
I Helper
N
G Welder/Grinder
0 0 0 0
Total Manpower
0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7
M
Man Hours (Basic) Saturday (5 Hours)
A
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14
R 0 0 0 0
S Total Man Hours
0
154
U R Fitter
A Helper
L Welder/Grinder
0 0 0 0
Total Manpower
0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7
M
Man Hours (Basic) Saturday (5 Hours)
A
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14
R 0 0 0 0
S Total Man Hours
0
DELAY
(No Drawing)
0069-PR-00)
ECEMBER (2022) JANUARY (2023)
Week 52 Week 1 Week 2 Week 3
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
0 0 4 4 4 4 4 4 4 4 0 0 0 0 0 0 0 0 0
20 12 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 0 0 28 42 42 0 0 42 0 0 0 0 0 0 0 0 0 0
112 42 0
FEBRUARY (2023)
Week 6 Week 7 Week 8
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
0)
MARCH (2
Week 8 Week 9 Week 10 Week 11
24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
MARCH (2
Week 8 Week 9 Week 10 Week 11
24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
MARCH (2023)
Week 11 Week 12 Week 13
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
MARCH (2023)
Week 11 Week 12 Week 13
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
HYDRAULIC MACHINERY SYSTEM
25
TOTAL SPOOL LINE :
NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL
1 H80069 P0
2 H80069 P0
3 H80069 P0
4 H80069 P0
5 H80069 P0
6 H80069 P0
7 H80069 P0
8 H80069 P0
9 H80069 P0
10 H80069 P0
11 H80069 P0
12 H80069 P0
13 H80069 P0
14 H80069 P0
15 H80069 P0
16 H80069 P0
17 H80069 P0
18 H80069 P0
19 H80069 P0
20 H80069 P0
21 H80069 P0
22 H80069 P0
23 H80069 P0
24 H80069 P0
25 H80069 P0
SPOOL CALCULATE ON SITE
0 0 0 0 0 0
FABRICATION INSTALLATION
0
0 0
FINAL INSPECTION
12% 3%
0%
0%
0%
0%
0% START
0% FINISH
0% DAYS
0%
0%
0%
0% START
0% FINISH
0% DAYS
0%
0%
0%
0% START
0% FINISH
0%
0%
0%
0%
0%
0%
0%
HYDRAULIC MACHINERY SYSTEM PROGRES
FABRICATION INSTALLATION
0% 0% 0% 0% 0% 0%
PLANNING
FABRICATION INSTALLATION
0 0
ACTUAL
FABRICATION INSTALLATION
0 0
VARIATION/DELAY
FABRICATION INSTALLATION
0 0
0 0
SYSTEM PROGRESS (%) DAILY MAN
FINAL INSPECTION
TOTAL TONNAGE TOTAL PROGRESS
Hydrotest Finishing
0% 0% 0 0%
FINAL INSPECTION
P
L
A
N
FINAL INSPECTION
N
I
N
G
FINAL INSPECTION
DAILY MA
A
C
A
C
T
U
A
L
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month DECEMBER (2022)
Week Week 52 Week 1
Day/Date 25 26 27 28 29 30 31 1 2
Fabrication
SPV
Foreman/Asst.
Fitter
M Helper
A Welder/Grinder
N
P Installation and Testing
O SPV
W
Foreman/Asst.
E
R Fitter
Helper
Welder/Grinder
0 0 0 0 0 0 0 0 0
Total Manpower
0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7
M
A Man Hours (Basic) Saturday (5 Hours) 5
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00) 3.5
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14 14
R 0 0 0 0 0 0 0 0 0
S Total Man Hours
0 0
507.5
Fabrication
SPV
Foreman/Asst.
Fitter
M Helper
A
N
P
O
W
M
A Welder/Grinder
N
P Installation and Testing
O SPV
W
Foreman/Asst.
E
R Fitter
Helper
Welder/Grinder
0 0 0 0 0 0 0 0 0
Total Manpower
0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7
M
A Man Hours (Basic) Saturday (5 Hours) 5
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00) 3.5
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14 14
R 0 0 0 0 0 0 0 0 0
S Total Man Hours
0 0
DELAY
(No Drawing)
JANUARY (2023)
Week 1 Week 2 Week 3
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
L (H80069-PR-00)
1 1 1 1 1 1 1
2 2 2 2 1 1 1
2 2 2 2 1 1 1
2 2 2 2 1 1 1
1 1 1 1 1
2 2 2 2 2
2 2 2 2 2
2 2 2 2 2
0 0 0 0 0 0 0 0 0 0 7 7 7 7 11 11 11 7 7
0 0 50 39
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 73.5 0 49 73.5 115.5 0 0 73.5 0
0 0 311.5 196
FEBRUARY (2023)
Week 6 Week 7 Week 8 Week 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
MARCH (2023)
Week 9 Week 10 Week 11 W
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 1
2 2
2 2
2 2
7 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
39 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
49 73.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
196 0 0
MARCH (2023)
Week 9 Week 10 Week 11 W
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
)
Week 12 Week 13
20 21 22 23 24 25 26 27 28 29 30 31
0 0 0 0 0 0 0 0 0 0 0 0
0 0
7 7 7 7 7 7 7 7 7 7
5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5
14
0 0 0 0 0 0 0 0 0 0 0 0
0 0
)
Week 12 Week 13
20 21 22 23 24 25 26 27 28 29 30 31
0 0 0 0 0 0 0 0 0 0 0 0
0 0
7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14
0 0 0 0 0 0 0 0 0 0 0 0
0 0
CO2 SYSTEM
NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL
1 H80069 P0
2 H80069 P0
3 H80069 P0
4 H80069 P0
5 H80069 P0
6 H80069 P0
7 H80069 P0
8 H80069 P0
9 H80069 P0
10 H80069 P0
11 H80069 P0
12 H80069 P0
13 H80069 P0
14 H80069 P0
15 H80069 P0
16 H80069 P0
17 H80069 P0
18 H80069 P0
19 H80069 P0
20 H80069 P0
SPOOL CALCULATE ON SITE
0 0 0 0 0 0
FABRICATION INSTALLATION
0
0 0
FINAL INSPECTION
12% 3%
0%
0%
0%
0%
0% START
0% FINISH
0% DAYS
0%
0%
0%
0% START
0% FINISH
0% DAYS
0%
0%
0%
0% START
0% FINISH
0%
0%
CO2 SYSTEM PROGRESS (%)
FABRICATION INSTALLATION
0% 0% 0% 0% 0%
PLANNING
FABRICATION INSTALLATION
0 0
ACTUAL
FABRICATION INSTALLATION
0 0
VARIATION/DELAY
FABRICATION INSTALLATION
0 0
0 0
CO2 SYSTEM PROGRESS (%)
TALLATION FINAL INSPECTION
TOTAL TONNAGE TOTAL PROGRESS
Testing Hydrotest Finishing
0% 0% 0% 0 0%
ELAY
0
0
DAILY MANPOWER AND MAN HOURS PLANNING (H80069-PR-00)
Month DECEMBER (2022)
Week Week 52
Day/Date 25 26 27 28
Fabrication
SPV
Foreman/Asst.
Fitter
M Helper
P A Welder/Grinder
L N
P Installation and Testing
A O SPV
N W
Foreman/Asst.
E
N R Fitter
I Helper
N Welder/Grinder
0 0 0 0
G Total Manpower
0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7
M
A Man Hours (Basic) Saturday (5 Hours)
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14
R 0 0 0 0
S Total Man Hours
0
532
Fabrication
SPV
Foreman/Asst.
Fitter
M Helper
A
N
A P
C O
W
M
A Welder/Grinder
N
A P Installation and Testing
C O SPV
W
T E
Foreman/Asst.
U R Fitter
A Helper
Welder/Grinder
L
0 0 0 0
Total Manpower
0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7
M
A Man Hours (Basic) Saturday (5 Hours)
N Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5
H
Man Hours (OT) Saturday (13.00 - 15.00)
O
U Man Hours (OT) Sunday (07.00 - 15.00) 14
R 0 0 0 0
S Total Man Hours
0
DELAY
(No Drawing)
80069-PR-00)
ECEMBER (2022) JANUARY (2023)
Week 52 Week 1 Week 2 Week 3
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
FEBRUARY (2023)
Week 6 Week 7 Week 8
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
0)
MARCH (2
Week 8 Week 9 Week 10 Week 11
24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 1 1 1 1 1 1
2 2 2 2 1 1 1
2 2 2 2 1 1 1
2 2 2 2 1 1 1
1 1 1 1 1 1 1
2 2 2 2 2 2 2
2 2 2 2 2 2 2
2 2 2 2 2 2 2
0 0 0 0 7 7 7 7 11 11 11 7 7 7 7 0 0 0 0
0 39 50 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 49 73.5 73.5 0 0 115.5 73.5 73.5 73.5 0 0 0 0 0
0 196 336 0
MARCH (2
Week 8 Week 9 Week 10 Week 11
24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
MARCH (2023)
Week 11 Week 12 Week 13
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
MARCH (2023)
Week 11 Week 12 Week 13
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
COMPRESSED AIR SYSTEM
NO. SHIP NO. BLOCK/ZONE SYSTEM LINE NO. ISOMETRIC NO. SPOOL
65 65 65 59 59 0 65
0
0
3% 100%
86%
86%
86%
FABRICATION
86%
86% START
86% FINISH
86% DAYS 0
86%
86%
FABRICATION
86%
86% START
86% FINISH
86% DAYS 0
86%
86%
FABRICATION
86%
86% START
86% FINISH
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
86%
56%
56%
56%
56%
56%
56%
DOMESTIC FW AND SW SYSTEM PROGRESS (%)
FABRICATION INSTALLATION FINAL INSPECTION
Welding Inspect. Fit Up Welding Testing Hydrotest Finishing
PLANNING
0 0
ACTUAL
0 0
VARIATION/DELAY
M
P A
L N
P
A O
N W
E
N R
I
N
G
M
A
N
H
O
U
R
S
M
A
N
A P
C O
W
T E
U R
A
N
A P
C O
W
T E
U R
A
L
M
A
N
H
O
U
R
S
Month
Week
Day/Date
A
C
T S
U P
O
A O
L L
OWER AND MAN HOURS PLANNING (H80069-PR-00)
Month MARCH (2023)
Week Week 12 Week 13
Day/Date 19 20 21 22 23 24 25 26 27 28 29
Fabrication
SPV
Foreman/Asst.
Fitter
Helper
Welder/Grinder
Installation and Testing
SPV
Foreman/Asst.
Fitter
Helper
Welder/Grinder
0 0 0 0 0 0 0 0 0 0 0
Total Manpower
0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7 7 7
Man Hours (Basic) Saturday (5 Hours) 5
Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
Man Hours (OT) Saturday (13.00 - 15.00) 3.5
Man Hours (OT) Sunday (07.00 - 15.00) 14 14
0 0 0 0 0 0 0 0 0 0 0
Total Man Hours
0 0
1064 \
POWER AND MAN HOURS ACTUAL (H80069-PR-00)DAILY MANPOWER AND MAN HOURS ACTUAL (H8006
Month MARCH (2023)
Week Week 12 Week 13
Day/Date 19 20 21 22 23 24 25 26 27 28 29
Fabrication
SPV
Foreman/Asst.
Fitter
Helper
Welder/Grinder
Installation and Testing
SPV
Foreman/Asst.
Fitter
Helper
Welder/Grinder
0 0 0 0 0 0 0 0 0 0 0
Total Manpower
0 0
Man Hours (Basic) Mon-Fri (7 Hours) 7 7 7 7 7 7 7 7 7
Man Hours (Basic) Saturday (5 Hours) 5
Man Hours (OT) Mon-Fri (15.00 - 17.00) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
Man Hours (OT) Saturday (13.00 - 15.00) 3.5
Man Hours (OT) Sunday (07.00 - 15.00) 14
0 0 0 0 0 0 0 0 0 0 0
Total Man Hours
0 0
DELAY
(No Drawing)
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
4 4
8 12 16 4
40
40
12
12
DAILY MANPOWER AND MAN HOU
023)
Week 16 Week 17 Week 18 W
19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
6 6
20 8
20 8
WER AND MAN HOURS PLANNING (H80069-PR-00)
MAY (2023)
Week 19 Week 20 Week 21 Week 22 Week 23
8 9 10 11 12 13 14 15 16 17 18 19 20 21 2 3 4 5
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0
MAY (2023)
Week 19 Week 20 Total Spool
7 8 9 10 11 12 13 14 15 16 17 18 19 20
6 6 2 2 65
12 13 65
25 65
25 65
40
40
0
0
JUNE(2023)
Week 23 Week 24 Week 25 Week 26
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
5 5 5
3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
3.5 3.5 3.5
14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0
0 0
0
7
5
3.5
3.5
0 0
0
Week 26
30 31
0 0
0
7
5
3.5
3.5
0 0
0
No. No. Drawing System
76 76 76 76 74 74
132 126 110 110 109 109
29 21 21 21 21 21
196 175 134 134 7 1
100 93 69 69 44 44
40 40 40 40 40 40
8 8 8 8 0 0
75 8 8 8 0 0
64 38 0 0 0 0
13 0 0 0 0 0
35 0 0 0 0 0
25 0 0 0 0 0
20 0 0 0 0 0
65 65 65 65 59 59
0 0 0 0 0 0
N SITE
LLATION REINSTATEMENT TESTING & FINISHING
ealization Spool Progress Realization Spool Progress Realization (%)
FINAL INSPECTION
Inspect. Fit Up Welding Inspect.
Hydrotest
74 74 74 74 74
0 109 109 0 109
0 21 21 0 21
1 7 1 1 7
0 44 44 0 44
0 40 40 0 40
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 59 59 0 59
0 0 0 0 0
G & FINISHING
Realization (%)
Finishing
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
TANK VENT SOUNDING SYSTEM OVERBOARD PENETRATION
WEIGHT CALCULATED WEIGHT CALCULATED
Date Weigth (Kg) 25-May-23 218
10-Mar-23 33.5
10-Mar-23 59
10-Mar-23 58
12-Mar-23 74
16-Mar-23 76
17-Mar-23 5.5
17-Mar-23 10.5
18-Mar-23 73.5
29-Mar-23 32
31-Mar-23 41.5
4-May-23 744
Total 1207.5
BILGE SYSTEM
WEIGHT CALCULATED
Date Weigth (Kg)
11-Mar-23 58
25-Mar-23 155.5
26-Mar-23 37.5
11-Mar-23 58
11-Mar-23 58
11-Mar-23 58
11-Apr-23 48
9-Jun-23 85
Total 558
FW/SW SYSTEM
WEIGHT CALCULATED
23-May-23 110.5