Feedback received so far has been collated to inform the development of BREEAM UK New Construction 2018
version. Our aim with the update continue to be to provide a robust and evidenced-based evaluation of
performance of new building projects. We welcome feedback on all issues contained within this DRAFT manual.
Please note, as this is a DRAFT document, we are aware there are a few typos and formatting issues, all of which will
be rectified for the FINAL manual. Please focus your comments on the technical proposals.
We are considering a re-structure to the transport-related issues in the manual. This has not yet been incorporated
in the DRAFT manual to enable consultation. We felt it important to consult on the concept prior to making the
amendments to the individual issues. Below outlines our proposed re-structure of the transport section.
Transport proposal
The aim of the transport-related issues in BREEAM is to encourage access to sustainable means of transport for
building users. These support reductions in transport-related energy use, pollution and congestion over the life of
the building. Historically the BREEAM transport category has favoured site locations in urban or metropolitan areas.
These areas are invariably well served by public transport networks, in close proximity to a wide range of local
amenities and services, and have restrictions on land available for car parking. In such cases, projects typically achieve
a significant number of credits for the transport category by default. Conversely, projects in rural areas typically
struggle to achieve credits due to the site’s location, regardless of efforts made to implement sustainable
transport initiatives.
Given the above, we are proposing to re-structure the criteria. This will reward projects that maximise opportunities
to deliver the outcomes that BREEAM is seeking to promote. The proposal attempts to refocus and adapt the
current requirements, rather than introduce a radically different approach.
The starting point will be an initial transport assessment in order to determine the ‘baseline’ for the assessment.
This can form the basis for developing a travel plan or strategy. Projects would be rewarded for the measures
implemented to improve upon the identified baseline.
The following provides an overview of the proposed structure and associated content for the updated transport
category.
– Tra 01 transport assessment and travel plan Understanding the baseline - essentially the current Tra 05
requirements with some minor amendments to the text. The criteria would include reporting on the number and
type of amenities within 500m of the site (based on current Tra 02 criteria), and reporting on the public
transport accessibility (i.e. Tra 01 - proximity to train, bus etc. stops and frequency of services), which could
include calculation of the Accessibility Index for the site.
– Tra 02 Sustainable transport measures Implementing sustainable transport measures - would reward projects
implementing sustainable transport measures recommended in the travel plan , with credits dependent upon
how many measures are implemented. A possible list of options could include:
– Improvements to local cycling or footpath network
– Provision of signposting to public transport, local amenities or both
– Negotiation with local bus, train or tram companies to increase service provision
– Provision of electric recharging stations
– Car sharing facilities or car pool
– Compliant cycle storage spaces and facilities
– Car parking provision exceeds the local authority’s maximum car parking standard relevant to the project
(i.e. provides less car parking than the prescribed maximum)
– Provision of amenities and services on site where these are not available locally (i.e. within ~500m from the
site)
To achieve any Tra 02 credits, it would be a prerequisite to achieve the Tra 01 credits for undertaking the site-
specific transport assessment and travel plan. We would appreciate feedback on the proposed re-structure via the
ii SD5078: BREEAM UK New Construction 2018 – Consultation draft
online survey which can be found here. In addition to the transport category, another change is proposed for
BREEAM UK New Construction 2018 manual. This is not currently included in this DRAFT, will be in the Land-use and
Ecology section.
The BREEAM UK Strategic Ecology Framework (SEF) is currently being implemented across the BREEAM family of
schemes as these are updated. This process involves development of the assessment issues, alignment, synergy
and consistency where relevant across BREEAM schemes and built environment lifecycle stages. In support of this
the proposed ecology assessment issues for this scheme are available for review in a separate consultation
document.
This contains the proposed content of the revised Ecology Assessment issues in this category. It outlines the
proposed Assessment Issues and contains the detailed criteria for review and comment.
We are seeking input from a wide range of stakeholders who are involved in planning, delivering or maintaining
BREEAM Ecology related aspects of development and assets. We very much welcome your input into this process.
Further information about the SEF and the consultation process is also available on the website.
TERMS AND CONDITIONS iii
Copyright
Save where Global has acknowledged third party-owned sources, the copyright in this Scheme Document is owned
by Global. The Scheme Document may be downloaded and reproduced only where:
Any other use of the Scheme Document shall be subject to specific agreements with Global.
Trade Marks
“BRE”, “BRE Global”, “BREEAM”, “SMARTWaste" and “the Green Guide” are all trademarks, whether registered or
unregistered, and are owned by either BRE or Global, and may not be used without written permission from BRE or
BRE Global Limited.
Acknowledgements
This manual has been made possible through the continued efforts of many dedicated BRE Group staff members,
the BRE Global Limited Governing Body, the BRE Global Limited Standing Panel of Experts, BREEAM Assessors and
those who have responded to our consultation calls and meetings or provided feedback in other ways. BRE Global
Limited also extends its gratitude to those who support BREEAM by continuing to specify and apply the method
and contribute towards a sustainable built environment.
Table of contents
PLEASE READ: BREEAM UK New Construction 2018 consultation i
Introduction to BREEAM 17
Building life cycle stages covered by the BREEAM UK New Construction 2018 scheme version 28
Buildings types not covered under the BREEAM UK New Construction 2018 scheme version 30
Building life cycle stages not covered by the BREEAM UK New Construction 2018 scheme version 31
Minimum standards 35
Management xliv
Energy clviii
Transport ccxxii
Water cclix
Table of contents vii
Materials cclxxxvi
Mat 01 Environmental impacts from construction products - Building life cycle assessment 287
Mat 01 Environmental impacts from construction products - Building life cycle assessment 289
Waste 331
Pollution 381
viii SD5078: BREEAM UK New Construction 2018 – Consultation draft
Innovation 422
Appendices cdxxviii
References 25
List of tables ix
List of tables
<b>Table 1 </b>BREEAM UK New Construction 2018 environmental sections and assessment
issues 20
<b>Table 12 </b>Space type and illuminance requirements - both criteria (average illuminance and
minimum point illuminance) should be met. xciii
<b>Table 13 </b>Additional alternative route for healthcare building types only xciv
<b>Table 18 </b>Reflectance for maximum room depths and window head heights xcix
<b>Table 27 </b>BREEAM acoustic criteria for Industrial, Retail, Prisons and Other building types cxxxix
<b>Table 33 </b>Credits available for each building type relating to the public transport AI
score. ccxxv
<b>Table 34 </b>Default hours of operation by building type for a typical day ccxxv
<b>Table 38 </b>Credits available in Tra04. Maximum car parking capacity for different
building types ccxlviii
<b>Table 40 </b>BREEAM Credits available for percentage improvement over baseline building
water consumption cclxii
<b>Table 46 </b>Substructure and hard landscaping – In scope (applicable to criteria 6 and 7) 297
<b>Table 54 </b>BREEAM credits available for percentage of RSM points achieved 309
<b>Table 55 </b>Scope assessment, common building element designation and location and
use categories 311
<b>Table 57 </b>Examples of relevant industry durability or quality standards and design guides 324
<b>Table 62 </b>Credits available relating to the Project Sustainable Aggregate points 344
<b>Table 74 </b>Default values for DELC calculation when manufacturer's figures are not
available 386
<b>Table 75 </b>List of some common refrigerant types with low GWP 389
<b>Table 76 </b>Maximum NOx emission levels by appliance type, fuel and AQMA 393
<b>Table 77 </b>Maximum particulate matter and volatile organic compound emissions for
appliances using biomass, solid fuel and wood pellets 393
List of figures
<b>Figure 1 </b>The BREEAM Certification mark 19
<b>Figure 2 </b>BREEAM assessment and certification stages and the Royal Institute of British
Architects (RIBA) Outline Plan of Work 2013 21
What the new icons mean xiii
Simple building
Shell only
Category weightings
Four icons showing the weighting for each assessment type within the category. For example, if the weighting for
fully fitted assessment is 15% then the icon will contain the figure 15%.
Where exemplary credits are available for an assessment issue, these are shown as a star in the top right hand
corner of the assessment issue icons. The number of exemplary credits is shown within the star.
Minimum standard
One of six minimum standard icons is shown along with the assessment issue credit icon. The minimum standard
star cluster indicates which BREEAM rating the assessment issue minimum standard applies to.
Outstanding
BRE Global Limited’s mission is to 'Protect People, Property and the Planet'.
BRE Global Limited’s product testing and approvals are carried out by recognised experts in our world renowned
testing laboratories.
1. Building Research Establishment's Environmental Assessment Method (BREEAM) - the world’s leading
environmental assessment method for buildings
2. Loss Prevention Certification Board (LPCB) for approval of fire and security products and services.
BRE Global Limited is a trading subsidiary of the BRE Trust, the registered research and education charity which owns
the BRE Group.
www.breglobal.comwww.greenbooklive.com
xvi SD5078: BREEAM UK New Construction 2018 – Consultation draft
The Scheme Document and the information detailed within is intended for use by trained, qualified and licensed
BREEAM UK Assessors in accordance with the procedural and operational requirements of BREEAM (as described
in the BREEAM and CSH: Operational Guidance, SD5070) under the terms and conditions of a BREEAM UK licence.
This document should be used by non-BREEAM UK Assessors for reference purposes only.
The online version of the BREEAM UK New Construction 2018 technical manual contains all applicable criteria and
benchmarks for all countries of the UK. Both the UK online and downloadable country-specific manuals for
Scotland, Wales, Northern Ireland and England are available from www.breeam.com
This document is the Scotland Wales Northern Ireland England UK technical manual for the BREEAM UK New
Construction 2018 Scheme. It describes an environmental performance standard against which new, non-
domestic buildings in this territory can be assessed and achieve a BREEAM New Construction rating.
The Scheme Document and the information detailed within is intended for use by trained, qualified and licensed
BREEAM UK Assessors in accordance with the procedural and operational requirements of BREEAM (as described
in the BREEAM and CSH: Operational Guidance, SD5070) under the terms and conditions of a BREEAM UK licence.
This document should be used by non-BREEAM UK Assessors for reference purposes only.
The full online version of the BREEAM UK New Construction 2018 technical manual contains the criteria and
benchmarks for all territories of the UK. Both the UK online and downloadable country-specific manuals for
Scotland, Wales, Northern Ireland and England are available from www.breeam.com
Any additions to this document that necessitates its re-issue will be highlighted throughout the text (note: deletions
are not identified in the updated issue). A detailed list of all additions and deletions made to each issue is available
separately. BREEAM Assessors can download this list of changes from the BREEAM Assessor's Extranet. The list of
changes is also available to other parties on request; please email [email protected].
Introduction to BREEAM 17
Introduction to BREEAM
BREEAM is the world’s first and leading sustainability assessment and certification scheme for the built environment.
It is an international standard that is locally adapted, operated and applied through a network of scheme
operators, assessors and industry professionals.
Through its application, BREEAM recognises and reflects the value in higher performing assets and aims to inspire
and empower change by rewarding and motivating sustainability across the life cycle of master-planning projects,
infrastructure and buildings.
Launched in 1990, to date, BREEAM has been used to certify over 590,000 assessments of buildings across the
building life cycle and is being applied in over 78 countries.
– encourage continuous performance improvement and innovation by setting and assessing against a broad
range of scientifically rigorous requirements that go beyond current regulations and practice,
– empower those who own, commission, deliver, manage or use buildings, infrastructure or communities to
achieve their sustainability aspirations,
– build confidence and value by providing independent certification that demonstrates the wider benefits to
individuals, business, society and the environment.
– Ensure environmental quality through an accessible, holistic and balanced measure of environmental impacts.
– Use quantified measures for determining environmental quality.
– Adopt a flexible approach that encourages and rewards positive outcomes, avoiding prescribed solutions.
– Use robust science and best practice as the basis for quantifying and calibrating a cost effective and rigorous
performance standard for defining environmental quality.
– Integrate building professionals in the development and operational processes to ensure wide understanding
and accessibility.
– Adopt third party certification to ensure independence, credibility and consistency of the label.
– Adopt existing industry tools, practices and other standards wherever possible to support developments in
policy and technology, build on existing skills and understanding and minimise costs.
– Align technically and operationally with relevant international standards, including the suite of standards on the
‘Sustainability of Construction Works’ prepared by the European Committee for Standardisation Technical
Committee CEN/TC 350.
– Engage with a representative range of stakeholders to inform ongoing development in accordance with the
underlying principles and the pace of change in performance standards (accounting for policy, regulation and
market capability).
The aims, objectives and principles of BREEAM are embodied within a Core Standard (Process, Science and
Technical) owned and managed by BRE Global Limited. This Core Standard is applied to cover aspects of the built
environment life through a suite of BREEAM Schemes.Locally developed and operated versions of the schemes are
used in other countries by organisations known as National Scheme Operators (NSOs).
All NSOs are required to maintain scheme operations to internationally agreed standards and seek accreditation
from a national accreditation body to demonstrate competence, impartiality and performance capability.
For a full list of BREEAM National Scheme Operators and Schemes visit www.breeam.com.
18 SD5078: BREEAM UK New Construction 2018 – Consultation draft
BRE is highly respected as a world leading authority in building performance research, testing, evaluation, standard
setting and certification with over 90 years of experience operating both within the UK and internationally. The
science-based content and independent application in accordance with recognised International Standards(4)
underpin both the creation and operation of BREEAM. BRE Global, the BRE’s certification body and operators of
BREEAM, is accredited by the United Kingdom Accreditation Service (UKAS) against these standards to ensure
independence, competence and impartiality.
A key aspect of this impartiality is the open and accountable governance structure. The operation of BREEAM (as
with all our assurance activities) is overseen by an independent Governing Body and a broad cross-industry
Standing Panel who provide peer and market review as well as technical and operational oversight of our activities.
The Governing Body represents a breadth of stakeholder interests to ensure, among other things, that BRE Global
acts in a manner that is beyond reproach, operates our processes correctly, treats our customers fairly and is
always acting for the public good.
2. Process of certification
Independence is a key feature of BREEAM as it provides confidence to the consumer. Assessors are trained and
licensed by BRE to undertake the BREEAM assessment and determine a rating. To view a current list of BREEAM
Assessors visit www.greenbooklive.com
The BREEAM Assessor will evaluate the design, specification and construction of a new development using the
criteria and methodologies defined in this technical manual and it’s supporting assessment tools.
Once an assessment is complete and has achieved a positive outcome in the BRE Global quality assurance
procedure, a certificate will be issued. The certificate provides formal verification that the BREEAM Assessor has
completed their assessment in accordance with the requirements of the scheme and its quality standards. In turn
providing confidence to any interested party or stakeholder in the BREEAM rating and performance of the new
development.
Anyone wishing to verify a certified assessment and rating of a new development against BREEAM can do so by
either checking its BREEAM certificate, see examples in Appendix F – Examples of BREEAM UK New Construction
certificates on page M, which will contain the scheme’s certification mark (see Figure 1 on the facing page), or by
searching the project listings on Green Book Live www.greenbooklive.com.
Introduction to BREEAM 19
All NSOs are required to maintain scheme operations to internationally agreed standards and seek accreditation
from a national accreditation body to demonstrate competence, impartiality and performance capability.
20 SD5078: BREEAM UK New Construction 2018 – Consultation draft
The primary aim of BREEAM UK New Construction is to mitigate the life cycle impacts of new buildings on the
environment in a robust and cost effective manner. This is achieved through integration and use of the scheme by
clients and their project teams at key stages in the design and construction process.
Clients can measure, evaluate and reflect the performance of their new building against best practice in an
independent and robust manner.
Performance is quantified by individual measures and associated criteria stretching across a range of
environmental issues and expressed as a single certified BREEAM rating, i.e. the label.
Table 1 BREEAM UK New Construction 2018 environmental sections and assessment issues
Management Health and wellbeing
– Project brief and design – Visual comfort
– Life cycle cost and service life planning – Indoor air quality
– Responsible construction practices – Safe containment in laboratories
– Commissioning and handover – Thermal comfort
– Aftercare – Acoustic performance
– Safety and security
– Safe and healthy surroundings
Energy Transport - subject to consultation
– Reduction of energy use and carbon emissions – Public transport accessibility
– Energy monitoring – Proximity to amenities
– External lighting – Cyclist facilities
– Low carbon design – Maximum car parking capacity
– Energy efficient cold storage – Travel plan
– Energy efficient transport systems
– Energy efficient laboratory systems
– Energy efficient equipment
Water Materials
– Water consumption – Building life cycle assessment
– Water monitoring – Environmental Product Declarations
– Water leak detection – Responsible sourcing of materials
– Water efficient equipment – Designing for durability and resilience
– Material efficiency
Waste Land use and ecology - subject to consultation
– Construction waste management – Site selection
– Low impact aggregates in the construction process
– Operational waste
– Speculative floor and ceiling finishes
– Adaptation to climate change
– Design for disassembly and functional adaptability
Pollution Innovation
– Impact of refrigerants – Innovation
– Local air quality
– Surface water run-off
– Reduction of night time light pollution
– Reduction of noise pollution
When and how to engage with the BREEAM UK New Construction scheme 21
Figure 2 below shows the link between the BREEAM UK New Construction assessment and certification stages and
the RIBA Outline Plan of Work 2013.
Clients can use this to understand when they should ideally engage with BREEAM and appoint a BREEAM Advisory
Professional and BREEAM Assessor.
Up to date listings of licensed BREEAM UK New Construction Assessors and BREEAM Advisory Professionals are
available at Green Book Live www.greenbooklive.com.
BREEAM primarily reflects the overall performance of the building rather than just the opportunities or limitations
placed on specific stakeholders involved in the process. In the case of new builds, this means that the client, design
team, principal contractor and BREEAM Assessor, as well as other specialist disciplines, have an important role to
play throughout the procurement process, if the desired performance level is to be achieved and reflected through
the certified BREEAM rating.
Orientating the brief towards BREEAM needs to come first and foremost from the client. BRE recommends that
clients and their project teams engage with a licensed BREEAM Assessor and BREEAM Advisory Professional no
later than the Preparation and Brief stage (RIBA Stage 1 or equivalent) and ideally sooner . This will ensure that
realistic targets are set and can be met, appropriate responsibilities can be defined and understood and low or no
cost solutions to environmental impacts can be sought and applied wherever possible.
Figure 2 BREEAM assessment and certification stages and the Royal Institute of British Architects (RIBA) Outline Plan
of Work 2013
22 SD5078: BREEAM UK New Construction 2018 – Consultation draft
1. Enable licensed BREEAM Assessors to complete BREEAM assessments and determine a rating
2. Enable BRE Global Ltd to complete quality assurance evaluation of a BREEAM Assessor's assessment and
make a certification decision.
3. Aid BREEAM Advisory Professionals (AP) to undertake project team facilitation, in defining, monitoring and
successfully achieving the desired BREEAM rating
4. Act as a reference for clients and members of the project team whose proposed building is being
BREEAM-assessed.
The Scope section describes the types of buildings and stages of assessment that this version of the BREEAM UK
New Construction scheme can be applied to. Appendices A to F provide additional scoping guidance for specific
building and project types. The Scope section can be used by clients and BREEAM Assessors to check whether this is
the correct BREEAM scheme to use for their project.
The Scoring and rating section illustrates how a building’s assessed performance is measured and rated. It outlines
the rating level benchmarks, the minimum standards for each rating level and the environmental section weightings.
It also includes a description of the BREEAM assessment issues and ‘credits’, including ‘Innovation credits’, and how
performance against these is calculated and expressed as a BREEAM rating.
The BREEAM evidential requirements section provides guidance to assessors and project teams on the various
types and forms of evidence required by the BREEAM Assessor to demonstrate compliance with assessment
criteria. This includes a description of why BREEAM requires an auditable trail of evidence, a table of general types of
information produced during a building project, and therefore typically required and used as evidence of
compliance, and guidance on the differing forms of evidence that can be used and at what stages of the
assessment, such as letters of commitment.
The BREEAM categories section includes the assessment issues, categorised in 10 environmental sections. Each
issue defines a level of performance (the assessment criteria) against which the assessed building demonstrates
compliance (using appropriate project information, i.e. evidence) in order to achieve BREEAM credits.
The majority of BREEAM issues and credits are tradable so a client and their project team can pick and choose which
ones to target to build their BREEAM score and achieve the desired rating. Several assessment issues have minimum
standards, meaning that specific credits or criteria must be achieved for a particular BREEAM rating (BREEAM
minimum standards are identified in the Scoring and rating BREEAM-assessed buildings section).
1. Issue information: contains the assessment issue reference, title, number of credits available(1) and
whether the issue forms part of the BREEAM minimum standards.
2. Aim: outlines the objective of the issue and the impact it measures or mitigates.
3. Value and context: outlines the key value of the issue and summarises beneficial outcomes resulting from
compliance with the issue criteria
4. Assessment scope: indicates how to apply the issue for different types of assessment and project specific
circumstances
5. Assessment criteria: identifies how many parts for the issue and the number of credits associated with
those parts. States each of the requirements of the issue and in affect the means by which the issue aim is
achieved and value is realised by the project, in complying. Where the building complies with all the relevant
criteria, as determined by the licensed BREEAM Assessor, the requisite number of credits can be awarded.
Some issues also have Exemplary Level Criteria with additional exemplary credits available where a building
24 SD5078: BREEAM UK New Construction 2018 – Consultation draft
demonstrates that it meets this criteria (refer to Innovation on page 422 for more details). Up to a
maximum of 10 Innovation credits are available.
6. Methodology: includes a description of any methodology used to determine the number of credits
achieved for a given level of building performance. It includes, for example, calculation procedures or
guidance on how to relate non-BREEAM schemes, standards or qualifications referenced to the
assessment criteria.
7. Evidence: describes the types of project information that the design team or client must provide to the
licensed BREEAM Assessor to enable verification of the building’s performance against the assessment
criteria and justification of credits awarded. The BREEAM evidence requirements section provides further
guidance on evidential requirements.
8. Definitions: includes any definition of terms used in the assessment issue
9. Checklists and tables: contains any checklists and useful tables.
10. Additional information: contains any further information relevant to the application of the assessment
criteria, or sources of additional information that may be of use in addressing the issue.
The Appendices provide supporting information relevant to either the scope of the BREEAM UK New Construction
2018 or its assessment criteria.
Scope of the BREEAM UK New Construction 2018scheme version 25
This BREEAM UK New Construction 2018 scheme version is applicable to new non-domestic buildings in the United
Kingdom only.
This is necessary as BREEAM defines criteria and benchmarks for some assessment issues according to building
type, function and use. To maintain comparability and consistency of the assessment and BREEAM rating, a
separate registration, assessment score and rating are therefore required for each building type function or use in
the development.
Licensed Assessors will find further guidance on how to define mixed use developments for the purpose of an
assessment in Guidance Note GN10 – Mixed use developments and similar buildings (or units).
– Fully fitted (applicable to all buildings apart from those defined as a 'simple' building)
– Fully fitted – 'simple' building (see Appendix E – Simple Building Assessments on page I)
– Shell and Core (see Appendix D – Shell only and Shell and Core Project Assessments on page D)
– Shell only (see Appendix D – Shell only and Shell and Core Project Assessments on page D)
Scope of the BREEAM UK New Construction 2018scheme version 27
The assessment criteria for these options are identified in each assessment issue in this technical manual. The
assessor in collaboration with the client and design team should determine which assessment type is relevant for
their project and assess the criteria accordingly.
For smaller projects, where the total development area is less than 1000m², a single BREEAM assessment can be
undertaken to cover both the new-build and refurbished areas. The choice of BREEAM New Construction or
BREEAM Refurbishment and Fit-out scheme should be based on whichever (new-build or refurbishment)
constitutes the majority of the assessed floor area.
For larger projects a single New Construction assessment can be undertaken, however the refurbished areas have
to comply with assessment criteria designed for new builds, which can be more challenging in some instances. If the
development is predominantly a refurbishment with new-build extension then the BREEAM Refurbishment and Fit-
out scheme may be the most appropriate, as it contains thresholds under which a single Refurbishment and Fit-out
assessment can be completed.
Where none of the above options are deemed suitable for the project there are two further options:
Option 1: Separate BREEAM New Construction and BREEAM Refurbishment and Fit-out assessments
Under option 1, two separate BREEAM assessments would be conducted with a BREEAM New Construction
assessment undertaken on the new extension and a BREEAM Refurbishment and Fit-out assessment undertaken on
the existing building refurbishment or fit-out. Two separate certificates and ratings can be obtained to indicate the
performance of both the new extension and existing building refurbishment or fit-out.
Option 2: Bespoke BREEAM combined New Construction and Refurbishment and Fit-out assessment
Under option 2, BRE Global will produce a Bespoke criteria appendix document which will determine, for specific
BREEAM issues, which issues and assessment criteria are applicable to the part new build-part refurbishment
project. It will refer to both the BREEAM UK Refurbishment and Fit Out manual and the BREEAM UK New
Construction manuals. A bespoke Scoring and Reporting tool will also be produced for the project.
As part of the bespoke criteria development for issue Ene 01 we allow the new build to be assessed against the
New Construction scheme and the refurbishment against the RFO scheme. The tool performs an area-weighted
average score. It is also possible for the extension to be included under the RFO criteria where following CN6
'Extensions to existing buildings and new constructed thermal elements'. The tool also creates area-weighted
construction resource benchmarks for the Resource efficiency credit in issue Wst 01 Construction waste
management on page 332.
In determining the appropriate option for a part new build part-refurbishment project, the BREEAM Assessor
should review the scope of the proposed works and consider in particular the scope of the refurbished elements.
Considerations such as whether it is a major refurbishment, will there be a significant change of use and will the
building's thermal and structural elements remain unchanged? Using this information the assessor should advise
the client on the most suitable BREEAM version or scheme for maximising the building's environmental
performance.
28 SD5078: BREEAM UK New Construction 2018 – Consultation draft
1. New Build Design Stage (DS) (optional) - leading to an Interim BREEAM rating and certificate of assessment
2. New Build post-construction Stage (PCS) – leading to a Final BREEAM rating and certificate of assessment
3. New Build Verification Stage (optional) - leading to a certification relating to robust best practice, to meet
design aspirations, in the following areas:
a. post occupancy handover and commissioning processes
b. performance monitoring
c. actions undertaken post occupancy to understand and manage the actual performance of the building.
Design Stage
The DS assessment and interim BREEAM rating is optional and can be used to demonstrate the proposed new
building’s performance at the design stage of the life cycle. It is strongly recommended that assessment and
certification should occur prior to the beginning of operations on site. The BREEAM rating at this stage is labelled as
‘interim’ because it does not represent the building’s final, new construction BREEAM performance.
To complete an assessment at this stage the design must be advanced to a point where the relevant design
information is available to enable the BREEAM Assessor to evaluate and verify the building’s performance against
the criteria defined in this Scheme Document. The interim DS assessment will therefore be completed and certified
at the scheme design or detailed design stages.
A PCR serves to confirm the assessment of a the building’s ‘as-built’ performance and rating and where
appropriate that it is in accordance with the assessment certified at the interim design stage. Where an interim DS
assessment has not been carried out and a BREEAM assessment and rating is required, a full post-construction
stage assessment can be conducted.
Verification Stage
The verification stage is an optional third stage of assessment under the UK New Construction scheme. This stage
confirms the process of monitoring, reviewing and reporting on the performance of the building once occupied. It
is carried out a minimum of 12 months after occupation and would normally be before a period of 2 years has
lapsed from the date of ‘full’ occupation (defined as occupation of 70% of the occupiable space in the building).
This will focus on best practice project commissioning and handover and post occupation support and aims to
help the Design Team, Facilities Manager and building owner understand the actual performance of the building
and optimise this in line with design expectations. The assessment will review post occupancy monitoring
processes and identify where there are deficiencies to rectify or opportunities to take. The verification stage is only
applicable to fully fitted assessments, it is not available for shell only and shell and core assessments.
The verification stage will also entail a review of commitments made at the Post Construction stage within the UK
New Construction scheme .
Building life cycle stages covered by the BREEAM UK New Construction 2018 scheme version 29
In order to complete the verification stage, various issues in the UK New Construction scheme need to be achieved
at the post construction stage, as follows:
For these issues, evidence must be collated after the building has been handed over to demonstrate compliance at
the verification stage. Evidence requirements are detailed in the individual assessment issues.
Additional credits are available within the UK New Construction scheme (Ene 01) where a contractual commitment
is made to complete and achieve certification at the verification stage. The verification stage is only applicable to
fully fitted assessments and is not available for Shell only and Shell and core assessments.
The verification stage can provide an interim step between the UK New Construction Post Construction
assessment and assessment in occupation under BREEAM In-Use. It provides a more realistic view of building
performance and occupation patterns than is possible at the new construction stage and so, helps to ensure that
the building performs as expected.
A more specific consultation on the details of the Verification stage process will follow this DRAFT manual and can
be found here.
30 SD5078: BREEAM UK New Construction 2018 – Consultation draft
1. Existing building major and minor refurbishments and fit-outs (See scope of BREEAM UK Refurbishment
and Fit-out scheme)
2. Existing building in operation or existing unoccupied building (BREEAM In-Use scheme)
3. Existing building de-construction (no BREEAM scheme for this life cycle stage at present)
4. Infrastructure projects (BREEAM infrastructure pilot scheme)
32 SD5078: BREEAM UK New Construction 2018 – Consultation draft
The next sections summarise how these elements combine to produce a BREEAM rating for a new building and are
followed by a description and example calculation of a rating.
BREEAM rating benchmarks for projects assessed using the 2018 version of BREEAM UK New Construction are:
BREEAM rating benchmarks enable a client and all other stakeholders to compare the performance of a newly
constructed building with other BREEAM rated buildings, and the typical sustainability performance of a stock of
new non-domestic buildings in the UK.
In this respect each BREEAM rating broadly represents performance equivalent to:
An unclassified BREEAM rating represents performance that is non-compliant with BREEAM, in terms of failing to
meet either the BREEAM minimum standards of performance for key environmental issues or the overall threshold
score required to achieve at least a Pass rating.
This weighting system is defined in greater detail within the BRE Global Core Process Standard (BES 5301) and it’s
supporting procedural documents. The process for defining the weightings is set out in a briefing available on the
BREEAM website.These form part of the over-arching BREEAM Standard and the Code for a Sustainable Built
Environment.
Minimum standards
To ensure performance against fundamental environmental issues is not overlooked in pursuit of a particular
rating, BREEAM sets minimum standards of performance in key areas, e.g. energy, water, waste etc. The majority of
BREEAM credits can, however, be traded, so non-compliance in one area can be offset through compliance in
another to achieve the target BREEAM rating.
The minimum acceptable levels of performance for each rating are summaries in Table 5 below.
To achieve a particular BREEAM rating, the minimum overall percentage score must be achieved as well as the
minimum standards detailed in Table 5 below.
BREEAM credits are awarded where a development meets the best practice performance levels defined for an
assessment issue, i.e. the impact has been mitigated. For example in the case of the health and wellbeing section, a
specific building occupant-related issue has been addressed, e.g. thermal comfort.
The number of credits available for an individual assessment issue will vary and generally reflect the importance of
mitigating the impact of the assessment issue. In most cases, where there are multiple credits available, the number
awarded is based on a sliding scale or benchmark, where progressively higher standards of building performance
are rewarded with a higher number of credits.
In addition to the category section score, overall score and BREEAM rating, verified performance against individual
assessment issues also provides users with a credible set of key building performance indicators for a range of
embodied, operational and construction phase building impacts. It is therefore possible to use the method to
define performance levels in support of specific organisational policy objectives for individual environmental issues
as well as using BREEAM to define overall targets. However, be aware that design flexibility and project cost
implications can occur if design targets are set using individual issues and credit levels.
Awarding credits for innovation enables clients and design teams to boost their building’s BREEAM performance
and, also helps to support the market for new innovative technologies, and design or construction practices.
1. By meeting exemplary performance criteria defined within an existing BREEAM issue, i.e. going beyond the
standard BREEAM assessment criteria
2. By the project’s licensed BREEAM Assessor applying to BRE Global to have a particular building technology
or feature, design or construction method or process recognised as ‘innovative’. If the application is
successful and subsequently compliance is verified, an ‘innovation credit’ can be awarded.
Each innovation credit achieved adds 1% to a building's overall score. The maximum number of ’innovation credits’
that can be awarded for any one building is 10; therefore the maximum additional score available for ‘innovation’ is
10%.
Innovation credits can be awarded regardless of the building’s final BREEAM rating, i.e. they can be awarded at any
BREEAM rating level. Refer to Inn 01 Innovation on page 423 for more detail.
Calculating a building's BREEAM rating 37
The process of determining a BREEAM rating and an example calculation, see Table 6 below
1. For each of BREEAM’s nine categories the number of credits awarded is determined by the BREEAM
Assessor according to the number of credits available when the criteria of each assessment issue have
been met (as detailed in the technical sections of this document).
2. The percentage of available credits achieved is calculated for each section.
3. The percentage of credits achieved in each section is multiplied by the corresponding weighting for each
section to give the overall environmental category score.
4. The section scores are added together to give the overall BREEAM score.
5. The overall score is compared to the BREEAM rating benchmark levels and, provided all minimum
standards have been met, the relevant BREEAM rating is achieved.
6. An additional 1% can be added to the final BREEAM score for each innovation credit achieved (up to a
maximum of 10% with the total BREEAM score capped at 100%).
To maintain consistency and confidence certification requires that , all assessment decisions be based on verified
and credible project information that can be traced, i.e. decisions are evidence based. This is not only important for
compliance with the international standards to which BRE Global is accredited as a certification body, but also
manages risk to clients and BREEAM Assessors in the event that a certification outcome is challenged.
Clear, ordered and well referenced evidence for each BREEAM issue and criterion addressed facilitates efficient
quality assurance and a certification decision BREEAM Assessors can access further guidance on assessment
referencing in Assessor Guidance Note 01, and the 'Reporting process' webinar, both available from the Resources
section of the BREEAM Projects website.
The BREEAM Assessor determines the BREEAM rating and their submitted assessment report is the formal record
of an assessor’s audit against the criteria defined in the technical manual for a BREEAM scheme. The BREEAM
certificate issued by BRE Global provides assurance that the service provided by the assessor , i.e. the assessment
and determination of the BREEAM rating has been conducted in accordance with the requirements of the scheme.
Evidence types
Evidence does not necessarily need to be prepared specifically for the purpose of the BREEAM assessment. In many
instances, the assessor should source readily available and prepared project information to demonstrate
compliance. For this reason, BREEAM aims to avoid being prescriptive on the type of evidence required, although
some issues do require specific documents to be provided.
The BREEAM Assessor and project team will find that many assessment issues require more than one piece or type
of information to demonstrate compliance with one criterion.Alternatively, one piece of information may be
sufficient to demonstrate compliance with multiple criteria.
To help project teams and the BREEAM Assessor understand how the different types of building information
documentation they collate can be used as evidence at each stage of assessment, the evidence types are grouped
broadly into three categories:
For some assessment issues, the assessor will require a mixture of general and specific evidence types.
General evidence includes a broad list of defined building information commonly produced for a building project.
One or more pieces of this type of information can be used to demonstrate compliance for one or more of the
assessment issues and criteria, as deemed appropriate by the BREEAM Assessor for the stage of assessment.
General BREEAM evidence types are listed in Table 9 on page 41, and not specifically in the Evidence section within
each BREEAM issue. Not all general evidence types will be appropriate for all assessment issues and it is the
The BREEAM evidential requirements 39
responsibility of the assessor to ensure that the evidence specifically demonstrates compliance and is fully
referenced in the assessment submission .
Specific evidence is particular building information that must be provided to verify compliance with the relevant
criteria for the BREEAM credit sought. In all cases this is the only type of evidence acceptable to BRE Global Ltd for
that particular issue or criteria. If the specific evidence is not provided and referenced appropriately in the
assessment submission , the Quality Assurance audit will identify it is a non-conformity and a certification decision
will be delayed until such time as the non-conformity is addressed. An example of specific evidence is a copy of the
Building Regulations output document from the approved software for BREEAM issue Ene 01 which is listed in the
evidence table for this issue.
When required, specific evidence is defined and listed in the Evidence section of the assessment issue for both
interim and final stages of assessment. Specific evidence required to demonstrate compliance with particular
criteria is listed but this evidence alone may not be sufficient to demonstrate full compliance. Additional general
evidence types may also be required. For example for Mat 01; to demonstrate compliance with criteria 1–5 at the
design stage, a copy of the Mat 01 Calculator tool is listed in the ‘Evidence’ table. However, in addition to the Mat 01
Calculator tool, further evidence is required to demonstrate how the inputs for this tool have been determined, i.e.
general evidence types such as building specifications or drawings etc., confirming the material specifications to be
used. Not all BREEAM issues have specific evidence requirements.
Other types of evidence provided by a client or design team not listed in Table 9 on page 41 or the ‘Evidence’
section for each issue, can still be used. To avoid non-conformities and delays in certification, other types of
evidence must be credible, robust and traceable to the same assurance level as, or better than, specified or general
evidence types defined in the technical manual. If in doubt, BRE should be contacted prior to awarding credits and
referencing such evidence in the submission for QA and certification decision.
While letters of commitment can play a role in demonstrating compliance, they are not a replacement for more
formal and established types of project information. The assessor must not award credits where they have a
reason to doubt the validity or intent of written commitments, or where it is not unreasonable to expect formal
design or specification information to be available to confirm compliance.
Evidence supplied at the post-construction stage must be reflective of the completed building and must therefore
demonstrate what has actually been implemented. For example, if sub-meters have been specified at the design
40 SD5078: BREEAM UK New Construction 2018 – Consultation draft
stage, evidence at the post-construction stage would need to demonstrate that these have actually been installed.
Appropriate evidence may be a site inspection report with supporting photographs or as-built drawings showing
the location of the sub-meters.
Letters of commitment cannot be used to demonstrate compliance at the final, post-construction stage of
assessment. The only exception to this is where the criteria require an action to take place after handover and
possibly during the initial stages of building operation, i.e. after completion of the post-construction stage of
assessment. An example could be a written commitment from the building owner or occupier making a
commitment to conduct post occupancy evaluation.
Where no specific evidence is listed , this means there are potentially a number of different types of ‘general’ project
information, as per Table 9 on the facing page that the BREEAM Assessor can source and use to demonstrate
compliance.
To determine whether general evidence types are appropriate for an assessment issue, the BREEAM Assessor
must consider the BREEAM evidence principles see BREEAM evidence principles below . Where the ‘general
evidence types’ meet the principles outlined in Table 8 below and the guidance provided in the ‘robustness of
evidence’ section, where appropriate, such evidence is admissible for the assessment and the BRE Global Quality
Assurance audit.
These principles are not listed in a hierarchical order and are all equally important when considering which evidence
type to assess, reference and submit.
Robustness of Evidence
Robust evidence provides confirmation that the assessment has been carried out correctly and the building
complies with the criteria for the BREEAM credits sought. The assessor should consider the following when
gathering project information and evaluating whether the evidence provided is as ‘robust’ as possible:
– Is there more than one piece of evidence that could be used to demonstrate compliance?
– Is the chosen evidence robust and appropriate to demonstrate that a particular criterion has been achieved?
Any evidence submitted for a BREEAM assessment must be robust in terms of its source and its traceability. The
minimum information the assessor must expect to see when certain types of evidence are submitted is:
Communication records: Any communication records used as evidence must provide clear confirmation of the site
name, author’s identity and role, the date and recipients identity.
Formal letters of correspondence: On company or organisation headed note-paper with a signature (electronic
signatures are acceptable). Ideally letters should be a secured document. (Please see sections relating to written
commitment for further information.)
Meeting minutes: Include date, location and attendee information (names, organisations and roles), along with a
record of the meeting and agreed actions.
Drawings: All drawings have the building or site name, phase (if applicable), title of drawing, date, revision number
and a scale.
Specification: A specification clearly relates to the project under assessment, and it has a date and revision number.
Where sections of a specification are provided the assessor should reference the extract and as a minimum submit
the front page of the specification detailing the project name, revision number and date.
Site inspection report: A site inspection report includes the building or site name, date, author and summary text to
detail what was witnessed, confirming compliance. Photographic evidence can be used to support the text in the
report.
For other types of evidence not listed, the assessor should use this minimum information list as a guide to suitable
evidence. As a minimum the evidence used to assess compliance must contain key information such as the project
name, the author, date, revision numbers etc.
Management
Summary
This category encourages the adoption of sustainable management practices in connection with design,
construction, commissioning, handover and aftercare. This ensures that robust sustainability objectives are set and
followed through into the operation of the building. Issues in this section focus on embedding sustainability
through the key stages of design, procurement and initial occupation, from the initial project brief stage to the
appropriate provision of aftercare.
– Encouraging an integrated design process, considering BREEAM performance targets early, to influence
decision-making and optimise building performance, while avoiding unnecessary costs.
Man 02 Life cycle cost and service life planning 4 credits
– Promoting the business case for sustainable buildings through the enhanced understanding of capital cost.
– Improving design, specification, maintenance and operation, by encouraging the use of life cycle costing.
Man 03 Responsible construction practices min standards 6 credits
– Encouraging construction sites to be managed in an environmentally and socially considerate and responsible
manner.
– Monitoring encourages continuous improvements and utility consumption reduction.
Man 04 Commissioning and handover min standards 4 credits
– Encouraging a well-managed handover and commissioning process, which will ensure building services and
fabric defects are identified and rectified.
– The building responds to the needs of the occupants.
Man 05 Aftercare min standards 3 credits
– Encouraging aftercare support during the first year of the building operation, to ensure the building operates in
accordance with the design intent and in response to the building occupants’ needs.
Man 01 Project brief and design xlv
4 2 4 4
Fully fitted Simple building Shell & core Shell only No Minimum standard
Aim
To optimise final building designthrough recognising and encouraging an integrated design process and robust
stakeholder engagement.
Value
– Identification of variation in stakeholder
needs, so maximising benefits and
acceptability of the project in operation to
users and those affected by it.
– Enhanced project team integration and
efficiency.
– Helping to achieve project targets and
maximise opportunities for project
performance.
– Minimise risks to project performance, delays
and cost arising as a result of ongoing design
development and project changes.
– Help to meet performance expectations in
operation and so minimise the risks of a
performance gap.
Context
Early stakeholder engagement ensures that key project stakeholders are identified and engaged to determine end
user requirements and operational adaptability, allowing them to be taken in to account throughout the project.
xlvi SD5078: BREEAM UK New Construction 2018 – Consultation draft
Research(8)highlights that when project stakeholders are not satisfied with the project management quality of the
final project, the project team will need to adjust the scope, time and cost to meet stakeholder requirements and
expectations on quality issues.
Adopting integrated design and engagement processes has been demonstrated to result in improved
operational performance, greater project efficiencies and reduced risks to performance, time and cost.
Following an integrated design process, maximises the opportunities for performance and minimises risks of
design conflicts appearing later on in a project when risks to time and cost are higher.
Assessment scope
Assessment criteria
1.a: Roles
1.b: Responsibilities
1.c: Contributions.
2 Consider each one of the following items when defining roles, responsibilities and contributions for each key
phase of the project:
2.d: Occupiers' budget and technical expertise in maintaining any proposed systems
2.f: Requirements for the production of project and end user documentation
Where the building occupants are not known, the list of considerations above still applies. The appropriate project
delivery stakeholder considers each item, based on likely scenarios of building occupancy.
3 The project team demonstrates how the project delivery stakeholders' contributions and the consultation
process outcomes influence the following:
5 Relevant members of the design team organise a design workshop focusing on operational energy (see Ene
01 Reduction of energy use and carbon emissions on page clxi).
6 Demonstrate how the stakeholder contributions and consultation exercise outcomes influence the Initial
Project Brief and Concept Design.
7 Prior to completion of the detailed design (RIBA Stage 4, Technical Design or equivalent), all interested parties
(see Definitions on page l) give and receive consultation feedback .
Additionally for Education, Healthcare, Law courts and Major transport hub
building types only:
8 An independent party (see Definitions on page l) carries out the consultation exercise. As an example, the
Design Quality Indicator (DQI) could be used as a method to assess the design quality of buildings.
10.a:Work with the project team, including the client, to consider the links between BREEAM issues and assist
them in maximising the project’s overall performance against BREEAM, from their appointment and
throughout the Concept Design stage.
10.b:Monitor progress against the performance targets (see Definitions on page l) agreed under criterion 9
above throughout all stages after their appointment where decisions critically impact BREEAM
performance.
10.c:Proactively identify risks and opportunities related to the achievement of the targets agreed under
criterion 9 above.
10.d:Provide feedback to the project team as appropriate, to support them in taking corrective actions and
achieving their agreed performance targets.
10.e:Monitor and, where relevant, coordinate the generation of appropriate evidence by the project team.
12 Involve the BREEAM AP in the project at an appropriate time and level to:
12.a:Work with the project team, including the client, to consider the links between BREEAM issues and to assist
them in maximising the project’s overall performance against BREEAM throughout the Developed Design
stages.
12.b:Monitor progress against the performance targets agreed under criterion 9 above throughout all stages
where decisions critically impact the specification and tendering process and the BREEAM performance.
12.c:Proactively identify risks and opportunities related to the achievement of the targets agreed under
criterion 9 above.
12.d:Provide feedback to the project team as appropriate, to support them in taking corrective actions and
achieving their agreed performance targets.
12.e:Monitor and, where relevant, coordinate the generation of appropriate evidence by the project team.
Man 01 Project brief and design xlix
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
9. How the building or grounds could best be designed to facilitate learning and provide a range of social
spaces appropriate to the needs of pupils, students and other users.
In the case of building types containing technical areas or functions, e.g. laboratories, workshops etc., minimum
content also includes:
10. The end users' broad requirements for such facilities, including appropriate sizing, optimisation and
integration of equipment and systems.
11. How to ensure a smooth, safe and secure transition between different modes of transport (air, rail, road,
bike and pedestrian).
Evidence
Definitions
Communication strategy
The RIBA Plan of Work 2013 defines the Communication Strategy as the strategy that sets out when the project
team will meet, how they will communicate effectively and the protocols for issuing information between the
various parties, both informally and at Information Exchanges.
Concept design
The objective at this stage is to develop outline proposals including site and spatial planning, building form,
structural and building services strategies, outline specifications, preliminary cost budgets including relevant
project strategies which support or influence the design programme and the ability to comply with BREEAM
requirements as the project progresses.
Activities can include: preparing the sustainability strategy, maintenance and operational strategy, handover
strategies, carrying out risk assessments, reviewing the project programme, considering construction logistics to
ensure efficiency, developing health and safety strategy, undertaking any third party consultations as required
and any research and development aspects.
Consultation feedback
This feedback focuses on the stakeholders' suggestions, comments, recommendations and the consultation
outcomes. It includes how the suggestions and outcomes influenced, or resulted in modifications to the
proposed design and building operation or use.
Developed Design
The objective at this stage is to develop detailed design proposals for built form, layout, constructional and
structural design, building services systems, specifications and cost information based on the concept design
and project strategies. Activities can include: reviewing and updating the sustainability strategy, maintenance and
operational strategy, handover strategies, risk assessments, construction logistics and health and safety
strategies, undertaking any third party consultations as required and concluding any research and development
aspects in accordance with the design.
Man 01 Project brief and design li
Formally agree
The term 'formally agreed' relates to performance targets. Examples of formal agreements include a contract or
letters of appointment with the architect and with other relevant project team members.
Independent party
A third-party, a person or body internal to a party involved (parties involved are typically a supplier (1st party) or
purchaser (2nd party)), who shall not be involved in the issue in question, and shall not have conflicts of interests
resulting from their position.To comply with the criterion relating to the use of an independent party, the client or
design team needs to demonstrate either :
1. They have used a party independent of the design process to conduct the necessary consultation
exercise; OR
2. If the consultation is to be carried out by an organisation involved with the design of the building, e.g. the
project architect, then they must present the assessor with evidence that robustly demonstrates the
independence of the consultation process. BREEAM has not attempted to define what form this
evidence must take; the onus is on the design team or relevant individual to clearly demonstrate to the
BREEAM Assessor a credible level of independence.
Interested parties
This includes but is not limited to:
1. Actual or intended building users (if known) including facilities management staff or those responsible
for the day-to-day operation of the building and grounds.
2. Representative consultation group from the existing community (if the building is a new development in
an existing community) or for a community still under construction.
3. Existing partnerships and networks that have knowledge of, and experience working on, existing
buildings of the same type.
4. Potential users of any shared facilities, e.g. operators of clubs and community groups.
AND the following where relevant:
5. In educational building types, representatives of local education Authorities, board of governors etc.
6. Local or national historic or heritage groups (over and above any requirements relating to statutory
consultees).
7. Specialist service and maintenance contractors or representatives where the building function has
particular technical requirements in complex environments, e.g. buildings containing laboratories.
8. For stations, passenger focus groups, train and station operations groups.
See criterion 7 on page xlviii.
Key phases
The key phases of project delivery are:
– Concept Design
– Developed Design
– Construction
– Commissioning and Handover
– In-Use occupation.
Performance targets
Performance targets refer to the BREEAM rating and minimum standards required. Where appropriate,
performance targets can be related to individual BREEAM credits. However, performance targets may also
involve other targets related to issues covered in BREEAM assessments, e.g. energy, health and wellbeing.
Project team
The composition of the project team may change through the duration of a project and may include several
members. This includes but is not limited to the client, the design teams, contractors etc.
Third party
A person or body that is recognised as being independent of the parties involved (parties involved are typically a
supplier (1st party) or purchaser (2nd party)), as concerns the issue in question.
Man 01 Project brief and design liii
Additional information
An AP can work for a construction organisation frequently undertaking BREEAM related work. Moreover, the
BREEAM AP can be the same person as the BREEAM Assessor. This allows flexibility and versatility of their role.
Cost efficiencies are expected where the appointed licensed assessor also acts as the BREEAM AP for a project.
In either case, an efficient AP will coordinate with the BREEAM Assessor to ensure an efficient and smooth
assessment process, aiming to maximise the performance of the assessed project.
The Government Soft Landings (GSL) is a version of the Soft Landings concept tailored for use on public sector
related projects to link in with the work of the government’s Building Information Modelling Task Group. It is
expected to be mandated alongside building information modelling (BIM) Level 2 and is to be implemented by
central government departments. It should be noted that the GSL programme will become compulsory for local
government developments. Further information is available from: www.bimtaskgroup.org.
liv SD5078: BREEAM UK New Construction 2018 – Consultation draft
4 1 4 4
Aim
To promote the business case for sustainable buildings and to deliver whole life value by encouraging the use of life
cycle costing to improve design, specification, through-life maintenance and operation.
Value
– Provide greater confidence in future
operational and maintenance costs.
– Focus design decision-making on whole life
costs throughout the project.
– Facilitate robust funding proposals and help
to make the business case for projects.
– Increase long term asset value.
– Support potential tenants by providing
credible information on the maintenance and
operational costs of a building when
choosing a property.
– Capital cost reporting provides invaluable
feedback into the design process improving
future design decisions and helping to
reinforce the business case for more
sustainable buildings.
Context
Property procurement decisions are predominantly made on the basis of upfront capital cost and a lack of
understanding of operational factors affecting cost, performance and satisfaction. Life cycle costing (LCC) is well
established in many sectors as a means of improving the consideration of operational and maintenance factors
Man 02 Life cycle cost and service life planning lv
throughout the procurement process. It is becoming part of Government policy for public sector procurement, as
emphasised in the UK Construction 2025 (11) strategy document. This is related to great financial and time-related
benefits: the construction industry and Government jointly aspire to achieve a 33% reduction in both the initial cost
of construction and the life cycle cost of assets.
Assessment scope
Assessment criteria
Credits for each one of the three parts are awarded independently from one another.
2.a: Provides an indication of future replacement costs over a period of analysis as required by the client (e.g.
20, 30, 50 or 60 years);
The study period should ideally be agreed by the client, in line with the design life expectancy of the building.
However, where the life expectancy of the building is not yet formally agreed (due to being at very early design
stages), the default design life of 60 years should be used for modelling purposes (in line with the UK default).
3 Demonstrate, using appropriate examples provided by the design team, how the elemental LCC plan has
been used to influence building and systems design and specification to minimise life cycle costs and maximise
critical value.
The Component level LCC option appraisal should review all of the above component types (where present).
However, you do not need to consider every single example cited under each component; only a selection of those
most likely to draw valued comparisons. This is to ensure that a wide range of options are considered and help
focus the analysis on components which would benefit the most from appraisal.
5 Demonstrate, using appropriate examples provided by the design team, how the component level LCC
options appraisal has been used to influence building and systems design and specification to minimise life
cycle costs and maximise critical value.
Man 02 Life cycle cost and service life planning lvii
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
At stage 2, when considering the outputs from the elemental LCC plan, examples could be in the form of elemental
appraisals (where appropriate), evolutions in concept design to reduce maintenance or replacement costs or
contracts for further elemental analysis.
At stage 4, when considering the outputs from the component level option analysis, examples are likely to be in the
form of component specifications coupled with justifications for their selection (i.e. how they reduce life cycle costs
or maximise critical value).
BSRIA Guide BG 67/2016 provides examples on identifying alternative solutions, calculating their life cycle costs and
interpreting the results.
The professional guidance note by RICS on LCC(13) summarises what is LCC and whole life costing service for both
new construction works and for the refurbishment of existing assets.
Pre-defined specifications
Where the building is constructed to a pre-defined standard specification, use the LCC elemental plan for this
specification to help demonstrate compliance.
Evidence
Definitions
Capital cost
The capital cost for the building includes the expenses related to the initial construction of the building:
– the likely design life of the building (rather than the contractual design life)
– minimum functional performance criteria for each component over the building’s design life
– components that must be repairable, maintainable or replaceable within the design life of the building. Only
the key differentiators between components and systems need to be comparatively modelled.
LCC
The cost of an asset or its parts throughout its life cycle, while fulfilling the performance requirements; a
methodology for systematic economic evaluation of life cycle costs over a period of analysis, as defined in the
agreed scope.
Additional information
BSRIA Guide BG 67/2016
BSRIA Guide BG 67/2016 (14) on Life Cycle Costing presents a practical approach LCC for the construction and
operation of buildings and is compatible with the parts of ISO 15686 that provide recommendations for life
Man 02 Life cycle cost and service life planning lix
cycle costing.
This document can be used as guidance illustrating the principles of LCC. It provides examples of considering
alternative solutions, calculating and fine-tuning life cycle costs, as well as interpreting the results of this analysis.
1. A UK standard cost data structure for LCC, which aligns with BS ISO 15686-5 and with the Building Cost
Information Service (BCIS) Standard Form of Capital Cost Analysis (SFCA) and industry recognised
occupancy cost codes. (Refer to Annexes A, B and C) (www.rics.org).
2. LCC practitioners with a standardised method of applying LCC, applicable to the UK construction
industry and to the key stages of the procurement process.
3. Process mapping the LCC stages – to help structure how to plan, generate, and interpret and present
the results for a variety of different purposes and levels of life cycle cost planning.
4. Instructions on how to define the client’s specific requirements for LCC and the required outputs and
forms of reporting – and to decide on which method of economic evaluation to apply.
5. Simplification and demystification – by providing practical guidance, instructions and definitions,
together with informative worked examples on how to undertake LCC (for construction).
6. An industry accepted methodology, to facilitate a more accurate, consistent and robust application of
LCC estimation and options appraisals, thereby creating a more effective and robust basis for LCC
analysis and benchmarking. The guide PD 156865: 2008 also seeks to help eliminate confusion over
scoping and terminology and to address concerns over the uncertainty and risks that are undermining
confidence in life cycle costs used for construction procurement. For further information, please refer to
PD 156865: 2008.
lx SD5078: BREEAM UK New Construction 2018 – Consultation draft
6 4 6 6
Minimum standards
Fully fitted Simple building Shell & core Shell only
Aim
To recognise and encourage construction sites which are managed in an environmentally and socially considerate,
responsible and accountable manner.
Value
– Prevent risks and liabilities arising from
pollution to the surrounding areas during
construction activities.
– Improve the safety of vehicle deliveries to
and around a site.
– Improve on-site and off-site health and
safety, including road safety.
– Improve project efficiency and
understanding of construction performance
through continuous construction progress
monitoring.
– Improve understanding of construction
impacts and resources helping to enhance
resource efficiency on current and future
projects.
Context
Adoption of more responsible construction practices can lead to a wide range of environmental, social and
financial benefits.
Building construction activities create many local ground, water and air quality pollution risks affecting workers on
site as well as others in the surrounding area. These can lead to significant liabilities on contractors and their clients.
Preventing pollution during construction is hence a major priority.
Man 03 Responsible construction practices lxi
The health and safety of the site operatives is a major concern within the construction sector. Within the UK
construction sector, 43 workers were fatally injured in 2015/16 and 66,000 non-fatal workplace injuries were
reported. Mental health is also a major cause of sickness and lost productivity in the construction sector with a CIOB
survey indicating almost a third of respondents felt that stress at work was impacting on their health and wellbeing.
In addition to the human cost of unaddressed mental health issues, there is also a financial one, with absences due
to sickness costing British businesses £26bn a year in lost productivity. But construction also impacts on health and
safety off site: approximately 19% of cyclist and 15% of pedestrian fatalities in the UK(15) involve large goods
vehicles over 3.5 tonnes many of which are related to construction traffic.
Monitoring health and safety procedures, resources, construction progress and site conditions is valuable in
informing construction practices and maximising project performance.
Assessment scope
Assessment criteria
3.a: Be third party certified, to ISO 14001: 2015 (16), EMAS (EU Eco-Management and Audit Scheme) or
equivalent standard;
OR
3.b.ii Reached implementation stage phase four ‘implementation and operation of the environmental
management system’
4 Any party who at any point manages the construction site (e.g. the principal contractor, the demolition
contractor) implements best practice pollution prevention policies and procedures on-site in accordance with
Working at construction and demolition sites: PPG6, Pollution Prevention Guidelines(18).
6.a: Work with the project team, including the client, to consider the links between BREEAM issues and assist
them in achieving and if possible going beyond the design intent, to maximise the project’s performance
against the agreed performance targets throughout the Construction, Handover and Close Out stages.
6.b: Monitor construction progress against the performance targets agreed under criterion 5 on the previous
page throughout all stages where decisions critically impact BREEAM performance.
6.c: Proactively identify risks and opportunities related to the procurement and construction process and the
achievement of the targets agreed under criterion 5 on the previous page.
6.d: Provide feedback to the constructors and the project team as appropriate, to support them in taking
corrective actions and achieving their agreed performance targets.
6.e: Monitor and, where relevant, coordinate the generation of appropriate evidence by the project team and
the provision to the assessor.
8 The principal contractor evaluates the risks (on-site and off-site), plans and implements actions to minimise the
identified risks, covering the following, where appropriate:
8.a.i Manage the construction site entrance to minimise the impacts related to the above arising from
vehicles approaching and leaving the site.
8.a.ii Ensure the site is accessible for delivery vehicles, including those fitted with safety features (e.g. side
under run protection).
8.a.iii Identify access routes to the site, including for heavy vehicles, that minimise traffic disruption and
safety risks to others.
8.b.i Minimise risks of vibration, air, land, water, light, noise pollution etc. within the assessment zone (see
Definitions).
8.b.ii Minimise risks of vibration, air, land, water, light, noise pollution etc. in the affected areas (see
Definitions).
8.c: Tidiness:
8.c.i Practices ensure the assessment zone is safe, clean and organised at all times. This includes, but is not
limited to facilities, materials and waste storage.
8.c.ii Remove all plant, surplus materials and temporary structures from the construction zone, on
completion of the construction works.
8.d.ii Establish initiatives by the principal contractor or employer promoting and maintaining the health
and wellbeing (e.g. occupational, physical and mental health) of the workforce.
lxiv SD5078: BREEAM UK New Construction 2018 – Consultation draft
8.d.iii Establish management practices and facilities encouraging equality, diversity, fair treatment and
respect of all site operatives, including accessible design, religious practices etc.
8.d.iv Provide secure, clean and organised facilities (e.g. changing and storage facilities) within a location in
the construction zone.
11 Training, awareness and feedback. The principal contractor is responsible for ensuring:
11.a:The community affected by the site works is identified, notified and kept informed on aspects of the
construction process that might influence them, ensuring that nuisance and intrusion are minimised.
11.b:Attitudes and conduct of the personnel associated with the site ensure safety and continuous
improvements to safety and nuisance.
11.c:All operatives and visitors are made aware of health and safety risks and any actions they must take to
reduce the risks within the assessment zone.
11.d:The principal contractor or employer addresses personal development needs of operatives through
training.
11.e:All relevant environmental risks and management practices are communicated to the operatives, the site
visitors and the neighbouring community.
11.f:The fleet operator (where present) undertakes driver training and awareness to promote safety within
the construction zone and off-site.
12.a:The fleet operator (where present) captures, analyses and investigates any road traffic accidents, incidents
and near misses and reports them back to the principal contractor. Include all items listed under criterion 8.
12.b:All accidents, incidents and near misses are recorded and action is taken to reduce the likelihood of them
reoccurring. Include all items listed in criteria 8 and 11.
12.c:Processes are in place to facilitate collecting and recording feedback from the community and to address
any concerns related to the construction zone and works.
16 Set targets for the site energy consumption in kWh (and where relevant, litres of fuel used) as a result of the use
of construction plant, equipment (mobile and fixed) and site accommodation.
17 Monitor and record data for the energy consumption described in criterion 16
18 Report the total carbon dioxide emissions (total kgCO2/project value) from the construction process via
BREEAM Projects (for the purposes of potential future BREEAM performance benchmarking).
Water consumption
19 Achieve criterion 14
20 Set targets for the potable water consumption (m³) arising from the use of construction plant, equipment
(mobile and fixed) and site accommodation.
21 Monitor and record data for the potable water consumption described in criterion 20.
22 Use the collated data to report the total net water consumption (m³), i.e. consumption minus any recycled
water use from the construction process via BREEAM Projects (for the purposes of potential future BREEAM
performance benchmarking).
24 Set targets for transport movements and impacts resulting from delivery of the majority of construction
materials to site and construction waste from site. As a minimum cover:
24.a:Transport of materials from the point of supply to the building site, including any transport, intermediate
storage and point of supply (see Definitions on page lxviii). Monitor as a minimum:
24.a.i Materials used in major building elements (i.e. those defined in BREEAM issue Mat 01 Environmental
impacts from construction products - Building life cycle assessment on page 287).
24.b:Transport of construction waste from the construction gate to waste disposal processing or recovery
centre gate. This monitoring must cover the construction waste groups outlined in the project's resource
management plan.
25 Monitor and record data for the transport movements as described in criterion 24 above.
26 Using the collated data, report separately for materials and waste, the total transport-related carbon dioxide
emissions (kgCO2 eq), plus total distance travelled (km) via BREEAM Projects (for the purposes of potential
future BREEAM performance benchmarking).
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
lxvi SD5078: BREEAM UK New Construction 2018 – Consultation draft
Methodology
In this context, visits should occur at key stages of the construction process, at times where:
– works can be observed before they are covered up or new works or trades start
– there are significant risks of conflicts or errors occurring
– timing is critical for demonstrating compliance
– key evidence is required to be produced at specific times. This includes, but is not limited to, photographic
evidence, delivery notes and other documentary evidence.
– different trades and systems come together and one could harm the integrity or compliance of another
system's performance against BREEAM requirements.
1. If data are available on the amount of fuel consumed, then multiply this by the fuel emission factor to
calculate the emissions produced.
2. If data are available on the cost of the fuel consumed, then divide this by the price (specific supplier’s price
where possible, historic average otherwise) to give the amount of fuel consumed, which can then be used
to calculate the emissions produced (via method 1).
3. If data are available on the distance travelled, vehicle loading and fuel efficiency of the vehicle at that
loading, then divide the distance by the efficiency to give an estimate of the amount of fuel consumed,
which can then be used to calculate the emissions produced (via method 1).
4. If data are available on the distance travelled and fuel efficiency of the vehicle at average loading, then
divide the distance by the efficiency to give an estimate of the amount of fuel consumed, which can then be
used to calculate the emissions produced (via method 1).
5. If data are available on the distance travelled and vehicle loading, then multiply the distance by the distance
emission factor appropriate for the vehicle type and loading to calculate an estimate of the emissions
produced.
6. If data are available only on the distance travelled, then multiply the distance by the distance emission
factor appropriate for the vehicle type at average loading to calculate an estimate of the emissions
produced.
phase can be excluded from the scope of this part of the issue.
Training
See criterion 11.
For the purposes of this BREEAM issue, training can be teaching, or developing in oneself or others, any skills and
knowledge that relate to specific useful competencies.
Dedicated persons
This can be a member of the project team or not. The person should ideally be based on site or frequently be on
site.
This does not have to be the same person throughout the process. However, they need to keep any records
required for BREEAM evidence purposes and make sure these are handed over if a new person takes over.
There can be one or more dedicated persons on site at the same time responsible for different items within criteria
11 and 12.
Evidence
Definitions
Affected areas
The areas over which ecological features, animals and humans may be affected by vibration, air, land, water, light,
noise pollution etc. caused by activities within the assessment zone.
Assessment zone
For the purpose of this BREEAM issue the assessment zone is defined as any land on the site which is being
developed (and therefore disturbed) for buildings, hardstanding, soft landscaping, site access, plus a 3m wide
zone measured outward from the boundary around these areas irrespective of site boundary. It also includes
any areas used for temporary site storage and buildings.
If it is not known exactly where buildings, hardstanding, site access and temporary storage will be located, it must
be assumed that the assessment zone is the entire site.
Construction process
The construction process includes the enabling works, assembly, installation and dis-assembly activities necessary
for servicing the construction and completion of a new building.
Formally agree
The term 'formally agreed' relates to performance targets. Examples of formal agreements include a contract or
letters of appointment with the architect and with other relevant project team members.
Man 03 Responsible construction practices lxix
For the avoidance of doubt, 100% of the timber and timber-based products must be compliant.
Further information on the UK Government's TPP and compliant responsible sourcing certification schemes is
available from the CPET website www.gov.uk/guidance/.
Reused timber formwork automatically complies. Reusable timber formwork itself does not automatically
comply. All timber used in the manufacturing of the formwork must be covered by a responsible sourcing
certification scheme (RSCS) recognised by BREEAM. See Guidance Note 18 for the BREEAM recognised RSCS
schemes.
Performance targets
Performance targets refer to the BREEAM rating and minimum standards required. Where appropriate,
performance targets can be related to individual BREEAM credits.
However, performance targets may also involve other targets related to issues covered in BREEAM
assessments, e.g. energy, health and wellbeing.
Point of supply
For the purposes of this issue, point of supply is the point where the product is supplied from to the site. This may
be the factory gate or the distribution centre, depending on the product type.
The factory gate is defined as the product manufacturer gate (i.e. where manufacture and pre-assembly finishes
and the material is in its final product form). Examples might include:
1. steel, concrete or glass manufacturers for cladding, windows and beams etc.
2. quarry gate for aggregate and sand
3. concrete plant for concrete
4. saw mill and timber processing plant for timber.
Project team
The composition of the project team may change through the duration of a project and may include several
members. This includes but is not limited to the client, the design teams, contractors etc.
Additional information
Information collated by contractors as part of their voluntary submissions to Constructing Excellence may also
serve to help demonstrate compliance with this BREEAM issue.
An AP can work for a construction organisation frequently undertaking BREEAM related work. Moreover, the
BREEAM AP can be the same person as the BREEAM Assessor. This allows flexibility and versatility of their role.
Cost efficiencies are expected where the appointed licensed assessor also acts as the BREEAM AP for a project.
In either case, an efficient AP will coordinate with the BREEAM Assessor to ensure an efficient and smooth
assessment process, aiming to maximise the performance of the assessed project.
4 2 4 2
Aim
To encourage a properly planned handover and commissioning process that reflects the needs of the building
occupants.
lxxii SD5078: BREEAM UK New Construction 2018 – Consultation draft
Value
– Improve actual building performance by
ensuring systems are adequately
commissioned prior to and following
handover.
– Reduce the gap between predicted design
performance and as-built actual
performance.
– Improve occupant comfort conditions and
meet end user requirements, therefore
boosting satisfaction and productivity.
– Reduce operation and maintenance costs
through robust and efficient maintenance
schedules, increased systems’ lifetime and
well trained operational and maintenance
staff.
– Allow facilities managers and building
owners to better understand the functionality of the building and how to ensure it continues to perform at
optimum levels.
Context
The performance of building services has a significant environmental, financial and health impact for buildings
occupants and owners. Operational energy consumption, and the associated CO2 emissions, can be up to five
times higher than design stage predictions(21) and much of this can be attributed to deficient management
practices and a lack of understanding of the design intentions. Badly installed and inadequately commissioned
ductwork is one of the biggest causes of poorly performing ventilation systems (www.cambridge-k1.co.uk),
leading to reductions in indoor air quality.
From a financial perspective, UK research (www.usablebuildings.co.uk) suggests that 90% of heating and
ventilating systems in buildings are ‘out of control’, costing industry and commerce an additional £500m per
annum in energy costs.
Assessment scope
over to the fit-out contractor, who can then complete the relevant sections based on the fit-out
strategy.
Building type specific
None
lxxiv SD5078: BREEAM UK New Construction 2018 – Consultation draft
Assessment criteria
2 The schedule identifies the appropriate standards for all commissioning activities to be conducted, where
applicable, in accordance with:
Exclude from the assessment any process or manufacture-related equipment specified as part of the project.
However, include such equipment in cases where they form an integral part of the building HVAC services, such
as some heat recovery systems.
3.a: Carry out commissioning of air and water systems when all control devices are installed, wired and
functional
3.b: Include physical measurements of room temperatures, off-coil temperatures and other key parameters,
as appropriate, in commissioning results
3.c: The BMS or controls installation should be running in auto with satisfactory internal conditions prior to
handover
3.d: All BMS schematics and graphics (if BMS is present) are fully installed and functional to user interface prior
to handover
3.e: Fully train the occupier or facilities team in the operation of the system.
5 The principal contractor accounts for the commissioning and testing programme, responsibilities and criteria
within their budget and the main programme of works. Allow the required time to complete all
commissioning and testing activities prior to handover.
Man 04 Commissioning and handover lxxv
7 During the design stage, the client or the principal contractor appoints an appropriate project team member
(see criterion 4), provided they are not involved in the general installation works for the building services
systems, with responsibility for:
7.a: Undertaking design reviews and giving advice on suitability for ease of commissioning.
7.b: Providing commissioning management input to construction programming and during installation
stages.
For buildings with complex building services and systems, this role needs to be carried out by a specialist
commissioning manager.
9 Complete post-construction testing and inspection to quality-assure the integrity of the building fabric,
including continuity of insulation, avoidance of thermal bridging and air leakage paths (this is through air
tightness testing and a thermographic survey). A suitably qualified professional (see Definitions on page lxxviii)
undertakes the survey and testing in accordance with the appropriate standard.
10 Rectify any defects identified during post-construction testing and inspection prior to building handover and
close out. Any remedial work meets the required performance characteristics for the building or element as
defined at the design stage (see Methodology).
A draft copy is developed and discussed with users first (where the building occupants are known) to ensure the
guide is most appropriate and useful to potential users.
12 Prepare two training schedules timed appropriately around handover and proposed occupation plans for the
following users:
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
users access, understand and operate the building efficiently and in accordance with the original design intent. The
content of the guides is specific to the building type and end users, but broadly should include information on the
following:
– Overview of the building and its environmental strategy, e.g. energy, water or waste efficiency policy or strategy
and how users should engage with and deliver the policy or strategy.
– Provision of, and access to, shared facilities.
– Safety and emergency information or instructions.
– Building-related operational procedures specific to building type or operation, e.g. laboratories.
– Building-related incident reporting and feedback arrangements.
– Provision of and access to transport facilities, e.g. public transport, cyclist facilities, pedestrian routes etc.
– Provision of and access to local amenities.
– Links, references and relevant contact details.
– Building services overview and access to building occupant controls, e.g. where to find them, what they control,
how to operate effectively and efficiently etc.
– Pre-arrival information for visitors, e.g. access and security procedures or provisions
– Building services overview and access to facilities management controls, e.g. where to find them, what they
control, how to operate effectively and efficiently etc.
– Re-fit, refurbishment and maintenance arrangements or considerations
– Building related training information or links
The building user guide for building occupiers shall be written in plain English and provide easily accessible and
understandable information relevant to the building’s staff (or where relevant residents) and to other building
users, e.g., visitors or community users.
The building user guide for facilities managers can use more technical language if appropriate and provide
understandable information relevant to the professionals managing the building facilities. This guide could be part
of the operations and maintenance (O&M) manual.
There is no requirement on the format the building user guide should take.
Building fabric
1. BS EN 13187: 1999 Thermal performance of buildings. Qualitative detection of thermal irregularities in
building envelopes. Infrared method (24)
2. BS EN ISO 9972: 2015 Thermal performance of buildings – Determination of air permeability of buildings –
Fan pressurisation method (25)
Commercial refrigeration
1. Guide to Good Commercial Refrigeration Practice, Part 5 Commissioning (26)
2. GPG 347 Installation and Commissioning of refrigeration systems (27)
Fume cupboards
1. Labs21programme: A design Guide for energy Efficient Research Laboratories: Commissioning section
(28) - (Applicable to Education building types only)
2. BS 7989:2001 Specification for recirculatory filtration fume cupboards(29)
3. BS EN 14175-4: 2004 Fume cupboards. On-site test methods(30)
4. CLEAPSS G9 Fume Cupboards in Schools - revision of DfEE (Department of Education and Employment)
Building Bulletin 88 (31)
Man 04 Commissioning and handover lxxvii
Thermographic survey
Scope
The thermographic survey must cover 100% of the treated spaces, unless it is a large complex building (see below).
Ensure that all elements of the building fabric that enclose an internal heated or conditioned (treated) zone of the
building are tested. This includes internal walls separating treated and untreated zones.
Remediation work
Any remediation work undertaken, resulting from a thermographic survey and air tightness test of the building,
should be robust and durable, i.e. the remedial work must have the same performance characteristics and life
expectancy of the surrounding elements.
Training schedule
The training schedules shall include the following as a minimum:
– Introduction to the building user guide for building occupiers and other relevant building documentation
– The available aftercare provision and aftercare team main contacts, including any scheduled commissioning and
post occupancy evaluation.
– Introduction to, and demonstration of, installed systems and key features, particularly building management
systems, controls and their interfaces.
– Introduction to the facilities managers’ user guide and other relevant building documentation, e.g. design data,
technical guides, maintenance strategy, operations and maintenance (O&M) manual, commissioning records, log
book etc.
– Maintenance requirements, including any maintenance contracts and regimes in place.
Evidence
Definitions
Complex systems
These include, but are not limited to, air-conditioning, comfort cooling, mechanical ventilation, displacement
ventilation, complex passive ventilation, BMS, renewable energy sources, microbiological safety cabinets and
fume cupboards, cold storage enclosures and refrigeration plant.
This is reflected in Ene 01 Reduction of energy use and carbon emissions on page clix, so no additional credit is
offered within this issue for thermal bridging assessments. However, good thermal bridging design and
assessment will contribute to successful building fabric testing results and the associated credit.
Additional information
Useful guidance
– Hawkins G. Commissioning Job Book - A framework for managing the commissioning process (BG 11/2010).
BSRIA; 2010.
– Parsloe C. Commissioning Water Systems (BG 2/2010). BSRIA; 2010.
– Brown R, Parsloe C. Pre-Commission Cleaning of Pipework Systems (BG 29/2012). BSRIA; 2012.
– CIBSE. CCB Commissioning Code B: Boilers. CIBSE; 2002. CIBSE. CCC Commissioning Code C: Automatic Controls.
CIBSE; 2001.
– CIBSE. CCL Commissioning Code L: Lighting. CIBSE; 2003. CIBSE. CCM Commissioning Code M: Commissioning
Management. CIBSE; 2003.
– CIBSE. CCR Commissioning Code R: Refrigerating Systems. CIBSE; 2002.
– CIBSE. CCW Commissioning Code W: Water Distribution Systems. CIBSE; 2010.
– Parsloe C. Commissioning Air Systems (BG 49/2015). BSRIA; 2015.
– Measuring air permeability of building envelopes (non-dwellings), Technical standard Level 2 (TSL2). The Air
Tightness Testing and Measurement Association (ATTMA). October 2010.
lxxx SD5078: BREEAM UK New Construction 2018 – Consultation draft
Man 05 Aftercare
Fully fitted Simple building Shell & core Shell only Minimum standards
Aim
To ensure the building operates in accordance with the design intent and operational demands, through providing
aftercare to the building owner and occupants during the first year of occupation.
Value
– Improve building performance by
continuing to monitor and commission the
building in early stages of occupation.
– Reduce the gap between predicted design
and as-built actual energy and environmental
performance.
– Improve occupant comfort and indoor
environmental conditions to meet end user
requirements and maximise occupant health
and wellbeing.
– Increase occupant satisfaction.
– Improve learning from actual building
performance to inform future procurement,
design, construction and management
practices as well as enhance asset value and
satisfaction.
Context
Buildings seldom perform in operation as they were predicted to do during design. This is caused by a variety of
factors, but deficiencies in operational management and a lack of user understanding play a significant part in this.
Man 05 Aftercare lxxxi
A lack of communication between building designers, installers and those who will operate them is a major factor.
Improved ongoing commissioning practices can help considerably in allowing for this transfer of knowledge and
understanding as well as ironing out teething problems in the building and its systems as occupants begin to settle
in.
Post Occupancy Evaluation (POE) is increasingly recognised as a valuable means of gaining understanding on how a
building is working for those that live and work in it. POE is becoming mandatory on many public sector projects but
is valuable in all sectors as poor building performance can impact on running costs, occupant wellbeing and
business efficiency. A POE can help to identify teething problems, gaps in building operation understanding and can
help share lessons for the benefit of future new build or refurbishment projects, improving our understanding of
how buildings are actually used and operated in practice.
Assessment scope
Man 05 Aftercare
Assessment criteria
1.a: A meeting between the aftercare support team or individual and the building occupier or management
team (prior to initial occupation, or as soon as possible thereafter) to:
1.a.i Introduce the aftercare support available, including the building user guide (where existing) and
training schedule and their content.
1.a.ii Present key information on the building including the design intent and how to use the building to
ensure it operates as efficiently and effectively as possible.
AND
1.b.ii introduction to and familiarisation with the building systems, their controls and how to operate
them in accordance with the design intent and operational demands.
1.c: Provide initial aftercare support for at least the first month of building occupation, e.g. weekly attendance
on-site, to support building users and management (the level of frequency will depend on the complexity
of the building and building operations).
1.d: Provide longer term aftercare support for occupiers for at least the first 12 months from occupation, e.g.
a helpline, nominated individual or other appropriate system to support building users and management.
2 Establish operational infrastructure and resources to coordinate the collection and monitoring of energy and
water consumption data for a minimum of 12 months, once the building is substantially occupied. This
facilitates analysis of discrepancies between actual and predicted performance, with a view to adjusting
systems and user behaviours accordingly.
3.a.i Identify changes made by the owner or operator that might have caused any impaired
performance.
Man 05 Aftercare lxxxiii
3.a.ii Test all building services under full load conditions, i.e. heating equipment in mid-winter, cooling and
ventilation equipment in mid-summer and under part load conditions (spring and autumn).
3.a.iii Where applicable, carry out testing during periods of extreme (high or low) occupancy.
3.a.iv Interview building occupants (where they are affected by the complex services) to identify problems
or concerns regarding the effectiveness of the systems.
3.a.v Produce monthly reports comparing sub-metered energy performance to the predicted one (see
Ene 01 Reduction of energy use and carbon emissions on page clix).
3.a.vii Re-commission systems (following any work needed to serve revised loads), and incorporate any
revisions in operating procedures into the operations and maintenance (O&M) manuals.
3.b: Simple systems (naturally ventilated): The external consultant, aftercare team or facilities manager will:
3.b.i Review thermal comfort, ventilation, and lighting, at three, six and nine month intervals after initial
occupation, either by measurement or occupant feedback.
3.b.iii Re-commission systems and incorporate any relevant revisions in operating procedures into the
O&M manuals.
5 An independent party (see Definitions on page lxxxv) carries out the POE covering:
5.a: A review of the design intent and construction process (review of design, procurement, construction and
handover processes).
5.b: Feedback from a wide range of building users including facilities management on the design and
environmental conditions of the building covering:
5.b.vi Other relevant issues, where appropriate (see Definitions on page lxxxv)
6 The client or building occupier commits funds to pay for the POE in advance. This requires an independent party
to be appointed to carry out the POE as described in criterion 5. Evidence of the appointment of the
independent party and schedule of responsibilities which fulfils the BREEAM criteria are acceptable to
demonstrate compliance.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
lxxxiv SD5078: BREEAM UK New Construction 2018 – Consultation draft
Methodology
OR
by the building owner or occupier's estates or facilities management team, where the building occupier is known
and able to confirm compliance based on their existing or proposed operations for the building.
Evidence
Definitions
Complex systems
These include, but are not limited to, air-conditioning, comfort cooling, mechanical ventilation, displacement
ventilation, complex passive ventilation, BMS, renewable energy sources, microbiological safety cabinets and
fume cupboards, cold storage enclosures and refrigeration plant.
Independent party
A third-party, a person or body internal to a party involved (parties involved are typically a supplier (1st party) or
purchaser (2nd party)), who shall not be involved in the issue in question, and shall not have conflicts of interests
resulting from their position.To comply with the criterion relating to the use of an independent party, the client or
design team needs to demonstrate either :
1. They have used a party independent of the design process to conduct the necessary consultation
exercise; OR
2. If the consultation is to be carried out by an organisation involved with the design of the building, e.g. the
project architect, then they must present the assessor with evidence that robustly demonstrates the
independence of the consultation process. BREEAM has not attempted to define what form this
evidence must take; the onus is on the design team or relevant individual to clearly demonstrate to the
BREEAM Assessor a credible level of independence.
POE
POE is also known as Building Performance Evaluation (BPE).
The POE is used to improve the building operation, occupants' comfort and other areas based on its outcomes.
Therefore, the POE provides suggestions on potential improvements, including, but not limited to the following:
– Re-commissioning activities
– Measures that maintain or improve end users’ comfort and productivity
– Health and safety
A POE can also be used as part of the stakeholder consultation at the briefing stage for a new building or the
refurbishment of an existing one, in cases where the building occupants are the same. This can be achieved
through the use of a questionnaire or workshops to highlight lessons from the orl or existing building that could
be taken into account in the design of the new project.
POE Methodologies
Any POE or BPE methodology that fulfils the criteria can be used. Further guidance on POE can be found in the
following resources:
lxxxvi SD5078: BREEAM UK New Construction 2018 – Consultation draft
– BCO guide to Post Occupancy Evaluation, British Council for Offices (BCO), 2007 (33)
– BRE’s Design Quality Method (DQM) is a tried and tested, independent, post occupancy evaluation (POE)
method used by all UK auditing authorities, and many funding bodies. Further information can be found at
www.bre.co.uk
– BRE Digest 478, Building performance feedback: getting started (34)
– Guide to Post Occupancy Evaluation Report and Toolkit (35)
– The Building Use Studies (BUS) methodology is an occupant satisfaction survey that will fulfil part of the POE
credit requirement, occupant feedback stage: www.busmethodology.org.uk/.
– The Design Quality Indicator (DQI) is a method to assess the design quality of buildings. DQI is a process that
actively involves a wide group of stakeholders in the design of building. It is delivered though a facilitated
workshop that enables representatives from both the demand and supply side to work together to achieve
the best outcome. Completion of the DQI Stage 5, In-use stage workshop could fulfil part of the POE credit
requirement, the occupant feedback stage. See www.dqi.org.uk
– BSRIA Guide to Building Performance Evaluation in Non-Domestic Buildings (36) is a general introduction to BPE,
and explains why it is important and how it can be carried out.
Substantially occupied
For the purposes of this BREEAM issue, a building is considered as substantially occupied when 80% of each
building function area is occupied.
Third party
A person or body that is recognised as being independent of the parties involved (parties involved are typically a
supplier (1st party) or purchaser (2nd party)), as concerns the issue in question.
Additional information
– CarbonBuzz: www.carbonbuzz.org
– Technology Strategy Board Building Performance Evaluation: connect.innovateuk.org
– Centre for Sustainable Energy, Display Energy Certificate Data, www.cse.org.uk
actual, an analysis should be carried out to understand why there may be discrepancies in performance. These
discrepancies can be due to reasons including:
– Predicted energy consumption is normally based upon building regulation compliance models which only focus
on ‘regulated’ energy use, therefore additional unregulated energy use may not have been modelled in the
design prediction model.
– There may be extended use due to extra occupancy and operating hours, which is not accounted for in
predicted models.
– Inefficiencies from poor control, bad commissioning or poor maintenance
– Additional special functions such as cafeteria, server rooms etc. not accounted for in the predicted model.
– Variances in actual occupant behaviour that vary from the predicted one, such as use of small power and lighting.
CIBSE TM54 (40) provides guidance on how to improve the accuracy of the model for operational energy use of
buildings at the design stage. The Carbon Trust guidance, ‘Closing the gap: Lessons learned on realising the
potential of low carbon building design’(41), also provides additional guidance on this issue.
lxxxviii SD5078: BREEAM UK New Construction 2018 – Consultation draft
14% 13% 7% 5%
Summary
This category encourages the increased health, wellbeing and safety of building users. Issues within this category
reward building design and specification decisions that create a healthy, safe and comfortable internal and external
environment. .
Hea 01 Visual comfort Up to 5 credits
– Providing occupants with the conditions that facilitate good visual comfort by designing out the potential for
glare, achieving good practice daylight factors and having an adequate view out.
– Internal and external lighting systems are designed to provide appropriate illuminance (lux) levels to provide a
more comfortable environment for occupants and internal lighting is zoned to allow for occupant control.
Hea 02 Indoor air quality 5 credits
– Indoor air pollution is considered, and a mitigation strategy in place, early in the design process so as to facilitate
good indoor air quality. s.
– Harmful emissions from building products are managed by specifying finishes and products that have been
tested in accordance with the appropriate standards.
– Specification of an appropriate ventilation strategy that maintains good indoor air quality in-use.
Hea 03 Safe containment in laboratories
2 credits
– Health and safety risks in laboratories are assessed and managed through best practice safety and
performance requirements.
– Mitigating health & nuisance effects of the dispersion and dilution of fumes from laboratories.
Hea 04 Thermal comfort 3 credits
– Thermal modelling informs the building design to provide a comfortable thermal environment that considers
current climatic conditions, and projected climate change scenario conditions.
– Occupants have control over their environment through appropriate temperature control strategies and
thermal zoning. .
Hea 05 Acoustic performance Up to 4 credits
– Occupants experience best practice acoustic performance levels appropriate to the functional activities in
occupied spaces.
Hea 06 Security 1 credit
– The building is designed to consider and take into account security needs to ensure occupants safety and
wellbeing.
Hea 07 Safe and healthy surroundings 2 credits
up to 5 up to 5 up to 3 up to 3
Aim
To encourage best practice in visual performance and comfort by ensuring daylighting, artificial lighting and
occupant controls are considered.
Value
– Supports building occupier health, mental
wellbeing and productivity
– Helps to provide a connection to nature by
maximising natural daylight and encouraging
an external view out
– Helps to reduce energy costs and
environmental impact by reducing the need
for artificial light
Context
Visual comfort is an important part of ensuring building occupant health, comfort and wellbeing. Reducing glare
that can cause discomfort and distraction, and enabling occupant lighting control, the building can increase
productivity of its users.By reducing the impacts of glare that can cause discomfort and distraction, and enabling
xc SD5078: BREEAM UK New Construction 2018 – Consultation draft
occupants to have a level of control over their visual environment, the building can increase productivity of its users.
Maximising exposure to natural daylight and providing an external view out provides users with a connection to
nature. This can in turn support mental wellbeing, for example by improving people’s mood and reducing the
symptoms of depression. Increasing the level of daylight within the building also reduces the need for artificial
lighting, which can reduce operational costs and environmental impacts of the building. Further to this, naturally lit
environments increase occupant productivity, and support the regulation of circadian rhythms.
Assessment scope
Assessment criteria
2 A glare control strategy designs out potential glare in all relevant building areas where risk has been identified.
This should be achieved through building form and layout or building design measures.
3 The glare control strategy does not increase energy consumption used for lighting. This is achieved by:
3.b: Ensuring the use or location of shading does not conflict with the operation of lighting control systems.
4.a: The relevant building areas meet good practice daylight factors and other criterion as outlined in Table 10
and Table 11 on the next page OR
4.b: The relevant building areas meet good practice average and minimum point daylight illuminance criteria as
outlined in Table 12 on page xciii.
4.c: The relevant building areas meet the median daylight factors and minimum daylight factors in Table 13 on
page xciv (see Methodology on page xcix).
Ref Criteria
buildings, 0.7m in other buildings).
(c) The room depth criterion d/w +d/HW < 2/(1-RB) is satisfied.
Where:
d = room depth,
w = room width,
HW = window head height from floor level,
RB = average reflectance of surfaces in the rear half of the room,
Table 18 on page xcix gives maximum room depths in metres for different room widths and
window head heights of side-lit rooms
Table 12 Space type and illuminance requirements - both criteria (average illuminance and minimum point
illuminance) should be met.
Area type Credits Minimum Average daylight Minimum daylight
area to illuminance (averaged illuminance at worst lit
comply over entire space) point
Education buildings
Preschools, schools, further 2 80% At least 300 lux for At least 90 lux for 2000
education - occupied 2000 hours per year or hours per year or more
spaces more
Higher education - 1 60%
occupied spaces
OR Higher education - 2 80%
occupied spaces
Healthcare buildings
Staff and public areas 1 80% At least 300 lux for At least 90 lux for 2000
2000 hours per year or hours per year or more
more
Occupied patients areas 80% At least 300 lux for At least 90 lux for 2000
(dayrooms, wards) and 2000 hours per year or hours per year or more
consulting rooms more
Staff and public areas 2 80% At least 300 lux for At least 90 lux for 2650
2650 hours per year or hours per year or more
more
Occupied patients areas 80% At least 300 lux for At least 90 lux for 2650
(dayrooms, wards) and 2650 hours per year or hours per year or more
consulting rooms more
Multi-residential buildings
Kitchen 2 100% At least 100 lux for At least 30 lux for 3450
3450 hours per year or hours per year or more
more
Living rooms, dining rooms, At least 100 lux for At least 30 lux for 3450
studies (including home 3450 hours per year or hours per year or more
office) more
Non-residential or 80% At least 200 lux for At least 60 lux for 2650
communal occupied spaces 2650 hours per year or hours per year or more
more
Retail buildings
Sales areas 1 35% At least 200 lux point daylight illuminances for 2650
hours per year or more
Other occupied areas 1 80% At least 200 lux for At least 60 lux for 2650
2650 hours per year or hours per year or more
more
Prison buildings
xciv SD5078: BREEAM UK New Construction 2018 – Consultation draft
6 The window or opening must be 20% of the surrounding wall area (refer to Definitions on page ci). Where the
room depth is greater than 8m, compliance is only possible where the percentage of window or opening is
the same as, or greater than, the values in Table 1.0 of BS 8206 (42).
7 In addition, the building type criteria in Table 14 below are applicable to view out criteria.
One credit - Internal and external lighting levels, zoning and control
Internal lighting
8 Internal lighting in all relevant areas of the building is designed to provide illuminance (lux) levels and colouring
rendering index in accordance with the SLL Code for Lighting 2012 and any other relevant industry standard.
Internal lighting should be appropriate to the tasks undertaken, accounting for building user concentration and
comfort levels.
9 For areas where computer screens are regularly used, the lighting design complies with CIBSE Lighting Guide 7
(43) sections 2.4, 2.13 to 2.15, 2.20, and 6.10 to 6.20. This gives recommendations highlighting:
9.a: Limits to the luminance of the luminaires to avoid screen reflections. (Manufacturers’ data for the
luminaires should be sought to confirm this.)
9.b: For uplighting, the recommendations refer to the luminance of the lit ceiling rather than the luminaire; a
design team calculation is usually required to demonstrate this.
9.c: Recommendations for direct lighting, ceiling illuminance, and average wall illuminance.
External lighting
10 All external lighting located within the construction zone is specified in accordance with BS 5489-1:2013
Lighting of roads and public amenity areas(44) and BS EN 12464-2:2014 (45) Light and lighting - Lighting of
work places - Part 2: Outdoor work places. External lighting should provide illuminance levels that enable users
to perform outdoor visual tasks efficiently and accurately, especially during the night.
11 Where no external light fittings are specified (either separate from or mounted on the external building façade
or roof), the criteria relating to external lighting do not apply and the credit can be awarded on the basis of
compliance with criteria 8 above–9.c above.
12.b:Workstations adjacent to windows or atria and other building areas separately zoned and controlled
12.c:Seminar and lecture rooms: zoned for presentation and audience areas
12.h:Dining, restaurant, café areas: separate zoning of servery and seating or dining areas
12.k:Wards or bedded areas: zoned lighting control for individual bed spaces and control for staff over groups
of bed spaces
12.l: Treatment areas, dayrooms, waiting areas: zoning of seating and activity areas and circulation space with
controls accessible to staff.
13 Areas used for teaching, seminar or lecture purposes have lighting controls provided in accordance with CIBSE
Lighting Guide 5 (46).
Lighting control of the zones in the above spaces, and the court as a whole, cater
for the following settings:
1. Full lighting (to allow cleaning etc.)
2. Normal lighting (for court sessions)
3. Dimmed (for the purpose of showing audio-visual evidence, but allowing
enough light for note taking).
Small spaces (less than Buildings consisting entirely of small rooms or spaces (less than 40m²) which do not
40m²) require any subdivision of lighting zones or control will meet the zoning criteria by
default.
Lighting zoning and The controls specified will depend on the size and use of the space but a typical
control - auditoria auditorium or lecture theatre with stepped seating and a formal lectern,
spaces demonstration or performance area would typically be expected to have lighting
controls as follows:
1. Full normal lighting (to allow for entry, exit, cleaning etc.)
2. Demonstration area lighting off and audience area lighting reduced to a
low level (for the purpose of line slide projection, but allowing enough light
for the audience to take notes)
3. All lighting off (for the projection of tone slides, colour slides, and for the
purposes of visual demonstrations or performances)
Hea 01 Visual comfort xcvii
15 Daylighting criteria have been met using either of the following options:
15.a:Relevant building areas meet exemplary daylight factors and the relevant criteria in Table 16 below.
15.b:Relevant building areas meet exemplary average and minimum point daylight illuminance criteria in Table
17 on the next page.
To achieve an exemplary performance credit for Internal and external lighting levels, zoning and control:
16 Lighting in each zone can be manually dimmed by occupants down to 20% of the maximum light output using
dimmer switches positioned in accessible locations. Dimming and control gear should avoid flicker and noise.
Table 17 Exemplary level illuminance value requirements. Both criteria (average illuminance and minimum point
illuminance) should be met.
Area type Credits Minimum Average daylight Minimum
area to illuminance daylight
comply (averaged over illuminance at
entire space) worst lit point
All building types (excluding retail – see below)
Multi-storey buildings 1 80% At least 300 lux At least 90 lux for
Occupied spaces for 2650 hours 2650 hours per
(unless indicated below) per year or more year or more
Single storey buildings 80% At least 300 lux At least 120 lux
Occupied spaces for 3000 hours for 3000 hours
(unless indicated below) per year or more per year or more;
or in spaces with
glazed roofs
(such as atria),
at least 210 lux
for 3000 hours
per year or more
Prisons and courts buildings 80% At least 100 lux N/A
Cells and custody cells for 3450 hours
per year or more
Prison buildings 80% At least 300 lux At least 210 lux
Internal association or atrium areas for 3250 hours for 3250 hours
per year or more per year or more
Retail
Retail buildings 1 50% At least 300 lux point daylight
Sales areas illuminances for 2000 hours per year or
more
Retail buildings 80% Select relevant
Other occupied areas criteria above for
occupied spaces
dependent on
whether you are
assessing a
multi-storey or
single- storey
building.
Table 18 Reflectance for maximum room depths and window head heights
Reflectance (RB) 0.4 0.5 0.6
Room width (m) 3 10 3 10 3 10
Window head height (m)
2.5 4.5 6.7 5.4 8.0 6.8 10.0
3.0 5.0 7.7 6.0 9.2 7.5 11.5
3.5 5.4 8.6 6.5 10.4 8.1 13.0
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
Glare control
Compliant shading measures for meeting glare control criteria can include:
Glare control must provide shading from both high level summer and low level winter sun. Design studies can be
used to demonstrate the sunlight is prevented from reaching the eyes of building occupants, or the computer
screens they are using, during occupied hours.
Curtains (where used without other forms of shading) do not meet the criteria for the glare control credit. This is
because they do not provide sufficient control to optimise daylight in to the space. A such, the use of curtains to
control glare is likely to cause occupants to rely more on artificial lighting.
comply. This is the equivalent to 4.8 rooms. The number of rooms must always be rounded up so, in this example,
five rooms must comply to achieve the credit.
Using the point daylight factor to determine compliance for retail sales areas, the minimum percentage area is
based on the total floor area being assessed. Individual 'rooms' or sub-areas do not need to meet the minimum
thresholds. This allows for typical building form restrictions and layout configurations for these types of spaces.
External obstructions
In calculating minimum and average daylight factors and daylight illuminances, external obstructions should be
taken into account. For illuminance calculations, the reflectance of external obstructions should be taken as 0.2
unless on-site measurements of external reflectance have been made.
Dirt factors
Daylight calculations should include a maintenance factor for dirt on the windows, as given in British Standard Code
of Practice for daylighting, BS 8206 Part 2, appendix A1.3.
Borrowed light
For areas where borrowed light is used to demonstrate compliance with daylighting criteria, calculations or results
from appropriate lighting design software must be provided to demonstrate that such areas meet the BREEAM
criteria (if the light from these sources is required in order for the room to comply). Examples of borrowed light
include: light shelves, clerestory glazing, sun pipes or internal translucent or transparent partitions (such as those
using frosted glass).
Room depth criterion- rooms lit from two opposite sites or via rooflights
For rooms lit by windows on two opposite sides, the maximum room depth that can be satisfactorily illuminated
by daylight is twice the limiting room depth (d) (measured from window wall to window wall; CIBSE Lighting Guide
LG10. The reflectance of the imaginary internal wall should be taken as 1.
The room depth criteria cannot be used where the lighting strategy relies on rooflights. In such areas either
appropriate software has to be used to calculate the uniformity ratio or, in the case of a regular array of rooflights
across the whole of the space, figure 2.11 (page 17) within CIBSE Lighting Guide 'LG10: Daylighting- a guide for
designers' can be used to determine the uniformity ratio.
In the calculations for the median daylight factor the areas within the space which are permanently occupied should
be used; this may exclude areas close to the walls unless work stations are located there.
0.4 0.15 3
0.6 0.2 3
1 0.2 5
2 0.3 6
5 0.6 8
10 1 10
25 2 12
50 3 17
100 5 20
The median daylight factor in an area is the daylight factor exceeded over 50% of the working plane in that area.
Where occupancy or workstation layout is not known, lighting control can be zoned on the basis of 40m²grids, i.e.
an assumption of 1 person or workspace per m².
Evidence
Definitions
Accessible locations
An accessible location for dimming switches is a location that can be easily accessed by all of the building users in
that zone.
be an internal view across the room, as this is likely to become obstructed by partitions, filing cabinets etc. In
addition to this, an external view out can offer positive effects on health and wellbeing that cannot be offered by
an internal view.
Clinical areas
Areas of the building in which medical functions are carried out that require specific restricted environmental
conditions such as humidity, daylighting, temperature, etc. (e.g. X-ray, operating department, delivery room, etc.).
Computer simulation
Software tools that can be used to model more complex room geometries for daylighting.
Construction zone
For the purpose of this BREEAM issue the construction zone is defined as the site which is being developed for the
BREEAM-assessed building. This includes the external site areas that fall within the scope of the new works.
Daylight factor
The daylight factor is defined as the ratio of the illuminance at a point on a given plane due to the light received
directly or indirectly from a sky assumed or known luminance distribution, to the illuminance on a horizontal plane
due to an unobstructed hemisphere of this sky, excluding the contribution of direct sunlight to both illuminances.
1. Media, arts production, SEN sensory spaces, x-ray rooms and other areas requiring strictly controlled
acoustic or lighting conditions
2. Clinical areas with controlled environmental conditions, e.g. operating theatres, delivery rooms or
pathology. However, BREEAM strongly advises that the benefits from daylighting and view out are
seriously considered when designing areas of critical and intensive care in healthcare buildings.
Hea 01 Visual comfort ciii
3. Clinical areas with controlled environmental conditions, e.g. operating theatres, delivery rooms or
pathology. However, BREEAM strongly advises that the benefits from daylighting and view out are
seriously considered when designing areas of critical and intensive care in healthcare buildings.
4. Clinical areas with controlled environmental conditions, e.g. operating theatres, delivery rooms or
pathology. However, BREEAM strongly advises that the benefits from daylighting and view out are
seriously considered when designing areas of critical and intensive care in healthcare buildings.
Illuminance
The amount of light falling on a surface per unit area, measured in lux.
Lighting zoning
For rooms or spaces not listed within 12 on page xcv, the assessor can exercise an element of judgment when
determining whether the specification is appropriate for the space given its end use, and the aim and criteria of
this BREEAM issue.
Occupied space
A room or space within the assessed building that is likely to be occupied for 30 minutes or more by a building
user. Please note there is a specific, unrelated, definition of 'unoccupied' with reference to acoustic testing and
measurement and this should not be confused with the definition used here.
Patient areas
Areas of the building used mainly by inpatients (e.g. wards, dayrooms, etc.).
– Minimum point daylight factor is the lowest value daylight factor at a point that is not within 0.5m of a wall.
– Minimum illuminance is illuminance at the worst lit point that is not within 0.5m of a wall.
– These points usually occur close to a rear corner of the room. Computer simulations are the most appropriate
tools to allow for point daylight factors and illuminances to be calculated.
Public areas
Within a healthcare building type, this includes areas of the building designed for public use where no medical
functions are carried out (e.g. reception, retail unit, waiting areas).
civ SD5078: BREEAM UK New Construction 2018 – Consultation draft
Staff areas
Areas of the building used mainly by staff (e.g. offices, meeting rooms, staff rooms) and medical areas where
patients are admitted but that do not require restricted environmental conditions (e.g. consulting rooms,
physiotherapy, etc.).
Uniformity
The uniformity is the ratio between the minimum illuminance (from daylight) on the working plane within a room
(or minimum daylight factor) and the average illuminance (from daylight) on the same working plane (or average
daylight factor).
1. Nurse bases where they are located centrally in a ward or patient area in order to enable patient
observation.
2. Courts and interview rooms where compliance is not possible due to security or privacy criteria.
3. Prison staff areas containing workstations that for security or observational purposes must be located
centrally within the building.
4. Any clinical areas where the control of environmental or operational conditions prevents such spaces
from providing a view out.
5. Conference rooms, lecture theatres, sports halls, acute SEN and also any spaces where the exclusion or
limitation of natural light is a functional requirement, e.g. laboratories, media spaces, etc.
6. Isolated work station for intermittent, short term work, e.g. work station within a server room
Working plane
CIBSE LG10 defines the working plane as the horizontal, vertical or inclined plane in which a visual task lies. The
working plane is normally taken as 0.7m above the floor for offices and 0.85m for industry.
Hea 01 Visual comfort cv
Additional information
For care homes housing people with dementia the following standard can be used instead of the SLL Code for
Lighting:
– Design Lighting for People with Dementia, University of Stirling, Stirling, 2013.
For multi-residential buildings, CIBSE SLL LG9 (47) can be considered as a relevant standard in addition to, or instead
of SLL Code for Lighting 2012
Please note that the illuminance levels specified in the SLL Code for Lighting, 2012 align with BS EN 12464-1.
BREEAM has not attempted to list all appropriate industry standards. Any recognised collaborative industry or
sector best practice standard or guidance that sets levels appropriate to the tasks undertaken, accounting for
building user concentration and comfort levels, can be considered an appropriate industry standard for the
purposes of this BREEAM issue.
cvi SD5078: BREEAM UK New Construction 2018 – Consultation draft
4 4 2 1
Aim
To encourage and support healthy internal environments with good indoor air quality.
Value
– Reduces the potential for indoor air
pollution from a variety of pollution sources
– Supports the physical health of building
occupants by reducing the risk of health
concerns associated with indoor air pollution
– Supports building occupant comfort and
productivity
Context
It is widely accepted that the quality of the indoor environment can impact occupant health. Poor indoor air quality
can have a range of negative impacts on the physical health of building occupants. These effects can include
Hea 02 Indoor air quality cvii
immediate impacts such eye, nose and throat irritation, headaches, dizziness and fatigue, while also contributing to
more long-term health issues such as asthma, respiratory diseases, heart disease and cancer.
Further to this, through the Control of Substances Hazardous to Health (COSHH) Regulations (2002), in workplaces
employers are required to control any substance in the workplace that may be hazardous to health.
As a result, measures need to be taken to ensure the internal environment maintains good air quality and reduces
the presence of common indoor air pollutants such as carbon dioxide, nitrogen dioxide, and volatile organic
compounds.
The quality of the indoor environment is a complex combination of both externally and internally generated
pollutants, which may be compounded by occupant behaviour.
Producing a project specific indoor air quality plan leads to building design, specification of products and
installation of ventilation systems that will minimise indoor air pollution.
Assessment scope
Assessment criteria
2.a: Provide fresh air into the building in accordance with the criteria of the relevant standard for ventilation.
2.b: Ventilation pathways are designed to minimise the ingress and build-up of air pollutants inside the
building (see Methodology on page cxi).
2.c: Where present, HVAC systems must incorporate suitable filtration to minimise external air pollution, as
defined in BS EN 13779:2007 Annex A3 (48).The specified filters should achieve a minimum Indoor Air
Quality of IDA2.
2.d: Areas of the building subject to large and unpredictable or variable occupancy patterns have carbon
dioxide (CO2) or air quality sensors specified and:
2.d.i In mechanically ventilated buildings or spaces: sensors are linked to the mechanical ventilation
system and provide demand-controlled ventilation to the space.
2.d.ii In naturally ventilated buildings or spaces: sensors either have the ability to alert the building owner
or manager when CO2 levels exceed the recommended set point, or are linked to controls with the
ability to adjust the quantity of fresh air, i.e. automatic opening windows or roof vents.
6 The formaldehyde sampling and analysis is performed in accordance with ISO 16000-2 (50) and ISO 16000-3
(51).
7 The total volatile organic compound (TVOC) concentration in indoor air is measured post construction (but
pre-occupancy) and does not exceed 500µg/m3over 8 hours.
8 The TVOC sampling and analysis is performed in accordance with ISO 16000-5 (52) and ISO 16000-6 (53) or ISO
16017-1 (54).
9 Where levels are found to exceed these limits, the project team confirms the measures that have, or will be,
undertaken in accordance with the IAQ plan, to reduce the TVOC and formaldehyde levels to within the above
limits.
10 The measured concentration levels of formaldehyde (µg/m³) and TVOC (µg/m³) are reported, via the BREEAM
Scoring and Reporting Tool.
One credit
11 All product types listed in Table 20 below meet the emission limits, testing requirements and any additional
requirements listed in Table 20 below.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
Ventilation
The design of air-conditioned and mixed-mode buildings should minimise the build-up of air pollutants. Locations
of ventilation intakes and airflow pathways should be designed in accordance with any or a combination of the
following methods;
1. Locating the building's air intakes and exhausts, in relation to each other and sources of external pollution, in
accordance with the following best practice as appropriate;
a. BS EN 13779:2007 Annex 2 (55),
b. BRE FB 30 Ventilation for healthy buildings: Reducing the impact of urban air pollution (2011)(56),
c. BRE IP 9/14 Locating ventilation inlets to reduce ingress of external pollutants into buildings(57), as
appropriate, and
d. CIBSE TM21 (58).
2. Pollutant dispersion modelling can be used to inform the location of the building's air intakes and exhausts
in relation to each other and sources of external pollution. This can be achieved using either wind tunnel
modelling or numerical modelling. Pollutant dispersion modelling in urban areas is complex, so it is
important that the person carrying out the modelling is a competent individual (See Definitions on
page cxv).
3. Positioning the building's air intakes and exhausts at least 10m of horizontal distance apart. Positioning
intakes at least 10m horizontal distance from sources of external pollution (including the location of air
exhausts from other buildings). The building's air intakes and exhausts should be located to reduce the
intake air being contaminated by the exhausts. Exhausts or other pollutant sources should not be
discharged into enclosed spaces, such as courtyards, in which intakes are also located.
Where a site is located within an Air Quality Management Area (AQMA) affected by gaseous pollutants (e.g. NOx)
the design should adopt a strategy that minimises indoor air quality impacts arising from local high pollution levels.
cxii SD5078: BREEAM UK New Construction 2018 – Consultation draft
Where this approach involves the use of gas phase filtration, these should be tested in accordance with BS EN ISO
10121 1:2014 (BS 2014) 'Test method for assessing the performance of gas-phase air cleaning media and
devices for general ventilation'(59). Design teams must ensure that filter performance is appropriate for the
pollutant conditions experienced at the site.
The design of naturally ventilated buildings should minimise the build-up of air pollutants. Ventilation intakes and
airflow pathways should be designed using the following methods;
These give guidance on ventilation strategies, and the optimum location of ventilation inlets, openable windows,
and trickle and background ventilators to reduce ingress of external pollutants into buildings.
– Positioning openable windows/ and background ventilators over at least 10m of horizontal distance from
sources of external pollution (including the location of any building related air exhausts).
User Control
For user control, the two levels of ventilation must be able to achieve the following:
– Higher level: higher rates of ventilation achievable to remove short term odours or prevent summertime
overheating
– Lower level: adequate levels of draught-free fresh air to meet the need for good indoor air quality throughout
the year, sufficient for the occupancy load and the internal pollution loads of the space.
Any opening mechanisms must be easily accessible and provide adequate user-control over air flow rates to avoid
draughts. Relevant industry standards for ventilation can be used to define 'adequate levels of fresh air' sufficient
for occupancy and internal air pollution loads relevant to the building type.
Multi-residential buildings with self-contained flats and individual bedrooms must have a degree of openable
window function. This does not need to provide two levels of user-control (as required above), but must be
occupant controlled.
Sampling and analysis of indoor air and analysis of emissions from building
products
–
Sampling: Pumped sampling for formaldehyde in air; Pumped sampling for VOCs in air
Sampling and chemical analysis of indoor air can be performed by separate organisations, but both must be
accredited.
Only products that are installed or applied in parts of the building where their emissions are likely to affect indoor air
quality need to be assessed. For the purposes of this issue, this means any product installed or applied:
Inherently non-VOC emitting products do not need to be assessed and can be deemed fully compliant with the
criteria. Examples of non-VOC emitting products include:
– Brick
– Natural stone
– Concrete
– Ceramic tile
– Glass
– Metal surfaces etc.
This is unless organic-based coatings, binders, or sealants are used in their production or finishes.
When assessing paints used in wet areas, evidence must be provided to show that the paints protect against
mould growth. Evidence could include appropriate test results (e.g. fungal or algal resistance testing) or
manufacturer’s product information or declaration. There are European standard tests which could be used: EN
15457 (61) and EN 15458 (62).
All products specified for a project that fall within one of the product types listed in Table 21 below and Table 20
on page cix must be assessed under this issue. However, it is accepted that it may be difficult to control the
specification of some products (e.g. sealants) that are used in small quantities for ad hoc purposes such as ‘making
good’. As such, any products used in this way do not need to be assessed for this issue. The BREEAM Assessor
should use their judgment to determine whether products being used or intended to be used for ad hoc purposes
will be used in significant quantities and therefore need to be assessed for this issue.
Guidance note 22 available from the BREEAM website provides a list of approved alternative schemes recognised
by BREEAM and that can be used to demonstrate compliance for the VOC emission levels. If assessors, clients or
scheme operators wish to seek recognition of other schemes not currently listed, please contact the BREEAM office
([email protected]) for details of the application process.
Evidence
Definitions
– Auditoria
– Gyms
– Retail stores or malls
cxvi SD5078: BREEAM UK New Construction 2018 – Consultation draft
– Cinemas
– Waiting rooms.
Where the assessed building does not have any areas deemed to be large with an unpredictable pattern of
occupancy, the criterion does not apply.
Clinical areas
Areas of the building in which medical functions are carried out that require specific restricted environmental
conditions such as humidity, daylighting, temperature, etc. (e.g. X-ray, operating department, delivery room, etc.).
– Holds a degree or equivalent qualification in a relevant engineering field (mechanical, chemical), physics,
mathematics, or meteorology, AND holds a membership to an appropriate professional body.
– Has a minimum of three years relevant experience.
Such experience must clearly demonstrate a practical understanding and experience of wind tunnel modelling
and factors affecting outdoor pollutant dispersion in relation to ventilation and the built environment.
– Holds a degree or equivalent qualification in a relevant engineering field (mechanical, chemical), physics,
mathematics, meteorology, environmental sciences, environmental engineering or a related environmental
discipline, AND holds a membership to an appropriate professional body,
– Demonstrated ability to interpret environmental guidelines, policies, plans and legislative requirements.
Numerical Modelling
Numerical modelling is a computer-based stimulation method for modelling pollutant dispersion and air quality
in the outdoor environment. Various numerical models are commercially available which may be used to
investigate the location of ventilation intakes and exhausts. Such as those based on empirical methods and
Computational Fluid Dynamics (CFD).
Occupied space
A room or space within the assessed building that is likely to be occupied for 30 minutes or more by a building
user. Please note there is a specific, unrelated, definition of 'unoccupied' with reference to acoustic testing and
measurement and this should not be confused with the definition used here.
The following building areas, where relevant to the building type, can be excluded from the definition of occupied
spaces for the potential for natural ventilation criteria:
1. Ancillary building areas, e.g. WCs, corridors, stairwells, store rooms, plant rooms
2. Swimming or hydrotherapy pools
3. Catering and small staff kitchens
4. Washrooms or changing areas
Hea 02 Indoor air quality cxvii
5. Laboratory or other areas where strictly controlled environmental conditions are a functional
requirement of the space
6. Custody cells and holding areas in law courts
7. Operational, shop floors or ancillary areas in industrial buildings and retail buildings
8. Healthcare buildings: rooms or departments where control of ventilation is required for prevention of
cross infection or controlled environmental conditions including:
a. Operating theatres
b. Laser surgery unit
c. Operative imaging unit
d. Intensive treatment unit
e. Infectious diseases isolation unit
f. Wards housing immuno-compromised patients
g. Manufacturing pharmacy
h. Specialised imaging, X-ray and scanning unit
i. Pathology containment laboratories
j. Mortuary and dissection suite
k. Research laboratories and associated animal houses
l. Sterilising and disinfecting unit (SDU)
m. Emerging treatment technologies including gene therapy and stem cell units
n. Areas immediately adjacent to the above are excluded if it can be demonstrated that reverse air
flow would be likely with natural ventilation
o. Any other areas which require mechanical ventilation to satisfy the requirements of healthcare
Technical Memoranda
p. Any other areas that require mechanical ventilation due to specific operational-related processes.
Occupied spaces requiring local exhaust ventilation, e.g. laboratories, workshops and food technology rooms,
must still demonstrate that they meet the criteria for potential for natural ventilation (unless listed as an
exempted area in this definition).
R-Value
Sum of all Ri values. Ri is the ratio Ci or LCIi, where Ci is the mass concentration of the individual VOC i. in the air of
the reference room, and LCIi is the LCI value of VOC i. The LCI value is the ‘Lowest Concentration of Interest’, which
is the substance-specific value for health-related evaluation of the emission from construction products as
agreed by the EU-LCI Working Group (https://ec.europa.eu/growth/sectors/construction/eu-lci_en).
Additional information
Uncertainties in sampling and analysis are inevitable and unavoidable, therefore it is recommended that replicate
samples are taken at each sampling location (ideally a minimum of three samples for each measurement
parameter). Before sampling, naturally ventilated rooms should be intensively ventilated for 15 minutes and then
outer doors and windows closed for at least 8 hours (e.g. overnight) before sampling begins with the room still
closed off. For mechanically ventilated rooms, the ventilation system should be running under standard operating
Hea 02 Indoor air quality cxix
conditions for at least for 3 hours before sampling begins. Sampling locations should be at least 1m to 2m from a
wall and at a height of between 1m to 1.5m.
This information is provided to assist project teams and BREEAM Assessors on the appropriate scope of post
construction indoor air quality measurement, and, as such, is intended as guidance only and not a compliance
requirement. The sampling strategy should be determined based on the advice of the appropriate person
appointed to conduct the testing.
cxx SD5078: BREEAM UK New Construction 2018 – Consultation draft
Aim
To recognise and encourage a healthy internal environment in laboratory areas through the safe containment and
removal of pollutants.
Value
– Reduced health and safety risks to
occupants within laboratories
– Managing the external discharge of
pollutants and to minimise the associated
health and wellbeing impacts
– Helping to create a comfortable and safe
laboratory workspace
Context
Laboratory spaces are more hazardous and contain higher risks than average workplaces. It is therefore essential
that the necessary measures are in place to ensure the health, safety and wellbeing of laboratory occupants and
users. Due to the nature of work carried out in laboratory spaces, internal pollution is a key risk for building
Hea 03 Safe containment in laboratories cxxi
occupants which is normally best managed through the installation of appropriate building services solutions.
Through the appropriate design and configuration of laboratory containment devices and flue or stack systems,
the potential for hazardous concentrations of substances being released into the internal environment can be
managed. Laboratories vary considerably in the type of pollution or contamination risks that they create and this
often changes over time. As a result, carrying out an objective risk assessment allows the identification of potential
hazardous, and enables the planning and implementation of the appropriate measures to control these risks and
protect building users.
Assessment scope
Assessment criteria
2 Where containment devices such as fume cupboards are specified their design, manufacture and installation
meet best practice safety and performance requirements and objectives (See Methodology below).
3 Where containment level 1, 2, 3 and 4 laboratory facilities are specified they must meet the best practice safety
and performance criteria and objectives (See Methodology below).
4 Modelling of the behaviour of the potentially contaminated plume released from laboratory stacks is
performed (See Methodology below) to inform the design of flue and stack systems for the release of
discharges from containment device exhausts.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
Risk assessment
The risk assessment must consider the proposed laboratory systems and should be carried out to ensure potential
risks are considered in the design of the laboratory. The risk assessment must inform the selection of an
appropriate performance band for containment devices that recognises both safety and sustainability objectives.
A method for conducting an objective based risk assessment is to use the Health and Safety Executive five step
method of risk assessment and its issued policy template (www.hse.gov.uk).
Hea 03 Safe containment in laboratories cxxiii
Containment devices
The following standards, where appropriate, should be considered as part of the design, manufacture and
installation of containment devices;
Fume cupboard performance should be defined by Containment Factors or Protection Factors (as described in the
BS EN 14175 series of standards) rather than face velocities.
– BS EN 12128:1998 Biotechnology- Laboratories for research, development and analysis - containment levels of
microbiology laboratories, areas of risk, localities and physical safety requirements.(92)
– The management, design and operation of microbiological containment laboratories, Health and Safety
Executive, 2001 (93)
– The Genetically Modified Organisms (Contained Use) Regulations 2014- Guidance on Regulations (L29), Health &
Safety Executive, 2014 (94)
– Biological agents: Managing the risks in laboratories and healthcare premises, Health & Safety Executive, 2005
(95)
– Draft The Biological Agents and Genetically Modified Organisms (Contained Use) Regulations 2010- Biosafety
Guidelines, Health & Safety Executive, 2009 (96)
1. Evaluate internal exhaust system dilution effects (through to the point of stack discharge).
2. Model the dilution or dispersion performance of the plume generated from the point of stack discharge.
cxxiv SD5078: BREEAM UK New Construction 2018 – Consultation draft
3. Consider the concentrations of toxic or nuisance fume impacting receptor locations (ventilation intakes,
opening windows, pedestrian areas, and public or private spaces).
4. Perform feedback iterations if the analysis suggests unacceptable conditions at any stage.
Appropriate levels of dilution from point of discharge to receptor locations for chemicals being used in
containment devices need to be determined. A number of techniques are available with one example being
described in: RWDI Technotes Issue No.17 - A dilution criterion for laboratory fume hood exhaust stacks, E Wong
and J Alberico (97). Consideration should also be given to potential nuisance caused by fume discharges in
accordance with the Environment Agency's Additional guidance for H4 Odour Management- How to comply with
your environmental permit, 2011 (98).
Modelling of behaviour of the potentially contaminated plume released from laboratory stacks can be achieved by
one of the following approaches;
– Calculation, e.g. ASHRAE Gaussian plume dispersion, dilution model (ASHRAE 1999 Fundamentals Handbook
Chapter 15 and ASHRAE 2003 HVAC Applications Chapter 44
– Low-speed wind tunnel study
– Computational fluid dynamics carried out by a competent individual
Evidence
Definitions
– Holds a degree, PhD or equivalent qualification in, for example, a relevant engineering field (mechanical,
chemical etc.), physics, mathematics, meteorology environmental sciences, environmental engineering or a
related environmental discipline and membership of an appropriate professional body.
– Holds a degree, PhD or equivalent qualification in, for example, a relevant engineering field (mechanical,
chemical etc.), physics, mathematics, meteorology environmental sciences, environmental engineering or a
related environmental discipline and membership of an appropriate professional body.
Laboratory
A laboratory is an area of a building in which activities using potentially hazardous materials (chemical, biological,
pathogenic, radioactive, physical) or processes requiring clean environments are undertaken in a combination of
Hea 03 Safe containment in laboratories cxxv
primary containment (fume cupboards, microbiological safety cabinets, isolaters, other devices) and secondary
containment (the envelope of the lab) using mechanical ventilation.
Risk assessment
For the purpose of the relevant laboratory criteria in this issue, a risk assessment is a systematic consideration of
any activity in which there is a hazard, followed by decisions on the substances, equipment and procedures used
and on the restrictions and precautions needed to make the risk acceptably low.
Additional information
BS EN 14175 Fume cupboard discharge velocity: Part 2 states that the discharge velocity from fume cupboard
extracts should be at least 7m/s but that a figure of 10m/s is preferable to ensure that the discharge will not be
trapped in the aerodynamic wake of the stack. Higher discharge velocities may be required, especially in windy
locations, but higher rates may cause noise problems.
cxxvi SD5078: BREEAM UK New Construction 2018 – Consultation draft
3 3 2 Not applicable
Fully fitted Simple building Shell & core Shell only No Minimum standards
Aim
Value
– Reduce the risk to occupier comfort, health
and wellbeing from extreme or unacceptable
winter and summer indoor temperatures.
– Provides future proofing of the building to
maximise its ability to provide adequate
thermal comfort for projected climate
change scenarios
– Reduces the impact on costs and the
environment through wasted heat, or from
the specification of complex and costly
systems such as air-conditioning.
Context
Research has shown that extreme temperatures are associated with an increased risk of illness, and have an
immediate effect on health and wellbeing. It is also recognised that measures taken to improve energy efficiency,
such as increased air tightness, thermal insulation levels etc. have the potential to result in more instances of
overheating in summer. With a changing climate, both under and overheating are an increasing problem in the
Hea 04 Thermal comfort cxxvii
buildings. Effective temperature regulation is therefore an integral part of ensuring a healthy and comfortable
internal environment. Achieving thermal comfort is dependent on the building being designed to allow for
seasonal changes and occupier preferences. However it is also important to consider future temperatures which
are expected throughout the lifetime of the building, so as to ensure future thermal comfort. The use of robust
thermal modelling supports an energy efficient design while also ensuring environmental comfort in-use. Designing
the building with thermal zones and controls ensures building user comfort by enabling a level of occupant control.
Modelling with consideration of a range of projected climate change environment allows future-proofing of the
building for projected climate conditions. .
Assessment scope
Assessment criteria
2 The software used to carry out the simulation at the detailed design stage provides full dynamic thermal
analysis. For smaller and more basic building designs with less complex heating or cooling systems, an
alternative less complex means of analysis may be appropriate (such methodologies must still be in
accordance with CIBSE AM11).
3.a: For air-conditioned buildings, summer and winter operative temperature ranges in occupied spaces are in
accordance with the criteria set out in CIBSE Guide A Environmental Design(100), Table 1.5; or other
appropriate industry standard (where this sets a higher or more appropriate requirement or level for the
building type).
3.b.i Winter operative temperature ranges in occupied spaces are in accordance with the criteria set out
in CIBSE Guide A Environmental design, Table 1.5. Or other appropriate industry standard (where this
sets a higher or more appropriate requirement or level for the building type).
3.b.ii The building is designed to limit the risk of overheating, in accordance with the adaptive comfort
methodology outlined in CIBSE TM52: The limits of thermal comfort: avoiding overheating in
European buildings(101).
3.c.i Winter operative temperature ranges in occupied spaces are in accordance with the criteria set out
in CIBSE Guide A Environmental design, Table 1.5. Or other appropriate industry standard (where this
sets a higher or more appropriate requirement or level for the building type).
3.c.ii The building is designed to limit the risk of overheating, in accordance with CIBSE TM59: Design
methodology for the assessment of overheating risk in homes(102).
4 For air-conditioned buildings, the PMV (predicted mean vote) and PPD (predicted percentage of dissatisfied)
indices based on the above modelling are reported via the BREEAM assessment scoring and reporting tool.
6 The thermal modelling demonstrates that the relevant requirements set out in criterion 3 on the previous page
are achieved for a projected climate change environment (see Definitions on page cxxxi).
7 Where criterion 6 aboveis not met, the project team demonstrates how the building has been adapted, or
designed to be easily adapted in future using passive design solutions in order to subsequently meet the
requirements under criterion 6 above
8 For air-conditioned buildings, the PMV and PPD indices based on the above modelling are reported via the
BREEAM assessment scoring and reporting tool.
10 The thermal modelling analysis (criteria1 on the previous page to 4 on the previous page) has informed the
temperature control strategy for the building and its users.
11 The strategy for proposed heating or cooling systems demonstrates that it has addressed the following:
11.a:Zones within the building, and how the building services could efficiently and appropriately heat or cool
these areas. For example consider the different requirements for the central core of a building compared
with the external perimeter adjacent to the windows.
11.b:The degree of occupant control required for these zones. This is based on discussions with the end user
(or alternatively building type or use specific design guidance, case studies, feedback) and considers:
11.b.iiOccupancy type, patterns and room functions (and therefore appropriate level of control required)
11.b.iiiHow the user is likely to operate or interact with the systems, e.g. are they likely to open windows,
access thermostatic radiator valves (TRV) on radiators, change air-conditioning settings etc.
11.b.ivThe user expectations (this may differ in the summer and winter) and degree of individual control (i.e.
obtaining the balance between occupant preferences, for example some occupants like fresh air
and others dislike draughts).
11.c:How the proposed systems will interact with each other (where there is more than one system) and how
this may affect the thermal comfort of the building occupants.
11.d:The need or otherwise for an accessible building user actuated manual override for any automatic
systems.
Compliance notes
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
cxxx SD5078: BREEAM UK New Construction 2018 – Consultation draft
Methodology
Compliance can be demonstrated where zoning allows separate occupant control (within the occupied space) of
each perimeter area (i.e. within 7m of each external wall) and the central zone (i.e. over 7m from the external walls).
For example, adequate TRVs placed in zones around the building perimeter, and the provision of local occupant
controls to internal areas, such as fan coil units.
The distance requirement for smaller buildings is approximate; however, the assessor must use sound judgment
considering the aims of this issue, before accepting solutions that do not strictly meet the above criteria.
Examples of potentially compliant heating control measures can be found in Technology Guide CTG065 Heating
control(103).
Evidence
Criteria Interim design stage Final post construction stage
All One or more of the appropriate evidence types listed in The BREEAM evidential
requirements on page 38 can be used to demonstrate compliance with these criteria.
10, 11, 12 Thermal comfort study Refer to generic evidence requirement
above
Hea 04 Thermal comfort cxxxi
Definitions
ClassCool
A tool developed by the Department for Children, Schools and Families (DCSF, formerly DfES (Department for
Education and Skills)) which provides a simplified method of assessing the extent of classroom overheating.
ClassCool may not be appropriate for other spaces, such as libraries and halls, and other means of assessing
overheating will be required, www.gov.uk.
Clinical areas
Areas of the building in which medical functions are carried out that require specific restricted environmental
conditions such as humidity, daylighting, temperature, etc. (e.g. X-ray, operating department, delivery room, etc.).
Occupied space
A room or space within the assessed building that is likely to be occupied for 30 minutes or more by a building
user. Please note there is a specific, unrelated, definition of 'unoccupied' with reference to acoustic testing and
measurement and this should not be confused with the definition used here.
However for the purpose of this issue, the definition excludes the following:
1. atria or concourses
2. entrance halls or reception areas
3. ancillary space, e.g. circulation areas, storerooms and plant rooms.
Patient areas
Areas of the building used mainly by inpatients (e.g. wards, dayrooms, etc.).
Passive design
Passive design uses layout, fabric and form to reduce or remove mechanical cooling, heating, ventilation and
lighting demand. Examples of passive design include:
– optimising spatial planning and orientation to control solar gains and maximise daylighting,
– manipulating the building form and fabric to facilitate natural ventilation strategies and
cxxxii SD5078: BREEAM UK New Construction 2018 – Consultation draft
– making effective use of thermal mass to help reduce peak internal temperatures.
Thermal comfort
In British Standard BS EN ISO 7730:2005: Ergonomics of the thermal environment. Analytical determination and
interpretation of thermal comfort (104), thermal comfort is defined using the calculation of PMV and PPD indices
and local thermal comfort criteria. It is also defined as ‘that condition of mind which expresses satisfaction with
the thermal environment.’ The term ‘thermal comfort’ describes a person’s psychological state of mind and is
usually referred to in terms of whether someone is feeling too hot or too cold. Thermal comfort is difficult to
define because it needs to account for a range of environmental and personal factors in order to establish what
makes people feel comfortable. HSE considers 80% of occupants as a reasonable limit for the minimum number
of people who should be thermally comfortable in an environment. The purpose of this issue is to encourage
appropriate and robust consideration of thermal comfort issues, and specification of appropriate occupant
controls to ensure both maximum flexibility of the space and thermal comfort for the majority of building
occupants.
Additional information
The operative room temperature ranges provided in CIBSE Guide A have been derived in accordance with the heat
balance model for thermal comfort (PMV and PPD) as detailed in BS EN ISO7730.
The CIBSE Guide A operative temperature ranges correspond to a PMV of ±0.25 which sits between the Category
A and Category B requirements listed in Annex A, Table A.1 of EN ISO 7730. Compliance with the CIBSE Guide A
criteria will therefore effectively also demonstrate compliance with the Category B requirements set out in EN ISO
7730.
The PROMETHEUS project at Exeter University has produced a number of future weather files specific to different
locations across the UK, created using the UKCP09 weather generator. Weather files produced under the
PROMETHEUS project are available at emps.exeter.ac.uk.
cxxxiv SD5078: BREEAM UK New Construction 2018 – Consultation draft
up to 4 up to 4 up to 4 up to 4
Aim
To ensure the building is capable of providing an appropriate acoustic environment to provide comfort for
building users.
Value
– Minimises disturbances to building
occupants from noise transition between
spaces
– Enhances productivity by providing
appropriate acoustic environment for the
different functions of various buildings and
spaces.
Context
Noise within buildings can come various sources, including building systems, occupants, equipment and external
sources. Excessive noise can have a range of adverse effects on building users including inconvenience and
Hea 05 Acoustic performance cxxxv
annoyance, loss of concentration, decreased productivity and sleep disturbance. Therefore, the management of
noise within a building is important to maximise occupant comfort, occupant efficiency to provide privacy. As a
result, building acoustics are an important consideration in the design, operation and construction of buildings.
Building acoustics should allow rooms to be used as intended, without compromising sound sensitive spaces or
activities. Designing to building type specific acoustic performance standards for sound insulation, indoor ambient
noise levels and reverberation times, supports acoustic comfort for building occupants.
Assessment scope
Assessment criteria
– Acoustic performance (up to three credits for all building types, except Multi-residential which has four credits
available)
– Acoustic performance for Multi-residential (Up to four credits for Multi-residential only)
1 The building meets the appropriate acoustic performance standards and testing requirements defined in the
relevant table below. These tables define criteria for the acoustic principles of:
OR
2 A suitably qualified acoustician (SQA) is appointed to define a bespoke set of performance requirements for all
function areas in the building. The bespoke performance requirements use the three acoustic principles
defined in criterion Hea 05 Acoustic performance: Criterion 1 above, setting out the performance
requirements for each and the testing regime required.
Table 27 BREEAM acoustic criteria for Industrial, Retail, Prisons and Other building types
Industrial, Retail, Prisons and Other building types (two credits)
First credit – Sound insulation
All room functions
Criteria The sound insulation between rooms and other occupied areas complies with the
performance criteria given in Section 7 of BS 8233:2014. Alternatively, propose
performance standard based on demonstrably best practice.
Testing A programme of pre-completion acoustic testing is carried out by a compliant test body
requirement in accordance with the acoustic testing and measurement procedures outlined in the
Methodology on the next page section of this BREEAM issue.
Rooms with Educational space (teaching and lecture spaces) refer to Table 23 on page cxxxvi
specific functions Medical treatment rooms refer to Table 24 on page cxxxvii
Second credit – Internal indoor ambient noise levels
Criteria Achieve indoor ambient noise levels that comply with the design ranges given in Section
7 of BS 8233:2014. .
Testing A programme of pre-completion acoustic testing is carried out by a compliant test body
requirement in accordance with the acoustic testing and measurement procedures outlined in the
Methodology on the next page section of this BREEAM Issue.
Rooms with Education space (teaching and learning spaces) refer to Table 23 on page cxxxvi
specific functions Medical treatment rooms refer to Table 24 on page cxxxvii
.
Third credit- Acoustic environment (control of reverberation and sound absorption)
Criteria Achieve the requirements relating to sound absorption and reverberation times, where
applicable, set out in Section 7 of BS 8233:2014
Testing A programme of pre-completion acoustic testing is carried out by a compliant test body
requirement in accordance with the acoustic testing and measurement procedures outlined in the
Methodology on the next page section of this BREEAM issue. For spaces where the
acoustic environment is controlled through use of defined amounts of sound
absorption, installation of a specification compliant with the BS 8233:2014 criteria
demonstrates compliance. A site inspection by the developer or SQA is required to
confirm that a compliant specification has been installed.
Rooms with Educational space (teaching and learning spaces) refer to Table 23 on page cxxxvi
specific functions Medical treatment rooms refer to Table 24 on page cxxxvii
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
Measurements of sound insulation (airborne and impact) should be made in accordance with the relevant part of
BS EN ISO 16283 (112), or the successor to these standards. Measurements should be conducted between one in
four pairs of adjacent rooms (or teaching spaces) of each room type or performance requirements category and
construction type. For measurements of reverberation time, the relevant principles of BS EN ISO 354:2003 (113)
should be used and the guidance provided in BS EN ISO 140-7:1998 (114) should be followed in respect of the
number of source and microphone positions, and decay measurements. For measurements of ambient noise,
when no specific guidance is available, the following procedures should be used:
1. Noise from both internal sources (e.g. mechanical ventilation systems, plant noise, noise-making systems)
and external sources (e.g. traffic noise transmitted via the building façade) should be included. Also, where
windows are openable as part of the ventilation strategy, these should be assumed to be open for the
purposes of calculations and measurements. If openable windows are present but do not form part of
the background or permanent ventilation strategy, then these should be assumed to be closed for the
purposes of calculations and measurements.
Hea 05 Acoustic performance cxli
2. Noise from occupants and office equipment (e.g. computers) should not be included in the measurements.
3. Unless otherwise stated in the referenced document, a rate of testing of at least one in ten rooms or
spaces of each performance level shall be subject to on-site performance testing.
4. Measurements should be made in at least four rooms in which noise levels can be expected to be greatest
either because they are on the noisiest façade or because they are on a naturally ventilated façade.
5. Where different ventilation strategies are used, measurements should be conducted in rooms utilising
each strategy. Otherwise, measurements should be made in rooms on the noisiest façade.
6. T in LAeq,T is taken as the duration of the normal working day (typically 8 hours between 09.00 and 17.00).
7. Measurements need not be made over a period of 8 hours if a shorter measurement period would be
suitably representative. . In this case, measurements should be made when external noise levels are
representative of normal conditions throughout the day.
8. Measurement periods less than 30 minutes may give representative values for indoor ambient noise levels
and may be utilised where this is the case. However measurement periods shorter than 5 minutes should
not be used.
9. Measurements should be taken in a minimum of three locations in rooms at a height of 1.2m above the
floor level and at least 1m away from any surface.
10. The measured level of ambient noise should be used to determine compliance with the criteria for
acoustically sensitive rooms. If at the time of acoustic commissioning it is not possible to measure ambient
noise levels in the absence of construction or other extraneous noise sources that will not be present when
the building is complete, then, for mechanical services the lower level of 35 dB, LAeq or the lowest design
limit for the acoustically sensitive space should be used.
The above is intended as guidance for undertaking acoustic testing or measurement to demonstrate compliance
with the performance requirements in BREEAM. If the acoustician has felt it necessary to deviate from the above
procedures, they should provide a reason for doing so and confirm that the alternative procedures are adequate
for demonstrating that the building meets the acoustic performance requirements.
It is not acceptable to undertake a shorter test programme due to site readiness on the day of testing. If this issue
arises additional testing should be scheduled. It may be that testing at less than the typical regime identified would
be acceptable in some instances, for example in small healthcare facilities. Where this is the case, clear reasoning
must be provided by the compliant test body prior to awarding the credits.
Remedial works
Where a programme of pre-completion testing identifies that spaces do not meet the standards, remedial works
must be carried out. The remedial works should occur prior to handover and occupation and the spaces re-tested
to ensure compliance. Remedial works must be carried out to all affected and potentially affected areas, including
rooms or spaces of a similar construction and performance requirement that were previously untested. The test
report, or covering correspondence, should include a clear statement that the testing is in accordance with the
required standard (where specified) or the BREEAM criteria and include the relevant pass or fail criteria.
cxlii SD5078: BREEAM UK New Construction 2018 – Consultation draft
Evidence
Definitions
1. Organisations having United Kingdom Accreditation Scheme (UKAS) accreditation to the appropriate
scope (for, e.g. to BS EN ISO/IEC 17025), or who are accredited by a member of the International
Accreditation Forum (IAF - www.iaf.nu) to the appropriate scope OR
2. Organisations or individuals registered with the ANC Registration Scheme OR
3. Companies or individuals that have been declared competent by an organisation who can provide
evidence that they follow the relevant principles of BS EN ISO/IEC 17024 (Conformity assessment -
General requirements for bodies operating certification of persons)(115) in relation to BREEAM
requirements.
Habitable rooms
For the purpose of this issue, habitable rooms include any room where individuals will sit or lie down and require a
reasonably quiet environmental to concentrate or rest. Such rooms are bedrooms, living rooms, dining rooms,
studies as well as kitchen-dining and kitchen-living rooms.
Occupied spaces
A room or space within the assessed building that is likely to be occupied for 30 minutes or more by a building
user. Please note that for this issue, there is a specific, unrelated, definition of 'unoccupied' with reference to
acoustic testing and measurement.
Hea 05 Acoustic performance cxliii
1. Has a minimum of three years relevant experience (within the last five years). Such experience must clearly
demonstrate a practical understanding of factors affecting acoustics in relation to construction and the
built environment; including, acting in an advisory capacity to provide recommendations for suitable
acoustic performance levels and mitigation measures.
2. An individual who holds a recognised acoustic qualification and membership of an appropriate
professional body. The primary professional body for acoustics in the UK is the Institute of Acoustics.
Where an SQA is verifying the acoustic measurements or calculations carried out by another acoustician who
does not meet the SQA requirements, they must, as a minimum, have read and reviewed the report and confirm
in writing that they have found it to:
Additional information
England
For multi-residential assessments, where the criteria refer to the performance standards in building regulations, in
England, this is referring to Approved Document E 2003 edition, with amendments 2004,2013 and 2015 –
Resistance to the passage of sound.
Northern Ireland
For multi-residential assessments, where the criteria refer to the performance standards in building regulations, in
Northern Ireland, this is referring to - DOE Technical Booklet G - Sound 2012
Scotland
For healthcare buildings, where the criteria refer to the use of HTM08-01, assessments in Scotland should use
SHTM08-01 (116).
For Law Courts buildings, where the criteria refer to the use of Section 28 of CSDG, HMCS, 2010-assessments in
Scotland should refer to ETS-01 Courtroom technology and spatial requirements design guide 2011 (117) and ETS-
03 Estates technical standard environmental performance, design guide 2011 (118).
For multi-residential assessments, where the criteria refer to the performance standards in building regulations, in
Scotland, this is referring to Technical Handbook 2016- Domestic: Section 5. Noise .
Wales
cxliv SD5078: BREEAM UK New Construction 2018 – Consultation draft
For multi-residential assessments, where the criteria refer to the performance standards in building regulations, in
Wales, this is referring to Approved Document E 2003 edition, with amendments 2004 and 2010 – Resistance to
the passage of sound.
Hea 06 Security
1 1 1 1
Aim
To encourage the planning and implementation of effective measures that provide an appropriate level of security
to the building and site.
Value
– Encourages the development and
implementation of security measures specific
to the project
– Improves the understanding of security risks
to enable more considered specification of
additional measures
– Reduces the risk of crime relating to both
people and property
– Improves the health and wellbeing of the
occupiers by limiting stress from the fear of
crime.
Context
Feelings of safety and security are essential to successful, sustainable communities. Freedom from crime and the
fear of crime has a major impact on quality of life, and therefore effects the wellbeing and productivity of building
cxlvi SD5078: BREEAM UK New Construction 2018 – Consultation draft
occupants.
Security risks are dependent on the context of a building and, as a result, need to be specifically determined based
on a number of variables including function and location. In addition to this, security risks are not static and can
change over time. Therefore consultation with the appropriate professionals is essential in determining the
necessary security measures for any development.
Through consultation with a Suitably Qualified Security Specialist (SQSS), site-specific recommendations can be
made to improve the security of the site. This creates a safer and more secure environment that reduces the fear of
and risk of crime. This supports the physical and mental wellbeing of building users, and the protection of property
and business.
Assessment scope
Hea 06 Security
Assessment criteria
2 The SQSS develops a set of security controls for incorporation in to the proposals. Those controls shall directly
relate to the threats and assets identified in the preceding SNA.
3 The recommendations shall be incorporated into proposals and implemented in the as-built development.
Any deviation from those recommendations shall be justified and agreed with the SQSS.
4 A compliant risk based security rating scheme has been used. The performance against the scheme has been
confirmed by independent assessment and verification.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
Timing of consultation
Where an SQSS was consulted at a later stage than RIBA stage 2, this credit may still be achievable. Provided all other
compliance requirements are met, the credit can still be awarded where the SQSS confirms that the implementation
of security measures have not been restricted, impaired or are not possible as a result of their later involvement (i.e.
everything that would or could have been recommended can still be implemented).
Evidence
Definitions
1. Local Transport Note 2/08 Cycle Infrastructure Design, Department of Transport, 2008.
2. The National Cycle Network Guidelines and Practical Details – issue 2, Sustrans and the relevant parts of
Appendix VI NCN Design and Construction Checklist.
Peer review
A process employed by a professional body to demonstrate that potential or current full members maintain a
standard of knowledge and experience required to ensure compliance with a code of conduct and professional
ethics.
SABRE
SABRE is a security assessment and certification scheme for buildings and built infrastructure assets. The scheme
provides facility owners, occupiers and interested parties with:
1. an independently assessed security risk management rating for a facility (SABRE Assurance Rating); and
2. the ability to measure, compare and evaluate the security performance of a facility against a range of
credible security threats.
SABRE has a star based rating system, with ratings subject to certain minimum criteria and the achievement of
issues. The scheme offers:
1. A visual audit of the site and surroundings, identifying environmental cues and features pertinent to the
security of the proposed development.
cl SD5078: BREEAM UK New Construction 2018 – Consultation draft
2. Formal consultation with relevant stakeholders, including the local ALO, CPDA and CTSA (as applicable), in
order to obtain a summary of crime and disorder issues in the immediate vicinity of the proposed
development.
3. Identify risks specific to the proposed, likely or potential use of the buildings.
4. Identify risks specific to the proposed, likely or potential user groups of the buildings.
5. Identify any detrimental effects the development may have on the existing community.
The purpose of the assessment is to inform stakeholder decision-making and allow the identification and
evaluation of security recommendations and solutions.
1. Minimum of three years experience in a relevant security profession (in the last five years). This experience
must clearly demonstrate a practical understanding of factors affecting security in relation to
construction and the built environment, relevant to the type and scale of the project being undertaken.
2. Holds a qualification relevant to security.
3. Maintains a full membership to a relevant professional body, institute or certification scheme that has a
professional code of conduct, to which member adhere.
4. A specialist registered with a BREEAM recognised third party licensing or registration scheme for security
specialists.
An SQSS may be any practising security professional (e.g. a private security consultant or advisor, an ALO, CPDA,
CTSA, or an individual associated with the client team), however they must demonstrate they hold the experience,
qualifications and memberships required by the SQSS criteria. When appointing the SQSS, consideration should be
given to the appropriateness of the individual to carry out the task assigned. The SQSS should be able to
demonstrate they have experience dealing with similar projects with equal security levels and similar risks.
The following are currently recognised as a third party licensing or registration scheme for an SQSS
SABRE
Any licensing or registration scheme for security specialists that wishes to apply to be recognised by BREEAM
should contact BRE Global.
Hea 06 Security cli
Additional information
The following is a list of existing schemes that may support the SQSS when developing the recommendations or
solutions addressing the issues raised in the SNA (criteria 1 and 2 on page cxlvii)
*The Safer Parking Scheme is only applicable to schemes where the primary function of the site is for parking of
vehicles, or to parking areas serving the prevailing site uses.
Useful references
The Metric Handbook(119) contains details of typical delivery or freight vehicle sizes and turning circles.
In addition to the SBD Schools guidance, Managing School Facilities, Guide 4 Improving Security in Schools, published
by the Department for Education and Employment (1996)(120), offers guidance on how to improve the security of
school premises.
clii SD5078: BREEAM UK New Construction 2018 – Consultation draft
2 2 2 2
No Minimum standards
Aim
To encourage the provision of safe access around the site and outdoor space that enhances the wellbeing of
building users. .
Value
– Ensures safe access to and safe movement
around the site
– Facilitates the activities that can have physical,
mental and social benefits for occupants
aiding staff retention.
– Adds to the desirability of the building
helping to increase its value and appeal to
occupants and neighbours
Context
The external environment of a building plays an important role in the health and wellbeing of building users, and the
overall appeal of the building. Safe access to the building, and safe movement around the site are important
Hea 07 Safe and healthy surroundings cliii
considerations to ensure the health, safety and general wellbeing of the building and site users.
The provision of green recreational space provides numerous benefits to building occupants, and the building’s
value. It brings an element of biophilia to a building by supporting human interaction with the natural environment.
Further to this, green recreational space can promote healthy lifestyles by promoting exercise and reducing stress
levels. As a result it is increasingly acknowledged within Corporate Social Responsibility. Government policy also
recognises the benefits of green recreational space to the health and wellbeing of people, but also the indirect
benefits such as alleviating flood risk. Furthermore the health benefits of recreational space are beginning to be
recognised by organisations such as the NHS. Including such a space in development increases the desirability of the
building, thus improving its value.
Assessment scope
Assessment criteria
1 Dedicated and safe cycle paths are provided from the site entrance to any cycle storage, and connect to off-
site cycle paths where applicable.
2 Dedicated and safe footpaths are provided on and around the site providing suitable links for the following:
3 Pedestrian drop off areas are designed off of, or adjoining to, the access road and should provide direct
access to other footpaths.
Where vehicle delivery access and drop-off areas form part of the assessed development, the following apply:
4 Delivery areas are not accessed through general parking areas and do not cross or share the following:
4.b: outside amenity areas accessible to building users and general public.
5 There is a dedicated parking or waiting area for goods vehicles with appropriate separation from the
manoeuvring area and staff and visitor car parking.
6 Parking and turning areas are designed for simple manoeuvring according to the type of delivery vehicle likely
to access the site, thus avoiding the need for repeated shunting.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Hea 07 Safe and healthy surroundings clv
Methodology
None.
Evidence
Definitions
1. Adequate external lighting in accordance with BS 5489-1:2013 (121) Lighting of roads and public
amenity areas.
2. Appropriate sized, designed and constructed. The following publications offer guidance on how to
demonstrate this:
a. Local Transport Note 2/08 Cycle Infrastructure Design, Department of Transport, 2008.
b. The National Cycle Network Guidelines and Practical Details – issue 2, Sustrans and the relevant parts
of Appendix VI NCN Design and Construction Checklist.
1. Dedicated pedestrian crossing points are provided where needed to allow pedestrians to cross vehicle
access routes
2. Appropriate traffic calming measures are in place to slow traffic at any crossing points
3. Developments with high numbers of visitors provide signposting to other local amenities and public
transport nodes off-site (where existing)
4. Adequate external lighting in accordance with BS 5489-1:2013 Lighting of roads and public amenity
areas.
pedestrians in the carriageway, by ensuring they can be clearly seen and requiring the driver of the vehicle to give
way to the pedestrian.
Outside space
The space is of an appropriate size to provide enough amenity for the predicted number of building users during
coffee or lunch breaks to gather, socialise, relax and connect with the natural environment. The space is
predominantly intended for building staff, but can be used by other building users where relevant and beneficial
to the building users. The outside space must:
– be an outdoor landscaped area, for example a garden, balcony or terrace. The majority of the space should be
open to the sky,
– have appropriate seating areas and be non-smoking,
– be located to ensure it is accessible to all building users and avoids areas that will have disturbances from
sources of noise (e.g. building services, car parks, busy roads, delivery areas, etc.).
Additional information
Applicability of issue
The safe access criteria apply only to developments that have areas external to the assessed building and within the
boundary of the assessed development (regardless or not of whether that external area is or will be the
responsibility of the future building occupant). This includes external parking areas. If the assessed building does
not have any external areas and access to the building is direct from the public highway or footpath, then the
criteria concerning safe access are not applicable and the credit can be awarded by default.
Where the assessed building has no external areas but does have a covered parking facility, and cyclists/
pedestrians/ delivery vehicles access the building via this area, then the relevant safe access criteria apply and this
area must be assessed against those criteria.
Where it is not practical to provide dedicated footpaths from each parking space within a car park, it is expected
that design teams take every practical measure to ensure the safety of pedestrians. In general terms, as a minimum,
a safe pedestrian route should be provided from the pedestrian exit of the car park to the building entrance. For
larger car parks it would be beneficial to provide footpaths at regular intervals across it, to aid safe access from the
car to the building entrance and the design team should demonstrate that they have achieved this as far as is
practical.
Criteria 4 on page cliv and 5 on page cliv (delivery access through general parking areas) can be relaxed for smaller
sites if it can be confirmed that the building is of an operational type and size which is likely to mean all deliveries to
the building will be made by small vans and not heavy goods vehicles. Where dedicated delivery access and drop-
off areas do not form part of the assessed development, this criteria and criteria 7 on page cliv are not applicable.
The outdoor space criteria apply to all assessments. Where it is not possible to provide outdoor space, due to
statutory requirements, or other issues outside of the control of the developer, then this criterion will be filtered
out.
Where both the safe access and outside space criteria are deemed not applicable to the project (in accordance
with the above, the issue will be filtered out.
Hea 07 Safe and healthy surroundings clvii
Useful references
The Metric Handbook(122) contains details of typical delivery or freight vehicle sizes and turning circles.
clviii SD5078: BREEAM UK New Construction 2018 – Consultation draft
Energy
Summary
This category encourages the specification and design of energy efficient building solutions, systems and
equipment that support the sustainable use and management of energy during the building’s operation. Issues in
this section assess measures to improve the inherent energy efficiency of the building, encourage the reduction of
carbon emissions and support efficient management throughout the operational phase of the building’s life.
Ene 01 Reduction of energy use and carbon emissions
min standards 13 credits
– Encourage the design of energy efficient buildings with energy performance above national building
regulations.
– Encourage the accurate modelling of operational energy consumption.
Ene 02 Energy monitoring min standards 2 credits
– Measure accurately the energy consumption of the building by end use, to help identify and reduce high energy
demands where possible.
Ene 03 External lighting 1 credit
– Reduce the building's energy consumption through the specification of energy efficient external lighting.
Ene 04 Low carbon design 3 credits
– Reduce the building's energy consumption through the adoption of passive design solutions, free cooling and
low or zero carbon (LZC) energy sources.
Ene 05 Energy efficient cold storage 2 credits
– Reduce the building's operational greenhouse gas emissions (CO2 eq.) through the design, installation and
commissioning of energy efficient refrigeration systems.
Ene 06 Energy efficient transport systems 3 credits
– Reduce the building's energy consumption by specifying the optimum number and size of energy efficient
transport systems.
Ene 07 Energy efficient laboratory systems 5 credits
– Reduce the building's operational greenhouse gas emissions (CO2 eq.) by specifying best practice energy
efficient laboratory equipment.
Ene 08 Energy efficient equipment 2 credits
– Demonstrate a meaningful reduction in the total unregulated energy demand of the building by using energy
efficient equipment.
Ene 01 Reduction of energy use and carbon emissions clix
13 13 13 9
Fully fitted Simple building Shell & core Shell only Minimum standards
Aim
To minimise operational energy demand, primary energy consumption and CO2 emissions.
Value
– Reduce operational energy consumption
and associated carbon emissions
– Promote energy performance beyond
regulatory requirements including
recognition of net zero carbon solutions in
line with WGBC policy
– Encourage consideration of operational
aspects in determining optimal energy
strategy
– Provides a route to verification of building
performance post occupation
– Help in reducing the performance gap
between predicted and actual performance
Context
Emissions from buildings account for 37% of total UK greenhouse gas emissions. These are made up of 45%
direct emissions due to the burning of fossil fuels for heat, and 55% indirect emissions related to electricity use
(123). Factors such as the thermal insulation, air permeability, shading and glazing areas should be carefully
considered early as they can be used to reduce heating, cooling and lighting demands. Systems efficiency and
carbon intensity of the selected energy source are also important and all are included in the BREEAM assessment.
clx SD5078: BREEAM UK New Construction 2018 – Consultation draft
Detailed and accurate energy modelling can take into account factors like occupancy, weather scenarios and
management of building services as well as any contributions from renewable and low carbon technologies. More
detailed modelling helps the design teams predict the expected energy performance and take appropriate
actions to reduce the performance gap where they are involved post occupation. Actual usage patterns are
changing over time and it is possible that predicted energy consumption will not be that close to the actual energy
consumption. However, with the use of accurate modelling any areas of difference can be identified and
appropriate actions can be taken to optimise energy performance.
Assessment scope
Assessment criteria
*Zero net regulated CO2 emissions are only required to achieve the maximum number of credits (9). There is no
additional CO2 minimum requirement for any BREEAM rating.
A description of how the EPR NC is calculated from a building's modelled operational energy performance, primary
energy consumption and CO2 emissions is provided in Energy performance on the next page.
Prerequisite
2 Achieve Man 01 Project brief and design: Criterion 5 on page xlviii for the design team to hold a preliminary
design workshop focusing on the design for operational energy performance.
4 Report predicted energy consumption targets by end use, design assumptions and input data (with
justifications).
5 Carry out a risk assessment to highlight any significant design, technical, and process risks that should be
monitored and managed throughout the construction and commissioning process.
clxii SD5078: BREEAM UK New Construction 2018 – Consultation draft
7 Energy generation from on-site and near-site LZC sources is sufficient to offset carbon emissions from
regulated energy use plus a percentage of emissions from unregulated energy use.
8 Award the exemplary credits based on the percentage of additional emissions from unregulated energy that
are offset by LZC sources (see Table 30 below).
11 The client commits to the verification stage and to report on the actual energy consumption compared with
the targets set in criterion 4 on the previous page.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
Energy performance
The methodology for the EPR NC calculation considers three metrics of modelled building performance when
determining the number of credits achieved for this issue. The three metrics are:
These three metrics for the actual modelled building performance are compared against the relevant national
building regulations compliant standard (i.e. a baseline) and each is expressed as a percentage improvement. The
percentage improvements are then compared against modelled building stock and translated into a ratio of
Ene 01 Reduction of energy use and carbon emissions clxiii
performance for each metric. These ratios are then weighted for each metric and added together to determine
the overall Energy Performance Ratio (EPR NC).
The calculation is determined using the following performance data from annual energy modelling of the building’s
specified or designed regulated fixed building services and fabric, as undertaken by an accredited energy assessor
using approved building energy calculation software:
The necessary energy modelling data required to determine building performance is sourced from National
Calculation Method compliant energy modelling software, used by the design team to demonstrate building
regulation compliance. This data are then entered into the BREEAM Ene 01 calculator to determine the EPR NC and
number of credits achieved. The Ene 01 calculator is within the BREEAM assessment scoring and reporting tool, in
the Assessment issue scoring tab, Energy section.
The four countries of the UK have their own building regulations for energy and while they use the same
methodology and approved calculation software, each have different definitions of the notional building and set
different requirements for regulatory compliance, i.e. baseline performance. This is accounted for in the BREEAM NC
2018 Ene 01 methodology through the ‘translator curves’ defined for each country. Therefore, the EPR NC and the
BREEAM credits are determined by comparing the assessed buildings modelled operational energy performance
relative to the regulatory baseline for the country in which the building is located.
The following lists the building regulations used to define each country’s BREEAM ‘translator curve’ to benchmark
building energy performance relative to a regulatory baseline and award credits.
Scotland
Technical Handbook 2016 Non-Domestic - Energy.
Northern Ireland
Technical Booklet F2 2012 Conservation of fuel and power in buildings other than dwellings.
England
Approved Document Part L2A 2010 Conservation of fuel and power in new buildings other than dwellings, 2013
edition with 2016 amendments - for use in England.
Wales
Approved Document Part L2A 2010 Conservation of fuel and power, New buildings other than dwellings, 2014
edition incorporating 2016 amendments - for use in Wales.
The relevant building regulations for Scotland are the Technical Handbook 2016 Non-Domestic, Section 6 Energy.
The relevant building regulations for Northern Ireland are the Technical Booklet F2 2012 Conservation of fuel and
power in buildings other than dwellings.
The relevant building regulations for England are Approved Document Part L2A 2010 Conservation of fuel and
power in new buildings other than dwellings, 2013 edition with 2016 amendments - for use in England.
The relevant building regulations for Wales are Approved Document Part L2A 2010 Conservation of fuel and
power, New buildings other than dwellings, 2014 edition incorporating 2016 amendments - for use in Wales.
The methodology is described in greater detail in Guidance Note provided on the BREEAM website.
building regulations documents, Approved Documents (AD) Part L2A and the NI Technical Handbook F2, are
classed as ‘buildings other than dwellings’. However this does also include ‘rooms for residential purposes’ (see
below). Areas classified as Part L1A or Technical Handbook F1 are ‘self-contained dwellings’. The Part L/Technical
Handbook F classification impacts this BREEAM issue in that areas classified as Part L2A/F2 must be assessed using
SBEM and areas classified as Part L1A/F1 must be assessed using SAP. For Scotland, see the General section and
Appendix A of the Technical Handbook Non-Domestic for definitions of domestic and non-domestic buildings.
For Wales, areas classified under the relevant building regulations documents, Approved Documents (AD) Part
L2A, are classed as ‘buildings other than dwellings’. However this does also include ‘rooms for residential purposes’
(see below). Areas classified as Part L1A are ‘self-contained dwellings’. The Part L classification impacts this BREEAM
issue in that areas classified as Part L2A must be assessed using SBEM and areas classified as Part L1A must be
assessed using SAP.
For Northern Ireland, areas classified under their relevant building regulations documents, the Technical Booklet F2,
are classed as ‘buildings other than dwellings’. However this does also include ‘rooms for residential purposes’ (see
below). Areas classified as Technical Booklet F1 are ‘self-contained dwellings’. The Technical Booklet F classification
impacts this BREEAM issue in that areas classified as Part F2 must be assessed using SBEM and areas classified as
Part F1 must be assessed using SAP.
For England, areas classified under the relevant building regulations documents, Approved Documents (AD) Part
L2A, are classed as ‘buildings other than dwellings’. However this does also include ‘rooms for residential purposes’
(see below). Areas classified as Part L1A are ‘self-contained dwellings’. The Part L classification impacts this BREEAM
issue in that areas classified as Part L2A must be assessed using SBEM and areas classified as Part L1A must be
assessed using SAP.
Room for residential purposes means a room, or suite of rooms, which is not a dwelling-house or a flat and which is
used by one or more persons to live and sleep and includes a room in a hostel, a hotel, a boarding house, a hall of
residence or a residential home but does not include a room in a hospital, or other similar establishment, used for
patient accommodation.
The Ene 01 Supplementary Calculator for Multi-Residential Buildings Using SAP describes in detail what data to
source from the SAP data sheets.
Guidance for assessing performance where the building has been modelled using SAP and SBEM
Where the building has been classified under both the non-dwelling and the dwelling regulations, because it
contains both residential and non-residential areas, two sets of energy performance data will be required: one set
from SBEM for the non-domestic areas; and one from SAP for the self-contained dwellings.
The relevant SAP data must first be entered into the 'Ene 01 Supplementary Calculator for Multi-Residential
Buildings Using SAP'. This calculator converts the data into the outputs outlined in Energy performance on page clxii.
This converted SAP data along with the relevant outputs from SBEM must then be added to BREEAM’s Ene 01
Calculator in the BREEAM Assessment Scoring and Reporting Tool. This calculator will then confirm the Energy
Performance Ratio (EPR NC) and number of BREEAM credits achieved.
Ene 01 Reduction of energy use and carbon emissions clxv
Where both SBEM and SAP outputs are used, the total credits achieved are determined by area weighting the
credits achieved for the domestic and non-domestic parts of the building. The area weighted totals are then
added together and rounded down to the nearest whole credit. The same method of area weighting is applied to
the percentage improvement on the building's Target Emission Rate. The area weighted credits and percentage
improvement are the totals used to determine compliance with BREEAM’s Ene 01 minimum standards.
Guidance for assessing performance where the building has new build and
refurbished areas
As part of the bespoke criteria development for Ene 01 issue, we allow the new-build to be assessed against the
New Construction scheme and the refurbishment against the Refurbishment and Fit-out scheme. The tool
performs an area-weighted average score.
The energy modelling does not have to consider the existing building fabric where this will not form part of the
scope of the BREEAM assessment. Nor does it have to consider existing building services where they are not
supplying services (heating, cooling or ventilation) to the new extension being assessed.
The energy modeller must model several scenarios creating a range of predicted consumptions, informed by a risk
assessment of the building energy uses.
– Weather
– Operating hours for systems
– Occupancy hours
– Management factors
The intention is to provide consistency with existing industry standard guidance where possible. Wherever
appropriate, the BREEAM methodology refers to existing documents for compatibility with current industry
standard methodologies. For more information please refer to the 'Energy Prediction and Verification' document
provided on the BREEAM website.
clxvi SD5078: BREEAM UK New Construction 2018 – Consultation draft
Verification stage
Where the exemplary credits are achieved and the verification stage will be followed, the building owner will need
to:
– report energy consumption for the first 12 months of normal occupancy for all relevant end uses
– report energy consumption for the first 12 months, broken down into monthly intervals, for all relevant end uses
(see Man 05 Aftercare on page lxxxii)
– compare reported energy consumption figures with targets set in criterion 4 on page clxi
– identify causes of discrepancies and the remediation actions required.
More information on the Verification stage is provided in Scope of the BREEAM UK New Construction
2018scheme version on page 25.
Evidence
Definitions
Only individuals that appear on the DCLG register for England and Wales, the Department of Finance register for
Northern Ireland and the Scottish Government register are qualified as accredited energy assessors.
A list of approved software for non-domestic buildings for Northern Ireland is provided here:
www.ncm.bre.co.uk/
A list of approved software for non-domestic buildings for England is provided here: www.ncm.bre.co.uk
A list of approved software for non-domestic buildings is as follows:
1. Scotland: www.gov.scot
2. Wales, Northern Ireland and England: www.ncm.bre.co.uk/
Approved building energy calculation software will provide the data required for calculating the EPR NC and
BREEAM Ene 01 credits. Please note that for dwellings (where relevant to the assessment of multi-residential
buildings), the government’s SAP may be used. The current version is SAP 2012 version 9.92 (October 2013).
Backstop levels
Backstop levels are identified as minimum energy efficiencies in the guidance to the standards on building
services in Section 6 of the Technical Handbook for Scotland.
Building regulations
Building regulations set standards for the design and construction of buildings to ensure the safety and health of
people in or about those buildings. They also include requirements to ensure that fuel and power is conserved
and facilities are provided for people, including those with disabilities, to access and move around inside
buildings. In Scotland, they also aim to secure the welfare and convenience of persons in or about buildings and
to further the achievement of sustainable development. See Energy performance on page clxii for details of the
relevant documents for each country.
Carbon neutral
Carbon neutral means that, through a transparent process of calculating building operational emissions,
reducing those emissions and offsetting residual emissions, net carbon emissions equal zero. This includes
carbon emissions from both regulated and unregulated energy consuming plant and systems.
The building regulations for energy performance of buildings define this as a service or fitting in relation to which
the building regulations imposes a requirement.
Energy demand
The building energy provided for end uses in the building such as space heating, hot water, space cooling,
lighting, fan power and pump power. Energy demands are the same as room loads. One of the outputs from the
building regulations output document is for heating and cooling energy demand only, not for any other building
energy uses. Heating and cooling energy demands are influenced by factors including building fabric heat loss, air
permeability, glazing and shading.
1. Fixed internal or external lighting systems but does not include emergency escape lighting or specialist
process lighting; or
2. Fixed systems for heating, hot water service, air-conditioning or mechanical ventilation.
binding green fit-out agreement is provided as evidence and it commits the tenant’s fit-out to meet the criteria
of this BREEAM issue, credits are available to be awarded.
Use whichever building regulations are relevant for the assessed building
The full details are described in the 2013 Wales NCM Modelling Guide, www.2013ncm.bre.co.uk.
The full details are described in the National Calculation Methodology (NCM) Modelling Guide for Scotland
(2010), www.gov.scot
The full details are described in the NCM Modelling Guide (2010) (128), www.ncm.bre.co.uk.
The full details are described in the NCM Modelling Guide (2013), www.ncm.bre.co.uk.
Near-site LZC
A LZC source of energy generation located near to the site of the assessed building. The source is most likely to
be providing energy for all or part of a local community of buildings, including the assessed building, e.g.
decentralised energy generation linked to a community heat network or renewable electricity sources connected
via a private wire arrangement.
Notional building
A hypothetical building of the same size, shape, orientation and shading as the actual building, with the same
activities, zoning and system types and exposed to the same weather data, but with pre-defined specified
properties for the building fabric, fittings and services. The notional building is concurrent with the national
building regulations for Wales 2014, Northern Ireland 2012 and England 2013.For Scotland 2013, the ‘notional’
building is generated based upon a building designed to meet the 2002 standards and a percentage
improvement is applied to define the compliant building target carbon dioxide emission rate (TER).
On-site LZC
A LZC source of energy generation which is located on the same site as the assessed building.
Ene 01 Reduction of energy use and carbon emissions clxxi
Primary energy
Energy from fossil fuel and renewable sources that has not undergone any conversion or transformation
process.
Regulated energy
Building energy consumption resulting from the specification of a controlled, fixed building services and fittings,
including space heating and cooling, hot water, ventilation and lighting.
Unregulated energy
Building energy consumption resulting from a system or process that is not ‘controlled’, i.e. energy consumption
from systems in the building on which the Building Regulations do not impose a requirement. For example, this
may include energy consumption from systems integral to the building and its operation, e.g. lifts, escalators,
clxxii SD5078: BREEAM UK New Construction 2018 – Consultation draft
refrigeration systems and ducted fume cupboards; or energy consumption from operational-related
equipment, e.g. computers, servers, printers, photocopiers, laptops, mobile fume cupboards, cooking, audio-
visual equipment and other appliances.
Additional information
None.
Ene 02 Energy monitoring clxxiii
2 2 2 Not applicable
Aim
To encourage the installation of energy sub-metering that facilitates the monitoring of operational energy
consumption. To enable managers and consultants post-handover to compare actual performance with targets in
order to inform ongoing management and help in reducing the performance gap.
Value
– Allows managers and occupants to
monitor operational energy consumption by
fuel and by end-use categories to identify
poor performance and changes in
consumption patterns
– Allows owners, managers and occupiers to
take steps to minimise the performance gap
between predicted and actual energy
consumption
– Allows the management of energy costs and
identification of areas of inefficient operation,
system deficiencies and building
management issues
– Allows comparison between the
performance of new and existing building
properties.
Context
‘You can’t manage what you do not measure’ - Through detailed energy metering and monitoring, owners and
facilities managers are able to understand how their building is performing in greater detail and take steps to
clxxiv SD5078: BREEAM UK New Construction 2018 – Consultation draft
improve deficiencies. Poor energy monitoring and management is the biggest single contributor to higher than
expected energy use in operational buildings and can present major opportunities to reduce energy consumption.
Appropriate actions such as changing practices and procedures, cutting wastage and managing energy use can
reduce operating costs, energy consumption and carbon emissions. Appropriate strategies for metering can also
ensure the building owner is better informed of the usage figures for the building to optimise energy supply
contracts and renegotiate new ones(129) as well as managing facilities management contractors and comparing
performance across a property portfolio.
Assessment scope
The first credit is applicable to all building types. The second credit is not applicable to preschools, primary schools,
law courts, prisons and multi-residential buildings.
An electric heating system can be combined with lighting and small power, as long as sub-metering
is provided for each floor plate or other appropriate sub-division.
2.5 Self-contained dwellings with individual utility meters
If self-contained dwellings covered by the assessment have their own individual energy supply and
utility meter (e.g. gas or electricity), this supply can be excluded from the scope of this issue. All
shared energy supplies and communal areas are still included in the assessment. For example, if
self-contained flats in an assisted living development have individual gas supplies with their own
utility meter, this supply will be excluded from the assessment. However, the lighting and small
power comes from a shared distribution board on each floor, in which case this shared supply will
need to be sub-metered in accordance with the criteria.
2.6 Office buildings relevant function areas or departments
Criteria 4.a.i and 4.b.ii on page clxxvii.
1. Office areas (metering by floor plate)
2. Catering
2.7 Retail buildings relevant function areas or department
Criteria 4.a.i and 4.b.ii on page clxxvii.
1. Sales area
2. Storage and warehouse
3. Cold storage
4. Offices
5. Catering
6. Tenant units
2.8 Industrial units relevant function areas or departments
Criteria 4.a.i and 4.b.ii on page clxxvii.
1. Office areas
2. Operational area
3. Ancillary areas (e.g. canteens etc.)
2.9 Hotel buildings relevant function areas or departments
Criteria 4.a.i and 4.b.ii on page clxxvii.
1. Office areas
2. Catering (e.g. kitchen, restaurant)
3. Conference suites
4. Swimming pool or leisure facilities
5. Hotel bedrooms metered per floor, core, floor plate in a strategy that would provide a
benefit to the facilities management.
It is acceptable for the electric heating system to be combined with lighting and small power for
metering purposes, as long as sub-metering is provided for each floor, core or floor plate. The
benefit to the facilities management can be measured by carrying out a comparison with similar
building areas where it would be possible to identify any unusual or excessive energy consumption.
2.10 Education buildings relevant function areas or departments
Criteria 4.a.i and 4.b.ii on page clxxvii.
1. Kitchens (excluding small staff kitchens and food technology rooms)
2. Computer suites
3. Workshops
4. Lecture halls
5. Conference rooms
6. Drama studios
7. Swimming pools
8. Sports halls
9. Process areas
10. Laboratories
11. High containment suites within laboratories
12. Controlled environment chambers
13. Animal accommodation areas
14. Data centres
15. IT work and study rooms, including IT-equipped library space and any space with provision
of more than one computer terminal per 5m².
clxxvi SD5078: BREEAM UK New Construction 2018 – Consultation draft
In small healthcare buildings (< 999m²) with no high energy load areas (as defined above), a single
meter per floor plate is sufficient to achieve this credit. Individual areas within each floor plate do
not need to be sub-metered.
2.12 Other buildings
Criteria 4.a.i and 4.b.ii on page clxxvii.
Other types of single occupant buildings should use the above lists of function areas as a guide to
the level of sub-metering provision required to comply. The above should consider that the aim of
the credit is to encourage the installation of energy sub-metering that facilitates the monitoring of
in-use energy consumption (in this case by area).
Ene 02 Energy monitoring clxxvii
Assessment criteria
2 Meter the energy consumption in buildings according to the total useful floor area:
2.a: If the area is greater than 1,000m², by end-use category with an appropriate energy monitoring and
management system.
2.b.ii separate accessible energy sub-meters with pulsed or other open protocol communication
outputs, for future connection to an energy monitoring and management system (see Definitions
on page clxxix).
3 Building users can identify the energy consuming end uses, for example through labelling or data outputs.
OR
4.b: Separate accessible energy sub-meters with pulsed or other open protocol communication outputs for
future connection to an energy monitoring and management system for:
5 Sub-meter per floor plate in large single occupancy or single tenancy buildings with one homogeneous
function, for example hotel bedrooms, offices.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
clxxviii SD5078: BREEAM UK New Construction 2018 – Consultation draft
Methodology
Metering strategy
Detailed guidance on how to develop an appropriate metering strategy for the energy criteria of a new building is
available in CIBSE TM39 Building energy metering (130) .
Evidence
Definitions
Accessible meters
Energy meters located in an area of the building that allows for easy access to facilitate regular monitoring and
readings by the building occupant or facilities manager. Typically this will be the plant room, main distribution
room or control room (where a building energy management system (BEMS) is installed).
Common areas
Developments that have several tenant units, particularly large retail developments, may also share common
facilities and access that is not owned or controlled by any one individual tenant, but used by all. Common areas
are typically managed and maintained by the development’s owner, i.e. landlord or their managing agent.
Examples of common areas include an atrium, stairwells, main entrance foyers or reception and external areas,
e.g. parking.
End-use categories
End-use categories include:
1. Space heating
2. Domestic hot water heating
3. Humidification*
4. Cooling*
5. Ventilation, i.e. fans (major)*
6. Pumps
7. Lighting
8. Small power
9. Renewable or low carbon systems (separately)
10. Controls
11. Other major energy consuming systems or plant, where appropriate. Depending on the building type,
this might include for example: plant used for swimming or hydrotherapy pools; other sports and leisure
facilities; kitchen plant or catering equipment; office equipment; cold storage plant; laboratory plant;
sterile services equipment; transport systems (e.g. lifts and escalators); drama studios and theatres with
clxxx SD5078: BREEAM UK New Construction 2018 – Consultation draft
large lighting rigs; telecommunications; dedicated computer room or suite; server rooms; dealing
rooms; covered car parks; ovens or furnaces; and floodlighting. See also CIBSE TM39: Building energy
metering for further information.
The systems succeeded by * must not be present where a BREEAM New Construction Simple Building
assessment is being carried out.
Energy supply
All types of energy supplied to a building area (function area, department, tenancy or unit) within the boundary of
the assessed development. These types of energy include electricity, gas, heat or other forms of energy or fuel
that are consumed in each relevant area.
Energy meters
Energy meters measure the amount of energy used on a circuit where energy is flowing. Primary meters measure
the main incoming energy and are used for billing by the utility supplier. They include the principal smart and
advanced utility meters to a site for electricity and gas.
Sub-meters are the second tier including heat and steam meters and secondary meters installed to measure
consumption by specific items of plant or equipment, or to discrete physical areas, e.g. individual buildings, floors
in a multi-storey building, tenanted areas, function areas.
Major fans
Major fans typically include fans in air handling units. Where multiple fans are within an air handling unit, they can
be metered as one unit. Small fans such as individual extract fans for single rooms, such as kitchen, bathroom and
toilet areas, are not required to be included where they only account for a small proportion of the total annual
energy use.
Significant majority
A significant majority of the energy supply to the tenanted areas or departments covers most of the energy uses
but does not have to include very small ones. As a guide, energy uses that cumulatively make up less than 10% of
the energy supply for that area may be excluded.
Sub-meter outputs
Examples include pulsed outputs and other open protocol communication outputs, such as Modbus.
Ene 02 Energy monitoring clxxxi
Additional information
1 1 1 1
Fully fitted Simple building Shell & core Shell only No Minimum standard
Aim
To reduce energy consumption through the specification of energy efficient light fittings for external areas of the
development.
Value
– Reduce the energy consumption,
associated with external light fittings left on
during the day and when no one is present,
thereby reducing CO2 emissions and
operating costs.
– Reduce the dependence on external lighting
for safety and comfort
Context
External lighting is often necessary to provide a sense of security at night, clear, safe and attractive access to people
and contribute to the regeneration of urban areas(133). External light fittings can often result in relatively high
energy usage as a result of poor specification of fittings and controls as well as inadequate maintenance. External
Ene 03 External lighting clxxxiii
lighting fittings with the highest luminous efficacy and their efficient utilisation can reduce the energy consumption
and associated costs attributed to essential external lighting while providing a pleasant and safe environment.
Assessment scope
Assessment criteria
One credit
1 No external lighting (which includes lighting on the building, at entrances and signs).
OR
2.a: Average initial luminous efficacy of no less than 70 luminaire lumens per circuit Watt.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
For lamps other than LED lamps, the luminous flux of a luminaire using those lamps can be determined by
multiplying the sum of the luminous fluxes produced by all the lamps in the luminaire by the light output ratio of the
luminaire (as confirmed by the luminaire manufacturer).
LED lamps are typically integral to the luminaire (LED luminaires). As such, the manufacturers' literature will
encompass both lamp and luminaire as a whole.
Emergency lighting
Emergency light fittings, including security lighting, that are also used for normal operation are assessed for this
issue. Non-maintained lighting which only activates in an emergency can be excluded from the assessment of this
issue.
Evidence
Definitions
Automatic control
An automatic external lighting control system prevents operation during daylight hours through either a time
switch or a daylight sensor (a manually switched lighting circuit with daylight sensor or time switch override is also
acceptable). In addition to the above, the system should provide presence detection in areas of intermittent
traffic. For external lighting not fitted with presence detectors, time switches must provide automatic switch off
of lighting after a specified curfew hour, except in cases where there is a specific requirement for lighting to be
left on all night.
Construction zone
For the purpose of this issue, the construction zone is defined as the site which is being developed for the
BREEAM-assessed building and its external site areas, i.e. the scope of the new works.
Daylight sensor
A type of sensor that detects daylight and switches lighting on at dusk and off at dawn.
clxxxvi SD5078: BREEAM UK New Construction 2018 – Consultation draft
Presence detector
A sensor that can turn lighting on when a presence is detected in the scanned area, and off after a pre-set time
when no presence is detected. Presence detectors must be compatible with the lamp type used as very frequent
switching can reduce the life of some lamp types.
Time switch
A switch with an inbuilt clock which will allow lighting to be switched on and off at programmed times.
Additional information
None.
Ene 04 Low carbon design clxxxvii
3 3 3 3
Fully fitted Simple building Shell & core Shell only No Minimum standard
Aim
To encourage the adoption of design measures, which reduce building energy consumption and associated
carbon emissions and minimise reliance on active building services systems.
Value
– Maximise the financial and environmental
benefits of adopting passive and other low
carbon solutions throughout the design
process
– Encourage the use of free heating and
cooling strategies, to reduce the building’s
energy demands and eliminate or reduce the
use of active cooling
– Ensure that the most appropriate low or zero
carbon technologies (LZC) are adopted for
the project
– Promote innovation to deliver practical and
cost effective low carbon building design.
Context
Factors such as the building massing, layout, orientation, fabric design, daylighting provision, ventilation strategies
and thermal mass will significantly affect the heat gains and losses in a building. Air-conditioning is a high energy
user and can conflict with more biophilic approaches to health and wellbeing. It should be avoided or minimised
where possible as its adoption will typically increase operational energy costs by around 50% to the running costs
of the building (134). The range of low and zero carbon technologies that supply electricity and heat is growing
clxxxviii SD5078: BREEAM UK New Construction 2018 – Consultation draft
rapidly and capital and operating costs are decreasing with economies of scale. This is often making them a cost
effective solution achieving a reduction in operational CO2 emissions.
Assessment scope
Assessment criteria
2 The project team analyses the proposed building design and development during Concept Design stage (RIBA
Stage 2 or equivalent) to identify opportunities for the implementation of passive design measures (see
Passive design analysis on the next page).
3 Implement passive design measures to reduce the total heating, cooling, mechanical ventilation, lighting loads
and energy consumption in line with the passive design analysis findings.
4 Quantify the reduced total energy demand and carbon dioxide (CO2) emissions resulting from the passive
design measures.
6 Include a free cooling analysis (see Free cooling analysis on the next page) in the passive design analysis carried
out under criterion 2.
8 The building is naturally ventilated or uses any combination of the free cooling strategies listed in Free cooling
analysis on the next page.
10 Establish the most appropriate recognised local (on site or near site) low or zero carbon (LZC) energy sources
for the building or development, (see Scope of LZC systems and how they are assessed on page cxci), based
on the feasibility study.
11 Specify local LZC technologies for the building or development in line with the feasibility study
recommendations.
12 Quantify the reduced regulated carbon dioxide (CO2) emissions resulting from the feasibility study.
cxc SD5078: BREEAM UK New Construction 2018 – Consultation draft
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
1. Site location
2. Site weather
3. Microclimate
4. Building layout Low and zero carbon feasibility study on the facing page
5. Building orientation
6. Building form
7. Building fabric
8. Thermal mass or other fabric thermal storage
9. Building occupancy type
10. Daylighting strategy
11. Ventilation strategy
12. Adaptation to climate change.
Any savings resulting from the incorporation of passive design measures should be demonstrated by comparing
the energy demand or CO2 emissions for the building with and without the proposed passive design measures
adopted, as identified in the passive design analysis.
To enable a baseline for comparison to be established, a ‘standard building’ should be modelled with fabric
performance equivalent to that of the local building regulations notional building (or for Scotland, an equivalent
compliant building) and without the passive design measures (where feasible, i.e. building orientation is likely to be
fixed). The glazing areas should remain the same in both models.
With the exception of any changes to account for passive design measures and fabric performance, this ‘standard
building’ should be modelled as equivalent to the actual building.
Any savings in energy demand or CO2 emissions should then be calculated by comparing the respective Building
Emission Rate (BER) outputs from two building models representing the ‘proposed building’ specification (fixed at a
point as agreed by the project team and assessor), and the ‘standard building’ specification.
These calculations should be carried out by a building services engineer who is a member of the Chartered Institute
of Building Services Engineers (CIBSE) or by an accredited energy assessor (see Definitions on page cxciv).
1. Night time cooling (which could include the use of a high exposed thermal mass)
2. Ground coupled air cooling
3. Displacement ventilation (not linked to any active cooling system)
4. Ground water cooling
5. Surface water cooling
6. Evaporative cooling, direct or indirect
7. Desiccant dehumidification and evaporative cooling, using waste heat
8. Absorption cooling, using waste heat.
Ene 04 Low carbon design cxci
The free cooling should apply to all occupied spaces in the building. Small IT rooms and lift motor rooms are
excluded.
It should be demonstrated that the free cooling can meet the building's cooling demand. The calculation methods
should take into account the passive design measures included in the analysis and should be carried out by a
building services engineer who is a member of the Chartered Institute of Building Services Engineers (CIBSE) or by an
accredited energy assessor. Where the free cooling approaches chosen cannot be adequately modelled by these
methods, the use of any alternative methods should be justified by the building services engineer or accredited
energy assessor, demonstrating that these methods are appropriate.
The reduction in regulated carbon dioxide (CO2) emissions can be demonstrated by comparing regulated carbon
dioxide (CO2) emissions with LZC technologies to the actual building regulated emissions without LZCs. When the
CO2 savings are compared for different technologies, they may be estimated separately from the building energy
model where appropriate, e.g. by using manufacturers' data, simple hand calculations or spreadsheets. For the
specified technologies, any CO2 savings are estimated using dynamic simulation modelling. The energy supply used
for the base case is mains gas and grid electricity. If mains gas is not available on site, then oil may be used instead.
The base case includes any passive design or free cooling measures adopted for the first two credits. The actual
building energy demands are calculated as for the passive design analysis. The carbon dioxide emissions factors
used for the building regulations calculations are then applied.
1. There must be a direct supply of energy produced to the building under assessment.
2. Technologies under 50kWe or 45kWth must be certified by a Microgeneration Certification Scheme (MCS),
or equivalent, and installed by MCS (or equivalent) certified installers.
3. Combined heat and power (CHP) schemes above 50kWe must be certified under the CHPQA standard.
CHP schemes fuelled by mains gas are eligible to contribute to performance against this issue.
4. Heat pumps can only be considered as a renewable technology when used in heating mode. Refer to
Annex VI of Directive 2009/28/EC for more detail on accounting for energy from heat pumps.
5. Where MCS or CHPQA certification is not available, the design team must investigate the availability of
alternative accreditation schemes in line with the Directives listed above, or an equivalent country or
cxcii SD5078: BREEAM UK New Construction 2018 – Consultation draft
regional directive or standard. Where an accreditation scheme exists, it should be used for the purpose of
verifying compliance of the specified LZC technology. If no accreditation scheme exists in the country, the
design team must demonstrate they have investigated the competence of the installer selected and are
confident that they have the skill and competence to install the LZC technology appropriately.
The novel technology would only be acceptable for the LZC credit if EITHER:
1. It is already demonstrably modelled in one of the approved dynamic simulation compliance tools;
2. The calculation procedure has been accepted by the SBEM-Q process and integrated into the SBEM tool;
OR
3. It has been applied for and is in the process of being accepted for SBEM-Q.
For one-off LZC technology designs, where it is not viable to obtain SBEM-Q approval, an application for a BREEAM
approved innovation credit can be submitted to BRE.
1. All other LZC technologies have been considered and discounted in the feasibility study and; EITHER
2. The local authority or region in which the incineration plant is located is demonstrably meeting its annual
waste reuse and recycling targets and waste management policies; OR
3. There is a near or on-site facility connected to the building, via a private wire arrangement, which is
demonstrably removing reusable and recyclable waste material prior to incineration.
Ene 04 Low carbon design cxciii
Biofuels
The use of other recycled or waste-derived biofuels such as waste oil from catering may also be recognised by
BREEAM subject to the above criteria. For smaller scale applications, the assessor will also need to demonstrate that
the biofuel is locally sourced. BREEAM does not qualify the term ‘locally sourced’ or specify a minimum supply
contract. However the assessor must determine and demonstrate that these are reasonable for the particular
application.
Evidence
Definitions
Accredited energy assessor
A person registered with an accredited energy assessment scheme provider. The scheme provider will be
licensed by the relevant government department to accredit competent persons in the energy assessment of
non-domestic or domestic buildings for the purposes of demonstrating compliance with the building
regulations in the country of origin. The energy assessor should be appropriately accredited for the building
being assessed. For a full list of approved accreditation schemes or organisations for energy assessors and links
to registers of accredited energy assessors visit: www.ndepcregister.com (non-domestic),
www.epcregister.com (domestic)
www.scotland.gov.uk/www.epbniregisternd.com (non-domestic), www.epbniregister.com (domestic)
Only individuals that appear on the DCLG register for England and Wales, the Department of Finance register for
Northern Ireland and the Scottish Government register are qualified as accredited energy assessors.
1. Scotland: www.gov.scot
2. Wales, Northern Ireland and England: www.ncm.bre.co.uk/
Approved building energy calculation software will provide the data required for calculating the EPR NC and
BREEAM Ene 01 credits. Please note that for dwellings (where relevant to the assessment of multi-residential
buildings), the government’s SAP may be used. The current version is SAP 2012 version 9.92 (October 2013).
Energy specialist
An individual who has acquired substantial expertise or a recognised qualification for undertaking assessments,
designs and installations of low or zero carbon solutions in the commercial buildings sector and is not
professionally connected to a single low or zero carbon technology or manufacturer.
Free cooling
The ability of the building to provide cooling to the internal occupied areas without the need to rely on energy
consuming mechanical cooling. Free cooling is an enhanced passive design method that requires engineering
design and modelling to demonstrate its effectiveness. Other similar methods include enhanced passive
ventilation and enhanced daylighting.
Near-site LZC
A LZC source of energy generation located near to the site of the assessed building. The source is most likely to
be providing energy for all or part of a local community of buildings, including the assessed building, e.g.
decentralised energy generation linked to a community heat network or renewable electricity sources connected
via a private wire arrangement.
On-site LZC
A LZC source of energy generation which is located on the same site as the assessed building.
Payback period
The period of time needed for a financial return on an investment to equal the sum of the original investment.
Additional information
Aim
To encourage the installation of energy efficient refrigeration systems, in order to reduce operational greenhouse
gas emissions resulting from the system's energy use.
Value
– Promote the design installation of energy
efficient refrigeration system, controls and
components in accordance with best practice
industry standards
– Ensure that the commissioning of the
refrigeration plant is properly planned and
will result in the system performing as
designed, therefore promoting an optimal
performance.
– Encourage the installation of refrigeration
systems that demonstrate savings in indirect
greenhouse gas emissions.
Context
About 15% of the world’s electricity is used to drive refrigerating and air-conditioning systems(136). Therefore,
refrigeration accounts for significant energy consumption in certain sectors, such as retail and industrial. Improving
the efficiency of the refrigeration plant can result in less waste of valuable energy resources and less impact to
cxcviii SD5078: BREEAM UK New Construction 2018 – Consultation draft
global warming, less likelihood of breakdown and significant running cost savings. Through proper operation,
maintenance and re-commissioning, cost savings of up to 50% and improved reliability can be achieved (137).
Assessment scope
Assessment criteria
1.a: In accordance with the Code of Conduct for carbon reduction in the refrigeration retail sector (138) (see
Additional information on page cci) and BS EN 378-2:2016 (139) .
1.b: Using robust and tested refrigeration systems or components included on the Enhanced Capital
Allowance (ECA) Energy Technology Product List (ETPL)(140) or an equivalent list (see Components on the
ECA Energy Technology Product List on the next page for a list of components).
2 Commission the refrigeration plant in compliance with the commissioning criteria in BREEAM issue Man 04
Commissioning and handover on page lxxi.
4 Demonstrate a saving in indirect greenhouse gas emissions (CO2 eq.) from the installed refrigeration system
over the course of its operational life.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
These types of installation are covered within BREEAM issue Ene 08 Energy efficient equipment on page ccxv. If the
building contains no refrigeration systems or only refrigeration systems that are standalone, i.e. are not integral to
cc SD5078: BREEAM UK New Construction 2018 – Consultation draft
the building and served by the building services, this issue is not applicable to the assessment. The scope of this
issue covers freezer or cold storage rooms which are integral to the building and served by the building’s own
refrigeration systems.
Calculations must be carried out by an appropriately qualified professional (e.g. a building services engineer),
including calculations to justify for assumptions and methodologies for savings in indirect greenhouse emissions.
Many of the technologies outlined in the Road Map are appropriate to non-food applications and therefore to
non-retail building types that specify or install cold storage refrigeration systems. If the ‘baseline supermarket’ does
not provide an appropriate benchmark for achieving the second credit, the design team can still comply with the
criteria by demonstrating a reduction in indirect greenhouse gas emissions (CO2 eq.) against an alternative baseline.
The design team must confirm details of the alternative baseline system used, and demonstrate that it is based on
a typical installation or technology for that building type. The systems being compared must have the same duty
and service conditions and include the relevant consumption from the refrigeration system's ancillary equipment.
Evidence
Definitions
Additional information
3 2 3 Not applicable
Aim
Value
– Ensure that transport types and
arrangement systems are best suited to
usage patterns and demand
– Promote the use of energy efficient features,
in line with best industry practice guidelines
– Maximise the use benefit and satisfaction
with transport systems
Context
Although issues such as safety, space restrictions and users’ comfort are prioritised by lift and escalators
manufacturers, energy efficiency of transport systems has been a increasing concern in the last decades. An
increase in lift and escalators provision is expected in the near future due to the need for convenience and comfort,
the growing ageing population and the urbanisation effect. The energy consumption of lifts and escalators is
estimated between 3 to 5 % of the overall consumption of a building (144) . The design and specification of energy
Ene 06 Energy efficient transport systems cciii
efficient transport technologies has become one of the key interests of manufacturers, that drives competition on
the market and helps customers save energy and operational costs.
Assessment scope
Assessment criteria
1.a: Analyse the transport demand and usage patterns for the building to determine the optimum number
and size of lifts, escalators or moving walks.
1.b: Calculate the energy consumption in accordance with BS EN ISO 25745 Part 2 (145) or Part 3 (146) for one
of the following:
1.b.i At least two types of system for each transport type required; OR
1.b.ii An arrangement of systems for example for lift systems, hydraulic, traction, machine room-less lift
(MRL); OR
1.c: Consider the use of regenerative drives, subject to the requirements in Regenerative drives on the facing
page.
1.d: Specify the transport system with the lowest energy consumption.
3.b: The lift car lighting and display lighting provides an average luminous efficacy across all fittings in the car of
> 70 luminaire lumens per circuit Watt.
3.c: Use of a drive controller capable of variable speed, variable-voltage, and variable-frequency (VVVF)
control of the drive motor.
5.a: A load-sensing device that synchronises motor output to passenger demand through a variable speed
drive; OR
5.b: A passenger-sensing device for automated operation (auto walk), so the escalator operates in auto start
mode when there is no passenger demand.
Ene 06 Energy efficient transport systems ccv
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
Transport analysis
The transport analysis can be in the form of a written statement justifying the lift selection for the following
conditions: where a single lift is provided in a low rise building for the purpose of providing disabled access only; or
where a goods lift is selected based on the size of the goods it is intended to carry.
Regenerative drives
A regenerative drive should only be considered where it produces an energy saving greater than the additional
standby energy used to support the drives. Regenerative drives will typically be appropriate for lifts with high travel
and high intensity use.
Building has no lifts, escalators or moving walks or has only one of the
transport systems
This issue will not be assessed where a building contains no lifts, escalators or moving walks. Where only either lifts,
escalators or moving walks are present, only one credit is available for the Energy efficient features credit. Where
both lifts and escalators or moving walks are present, then two credits are available.
Evidence
Definitions
Idle condition
A condition when a lift is stationary at a floor following a run before the standby mode is entered (from BS EN ISO
25745-1: 2012).
Additional information
In Part 1, it has been estimated that approximately 5% of a building’s total energy consumption can be attributed
to the operation of lifts and a large proportion of this can be attributed to standby mode in many situations. BS EN
ISO 25745 Parts 2 and 3 have been prepared in response to the rapidly increasing need to ensure and to support
the efficient and effective use of energy, providing:
1. A method to estimate energy consumption on a daily and an annual basis for lifts, escalators and moving
walks.
2. A method for energy classification of new, existing or modernised lifts, escalators and moving walks.
Ene 06 Energy efficient transport systems ccvii
3. Guidelines for reducing energy consumption that can be used to support building environmental and
energy classification systems.
ccviii SD5078: BREEAM UK New Construction 2018 – Consultation draft
Aim
To encourage laboratory areas that are designed to minimise their operational energy consumption and
associated CO2 emissions.
Value
– Encourage effective communication
between the client and the design team to
identify the occupant requirements and
performance criteria
– Reduced capital and operating costs as a
result of appropriate sizing and specification
of equipment and adoption of best practice
design principles
– Ensure that energy efficiency measures do
not affect the health and safety of the
occupants.
Context
Laboratory facilities are required to comply with regulations and other standards for safety and various
environmental conditions such temperature and air quality. Compared to an office building, the average laboratory
consumes ten times more energy per square feet, with some labs using as much as 100 times more energy(149).
Ene 07 Energy efficient laboratory systems ccix
Therefore, energy efficient measures can result in significantly reduced energy costs and waste, improved systems
efficiency and long-term sustainability.
Assessment scope
This issue is applicable only to further education, higher education, offices with research and development areas
and other buildings with research and development facilities that contain laboratory space and containment
devices or areas. This issue is not applicable for school buildings (primary and secondary level).
Assessment criteria
– Prerequisite
– Design specification (1 credit)
– Best practice energy efficient measures (up to 4 credits) - building type dependent.
Prerequisite
1 Achieve Hea 03 Safe containment in laboratories : Criterion 1 on page cxxii
3 Size the services system equipment (including ventilation supply and extract) correctly (see Definitions on
page ccxiii).
4 Demonstrate the minimised energy demand of the laboratory facilities resulting from the achievement of the
defined design performance criteria.
6.a: Demonstrate that the average design air flow rate is no greater than 0.16m³/s per linear metre (internal
width) of fume cupboard workspace.
6.b: Measure the volume flow rate in the exhaust duct (at the boundary of the laboratory) to take account of
reductions in (inward) volume flow rate from fume cupboard leakage.
Ene 07 Energy efficient laboratory systems ccxi
6.c: Demonstrate that a reduction in air flow does not compromise the defined performance criteria and
does not increase the health and safety risk to future building occupants.
7 Achieve criteria 1 to 6 on the previous page (or criteria 1 to 5 on the previous page where there are no ducted
fume cupboards).
8 Design, specify and install laboratory plant and systems to promote energy efficiency. Demonstrate
compliance with items in Table 31 below (see 8.a and 8.b below for credits available).
8.a: Up to 2 credits: laboratory areas (see Definitions on page ccxiii) account for at least 10% (but less than
25%) of the total building floor area; OR
8.b: Up to 4 credits: laboratory areas account for 25% or more of the total building floor area.
9 Demonstrate by calculations or modelling that the chosen measures have a reasonably significant effect on the
total energy consumption of the laboratory, i.e. 2% reduction or greater.
10 Demonstrate that the energy efficient measures specified do not compromise the defined performance
criteria, and do not increase the health and safety risk to future building occupants.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
Applicable standards
The laboratory criteria within issue Hea 03 Safe containment in laboratories on page cxx and guidance within G9
Fume Cupboards in Schools (Building Bulletin 88 can be used for assessments in Northern Ireland) should be
followed. Where containment devices present in a school or sixth form college assessment are of a specialist
nature more typical of a commercial or research laboratory, BRE should be contacted for further guidance.
Evidence
Definitions
Laboratory areas
Laboratory areas are defined as highly serviced (temperature, ventilation, humidity or containment controlled)
spaces where physical, biological or chemical processing or testing is carried out. Such areas will have inherently
high energy demands. In order to maintain controlled conditions to enable experiments and comply with health
and safety standards, typically laboratories:
1. Contain various exhaust and containment devices (such as fume cupboards and microbiological safety
cabinets)
2. Are heavily serviced to circulate air and to supply heating, cooling, humidity, and clean air
3. Often require 24-hour access and failsafe redundant backup systems and uninterrupted power supply
or emergency power to enable irreplaceable experiments.
Therefore, for the purpose of assessing this BREEAM issue, the definition of laboratory areas excludes any
laboratory support areas such as:
1. Write up or offices
2. Meeting rooms
3. Storage
4. Ancillary and other support areas with lower servicing requirements.
Teaching and other laboratories or workshops with a limited amount of fume cupboards or other containment
devices or no energy intensive process equipment specified are excluded, unless the design team can provide
evidence that their consumption is at least 50% higher than a typical office due to the laboratory process-related
activities. Benchmarks for general offices can be found in Table 1 in CIBSE TM46 (150) Energy benchmarks.
Typically, in buildings where 40% of the floor area is laboratory related, only 10% will actually constitute
laboratory areas as per the BREEAM definition. Different types of laboratories have different requirements for
heating, ventilation and air-conditioning, plug load equipment and access. This can lead to enormous variations in
energy and water requirements. The main types of laboratories include:
1. Wet laboratories - where chemicals, drugs or other material or biological matter are tested and analysed
requiring water, direct ventilation and specialised piped utilities. They typically include chemical science
laboratories. These laboratories require specially designed facilities.
2. Dry laboratories - contain dry stored materials, electronics, or large instruments with few piped services.
They typically include engineering or analytical laboratories that may require accurate temperature and
humidity control, dust control, and clean power.
3. Microbiological or clinical laboratories - often involve working with infectious agents. They typically
require higher levels of primary containment and multiple secondary barriers including specialised
ventilation systems to ensure directional air flow, air treatment systems to decontaminate or remove
agents from exhaust air, controlled access zones, airlocks as laboratory entrances, or separate buildings
or modules to isolate the laboratory.
4. In vivo laboratories - these require highly controlled environments for the care and maintenance of flora
and fauna. The facilities are complex, expensive to build and to operate. Tight environmental control over
the facility is required to avoid the introduction of contaminants or pathogens, prevent the possibility of
infectious outbreaks, and avoid the transmission of odours.
5. Teaching laboratories - unique to academic institutes, they require space for teaching equipment,
storage space for student belongings and less instrumentation than research labs.
6. Clean rooms - refers to a controlled environment (air quality, temperature and humidity) which prevent
contamination and the regulating of environmental conditions, to facilitate accurate research and
production needs. They are typically used in UK universities for nanotechnology, medical and
pharmaceutical research or studies and microelectronics applications.
ccxiv SD5078: BREEAM UK New Construction 2018 – Consultation draft
Right-sizing
Right-sizing principles encourage the use of better estimates in equipment loads from which services equipment
is sized in comparison to traditional methods of estimates based on ‘rated’ data obtained from manufacturers’
literature or design assumptions from previous projects. This can result in construction cost savings in addition to
life cycle cost benefits, while taking account of the need for appropriate contingency.
Additional information
Aim
To encourage installation of energy efficient equipment to ensure optimum performance and energy savings in
operation.
Value
– Reduce unregulated energy consumption
loads based on the building’s usage and
occupants patterns
– Promote a better understanding of
unregulated energy consumption for the
significantly consuming systems, therefore
reducing the performance gap
Context
The current building regulations do not account for all energy uses in buildings and aim to address regulated
energy consumption. Unregulated sources of energy consumption such as swimming pools, server rooms,
commercial and domestic scale appliances, are rarely considered and modelled at the design stage. However, they
ccxvi SD5078: BREEAM UK New Construction 2018 – Consultation draft
can have significant impact on the energy use. In an office building for instance, they typically account for more than
30% of the energy consumption(151). It is important to encourage solutions that result in unregulated energy
reduction, which is variable between different building types and ignored by current regulatory standards.
Assessment scope
Domestic scale appliances (individual and communal facilities) on page ccxvii. item 5b is only applicable to multi-
residential assessments.
Assessment criteria
Two credits
1 Identify the building's unregulated energy consuming loads. Estimate their contribution to the total annual
unregulated energy consumption of the building, assuming a typical or standard specification.
2 Identify the systems or processes that use a significant proportion of the total annual unregulated energy
consumption of the building.
3 Demonstrate a meaningful reduction in the total annual unregulated energy consumption of the building.
Table 32 below lists some examples of significant contributors to unregulated energy consumption. If none of
the examples listed in the table will be specified in the assessed building, the design team should justify how a
meaningful reduction will be achieved.
Table 32 Examples of significant contributors to unregulated energy consumption, for a number of different
building types or functions, and the solutions deemed to comply.
Swimming pool
1. Specify automatic or semi-automatic pool covers, or ‘liquid’ pool covers with an automatic dosing
system to ALL pools, including spa pools and hot tubs.
2. The covers envelop the entire pool surface when fully extended.
3. Control the air temperature in the pool hall so that it is 1°C above the water temperature.
Laundry facilities with commercial-sized appliances
Demonstrate at least one of the following for commercial-sized appliances:
1. Specification of heat recovery from waste water
2. Use of greywater for part of the washing process. This may be recycled from the final rinse and used
for the next pre-wash.
3. The commercial or industrial sized machines is identified as eligible for the UK’s Enhanced Capital
Allowance Scheme for water (152).
Data centres
1. Design is in accordance with the ‘Best practices for the EU Code of Conduct on Data Centres’(153)
principles with the data centre achieving at least the ‘Expected minimum practice’ level (as defined in
the Code of Conduct).
2. Temperature set points are not less than 24°C, as measured at the inlet of the equipment in the rack.
IT-intensive operating areas
1. Specify a natural ventilation and cooling strategy as standard. Use forced ventilation only when the
internal temperature exceeds 20°C and active cooling only when the internal temperature exceeds
22°C.
2. Specify a mechanism to achieve automatic power-down of equipment when not in-use, including
overnight.
Domestic scale appliances (individual and communal facilities)
Any white goods, available to purchase from the developer, must c achieve the following ratings (or better)
under the EU Energy Efficiency Labelling Scheme:
1. Fridges, fridge-freezers: A+ rating
2. Washing machines: A++ rating
3. Dishwashers: A+ rating
ccxviii SD5078: BREEAM UK New Construction 2018 – Consultation draft
4. Washer-dryers: A rating
5. Tumble dryers:
a. A rating OR
b. For Multi-residential assessments only, provide an adequate internal or external space capable of
holding drying lines as specified in the Drying lines section.
Healthcare
Carry out a life cycle costing analysis for at least two options in accordance with HTM07-02,Part B, Chapter 1
(154). Inform and specify large-scale equipment (where present, see Definitions on page ccxx) and sets of
electrical equipment (where numbering more than 50) based on the life cycle costing analysis.
Kitchen and catering facilities
Incorporate at least two-thirds of the energy efficiency measures outlined in the 'section summary' boxes of
each of the following sections of CIBSE Guide TM50 (155) (except as specified):
1. Section 8 - Drainage and kitchen waste removal
2. Section 9 - Energy controls - specifically controls relevant to appliances
3. Section 11 - Appliance specification - excluding fabrication or utensil specifications
4. Section 12 - Refrigeration
5. Section 13 - Warewashing: dishwashers and glasswashers
6. Section 14 - Cooking appliance selection
7. Section 15 - Water temperatures, taps, faucets and water saving controls.
Refrigeration (see Refrigeration equipment on the facing page) for kitchen and catering facilities should be
assessed here, not in Ene 05 Energy efficient cold storage on page cxcvii.
Compliance notes
Methodology
The project team must justify how they have determined or judged a meaningful reduction from the unregulated
energy demand and the assessor must be satisfied that this is an appropriate justification.
Drying lines
Domestic scale appliances (individual and communal facilities) requires the provision of an adequate internal or
external secure space with posts and footings, or fixings capable of holding:
This issue does not apply to multi-residential assessments of supported living facilities (for safety reasons, to
minimise ligature risk to particular residents). It is also not applicable to projects where occupancy is transient, such
as hotel- or hostel-type developments, but does apply to long term residential buildings.
OR
An unheated outbuilding, where calculations by an appropriate Member of the Chartered Institute of Building
Services Engineers (CIBSE) or an equivalent professional demonstrate that ventilation in the space is adequate to
allow drying in normal climatic conditions and to prevent condensation and mould growth. The fixing or fitting
needs to be a permanent feature of the room. Internal drying spaces in the following rooms do not comply:
1. Living rooms
2. Kitchens
3. Dining rooms
4. Main halls
5. Bedrooms.
Refrigeration equipment
Section 12 - Refrigeration and Kitchen and catering facilities on the previous page apply to the following
refrigeration equipment (where present):
Cold storage
The criteria do apply to commercial kitchen refrigeration but not to other commercial or industrial sized
refrigeration and storage systems. These systems are covered within the scope of Ene 05 Energy efficient cold
storage on page cxcvii and should be removed from the list of unregulated loads with respect to this issue.
Laboratory systems
This issue does not apply to laboratory ducted fume cupboards. These systems are covered within the scope of
Ene 07 Energy efficient laboratory systems on page ccviii and should be removed from the list of unregulated
loads with respect to this issue.
Reuse of equipment
Reuse of electrical equipment does not comply by default, as it may not be the most energy efficient option.
However, the credit could be awarded if either of the following criteria are demonstrated:
1. The existing electrical appliances meet the criteria for inclusion on the Enhanced Capital Allowance Scheme
Energy Technology Product List (157).
2. Reusing the old equipment would, over the course of its life, be a more energy efficient option than
specifying new equipment.
Evidence
Definitions
Data centre
For the purpose of this BREEAM issue, the term ‘data centres’ includes all buildings, facilities and rooms which
contain enterprise servers, server communication equipment, cooling equipment and power equipment, and
may provide some form of data service (e.g. large-scale mission critical facilities all the way down to small server
rooms located in office buildings).
Ene 08 Energy efficient equipment ccxxi
IT-intensive areas
These include computer areas where more than one computer per 5m²is provided, e.g. training suites, design
studios, libraries’ IT areas and other areas with a high density of computing devices.
Regulated energy
Building energy consumption resulting from the specification of a controlled, fixed building services and fittings,
including space heating and cooling, hot water, ventilation and lighting.
Secure space
For self-contained dwellings this can be defined as an enclosed space only accessible to the residents of the
dwelling. For buildings with a communal drying space it is an enclosed space with a secure entrance, accessible to
the residents of the building only.
Unregulated energy
Building energy consumption resulting from a system or process that is not ‘controlled’, i.e. energy consumption
from systems in the building on which the building regulations do not impose a requirement. This may include
energy consumption from operational-related equipment, e.g. computers, servers, printers, laptops, mobile
fume cupboards, cooking, audio-visual equipment and other appliances etc.
Unlike the definition for Ene 01 Reduction of energy use and carbon emissions, for this issue, it does not include
energy consumption from systems integral to the building and its operation, e.g. commercial or industrial
refrigeration systems; lifts, escalators and other transport systems; and ducted fume cupboards; because they
are already assessed separately in issues Ene 05, Ene 06 and Ene 07 respectively.
White goods
Domestic appliances for example washing machines, fridges, freezers, fridge-freezers, tumble dryers, washer-
dryers.
Additional information
The following lists the building regulations relevant for the assessment of this issue specific to the country of the UK:
Transport
10% 9 12 14.5
Summary
This category encourages provision of and improved access to local amenities and to sustainable means of
transport, i.e. public transport and other alternative transport solutions for building users. The aim is to reward
locations and solutions that support reductions in car journeys and, therefore, congestion andCO2 emissions over
the life of the building.
Tra 01 Public transport accessibility Up to 5 credits
– Recognition for developments in proximity to good public transport networks, thereby helping to reduce
transport-related pollution and congestion.
Tra 02 Proximity to amenities Up to 2 credits
– Recognition of developments in close proximity of, and accessible to, local amenities which are likely to be
frequently required and used by building occupants.
Tra 03 Alternative modes of transport Up to 2 credits
– Provision of facilities to encourage travel using low carbon modes of transport and to minimise individual
journeys.
Tra 04 Maximum car parking capacity Up to 2 credits
Up to 5 Up to 5 Up to 5 Up to 5
Aim
To reduce the impacts of transport-related pollution and congestion by promoting the provision and use of public
transport.
Value
– Promotes the use of public transport
– Promotes the provision of bus services
tailored to the use of the building
– Reduces building users’ carbon footprint and
associated negative environmental impacts,
improving local air quality and reducing local
congestion
Context
Transport accounts for around a quarter of UK greenhouse gas emissions, significantly affecting air quality at the
roadside(158). Public transport offers a route to addressing transport-related greenhouse gas emissions and will
contribute towards the UK’s long term goal of reducing greenhouse gas emissions by at least 80%, compared to
1990 levels by 2050. The emissions from trains and buses can be up to eight times lower than car travel(159).
ccxxiv SD5078: BREEAM UK New Construction 2018 – Consultation draft
Furthermore we have all experienced poor access to public transport and traffic congestion, adding in some cases,
hours onto our travel times.
It is not only important to have capacity in our public transport, but also to ensure that the public transport is
accessible for all and operates at convenient times to meet our needs. The National Planning Policy Framework
places significant emphasis on sustainable transport options, stating that planning should “make the fullest
possible use of public transport, walking and cycling, and focus significant development in locations which are or
can be made sustainable”(160).
By reducing air pollution levels, the burden of disease from stroke, heart disease, lung cancer and both chronic and
acute respiratory diseases, including asthma, can be lessen.
Air pollution is estimated to cause 29,000 deaths each year and to reduce the life expectancy by 6 months on
overage in the UK, at a cost of £16 billion per year.
It also damages plants and animals, affecting biodiversity and crop yields(161).
While the role of strategic policies is key, the need to address this issues with careful planning and design remains
key to the creation of urban environments that are healthier and more pleasant to live.
Assessment scope
Assessment criteria
1.a: Distance (m) from the main building entrance to each compliant public transport node
1.b: Public transport type serving the compliant node, e.g. bus or rail;
1.c: Average number of services stopping per hour at each compliant node during the operating hours of the
building for a typical day, (see Table 34).
2 Use the BREEAM Tra01 calculator to calculate the AI and determine the BREEAM credits for the assessed
building.
Table 33 Credits available for each building type relating to the public transport AI score.
AI ≥ ≥ ≥ ≥ ≥ ≥
2 4 8 10 12 18
Building type BREEAM credits available
Offices, Industrial, Multi-residential, Other building transport 1 2 3 - - -
type 1
Preschool, School, Sixth Form 1 2 3 - - -
Retail, Law Court, Further Education College, Higher Education 1 2 3 3 4 5
type 1, Other building transport type 2
Higher Education type 2 1 2 3 4 5 -
Healthcare - Hospitals (Acute, Specialist, Teaching, Mental 1 2 3 3 4 5
health)
Healthcare - GP surgery, Health centre, Community hospital 1 2 3 4 5 -
Rural location sensitive buildings. Other building transport 1 2 - - - -
type 3
Prison site, MOD site 1 2 - - - -
Transport hub 1 2 3 3 3 4
OR
3 For buildings with a fixed shift pattern, where users will predominantly arrive or depart at set times, e.g.
schools, offices, retail, factories, prisons etc., the building occupier commits to providing a dedicated bus
service to and from the building at the beginning and end of each shift or day.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
The methodology for calculating the AI uses Transport for London’s Public Transport Accessibility Level (PTAL)
method, itself based on a methodology developed in 1992 by the London Borough of Hammersmith and Fulham.
For a detailed description of the PTAL methodology see the 'Assessing transport connectivity in London'
document .
Multiple services
Services that operate from more than one node within proximity of the building, i.e. two separate bus stops served
by the same bus, must be considered only once - at the node in closest proximity to the building. Different services
at the same node can be considered as separate.
Bi-directional routes
Routes will be bi-directional; however for the purpose of calculating the index, consider only the direction with the
highest frequency (in accordance with the PTAL methodology).
If the site has more than one main entrance, either entrance can be used for the calculation.
Where less than 80% of the buildings are within 1000m of the campus' main entrance, the assessed building’s main
entrance must be used to determine the distance to a compliant node. This aims to encourage the location of
public transport nodes inside or on the periphery of the campuses.
Phased developments
New transport facilities provided at a later stage, as part of a large phased development, can be deemed to meet
the requirements on condition that:
A commitment has been made within the General Contract Specification or in the form of a Section 106
Agreement, to provide transport facilities within the shortest of the following periods:
1. The transport facilities will be available for use by the time 25% of all phases have been completed and are
ready for occupation. OR
2. The transport facilities will be available for use within 25% of the total build time for the phase in which the
assessed building forms a part, measured from the completion date of that phase.
Where the transport facilities will not be available for use within a period of five years from occupation of the
building, they cannot be considered for determining compliance with the BREEAM criteria.
ccxxviii SD5078: BREEAM UK New Construction 2018 – Consultation draft
Evidence
Definitions
Higher Education transport type 2: H.E. buildings located on a campus where 25% or more of the students are
resident on the campus or within 1km radius from the campus’ main entrance.
Other Building transport type 1: A building predominantly occupied by staff or employees with occasional
business related visitors.
Other Building transport type 2: A building occupied by a number of core staff or employees with a larger
number of consistently frequent visitors or users (either resident or non-resident).
Other Building transport type 3: As type 2, but building types specifically required to be located rurally as a result
of its function, i.e. a building which would never be located within an urban area, e.g. a National Park visitor centre
(see definition of rural and rural location sensitive buildings location).
Operating hours
BREEAM seeks to define the building’s accessibility to the public transport network for the period during which
the majority of building users will travel to and from the building. In most cases the normal operating hours of the
building can be used. Where shift patterns see the majority of building users (over 80%) arriving or leaving during
a certain period, for example an office building where the majority of office workers arrive between 8.00-10.00,
that period can be used as an alternative to the operating hours of the building. This accounts for some building
types that operate a 24 hour day and on a shift work basis. During what typically would be deemed unsociable
hours, and therefore periods where there is little if any public transport operating, such periods are not required
to be accounted for in the assessment of this issue. Where the assessed building operates on a 24-hour basis or
the operating hours are unknown at the time of assessment, then refer to and use the table of default operating
hours, which can be found in the additional information section of this issue.
Rural location
A rural location is defined in this context as a site clearly not within or on the boundary of a small, medium or large
urban cover. An urban cover will have a population of 3000 people or more, located within a tract of
continuously built-up urban land extending 20 hectares or more. Therefore, the definition of rural includes village
ccxxx SD5078: BREEAM UK New Construction 2018 – Consultation draft
locations, green field sites or small urban centres with a population of less 3000 people within a tract of land no
greater than 20 hectares. Such locations will most likely be on a local bus route to larger urban areas or other local
towns and may have local shops and other facilities. This classification is based on the Department of Transport
National Travel Survey definition, which specifies urban areas based on the extent of urban development
indicated on Ordnance Survey maps.
Typical day
The typical day is that which represents the period when travel to and from the building by its users and visitors
will be at its highest. For most buildings this should be taken as a mid-week day. In choosing a typical day the
assessor should check that timetabled information for that day is, within reason, representative of the public
transport provision for the entire operating week (excluding Sundays).
Additional information
None.
Tra 02 Proximity to amenities ccxxxi
Up to 2 Up to 2 Up to 2 Up to 2
Aim
To reward a building location and design solutions that facilitate easy access to local services, in this way helping to
avoid unnecessary environmental, social and economic impacts of longer building user journeys.
Value
– Helps to reduce the need for travel,
reducing building users’ carbon footprint,
travelling time and costs
– Improves health and wellbeing by
encouraging use of more active means of
travel, reducing staff down time and costs to
society, i.e. sickness and health costs, etc
– Enhances the viability of local services and
amenities, which benefit both business and
community more generally
– Enhances attractiveness to tenants and
occupants, hence staff recruitment and
retention benefits, etc
– Promotes community cohesion,
engagement and sense of place
Context
The growing focus on out of edge of town developments in the commercial and retail sectors especially, is
increasing the dependency on private travel point. This fragments the provision of local services and amenities,
resulting in a significant increase in short distance travel, often by private transport.
ccxxxii SD5078: BREEAM UK New Construction 2018 – Consultation draft
New developments have the potential to enhance the viability of local services and amenities that benefit both
businesses and the wider community or society.
Assessment scope
Assessment criteria
Up to two credits
With reference to the criteria in Table 35 below:
1 All Building Groups (BG), apart from BG 6, are located within the stated proximity of at least two core (C)
amenities.
2 Meet the remaining number of amenities required using any other applicable or core amenities.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
If the site has more than one main entrance, either entrance can be used for the calculation.
Where less than 80% of the buildings are within 1000m of the campus' main entrance, the assessed building’s
main entrance must be used to determine the distance to a compliant node. This aims to encourage the location of
public transport nodes inside or on the periphery of the campuses.
Evidence
Definitions
Accessible amenities
Amenities (as listed) that are accessible via safe pedestrian routes, e.g. pavements, paths and safe crossing
points or, where provided, dedicated pedestrian crossing points. The distance should not be measured in a
straight line, ‘as the crow flies’.
Community facility
An internal space that will facilitate community activities for the assessed building and its users. For example, for a
multi-residential building this could be a community hall or, for an office building, a public house.
Outdoor open space (public or private, suitably sized and accessible to building users)
A space that enables building users to take a break from internal building activities. For example, an office building
with space to sit outside for lunch. The space must be suitably sized for the building users associated with the
project and not form part of the public highway.
Additional information
None.
ccxxxvi SD5078: BREEAM UK New Construction 2018 – Consultation draft
Up to 2 Up to 2 Up to 2 Up to 2
Fully fitted Simple building Shell & core Shell only No Minimum standards
Aim
To encourage the use of low carbon transport modes through the provision of facilities and support mechanisms.
Value
– Promotes improvement of the local cycling
network and of public transport accessibility
to the site
– Cost savings for building users, compared
with maintaining and running a traditionally
fuelled car
– Encourages active travel, improving people’s
health and wellbeing
– Improves local air quality by encouraging
clean travel and reducing reliance on
traditionally fuelled car and individuals’ car
journeys (i.e. electric cars, cycling etc.)
Context
Provision of alternative sustainable transport options can play a critical role in allowing people to travel around their
local area while reducing associated congestion, carbon emissions and improving air quality. The government is
encouraging alternative means of sustainable transport. The Cycling Delivery Plan and the provision of grants for
‘plug in cars’(162) are examples of this. Statistics published by the Department for Transport showed that 5% of
people were considering buying an electric car or van(163). We need to ensure that the infrastructure is there to
support people in making the move to alternative sustainable transport.
>
Tra 03 Alternative modes of transport ccxxxvii
Assessment scope
A
Tra 03 Alternative modes of transport
Assessment criteria
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Tra 03 Alternative modes of transport ccxli
Methodology
Phased developments
New transport facilities provided at a later stage, as part of a large phased development, can be deemed to meet
the requirements on condition that:
A commitment has been made within the General Contract Specification or in the form of a Section 106
Agreement, to provide transport facilities within the shortest of the following periods:
1. The transport facilities will be available for use by the time 25% of all phases have been completed and are
ready for occupation. OR
2. The transport facilities will be available for use within 25% of the total build time for the phase in which the
assessed building forms a part, measured from the completion date of that phase.
Where the transport facilities will not be available for use within a period of five years from occupation of the
building, they cannot be considered for determining compliance with the BREEAM criteria.
Building types where the number of required showers or lockers is not based on cycle storage provision can reduce
the actual requirement for compliant showers or lockers by 50%.
This reduction cannot be combined with the sliding scale.
Rural locations
For sites in rural locations:
1. Where the distance to the nearest urban location is greater than 10 miles, the number of compliant cycle
spaces can be reduced by 50%.
2. Where the distance to the nearest urban location is greater than 20 miles, the number of compliant cycle
spaces can be reduced by 70%.
3. Where the distance to the nearest urban location is greater than 30 miles, the number of compliant cycle
spaces can be reduced by 90%.
The reduction will also reduce the requirement for compliant shower and lockers by the same margin for most
building types by default, since the calculation is based on the number of cycle storage spaces. Building types where
the number of required showers or lockers is not based on cycle storage provision can reduce the actual
requirement for compliant showers or lockers by 50%, 70% or 90% as appropriate.
This reduction cannot be applied in addition to the 50% reduction due to the building's Public Transport
Accessibility level (as described in Methodology).
ccxlii SD5078: BREEAM UK New Construction 2018 – Consultation draft
1. For buildings with more than 200 users but less than 300, the unit of measure can be increased by a ratio
of 1.5.
2. For buildings with more than 300 users but less than 400, the unit of measure can be increased by a ratio
of 2.
3. For buildings with more than 400 users, the unit of measure can be increased by a ratio of 2.5.
For example, an office building with 800 users would be required to provide the following number of cycle storage
spaces:
The sliding scale of compliance does not apply to the following building types: primary schools, multi-residential
buildings and MOD residential buildings.
Standalone approach
Cycle storage and associated facilities for the assessed building only:
Cyclists' storage:
– The number of cycle storage spaces is compliant based on the number of users in the assessed building. The
sliding scale of compliance can be used (where applicable) when determining the number of storage spaces
required.
– All storage spaces provided must be BREEAM compliant and these must be located within, or in close proximity
to the assessed building. Access arrangements, demarcation and positioning clearly associate the cycle storage
provided with the assessed building only.
Cyclists' facilities:
– All new and existing facilities may be included provided they are BREEAM compliant.
– Facilities should be located within the assessed building, or in an accessible adjacent building for the sole use of
the assessed building’s users.
Tra 03 Alternative modes of transport ccxliii
Site-wide approach
Cycle storage and associated facilities accessible to users of the entire site, or where there is a distinct group of local
buildings within a site that would share facilities:
Cyclists' storage:
– The number of cycle storage spaces is compliant based on the number of users on site or within a group of local
buildings. The sliding scale of compliance can be used (where applicable) when determining the number of
storage spaces required.
– All new storage spaces must be BREEAM compliant. Existing storage spaces may also be counted, provided they
allow bikes to be easily stored and accessed with the ability to be locked securely against a fixed structure.
Cyclists' facilities:
– The number of compliant cyclists' facilities is based on the number of users on site who would be able to use
these facilities.
– Cyclists' facilities may be located anywhere on site. However, the total route that cyclists must take to access the
nearest cycle storage, cyclists' facilities and building entrances must be no greater than 500m via a safe and
convenient route. The distances should be measured from the first to the last point on the route. Where possible,
different types of cyclist facilities should be grouped together in designated areas for ease of access and use.
– All new and existing facilities may be included provided they are BREEAM compliant and conform to the 500m
requirement above.
Evidence
Definitions
visitor centre (see definition of rural and rural location sensitive buildings location).
1. Cycles can be secured within spaces in racks with overhead covering. The cycle racks are set in or fixed to
a permanent structure (building or hardstanding) or alternatively may be located in a locked structure
fixed to, or part of, a permanent structure with appropriate surveillance.
2. The distance between each cycle rack, and the cycle racks and other obstructions, e.g. a wall, allows
appropriate access to the cycle storage space for easy storage and access to bikes.
3. The storage facility or entrance to the facility is in a prominent site location that is visible to potential users
from either an occupied building or a main access to a building.
4. The cycle storage facility has adequate lighting; demonstrated by meeting the lighting criteria in BREEAM
issue Hea 01 Visual comfort on page lxxxix. The lighting must be controlled to avoid out-of-hours use
and operation during daylight hours, where there is sufficient daylight in or around the facility.
1. Appropriately sized for the number of users. The assessor uses their judgment on whether the changing
area is appropriately sized given the number of cycle storage spaces or showers provided.
2. Changing areas include adequate space and facilities to hang or store clothing and equipment while
changing or showering, e.g. bench seat or hooks.
3. Toilet or shower cubicles cannot be counted as changing facilities.
Compliant lockers
Compliant lockers are defined as those that meet the following:
1. The number of lockers is at least equal to the number of cycle spaces required.
2. Lockers are in or adjacent to compliant changing rooms, where provided.
3. The lockers are sized appropriately for the storage of a cyclist's equipment.
Compliant showers
Compliant showers are defined as those that meet the following:
1. Provision of one shower for every 10 cycle storage spaces, subject to a minimum provision of one
shower.
2. Any building providing eight showers or more complies regardless of the number of cycle storage
spaces provided.
3. Both male and female users must be catered for either separate showers within shared gender-specific
facilities (required provision split 50-50) or single shower cubicles and changing space for mixed use.
4. The showers do not need to be dedicated to cyclists and can be those shared with other users or uses.
Rural location
A rural location is defined in this context as a site clearly not within or on the boundary of a small, medium or large
urban cover. An urban cover will have a population of 3000 people or more, located within a tract of
continuously built-up urban land extending 20 hectares or more. Therefore, the definition of rural includes village
locations, green field sites or small urban centres with a population of less 3000 people within a tract of land no
greater than 20 hectares. Such locations will most likely be on a local bus route to larger urban areas or other local
towns and may have local shops and other facilities. This classification is based on the Department of Transport
National Travel Survey definition, which specifies urban areas based on the extent of urban development
indicated on Ordnance Survey maps.
Additional information
None.
ccxlvi SD5078: BREEAM UK New Construction 2018 – Consultation draft
Up to 2 Not applicable Up to 2 Up to 2
Fully fitted Simple building Shell & core Shell only No Minimum standards
Aim
To avoid excessive use of private cars by limiting car parking provision, thereby helping to reduce transport-related
emissions and traffic congestion associated with the building’s operation.
Value
– Reduced land requirements and
associated costs
– Improved safety and security around the
building or site
– Discourages reliance on the private car for
commuters by restricting the number of car
parking spaces provided
– Encourages the use of public transport for
sites located in the proximity of transport
links
– Reduces transport-related energy use,
congestion, noise pollution, carbon emissions
and traffic-related issues
– Encourages active travel, improving people’s
health
Context
Cities around the world are actively looking at ways of improving quality of life, air quality, congestion, etc. The use
of private cars is a key area that is being looked at. This is resulting in the consideration of increasingly stringent
policies relating to controls over private car use and the dependency on them. Future asset value is likely to be
impacted by the availability of alternative means of transport and their viability is dependent on the ease of private
car use. Reducing car parking provision is a key area being considered.
Tra 04 Maximum car parking capacity ccxlvii
While limiting car park provision for a development benefits building users’ health, on a larger scale it frees up space
for public space improvements and on-site amenity space with consequent benefits to occupant health, wellbeing
and satisfaction. It also challenges the perception that there is never enough parking, when the reality is different.
Assessment scope
Assessment criteria
Table 38 Credits available in Tra04. Maximum car parking capacity for different building types
Criteria Credits
Building's Accessibility Index <4 ≥4<8 ≥8
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
Exclusions
Parking spaces set aside for the following building users can be excluded provided these spaces are dedicated for
that use, i.e. sized accordingly with the appropriate signage or markings:
1. Disabled
2. Parent and baby
3. Motorbike
4. Car share
5. Operational
In the case of excluding car share spaces, the future building occupier will need to confirm they have an enforceable
car share policy.
1. Assess compliance on the basis of parking capacity for the whole development, accounting for all existing
and new users and parking spaces.
2. Assess compliance using a pro-rata of parking capacity to building users, e.g. if the assessed building is
occupied by 20% of the development’s total occupants, then attribute 20% of the total parking spaces to
the assessed building for the purpose of the assessment.
Evidence
Definitions
Building users
Where the term building users is referenced in this BREEAM issue it refers to the following, where relevant to the
building type:
Care homes
For the purpose of BREEAM, care homes are defined as those buildings which are legally required to register with
the Commission for Social Care Inspection by the Care Standards Act, 2000.
Tra 04 Maximum car parking capacity ccli
Rural location
A rural location is defined in this context as a site clearly not within or on the boundary of a small, medium or large
urban cover. An urban cover will have a population of 3000 people or more, located within a tract of
continuously built-up urban land extending 20 hectares or more. Therefore, the definition of rural includes village
locations, green field sites or small urban centres with a population of less 3000 people within a tract of land no
greater than 20 hectares. Such locations will most likely be on a local bus route to larger urban areas or other local
towns and may have local shops and other facilities. This classification is based on the Department of Transport
National Travel Survey definition, which specifies urban areas based on the extent of urban development
indicated on Ordnance Survey maps.
Sheltered housing
Sheltered housing falls within Class C3 of the Town and Country Planning (Use Classes) Order 1987, and can be
defined as self-contained accommodation, usually with an emergency alarm system, communal facilities and a
resident warden. This includes all sheltered housing defined as 'Category 1, 2, 2.5 and 3' in accordance with the
1969 Ministry of Housing and Local Government Circular 82/69 and Local Authority Guidelines.
Additional information
Building type and function area Occupant Building type and function area Occupant density
density
(staffed)
Small workshop or category lab 0.068 Hall, lecture theatre or 0.183
space assembly area
Industrial Eating and drinking area 0.141
Food preparation area 0.213 Workshop - small-scale 0.048
Industrial process area 0.022 Laundry 0.086
Laboratory 0.107 Classroom 0.183
Reception 0.110 Office and consulting areas 0.093
Warehouse storage 0.009 Food preparation area 0.111
Generic office area 0.108 Libraries, museums, galleries
Hospitals, care homes Reception 0.095
Reception 0.152 Food preparation area 0.176
Post mortem facility 0.050 Hall, lecture theatre or 0.150
assembly area
Food preparation area 0.161 Laboratory 0.098
Physiotherapy studio 0.200 Workshop - small-scale 0.062
Bedroom unit 0.105 Display and public areas 0.150
Laundry 0.117 Generic office area 0.099
24-hours consulting or 0.000 General assembly and leisure, clubs, theatres
treatment areas
Assembly areas or halls 1.000 Dry sports hall 0.047
Hydrotherapy pool hall 0.100 Fitness studio 0.132
Industrial process area 0.124 Fitness suite or gym 0.170
Laboratory 0.080 Food preparation area 0.131
Operating theatre 0.125 Hall, lecture theatre or 0.175
assembly area
Classroom 1.000 Auditoria 0.341
Diagnostic imaging 0.100 Ice rink 0.225
Generic ward 0.175 Performance area (stage) 0.049
Office and consulting areas 0.195 Public circulation areas 0.241
Primary healthcare Reception 0.126
Reception 0.11 Sales area - general 0.102
Office and consulting areas 0.082 Swimming pool 0.163
Further and higher education Workshop - small-scale 0.067
Residents bedroom 0.120 Generic office area 0.116
Classroom 0.203 Display area 0.001
Food preparation area 0.096 Community or day centres
Hall, lecture theatre or 0.202 Reception 0.108
assembly area
Computer laboratory 0.231 Dry sports hall 0.047
Laboratory 0.106 Food preparation area 0.143
Laundry 0.105 Workshop - small scale 0.064
Reception 0.112 Hall, lecture theatre or 0.169
assembly area
Workshop - small scale 0.068 Office and consulting areas 0.106
Office and consulting areas 0.098 Other spaces and buildings
Hotels Data centre 0.096
Bedroom 0.094 Server room 0.096
Food preparation area 0.108 Heavy plant room 0.096
Tra 04 Maximum car parking capacity ccliii
Building type and function area Occupant Building type and function area Occupant density
density
Reception 0.105
Generic office area 0.106
1 Not applicable 1 1
Fully fitted Simple building Shell & core Shell only No Minimum standards
Aim
To minimise the environmental, economic and social impacts of transport use in operation through careful design
and the preparation of information to aid the ongoing management of the building and its occupants.
Value
– Promotes the implementation of travel
solutions that are relevant to the challenges
and opportunities of a specific site
– Raise awareness, understanding and
accessibility of travel options, allowing for
affordable access to services
– Encourages more sustainable modes of
transport and movement of people and
goods to and around the site
– Allows designers to take account of the
travel needs of future occupants, thus
allowing for better management in
operation
– Reduced congestion and improved safety of
the site and local roads
– Increased attractiveness of the site to
potential users
Context
The National Planning Practice Guidance indicates that travel plans should be considered in parallel to development
proposals and that they should be integrated into the design of a new site.
Tra 05 Travel plan cclv
Based on evidence of the anticipated transport impacts of new developments, Travel Plans are a long-term
management strategy for implementing the mitigating measures addressed by the Transport Assessments or
Statements.
While they are not meant to unrealistically penalise drivers and impact negatively on the local street network, they
intend to promote sustainable and active travel. Their purpose is to deliver transport and transport-related
benefits to the development itself but also to the wider community(164). As they include a package of actions
designed to address the needs of the users in that local area, effective but unpopular solutions, such as parking
restrictions, can be combined with popular but expensive solutions, such as bus subsidies, to ensure that the
negative impacts are neutralised by the benefits.
The transport tools proposed by the Travel Plan are user-focused and ensure the increase and improvement of
travel choices to the users, cost savings and improved company image and staff health and wellbeing.
Assessment scope
Assessment criteria
One credit
1 Develop a travel plan during the feasibility and design stages.
2 Produce a site-specific travel assessment or statement for the particular site covering, as a minimum:
2.a: Existing travel patterns and opinions of existing building or site users towards cycling and walking
identifying constraints and opportunities , if relevant.
2.c: Current local environment for walkers and cyclists (accounting for visitors who may be accompanied by
young children).
2.d: Disabled access (accounting for varying levels of disability and visual impairment).
3 Includes a package of measures in the travel plan to encourage the use of sustainable modes of transport and
movement of people and goods during the building's operation and use.
4 Involve the occupier, if known, in the development of the travel plan and confirm they will implement it post-
construction with in-use operational support from the building's management .
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
Evidence
Definitions
Travel plan
A travel plan is a strategy for managing all travel and transport within an organisation, principally to increase
choice and reduce reliance on the car by seeking to improve access to a site or development by sustainable
modes of transport. A travel plan contains both physical and behavioural measures to increase travel choices and
reduce reliance on single occupancy car travel.
Building users
Where the term 'building users' is used, this refers to the following, as appropriate to building type:
Additional information
None.
Water cclix
Water
7% 4.5% 4% 2%
Summary
This category encourages sustainable water use in the operation of the building and its site. Issues in this section
focus on identifying means of reducing potable water consumption (internal and external) over the lifetime of the
building and minimising losses through leakage.
Wat 01 Water consumption min standards 5 credits
– Reducing the demand for potable water through the provision of efficient sanitary fittings, rainwater collection
and water recycling systems.
Wat 02 Water monitoring min standards 1 credit
– Specification of water meters to allow for management and monitoring of water use in the building. This
encourages reductions in water use by identifying areas of high usage and investigating potential causes.
Wat 03 Water leak detection 2 credits
– Reducing the unintended water consumption due to leaks by installing leak detection systems and flow control
devices.
Wat 04 Water efficient equipment 1 credit
– Reducing water consumption for non-domestic scale, non-sanitary water uses by specifying efficient systems
and improving the design efficiency of any water-using processes.
cclx SD5078: BREEAM UK New Construction 2018 – Consultation draft
5 5 5 Not applicable
Fully fitted Simple building Shell & core Shell only Minimum standards
Aim
To reduce the consumption of potable water for sanitary use in new buildings through the use of water efficient
components and water recycling systems.
Value
– Improving water efficiency and reducing
cost related to water consumption in use.
– Reducing potable water use so helping to
conserve stretched water reserves at times
of shortage.
– Reducing water industry greenhouse gas
emissions, pollution impacts and associated
costs on a national level.
Context
In England (165) the average person uses about 150 litres of water a day for a range of uses including sanitation,
where significant savings are possible. Given that climate projections forecast half as much rainfall in summer in the
South East of England by 2080, it is important to build water efficiency in to our building stock and minimise the
need for major infrastructure enhancements to meet these pressures as well as growing demands. Under these
scenarios and with the expected high population growth, unless adaptation interventions are made, deficits are
Wat 01 Water consumption cclxi
expected to be already widespread by the 2050s. The UK is expected to be in deficit by up to 16% of the total
water demand in the 2050s and of up to 29% in the 2080s leading to major impacts on cost and resource levels
(166).
Assessment scope
If the developer is not installing some of these, use the baseline values for any unknown
components.
All water-consuming components and greywater or rainwater systems specified and installed by
the developer are assessed.
Components not listed above and located within tenant areas that are not specified by the
developer, but will be specified by the tenant, do not need to be assessed.
In cases where the end client is known and they make a commitment to specify and install specific
water-consuming components, assess the issue based on the relevant information.
1.1 Where components are not specified and installed by the developer but by the tenant, the
minimum standard will not prevent the assessment from achieving a BREEAM rating.
1.2 Minimum standard is not applicable.
Building type specific
2.0 Healthcare Components in clinical areas may be omitted. Clinical areas refer to all areas with a
scrub-up trough, clinical sink or clinical basin. This is not an exhaustive list and guidance should always
be sought from the appropriate professional, to ascertain areas of exemption specific to infection
control and other considerations. Appropriate professionals could include a health authorities
infection control officer or a client infection control representative or equivalent.
Although exempt, HTM 07-04 (167) contains guidance on water savings from medical-related
activities. Furthermore, in some cases, the use of water efficient fittings and appliances may not be
appropriate to the needs of the patient, and inappropriate specification may adversely affect the
incidence and propagation of infections. In such instances, the assessor will need to confirm with
BRE Global whether components from the relevant building areas are exempt. The design team
should also consult NHS guidelines concerning appropriate selection of sanitary fittings and fixtures
and the control of Legionella.
cclxii SD5078: BREEAM UK New Construction 2018 – Consultation draft
Wat 01 Waterconsumption
Assessment criteria
Up to five credits
1 Use the BREEAM Wat 01 calculator to assess the efficiency of the domestic water-consuming components.
2 Use the standard Wat 01 method (seeMethodology on the facing page) to compare the water consumption
(L/person/day) for the assessed building against a baseline performance. Award BREEAM credits based upon
Table 40 below. Where it is not possible to use the standard method, complete the assessment using the
alternative Wat 01 method (seeMethodology on the facing page).
Table 40 BREEAM Credits available for percentage improvement over baseline building water consumption
No. of BREEAM credits % improvement
1 12.5%
2 25%
3 40%
4 50%
5 55%
1 Exemplary performance credit 65%
For some building types an alternative approach to compliance must be used to award credits (for further
information please refer to Methodology on the facing page and the BREEAM Wat 01 calculator).
3 If a greywater or rainwater system (seeDefinitions on page cclxix) is specified, use its yield in L/person/day to
offsetpotable water demand from components.
4.a: Greywater systems in compliance with BS 8525-1:2010 Greywater Systems - Part 1 Code of Practice(168).
4.b: Rainwater systems in compliance with BS 8515:2009+A1:2013 Rainwater Harvesting Systems - Code of
practice(169).
8 The water consumption (L/person/day) for the assessed building achieves the 65% improvement described
as exemplary performance in Table 40 above.
Wat 01 Waterconsumption cclxiii
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
Include the efficiency of the following domestic scale water-consuming components (where specified):
– WCs
– Urinals
– Taps (wash-hand basins and, where specified, kitchen taps and waste disposal unit)
– Showers
– Baths
– Dishwashers (domestic and commercial-sized)
– Washing machines (domestic and commercial or industrial sized).
The BREEAM Wat 01 calculator defines the building types and activity areas for which the above components must
be assessed.
Use one of the following methods to determine the building's water efficient performance:
OR
The baseline component specification is equivalent to the water efficiency of industry standard components (see
Table 42 on page cclxv), steered by the minimum levels required by the Water Supply (Water Fittings) Regulations
(170) and Part G of the Building Regulations(171). The BREEAM percentage improvement benchmarks are based on
progressively more efficient standards and product market availability for water-consuming components. For the
higher levels of performance, the specification of greywater and rainwater systems is required.
The standard approach is the default method for calculating the water efficiency of the assessed building. It is used
for most of the common building types, where usage data are available. For building types where usage data are
not available, the standard approach cannot be used, an alternative approach to compliance must be used
(described below). Refer to the BREEAM Wat 01 calculator for the building types which can currently be assessed
using the standard approach.
1. Use the list of applicable domestic scale water-consuming components and determine those that are
specified or present in the assessed building.
2. Use the actual specification for each component type to complete the 'Other building type calculator'
worksheet of the BREEAM Wat 01 calculator. Table 42 on the facing page defines the levels of
performance for each component type. The volumes quoted are maximum values for each level but the
greywater or rainwater system % is a minimum for the '% of WC or urinal flushing demand met using
recycled non-potable water’ .
3. Weightings applied in the calculator are:
a. building type specific weightings to each component level to reflect its ‘in-use’ consumption relative to
the other components present. A component with high ‘in-use’ water consumption has a higher
weighting than one with lower ‘in-use’ consumption and therefore makes a relatively larger contribution
to the building’s overall level of performance .
b. derived from data on actual water consumption per day from non-domestic buildings, sourced from
BNWAT22 (172). These are in the BREEAM Wat 01 calculator.
4. Based upon the performance level of each component type and the component weighting, the calculator
determines an overall level of performance and awards the relevant number of BREEAM credits, see Table
41 below:
1. An exemplary performance credit is awarded where the component specification achieves level 5 and >
95% of WC or urinal flushing demand is met using recycled non-potable water.
2. Achieving a specific overall component level does not necessarily mean that an equivalent number of
credits is awarded. The levels are not directly linked to the improvement percentages and the greywater
and rainwater levels achieved also have an influence.
3. Due to the use of the weightings, the overall component level achieved is not necessarily a whole number.
Where this is the case the methodology always rounds down to the nearest component level and
therefore BREEAM credits level, e.g. if the component specification achieved is 3.6 credits, the actual
number of credits awarded is 3 credits (the methodology does not round up to 4 credits because the
performance specification for 4 credits has not been achieved).
4. Where the assessed building development has multiple specifications for the same water-consuming
component type, the number of fittings and component level achieved for each specification is entered in
the 'Other building type calculator'. Using this information, the calculator determines the building’s
aggregated performance level for that component type.
While attempts have been made to align the benchmarking of both the standard and alternative methodologies,
performance is determined in different ways. The number of BREEAM credits awarded by each method could
differ for the same water component specification. This could lead to variation in the credits achieved when
applying BREEAM New Construction to a number of different building types that form a part of the same overall
development.
Component type
Table 42 outlines the consumption performance levels, by component type, used in BREEAM. These levels of
efficiency have been steered by a range of published sources of information(173) and reflect robust levels of
typical, good, best and exemplary practice.
Wat 01 Waterconsumption cclxv
Specifying components for a building in accordance with the above levels might result in the corresponding
number of BREEAM credits being achieved. However, the component specifications above are akin to thresholds
between each level. Therefore caution should be exercised when defining a component specification for a BREEAM-
assessed building using exactly the same levels as the threshold levels. It is recommended that, where Wat 01
credits are targeted, the performance of a particular building’s component specification is verified using the
BREEAM Wat 01 calculator before committing to a particular specification and ordering or installing components.
This will provide greater assurance that the component specification achieves the targeted number of BREEAM
credits.
Taps Flow rate of each tap, at full flow rate in litres per minute measured at a dynamic
pressure:
For high pressure (Type 1) taps 3± 0.2 bar (0.3 ± 0.02 MPa)
OR
For low pressure (Type 2) taps 0.1 ± 0.02 bar (0.01 ± 0.002 MPa)
(BS EN 200:2008, sanitary tapware, single taps and combination taps for supply
systems of type 1 and 2. General technical specifications)
This includes any reductions achieved with flow restrictions.
Showers Flow rate of each shower at the outlet using cold water (T 30˚C), in litres per minute
measured at a dynamic pressure:
3 ± 0.2 bar (0.3 ± 0.02 MPa) for high pressure (Type 1) supply systems
OR
0.1 ± 0.05 bar (0.01 ± 0.005 MPa) for low pressure (Type 2) supply systems (BS EN
1112:2008 (174)).
Kitchen taps Maximum flow rate litres/minute.
Baths Capacity to overflow in litres. Taps on baths should not be included in the calculation, as
the water consumption from bath taps is taken into account in the use factor for baths.
The calculation of water consumption for baths assumes 40% of the capacity to the
overflow. This is to reflect that:
1. Users tend not to fill the bath to overflow; and
2. The displacement effect the user has on the actual volume of water required
for a bath.
Dishwasher Litres/cycle for domestic applications or appliances or litres/rack for commercial
applications or appliances.
Washing machine Litres/use for domestic applications (for a typical wash cycle) or appliances or litres/kg
for commercial applications or appliances, e.g. in hotels.
Waste disposal Flow rate in litres/minute.
unit
Where greywater or rainwater systems are specified, a minimum level of component efficiency must be achieved to
award 4 or 5 BREEAM credits and the exemplary level credit. This is to avoid awarding a higher number of BREEAM
credits where performance from less efficient fittings is offset by the specification of a greywater or rainwater
collection system.
The intention behind this, is to ensure demand reduction is prioritised before offsetting consumption. Where a
greywater or rainwater system is specified or installed, the component specification must achieve at least a 25%
percentage reduction in water consumption (over the baseline specification) equivalent to 2 credits. Where this level
is achieved, the total water demand met by greywater or rainwater sources can contribute to the overall
percentage improvement required to achieve BREEAM credits. If this minimum is not achieved, the percentage of
greywater or rainwater allowable will be equivalent to the percentage improvement in water consumption
achieved for the component specification, i.e. percentage improvement on baseline performance.
For example, if a 20% improvement only is achieved, and therefore the building does not meet the 25%
requirement, only 20% of the water demand met via greywater or rainwater sources can be used to offset water
consumption from the micro-components. This minimum requirement does not apply where only 1, 2 or 3 credits
are sought or where no greywater or rainwater system is specified, i.e. percentage improvement is based solely on
the water efficiency of the micro-component specification.
BRE Global may allow some exemptions to this rule in instances where a particular fitting type requires a high flow
rate due to specialised end user requirements, and its specification prevents compliance with the 25%
improvement.
Determine the building’s total water consumption performance by carrying out separate assessments for each
relevant activity area or building type. On completion of all the individual assessments, the assessor will need to
determine the percentage improvement as follows:
Where greywater or rainwater systems are specified, the assessor should take care to avoid unintended double
counting of the yield from such systems and use it to offset demand for each activity area or building type.
No fittings present
Where a project under assessment contains none of the specified components, identify in the assessment the
facilities most likely to be used by the occupants and visitors of the assessed building (e.g. specific facilities provided
in a nearby accessible building). Conduct the calculations based on the performance specification of the
components in those nearby facilities.
This rule also applies where a project under assessment consists solely of an extension to an existing building, i.e.
where the extended building contains no new sanitary facilities because there are facilities present within the
existing building.
cclxviii SD5078: BREEAM UK New Construction 2018 – Consultation draft
If a tap runs for less than 20 seconds per activation, assume it will be activated twice per person for the timed
duration. For example, for a tap with a flow rate of 9 litres/min and a 15 second usage duration, the water
consumed per person would be: 9 x 15/60 x 2 = 4.5 litres/min.
If a tap runs for 20 seconds or more per activation, assume one activation per person for the timed duration. For
example, for a tap with a flow rate of 9 litres/min and a 20 second usage duration, the water consumed per
person would be: 9 x 20/60 x 1 = 3 litres/min.
Step 2: Multiply the water consumption figure per person by 1.5 and enter this figure into the calculator tool.
Multiplying by 1.5 adjusts the consumption figure to compensate for the typical non-timed tap use of 40 seconds
that has already been taken into account in the tool. Taking the first example above, if we multiply 4.5 litres/min by
1.5 we get 6.75 litres/min. When this is used in the tool as the flow rate specification, the consumption is 4.57
L/person/day which more closely reflects the true level of water consumption for the push tap.
Evidence
Definitions
Clinical areas
Areas of the building in which medical functions are carried out that require specific restricted environmental
conditions such as humidity, daylighting, temperature, etc. (e.g. X-ray, operating department, delivery room, etc.).
– Non-domestic: {(6 litre x 1) + (4 litre x 3)}/4 = 4.5 litre effective flushing volume (for a 6/4 dual flush WC)
– Domestic: {(6 litre x 1) + (4 litre x 2)}/3 = 4.67 litre effective flushing volume (for a 6/4 dual flush WC)
The different ratio between non-domestic and domestic buildings reflects the different patterns of user
behaviour between these building types.
Where buildings have both, domestic and non-domestic function areas, conduct the calculations accordingly for
the WCs specified in the relevant spaces. For example, in a hotel building, for WCs in hotel rooms use the
'domestic' effective flush volume calculation and for WCs in staff areas use the 'non-domestic' calculation.
Greywater recycling
The appropriate collection, treatment and storage of domestic wastewater (which is defined as that discharged
from kitchens, baths or showers, laundry rooms and similar) to meet a non-potable water demand in the
building, e.g. WC flushing, or other permissible non-potable use on the site of the assessed building.
Potable water
Water suitable for human consumption that meets the requirements of Section 67 (Standards of
Wholesomeness) of the Water Industry Act 1991 (177) is referred to as 'wholesome water'.
Non-potable water
Any water other than potable water, also referred to as unwholesome water (BS 8525).
Rainwater recycling
The appropriate collection and storage of rainwater run-off from hard outdoor surfaces to meet a non-potable
water demand in the building, e.g. WC flushing, or other permissible non-potable use on the site of the assessed
building.
Volume controller
An automatic control device used to turn off the water supply once the maximum preset volume is reached
within a defined period.
Additional information
Useful guidance
The following list of documents may be useful:
– BRE Global. SD129: Certification and Listing of Low Flush WC appliances. 2008.
– BS 6465-3:2006. Sanitary installations. Code of practice for the selection, installation and maintenance of
sanitary and associated appliances. BSI; 2006.
– Communities and Local Government. Waterwise: Water Efficiency Calculator for New Dwellings [Internet]. 2009.
Available from: www.waterwise.org.uk
– Entec UK Limited. BD 2683: Assessing the costs and benefits of improvements to the water efficiency of new
non-household buildings - Final research report. Department for Communities and Local Government; 2010.
– Environment Agency. Conserving water in buildings, a practical guide. 2007.
Wat 01 Waterconsumption cclxxi
– Market Transformation Programme. BNWAT07: Baths - water efficiency performance tests (version 2.0). 2007.
– Market Transformation Programme. BNWAT23: Reliability of information on water consumption of appliances
(version 1). 2007.
– Market Transformation Programme. Sustainable Products 2006: Policy Analysis and Projections. Defra; 2006.
– Waggett R, Arotsky C. CIRIA W10 Key Performance Indicators for water use in hotels. CIRIA; 2006.
– Waggett R, Arotsky C. CIRIA W11 Key Performance Indicators for water use in offices. CIRIA; 2006.
– Water UK. Waste macerators - the impact on sewers: 2009.
– BRE Global. SD175: Certification and Listing of Water Efficient Baths. 2008.
– Water efficient product labelling scheme: www.water-efficiencylabel.org.uk
cclxxii SD5078: BREEAM UK New Construction 2018 – Consultation draft
1 1 1 1
Fully fitted Simple building Shell & core Shell only Minimum standards
Aim
To reduce the consumption of potable water in new buildings through the effective management and monitoring
of water consumption.
Value
– Increasing awareness of water usage
within the building.
– Identifying and monitoring large water uses
and changed consumption levels to improve
management and maintenance as well as to
encourage reductions in unnecessary
consumption.
– Reducing costs related to water
consumption.
– Managing water demand for different
building areas and uses.
– Reducing the need for large scale increases in
water infrastructure in the future which are
likely to increase costs over time as well as
impact on our rural and urban landscapes
and communities.
Context
Due to our increasing population densities and relatively high levels of water consumption, much of the UK is at risk
of water shortages which are likely to increase over time as rainfall patterns change as a result of a changing
climate. Reducing water consumption in the UK is, therefore, crucial.
Wat 02 Water monitoring cclxxiii
Sub-metering water consumption means that water consumption can be better accounted for. Large water
consumers can be identified with the aim to encourage the reduction of water use where practical. Moreover,
changes in consumption can be identified and dealt with as appropriate, minimising risks of systems failures which
can have costly and disruptive consequences.
Assessment scope
Assessment criteria
One credit
1 Specify a water meter on the mains water supply to each building. This includes instances where water is
supplied via a borehole or other private source.
2 For water-consuming plant or building areas consuming 10% or more of the building’s total water demand:
OR
AND
3.b: connect it to an appropriate utility monitoring and management system, e.g. a building management
system (BMS), for the monitoring of water consumption. If there is no BMS system in operation at Post-
Construction stage, award credits provided that the system used enables connection when the BMS
becomes operational.
4 In buildings with swimming pools, fit separate sub-meters on the water supply of the swimming pool and its
associated changing facilities (toilets, showers etc.) irrespective of their water consumption levels.
5 In buildings containing laboratories, fit a separate water meter on the water supply to any process or cooling
loop for ‘plumbed-in’ laboratory process equipment, irrespective of their water consumption levels.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
On sites with multiple units or buildings, e.g. shopping centres, industrial units, retail parks etc. fit separate sub
meters on the water supply to the following areas (where present):
– Service areas (covering the supply to outlets within storage, delivery, waste disposal areas etc.)
– Ancillary or separate buildings to the main development with water supply.
If no new water supply is installed, identify in the assessment the facilities most likely to be used by the occupants
and visitors of the assessed building (e.g. specific facilities provided in a nearby accessible building). In this case,
provide the following in this building:
The meters provided must have a pulsed output or connection to existing BMS in accordance with the assessment
criteria.
Where the assessor confirms there is no additional monitoring benefit resulting from the installation of sub-meters,
the requirement does not apply in the following cases:
– The building has only one or two small sources of water demand (e.g. an office with sanitary fittings and a small
kitchen).
– The building has two sources of water demand, one significantly larger than the other, and the water
consumption for the larger demand is likely to mask the smaller one.
Evidence
Definitions
Clinical areas
Areas of the building in which medical functions are carried out that require specific restricted environmental
conditions such as humidity, daylighting, temperature, etc. (e.g. X-ray, operating department, delivery room, etc.).
Meter outputs
Examples include pulsed outputs and other open protocol communication outputs, such as Modbus.
Patient areas
Areas of the building used mainly by inpatients (e.g. wards, dayrooms, etc.).
cclxxvi SD5078: BREEAM UK New Construction 2018 – Consultation draft
Staff areas
Areas of the building used mainly by staff (e.g. offices, meeting rooms, staff rooms) and medical areas where
patients are admitted but that do not require restricted environmental conditions (e.g. consulting rooms,
physiotherapy, etc.).
Additional information
None
Wat 03 Water leak detection cclxxvii
2 2 2 2
No Minimum standards
Aim
To reduce the consumption of potable water in new buildings through minimising wastage due to water leaks.
Value
– Reducing potable water wastage
associated with leaks.
– Minimising damage, costs and disruption
arising from water leaks.
– Reducing costs related to water
consumption.
Context
Water leakage within customers’ properties represents 6% of the total public water supply in England and Wales
(178). This is equivalent to 25% of the total water leakage, with the rest being attributed to water distribution
systems of the supply companies. Water leaks in building systems are responsible for major damage to property
resulting in major disruption and costs. It is, therefore, important to ensure that water leaks are detected and
controlled on a building level as early as possible.
cclxxviii SD5078: BREEAM UK New Construction 2018 – Consultation draft
Assessment scope
Assessment criteria
1.a: On the utilities water supply within the buildings, to detect any major leaks within the buildings.
AND
1.b: Between the buildings and the utilities water supply, to detect any major leaks between the utilities supply
and the buildings under assessment.
2.a: A permanent automated water leak detection system that alerts the building occupants to the leak OR an
inbuilt automated diagnostic procedure for detecting leaks.
2.b: Activated when the flow of water passing through the water meter or data logger is at a flow rate above
a pre-set maximum for a pre-set period of time. This usually involves installing a system which detects
higher than normal flow rates at meters or sub-meters. It does not necessarily require a system that
directly detects water leakage along part or the whole length of the water supply system.
2.c: Able to identify different flow and therefore leakage rates, e.g. continuous, high or low level, over set time
periods. Although high and low level leakage rates are not specified, the leak detection equipment
installed must have the flexibility to distinguish between different flow rates to enable it to be
programmed to suit the building type and owner's or occupier's usage patterns.
2.e: Where applicable, designed to avoid false alarms caused by normal operation of large water-consuming
plant such as chillers.
Where there is physically no space for a leak detection system between the utilities water meter and the building,
alternative solutions can be used, provided that a major leak can still be detected.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
cclxxx SD5078: BREEAM UK New Construction 2018 – Consultation draft
Methodology
The flow control criteria for this issue do apply to facilities which have only a single WC (potentially within smaller or
low occupancy buildings). In these instances shut-off could be provided via the same switch that controls the
lighting (whether proximity detection or a manual switch).
– A time controller, i.e. an automatic time switch device to switch off the water supply after a predetermined
interval
– A programmed time controller, i.e. an automatic time switch device to switch water on or off at predetermined
times.
– A volume controller, i.e. an automatic control device to turn off the water supply once the maximum pre-set
volume is reached
– A presence detector and controller, i.e. an automatic device that switches water on and off, depending on the
detection of occupancy or movement
– A central control unit, i.e. a dedicated computer-based control unit for the overall management of a water
control system, utilising some or all of the types of control elements listed above.
Where there is a utilities water meter at the site or building boundary, it may be necessary to install a separate flow
meter (or alternative measurement system) just after the utilities water meter to detect leaks. However, if the water
utilities company agrees to some form of leak detection being installed on their meter, this would also be
acceptable.
Wat 03 Water leak detection cclxxxi
Evidence
Definitions
Clinical areas
Areas of the building in which medical functions are carried out that require specific restricted environmental
conditions such as humidity, daylighting, temperature, etc. (e.g. X-ray, operating department, delivery room, etc.).
WC areas or facilities
WC areas or facilities refer to the cold water supply to taps, WCs and urinals. The water supply system must not
allow the cold water to automatically switch off in the showers while the hot water is still running to avoid hot-
water scalding.
Additional information
None
cclxxxii SD5078: BREEAM UK New Construction 2018 – Consultation draft
1 1 1 1
Aim
To reduce water consumption for uses not assessed under Wat 01 by encouraging specification of water efficient
equipment.
Value
– Reducing potable water use in high
consumption equipment and associated
energy consumption.
– Reducing costs related to water
consumption and water heating.
– Promoting innovation and manufacture of
more water efficient equipment.
Context
Water consumption associated to non-domestic scale, non-sanitary water uses can be very significant depending
on the building type and relevant uses. Industrial processes and other project-specific processes do not always
require water to be treated to potable quality. Therefore there is scope to adopt more imaginative solutions to
meeting this demand through alternative sources, reuse or recycling solutions which are often project-specific.
Wat 04 Water efficient equipment cclxxxiii
With the predicted higher climatic temperatures and drier summers, the need for irrigation is likely to increase in the
UK, impacting on our ability as a society to provide adequate water supplies at a reasonable cost.
Therefore, there is a need to address these types of water uses, encouraging reductions in potable water
consumption.
Assessment scope
Assessment criteria
One credit
1 Identify all water demands from uses other those listed under Wat 01 Water consumption �on page cclxthat
could be realistically mitigated or reduced. Where there is no water demand from uses other than domestic-
scale, sanitary use components in the building, this issue is not applicable.
2 Identify systems or processes to reduce the relevant water demand (criterion 1 above), and establish, through
either good practice design or specification, a demonstrable reduction in the total water demand of the
building.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
None.
Evidence
Definitions
– swimming pools
– recreational hot tubs and hydrotherapy pools
– equipment used for irrigation
– vehicle wash equipment
– project-specific industrial processes
– building services (e.g. boilers, cooling towers and humidification systems.
Vehicle wash
A commercial scale automatic, semi-automatic or manual system for washing vehicles. This includes wheel and
chassis wash, fixed gantry and screen wash systems using brushes, spray or handheld jet hoses.
Additional information
None.
cclxxxvi SD5078: BREEAM UK New Construction 2018 – Consultation draft
Materials
Summary
This category encourages decisions which reduce the environmental and social impact of construction products
used on a project. It takes a ‘whole life cycle’ approach to construction product impacts, encouraging consideration
of impacts during manufacture, design, procurement, installation, in-use and end-of-life. The issue focuses on
construction product efficiency, environmental impact, responsible sourcing and product durability.
Mat 01 Environmental impacts from construction products - Building life cycle assessment on
page 287
– Reducing buildings’ environmental life cycle impacts through conducting Life Cycle Analysis and integrating its
outcomes in the design decision-making process.
Mat 02 Environmental impacts from construction products on page 302 1 credit
– Encouraging the reduction of environmental life cycle impacts through rewarding the specification of products
with a recognised environmental product declaration. Encouraging the reduction of environmental life cycle
impacts through rewarding the specification of products with a recognised environmental product declaration.
4 credits
Mat 03 Responsible sourcing of materials on pagemin307standards
– Recognising and encouraging responsible sourcing of construction materials. This includes the source of
products and the intermediary companies processing and transport of the product to site.
Mat 05 Designing for durability and resilience on page 319 1 credit
– Increasing the lifespan of the building through designing for durability and protection from degradation and
specifying appropriate construction products.
Mat 06 Material efficiency on page 325
– Encouraging the reduction of environmental impacts through optimising the use of materials during all stages
of the project.
Mat 01 Environmental impacts from construction products - Building life cycle assessment 287
No Minimum standards
Aim
To reduce the burden on the environment from construction products by recognising and encouraging measures
to optimise construction product consumption efficiency and the selection of products with a low environmental
impact (including embodied carbon), over the life cycle of the building.
Value
– Help project teams to understand the
overall environmental impact of the building
design.
– Ensure that all life cycle greenhouse gas
emissions are taken into account in the
design, not just operational emissions.
– Reduce the impact of the construction
industry and construction product industries.
– Assess the environmental impacts at the
building level to provide flexibility when
specifying materials and components, to take
into account project specific conditions and
priorities.
– Allow optimal solutions to be identified and
adopted to reduce overall environmental
impacts arising from materials use.
Context
The use of construction materials leads to a wide range of environmental and social impacts across the life cycle
through initial procurement, wastage, maintenance and replacement. Taken together, construction products make
288 SD5078: BREEAM UK New Construction 2018 – Consultation draft
a highly significant contribution to the overall life cycle impacts of a building. In some cases they may even outweigh
operational impacts (such as energy consumption).
The introduction of Part L into the building regulations has led to reductions in the operational energy consumption
of buildings which are being progressively tightened. As a result, greenhouse gas emissions from other aspects of
buildings, such as embodied emissions, are becoming increasingly important in terms of reducing the overall
emissions, resulting from the procurement, maintenance and replacement of materials over the buildings life, that
lead to climate change.
In addition to climate change, there are several other embodied environmental impacts associated with
construction products and the processes that occur during and after construction that should be considered
during design, for example CSR and other regulatory obligations.
Assessment scope
Seven credits (see criteria 1 to 7) and three exemplary credits (see criteria 8 to 18) are available in this issue. Some
credits require preceding criteria to be fulfilled first.
Credits for building Life Cycle Assessment (LCA) of the superstructure (criteria 1 to 5) are awarded as a combined
total. Of these, credits for LCA benchmarking of the superstructure (criteria 1 to 2) are only applicable to offices,
industrial and retail buildings.
For other building types, the same number of credits are available for LCA options appraisal alone (criteria 3 to 5).
For further details, please see Table 44 on page 291.
1 During RIBA stage 2 ‘Concept design’, carry out a building LCA on of the superstructure design and compare
the results with the benchmark to demonstrate environmental impact performance, as follows :
1.a: Using either the BREEAM Simplified building LCA tool or an IMPACT Compliant LCA tool.
1.b: The scope of the assessment shall include the building elements indicated in Mat 01 Environmental
impacts from construction products - Building life cycle assessment �Assessment scope on page 288,
where present in the building.
1.c: The building LCA tool and LCA shall fulfil the quality requirements shown in Table 48 on page 297.
1.d: The results from the building LCA tool and other required information shall be entered into the Mat 01
Results Submission Tool. The Mat 01 Results Submission Tool will calculate the number of credits awarded.
1.e: The Mat 01 Results Submission Tool shall be submitted to BRE Global before the end of RIBA stage 2, and
before planning permission is applied for (that includes external material or product specifications).
2 At the end of RIBA stage 4 (technical design), using the same tool as used for the RIBA stage 2 submission,
update the building LCA of the superstructure design and recompare the results with the benchmark, as
follows:
2.b: The Mat 01 Results Submission Tool shall be submitted to BRE Global at the end of RIBA stage 4.
4 During RIBA stage 2 ‘Concept design’, carry out building LCA options appraisal of 2 to 4 significantly different
superstructure design options to identify reductions in environmental impacts, as follows:
4.a: Using a building LCA tool as defined in criterion 1.a or another building LCA tool recognised by BREEAM as
suitable for assessing superstructure at RIBA stage 2.
290 SD5078: BREEAM UK New Construction 2018 – Consultation draft
4.c: Each design option shall fulfil the same functional requirements by the client and statutory requirements
(to ensure functional equivalency).
4.d: The building LCA activity shall be integrated within the wider design decision-making process.
4.e: An LCA options appraisal report shall be produced by the project design team that enables the design
team and client to make better informed decisions on the different design options. The LCA options
appraisal report shall provide information on the environmental impacts of each design option along with
the effect, if any, on other relevant factors such as (but not necessarily limited to) capital cost and delivery
times (life cycle cost integration is rewarded by criteria 10 to 14). The LCA options appraisal report shall be
reviewed by the design team and client.
4.f: Prior to submission, the following shall be recorded in the Mat 01 Results Submission Tool. The differences
between the design options; the design option selected by the client to be progressed beyond the
current RIBA stage; the reasons for selecting it and the reasons for not selecting the other design options.
If the building LCA tool recognised by BREEAM used for criteria 3 to 7 (and 8 to 9, if pursued) is not an IMPACT
Compliant LCA tool and criteria 4 to 2 are applicable, then the BREEAM Simplified building LCA tool (or an IMPACT
Compliant LCA tool) shall be used for criteria 1 to 2.
5.a: Using either an IMPACT Compliant LCA tool or another building LCA tool recognised by BREEAM as
suitable for assessing superstructure at RIBA stage 4.
5.b: As criteria 4.b to 4.f. Where an options appraisal report was produced at RIBA stage 2, it is updated to
include the RIBA stage 4 design options.
7 During RIBA stage 2 ‘Concept design’, carry out building LCA options appraisal of a combined total of at least
6 significantly different substructure or hard landscaping design options (at least two shall be substructure
and at least two shall be hard landscaping) to identify reductions in environmental impacts, as follows:
7.a: Using a building LCA tool recognised by BREEAM as suitable for assessing substructure and hard
landscaping.
Hard landscaping that is within a defined curtilage of the building or is clearly more associated with it rather than
any other building shall be included. Hard landscaping with no such distinction shall be excluded.
9 During RIBA stage 2 ‘Concept design’, carry out building LCA options appraisal of at least 3 significantly
different core building services design options to identify reductions in environmental impacts, as follows:
Mat 01 Environmental impacts from construction products - Building life cycle assessment 291
9.a: Using a building LCA tool recognised by BREEAM as suitable for assessing core building services.
11 Achieve Elemental LCC plan and Component Level LCC options appraisal credits ( Man 02 Life cycle cost and
service life planning on page liv).
12 The design options appraised for criteria 3 to 4 (and 6 to 7 and 8 to 9, if pursued) at RIBA stage 2 are included
in the ‘elemental LCC plan’ in issue ‘Man 02 Life cycle cost and service life planning’.
13 The design options appraised for criteria 5 at RIBA stage 4 are included in the ‘Component level LCC option
appraisal’ in ( Man 02 Life cycle cost and service life planning on page liv).
14 The relevant cost information from the ‘elemental LCC plan’ and ‘Component level LCC option appraisal’ shall
be summarised in the LCA options appraisal report to enable the client and design team to make better
informed decisions at the relevant stages given in criteria 3 to 5 (and 6 to 7 and 8 to 9, if pursued).
16 A suitably qualified 3rd party (see Definitions on page 294) shall either carry out the building LCAs or produce a
report verifying the building LCAs accurately represent the designs under consideration at RIBA stages 2 and 4
with reference to the requirements of criteria 1 to 7 (and 8 to 14 if pursued).
17 For each LCA option, the report shall itemise the findings of the verification checks made by the suitably
qualified 3rd party including, as a minimum, the quality requirements show in Table 48 on page 297.
18 The report shall include details of their relevant skills and experience and a declaration of their 3rd party
independence from the project client and design team.
Credit Summary
Table 44 sets out the allocation of credits for the criteria above. The actual credits achieved in an assessment is
calculated by the Mat 01 Results Submission Tool.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
Building LCA comparison with the BREEAM benchmark and building LCA
option appraisal
Criteria 1 to 9.
Step 2: In the BREEAM Simplified building LCA tool, for the elements identified in step 1 only, select the elemental
construction description that is the most similar to the actual elemental construction. If an element has more than
one type of construction, then select an elemental construction for each type.
Step 3: For each of the elemental constructions, enter the total quantity in the building. Enter any further information
required by the tool. Ensure that the quality requirements are adhered to (see Table 48 on page 297).
Step 4: A total EcoPoint result is generated by the BREEAM Simplified building LCA tool.
Step 5: Enter the total BRE EN EcoPoints result into the Mat01 Results Submission Tool. Enter any further information
required by the tool. The Mat 01 Results Submission Tool will calculate the credit award for the building.
Method using an IMPACT Compliant LCA tool or another building LCA tool
recognised by BREEAM
Step 1: Identify the elements that form the building and are in scope, based on Mat 01 Environmental impacts from
construction products - Building life cycle assessment �Assessment scope on page 288.
Step 2: Using a building LCA tool that is recognised by BREEAM (see The Mat 01 Results Submission Tool), produce a
building LCA model. Ensure as a minimum that all the in -scope elements are included. Ensure that the quality
requirements are adhered to (see Table 48 on page 297).
Mat 01 Environmental impacts from construction products - Building life cycle assessment 293
Step 3: Obtain the LCA results for the building from the tool only for the in -scope elements. Enter the results into
the Mat 01 Results Submission Tool. Enter further information required by the tool including (but not necessarily
limited to) construction and product descriptions, quantities, service lives, transport distances, classifications and
justification for design decisions. The Mat 01 Results Submission Tool will calculate the credit award for the building.
Depending on the functionality of the building LCA tool, the information required may be readily exportable for
importing into the Mat 01 Results Submission Tool.
At Concept Design (RIBA stage 2), significantly different options are typically at the elemental construction level, for
example:
– For the majority of the element ‘1. External enclosing walls above ground floor level’, option ‘A’ has a timber
cladding external finish and option ‘B’ has cement render (each will likely have different substrates accordingly).
– For element ‘2. Superstructure/1. Frame’, option ‘A’ is a concrete based frame and option ‘B’ is a steel based
frame.
– For element ‘2. Superstructure/1. Frame’, option ‘A’ is a cast in-situ concrete based frame and option ‘B’ is a
precast concrete based frame.
– For ‘5. Central heating and cooling’, option ‘A’ is a refrigerant distribution based system and option ‘B’ is an air
distribution based system.
At Technical Design (RIBA stage 4), significantly different options are typically at the product level (within elemental
constructions established at RIBA stage 2), for example:
– For the element ‘1. External enclosing walls above ground floor level’, where both options have cement render
but ‘A’ is a different type of render from ‘B’.
– For the element ‘3. Roof’, option ‘A’ has a one type of insulation and option ‘B’ has another type of insulation.
– For ‘5. Central heating and cooling’, the pipework manufacturer for option ‘A’ is different from option ‘B’.
The Mat 01 Results Submission Tool contains functionality to assist in determining if the options are significantly
different.
Evidence
Definitions
BRE EN EcoPoints
BRE EN EcoPoints are an indicator that is made up of broad set of individual environmental indicators which are
then combined into a single value. For more information about BRE EN EcoPoints, visit www.bre.co.uk or contact
BRE.
Credit cap
The total number of credits that the tool can be awarded is less than the total number of credits available
because the tool is technically inferior to uncapped tools. For example, fewer environmental indicators are
reported or the requirements on data entered by the user are less detailed. The Mat01 Results Submission Tool
indicates which tools have a credit cap.
Functional requirements
The functional requirements are normally determined by the project client at RIBA stage 1 with the help of the
design team. They define the required functional properties such as the activities that the building will be used for,
usable floor area, design life, budget, sustainability targets etc. The functional requirements exclude any
requirements that only relate to visual or other non-functional preference.
If the client has not set formal functional requirements, the design team shall determine functional requirements
that reasonably serve the client’s needs as far as they are understood.
– Is a third party
– Has received training on using the building LCA tool that is recognised by the tool supplier, and has passed the
associated tests or exams (if any).
– Has completed building LCA for at least three projects for paying customers in the last two years.
– Is able to interpret construction documentation (drawings, specifications, schedules etc.), which may be
evidenced by a suitable construction related qualification or relevant experience.
Third party
A person or body that is recognised as being independent of the parties involved (parties involved are typically
a supplier (1st party) or purchaser (2nd party), as concerns the issue in question
Scope of assessment
The following tables indicates the level 3 sub-elements that shall be included in the scope of the building LCA.
Inclusion of the in scope sub-elements is necessary to ensure an appropriate level of comparability between
assessments. All other sub-elements shall be ignored for the purposes of the BREEAM LCA. For tables showing
sub-elements that shall be excluded see ‘Out of scope elements’ within ‘Additional Information’.
If a sub-element is not present in the building, it does not need to be included. If a particular sub-element appears
to be associated with more than one classification, the classification with the strongest association shall be used. If
a particular sub-element appears to be associated with an in scope classification and an out of scope classification,
it shall be classified under the in scope classification (and included in the assessment).
If the BREEAM Simplified building LCA tool is used, the constructions available in the tool may cover more than one
item identified in the tables below. A completed BREEAM Simplified building LCA tool (that includes one or more
constructions for each building element identified as present in the building) is compliant with these scope
requirements.
In addition, the table shows the classification codes that shall be used in the BREEAM Simplified building LCA tool,
based on the RICS New Rules of Measurement (NRM) classification system. For example, the code for ‘Standard
foundations’ is ‘1.1.1’.
2. Roof coverings
3. Specialist roof systems
4. Rooflights, skylights and openings
4. Stairs and ramps 1. Stair or ramp structures
5. External walls 1. External enclosing walls above ground
floor level
2. External enclosing walls below ground
level
3. Solar or rain screening
6. Windows and 1. External windows
external doors
7. Internal Walls and 1. Walls and partitions (Education only)
Partitions
Quality requirements
The LCA fulfils the following requirements at the relevant RIBA stage.
individual products.
Product transport Typical or generic values.
distances Project specific distances may
be used where known.
Product service lives A reasonable estimate for the
and site wastage actual installation scenario.
Adhesives Excluded if the adhesive is applied to less than Excluded if the adhesive is
20% of the product's surface applied to less than 20% of the
product's surface
Minor fixings (e.g. Excluded Excluded
brackets, nails, screws),
sealants and
ironmongery items
Study period 60 years 60 years
Results reported Results reported separately for each environmental indicator, for each EN
15978:2011 module as follows:
– Stage A: A1, A2 and A3 (may be combined).
– Stage B: Separately, each module possible in the building LCA tool (see
definition Building LCA tools recognised by BREEAM)
– Stage C: As stage B
In addition, the table shows classification codes based on the RICS New Rules of Measurement (NRM) classification
system. For example, the code for ‘Standard foundations’ is‘1.1.1’.
ceilings
4. Fittings, furnishings and 1. Fittings, furnishings and 1. General fittings,
equipment equipment furnishings and
equipment
2. Domestic kitchen fittings
and equipment
3. Special purpose fittings,
furnishings and
equipment
4. Signs or Notices
5. Works of art
6. Equipment
7. Internal planting
8. Bird and vermin control
8.Local air-conditioning
7. Ventilation 2. Local and special ventilation
8. Electrical Installations 1. Electrical mains and sub-mains
distribution
2. Power installations
3. Lighting installations
4. Specialist lighting installations
5. Local electricity generation systems
6. Earthing and bonding systems
10. Lift and Conveyor 1. Lifts and enclosed hoists
Installations or Systems 2. Escalators
3. Moving pavements
4. Powered stairlifts
5. Conveyors
6. Dock levellers and scissor lifts
7. Cranes and unenclosed hoists
8. Car lifts, car stacking systems,
turntables and the like
9. Document handling systems
10. Other transport systems
11. Fire and Lightning 1. Fire fighting systems
Protection 2. Fire suppression systems
3. Lightning protection
12. Communication, 1. Communication systems
Security and Control 2. Security systems
Systems 3. Central control or building
management systems
13. Special Installations or 1. Specialist piped supply installations
Systems 2. Specialist refrigeration systems
3. Other specialist mechanical
installations or systems
4. Specialist electrical or electronic
installations systems
5. Water features
14. Builder’s Work in 1. General builder’s work
Connection with
Services
8. External Works 6. External Drainage 1. Surface water and foul water drainage
2. Ancillary drainage systems
3. External chemical, toxic and industrial
liquid waste drainage
4. Land drainage
7. External Services 1. Water mains supply
2. Electricity mains supply
3. External transformation devices
4. Electricity distribution to external plant
and equipment
5. Gas mains supply
6. Telecommunications and other
communication system connections
7. External fuel storage and piped
distribution systems
8. External security systems
9. Site or street lighting systems
10. Local or district heating installations
11. Builder’s work in connection with
external services
Mat 01 Environmental impacts from construction products - Building life cycle assessment 301
Additional information
None.
302 SD5078: BREEAM UK New Construction 2018 – Consultation draft
1 1 1 1
Aim
To encourage availability of robust and comparable data on the impacts of construction materials through the
provision of EPD.
Value
– Improve the accuracy of building life cycle
assessment (LCA)
– Improve the availability if robust and
comparable data for designers and
specifiers to aid materials selection and
specification
– Increase the consistency in the information
requested from manufacturers
– Increase the uptake of EPD by material and
product manufacturers
– Increase the accuracy and comparability of
building level LCA so helping to reduce the
overall life cycle impacts arising from the
building
Context
A variety of construction product environmental claims are offered by manufactures, other industry sources and in
guidance, but the results presented are often inconsistent and therefore not suitable for making comparisons. In
addition, even comparable information is difficult for a non-specialist to understand. Such information will often be
biased towards presenting the benefits of a material and avoid or reduce the emphasis on negative impacts. This
Mat 02 Environmental impacts from construction products 303
risks designers, clients and constructors being misled by the information provided, leading to incorrect decisions
being taken that could result in increased environmental impacts. As a result, available information can often be
misleading to designers and specifiers.
Specifiers can make better informed decisions using comparable EPD and generic LCA data in a recognised
building LCA tool (see Mat 01 Environmental impacts from construction products - Building life cycle assessment
on page 287), that presents results at the building level and over the life cycle of the building.
Increasing numbers of EPD are being produced by construction product manufacturers. However, many
construction products do not have an EPD, meaning generic LCA data must be used when carrying out a building
LCA. While helpful in making basic materials choices at the early design stage, this does not assist in specifying less
impacting products and materials during detailed design and construction stages. Further accuracy can be gained
when carrying out LCA or specifying materials and components by using EPD specific to a manufacturer’s product
range or, better still, the specific construction product.
Assessment scope
Assessment criteria
2 Enter the details of each EPD into the Mat 01 Results Submission Tool, including the material category
classification. The Mat 01 Results Submission Tool will verify the EPD points score and credit award
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
1. For each EPD that is applicable to a specified construction product, use Table 52 below to find the EPD
points score.
2. For each EPD, use Table 53 on the facing page to find the applicable material classification (according to
the construction product). If a product comprises more than one material, the material category
classification representing the majority of the product (by volume) should be selected.
3. Add together the applicable EPD points for each material classification (an EPD can be counted in only one
classification group).
4. If a material classification has a calculated score higher than 4 EPD points, reduce the score to 4.
5. Add together the EPD points calculated for each material classification to obtain the total EPD points score.
EPD applicable to more than one Regulations, the EPD must have been generated 0.75
product in the same product category, using product category rules based on either EN
and a single manufacturer 15804 or ISO 21930
EPD applicable to a single product, and 1.5
a single manufacturer (the product may
be manufactured in more than one
location)
Evidence
Definitions
modelled with other sources of design information (bills of quantities, drawings, specifications etc.), and see the
breakdown of environmental impacts. In addition, the data in the tool may be used by BRE Global for updating
the BREEAM benchmarks and for other research activities (in a way that is not attributable to individual buildings).
Additional information
None.
Mat 03 Responsible sourcing of materials 307
4 4 4 4
Fully fitted Simple building Shell & core Shell only Criterion 1
Aim
To facilitate the selection of products that involve lower levels of negative environmental, economic and social
impact across their supply chain including extraction, processing and manufacture.
Value
– Promote more economically , socially and
environmentally responsible practices across
the construction materials, component
manufacturing and supply sectors.
– Encourages the construction industry to
identify risks and reduce the environmental,
economic and social issues in the supply chain
of construction products.
– Encourages the use and the improvement of
credible and comparable schemes to
evaluate the responsible sourcing of
materials.
Context
Most construction materials involve long and complex supply chains that result in a wide range of impacts globally.
These might include environmental (e.g. toxicity or biodiversity), economic (e.g. corruption) or social (e.g. slave
labour, equality) issues and can occur during the extraction, processing, manufacturing or supply chain stages. The
construction sector in the UK has considerable growth opportunities, not only nationally, but also internationally.
The global construction market is forecast to grow by over 70% by 2025. Increased global competition does risk
less responsible practices being employed. Credible certification schemes exist to give confidence to specifiers that
308 SD5078: BREEAM UK New Construction 2018 – Consultation draft
risks are being minimised or avoided and their use ensures that specifiers are able to demonstrate the responsible
nature of their selection decisions.
Assessment scope
Assessment criteria
Prerequisite
1 All timber and timber-based products used on the project are legally harvested and tradedtimber as per the
UK government's Timber Procurement Policy (TPP)(179). See Definitions on page 316.
Compliance with criterion 1 is a minimum requirement for achieving any BREEAM rating.
2.b: Include sustainability aims, objectives and targets to guide procurement activities
2.c: Include an assessment of the potential to procure materials locally. There must be a policy to procure
materials locally where possible.
2.d: Include details of procedures in place to check and verify the effective implementation of the sustainable
procurement plan
In addition, if the plan is applied to several sites or adopted at an organisational level it must:
2.e: Identify the risks and opportunities of procurement against a broad range of social, environmental and
economic issues following the process set out in BS ISO20400:2017 (180).
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
310 SD5078: BREEAM UK New Construction 2018 – Consultation draft
Methodology
Assessment process
To determine the number of credits that are achieved for the Responsible Sourcing of Construction Products
(criterion 3), the Mat 03 calculator tool must be completed with all the relevant information. Each construction
product is entered in the tool individually unless they are below the relevant threshold. Where the quantity of a
product has not been calculated, use Route 1 on page 315 for that product. Where the quantity of a product is
known, use Route 2 on page 315. This It may be the case that across an assessment there will be a combination of
routes for products. For example, route 1 may be used for the timber or timber-based category and route 2 for
the metal category. Only one route may be used per materials category. The following steps outline the process to
be followed to determine the number of credits achieved for responsible sourcing, followed by illustrative
examples.
For examples and a further explanation of this method, along with a simplified methodology for building services
construction products, see Guidance Note 24.
For all routes, the BREEAM UK Mat 03 tool is used according to the following steps.
1. For each construction product in the building that is in the scope: (see Table 56 on page 314 under 'Scope of
assessment' section below):
Note: For route 1, only steps 1.1, 1.3, 1.5, 1.6, 1.7 and 1.9 must be followed. Step 1.4 is optional for routes 1 and 2.
Step 1.1: Estimate if the quantity of the product is above the cut-off volume (see Route 1 Cut-off on page 315).
If it is, enter the construction product in the tool and assign it a ' Location and use' category, then proceed to the
next step. If the quantity meets the cut-off then the product can be excluded.
Step 1.2 Route 2: Estimate the quantity (mass or volume) of the product. (See Quantities precision on
page 315).
Step 1.3: Obtain the BREEAM recognised responsible sourcing certifications scheme (RSCS) certification or
environmental management system (EMS) certification, if any (see Definitions on page 316). Compare the
certification with Guidance Note 18 and obtain the RSCS point score. Where the construction product has no
certification, is non-compliant with broken chain requirements (see Broken chain on page 314) or the
certification type is not listed in Guidance Note 18, the score is zero. Where the construction product is a reused
product, obtain the score from Guidance Note 18 for these products.
Step 1.4 (Optional, if not being followed go to step 1.5): Where a constituent construction product has a better
certification score than the overall construction product and it complies with the broken chain requirements, the
following steps should be followed:
Step 1.4.1: Identify the materials categories that make up an estimated≥ 80% of the
constituent construction product's volume.
Step 1.4.2: Include each identified materials category in the tool (by creating new rows in the
tool).
Step 1.4.3: If ≥ 5% of the volume is unaccounted for in step 1.4.1, include the 'Other' material
category.
Step 1.4.4 Route 2: For each material following route 2 and identified in step 1.4.1, enter the
building-wide quantity into the tool. This may be based on a percentage of the overall
construction product's quantity estimated in step 1.1.
Mat 03 Responsible sourcing of materials 311
Step 1.4.5: For each material category (including 'Other'), enter the constituent's certification
score identified in step 1.4 into the tool.
Step 1.5: Identify the materials categories that make up an estimated≥ 80% of the product's volume (excluding
quantities entered for step 1.4.1 , if applicable).
Step 1.6: Include each identified materials category in the tool (by duplicating the entry made in step 1.1).
Step 1.7: If ≥ 5% of the volume is unaccounted for in step 1.5 (and step 1.4, where applicable), include the
'Other' material category.
Step 1.8 Route 2: For each material category following route 2 and identified in step 1.5, enter the building-
wide quantity into the tool. This may be based on a percentage of the overall construction product's quantity
estimated in step1.1.
Step 1.9: For each material category (including 'Other'), enter the overall construction product's certification
score (from step 1.3) into the tool.
Step 2.1: Enter the credit result produced by the BREEAM UK Mat 03 tool into the BREEAM UKs Scoring and
Reporting tool.
Scope of Assessment
Table 55 below (based on the New Rules of Measurement (NRM) classification system) indicates the building
elements that must be included in the scope of the assessment. Including these elements (and only these) is
necessary to ensure an appropriate level of comparability. All construction products that are installed as part of
one or more of these building elements are in scope and must be included in the BREEAM UK Mat 03 tool. For each
building element the respective location or use category for use in the BREEAM UK Mat 03 tool is provided in the
table.
Table 55 Scope assessment, common building element designation and location and use categories
RICS NRM elements and BREEAM equivalents
Level 1 element: 1–Substructure
Level 2 element: 1–Substructure
Level 3 sub-element BREEAM ‘Location and use’ category To be
included
1 Standard foundations 7. Structure , primary and secondary Y
2 Specialist foundations systems 7. Structure , primary and secondary Y
3 Lowest floor construction 7. Structure , primary and secondary Y
4 Basement excavation N/A Y
5 Basement retaining walls 7. Structure , primary and secondary Y
Level 1 element: 2–Superstructure
Level 2 element: 1–Frame
Level 3 sub-element BREEAM ‘Location and use’ category To be
included
1 Steel frames 7. Structure, primary and secondary Y
2 Space decks 7. Structure, primary and secondary Y
3 Concrete casings to steel frames 7. Structure, primary and secondary Y
4 Concrete frames 7. Structure, primary and secondary Y
5 Timber frames 7. Structure, primary and secondary Y
6 Other frame systems 7. Structure, primary and secondary Y
Level 1 element: 2–Superstructure
Level 2 element: 2–Upper Floors
Sub- BREEAM Location BREEAM ‘Location and use’ category To be
element included
312 SD5078: BREEAM UK New Construction 2018 – Consultation draft
The material categories, for use in the BREEAM UK Mat 03 tool, must be in accordance with Materialcategories
below. For each construction product, identify the closest matching category.
Table 56 Materialcategories
Material categories
1. Timber or timber-based products
2. Concrete or cementitious
3. Metal
4. Stone or aggregate
5. Clay-based
6. Gypsum
7. Glass
8. Plastic, polymer, resin, paint, chemicals and bituminous
9. Animal fibre, skin, cellulose fibre
10. Other.
Some schemes will provide downloadable copies of the relevant certificate which can in turn be used as evidence of
compliance for this BREEAM issue.
Broken chain
To recognise responsible sourcing certification where it does exist in the supply chain, while reducing the risks
associated with a broken chain, it is permissible to use the upstream certification score in the BREEAM UK Mat 03
tool where the downstream risk to responsible sourcing is considered to be low. Specifically, it is acceptable for the
following types of organisations in the supply chain (that are downstream of the organisation with certification)
not to have their own responsible sourcing certification:
not occurred AND are operating in a jurisdiction that can demonstrate relatively robust and well enforced
environmental, social and economic controls. For example, states which are members of the EU1—states
that have declared adherence to the OECD Guidelines for Multinational Enterprises.
Route 1 Cut-off
See Step 1: Collating information and entering it in the BREEAM UK Mat 03 tool on page 310. Any construction
product in the following location or use categories which clearly accounts for less than the following volumes can
be excluded from the assessment. The volume considered should be taken as the construction product's overall
external dimensions, including any internal voids and air spaces. Minor fixings (brackets, nails, screws etc.), adhesives,
seals and ironmongery would normally fall below this threshold. See also Quantities precision. - 'Internal partition
and internal walls (including finishes)': Less than 0.33 m³per 1000m²of gross internal floor area (GIFA). - 'Ceiling
(including ceiling finishes)': Less than 0.33 m³per 1000m²of GIFA. - All other location or use categories: Less than
1m³per 1000 m²of GIFA.
Quantities precision
The degree of tolerance accepted for estimating quantities is ± 20% of the final installed quantity. It is not
necessary for the assessor to submit calculations in order to justify estimates. In particular, the cut-off estimation
for many construction products (that are clearly below the cut-off) may be done without the need for any
calculations at all.
Route 1
Route 1 does not require the quantities of each construction product to be entered into the BREEAM International
Mat 03 tool. This reduces the time taken to calculate the score achieved per construction product but, because the
varying quantities of each construction product in the building cannot be taken into account when the credit is
calculated, the lowest 'location or use' category score per materials category is used for the overall materials
category score.
Route 2
Route 2 provides a more accurate measurement of the risks in the building design associated with construction
products by taking account of the quantity of each construction product with a location and use category. It
requires quantities to be entered into BREEAM International Mat 03 tool rather than using the lowest 'location or
use' category score per material category. The improvement in rigour justifies route 2 having the potential to
produce better scores than route 1.
Evidence
Definitions
For the avoidance of doubt, 100% of the timber and timber-based products must be compliant.
Further information on the UK Government's TPP and compliant responsible sourcing certification schemes is
available from the CPET website www.gov.uk/guidance/.
Responsible sourcing
The management and implementation of sustainable development principles in the provision, procurement and
traceability of construction materials and components. In BREEAM, this is demonstrated through auditable third
party certification schemes. Refer to Guidance Note 18 available in the Resources section of the BREEAM website
for an up-to-date table of responsible sourcing certification schemes recognised by BRE Global Ltd for the
purposes of a BREEAM assessment.
Additional information
None.
318 SD5078: BREEAM UK New Construction 2018 – Consultation draft
Mat 04 Insulation
This is no longer assessed as a separate issue within BREEAM UK New Construction 2018.
Mat 05 Designing for durability and resilience 319
1 1 1 1
Fully-fitted Simple building Shell & core Shell only No minimum standards
Aim
To reduce the need to repair and replace materials resulting from damage to exposed elements of the building
and landscape.
Value
– Avoid unnecessary cost and material use
resulting from the need to repair and replace
damaged elements as a result of operational
wear and tear.
–
Minimise costs and disruption resulting from
environmental degradation to building
elements as a result of avoidable
weathering and changes to climatic
conditions over time.
Context
Exposed elements of a building or landscaping are at risk of damage through impact or wear and tear. This can
result in significant and unnecessary materials use and waste generation across the life of a building. This can be
minimised by risk areas being identified and designed out, and suitable protection measures being provided. The
inclusion of this issue within BREEAM, highlights the need to consider future repairs and replacements, as well as
their associated costs, when designing and specifying materials for a new building.
320 SD5078: BREEAM UK New Construction 2018 – Consultation draft
In addition climate change can significantly accelerate the deterioration of materials used in a building. It is therefore
important to consider the impact of climate change and its associated environmental changes on the vulnerable
elements within the built environment. Impacts of climate change can be mitigated by good design and
specification so that stakeholders can have increased confidence in the durability of new buildings and their
individual elements.
Assessment scope
Assessment criteria
One credit
1.a: Negative impacts of high user numbers in relevant areas of the building (e.g. corridors, lifts, stairs, doors
etc.).
1.b: Damage from any vehicle or trolley movements within 1m of the internal building fabric in storage,
delivery, corridor and kitchen areas.
1.c: External building fabric damage by a vehicle. Protection where parking or manoeuvring areas are within 1
metre of the building façade and where delivery areas or routes are within 2 metres of the façade, i.e.
specifying bollards or protection rails.
1.d: Potential malicious damage to building materials and finishes, in public and common areas where
appropriate.
2.a: The element or product achieving an appropriate quality or durability standard or design guide (or if none
available, BS 7543:2015 (181) as the default appropriate standard)
2.b: A detailed assessment of the element's resilience when exposed to the applicable material degradation
and environmental factors set out in Table 57 on page 324.
3 If BS 7543:2015 is used, the design team can deviate from it to meet criterion 2.a. The assessor should use
their professional judgment in determining whether the deviations are acceptable, ensuring that the choices
demonstrated that they have designed and specified materials or measures which will be effective in
preventing unnecessary deterioration, so reducing frequent replacements, repairs and maintenance through
the life cycle of the building.
4 Include convenient access to the roof and façade for cost effective cleaning, replacement and repair in the
building's design.
5 Design the roof and façade to prevent water damage, ingress, and detrimental ponding.
See Table 57 on page 324 for an example list of relevant industry durability and quality standards.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
322 SD5078: BREEAM UK New Construction 2018 – Consultation draft
Methodology
None.
Evidence
Definitions
confirm that the standard used is appropriate for the element or product it is applied to and increases its
durability.
Convenient access
Access to the roof and façade is safe and convenient for routine maintenance, cleaning and repair. A façade
access strategy designed in line with CIRIA guide C686 would be considered compliant. If access to the majority
of the façade requires contracting on a one-off basis an external firm with specialist equipment, or specialist
access professionals it would not generally be considered to be convenient.
Durability
Ability of a building and its parts to perform its required function over a period of time and under the influence of
degrading agents, without undue maintenance, repair, replacement or refurbishment.
Material efficiency
The process of undertaking a building project to enable the most efficient use of materials over the life cycle of
the building and its components. This includes using fewer materials, reusing existing demolition and strip-out
materials and, where appropriate, procuring materials with higher levels of recycled content. It may also include
the adoption of alternative means of design and construction that result in lower materials usage and lower
wastage levels including off-site manufacture and use of pre-assembled service pods.
Additional information
common durability failures for typical construction materials. In addition, it lists some example predicted service
lives for typical materials.
Table 57 Examples of relevant industry durability or quality standards and design guides
Examples of relevant industry durability or quality standards and design guides
Timber
Class 1 or 2 against BS EN 350-1:1994
TRADA: WIS 4-28 Durability by design
TRADA: Specifying timber exposed to weathering
TRADA: Timber external Doors
(BRE Good practice guidance?)
BS8605:2014 External Timber Cladding Part 1 - Method of Specifying
Curtain walling
Centre for Window and Cladding Technology (CWCT) Curtain Wall Standards
BS EN ISO 9001, BS EN ISO 14001 and OHSAS 18001 Standards. Weather tested to CWCT Sequence B and
EN13830:2003
BS EN 13830 Specification for Curtain Walling
CWCT: Curtain Wall Installation Handbook
Brickwork, blockwork
BDA Design note 7: Brickwork Durability
BDA: Severely Exposed Brickwork
Roof elements
BRE: Roofs and roofing. Performance, diagnosis, maintenance, repair and the avoidance of defects. 3rd edition
(2009)
NFRC: Profiled Sheet Roofing and Cladding- The guide to Design and Best Practice (2016)
CIBSE: Guidelines for the design and application of green roof systems (2013)
Flexible Membrane Roofing: A Professional's Guide to Specifications
Metal cladding
NFRC: Profiled Sheet Roofing and Cladding- The guide to Design and Best Practice (2016)
MCRMA: Metal Fabrications: Design, Detailing and Installation Guide
Glazing
BS EN 12488:2016: Glass in building - glazing recommendations - assembly principles for vertical and sloping
glazing
Masonry
PD 6697:2010 – Recommendations for the design of masonry structures
BS EN 1996-2:2006 Design of Masonry Structures –Durability Section
Other useful standards or design guides
BRE: Cracking in Buildings (2016)
BS 7543:2015: Guide to durability of buildings and building elements, products and components
If you would like an additional standard or design guide to be recognised, please submit your proposal as a
technical query to [email protected].
Mat 06 Material efficiency 325
1 1 1 1
Minimum standards
Aim
To avoid unnecessary materials use arising from over specification without compromising structural stability,
durability or the service life of the building.
Value
– Reductions in cost as a result of a reduction
of material use in building design.
– Encourages the reuse of existing materials.
– Encourages the use of materials with higher
levels of recycled content.
– Improve understanding of and the
performance of alternative design and
construction methods that result in lower
material usage and waste levels.
Context
The construction industry accounts for approximately 55% of the total annual material use and buildings
contribute 50% of total emissions of CO2eq. They are also responsible for 30% of total UK water use and 35% of
arising waste. The breakdown of global industrial carbon emissions shows that 55% comes from the
326 SD5078: BREEAM UK New Construction 2018 – Consultation draft
manufacturing and processing of five stock materials: steel (25%), cement (19%), paper (4%), plastic and
aluminium (3%).
Building standards and institutional requirements are often based on standardised, tried and tested design
solutions which can result in significant over specification of elements and hence material use. Some of this is to
allow for future flexibility in use that will never in reality be used and more is the result of conservative evaluation of
risk.
Therefore, optimising material use in the context of a specific project is one of the key resource efficiency goals for
any sustainability strategy. This can be achieved through careful consideration of current and future project
demands to maximise the efficient use of materials, waste prevention and reduction, minimal damage to the
environment and reduced depletion of natural resources.
Assessment scope
Assessment criteria
One credit
1 Identify opportunities to optimise the use of materials during the design, procurement, and construction of the
project, also considering material maintenance and end of life
2 Implement appropriate and effective opportunities in the building’s design and specification
3 The design and construction team consult with relevant participants at each of the following RIBA stages:
3.e: Construction.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
None.
Evidence
Definitions
Material efficiency
The process of designing a building to achieve its stated performance standards while reducing its embodied
impact by reducing the quantity of materials required to do so. This includes using fewer materials, reusing
existing demolition and strip-out materials and, where appropriate, procuring materials with higher levels of
recycled content. It may also include the adoption of alternative means of design and construction that result in
lower materials usage and lower wastage levels including off-site manufacturer or use of pre-assembled service
pods.
Additional information
Optimising material use is one the key resource efficiency goals for any sustainability strategy. This involves various
components to ensure efficient use of materials, waste prevention and reduction, minimal damage to the
environment and depletion of natural resources. This new BREEAM issue aims to encourage and support efforts to
reduce the amount of materials use in building design without compromising on the structural stability. BRE intends
to further develop the assessment criteria for this issue in future updates of BREEAM and as such BRE would
welcome any feedback on the application of this assessment issue to assist with the evolution of the criteria and
inclusion of additional guidance on compliance in future BREEAM versions.
WRAP
Designing out Waste: A design team guide for Buildings(186). This document outlines five principles of designing
out waste and can be applied during design development, and prompts opportunities to investigate for material
efficiency in design. Some key questions to consider are:
1. Can the design, form and layout be simplified without compromising the design concept?
2. Can the design be coordinated to avoid or minimise excess cutting and jointing of materials that generate
waste?
3. Is the building designed to standard material dimensions?
4. Can the range of materials required be standardised to encourage reuse of offcuts?
5. Is there repetition and coordination of the design, to reduce the number of variables and allow for
operational refinement (e.g. reusing formwork)?
Waste 331
Waste
6% 7.5% 7% 8.5%
Summary
This section encourages the reduction of waste from construction and throughout the lifetime of the building. It
rewards sustainable waste management, as well as waste reporting, reduction and diversion from landfill during
construction, but also encourages sustainable practices during the building operation. Finally, this section
encourages waste minimisation through optimised design methods, which consider current, but also future needs,
responding to functional requirements and climate change adaptation.It includes recognition of measures to
reduce future waste as a result of the need to alter the building in the light of future changes to climate.
Wst 01 Construction waste management 5 credits
Improving resource efficiency through developing a pre-demolition audit and a Resource Management Plan,
maximising the recovery of material during demolition and diverting non-hazardous waste from landfill.
Wst 02 Use of recycled and sustainably sourced aggregates 1 credit
Encouraging the use of recycled or secondary aggregate or aggregate types with lower environmental impact to
reduce waste and optimise material efficiency.
Wst 03 Operational waste 1 credit
Encouraging the diversion of operational waste form landfill through the provision of space and facilities allowing
the segregation and storage of recyclable waste.
Wst 04 Speculative floor and ceiling finishes 1 credit
Specification of floor and ceiling finishes only where agreed with the occupant or, for tenanted areas where the
future occupant is unknown, installation in a show area only, to reduce wastage.
Wst 05 Adaptation to climate change 1 credit
Encourage consideration and implementation of measures to mitigate the impact of more extreme weather
conditions arising from climate change over the lifespan of the building.
Wst 06 Design for disassembly and adaptability 2 credits
Encourage consideration and implementation of measures design options related to adaptability and
disassembly, which can accommodate future changes to the use of the building and its systems over its lifespan.
332 SD5078: BREEAM UK New Construction 2018 – Consultation draft
5 5 5 5
Aim
To reduce construction waste by encouraging reuse, recovery and best practice waste management practices to
minimise waste going to landfill.
Value
– Minimise cost and environmental damage
resulting from waste going to landfill
–
Maximise the recovery and reuse of
construction materials to avoid
unnecessary extraction and processing of
virgin materials
Context
One third of all waste in the UK, 120 million tonnes of waste per year, is generated by the construction and
demolition sector, which is the largest contributor of waste in the nation.
Wst 01 Construction waste management 333
Best practice solutions include; off-site construction, where construction waste can be halved, the adoption of
waste management methods such as the waste hierarchy and the implementation of the circular economy
concept, which provides an alternative to a traditional linear economy (make, use, dispose). This approach is
adopted by certain manufacturers that offer a 'take back' scheme and by design teams that use the concept of
'design for de-construction'(187).
Reducing waste simultaneously reduces the environmental impact as well as the cost of the construction process.
The true cost of waste encompasses the cost of the product or material that is wasted, the cost of handling waste
and the cost of waste management. While there may be revenue associated with the recycling of certain material
streams, typically construction sites have to pay for collection or processing of the waste. Legislation in this area has
changed over time, however the benefit to the developer of avoiding unnecessary materials use and waste and the
environment remain the same.
Assessment scope
Assessment criteria
OR
1.b: Be carried out at Concept Design stage (RIBA Stage 2) by a competent person (see Definitions); prior to
strip-out or demolition works;
1.c: Guide the design, consider materials for reuse and set targets for waste management;
1.d: Engage all contractors in the process of maximising high grade reuse and recycling opportunities.
1.e: Compare actual waste arisings and waste management routes used with those forecast and investigate
significant deviations from planned targets.
2 Make reference to the audit in the Resource Management Plan (RMP) (see Definitions).
3.a: Non-hazardous waste materials (from on-site construction and dedicated off-site manufacture or
fabrication, see Additional information ), including demolition and excavation waste.
3.b: Accurate data records on waste arisings and waste management routes (see KB).
4 Meet or improve upon the benchmarks in Table 59 for non-hazardous construction waste, excluding
demolition and excavation waste.
6 Sort waste materials into separate key waste groups as per Table 61, either on-site or through a licensed
contractor for recovery.
8 The percentage of non-hazardous construction, demolition and excavation waste (if relevant) diverted from
landfill meets or exceeds the exemplary level percentage benchmarks in Table 60.
9 All key waste groups in Table 61 for diversion from landfill are covered in the RMP.
10 Waste data obtained from licensed external waste contractors is reliable and verifiable, by using data from
EA/SEPA/EA Wales/NIEA Waste Return Forms or from a PAS 402:2013 certified company (see Definitions on
page 337).
14 Waste management procedures recorded in the RMP and implemented measure and report:
14.a:Construction waste generated by the project in m3 or tonnes per 100m2 gross internal floor area; exclude
demolition and excavation waste.
14.b:The proportion of construction waste diverted from landfill, i.e. reused, recycled or recovered
17 Record the source of the waste arisings of the non-hazardous construction waste measured or monitored by
associating the waste with project work packages (see Methodology below).
18 Meet or improve on the BREEAM exemplary level benchmark (Table 60) for the diversion from landfill of
generated non-hazardous construction and demolition waste.
Compliance notes
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
The performance benchmarks for the award of credits are based on non-hazardous materials and exclude
hazardous waste, demolition waste, excavation waste, canteen, office and municipal waste.
1. Identification and quantification of the key materials where present on the project (see Table 61);
2. Potential applications and any related issues for the reuse and recycling of the key materials in accordance
with the waste hierarchy;
3. Opportunities for reuse and recycling within the same development;
4. Identification of local reprocessors or recyclers for recycling of materials;
5. Identification of overall recycling targets where appropriate;
6. Identification of reuse targets where appropriate;
7. Identification of overall landfill diversion rate for all key materials.
Work packages
For the simple building exemplary criteria, the waste arisings need to be associated with the source of waste by
project work packages. These work packages could include:
1. Asbestos removal
2. External and site works
Wst 01 Construction waste management 337
Evidence
Definitions
1. A target benchmark for resource efficiency, i.e. m³of waste per 100m²or tonnes of waste per 100m²
2. Procedures and commitments to minimise non-hazardous waste in line with the target benchmark
3. Procedures to minimise hazardous waste; these are:
a. A waste-minimisation target and details of waste minimisation actions to be undertaken
b. Procedures to estimate, monitor, measures and report on hazardous and non-hazardous site waste
and demolition waste, where relevant, arising from work carried out by the principal contractor and
all subcontractors. Waste data obtained from licensed external waste contractors needs to be
reliable and verifiable, e.g. using data from EA/SEPA/EA Wales/NIEA waste return forms or from
PAS402 certified company
c. Monthly reporting of all construction waste data throughout the project checked against what
would be expected based on the stage of the project, invoices, etc., to validate completeness of
waste reporting data
d. Procedures to sort, reuse and recycle construction waste into defined waste groups, either on site or
through a licensed external contractor
e. Procedures to review and update the plan
f. The name or job title of the individual responsible for implementing the above.
4. A waste-minimisation target and details of waste minimisation actions to be undertaken
338 SD5078: BREEAM UK New Construction 2018 – Consultation draft
5. Procedures to estimate, monitor, measures and report on hazardous and non-hazardous site waste
and demolition waste, where relevant, arising from work carried out by the principal contractor and all
subcontractors. Waste data obtained from licensed external waste contractors needs to be reliable and
verifiable, e.g. using data from EA/SEPA/EA Wales/NIEA waste return forms or from PAS402 certified
company
6. Monthly reporting of all construction waste data throughout the project checked against what would be
expected based on the stage of the project, invoices, etc., to validate completeness of waste reporting
data
7. Procedures to sort, reuse and recycle construction waste into defined waste groups, either on site or
through a licensed external contractor
8. Procedures to review and update the plan
9. The name or job title of the individual responsible for implementing the above.
Best practice construction waste management plan (see RMP and SWMP)
Best practice is a combination of commitments to:
PAS 402:2013
PAS 402:2013 is a specification for performance reporting that can be adopted by waste management
organisations. It is applicable to waste management organisations that process waste, e.g. a waste treatment
facility and not those operating solely as carriers or brokers. The specification provides the framework for the
demonstration of performance against key areas of delivery, including how waste management activities are
conducted, landfill diversion and materials recovery, assuring potential and existing customers of the service they
are procuring. It can provide clients such as government and local authorities with a framework for good practice
which they can specify.
achieve any of the construction waste management credits the assessed development, regardless of value or
locality, must have a BREEAM compliant Resource Management Plan that should be written in line with best
practice.
Waste hierarchy
The order of priority for the management of waste where waste generation could or does occur. This is listed in
descending order of environmental preference in The Waste (England and Wales) Regulation 2011 (188) as:
– Prevention: using material in design and manufacture, keeping products for longer, re-use, using less
hazardous materials
– Preparing for re-use: checking, cleaning, repairing, refurbishment, whole items or spare parts
– Recycling: turning waste into a new substance or produce. It includes composting if it meets quality protocols
– Other recovery: includes anaerobic digestions, incineration with energy recovery, gasification and pyrolysis,
which produce energy (fuels, heat and power) and materials from waste
– Disposal landfill and incineration without energy recovery.
Waste minimisation
This term encompasses two elements of the waste hierarchy: waste reduction or prevention = using less material
in design, manufacture and installation, keeping products for longer, using no hazardous materials; Reuse = using
products again for the same purpose for which they were conceived, which may require checking, cleaning or
repairing (preparing for reuse). Types of waste minimisation actions include:
Additional information
1. One credit: Performance in the top 50% of projects (better than standard practice)
2. Two credits: Performance in the top 25% of projects (good practice)
3. Three credits: Performance in the top 10% of projects (best practice)
4. Exemplary level: Performance in the top 5% of projects (exemplary practice).
Why does BREEAM exclude demolition and excavation waste from the
resource efficiency benchmarks?
BREEAM does not include demolition and excavation (D&E) waste in its resource efficiency benchmark, despite it
often being the largest tonnage of waste on-site, because the amount of D&E waste produced is site-dependent.
Furthermore, it is not necessarily possible to reduce the amount of demolition waste (unless a decision is taken not
to demolish in the first place).
1. Not encourage sites with unavoidably large amounts of D&E waste to focus on reducing waste arising
from construction materials (which would have further knock-on environmental impacts); and
2. Mean that sites with little or no D&E waste would find compliance with the benchmark more straight
forward, which would weaken the drivers for reducing construction waste resulting from the specification
and use of new building materials.
BREEAM aims to ensure that, where D&E waste is generated, it is diverted from landfill and where possible reused
for high grade use on site to reduce the volume of new materials produced or required in the supply chain (which
themselves may go on to generate additional waste). One credit and an exemplary level credit are available where it
can be demonstrated that D&E waste has been diverted from landfill.
This membership tool is frequently updated and offers the user flexibility, reporting and support. Templates are
available to meet the latest BREEAM credits and can also be downloaded. More information is available at
www.smartwaste.co.uk.
Other tools for preparing, implementing and reviewing a RMP may be available.
342 Wst 02 Use of recycled and
SD5078: BREEAM sustainably
UK New Construction 2018 – Consultation draft
sourced aggregates
1 1 1 1
Aim
To encourage the use of more sustainably sourced aggregates, encourage reuse where appropriate and avoid
waste and pollution arising from disposal of demolition and other forms of waste.
Value
– Encourages the specification of more
sustainable aggregate sourcing options
– Considers a broad range of factors
influencing aggregates’ selection, i.e. regional
aggregate availability, environmental and
social impacts of transport and the overall
carbon footprint
Context
The use of secondary and recycled aggregate in higher value situations should be rewarded as a means to
discourage their devaluation as a material resource or their disposal to landfill.
Wst 02 Use of recycled and sustainably sourced aggregates 343
Thanks to the Aggregates Levy and the Landfill Tax, recent evidence indicates that the amount of aggregates being
disposed of in landfill and being used as low grade fill has decreased markedly in recent years. However sourcing of
aggregates remains an issue in terms of the range of environmental and social impacts that arise from the
extraction and transport of aggregates in the UK.
Therefore, primary aggregates can still be considered a sustainable option, where locally sourced, sustainably
transported and from a region where that aggregate type is abundant. In addition, the use of secondary
aggregates resulting from other processes such as marine dredging can also be considered sustainable under
certain circumstances.
Assessment scope
1 1 1 1
5
Assessment criteria
Prerequisite
To encourage the reuse of site-won material on site, when demolition occurs, complete a pre-demolition audit of
any existing buildings, structures or hard surfaces to be demolished in accordance with Wst 01 Construction waste
management: Criterion on page 332.
2 Determine the quantity in tonnes for each identified use and aggregate type
5 Enter the information into the BREEAM Wst 02 calculator to calculate the Project Sustainable Aggregate points.
The corresponding number of BREEAM credits will be awarded as shown in Table 62
6 The Project Sustainable Aggregate points score meets or exceeds the exemplary level performance
benchmark in Table 62.
Wst 02 Use of recycled and sustainably sourced aggregates 345
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
Information on the quantity, source and use of each type of aggregate used must be obtained and entered into
the BREEAM Wst 02 calculator. This generates the Project Sustainable Aggregate point score, which determines the
number of credits awarded.
The information required to calculate the Project Sustainable Aggregate point score is specified below:
1. Identify all aggregates uses on the project (Table 63) and the aggregate type (Table 64);
1. Determine the quantity in tonnes for each identified use and aggregate type. Include all aggregates that
represent at least 5% of the overall aggregate demand for the project. The conversions in Table 63 can be
applied at Design Stage where exact details of concrete mix designs and aggregate specifications are not
yet known. Exact values must be reported at Post Construction;
2. Identify the region in which the aggregate source is located, according to the categories inTable 65
3. Identify the distance in kilometres travelled by all aggregates by transport type from ‘aggregate gate’ to
site;
4. Based on the above data inserted for all aggregates, the Wst 02 calculator will determine
a. Mineral resource depletion (kgSbeq)
b. Social cost of transport (pence/tonne)
c. Carbon footprint (kgCO2e/tonne)
d. The correspondent Sustainable Aggregates Points per tonne
e. The number of credits achieved, as per Table 62
5. Enter the credit score into the BREEAM scoring and reporting tool.
Evidence
Definitions
and BS Aggregates Standards that apply to the end use application (e.g. bitumen bound, unbound etc.)
– Marine dredged aggregates: the wharf at which the aggregate is first landed;
– Land-based resources: the quarry or recycling facility.
Quality Protocol
The purpose of a Quality Protocol is to provide a uniform control process for producers, from which they can
reasonably state and demonstrate that their product has been fully recovered and is no longer a waste. It also
provides purchasers with a product quality managed to common standards, which increases confidence in
performance. Aggregates that do not meet the requirements of a Quality Protocol or relevant aggregate
standards will still be considered waste. Protocols exists for:
Recycled aggregates
Recycled aggregates are those derived from reprocessing materials previously used in construction, e.g. crushed
concrete or masonry from construction and demolition waste material and recycled glass bottles.
Secondary aggregates
By-products of industrial processes that can be processed to produce secondary aggregates. Secondary
aggregates are subdivided into manufactured and natural, depending on their source. Recognised non-
construction post-consumer or post-industrial byproducts include:
PFA and GGBFS, used as a cement replacement, should not be included in these calculations
Strategic motorways
In the UK these are:
M60, M25, M3 in Hampshire (junctions 9 to 14), M6 in the vicinity of Birmingham (junctions 4 to 10a), M6 in the
vicinity of Manchester (and junctions 15 to 21a), M62 in the vicinity of Rochdale (junctions 18 to 21), M62 in the
vicinity of Leeds (junctions 26 to 30), M42 in the vicinity of Solihull (junctions 3a to 7), M1 in the vicinity of
Wst 02 Use of recycled and sustainably sourced aggregates 349
Northampton and Rugby (junctions 15 to 17), M1 in the vicinity of Nottingham and Sheffield (junctions 28 to
35a), M4 in the vicinity of Slough (junction 4b to 7), M4 in the vicinity of Cardiff (junctions 30 to 33).
Additional information
Wst 02 calculator
The Wst 02 calculator combines scores for regional mineral depletion, social cost of transport and carbon
footprint. Each of these metrics has an equal weighting in the scoring tool, with a maximum score of 3 for each
metric, giving a maximum Sustainable Aggregate Point score of 9.
– The regional mineral depletion is measured using the Abiotic Depletion Potential, which is determined by the
aggregate type and the region where it is sourced.
– The social cost of transport reflects expenses to society that arise from additional congestion, respiratory
disorders, accidents, noise, taxation and infrastructure maintenance associated with transport.
– The carbon footprint score is determined by the aggregate type, the transport mode and the distance travelled.
The data used to build the Wst 02 tool is based on extensive analysis of existing dataset and reference sources
including: the Crown Estate, British Marine Aggregates Producers Association, Mineral Products Association,
Department of the Environment, Food and Rural Affairs, Waste Resources Action Programme, Building Research
Establishment, Environment Agency and Industry data from rail, aggregate and concrete industries.
Table 66, Table 67 and Table 68 summarise the datasets used by the Wst 02 tool.
The calculator tool uses an ADP value of ‘0’ when the resource is not currently depleting and a value of ‘1’ when no
reserves are available.
350 SD5078: BREEAM UK New Construction 2018 – Consultation draft
UK quarries, concrete batching plants, precast concrete suppliers and asphalt plants that hold BES6001
certification can be found through GreenbookLive
This does not represent the total carbon footprint of the concrete or asphalt product and should not be
referenced as such.
Further guidance
The Environment Agency publishes and updates Quality Protocols at www.environment-agency.gov.uk
Wst 02 Use of recycled and sustainably sourced aggregates 351
Current guidance
– The Quality Protocol for production of aggregates from inert waste, www.gov.uk/government/publications
– Steel slag, incinerator bottom ash aggregates and furnace bottom ash (from coal fired power generation) are
not covered by the above Quality Protocol but are or will be covered by their own quality protocols.
– BS EN 12620:2013. Aggregates for concrete. BSI; 2013.
– BS EN 13139:2013. Aggregates for mortar. BSI; 2013.
– BS EN 13450:2013. Aggregates for railway ballast. BSI; 2013.
– BS EN 13242:2013. Aggregates for unbound and hydraulically bound materials for use in civil engineering work
and road construction. BSI; 2013.
– BS EN 13383-1:2013. Armourstone. Specification. BSI; 2013.
– BS EN 13108-1:2016. Bituminous mixtures. Material specifications. Asphalt Concrete. BSI; 2006.
– BS EN 13108-2:2016. Bituminous mixtures. Material specifications. Asphalt Concrete for Very Thin Layers (BBTM).
BSI; 2016.
– BS EN 13108-4:2016. Bituminous mixtures. Material specifications. Hot Rolled Asphalt. BSI; 2016.
– BS EN 13108-6:2016. Bituminous mixtures. Material specifications. Mastic asphalt. BSI; 2006.
– BS EN 13108-7:2016. Bituminous mixtures. Material specifications. Porous Asphalt. BSI; 2016.
– BS EN 13108-8:2016. Bituminous mixtures. Material specifications. Reclaimed asphalt. BSI; 2016.
– BS EN 13108-3:2016. Bituminous mixtures. Material specifications. Soft Asphalt. BSI; 2016.
– BS EN 13108-5:2016. Bituminous mixtures. Material specifications. Stone Mastic Asphalt. BSI; 2016.
– BS EN 450-1:2012. Fly ash for concrete. Definition, specifications and conformity criteria. BSI; 2012.
– BS EN 14227-3:2013. Hydraulically bound mixtures. Specifications. Fly ash bound granular mixtures. BSI; 2013.
– BS EN 14227-4:2013. Hydraulically bound mixtures. Specifications. Fly ash for hydraulically bound mixtures. BSI;
2013.
– BS EN 13055:2016. Lightweight aggregates. BSI; 2016.
– Highways Agency. Specification for Highway Works - series 600. 2016.
– BS EN 13285:2010. Unbound mixtures. Specifications. BSI; 2010.
352 SD5078: BREEAM UK New Construction 2018 – Consultation draft
1 1 1 1
Aim
To encourage the recycling of operational waste through the provision of dedicated storage facilities and space.
Value
–
Helping to meet corporate and statutory
waste recycling targets
–
Reducing environmental impacts and costs
arising from the disposal of operational
waste
–
Ensuring that occupants have the facilities to
enable them to sort waste at source rather
than paying for this to be carried out off
site
Context
It is a statutory requirement for local authorities and private sector organisations to meet increasing recycling
targets. The aim is to reach higher amounts of recyclable and reusable waste that is re-processed as useful
materials.
Wst 03 Operational waste 353
It is therefore important to provide sufficient storage areas within the building to reflect the recyclable waste
streams that are generated and then collected by the local waste authority. This makes it as clear and convenient as
possible for the building users to separate waste at source and encourage the reduction of waste to landfill.
Assessment scope
Where a green or kitchen waste collection scheme is in operation, the information leaflet provided
by the local authority is sufficient to meet the information leaflet criteria.
2.3 Secure accommodation For a secure accommodation unit, compliance should be based on visitors
(not beds).
2.4 Multi-residential: supported living facility Where it is not possible to locate the recycling bins within a
communal area accessible to residents for safety reasons (e.g. where the residents have mental
health problems and free access to these facilities would pose significant risk of self-harm or harm
to others), it is acceptable to locate them within a dedicated non-obtrusive position accessible to
staff only, but in close proximity to the areas where recyclable waste material is generated.
2.5 Healthcare buildings and country-specific guidance In addition to the standard criteria, the waste
facilities are compliant with the relevant NHS guidelines for that part of the UK.
England
Use HTM 07-01 (England version) where the criterion refers to the use of relevant NHS guidelines
for the country.
Northern Ireland
Use HTM07-01 (Northern Ireland version)where the criterion refers to the use of relevant NHS
guidelines for the country.
Scotland
Use SHTN3 NHS Scotland Waste Management guidance Part A-Best Practice Overview and Part B
Waste Management Policy template where the criterion refers to the use of relevant NHS guidelines
for the country.
Wales
Use WHTM07-01 Safe management of healthcare (Wales) where the criterion refers to the use of
relevant NHS guidelines for the country.
354 SD5078: BREEAM UK New Construction 2018 – Consultation draft
Assessment criteria
1.a: Clearly labelled, to assist with segregation, storage and collection of the recyclable waste streams
1.b: Accessible to building occupants or facilities operators for the deposit of materials and collections by
waste management contractors
1.c: Of a capacity appropriate to the building type, size, number of units (if relevant) and predicted volumes of
waste that will arise from daily or weekly operational activities and occupancy rates.
2.a: Static waste compactors or balers; situated in a service area or dedicated waste management space
2.b: Vessels for composting suitable organic waste OR adequate spaces for storing segregated food waste
and compostable organic material for collection and delivery to an alternative composting facility
2.c: A water outlet provided adjacent to or within the facility for cleaning and hygiene purposes where organic
waste is to be stored or composted on site.
5 Provide home composting facilities and a home composting information leaflet within the kitchen area or
communal space for each self-contain dwelling or bedsit
7.b: Communal space such as communal lounges or utility areas, if no communal kitchens are present
8 Provide home composting facilities and a home composting information leaflet within the kitchen area or
communal space
9 Internal composting waste storage is a minimum of 10 litres in volume for all homes
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
The design team demonstrates that the provision of waste management facilities for the assessed building is
adequate given the building type, occupier (if known), operational function and likely waste streams and volumes to
be generated.
Where it is not possible to determine what provision should be made, use the following guide for minimum
storage space provision:
1. At least 2m²per 1000m²of net floor area for buildings < 5000m²
2. A minimum of 10m²for buildings ≥ 5000m²
3. An additional 2m²per 1000m²of net floor area where catering is provided (with an additional minimum
of 10m²for buildings ≥ 5000m²).
General waste
The storage area for recyclable materials must be in addition to areas and facilities provided for dealing with
general waste and other waste management facilities, e.g. compactors, balers and composters.
Evidence
Definitions
Accessible space
Accessible space is typically within 20m of a building entrance. Depending on the size of the building, site
restrictions or tenancy arrangements, it may not be possible for the facilities to be within 20m of a building
entrance. In such circumstances, judgment on whether the space is ‘accessible’ to the building occupants and
vehicle collection must be made.
Clinical waste
Waste-derived from medical practices and defined as bodily fluids and wastes, drugs and medical equipment;
and other waste which, unless rendered safe, may prove hazardous or infectious to persons coming into contact
with it.
Recyclable storage
The following footprint dimensions (informed by the Metric handbook, Planning and design data(191)) can act as
a guide when determining size and accessibility criteria for the recyclable storage space:
1. Compactor dimensions: about the size of one car parking bay; 4.8 x 2.4m
2. Skip: the footprint of an 8 and 12 cubic yard skip measures 3.4m x 1.8m, therefore allow a minimum of
2.0m width and 4.0m length or 8m²area for the storage and access of such containers
3. Wheeled bins: 360 litre = 0.86m x 0.62/660 L= 1.2m x 0.7m/1100 L = 1.28m x 0.98m
4. Roll-on-roll-off containers: allow a minimum of 6.1m x 2.4m
5. Vehicle access: the following are dimensions for lorry types that are typically used to collect waste.
Therefore gate height and widths should not be smaller than these measurements:
a. Dustcart: medium capacity; length = 7.4m Height = 4m width 3.1m
b. Skip lorry: length = 7m Height = 3.35m width 3.1m.
Consideration must also be given to any other types of vehicle requiring access to this area, e.g. lorries for roll
on/off containers.
Individual recycling bins located at convenient locations throughout the building are necessary to maximise
recycling rates.
Additional information
None.
Wst 04 Speculative floor and ceiling finishes 357
1 1 1
Aim
To minimise the wastage associated with the installation of floor and ceiling finishes in lettable areas in speculative
buildings where tenants have not been involved in their selection.
Value
–
Reduce costs associated with the
procurement, installation, removal and
disposal of materials following letting of
tenants' areas
–
Avoid environmental impacts associated with
the disposal of speculative materials
Context
It is common practice for carpets and other floor finishes to be installed throughout office buildings built as
speculative developments. However, once tenants occupy the buildings they often replace the floor finishes to suit
their particular requirements, resulting in the original materials being wasted as it is rarely possible for them to be
358 SD5078: BREEAM UK New Construction 2018 – Consultation draft
reused elsewhere. In a typical office development, floor finishes are responsible for approximately one third of the
total embodied impacts.
Assessment scope
Assessment criteria
2 Only install specified floor and ceiling finishes selected by the known occupant of a development. Alternatively,
where only ceiling finishes and no carpets are installed, the building owner confirms that the first tenants will be
refused permission to make substantial alterations to the ceiling finishes.
None.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
None.
Evidence
Definitions
None.
360 SD5078: BREEAM UK New Construction 2018 – Consultation draft
Additional information
None.
Wst 05 Adaptation to climate change 361
1 1 1 1
Aim
To minimise the future need of carrying out works to adapt the building to take account of more extreme weather
changes resulting from climate change and changing weather patterns.
Value
– Maximise asset resilience and value
through consideration of the likely impacts of
future climate change on the project.
– Reduce future risks to end user safety arising
from extreme weather events and climate
change.
– Contribute to business continuity, planning in
response to the risks of extreme weather
events and climate change.
– Reduce the need for future adaptation,
maintenance, and disruption associated with
responding to climate change and extreme
weather events.
Context
Annual average UK temperature was 0.9C higher during the period 2005-2014 compared to 1961-1990.
Moreover, sea levels around the UK have risen by 15-20 centimetres since 1900 (192). These figures are forecast to
continue to change as a result of climate change. At the same time, there are upward trends in rainfall across the
UK. Higher levels of winter rainfall have been experienced often in increasingly heavy rainfall events leading to more
362 SD5078: BREEAM UK New Construction 2018 – Consultation draft
flooding and damage to buildings and infrastructure. These patterns are consistent with projections of more and
heavier rainfall for the UK in a warmer global atmosphere.
These changes increase health and safety risks to people and the built environment, increasing costs and disruption
for repair and adaptation. The building stock will largely remain as it currently is for the next 50 to 60 years, given
the relatively low levels of replacement that are likely to occur.
Therefore, there is a need for strategies to mitigate the impact of these events on our building stock overall and in
particular to ensure that new buildings are designed and constructed to minimise future risks while avoiding over
specification and resource use in the meantime.
Assessment scope
Assessment criteria
1.a: A systematic risk assessment to identify the impact of expected extreme weather conditions arising from
climate change on the building over its projected life cycle. The assessment covers the installation of
building services and renewable systems, as well as structural and fabric resilience aspects and includes
(see Methodology on the next page):
2 Develop recommendations or solutions based on the climate change adaptation strategy appraisal, during or
prior to Concept Design (RIBA Stage 2 or equivalent), that aim to mitigate the identified impact.
3 Provide an update during Technical Design (RIBA Stage 4 or equivalent) demonstrating how the
recommendations or solutions proposed at Concept Design have been implemented where practical and
cost effective. Omissions have been justified in writing by the assessor.
5 Meet the criteria or achieve credits of the assessment issues given in Table 69 below.
Wat 01 Water consumption A minimum of three Minimise water demand in periods of drought
credits
Mat 05 Designing for Criteria 2–5 Avoid increased risks of deterioration and higher
durability and resilience maintenance demands
Pol 03 Flood and surface Flood resilience : a Minimise the risks of increased flood risk and surface
water management minimum of one water run-off affecting the site or others
credit
Surface water run-
off: two credits
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
As a minimum follow these steps when completing the climate change adaptation strategy appraisal (see criterion
1)
Responsible individual
1. Nominate an individual to co-ordinate the necessary work and to be responsible for the final report. For
example, this could be a BREEAM AP if appointed.
Hazard identification
1. Review the evidence and information from relevant bodies and resources (Additional information on
page 367) to identify and understand the expected impacts of increased extreme weather events and
climate change on the building. Relevant bodies include, but are not limited to, the following:
a. Local authorities
b. Statutory bodies, e.g. Defra, Environment Agency, Northern Ireland Environment Agency (NIEA), Scottish
Environment Protection Agency (SEPA) etc.
c. Technical bodies, e.g. CIBSE, UK Climate Impacts Programme (UKCIP).
2. As a guide, all adaptation plans should consider the following impacts of climate change and extreme
weather events and describe how the design mitigates against them, where appropriate:
a. Flooding
b. Storms (including high winds)
c. Cold events
d. Heat waves (including temperature increases)
e. Drought (including reduced summer rainfall)
f. Milder winters
g. Wetter winters (including increased moisture and driving rain)
h. Warmer summers and increased solar radiation
i. Temperature variation
j. Precipitation, e.g. rain and snow
k. Subsidence or ground movement
3. Identify likely hazards.
Hazard assessment
1. Identify the likelihood and the magnitude or scale of the hazards identified.
Wst 05 Adaptation to climate change 365
This includes climate change scenarios and their potential impact throughout the lifetime of different building
elements.
Risk estimation
1. Identify the risk presented by these hazards to the building and the likely impact of the hazards taking into
account the following aspects as a minimum:
a. Structural stability
b. Structural robustness
c. Weather proofing and detailing
d. Material durability
e. Health and safety of building occupants and others
f. Impacts on building contents and business continuity.
Risk evaluation
1. Evaluate the potential impact of these risks on the building.
2. Determine the tolerable risk threshold.
3. Check the sensitivity of the risk assessment (see Definitions below).
4. Identify areas where the risks are unacceptable in health and safety, life cycle assessment and financial
terms.
Risk management
1. Identify risk reduction measures.
2. Mitigate the hazards as far as is practically feasible.
3. Adapt the design and specification to incorporate the measures identified by the risk assessment in the
final design.
Evidence
Definitions
Durability
The ability to withstand wear, pressure or damage.
Hazard
A hazard is a situation or event which has the potential to cause harm. It may be an accidental or a malicious
action, insufficient strength or resistance, or excessive deviation from intended limits.
Resilience
The ability of a building or structural system or material to withstand an accidental or exceptional loading or other
incident without experiencing an undue degree of damage or decrease in performance, such that progressive
366 SD5078: BREEAM UK New Construction 2018 – Consultation draft
Table 70 below is an example of a climate change adaptation strategy appraisal for a selection of building
elements and climate change impacts. This example is not a complete appraisal, but illustrates some of the content
that should be included in the appraisal.
Additional information
The following resources for climate change scenarios and impacts are available:
1. Relevant Intergovernmental Panel on Climate Change (IPCC) report on Impacts of Climate Change and
Adaptation(193)
2. UK Climate Change Risk Assessment (194)
3. Climate Change Impacts www.climatejust.org.uk
4. Developing H++ climate change scenarios for heat waves, droughts, floods, windstorms and cold snaps
(195)
The following resources for best practice design guidance are available:
The book 'Design for climate change' describes buildings and issues as part of the Design for Future
Climate, Adapting Buildings programme, the largest programme focusing on the climate change
adaptation of buildings in the UK. This programme from the Technology Strategy Board (TSB) aims to
improve the climate resilience of building projects. The book has guidance on construction, including
structural stability.
The National Adaptation Programme report has been drawn up by the government, industry and other non-
government organisations working together. It contains a mix of policies and actions to help the UK to adapt
successfully to future weather conditions, by dealing with the risks and making the most of the opportunities.
The BRE report 'Potential implications of climate change in the built environment', discusses climate change
adaptation strategies, including some for structural resilience
368 SD5078: BREEAM UK New Construction 2018 – Consultation draft
2 2 2 2
Aim
To avoid unnecessary materials use, cost and disruption arising from the need for future adaptation works as a
result of changing functional demands, climatic change and to maximise the ability to reclaim and reuse materials at
final demolition in line with the principles of a circular economy.
Value
– Reduced waste and cost associated with
future refurbishment or fit-out works and
ultimately in demolition.
– Improved the ability to cost-effectively reuse
and recycle materials.
– Increased the lifetime value of materials and
products.
– Encourage consideration of circular economy
principles during design and construction.
– Reduced costs and disruption associated
with the need for future adaptation,
demolition and strip-out, and therefore
reducing the associated waste and costs.
Context
The construction industry is responsible for approximately 60% of total UK materials use and one third of all waste
produced (202). At least 17 million tonnes of inert waste are produced by the UK construction industry(203).
Typically buildings are stripped out or in many cases even demolished considerably earlier than their design life
would predict or structural stability require. In most cases only high value materials are reclaimed or reused and
Wst 06 Design for disassembly and adaptability 369
many resources are either used for low grade uses, taken to landfill or in some cases, even illegally dumped leading
to increased environmental damage and costs to local authorities and society. This risk can be reduced by
considering building adaptability and also future disassembly to allow easy material separation and reuse. This
includes exposed and reversible connections, layer independence and standardisation which can facilitate
disassembly.
Assessment scope
Assessment criteria
2 Develop recommendations or solutions (see Functional adaptation implementation ) based on the study
(criterion 1 above), during or prior to Concept Design (RIBA Stage 2 or equivalent), that aim to enable and
facilitate disassembly and functional adaptation.
3.a: How the recommendations or solutions proposed by Concept Design have been implemented where
practical and cost effective. Omissions have been justified in writing to the assessor.
3.b: Changes to the recommendations and solutions for the development during the development of the
Technical Design.
4 Produce a building adaptability guide to communicate the characteristics allowing functional adaptability and
disassembly to prospective tenants.
5.a: Design occupied spaces of the building so that they are capable of providing fresh air entirely via a natural
ventilation strategy. The following are methods deemed to satisfy this criterion dependent upon the
complexity of the proposed system:
5.a.i Design room depths in accordance with CIBSE AM10 (205) (section 2.4) to ensure effectiveness of
any natural ventilation system. The openable window area in each occupied space is equivalent to
5% of the gross internal floor area of that room or floor plate;
OR
5.a.ii The design demonstrates that the natural ventilation strategy provides adequate cross flow of air
to maintain the required thermal comfort conditions and ventilation rates. This is demonstrated
using ventilation design tool types that meet the requirements of CIBSE AM10 (or for education
buildings by using the ClassVent tool).
5.b: For a strategy which does not rely on openable windows, or which has occupied spaces with a plan depth
greater than 15m, the design must demonstrate (in accordance with criterion 5.a.ii above above) that the
ventilation strategy can provide adequate cross flow of air to maintain the required thermal comfort
conditions and ventilation rates.
Wst 06 Design for disassembly and adaptability 371
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
– Feasibility: The likelihood to contain multiple or alternative building uses and area functions over the expected life
cycle, e.g. related to the structural design of the building.
– Accessibility: Design aspects that facilitate the replacement of all major plant within the life of the building, e.g.
panels in floors and walls that can be removed without affecting the structure, providing lifting beams and
hoists. Accessibility also involves access to local services, such as local power, data infrastructure etc.
– Versatility: The degree of adaptability of the internal environment to accommodate changes in working
practices.
– Convertibility: The degree of adaptability of the internal physical space and external shell to accommodate
changes of in-use.
– Expandability: The potential for the building to be extended, horizontally or vertically.
– 'Refurbishment potential': The potential for major refurbishment, including replacing the façade.
– Options for multiple building uses and area functions based on design details, e.g. modularity.
– Routes and methods for major plant replacement, e.g. networks and connections have flexibility and capacity for
expansion.
– Accessibility for local plant and service distribution routes, e.g. detailed information on building conduits and
connections infrastructure.
– The potential for the building to be extended, horizontally or vertically.
Ease of disassembly
Ease of disassembly is facilitated by principles allowing the building or parts of the building to be disassembled at
the end of its life, or to be renovated rather than demolished, with individual components being used for other
purposes. The study should consider the following as a minimum:
– Durability: use materials which require less frequent maintenance, repair or replacement, considering them within
the context of the life span of the building.
– Exposed and reversible connections: making the connections more visible provides opportunities to optimise
material and product reuse. Welded connections prohibit disassembly and it is preferable to use screws and
bolts to allow for disassembly and material reuse.
– Layer independence: designing building systems and components in layers so that removal, adjustment or
replacement of some elements is feasible, especially when different components have different life spans and
maintenance needs.
– Avoidance of unnecessary toxic treatments and finishes. Some finishes can contaminate the substrate in a way
that they are no longer reusable or recyclable. This should be avoided unless finishes serve a specific purpose.
372 SD5078: BREEAM UK New Construction 2018 – Consultation draft
– Standardisation can accommodate reuse and upgrading. It involves aspects such as dimensions, components,
connections and modularity.
Buildings that employ a mechanically ventilating or cooling strategy are still able to achieve this credit provided it can
be demonstrated that the features required by the criteria can be made easily available to the building user, e.g.
windows fixed shut for an air-conditioned strategy can be modified to be opening windows. The aim of the
potential for natural ventilation criteria is to ensure that a building is capable of providing fresh air using a natural
ventilation strategy. Where the building is predominantly naturally ventilated, but mechanical ventilation is necessary
to boost ventilation during peak conditions, (i.e. maximum occupancy and peak temperature conditions) due to the
function or specific usage patterns of the building, the potential for the natural ventilation credit can still be
awarded provided calculations or modelling demonstrate that the mechanical ventilation system will be required
for ≤ 5% of the annual occupied hours in the occupied spaces for the adopted building design or layout.
Evidence
BRE has avoided being overly prescriptive for this issue, recognising that this is a complex environmental and design
issue where solutions and approaches are largely influenced by building specific factors. The evidence required to
demonstrate compliance will vary according to RIBA stage. Some examples are:
– Concept Design: reports outlining the activity relating to functional adaptability and disassembly - ideas
discussed, analysis and decisions taken
– Concept and Developed Design stages: drawings or building information model (BIM).
– All stages: meeting notes, construction programme, responsibilities schedule-indicating parties consulted.
The BREEAM Assessor should use their judgment in determining whether the aim and intent of the credit has been
met using appropriate project information to back their judgment. BRE Global will endorse the BREEAM Assessor's
judgment through the Quality Assurance audit where a reasonable justification to award the credit on the basis of
project team actions and proposed design solutions is evident.
Definitions
Building adaptability guide
The guide can be in the form of an analogue document or an Asset Information Model from the Building
Information Model (BIM) created in accordance with PAS 1192 Part 2-2013 (206) and PAS 1192 Part 3-2014
(207). See the new ISO 20887 for information on what the guide could include.
Functional adaptability
The ability of a building to be adapted for a change in operational requirements within the same building type or
for use as a different building type.
Occupied space
A room or space within the assessed building that is likely to be occupied for 30 minutes or more by a building
user. Please note there is a specific, unrelated, definition of 'unoccupied' with reference to acoustic testing and
measurement and this should not be confused with the definition used here.
Additional information
The Health Technical Memorandum 07-07 (208) includes guidance on future-proofing healthcare buildings.
A new ISO (20887) focusing on the ‘Design for disassembly and adaptability of buildings and civil engineering
works’ is expected to be published.
Table 71 below provides examples of functional design measures that may be adopted for each assessment part
when considering accessibility, spatial adaptability and expandability
Table 72 on the next page provides examples of considerations when designing for disassembly.
374 SD5078: BREEAM UK New Construction 2018 – Consultation draft
Table 72 Examples of design measures and aspects to consider regarding future disassembly
Principles for Examples of design measures and aspects to consider
disassembly
Durability – Durability of different building elements based on warranties and risk of being
broken during disassembly
– Consider building elements within the context of the building life span and the
building sector
– Use of temporary structures when a short life span is expected
Exposed and reversible – Exposed and reversible connections facilitate disassembly
connections – Consider space availability between building elements when aiming to
accommodate disassembly
– Poured and welded connections are likely to harm components and prevent
disassembly
Layer independence Layers standing independently, especially when components have different
lifespans.
The following principal layers can be identified as follows:
– Structure: foundation and load-bearing elements
– Skin: exterior surfaces
– Services
– Space plan: the interior layout
– Stuff: furnishings and carpets
Standardisation – Standard-size materials can accommodate multiple uses, reuse and upgrading
– Standard types of connections can be separated and reused more easily
– Modularity allows elements to be slotted together or taken apart to promote
disassembly and flexible environments
Land Use and Ecology 375
Summary
This category encourages sustainable land use, habitat protection and creation, and improvement of long term
biodiversity for the building’s site and surrounding land. Issues in this section relate to the reuse of brownfield sites
or those of low ecological value, mitigation and enhancement of ecology and long term biodiversity management.
LE 01 Site selection 2 credits
– Recognition of the reuse of previously developed and contaminated land where appropriate remediation has
taken place.
376 SD5078: BREEAM UK New Construction 2018 – Consultation draft
LE 01 Site selection
fsd 2 2 2
Aim
To encourage the use of previously occupied or contaminated land and avoid land which has not been previously
disturbed.
Value
– Avoids the use of greenfield land
therefore reducing the environmental impact
of the development
– Regeneration provides social and economic
benefits to the development and the
surrounding local community
– Remediation removes threats to health and
safety, and enables land, to be improved that
would otherwise be left.
Context
Brownfield redevelopment not only cleans up environmental health hazards and eyesores, but also stimulates
community regeneration, particularly when communities input into the consultation process. The reclamation and
reuse of previously developed sites also aligns with Government policies to increase the uptake of brownfield land,
and allows us to preserve existing biodiversity by reducing our reliance on greenfield land.
LE 01 Site selection 377
Assessment scope
LE 01 Site selection
Assessment criteria
2.c: The options for remediating sources of contamination which present an unacceptable risk.
3 The client or principal contractor confirms that remediation of the site will be carried out in accordance with the
remediation strategy and its implementation plan as recommended by the contaminated land professional
(see Definitions).
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
Evidence
Definitions
Development footprint
The development footprint includes any land used for buildings, hardstanding, landscaping, site access or where
construction work is carried out (or land is being disturbed in any other way), plus a 3m boundary in every
direction around these areas. It also includes any areas used for temporary site storage and buildings. If it is not
known exactly where buildings, hardstanding, site access, temporary storage and buildings will be located, it
must be assumed that the development footprint is the entire development site.
Where asbestos is found to be present in the ground this is classed as contamination for the purposes of this
issue. If asbestos is present in existing building fabric, the site cannot be classified as contaminated land.
Proposed development
Any development (building, hard landscaping, car park and access roads) that falls within the boundary of the
assessed site.
Remediation
Any activity undertaken to prevent, minimise, remedy or mitigate the risk caused by contaminated land to human
health, the environment or local resources such as sources of potable water.
Additional information
None.
Pollution 381
Pollution
Summary
This category addresses the prevention and control of pollution and surface water run-off associated with the
building's location and use. Issues in this section aim to reduce the buildings impact on surrounding communities
and environments arising from light-pollution, noise, flooding and emissions to air, land and water.
Pol 01 Impact of refrigerants 3 credits
– To recognise buildings which limit their impact on local air quality, by consideration of the combustion plant and
fuel used on site.
Pol 03 Flood and surface water management 5 credits
– To reward buildings and their sites that limit on and off-site local flooding and hence the damage this can lead
to.
Pol 04 Reduction of night time light pollution 5 credits
– Avoidance or reduction of the impact of night time light pollution, through careful design and specification of
light sources.
Pol 05 Reduction of noise pollution 5 credits
3 3 3 Not applicable
Fully fitted Simple building Shell & core Shell only No Minimum standard
Aim
To reduce the level of greenhouse gas emissions arising from the leakage of refrigerants from building systems.
Value
– Increase system resilience and market
value through the use of low impact
refrigerants in buildings.
– Minimising future liabilities and adaptation
costs associated with changes to statutory
requirements relating to refrigerant use.
– Limit the potential release and impact of
refrigerant gases into the atmosphere.
– Assist in meeting corporate CSR reporting
targets relating to refrigerant use.
Context
The typical refrigerants used in building cooling systems are major greenhouse gases that are many times more
potent than carbon dioxide in their contribution to global warming and climate change. Although released in much
smaller quantities they are, never the less, a significant contributor to increasing global temperatures. As such they
are the focus of increasingly strict regulatory controls internationally and nationally. Worldwide agreements such as
the 1992 United Nations Framework Convention on Climate Change (UNFCCC) and its extension the Kyoto
Protocol commit signatories to reducing greenhouse gas emissions and banning the worst performing gases. The
Pol 01 Impact of refrigerants 383
agreements seek to shift use to low impact refrigerants over time and so provide a timescale for the phasing out
of more potent refrigerants because the use of the gases is widespread and key to industries across developed
and developing countries.
BREEAM seeks to support this agenda and promote more rapid change by creating market value for
developments with reduced impact refrigerants by limiting the volume or weight of gases used, their potential
impact and for specifying systems which detect and control leakage of gas to the atmosphere.
Assessment scope
Assessment criteria
OR alternatively, where the building does require the use of refrigerants, the three credits can be awarded as
follows:
Prerequisite
2 All systems (with electric compressors) must comply with the requirements of BS EN 378:2008 (210) (parts 2
and 3). Where refrigeration systems containing ammonia are installed, the Institute of Refrigeration Ammonia
Refrigeration Systems code of practice(211) must be complied with.
Impact of refrigerant
Two credits
3 Where the systems using refrigerants have direct effect life cycle CO2 equivalent emissions (DELC) of ≤ 100
kgCO2e/kW. For systems which provide cooling and heating, the worst performing output based on the lower
of kW cooling output and KW heating output must be used to complete the calculation. To calculate the DELC
please refer to the relevant definitions in the Methodology on the facing page and Additional information on
page 389 sections.
OR
4 Where air-conditioning or refrigeration systems are installed the refrigerants used have a Global Warming
Potential (GWP) ≤ 10.
OR
One credit
5 Where the systems using refrigerants have DELC of ≤ 1000 kgCO2e/kW cooling and heating capacity.
OR
6.a.i Systems using refrigerants have a permanent automated refrigerant leak detection system
installed, that is robust and tested and capable of continuously monitoring for leaks.
OR
Pol 01 Impact of refrigerants 385
6.a.ii Where an inbuilt automated diagnostic procedure for detecting leakage is installed, which is enabled
for detecting leaks.
6.b: In the event of a leak, the system must be capable of automatically responding and managing the
remaining refrigerant charge to limit loss of refrigerant (see Automatic isolation and containment of
refrigerant on page 389).
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
The direct effect life cycle CO2e emissions (DELC) per kW of cooling and heating capacity are calculated using the
following equation:
Where:
Where:
The following default values must be used, where system specific data are not available:
Sysop-life: System operational design life (years): see Table 73 on the next page
L1: Annual leakage rates (% refrigerant charge): see Table 74 on the next page.
L2: Annual purge release factor (% refrigerant charge): 0.5 (if the system does not require an annual purge, zero
should be used).
S1: Annual service release (% refrigerant charge): 0.25 (this applies where the system requires opening up to carry
out the annual service. For systems which do not require opening up, there will be no associated annual release of
refrigerant, therefore a default of zero should be used).
S2: Probability factor for catastrophic failure (% refrigerant charge loss/year): 1 (based on a failure rate of 1 in 100
systems).
386 SD5078: BREEAM UK New Construction 2018 – Consultation draft
The following information must be sourced from the design team's mechanical and electrical engineer or system
manufacturer:
– System type
– Ref charge: Refrigerant charge (kg)
– GWP: Global Warming Potential of refrigerants
– cooling and heating capacity (kW).
Table 74 Default values for DELC calculation when manufacturer's figures are not available
System type Annual leakage rate
(% of charge per annum)
Cold storage and display systems
Integral cabinets 3%
Split or condensing units 18%
Centralised 19%
Air-conditioning systems
Unitary split 15%
Small-scale chillers 10%
Medium or large chillers 5%
Heat pumps 6%
These figures are based on those reported in LOT 6 for air-conditioning units and also Table 2 of the Market
Transformation Programmes Briefing Note for Commercial Refrigeration no. 36, 'Direct Emission of
Refrigerant Gases' (version 1.2). The figures are based on the average of the leakage rates from the four
separate studies reported in Table 2 (where a range is reported, the higher value was used).
Leak detection
The refrigerant leak detection criteria are still applicable in instances where any type of non-solid refrigerant is
present, i.e. even if the refrigerant meets BREEAM's DELC CO2e benchmarks. Exceptions to this are systems that use
natural and environmentally benign refrigerants, such as air and water (for example lithium bromide or water
absorption chillers) and installations of small multiple hermetic systems. These types of system or refrigerants will
achieve the leak detection credit by default. See criterion 6 on page 384.
Pol 01 Impact of refrigerants 387
Evidence
Definitions
Refrigerant recovery
The process of removing refrigerant from a system and storing it in an airtight container.
388 SD5078: BREEAM UK New Construction 2018 – Consultation draft
product list or an equivalent list, the design team must demonstrate to the assessor that the system specified
meets the principles of the scheme as far as is applicable.
Refrigerant
There are three main types of refrigerants:
1. Hydrogenated fluorocarbon refrigerants (HFCs) are made up of hydrogen, fluorine and carbon. These
do not use a chlorine atom (which is used in most refrigerants). Due to this they are known to be one of
the least damaging to the earth's ozone layer.
2. Hydrogenated chlorofluorocarbon refrigerants (HCFCs) are made up of hydrogen, chlorine, fluorine and
carbon. These refrigerants contain minimal amounts of chlorine; they are not as detrimental to the
environment as some other refrigerants.
Pol 01 Impact of refrigerants 389
3. Chlorofluorocarbon refrigerants (CFCs) contain chlorine, fluorine and carbon. These refrigerants carry
high amounts of chlorine so they are known to be the most hazardous to the ozone layer.
The use of CFCs and HCFCs as refrigerants has been addressed under the Montreal protocol. Phase-out
programmes have been agreed resulting in these substances no longer being used as refrigerants in all new
installations and most existing situations. The industry's favoured replacements are currently HFCs which are
often potent global warming contributors. Hydrocarbons and ammonia-based refrigerants have low or zero
GWP and are therefore preferred long term options. These are now widely available and are valid alternatives to
HFCs in all buildings, provided health and safety issues are fully addressed. The United Nations Environment
Programme (UNEP) hosts a HCFC help centre which contains information about the management and phase out
of HCFCs and alternatives to HCFCs in the refrigeration and air-conditioning sector www.uneptie.org.
Additional information
Common refrigerants
Table 75 List of some common refrigerant types with low GWP
R-Number Chemical name GWP
100-yr
R-30 Dichloromethane 9
R-170 Ethane 3
R-290 Propane 3
R-600 Butane 3
R-600a Isobutane 3
R-702 Hydrogen 5.8
R-717 Ammonia 0
R-718 Water 0.2–0.2
R-729 Air (nitrogen, oxygen, argon) 1
R-744 Carbon dioxide 1
R1150 Ethylene 3
R-1234yf 2,3,3,3-Tetrafluoropropene 4
R-1270 Propylene 3
Sources: The United Nations Environment Programme '2010 Report of the Refrigeration, Air-conditioning and
Heat Pumps Technical Options Committee'
EN 378-1:2008+A2:2012 Refrigerating systems and heat pumps - Safety and environmental requirements.
Part 1: Basic requirements, definitions, classification and selection criteria - Annex E.
The Intergovernmental Panel on Climate Change' 5th Assessment Report, Chapter 8, 'Anthropogenic and
Natural Radiative Forcing', 2013
390 SD5078: BREEAM UK New Construction 2018 – Consultation draft
The formula used to calculate the DELC emissions in BREEAM is based on the total equivalent warming impact
(TEWI) calculation method for new stationary refrigeration and air-conditioning systems. TEWI is a measure of the
global warming impact of equipment that takes into account both direct emissions and indirect emissions
produced through the energy consumed in operating the equipment. This BREEAM issue is concerned with direct
emissions and the BREEAM energy section is concerned with indirect emissions.
Refer to BS EN 378-1 (214) and the BRA's Guideline methods of calculating TEWI for further details. The BRA
publication also includes sectorial release factors for new systems designed to best practice standards.
REAL Zero
The refrigeration and air-conditioning sector supported by the Carbon Trust is working across all sectors of
business and industry, to help achieve significant reductions in carbon emissions due to refrigerant leakage from
installed systems. The Institute of Refrigeration led initiative, Real Zero, is building a clearer understanding of where
and why leakage occurs as well as how to prevent it.
For further information including guidance notes, calculators, tools and case study information, visit:
www.ior.org.uk and www.realskillseurope.eu.
Pol 02 Local air quality 391
2 2 2 Not applicable
Fully fitted Simple building Shell & core Shell only No Minimum standard
Aim
To contribute to a reduction in local air pollution through the use of low emission combustion appliances in the
building.
Value
– Improved air quality for building occupants, visitors and neighbours leading to better health and wellbeing
outcomes.
– Increased staff satisfaction and productivity.
– Enhanced acceptability of a building locally especially in areas with compromised air quality that have their
emissions even more tightly controlled.
392 SD5078: BREEAM UK New Construction 2018 – Consultation draft
Context
Poor air quality has a detrimental effect on humans, fauna and flora. Gases such as Nitrous Oxides (NOx) can react
with other gases and environmental factors including sunlight to create substances that have a major impact on
health and wellbeing. The resulting substances can be highly detrimental to human health. They can be carcinogenic,
affect respiratory function (including asthma and other bronchial complaints), have a sensitising effect for allergy
suffers and increase instances of heart disease. Legislation covering the UK sets maximum acceptable limits for
measured air pollutants. Under this issue BREEAM seeks to limit emissions from developments in use that affect
local air quality.
Assessment scope
Assessment criteria
Up to two credits
1 All installed combustion plant that provide space heating and domestic hot water and for which minimum
emission levels have been set under European Directive 2009/125/EC(215)must meet the following emission
levels. All measurements must be provided by manufacturers, following the labelling requirements of the
directive. To award either one or two credits, all systems must be compliant for all emission levels, including the
second table if relevant to the fuel. Regardless of the pollutants responsible for the creation of an Air Quality
Management Area (AQMA), if the development is in an AQMA all emissions must meet the lower levels for that
technology and fuel for the credits to be awarded.
Table 76 Maximum NOx emission levels by appliance type, fuel and AQMA
Appliance type and unit Fuel In AQMA Outside AQMA
NO x NO x NO x NO x
(1 credit) (2 credits) (1 credit) (2 credits)
Boiler (mg/kWh) Gas 27 24 41 27
Boiler (mg/kWh) Oil 56 50 63 56
Boiler (mg/m³) Biomass 56 50 165 131
Boiler (mg/m³) Solid fuel 56 50 165 131
Cogeneration or heat pumps using Gas 34 30 52 34
external combustion (mg/kWh)
Cogeneration or heat pumps using Oil 56 50 108 96
external combustion(mg/kWh)
Cogeneration - using internal Gas 56 50 179 119
combustion engine
Cogeneration - using internal Oil 56 50 379 339
combustion engine(mg/kWh)
Local Space Heaters (mg/kWh) Gas and Oil 56 50 103 76
Open and closed fronted local Biomass, 56 50 165 131
space heaters (mg/m³) Solid fuel
and Wood
pellets
Table 77 Maximum particulate matter and volatile organic compound emissions for appliances using biomass,
solid fuel and wood pellets
Appliance type and Fuel In AQMA Outside AQMA
unit 1 Credit 2 Credits 1 Credits 2 Credits
PM VOC PM VOC PM VOC PM VOC
Boiler (mg/m³) Biomass 6 7 4 5 27 13 14 7
Boiler (mg/m³) Solid Fuel 6 7 4 5 29 13 19 7
Open faced local Biomass 6 20 4 10 39 50 29 50
space heater (mg/m³) and Solid
Fuel
394 SD5078: BREEAM UK New Construction 2018 – Consultation draft
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
Awarding credits
All three emission levels (if applicable to the fuel) must be met. Where a development is in an AQMA, regardless of
the emissions which have resulted in the AQMA, all relevant emission levels in the tables need to be met to award
credits.
Grid electricity
Where grid electricity is used to supply building systems emissions should be assumed to be zero for the purpose
of BREEAM. The reason for this is based on the aim of the issue, which is to improve local air quality.
Heat recovery
Heat recovery can be considered as having zero NOx emissions for the purpose of this issue.
Open flue
No credits may be awarded for open flue heating or hot water systems.
Pol 02 Local air quality 395
Evidence
Definitions
1. Scotland: www.gov.scot
2. Wales, Northern Ireland and England: www.ncm.bre.co.uk/
Approved building energy calculation software will provide the data required for calculating the EPR NC and
BREEAM Ene 01 credits. Please note that for dwellings (where relevant to the assessment of multi-residential
buildings), the government’s SAP may be used. The current version is SAP 2012 version 9.92 (October 2013).
NO x emissions
NOx emissions are pollutant gases produced by the combustion of fossil fuels. NOx reacts with heat and sunlight
to produce ozone that can cause serious respiratory problems. It also reacts with water to produce acid rain
which has a detrimental effect on ecosystems.
Additional information
The BREEAM requirements are set against AQMAs because these areas have fallen below an acceptable standard.
Hence, air quality is of greater importance in these areas, so new buildings and assets are required to perform
better to achieve credits.
See www.uk-air.defra.gov.uk.
Ecodesign Directive
The EU’s Ecodesign Directive sets a framework for mandatory requirements for energy-using products. A number
of separate commission regulations documents specify minimum levels for various emissions for different
technologies. Where minimum emission levels have been set, the measured emission levels achieved must be
included on the product label. These documents define both minimum and BAT (best available technology)
emission levels for relevant emissions and BREEAM has used these emission levels as a basis for setting the
benchmarks in Table 76 on page 393 and Table 77 on page 393. Regardless of the implementation date of the
regulation covering the appliance, the relevant BREEAM benchmarks must be achieved to award credits.
The relevant EU Commission Regulation documents are listed below together with the relevant implementation
dates:
– Commission Regulation (EU) No 813/2013 of 2 August 2013 implementing Directive 2009/125/EC of the
European Parliament and of the Council with regard to ecodesign requirements for space heaters and
combination heaters
– Commission Regulations (EU) No 814/2013 of 2 August 2013 implementing Directive 2009/125/EC of the
European Parliament and of the Council with regard to ecodesign requirements for water heaters and hot water
storage tanks
– Commission Regulations (EU) No 2015/1189 of 28 April 2015 implementing Directive 2009/125/EC of the
European Parliament and of the Council with regard to ecodesign requirements for solid fuel boilers
– Commission Regulation (EU) 2015/1188 of 28 April 2015 implementing Directive 2009/125/EC of the
European Parliament and of the Council with regard to ecodesign requirements for local space heaters
– Commission Regulation (EU) 2015/1185 of 24 April 2015 implementing Directive 2009/125/EC of the
European Parliament and of the Council with regard to ecodesign requirements for solid fuel local space heaters
Market research shows that the benchmarks are achievable but in some cases is challenging and in AQM areas only
technologies and fuel types with lower emission levels are likely to achieve any credits. This has been done to
incentivise the market to improve the performance of products.
Pol 03 Flood and surface water management 397
5 5 5 5
No Minimum standard
Aim
To avoid, reduce and delay the discharge of rainfall to public sewers and watercourses, thereby minimising the risk
and impact of localised flooding on and off-site, watercourse pollution and other environmental damage.
Value
–
– Incentivise site selection and development
design that minimises the potential for
flooding on and off site.
– Limit the impact of development on off-
site water management infrastructure,
including the potential future increase in
rainwater from climate change.
– Enhance the resilience of local drainage
and flood prevention systems.
– Minimising the release of waterborne
pollutants off-site.
Context
In the UK around 0.5 million homes, offices, factories and warehouses are considered to be at a significant risk of
flooding, i.e. they have a greater than one in 75 chance per year of being flooded. Apart from the initial effects of
being flooded, i.e. access and use of the building, once flood water is removed significant resources (man hours,
time and cost) are usually required to clean, refit and re-open buildings for use.
398 SD5078: BREEAM UK New Construction 2018 – Consultation draft
This has major impacts on business continuity that can be costly and time consuming to manage. With due
consideration at an early stage the location, design and specification of the development (including the building,
curtilage and wider site) the risk of flooding and impact if it is flooded can be managed.
Assessment scope
Fully Simple building Shell and Shell
fitted core only
Applicable Assessment 1–22 All 1–22 1–22
criteria
Assessment type specific None 1 (2 credit) or 2 and 3 (1 None None
notes credit)
23 (2 credits) or 24 (1 credit)
4 to 14 (1 exemplary credit)
15 to 22 (1 credit)
Assessment criteria
Prerequisite
1 An appropriate consultant is appointed to carry out, demonstrate and confirm the development's compliance
with all criteria.
4 To increase the resilience and resistance of the development to flooding, one of the following must be
achieved:
4.a: The ground level of the building and access to both the building and the site, are designed (or zoned) so
they are at least 600mm above the design flood level of the flood zone in which the assessed
development is located (see Pol 03 Flood and surface water management above).
4.b: The final design of the building and the wider site reflects the recommendations made by an appropriate
consultant in accordance with the hierarchy approach outlined in section 5 of BS 8533:2011 (216).
One credit
6 Where drainage measures are specified to ensure that the peak rate of run-off from the site to the
watercourses (natural or municipal), a 30% improvement must be shown for the developed site compared to
the pre-developed site. This should comply at the 1-year and 100-year return period events.
400 SD5078: BREEAM UK New Construction 2018 – Consultation draft
7 Relevant maintenance agreements for the ownership, long term operation and maintenance of all specified
Sustainable Drainage Systems (SuDS) are in place.
8 Calculations include an allowance for climate change; this should be made in accordance with current best
practice planning guidance (see definitions).
One credit
9 Where flooding of property will not occur in the event of local drainage system failure (caused either by
extreme rainfall or a lack of maintenance); AND
EITHER
10 Drainage design measures are specified to ensure that the post development run-off volume, over the
development lifetime, is no greater than it would have been prior to the assessed site’s development. This
must be for the 100-year 6-hour event, including an allowance for climate change (see criterion 14).
11 Any additional predicted volume of run-off for this event is prevented from leaving the site by using infiltration
or other SuDS techniques.
12 Justification from the appropriate consultant indicating why the above criteria cannot be achieved, i.e. where
infiltration or other SuDS techniques are not technically viable options.
13 Drainage design measures are specified to ensure that the post development peak rate of run-off is reduced
to the limiting discharge. The limiting discharge is defined as the highest flow rate from the following options:
13.c:2L/s/ha.
For the one-year peak flow rate, the one-year return period event criterion applies.
14 Relevant maintenance agreements for the ownership, long term operation and maintenance of all specified
SuDS are in place.
15 For either option, above calculations must include an allowance for climate change; this should be made in
accordance with current best practice planning guidance.
17 In areas with a low risk source of watercourse pollution, an appropriate level of pollution prevention treatment
is provided, using appropriate SuDS techniques.
18 Where there is a high risk of contamination or spillage of substances such as petrol and oil, separators (or an
equivalent system) are installed in surface water drainage systems.
19 Where the building has chemical or liquid gas storage areas, a means of containment is fitted to the site
drainage system (i.e. shut-off valves) to prevent the escape of chemicals to natural watercourses (in the event
of a spillage or bunding failure).
20 All water pollution prevention systems have been designed and installed in accordance with the
recommendations of documents such as the National Planning Policy Framework(217) or where applicable the
SuDS manual (218). They must be bespoke solutions taking account of the specific site requirements and
natural or man-made environment of and surrounding the site. For areas where vehicle washing will be taking
place, pollution prevention systems must be in accordance with Pollution Prevention Guidelines 13 (219).
21 A comprehensive and up to date drainage plan of the site will be made available for the building or site
occupiers.
Pol 03 Flood and surface water management 401
22 Relevant maintenance agreements for the ownership, long term operation and maintenance of all specified
SuDS must be in place.
23 Where present, all external storage and delivery areas designed and detailed in accordance with the current
best practice planning guidance (see Pol 03 Flood and surface water management on page 399).
24.a:There is a decrease in the impermeable area by 50% or more, from the pre-existing impermeable hard
surfaces.
24.b:Where all run-off from the roof for rainfall depths up to 5mm from all new and existing parts of the
building have been managed on-site using source control methods.
OR
25.b:If there is an increase in the impermeable surface as a result of the new construction then the following
must be met:
25.b.iHard standing areas—where there is an extension or increase in the hardstanding areas and hence
an increase in the total impermeable area as a result of the new construction, the hardstanding area
must be permeable or be provided with on-site SuDS to allow full infiltration of the additional
volume, to achieve the same end result. The permeable hardstanding must include all pavements
and public rights of way, car parks, driveways and non-adoptable roads, but can exclude small
garden paths which will drain onto a naturally permeable surface.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
Contaminated sites
Drainage designs for sites must take into account legislation relating to contaminated sites, however in many
circumstances, even on contaminated sites, there may be opportunities for the installation of some SuDS
techniques.
Sources of flooding
The FRA must detail the risk of flooding from the following sources:
1. Fluvial (rivers)
2. Tidal
3. Surface water: sheet run-off from adjacent land (urban or rural)
4. Groundwater: most common in low-lying areas underlain by permeable rock (aquifers)
5. Sewers: combined, foul or surface water sewers
6. Reservoirs, canals and other artificial sources.
Pol 03 Flood and surface water management on page 399 provides more detail on the above sources of
flooding.
The content of the FRA should be based on historic trends, but should also account for predicted changes to the
climate which may impact on the flood risk to the site in future
600mm threshold
It is accepted that, for buildings located in medium and high risk flood zones, areas of the car park and site access
may be allowed to flood and therefore fall below the 600mm threshold. In such cases the credit is still achievable
provided safe access to the site, and the ground floor of the building can be maintained (i.e. they are 600mm
above the design flood level) to ensure the building and site do not become an ‘island’ in the event of a flood.
Where the development has been permitted and the ground levels of the topography or infrastructure
immediately adjacent to the site fall below the 600mm threshold, the credit can still be awarded. This is provided
there are no other practical solutions for access to the site above this level and the assessed building, and access to
it, meet the assessment criteria. As much of the external site area as possible (or as required by an appropriate
statutory body) should be designed at or above the threshold. For buildings located in medium or high flood risk
zones, any areas used to store sensitive, historical, hazardous, valuable and perishable materials, e.g. radioactive
materials, microbiological facilities, server rooms, libraries, etc., must be located above the 600mm threshold.
For small simple sites (2000 m²and less), an acceptable FRA could be a brief report carried out by the contractor’s
engineer confirming the risk of flooding from all sources of flooding, including information obtained from the
Environment Agency, water company or sewerage undertaker, other relevant statutory authorities, site
investigation and local knowledge.
1. The individual building and its associated hardstanding areas can be assessed independently where the
run-off is being dealt with on a building-by-building basis (i.e. each building has its own dedicated sub-
catchment that serves only that building).
Pol 03 Flood and surface water management 403
2. When assessing the run-off from a number of buildings (including domestic and non-domestic buildings)
the assessment must take into account the drainage from the local sub-catchment serving all those
dwellings or buildings. Note that proportioning cannot be used to calculate the percentage of run-off
discharging into the local sub-catchment resulting from just the assessed building.
3. The whole development can be assessed for compliance.
Whichever approach is taken to demonstrate compliance, it must be consistent when completing both the rate of
run-off and volume of run-off calculations.
Roof plant
Roof-top plant space must be considered where there is a risk from polluting substances such as petrol or oil.
Refrigerants are not assessed under the pollution aspect of this issue, as the main risk of pollution is to air and not
the watercourse.
Brownfield sites
The calculation of brownfield run-off rates should be as follows:
– If the existing drainage is known then it should be modelled using best practice simulation modelling, to
determine the one-year and 100-year peak flow rates at discharge points (without allowing surcharge of the
system above cover levels to drive greater flow rates through the discharge points).
– If the system is not known, then the brownfield run-off should be calculated using the greenfield run-off models
described above but with a Soil Type 5.
– Priority Level 1 Water is collected for use in the development (e.g. rainwater harvesting)
– Priority Level 2 Water is infiltrated into the ground
– Priority Level 3 Water is discharged to surface water body
– Priority Level 4 Water is discharged to the drainage system
– Priority Level 5 Water is discharged to a combined sewer
For example, if the flow rate for the 1 year and 100 year events were 4L/s and 7L/s respectively, then the limiting
discharges would be 5L/s and 7L/s. Similarly, if it was calculated to be 2L/s and 4L/s, then a maximum of 5L/s
limiting discharge rate could be applied to both discharge points.
Sites should not be subdivided to enable higher overall limiting discharge rates to be claimed. It is, however,
recognised that some sites may require more than one discharge point as a result of the local topography or
existing surrounding drainage infrastructure. In such cases, the limiting discharge flow rate may be increased to a
level no more than 5L/s at each discharge point. The assessor should seek evidence that the number of discharge
points is necessary due to topography or infrastructure limitations. Evidence may be in the form of a topographical
map and an explanation from the appropriate consultant as to why multiple discharge points are required, stating
that it is not feasible to have fewer discharge points.
Evidence
Definitions
Adoptable highways
For the purposes of BREEAM, an ‘adoptable’ highway is a highway that is the responsibility of the highways
authority in terms of installation and maintenance of surface water drainage which only carries run-off from the
highway itself. This means that to fall under the definition of an ‘adoptable highway’ the drainage network must
not be directly connected to any other upstream drainage network (e.g. from a private development) and only
handle run-off from the adoptable highway. Where drainage within the highway will carry run-off from both the
highway and housing, it is not regarded as an 'adoptable' highway. In this instance the drainage design must take
account of the highway run-off.
Appropriate consultant
A consultant with qualifications and experience relevant to designing SuDS and flood prevention measures and
completing peak rate of run-off calculations. Where complex flooding calculations and prevention measures are
required, this must be a specialist hydrological engineer.
406 SD5078: BREEAM UK New Construction 2018 – Consultation draft
Catchment
The area contributing surface water flow to a point on a drainage or water course. It can be divided into sub-
catchments.
Control devices
Any drainage structure or unit designed to control the run-off of storm water. Examples of SuDS control devices
are check dams within swales and basins, and combined weir or orifice controls for ponds. Examples of
traditional control devices are throttles constructed with pipes and vortex controls. The control devices must be
capable of regular inspection and maintenance, and the system should be failsafe so that upstream flooding
does not result from blockage or other malfunction. For guidance on control devices, refer to The SuDS manual
(CIRIA C697, 2007) and other best practice guidelines.
Discharge point
The discharge points is the point at which the run-off from the site leaves the site boundary and enters a
watercourse.
Flood defences
Flood defences do not completely remove the risk of flooding, but they do reduce it. Building in areas where
flood defences are present (and appropriately designed to withstand a certain magnitude of flooding) is
therefore preferable to those built in medium or high risk areas without defences. However, for the purpose of
this issue, it is still preferable to build in areas of low risk than encourage development of new flood defences in
areas with a higher risk of flooding purely for the sake of new development.
Flood event
A flooding incident characterised by its peak level or flow, or by its level or flow hydrograph.
Pol 03 Flood and surface water management 407
Flood probability
The estimated probability of a flood of given magnitude occurring or being exceeded in any specified time
period. For example, the 100-year flood has a 1% chance of occurring in any given year.
Flood risk
The combination of the flood probability and the magnitude of the potential consequences of the flood event.
Flood storage
The temporary storage of excess run-off or river flow in ponds, basins, reservoirs or on the flood plain during a
flood event.
Flood zones
Flood zones are defined in the relevant planning, policy and technical guidance documents for each country in the
UK: Planning Practice Guidance - Flood Risk and Coastal Changes (England), TAN15 (Wales), SPP7 (Scotland),
PPS15 (Northern Ireland). Please note, PPS15 does not categorise flood risk zones and there are no similar
publicly available flood maps covering Northern Ireland. Assessments in Northern Ireland will therefore need to
rely on-site-specific flood risk assessments, or other relevant data or surveys, to determine the extent of flood
risk for a specific development, and use the same definitions as those outlined for England ( Table 78 on
page 410). The Northern Ireland Department of Environment or Rivers Agency may offer further advice or
recommendations in this respect www.doeni.gov.uk and www.dardni.gov.uk.
While the definitions of flood zones and probabilities of flooding are generally the same throughout the UK,
there are some differences. The definitions are outlined in Table 78 on page 410.
Greenfield
A site which has either never been built on, or one which has remained undisturbed for five years or more.
Hard surfaces
These include roofs, car parks, access roads, pavements, delivery or service yards and external hard landscaping.
Footpaths less than 1.5 m wide which have free drainage to soft landscaped areas on both sides may be
excluded.
Infiltration
The passage of water into a permeable surface, such as soil, permeable paving, soakaways and so on.
Limiting discharge
The limiting discharge is based upon the calculated pre-development flow rate at a discharge point.
408 SD5078: BREEAM UK New Construction 2018 – Consultation draft
Pre-development
The state of the site under assessment immediately prior to purchase of the site by the client or developer (or,
where the client has owned or occupied the site for a number of years, its current state).
Qbar
An estimation of the mean annual flood flow rate from a catchment (see Report IH124 Flood estimations for
small catchments).
Rainwater discharge
Rainwater discharge is the rainwater which flows from the development site to watercourses and sewers. It is
also referred to as run-off.
Run-off
This is usually rainwater, but can also be groundwater or overspill from sewers and other sources.
Sewerage undertaker
This is a Body, typically a water company, with statutory responsibility for sewerage and sewerage disposal and
also surface water from roofs and yards of premises.
Soakaways
A subsurface structure designed to promote the infiltration of surface water into the ground. As a general point,
soakaways may be shallow and broad–as in a blanket under permeable paving, or deeper structures. Deeper,
point source soakaways should be avoided for road and car park drainage, but shallow structures providing
infiltration in an extensive way (infiltration trenches and permeable paving) do not need oil separators.
SuDS techniques
One or more components built to manage surface water run-off to prevent flooding and pollution, including for
example: wet ponds, infiltration basins, detention basins, swales, reed beds, pervious (porous or permeable)
paving, soakaways, rainwater harvesting, filter strips, filter drains and trenches with or without perforates pipes,
green roofs and underground attenuation storage. For more information refer to The SuDS manual (CIRIA C753,
2015).
Tidal estuary
A tidal estuary is defined as a semi-enclosed coastal body of water which has a free connection with the open sea
and within which seawater is measurably diluted with fresh water derived from land drainage. An estuary should
be unconstrained tidal waters, i.e. there should be no barriers or constricted shorelines that would restrict the
free flow of water into the open sea in any conditions. The impact on the total volume of run-off from the site
(and other sites which may in future discharge into the estuary) should be insignificant in terms of the overall
water levels in the estuary. Tidal rivers (i.e. where no or limited measurable seawater content is present during
normal tidal movements) cannot be included as part of the estuary for the purposes of BREEAM.
Treatment
Improving the quality of water by physical, chemical or biological means.
Bypass separators: These fully treat all flows generated by rainfall rates of up to 5mm/hr. Flows above this rate
are allowed to bypass the separator. These separators are used when it is an acceptable risk not to provide full
treatment for high flows.
Volume of run-off
The volume of run-off that is generated by rainfall occurring on the site. This is typically measured in cubic metres.
Additional predicted volume of run-off is the difference between the volumes of run-off pre- and post
development.
Additional information
This section will be revised when the national standards for sustainable drainage and associated regulations come
into force.
– Holding ponds
– Swales
– Reed beds
– Permeable paving - in areas where local geological and hydrological conditions allow this to function, e.g. block
paved surface on permeable sub-base over gravel bed to store the water and allow it to seep into the soil. For
less permeable soils, the gravel layer might be deeper and the water taken to a soakaway although this is not an
option in some areas
– Local or centralised soakaways either as full systems or as ‘overflow’ or ‘holding’ systems, in areas where local
geological and hydrological conditions allow them to function
– Run-off from roofs collected as a part of a rainwater harvesting system
– Run-off from roofs directed to a local soakaway or other holding facility such as tanks, ponds, swales etc.
– Green roofs.
For more information refer to The SuDS Manual (CIRIA C753, 2015).
For assessment in Wales and England, the recommendations of the Environment Agency’s publication Pollution
Prevention Pays Guidance, 2013 (225) should be followed.
For assessment in Scotland and Northern Ireland, the 'Pollution Prevention Pays Guidelines' from the Environment
Agency reference the following documents which are relevant:
Contaminated sites
Examples of contamination legislation that should be considered includes: the Water Resources Act 1991, the
Environmental Protection Act 1990, the Groundwater Directive (2006/118/EC) and, more recently the
Groundwater (England and Wales) Regulations 2009. Where the site risk assessment confirms that infiltration SuDS
techniques are not appropriate, SuDS techniques that do not allow infiltration, such as swales lined with an
impermeable membrane, can be used.
It may be the case that only some areas of the site are contaminated and therefore infiltration SuDS techniques can
be used elsewhere on the site. There may also be a requirement to remediate the contaminated soils, creating
opportunities for the use of infiltration SuDS post-remediation.
Pol 04 Reduction of night time light pollution 413
1 1 1 1
Fully fitted Simple building Shell & core Shell only No Minimum standard
Aim
To ensure that external lighting is concentrated in the appropriate areas and that upward lighting is minimised,
reducing unnecessary light pollution, energy consumption and nuisance to neighbouring properties.
Value
– Minimise nuisance to neighbouring
properties due to lighting.
– Maintain an adequate level of safety and
security lighting on the site.
– Reduce energy use by designing coverage
and control systems that are appropriate for
the development.
Context
The external lighting used by buildings can have a detrimental impact on the use and enjoyment of neighbouring
properties and the mental and physical wellbeing of individuals in them. It also has a significant and often
detrimental impact on local wildlife.
414 SD5078: BREEAM UK New Construction 2018 – Consultation draft
The design of lighting installations can reduce the impacts without limiting their functionality and there are a
number of appropriate best practice standards for the design and control of such lighting installations that aim to
minimise these detrimental impacts.
By limiting light pollution the impact and energy use of the building may be reduced making it more acceptable to
local communities and reducing impacts on local wildlife.
Assessment scope
A
Pol 04 Reduction of night time light pollution
Assessment criteria
One credit
1 Where external lighting pollution has been eliminated through effective design that removes the need for
external lighting without adversely affecting the safety and security of the site and its users.
OR alternatively, where the building does have external lighting, one credit can be awarded as follows:
2 The external lighting strategy has been designed in compliance with Table 2 (and its accompanying notes) of
the Institute of Lighting Professionals (ILP) Guidance notes for the reduction of obtrusive light, 2011 (226).
Buildings
3 All external lighting (except for safety and security lighting) can be automatically switched off between 23:00
and 07:00.
4 If safety or security lighting is provided and will be used between 23:00 and 07:00, this part of the lighting
system complies with the lower levels of lighting recommended during these hours in Table 2 of the ILP
guidance notes.
5 Illuminated advertisements, where specified, must be designed in compliance with ILP PLG05 The Brightness of
Illuminated Advertisements .(227).
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
Scope of assessment
Where the assessment is of an individual building on an existing site then only those areas affected by the works, i.e.
within the construction zone, need to be assessed. Where the assessment is of a building that forms part of an
entire new development, the criteria apply site-wide.
Illuminated advertisements
All types of illuminated advertisement must meet the criteria, both self-illuminated and those illuminated by
reflection from other sources.
Evidence
Definitions
Construction zone
For the purpose of this issue the construction zone is defined as the site which is being developed for the
BREEAM-assessed building and its external site areas, i.e. the scope of the new works.
Additional information
The ILP Guidance notes for the Reduction of Obtrusive Light, 2011 are available free of charge from the ILP website
www.theilp.org.uk.
Table 2 of the ILP guidance and its accompanying notes outlines four sets of recommendations:
1. Limits to the average upward light ratio of the luminaires, to restrict sky glow.
2. Limiting illuminance at the windows of nearby properties for which light trespass might be an issue.
3. Limiting the intensity of each light source in potentially obtrusive directions beyond the site boundaries.
4. Limiting the average luminance of the building, if it is floodlit.
In each case the limiting values depend on the location of the site of the building (for example rural, urban or city
centre). A calculation of illuminance (2) or intensity (3) is not required if all luminaires are cut-off types and angled so
that light in potentially obtrusive directions is blocked.
Pol 05 Reduction of noise pollution 417
Aim
To reduce the likelihood of noise arising from fixed installations on the new development affecting nearby noise-
sensitive buildings.
Value
– Minimise nuisance noise to neighbours and
local wildlife.
Context
Excessive noise can have a detrimental effect on the use and enjoyment of private property such as dwellings and
business premises. It can also cause disruption for wildlife. Noise can have a major impact on the mental and
physical wellbeing of individuals both within and neighbouring a building. Legislation is in place to control buildings
418 SD5078: BREEAM UK New Construction 2018 – Consultation draft
and other noise-producing processes but these are typically enforced following complaints from neighbours and
improvements required as a result can be costly to make.
It is important to consider the noise that will be produced by developments at an early stage, plan the
development in a way that minimises them, and seek to design and specify the building and its services in a way that
limits its impact.
Assessment scope
Assessment criteria
One credit
1 Where there are, or will be, no noise-sensitive areas or buildings within 800m radius of the assessed site.
OR
2 Commission a noise impact assessment compliant with BS4142:2014, if the building has noise-sensitive areas
or buildings within 800m radius of the site, with noise levels measured or determined for:
2.a.i at the nearest or most exposed noise-sensitive development to the proposed development
2.a.ii including existing plant on a building to which an extension is being built and assessed
3 The noise impact assessment must be carried out by a suitably qualified acoustic consultant..
4 The noise level from the proposed site or building, as measured in the locality of the nearest or most exposed
noise-sensitive development, is a difference to the background noise of at least -5dB throughout the day and
night.
5 Where the noise sources from the proposed site or building is greater than the levels described in criterion 4,
measures have been installed to attenuate the noise at its source to a level where it will comply with the
criterion.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
Methodology
For such cases, BS4142 states ‘Determine the specific sound level by calculation alone if measurement is not
practicable, for example if the source is not yet in operation. In such cases, report the method of calculation in detail
and give the reason for using it’. Where prediction methods are not possible, measurement will be necessary using
either a noise source similar to that proposed or, alternatively, measurement of the actual noise from the
installation (once installed); compliance with the latter approach requires a written commitment to appoint a
420 SD5078: BREEAM UK New Construction 2018 – Consultation draft
suitably qualified acoustician to carry out the required measurements post-installation, and a further commitment
to attenuate the noise source in compliance with criteria 4 on the previous page and 5 on the previous page (if
proved necessary by the measurements).
Evidence
Definitions
Noise-sensitive area
Landscapes or buildings where the occupiers are likely to be sensitive to noise created by the new plant installed
in the assessed building, including:
1. Residential areas
2. Hospitals, health centres, care homes, doctor’s surgeries etc.
3. Schools, colleges and other teaching establishments
4. Libraries
5. Places of worship
6. Wildlife areas, historic landscapes, parks and gardens
7. Located in an Area of Outstanding Natural Beauty or near a Site of Special Scientific Interest
8. Any other development that can be considered noise-sensitive.
Not all of these locations will necessarily be “sensitive” at all times. The assessments should be carried out at
times which are relevant to the location use. For example, schools, libraries and doctor’s surgeries may not
require a night-time assessment of background noise if they are unoccupied at the time. When making the
assessment the SQA should make it clear during which periods the receptor is considered “sensitive” providing
clear reasoning and justification.
1. Has a minimum of three years relevant experience (within the last five years). Such experience must clearly
demonstrate a practical understanding of factors affecting acoustics in relation to construction and the
built environment; including, acting in an advisory capacity to provide recommendations for suitable
acoustic performance levels and mitigation measures.
2. An individual who holds a recognised acoustic qualification and membership of an appropriate
professional body. The primary professional body for acoustics in the UK is the Institute of Acoustics.
Where an SQA is verifying the acoustic measurements or calculations carried out by another acoustician who
does not meet the SQA requirements, they must, as a minimum, have read and reviewed the report and confirm
in writing that they have found it to:
Additional information
Innovation
Summary
The innovation category provides opportunities for exemplary performance and innovation to be recognised that
are not included within, or go beyond the requirements of the credit criteria. This includes exemplary performance
credits, for where the building meets the exemplary performance levels of a particular issue. It also includes
innovative products and processes for which an innovation credit can be claimed, where they have been approved
by BRE Global Ltd.
The cost-saving benefits of innovation are fostered and facilitated by helping encourage, drive and publicise
accelerated uptake of innovative measures.
Inn 01 Innovation 423
Inn 01 Innovation
10 10 10 10
No Minimum standards
Aim
To support innovation within the construction industry through the recognition of sustainability related benefits
which are not rewarded by standard BREEAM issues.
Value
– Testing out new ideas which, if successful,
could change the status quo of the industry
– Allows the industry to explore new
opportunities and evolve its processes.
Context
Innovation creates a platform to encourage free thinking, for industry to push the boundaries of what is considered
the norm, and propose new ideas and approaches which may change the way the industry works in future.
424 SD5078: BREEAM UK New Construction 2018 – Consultation draft
Innovation allows the industry to grow and develop new ideas, and ultimately produce better buildings, more
efficiently.
Assessment scope
Inn 01 Innovation
Assessment criteria
Approved innovations
1 Where the building demonstrates exemplary performance by meeting defined exemplary level performance
criteria in one or more of following BREEAM assessment issues:
1.g: Mat 01 Environmental impacts from construction products - Building life cycle assessment
1.l: Pol 03 Flood and surface water management (Simple buildings only).
Please refer to the relevant BREEAM issue within this scheme document for details of the exemplary level
performance assessment criteria.
2 One innovation credit can be awarded for each innovation application approved by BRE Global, where the
building complies with the criteria defined within an approved innovation application form.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
426 SD5078: BREEAM UK New Construction 2018 – Consultation draft
Methodology
Approved innovations
Innovation applications can be submitted to BRE Global by a licensed BREEAM Assessor using the formal Approved
Innovation Application Form (available from the BREEAM website).
Evidence
Definitions
Approved innovation
Any new technology, design, construction, operation, maintenance or demolition method or process that can be
shown to improve the sustainability performance of a building and is of demonstrable benefit to the wider
industry in a manner that is not covered elsewhere in BREEAM. In addition the innovation has been approved by
BRE Global in accordance with its published BREEAM Innovation credit procedures.
Inn 01 Innovation 427
Additional information
Appendices
Appendix A – Healthcare building types A
Typical facilities and services offered by and forming part of one of the healthcare buildings are described in Table
A1 below. If a healthcare development does not fit one of the building type descriptions , it can still be assessed if it
falls within the building type category descriptions outlined in the scope section of this document. Where it does
not fall in to one of these categories, bespoke assessment criteria will be required to assess the project.
1. Preschool, including;
a. Nursery schools(229)
b. Children’s centres(230)
2. Schools, including;
a. Primary schools
b. Secondary schools (including those containing sixth form colleges)
c. All age range schools (including education or teaching buildings at boarding schools)
d. Academies
e. Non-acute special educational needs (SEN) schools
3. Sixth form colleges
4. Further and higher education or vocational colleges and Institutions, including;
a. Teaching facility
b. Learning Resource Centre
c. Laboratory, workshop or studio
d. Student union
e. Or a mixture of the above types.
This scheme has not been specifically tailored to assess acute SEN schools. Assessment is still possible, except
where highly specialised accommodation is provided. Acute SEN schools are defined as an 'Other' building type and
BREEAM Assessors carrying out assessments on schools for pupils with such needs need to consider carefully all
the BREEAM issues that might be affected by the need to provide special facilities for these building users, e.g. View
out, Cyclist facilities, etc. Where criteria in this scheme document are not explicit for this building type, the assessor
will need to decide which criteria are appropriate and apply them accordingly, seeking confirmation from BRE
Global Ltd. on the application of alternative building criteria.
For more information on SEN refer to Building Bulletin 102 Designing for disabled children with special educational
needs, published by the Department for Children Schools and Families (available from www.education.gov.uk)
BREEAM UK New Construction 2018 can be used to assess the following types of multi-residential buildings:
Where both an HQM and a BREEAM assessment are required, to avoid duplication of effort, evidence collected for
the purpose of an HQM assessment can be used towards demonstrating compliance with the equivalent BREEAM
assessment criteria and vice versa.
D SD5078: BREEAM UK New Construction 2018 – Consultation draft
This section provides guidance to assessors and project teams on the application of BREEAM to shell only and shell
and core projects.
A shell only or shell and core building project is defined as one where the developer’s scope of works is the design
and construction of the base building only, leaving a range of construction and fit-out works to be completed
before the building can be occupied. The project will have some or all of the following elements:
– the structure
– building envelope
– core building systems including building servicing strategy
– installations (such as HVAC) or plant support for installation of such systems
– fit-out of common areas
In these projects performance of the building and compliance with BREEAM is verified based on the developer’s
scope of works. Two standard project type options are defined with applicable assessment criteria . For projects
that in scope from these standard options, assessment against some BREEAM issues will be excluded even where
they are within the developer’s scope of works. This approach ensures clarity, consistency and comparability within
the property market. Varying the criteria or issues based on each individual projects scope would make BREEAM
ratings incomparable in terms of performance benchmarking and for promotional or publicity purposes.
– External walls, windows, doors (external), roof, core internal walls, structural floors
– Hard and soft landscaping areas (where present and within scope of works)
does not include the full scope of a typical Category A fit-out, due to the fact that the specification of items such as
ceiling finishes, raised floors and the zoning of local services above the lettable floor area and other Category A
works are not typically finalised until the space undergoes final fit-out according to the tenant's specification and
are liable to change. These items are, therefore, excluded from a shell and core assessment.
The Shell only and Shell and core assessment options are available for all building types
For these assessments, the scope of works being undertaken must be specified clearly and provided for the
accurate certification of the project.
Table D1 on the next pagesummarises the BREEAM UK New Construction 2018 assessment issues and their
applicability to shell only and shell and core projects.
Applicability of the Shell only and Shell and core assessment type
to Simple buildings assessments
Shell only and shell and core assessment criteria cannot be applied to Simple building assessments. For a project to
be assessed as a Simple Building, it must be clear that the building can be classified as a ‘simple’. At the shell only or
shell and core stage, it is not possible to determine whether a building will be ‘simple’ therefore these assessment
options are not applicable to Simple building assessments.
Figure D1 UK New Construction and the UK Refurbishment and Fit-out schemes and the assessment options
The scope of the BREEAM UK New Construction - Shell only and Shell and core assessment types - and BREEAM UK
Refurbishment and Fit-out schemes have been defined using recognised industry definitions, such as the British
Council for Offices definition of Category A and B fit-out as far as possible. However, in practice, there is no fixed
industry standard definition of refurbishment and fit-out works, with a large degree of variability from project to
project. Due to this variety and also the need to ensure a consistent definition is used for assessment comparability
purposes, the BREEAM Refurbishment and Fit-out scheme has defined a number of optional assessment 'parts'.
The scope for each of these assessment parts has largely been based upon setting boundaries around the key
physical parameters of the building. Under that scheme, clients are able to seek assessment certification against
any combination of parts according to the scope of their refurbishment and fit-out works, therefore providing a
highly flexible scheme.
The scope of Part 1 of the BREEAM UK Refurbishment and Fit-out scheme aligns with the shell only option of the
BREEAM UK New Construction scheme. Parts 1 and 2 combined align with the shell and core option of the BREEAM
UK New Construction scheme. Parts 3 and 4 cover the scope of work that is covered under the tenants fit-out
works could be used to 'top up' a Shell and Core Assessment .
– Part 1 - Fabric and structure: external envelope including walls, roof, windows and floor
– Part 2 - Core services: centralised mechanical and electrical plant including heating, cooling and ventilation
– Part 3 - Local services: localised services including lighting, local heating, cooling and ventilation
– Part 4 - Interior design: interior finishes, furniture, fittings and equipment
Further information on the BREEAM UK Refurbishment and Fit-out scheme can be found at www.breeam.com.
Table D1 BREEAM UK New Construction 2018 assessment issues: shell only and shell and core project applicability
Ref Issue Applicability
Shell Shell and
only core
Management
Man 01 Project brief Y Y
Man 02 Life cycle costing and service life planning Y Y
Man 03 Responsible construction practices Y Y
Man 04 Commissioning and handover N Y
Appendix D – Shell only and Shell and Core Project Assessments G
3
Appendix E – Simple Building Assessments
The BREEAM UK New Construction 2018 version can be applied to both complex and less complex building
projects. This section provides guidance on its application to less complex projects, i.e. a Simple building
assessment.
A Simple building is defined as having building services that are predominantly of limited capacity and local in their
delivery, largely independent of other systems in the building fabric and without complex control systems.
If the building includes complex services, systems, functions or facilities including, but not limited to those listed
below, it cannot be defined or assessed as a Simple Building and a full BREEAM UK New Construction 2018
assessment should be carried out:
– Air-conditioning (with the exception of local split cooling systems, see Building Services section).
– Full mechanical ventilation, displacement ventilation, and complex passive ventilation (see Building Services section
for guidance on permitted systems).
– Renewable energy sources, with the exception of on-site micro-generation technologies(231) or connection to
existing community or district heating or cooling systems.
– Laboratories and buildings that contain either fume cupboards or safety cabinets or containment areas.
– Major water-consuming plant or functions such as swimming, hydrotherapy or research pools or vehicle wash or
irrigation systems.
– Cold storage plant and enclosures, with the exception of domestic scale refrigeration
– Escalators or travelling walkways.
This list is not exhaustive, but serves to indicate the types of services and systems likely to be present in a more
complex building and unlikely to be present in a simple building. Examples of a Simple building could (depending on
the remit of the works) include: office, educational and community buildings, GP surgeries, basic industrial units and
extensions to existing buildings.The Assessor can seek assistance in classifying a project through BREEAM Technical
Support by contacting [email protected]
The following section describes additional features a Simple Building may have. These descriptions can be used to
support the classification of a building of a BREEAM Simple building assessment.
Heating
Space or hot water heating is provided by simple systems only, e.g. systems with total capacity of less than 100kW.
Cooling
Small systems, such as local split cooling systems to service single rooms or areas for occasional or seasonal use,
with a total system capacity of less than 12kW(232) and a total collective refrigerant charge of less than 6kg.
Ventilation
1. Single sided and cross ventilation using windows, rooflights or trickle vents
2. Simple ‘bespoke’ passive solutions utilising wind driven or stack ventilation where:
a. The system does not serve multiple rooms or levels
b. The system does not use multiple (more than one) control dampers to control air flow
c. The system uses local standalone controls only and is not linked to a building management system that
controls the whole building ventilation strategy
3. Standalone ‘off the shelf’ natural or assisted natural ventilation solutions where:
a. The system does not serve multiple rooms or levels
b. The system uses local standalone controls only and is not linked to a building management system that
controls the whole building ventilation strategy
c. The system utilises only basic components, e.g. low power fans, control dampers, filters
J SD5078: BREEAM UK New Construction 2018 – Consultation draft
d. The product supplier or manufacturer does not recommend specialist commissioning, i.e. no special
training is required to ensure the unit is commissioned correctly
4. Local mechanical ventilation where:
a. The system does not serve multiple rooms or levels
b. The system uses local standalone controls only and is not linked to a building management system that
controls the whole building ventilation strategy
c. The central fan or air handling unit (AHU) utilises only basic components, e.g. fan, filter, basic air to air heat
recovery, and only requires a single phase electrical supply
d. The system does provide any form of heating, cooling or humidification to the supply air (except via basic
air to air heat recovery)
e. The system does not comprise multiple duct work branches that require proportional balancing
f. The system is not a Variable Air Volume (VAV) system, i.e. one which comprises variable performance
fans and complex control systems that would require specialist commissioning
g. The central fan or AHU supplier or manufacturer does not recommend specialist commissioning, i.e. no
special training is required to ensure the unit is commissioned correctly
Additional Requirements
Domestic scale sanitary, kitchen and laundry facilities with only basic connections for hot and cold water provision
and drainage.
If a building does not meet the profile described above, but exhibits features which suggest it could be classified as
a Simple building, review this guidance and highlight the areas for further consideration to BREEAM Technical
Support by contacting [email protected] for further advice and classification.
Table 79 below summarises the BREEAM UK New Construction 2018 assessment issues, credits and criteria
applicable to a Simple building assessment '.
Table 79 BREEAM UK New Construction 2018issue applicability for Simple building assessments
Issue Criteria applicability to Simple Credits available Exemplary credits
ID Buildings available
No Simplified N/A
change
Management
Man ✔ 2 2
01
Man ✔ 1 0
02
Man ✔ 4 2
03
Man ✔ 2 0
04
Man ✔ 3 0
05
Health and Wellbeing
Hea ✔ (3 to 5) building type 1
01 dependent
Hea ✔ (2 to 3) building type 2
02 dependent
Hea ✔ N/A N/A
03
Appendix E – Simple Building Assessments K
Transport
Tra 01 ✔ (Up to 5) building type 0
dependent
Tra 02 ✔ (1 to 2) building type 0
dependent
Tra 03 ✔ (1 to 2) building type 0
dependent
Tra 04 ✔ N/A N/A
Tra 05 ✔ N/A N/A
Water
Wat ✔ 5 1
01
Wat ✔ 1 0
02
Wat ✔ 2 0
03
Wat ✔ N/A N/A
04
Materials
Mat ✔ (Up to 6) building type 3
01 dependent
Mat ✔ 1 0
02
Mat ✔ 4 1
03
Mat ✔ 1 0
05
Mat ✔ 1 0
06
L SD5078: BREEAM UK New Construction 2018 – Consultation draft
Man 05 Aftercare
No additional issue-specific compliance notes apply.
6.0 Energy
Ene 01 Reduction of energy use and carbon emissions
No additional issue-specific compliance notes apply.
8.0 Water
9.0 Materials
Mat 01 Life cycle impacts
No additional issue-specific compliance notes apply.
Transport
Waste
Wst 01 Construction waste management
Pre-demolition Where access to the building to carry out the audit is not possible at Concept Design stage,
audit this needs to be justified and evidence provided that the design has included feasibility of
refurbishment and consideration of material reuse.
Limitied site space for segregation and storage
When space is too limited to allow materials to be segregated on site, a waste contractor can be used to
separate and process recyclable materials off-site. Similarly, manufacturers’ take-back schemes can be used. In
such cases, evidence must be produced to demonstrate segregation of materials was carried out to the agreed
levels and that materials were reused or recycled appropriately. Such evidence could be Environment Agency
(EA), Scottish Environment Protection Agency (SEPA), Environment Agency Wales (EA Wales) or Northern Ireland
Environment Agency (NIEA) Waste Return Forms.
Waste from temporary structures
Waste generated on-site for the purposes of the development (excluding demolition and excavation waste)
must be included in the assessment of this issue. If temporary support structures, or any other materials or
system brought on-site to facilitate construction of a building enter the waste stream (albeit for recycling), they
will need to be classified as construction waste and will contribute to the construction waste generated.
If the support structure is reused by the contractor (or by another contractor) on other sites, it has not been
discarded and does not enter the waste stream. It wouldn’t be included in the waste generated nor be assessed
against the benchmark figures. The same would apply to timber formwork where reused.
Appendix G – Notes for compliance 21
In healthcare buildings some openings in public and patient areas need to be provided with restricted opening
distances of not more than 100mm (HBN 00-10 Part D: Windows and associated hardware(235)). This is for health H
and safety reasons, especially where windows are within reach of the elderly, mentally ill or children. However, it is
felt that good design can overcome these restrictions and provide compliant natural ventilation solutions, even in
safety-sensitive areas.
e
a 03 Safe containment in laboratories
No additional issue-specific compliance notes apply.
Compliance notes
Compliance notes are located in Appendix G – Notes for compliance on page 18 for the consultation. These
compliance notes will be available through the knowledge base when the scheme goes live.
12.0 Pollution
Pol 01 Impact of refrigerants
No additional issue-specific compliance notes apply.
The BREEAM credit for locating in a flood zone of ‘medium or high annual probability’ cannot be awarded where
the building is located in the functional flood plain. This is defined in the current best practice national planning
guidance for each country’. If the building assessed is or has been defined as ‘water-compatible development’,
confirmation should be provided from the local planning authority that they are satisfied with the proposals.
Flood defences
Third party defences
There are many landscape feature defences, owned by third parties, which due to their location act as a flood
defence by default, e.g. motorway, railway embankments, walls etc. It can be assumed that such embankments
will remain in place for the lifetime of the development, unless the assessor or project team have reason to
believe otherwise. For walls, assurance must be sought that the wall is likely to remain for the design life of the
building.
Pre-existing flood defences
In an area protected by existing flood defences, (designed to withstand a certain magnitude of flooding), the
appropriate number of flood risk credits can be awarded where the defences reduce the risk to ‘low’ or
‘medium’ and the following conditions are met:
1. The development is not located in an area where new flood defences have to be, or have been, constructed to
minimise the risk of flooding to the site and its locality purely for the purpose of the development or its wider
master plan.
2. The development is located on previously occupied land (as defined by the criteria in BREEAM issue LE 01 Site
selection on page 376).
3. The relevant agency confirms that, as a result of such defences, the risk of a flood event occurring is reduced to
low or medium risk. If firm confirmation is not provided then the credit cannot be awarded.
A statutory body’s local or regional office may be able to provide more information on existing defences in the
area in which the assessed development is located.
Where a site is situated
Sitesacross
whichmore
crossthan
multiple
oneflood
flood zones
zone, the flood zone with the highest probability of flooding
must be considered for the purpose of the BREEAM assessment. This is unless the areas in the higher probability
zone only contain soft landscaping and access to the building will be maintained if there is a flooding event.
In a small number of sites it may not be possible for the first 5mm of rainfall to be prevented from leaving site
completely. Where this is the case, an appropriately qualified professional must design the system to ensure that
the intent of this criterion has been met as far as possible and provide justifications to explain why the criterion
could not be fully achieved on the site. Where this can be justified, the awarding of the water quality credit would
not be affected, provided all other relevant criteria have been achieved.
5mm requirement - end-of-pipe solutions
End-of-pipe solutions, such as ponds and basins, will only be deemed to comply with the 5mm criteria where the
principal run-off control to prevent discharge from the first 5mm of a rainfall event, is achieved using source
control and site control methods.
5mm requirement - green roofs
Green roofs can be deemed to comply with this requirement for the rain that falls onto their surface. However
evidence is still required to demonstrate that the 5mm rainfall from all other hard surfaces on-site is being dealt
with, to allow this credit to be awarded.
Extension or infill building on existing site
Where the assessment is of an individual building on an existing site, i.e. infill development, the watercourse
pollution criteria apply to areas within the construction zone that present a risk of pollution, as well as any areas
external to the construction zone that are affected by the new works, i.e. drainage onto or from the proposed
development.
13.0 Innovation
Inn 01 Innovation
No additional issue-specific compliance notes apply.
References 25
References
1 For some assessment issues the number of credits available will vary by building type. Furthermore, some issues
may not be applicable to certain building types or buildings which do not contain a particular function or area, e.g. a
laboratory.
2 For schools, further and higher educational building types, see also Appendix B – Education building types.
3 For healthcare building types, see also Appendix A – Healthcare building types.
4 The prisons category includes any building type that is part of a prison establishment, including residential blocks
or a hybrid of building types.
5 For multi-residential building types, see also Appendix C – Multi-residential building types for further detail of
scope
6 For the purpose of BREEAM the specific clause of the specification must be referenced within the report.
7 Evidence in the form of design drawings must be presented in a clear, professional working format with clearly
identified legends indicating revision number, date, title, owner etc. (where appropriate).
8 Heravitorbati A, Coffey V, Trigunarsyah B, Saghatforoush E. Evaluating the influences of stakeholder management
on construction project quality. In: Proceedings of 1st International Construction Business & Management
Symposium. University Teknologi Malaysia, Kuala Lumpur; 2011.
9 Usable Buildings Trust. BSRIA BG 4/2009: The Soft Landings Framework, for better briefing, design, handover and
building performance in-use. BSRIA; 2009.
10 BSRIA. BSRIA BG 28/2011: BREEAM 2011 and Soft Landings, an interpretation note for clients and designers.
BSRIA; 2011.
11 HM Government. Construction 2025: Industrial Strategy: government and industry in partnership [Internet].
2013. Available from:www.gov.uk/government/uploads/system/uploads/attachment_data/file/210099/bis-13-
955-construction-2025-industrial-strategy.pdf
12 PD 156865: 2008. Standardized method of life cycle costing for construction procurement. A supplement to
BS ISO 15686-5. Buildings and constructed assets. Service life planning. Life cycle costing. London: BSI; 2008.
13 RICS. Life cycle costing - RICS professional guidance, UK. RICS; 2016.
14 Churcher D, Tse P. BG 67/2016: Life cycle costing. BSRIA; 2016.
15 CLOCS. Standard for construction logistics: Managing work related road risk [Internet]. 2015. Available from
www.clocs.org.uk/wp-content/uploads/2016/01/CLOCS-Standard-v2-DEC_2015-.pdf
16 ISO 14001: 2015. Environmental management systems - Requirements with guidance for use. ISO; 2015.
17 BS 8555: 2016. Environmental management systems. Guide to the phased implementation of an
environmental management system including the use of environmental performance evaluation. BSI; 2016.
18 Environment Agency, Northern Ireland Environment Agency, Scottish Environmental Protection Agency. Working
at construction and demolition sites: PPG6, Pollution Prevention Guidelines. Environment Agency; 2012.
19 Defra. Government conversion factors for company reporting: Greenhouse Gas Conversion Factor Repository
[Internet]. Defra; Available from: www.gov.uk/government/collections/government-conversion-factors-for-
company-reporting
20 Department for Environment Food and Rural Affairs. Guidance on measuring and reporting Greenhouse Gas
(GHG) emissions from freight transport operations. Defra; 2014.
21 Carbon Trust. CTG047 Closing the gap: Lessons learned on realising the potential of low carbon building
design. Carbon Trust; 2011.
22 Wild J. Commissioning HVAC Systems: Guidance on the division of responsibilities (TM 1/88.1). BSRIA; 2002.
23 CIBSE. CCA Commissioning Code A: 1996 (2006) Air Distribution Systems. CIBSE; 2004.
26 SD5078: BREEAM UK New Construction 2018 – Consultation draft
24 BS EN 13187: 1999. Thermal performance of buildings. Qualitative detection of thermal irregularities in building
envelopes. Infrared method. BSI; 1999.
25 BS EN ISO 9972: 2015. Thermal performance of buildings. Determination of air permeability of buildings. Fan
pressurisation method. BSI; 2015.
26 British Refrigeration Association, Institute of Refrigeration. Guide to Good Commercial Refrigeration Practice,
Part 5 Commissioning. 2008.
27 Carbon Trust. Good Practice Guide 347: Installation and Commissioning of Refrigeration Systems. Carbon
Trust; 2003.
28 Mills E, Bell G, Sartor D, Avery D, Siminovitch M, Piette MA. Labs21 programme: A Design Guide for Energy
Efficient Research Laboratories. 1996.
29 BS 7989: 2001. Specification for recirculatory filtration fume cupboards. BSI; 2001.
30 BS EN 14175-4: 2004. Fume cupboards. On-site test methods (incorporating corrigendum January 2014). BSI;
2004.
31 CLEAPSS G9 Fume Cupboards in Schools Revision of DfEE Building Bulletin 88. CLEAPSS; 2014.
32 The Air Tightness Testing and Measurement Association. Measuring air permeability of building envelopes
(non-dwellings), Technical standard Level 2 (TSL2). ATTMA; 2010.
33 British Council for Offices. BCO Guide to Post Occupancy Evaluation. BCO; 2007.
34 Jaunzens D, Grigg P, Cohen R, Watson M, Picton E. BRE Digest 478 Building performance feedback: getting
started. BRE; 2003.
35 HEFCE, AUDE, University of Westminster. Guide to Post Occupancy Evaluation: Report and Toolkit. Higher
Education Funding Council for England; 2006.
36 Agha-Hossein M, Birchall S, Vatal S. BG 63/2015 BSRIA Guide to Building Performance Evaluation is a general
introduction to BPE. BSRIA; 2015.
37 CIBSE. GVF2012 Guide F: Energy Efficiency in Buildings (2012 with 2016 corrigendum). CIBSE; 2012.
38 CIBSE. TM46: Energy Benchmarks. CIBSE; 2008.
39 CIBSE. TM47: Operational Ratings & Display Energy Certificates. CIBSE; 2009.
40 CIBSE. TM54: Evaluating Operational Energy Performance of Buildings at the Design Stage. CIBSE; 2013.
41 Carbon Trust. CTG047 Closing the gap: Lessons learned on realising the potential of low carbon building
design. Carbon Trust; 2011.
42 BS 8206-2:2008. Lighting for buildings. Code of Practice. BSI; 2008.
43 CIBSE. LG 7: Lighting Guide 07: Offices. 2015.
44 BS 5489-1: 2013. Code of practice for the design of road lighting - Lighting of roads and public amenity areas.
BSI; 2013. .
45 BS EN 12464-2:2014. Light and lighting. Lighting of work places - Outdoor work places. BSI; 2014.
46 CIBSE. LG 5: Lighting guide 05: Lighting for education. 2011.
47 CIBSE. LG 9: Lighting Guide 09: Lighting for Communal Residential Buildings. 2013.
48 BS EN 13779:2007. Ventilation for non-residential buildings - Performance requirements for ventilation and
room-conditioning systems. Annex 3. BSI; 2007
49 WHO. Guidelines for indoor air quality: Selected pollutants. World Health Organisation; 2010.
50 BS EN ISO 16000-2:2006. Indoor air - Part 2: Sampling strategy for formaldehyde. ISO; 2006.
51 BS ISO 16000-3:2011. Indoor air - part 3: Determination of formaldehyde and other carbonyl compounds in
indoor air test and chamber air - active sampling method. ISO; 2011.
52 BS ISO 16000-5:2007. Indoor air - Part 5: Sampling strategy for volatile organic compounds (VOCs). ISO; 2007.
References 27
53 BS ISO 16000-6:2011. Indoor air - part 6: Determination of volatile organic compounds in indoor and test
chamber air by active sampling on Tenax TA sorbent, thermal desorption and gas chromatography using MS or
MS-FID. ISO; 2011.
54 BS EN ISO 16017-2:2003. Indoor, ambient and workplace air. Sampling and analysis of volatile organic
compounds by sorbent tube/thermal desorption/capillary gas chromatography - Diffusive sampling. ISO; 2003.
55 BS EN 13779:2007. Ventilation for non-residential buildings - Performance requirements for ventilation and
room-conditioning systems. Annex 2. BSI; 2007.
56 Kukadia V, Hall D. FB30: Ventilation for healthy buildings: reducing the impact of urban air pollution. BRE; 2011.
57 Cheng H, Kukadia V, Hall D. IP9/14: Locating ventilation inlets to reduce ingress of external pollutants into
buildings: A new methodology. BRE; 2014.
58 CIBSE. TM21: Minimising pollution at air intakes. 1999.
59 BS EN ISO 10121 1:2014 (BS 2014) 'Test method for assessing the performance of gas-phase air cleaning
media and devices for general ventilation'
60 ISO/IEC 17025:2005. General requirements for the competence of testing and calibration laboratories. ISO;
2005.
61 BS EN 15457:2014. Paints and varnishes - Laboratory method for testing the efficacy of film preservatives in a
coating against fungi. BSI; 2014.
62 BS EN 15458:2014. Paints and varnishes - Laboratory method for testing the efficacy of film preservatives in a
coating against algae. BSI; 2014.
63 BS EN 16402:2013. Paints and varnishes. Assessment of emissions of substances from coatings into indoor air -
Sampling, conditioning and testing. BSI; 2013.
64 BS ISO 160009:2006. Indoor air - part 9: Determination of the emission of volatile organic compounds from
building products and furnishing -- Emission test chamber method. ISO; 2006.
65 CEN/TS 16516:2015. Construction products - Assessments of release of dangerous substances -
Determination of emissions into indoor air. BSI; 2015.
66 California Department of Public Health (CDPH). Standard method for the testing and evaluation of volatile
organic chemical emissions from indoor sources using environmental chambers. Version 1.1. 2010.
67 BS EN 717-1:2004. Wood-based panels. Determinations of formaldehyde release - Formaldehyde emission by
the chamber method. BSI; 2004.
68 BS EN 13999-1:2013. Adhesives. Short term method for measuring the emission properties of low-solvent or
solvent-free adhesives after application - General procedure. BSI; 2013.
69 BS EN 13999-2:2013. Adhesives. Short term method for measuring the emission properties of low-solvent or
solvent-free adhesives after application - Determination of volatile organic compounds. BSI; 2013.
70 BS EN 13999-3:2007+A1:2009. Adhesives. Short term method for measuring the emission properties of low-
solvent or solvent-free adhesives after application - Determination of volatile aldehydes. BSI; 2007.
71 BS EN 13999-4:2007+A1:2009. Adhesives. Short term method for measuring the emission properties of low-
solvent or solvent-free adhesives after application - Determination of volatile diisocyanates. BSI; 2007.
72 Regulation (EC) No 1272/2008 of the European Parliament and of the Council of 16 December 2008 on
classification, labelling and packaging of substances and mixtures, amending and repealing Directives 67/548/EEC
and 1999/45/EC, and amending Regulation (EC) No 1907/2006 (2008). European Union.
73 EN 16516:2015 Construction products - Assessment of release of dangerous substances - Determination of
emissions into indoor air (2015). European Committee for Standardisation (CEN).
74 BCO Guide 2009, Best Practice in the Specification of Offices, BCO, 2009.
75 HTM 03-01 Specialised ventilation for healthcare premises, Department of Health, 2007.
28 SD5078: BREEAM UK New Construction 2018 – Consultation draft
76 SHTM03-01 Ventilation for healthcare Premises Part A: Design and Validation, Health Facilities Scotland, Feb
2013
77 ISO 16000-2:2006 Indoor air. Part 2: Sampling strategy for formaldehyde (2006). International Organization
for Standardisation (ISO).
78 BS EN 14175-1:2003. Fume cupboards - Vocabulary. BSI; 2003.
79 BS EN 14175-2:2003. Fume cupboards - Safety and performance requirements. BSI; 2003.
80 BS EN 14175-3:2003. Fume cupboards - Type test methods. BSI; 2003.
81 DD CEN/TS 14175-5:2006. Fume cupboards - Recommendations for installation and maintenance. BSI; 2006.
82 BS EN 14175-6:2006. Fume cupboards - Variable air volume fume cupboards. BSI; 2006.
83 BS EN 14175-7:2012. Fume cupboards - Fume cupboards for high heat and acidic load. BSI; 2012.
84 DIN 25466:2012-08. Fume hoods for radioactive materials - Rules for construction and tests. 2012.
85 BS 7989:2001. Specification for recirculatory filtration fume cupboards. BSI; 2001.
86 BS EN 12469:2000. Biotechnology - Performance criteria for microbiological safety cabinets. BSI; 2000.
87 BS 5726:2005. Microbiological safety cabinets. Information to be supplied by the purchaser to the vendor and
to the installer, and siting and use of cabinets - Recommendations and guidance. BSI; 2005.
88 BS EN ISO 14644-7:2004. Cleanrooms and associated controlled environments - Separative devices (clean air
hoods, gloveboxes, isolators and mini-environments). BSI; 2004.
89 AGS-G001. Guideline for gloveboxes. 3rd ed. American Glovebox Society; 2007.
90 PD CEN/TR 16589:2013. Laboratory installations - Capture devices with articulated extract arm. BSI; 2013.
91 CLEAPSS. G9 - Fume cupboards in schools. 2014.
92 BS EN 12128:1998. Biotechnology - Laboratories for research, development and analysis - Containment levels
of microbiology laboratories, areas of risk, localities and physical safety requirements. BSI; 1998.
93 Advisory Committee on Dangerous Pathogens. The management, design and operation of microbiological
containment laboratories. 1st ed. HSE; 2001.
94 HSE. The genetically modified organisms (Contained Use) Regulations - Guidance on Regulations. HSE; 2014.
95 Advisory Committee on Dangerous Pathogens. Biological agents: Managing the risk in laboratories and
healthcare premises. HSE; 2005.
96 HSE. DRAFT - The biological agents and genetically modified organisms (contained use) regulations - Biosafety
guidelines. HSE; 2010.
97 Wong E, Alberico J. Technote 17: A dilution criterion for laboratory fume hood exhaust stacks. RWDI. (17).
98 Environment Agency. H4 odour management - how to comply with your environment permit. 2011.
99 CIBSE. AM11 - Building performance modelling. 2015.
100 CIBSE. GVA/15 CIBSE Guide A: Environmental Design 2015. 8th Edition. 2015.
101 CIBSE. TM 52: The Limits of Thermal Comfort: Avoiding Overheating in European Buildings. 2013.
102 CIBSE. TM59: Design methodology for the assessment of overheating risk in homes. 2017.
103 CTG065. Heating Control: Maximising comfort, minimising energy consumption. The Carbon Trust; 2011.
104 EN ISO 7730:2005. Ergonomics of the thermal environment - Analytical determination and interpretation of
thermal comfort using calculation of the PMV and PPD indices and local thermal comfort criteria. ISO; 2005.
105 HTM 03-01. Specialised ventilation for healthcare premises. Department of Health; 2007.
106 Education Funding Agency. Building Bulletin 101: Ventilation for school buildings. 2014.
107 Education Funding Agency. Building Bulletin 93: acoustic design of schools - performance standards. 2003.
108 ANC. ANC Good practice guide: Acoustics testing of schools. Version 1.2. 2011.
109 HTM 08-01. Health sector buildings: acoustic design requirements. Department of Health; 2013.
110 BS 8233:2014. Guidance on sound insulation and noise reduction for buildings. BSI; 2014.
111 Her Majesty’s Court Service HMCS. Court Service Design Guide (CSDG). 2010.
References 29
112 BS EN ISO 16283-1:2014. Acoustics - Field measurement of sound insulation in buildings and of building
elements. Airborne sound insulation. ISO; 2014.
113 BS EN ISO 354:2003. Acoustics - Measurement of sound absorption in a reverberation room. ISO; 2003.
114 BS EN ISO 140-7:1998. Acoustics - Measurement of sound insulation in buildings and of building elements -
Field measurements of impact sound insulation of floors. ISO; 1998.
115 ISO/IEC 17024:2012. Conformity assessment - General requirements for bodies operating certification of
persons. ISO; 2012.
116 SHTM 08-01. Specialist services Acoustics. NHS National Services Scotland; 2015.
117 ETS-01. Courtroom technology and spatial requirements: Design Guide. Scottish Court Service; 2011.
118 ETS-03. Estates technical standard environmental performance: Design Guide. Scottish Court Service; 2011.
119 Adler D. Metric handbook Planning and design data. 5th Edition; 2015.
120 Department for Education and Employment. Managing School Facilities, Guide 4 Improving Security in Schools.
1996.
121 BS 5489-1:2013. Code of practice for the design of road lighting - Lighting of roads and public amenity areas.
BSI; 2013.
122 Adler D. Metric handbook Planning and design data. 5th Edition; 2015.
123 2013 Progress Report to Parliament Committee on Climate Change. Meeting Carbon Budgets. 2013
124 CIBSE. TM54: Evaluating operational energy performance of buildings at the design stage. 2013.
125 The Building Regulation, 2000. The conservation of fuel and power in new buildings other than dwellings.
2013.
126 National Calculation Methodology. Modelling Guide for Non-Domestic Buildings in Scotland. 2015.
127 National Calculation Methodology. Modelling Guide (buildings other than dwellings) in England and Wales.
2013.
128 National Calculation Methodology. Modelling Guide (buildings other than dwellings) in England and Wales.
2013.
129 Schneider Electric. Designing a metering system for small and medium sized buildings. 2010
130 CIBSE. TM39: Building Energy Metering. 2009.
131 CIBSE. TM54: Evaluating operational energy performance of buildings at the design stage. 2013.
132 CIBSE, TM46. 2008. Energy benchmarks. London: Chartered institution of building services engineers
133 CIBSE, The Society of Light and Lighting. Lighting Guide 6: The exterior environment. 2016
134 CIBSE. Guide F: Energy efficiency of buildings. 2012
135 United Nations. Sustainable Bioenergy: a framework for decision makers. 2007;
136 International Institute of Refrigeration. 17th Informatory Note on Refrigerating Technologies: How to improve
energy efficiency in refrigerating equipment. 2003
137 The Carbon Trust. Refrigeration systems: Guide to key energy saving opportunities. 2011
138 Institute of Refrigeration. Code of Conduct for carbon reduction in the retail refrigeration sector. Carbon Trust;
2011.
139 BS EN 378-2:2016. Refrigerating systems and heat pumps. Safety and environmental requirements Part 2:
Design, construction, testing, marking and documentation. BSI; 2016.
140 Department of Energy and Climate Change. Enhanced capital allowance scheme: energy technology product
list. 2014.
141 BS EN 378-1:2008. Refrigerating systems and heat pumps. Safety and environmental requirements Part 1:
Basic requirements, definitions, classification and selection criteria. BSI; 2008.
142 British Refrigeration Association. Guideline methods of calculating TEWI. BRA Specification; 2006.
30 SD5078: BREEAM UK New Construction 2018 – Consultation draft
143 CTG021. Refrigeration Road Map - An action plan for the retail sector. The Carbon Trust;
2012.www.carbontrust.com/resources/guides/energy efficiency/refrigeration/
144 Intelligent Energy Europe E4 project. Energy efficient elevators and escalators. 2010
145 BS EN ISO 25745-2:2015. Energy performance of lifts, escalators and moving walks. Energy calculation and
classification for lifts. BSI; 2015.
146 BS EN ISO 25745-3:2015. Energy performance of lifts, escalators and moving walks. Energy calculation and
classification of escalators and moving walks. BSI; 2015.
147 BS EN 81-20:2014. Safety rules for the construction and installation of lifts. Lifts for the transport of persons
and goods. Passenger and goods passenger lifts. BSI; 2014.
148 BS EN ISO 25745-1:2012. Energy performance of lifts, escalators and moving walks. Energy measurement and
verification. BSI; 2012.
149 Schneider Electric. Four steps for improving energy efficiency in laboratories. 2013
150 CIBSE. TM46: Energy Benchmarks. 2008.
151 Design Buildings Wiki. Performance gap between building design and operation. 2010
152 HM Government. Enhanced Capital Allowance Scheme for water. 2014.
153 Acton M, Bertoldi P, Booth J, Flucker S, Newcombe L, Rouyer A. Best Practice Guidelines for the EU code of
conduct on data centre energy efficiency. Publications Office of the European Union; 2017.
154 Short A, Guthrie P, Soulti E, Macmillan S. Health Technical Memorandum 07-02: EnCO2de 2015- making energy
work in healthcare. Part B: Procurement and energy considerations for new and existing building facilities.
Department of Health; 2015.
155 CIBSE. TM50: Energy Efficiency in Commercial Kitchens. 2009.
156 CIBSE. TM54: Evaluating operational energy performance of buildings at the design stage. 2013.
157 Department of Energy and Climate Change. Enhanced capital allowance scheme: energy technology product
list. 2014. Enhanced Capital Allowance (ECA) scheme, Energy Technology Product List:etl.beis.gov.uk
158 Department of Energy and Climate Change. 2015. 2013 UK Greenhouse Gas Emissions, Final Figures. 2015
159 Sustrans. Why use public transport. Sustrans. [Online] [Cited:15 October 2015.] www.sustrans.org.uk/change-
your-travel/reducingyour-car-use/why-use-public-transport.
160 Department for Communities and Local Government. 2012.National Planning Policy Framework. 2012.
161 Department for Environment Food & Rural Affairs. Gov.uk [Online] 2015. [Cited:01 September 2017.] Policy
paper 2010 to 2015 government policy: environmental quality. www.gov.uk/government/publications/2010-to-
2015-government-policy-environmental-quality/2010-to-2015-government-policy-environmental-quality.
162 UK Government. 2015. Plug-in car grant.Gov.uk. [Online] 26 August 2015. [Cited:15 October 2015.]
www.gov.uk/government/publications/plug-in-car-grant.
163 Department for Transport. 2015. Public attitudes towards electric vehicles: 2015.
164 UK Government 2014. Travel Plans, Transport Assessments and Statements. Gov. UK. [Cited: 01 September
2017.] https://www.gov.uk/guidance/travel-plans-transport-assessments-and-statements.
165 HM Government, Defra. Future Water: The Government’s water strategy for England [Internet]. The Stationery
Office; 2008. Available from: https://www.gov.uk/government/uploads/system/uploads/attachment_
data/file/69346/pb13562-future-water-080204.pdf
166 HR Wallingford. CCRA2: Updated projections for water availability for the UK Final Report [Internet]. 2015.
Available from: https://www.theccc.org.uk/wp-content/uploads/2015/09/CCRA-2-Updated-projections-of-
water-availability-for-the-UK.pdf
167 Department of Health. Health Technical Memorandum 07-04: Water management and water efficiency –
best practice advice for the healthcare sector. Crown copyright; 2013.
168 BS 8525-1:2010. Greywater systems. Code of practice. BSI; 2010.
References 31
194 Humphrey K, Murphy J, Harris G, Brown S, Lowe J, McCarthy M, et al. UK Climate Change Risk Assessment
Evidence Report: Chapter 1, Introduction. London: Report prepared for the Adaptation Sub-Committee of the
Committee on Climate Change; 2016.
195 Met Office, University of Reading, CEH. Developing H++ climate change scenarios for heat waves, droughts,
floods, windstorms and cold snaps. 2015.
196 Pelsmakers S. The Environmental Design Pocketbook. 2nd ed. RIBA Publishing; 2015.
197 Three Regions Climate Change Group. Your home in a changing climate: Retrofitting existing homes for
climate change impacts: Report for policy makers. Greater London Authority; 2008.
198 Gething B, Puckett K. Design for climate change. RIBA Publishing; 2013.
199 UNFCCC. Potential costs and benefits of adaptation options: A review of existing literature. 2009.
200 HM Government. The National Adaptation Programme: Making the country resilient to a changing climate.
The Stationery Office; 2013.
201 Graves HM, Phillipson MC. Potential implications of climate change in the built environment. BRE; 2000.
202 Cheshire D. Building revolutions: Applying the circular economy to the built environment. RIBA; 2016.
203 Adams K, Hobbs G, Yapp C. Dealing with difficult demolition wastes: A guide. IHS BRE Press; 2013.
204 HBN 00-10. Health Building Note 00-10 Part D: Windows and associated hardware. Department of Health;
2013.
205 CIBSE. AM10 Natural Ventilation in Non-Domestic Buildings. CIBSE; 2005.
206 PAS 1192-2:2013. Specification for information management for the capital and delivery phase of
construction projects using building information modelling. PAS; 2013.
207 PAS 1192-3:2014. Specification for information management for the operational phase of assets using
building information modelling. PAS; 2014.
208 Health Technical Memorandum 07-07: Sustainable health and social care buildings. Department of Health;
2013
209 National Planning Policy Framework. www.gov.uk/guidance/national-planning-policy-framework/annex-2-
glossary
210 BS EN 378:2008. Refrigerating systems and heat pumps. Safety and environmental requirements. Operation,
maintenance, repair and recovery. BSI; 2008.
211 Institute of Refrigeration. Ammonia Refrigeration Systems Code of Practice. 2009.
212 British Refrigeration Association. Specification Guideline methods of calculating TEWI. 2006.
213 Department of Energy and Climate Change. Enhanced Capital Allowance Scheme: Energy Technology
Product List. Department of Energy & Climate Change; 2014.
214 BS EN 378-1:2008. Refrigerating systems and heat pumps. Safety and environmental requirements. Basic
requirements, definitions. classification and selection criteria. BSI; 2008.
215 EC European Commission. Directive 2009/125/EC Establishing a framework for the setting of ecodesign
requirements for energy-related products. 2009;
216 BS 8533:2011. Assessing and managing flood risk in development. Code of Practice. BSI; 2011.
217 National Planning Policy Framework. 2012.
218 CIRIA. The SuDS Manual (C753). CIRIA; 2015.
219 Environment Agency. GPP 13: Vehicle washing and cleaning. 2017.
220 CIRIA. The SuDS Manual (C753). CIRIA; 2015.
221 Environment Agency. Rainfall run-off management for developments. 2013.
222 Marshall D, Bayliss A. Flood estimation for small catchments. Institute of Hydrology; 1994.
223 Institute of Hydrology. Flood estimation handbook. 1999.
224 CIRIA. Designing for exceedance in urban drainage - good practice C635. CIRIA; 2006.
References 33
225 Environment Agency. PPG 1: Understanding Your Environmental Responsibilities - Good Environmental
Practice. 2013.
226 Institution of Lighting Professionals. Guidance notes for the reduction of obtrusive light. GN01. 2011;
227 Institution of Lighting Professionals. The Brightness of illuminated advertisements. PLG05. 2015;
228 BS 8233:2014. Guidance on sound insulation and noise reduction for buildings. BSI; 2014.
229 Nursery school or education means full-time or part-time education suitable for children who have not
attained compulsory school age (whether provided at schools or elsewhere), i.e. facilities or buildings for the
teaching of children who are between the ages of two or three to five years old.
230 Children’s centres are multi-agency service hubs where young children and their families can receive early
education, full day childcare, parental support and child and family health services, such as access to health visitors
and health screening. Children’s centres will often be allied to a local primary school, on or adjacent to the school
site.
231 Micro-generation is defined under the Energy Act 2004 as < 45KWth (micro-heat) and <50KWe (micro-
electricity). Micro-generation can refer to community scale energy which may fall within these capacities
232 To refer to the total for more than one unit where applicable. Multi-split cooling systems and VRF systems
cannot be assessed under the Simple Buildings criteria
233 Typically, complex systems are systems that involve interaction between a number of components to ensure
proper operation. They will usually require specific knowledge and expertise to be designed and installed, and they
may depend on other systems such as control systems to work effectively
234 Education Funding Agency. PSBP: facilities and services output specifications. 2014.
235 HBN 00-10. Health Building Note 00-10 Part D: Windows and associated hardware. Department of Health;
2013.
236 BS 8533:2011. Assessing and managing flood risk in development. Code of Practice. BSI; 2011.