GAMBAR DETAIL

PERENCANAAN PEMBANGUNAN FASILITAS PENYIMPANAN SEMENTARA


LIMBAH B3 FLH ASH DAN BOTTOM ASH

DI KELURAHAN LAMBARA KECAMATAN TAWAELI KOTA PALU

PALU, MARET 2017


No. Lembar Kode Gambar Judul Gambar Ukuran Layout
1 SP-TT Topografi TPS A2
2 SP-LKS Site Plan Lokasi TPS A2
3 SP-TTF Site Plan Lokasi TPS/Topografi Forward A2
4 SP-TTB Site Plan Lokasi TPS/Topografi Behind A2
5 IM3DA 3D Visual TPS A A3
6 IM3DB 3D Visual TPS B A3
7 IM3DC 3D Visual TPS C A3
8 IM3DD 3D Visual TPS D A3
9 IM3DE 3D Visual TPS E A3
10 IM3DF 3D Visual TPS F A3
11 IM3DG 3D Visual TPS G A3
12 KET-TPS Keterangan Lintasan Potongan Site Plan Lokasi TPS A2
13 CRS-ALL Potongan Melintang TPS Keseluruhan A2
14 CRS-ALL-B3 Potongan Melintang TPS Keseluruhan withFly Ash dan Bottom Ash A2
15 CRS-TPS12 Potongan Melintang TPS unit 1 dan 2 A3
16 CRS-TPS12-B3 Potongan Melintang TPS unit 1 dan 2 withFly Ash dan Bottom Ash A3
17 CRS-TPS3 Potongan Melintang TPS unit 3 A3
18 CRS-TPS3-B3 Potongan Melintang TPS unit 3 withFly Ash dan Bottom Ash A3
19 CRS-LTPS-D-J Potongan Memanjang TPS, Drainase Sistem TPS, Jalan A2
20 CRS-BPS Potongan Bak Sampah A3
21 SP-JJD Site Plan Jaringan Jalan dan Drainase A3
22 CRS-JD Potongan Jalan dan Drainase A3
23 CRS-D-TPS12 Potongan Drainase Tengah TPS 1- 2 dan TPS 2-3 A3
24 CRS-TPS-D-EE Site Plan TPS dan Sistem Drainase EE A2
25 S-D-D Site Drainase A2
No : 1 CODE : SP-TT

N
LEGENDA N E
Z
N E
E Z
Garis Kontur Z

Nilai Garis Kontur N


E
Z

A
Banch Mark

B Garis Penampang
N
Penampang

Tanah Rencana

Tanah Asli

N
E
Z

N
E
Z

N
E
Z

N
E
Z

TOPOGRAFI TPS
INTERVAL KONTUR : 1 meter N
E
Z

0 15 30
meter
SKALA 1 : 500
No : 2 CODE : SP-LKS

KETERANGAN DIMENSI BANGUNAN


NAMA BANGUNAN SIMBOL DIMENSI (m)
Pos Jaga 1 & 2 5x4
Lahan Parkir
Bak penampungan
sampah
30 x 12

20 x 15
N
1 10
2 2
Kantor 3 10
4 20
5 5
6 10
Taman
7 5
Gedung dan parkir 20 x 12
alat berat
6 7
Tempat pencucuai mobil 10 x 12 3
2
4
1

KETERANGAN
PJ1 Pos Jaga 1
SITE PLAN LOKASI TPS
PJ2 Pos Jaga 2
BS Bak Sampah
TPM Tempat Pencucian Mobil
GAB Gudang/Parkir Alat Berat
Drainase
Jalan Masuk Ke TPS
0 15 30
meter
SKALA 1 : 500
No : 3 CODE : SP-TTF

KETERANGAN DIMENSI BANGUNAN


NAMA BANGUNAN SIMBOL DIMENSI (m)
Pos Jaga 1 & 2 5x4
Lahan Parkir 30 x 12

N
Bak penampungan
20 x 15
sampah
1 10
2 2
Kantor 3 10
4 20
5 5
6 10
Taman
7 5
Gedung dan parkir 20 x 12
alat berat
6 7
Tempat pencucuai mobil 10 x 12 3
2
4
1

KETERANGAN
PJ1 Pos Jaga 1
PJ2 Pos Jaga 2 SITE PLAN LOKASI TPS/TOPOGRAFI
FORWARD
BS Bak Sampah
TPM Tempat Pencucian Mobil INTERVAL KONTUR : 1 meter
GAB Gudang/Parkir Alat Berat
Drainase
Jalan Masuk Ke TPS
0 15 30
meter
SKALA 1 : 500
No : 4 CODE : SP-TTB

N
N N N N E N
N E
E E E Z E
E Z
Z Z Z Z
Z
N
KETERANGAN DIMENSI BANGUNAN E
NAMA BANGUNAN SIMBOL DIMENSI (m) Z
Pos Jaga 1 & 2
Lahan Parkir
5x4
30 x 12
N
E
Z
N
Bak penampungan
20 x 15 N
sampah E
Z
1 10
2 2
Kantor 3 10
4 20
5 5
6 10 N
Taman E
7 5 Z
6 7
Gedung dan parkir 20 x 12 3
alat berat
2
Tempat pencucuai mobil 10 x 12 4
1
N
E
5
Z

N
KETERANGAN N
N
E
E
PJ1 Pos Jaga 1 E
Z
Z
N
Z
PJ2 Pos Jaga 2 E N
Z E N
BS Bak Sampah Z E
SITE PLAN LOKASI TPS/TOPOGRAFI BEHIND Z
TPM Tempat Pencucian Mobil INTERVAL KONTUR : 1 meter
GAB Gudang/Parkir Alat Berat
Drainase
Jalan Masuk Ke TPS
Banch Mark 0 15 30
meter
SKALA 1 : 500
No. 5 CODE : IM3DA

3D VISUAL TPS A
SKALA 1:500
0 15 30
Meter
No. 6 CODE : IM3DB

3D VISUAL TPS B
SKALA 1:500
0 15 30
Meter
No. 7 CODE : IM3DC

3D VISUAL TPS C
SKALA 1:500
0 15 30
Meter
No. 8 CODE : IM3DD

3D VISUAL TPS D
SKALA 1:500
0 15 30
Meter
CODE : IM3DE
No. 9

3D VISUAL TPS E
SKALA 1:200
0 6 12
Meter
CODE : IM3DF
No.10

3D VISUAL TPS F
SKALA 1:150
0 4.5 9
Meter
No.11 CODE : IM3DG

3D VISUAL TPS G
SKALA 1:150
0 4.5 9
Meter
No : 12 CODE : KET-TPS

KETERANGAN DIMENSI BANGUNAN


NAMA BANGUNAN SIMBOL DIMENSI (m)
Pos Jaga 1 & 2 5x4
Lahan Parkir
Bak penampungan
sampah
30 x 12

20 x 15 q
e

k
N
f
1 10
2 2
Kantor 3 10
4 20
5 5
6 10
Taman
7 5
Gedung dan parkir 20 x 12
alat berat
j 6 7
i
Tempat pencucuai mobil 10 x 12 3
2
p 4
o 1
m n

a b

g
d
r l

KETERANGAN
PJ1 Pos Jaga 1
PJ2 Pos Jaga 2 KETERANGAN LINTASAN POTONGAN
BS Bak Sampah SITE PLAN LOKASI TPS
TPM Tempat Pencucian Mobil
GAB Gudang/Parkir Alat Berat
Drainase
Jalan Masuk Ke TPS
0 15 30
meter
SKALA 1 : 500
No. 13 CODE : CRS-ALL

POTONGAN MELINTANG TPS KESELURUHAN


SKALA 1:250
0 7.5 15

Meter
No. 14 CODE : CRS-ALL-B3

POTONGAN MELINTANGTPS KESELURUHAN


WITH FLY ASH & BOTTOM ASH
SKALA 1:250
0 7.5 15

Meter
No. 15 CODE : CRS-TPS12

POTONGAN MELINTANG TPS UNIT 1 & 2


SKALA 1:150
0 4.5 9

Meter
No. 16 CODE : CRS-TPS12-B3

POTONGAN MELINTANG TPS UNIT 1 & 2


WITH FLY ASH & BOTTOM ASH
SKALA 1:150
0 4.5 9

Meter
No. 17 CODE : CRS-TPS3

POTONGAN MELINTANG TPS UNIT 3


SKALA 1:100
0 3 6

Meter
No. 18 CODE : CRS-TPS3-B3

POTONGAN MELINTANG TPS UNIT 3


WITH FLY ASH & BOTTOM ASH
SKALA 1:100
0 3 6

Meter
No. 19 CODE : CRS-LTPS-D-J

POTONGAN MEMANJANG TPS


SKALA 1:200
0 7.5 15

Meter

POTONGAN MEMANJANG TPS, DRAINASE TENGAH, JALAN


SKALA 1:200
0 7.5 15

Meter
No : 20 CODE : CRS-BS

a b

c d
a-b

c-d

0 2,25 4,5
POTONGAN BAK SAMPAH meter
SKALA 1 : 75
No : 21 CODE : SP-JJD

KETERANGAN DIMENSI BANGUNAN


NAMA BANGUNAN SIMBOL DIMENSI (m)
Pos Jaga 1 & 2 5x4
Lahan Parkir 30 x 12
Bak penampungan
sampah
1
20 x 15

10
N
2 2
Kantor 3 10
4 20
5 5
6 10
Taman
7 5
Gedung dan parkir 20 x 12
alat berat
6 7
Tempat pencucuai mobil 10 x 12 3
2
4
1

KETERANGAN
PJ1 Pos Jaga 1
SITE PLAN JARINGAN JALAN & DRAINASE
PJ2 Pos Jaga 2
BS Bak Sampah
TPM Tempat Pencucian Mobil
GAB Gudang/Parkir Alat Berat
Drainase
Jalan Masuk Ke TPS
0 15 30
meter
SKALA 1 : 500
No : 22 CODE : CRS-JD

e f

g h
POTONGAN JALAN & DRAINASE
0 0,75 1,5
meter
SKALA 1 : 25
No : 23 CODE : CRS-D-TPS12

Potongan Drainase Tengah TPS 1-2 & TPS 2-3


SKALA 1: 2

i j

POTONGAN TPS KESELURUHAN 0 15 30


meter
SKALA 1 : 500
No : 24 CODE : CRS-TPS-D-EE

KETERANGAN DIMENSI BANGUNAN


NAMA BANGUNAN SIMBOL DIMENSI (m)
Pos Jaga 1 & 2 5x4
Lahan Parkir 30 x 12
Bak penampungan
sampah
20 x 15 N
1 10
2 2
Kantor 3 10
4 20
5 5
6 10
Taman
7 5
Gedung dan parkir 20 x 12
alat berat
6 7
Tempat pencucuai mobil 10 x 12 3
2
4
1

KETERANGAN
PJ1 Pos Jaga 1
SITE PLAN TPS & SISTEM DRAINASE EE
PJ2 Pos Jaga 2
INTERVAL KONTUR : 1 meter
BS Bak Sampah
TPM Tempat Pencucian Mobil
GAB Gudang/Parkir Alat Berat
Drainase
Sistem Drainase TPS
Jalan Masuk Ke TPS 0 15 30
meter
SKALA 1 : 500
No : 25 CODE : S-D-D

l
a N
m

b c d e n

f
j
h g i
k

SITE DETAIL DRAINASE


INTERVAL KONTUR : 1 meter

0 15 30
meter
SKALA 1 : 500