Item Reference Description Qty.: Air Conditioning - Basic Module Ref: 0930

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

AIR CONDITIONING.

BASIC MODULE
issue:01/11
Ref: 0930
ITEM REFERENCE DESCRIPTION QTY.
1 / 2
1 TAAC COMPUTER CONTROLLED AIR CONDITIONING
LABORATORY EQUIPMENT, FORMED BY:
1
TAAC.Unit AIR CONDITIONING LABORATORY EQUIPMENT 1
TAAC/CIB CONTROL INTERFACE BOX FOR AIR CONDITIONING
LABORATORY EQUIPMENT
1
DAB DATA ACQUISITION BOARD 1
TAAC/CCSOF COMPUTER CONTROL + DATA ACQUISITION DATA
MANAGEMENT SOFTWARE FOR AIR CONDITIONING
LABORATORY EQUIPMENT
1
2 TAAC/CAL COMPUTER AIDED LEARNING SOFTWARE FOR AIR
CONDITIONING EQUPMENT (RESULTS CALCULATION
AND ANALYSIS)
1
3 TTEC BENCH TOP COOLING TOWER, COMPUTER
CONTROLLED. FORMED BY:
1
TTEC.Unit BENCH TOP COOLING TOWER 1
TTEC/CIB CONTROL INTERFACE BOX FOR BENCH TOP COOLING
TOWER
1
DAB DATA ACQUISITION BOARD 1
TTEC/CCSOF COMPUTER CONTROL + DATA ACQUISITION + DATA
MANAGEMENT SOFTWARE FOR BENCH TOP COLLING
TOWER
1
4 TTEC/CAL COMPUTER AIDED LEARNING SOFTWARE FOR BENCH
TOP COOLING TOWER (RESULTS CALCULATION AND
ANALYSIS)
1
5 TTEC/OC OPTIONAL COLUMNS FOR BENCH TOP COOLING
TOWER. FORMED BY:
TTEC/A COLUMN TYPE A 1
TTEC/C COLUMN TYPE C 1
TTEC/D COLUMN TYPE D 1
TTEC/E COLUMN TYPE E 1
6 0930PARTS COMPONENTS AND SPARE PARTS 1
7 0930PA COMPLEMENTARY ITEM 1
8 0930IYPM INSTALLATION AND STARTING-UP 1
9 0930CAPRO TRAINING AND BRINGING UP TO DATE OF TEACHERS 1
10 0930TD TEACHING TECHNIQUES "KNOW-HOW" 1
11 0930MANU DOCUMENTATION AND MANUALS 1
Ref: 0930

2 / 2
Notes:
This module has only one unit in each item, but we can recommend the
number of units for 10 or 30 students working simultaneously.
2)Supply conditions:
a) Technical conditions included:
- Laboratories adaptation.
- Installation of all units supplied.
- Starting up for all units.
- Training about the exercises to be done with any unit.
- Teacher training related with t and the teaching unit and
the teaching techniques uses.
- Technology transfer.
b) Commercial conditions:
- Packing.
- Financing charges.
- C.I.F. charges.
c) Others conditions:
- 8 Manuals for each EDIBON teaching unit:
. Required services manual.
. Assembly and installation manual.
. Interface and software/control console manual.
. Set in operation manual.
. Safety norms manual.
. Practices manual.
. Maintenance manual.
. Calibration manual.
1) Multipost option:
See Catalogues in next pages
TAAC. Unit:
Anodized aluminium structure. Diagram in the front panel with similar distribution that the elements in the real unit.
Tunnel of 300 x 300 x 1600 mm. , made in stainless steel with 2 windows of 200 x 300 mm. to visualize the tunnel inside. 2
electrical resistances: one of 2000W (pre-heater) to the inlet of the evaporator and other of 1000 W (re-heater) to the outlet
of the evaporator.4 Hygrometers placed along the tunnel, formed each one by 2 temperature sensors (wet and dry bulb).
Fan, with speed controlled by computer. Evaporator. Compressor. Condenser unit. Condensate measurement. High-
pressure cut-out. Filter dryer. Flow meter.
Sensors included:
Temperature (12): 4 dry bulb, 4 wet bulb, 1 J type (inlet of the evaporator), 1 J type (outlet of the evaporator), 1 J
type(outlet of the condenser). Pressure (6): 1 sensor (outlet of the condenser), 1 sensor (inlet of the condenser), 1
differential sensor (measure of flow), 1bourdon manometer (outlet of the condenser), 1 bourdon manometer (inlet of the
evaporator),1bourdon manometer (outlet of the evaporator). 1 Refrigerant flow sensor.
TAAC/CIB. Control Interface Box :
With process diagram in the front panel. The unit control elements are permanently computer controlled. Simultaneous
visualization in the computer of all parameters involved in the process. Calibration of all sensors involved in the process.
Real time curves representation. All the actuators values can be changed at any time from the keyboard. Shield and filtered
signals to avoid external interferences. Real time control with flexibility of modifications from the computer keyboard of the
parameters, at any moment during the process. Open control allowing modifications, at any time and in a real time, of
parameters involved in the process. 3 safety levels: mechanical in the unit, electronic in control interface, and th the third one
in the control software.
DAB. Data Acquisition Board:
PCI Data acquisition National Instruments board to be placed in a computer slot. 16 Analog inputs. Sampling rate up
to:250 KS/s. 2 Analog outputs. 24 Digital Inputs/Outputs.
TAAC/CCSOF.Computer Control+Data Acquisition+Data Management Software:
Flexible, open and multicontrol software. Management, processing, comparison and storage of data. Sampling velocity up
to 250,000 data per second. It allows the registration of the alarms state and the graphic representation in real time.
Cables and Accessories,for normal operation.
Manuals: This unit is supplied with 8 manuals.
Kg. Control Interface: 490x330x310 mm. Weight: 10 Kg. Dimensions (approx.) =Unit: 1600x570x1500 mm. Weight:200
TAAC. Computer Controlled Air Conditioning Laboratory Unit
2
1 Unit: TAAC. Air Conditioning Laboratory Unit
Teaching
Technique
used
Software for:
4
- Data Acquisition
- Data Management
- Computer Control
Data
Acquisition
Board
3
Control
Interface Box
Cables and Accessories
Manuals
SCADA. EDIBON Computer Control System
5
6
Always included
in the supply:
OPEN CONTROL + MULTICONTROL + REAL TIME CONTROL
SPECIFICATIONS SUMMARY
Items supplied as standard
PRACTICAL POSSIBILITIES
1.- Demonstration of the processes
and components used in heating,
cooling, humidification, dehumi-
dification of an airstream.
2.- Obtaining of the steam generator
efficiency curve.
3.- Energy balance in the steam
generator.
4.- Efficiency determination of the
preheating resistance.
5.- Preheati ng effect i n an ai r
conditioning installation.
6.- Dehumidification process study.
7.- Material balance in the evaporator.
8.- Energy balance in the evaporator.
9.- Re-heat effect.
10.- Experimental determination of the
air specific heating capacity.
Other possible practices:
11.- Psychrometric chart.
12.- Example of the air properties
determination.
13.- Usage of psychrometric chart.
14.- Determination of the airflow.
15.- Temperature sensors calibration.
16.- Pressure sensors calibration.
17.- Determination of a PWM controller
adjustment parameters.
18.- Properties of the Refrigerant R134a.
19.- Enthalpy-Pressure diagram for the
refrigerant R134a.
20-38.- Practice with PLC.
1
2
3
4
5
6
TARC. Computer Controlled Recirculating Air Conditioning Unit
1 Unit: TARC. Recirculating Air Conditioning Unit
Software for:
4
- Data Acquisition
- Data Management
- Computer Control
Data
Acquisition
Board
3
2
Control
Interface Box
Cables and Accessories
Manuals
SCADA. EDIBON Computer Control System
5
6
Always included
in the supply:
Teaching
Technique
used
SPECIFICATIONS SUMMARY
Items supplied as standard
PRACTICAL POSSIBILITIES
1.- Demonstration of
6.- Obtaining of the steam generator efficiency
curve.
7.- Energy balance in the steam generator.
8.- Efficiency determination of the preheating
resistance.
9.- Preheating effect in an air conditioning
installation.
10.- De-humidification process study.
11.- Material balance in the evaporator.
12.- Energy balance in the evaporator.
13.- Re-heat effect.
14.- Experimental determination of the air specific
heating capacity.
Other possible practices:
15.- Psychrometric chart.
16.- Determination of the air flow.
17.- Example of the air properties determination.
18.- Properties of the Refrigerant R134a.
19.- Enthalpy-Pressure diagram for the refrigerant
R134a.
20-38 .- Practices with PLC.
the processes of air heating,
cooling, humidification, de-humidification,
recirculating and mixing.
2.- Demonstration of recirculating and the
"adiabatic" mixing of two air steams at different
states and enables the resulting condition to be
plotted on the psychrometric chart.
3.- It enables the condensate formed during de-
humidification to be compared with that expected
from the change of air properties across the
evaporator.
4.- Comparison between the heat transfer to the
refrigerant and the heat transfer from the air at the
cooling section.
5.- Compares the heat transfer at the boiler with the
enthalpy increase of the air during steam
injection.
TARC. Unit:
Anodized aluminium structure. Diagram in the front panel with similar distribution that the elements in the real
unit.
Tunnel, made in stainless steel with 2 windows of 200 x 300 mm. to visualize the tunnel inside. 3 electrical
heating resistances. Fan, with speed control by computer. Evaporator. Compressor. Condenser unit.
Condensate measurement. High-pressure cut-out. Flow meter. Filter.
Sensors included: 12 Temperature sensors. 4 Pressure sensors. Flow sensor.
Manometers.
TARC/CIB. Control Interface Box :
With process diagram in the front panel. The unit control elements are permanently computer controlled.
Simultaneous visualization in the computer of all parameters involved in the process. Calibration of all sensors
involved in the process. Real time curves representation. All the actuators values can be changed at any time
from thekeyboard. Shield and filtered signals to avoid external interferences. Real time PID control with flexibility
of modifications from the computer keyboard of the PID parameters, at any moment during the process. Open
control allowing modifications, at any time and in a real time, of parameters involved in the process. 3 safety
levels: mechanical in the unit, electronic in control interface, and the third one in the control software.
DAB. Data Acquisition Board:
PCI Data acquisition National Instruments board to be placed in a computer slot. 16 Analog inputs. Sampling
rate up to: 250 KS/s. 2 Analog outputs. 24 Digital Inputs/Outputs.
TARC/CCSOF.Computer Control+Data Acquisition+Data Management Software:
Flexible, open and multicontrol software. Management, processing, comparison and storage of data. Sampling
velocity up to 250,000 data per second. It allows the registration of the alarms state and the graphic
representation in real time.
Cables and Accessories, for normal operation.
Manuals:This unit is supplied with 8 manuals.
Kg.
Control Interface: 490x450x470 mm. Weight: 20Kg.
Refrigerant flow sensor.
Enthalpy diagram of the refrigerant R134a.
Dimensions (approx.) = Unit: 2700 x 1100 x 1600 mm.Weight: 250
1
2
3
4
5
6
Non computer controlled version available.
OPEN CONTROL + MULTICONTROL + REAL TIME CONTROL
Page 43
More information in: www.edibon.com/products/catalogues/en/units/thermodynamicsthermotechnics/
airconditioning/TARC.pdf
More information in: www.edibon.com/products/catalogues/en/units/thermodynamicsthermotechnics/
airconditioning/TAAC.pdf
9
.
-

T
h
e
r
m
o
d
y
n
a
m
i
c
s

&

T
h
e
r
m
o
t
e
c
h
n
i
c
s
9.5- Air Conditioning (continuation)
www.edibon.com
TAAUC. Computer Controlled Automobile Air Conditioning Trainer
OPEN CONTROL + MULTICONTROL + REAL TIME CONTROL
SPECIFICATIONS SUMMARY
Items supplied as standard
PRACTICAL POSSIBILITIES
1.-General use of the air conditioning:
Manual /Auto modes.
2.-Cooling with and without internal
circulation.
3.-Speed of the automobile engine.
4.-Cooling in function of the radiator
fans.
5.-Cooling in function of the automobile
inlet fan.
6.-Energy balance in the evaporator.
7.-Matter balance in the evaporator.
8.-Experimental determination of the
specific calorific capacity of the air.
9.-Optimum determination of the
parameters involved in an air
conditioning process.
10.-Temperature sensors calibration.
11.-Absolute pressure sensors calibration.
Other possible practices
15-33.- Practices with PLC.
:
12.-Use of a psychometric map.
13.-Properties of the coolant R134a.
14.-Enthalpy diagram-pressure of the
R134a.
TAAUC. Unit:
Bench-top unit. Anodized aluminium structure. Panels and main metallic elements in stainless steel.
TAAUC/CIB. Control Interface Box :
With process diagram in the front panel. The unit control elements are permanently computer controlled. Simultaneous
visualization in the computer of all parameters involved in the process. Calibration of all sensors involved in the process.
Real time curves representation. All the actuators values can be changed at any time from the keyboard. Shield and filtered
signals to avoid external interferences. Real time control with flexibility of modifications from the computer keyboard of the
parameters, at any moment during the process. Open control allowing modifications, at any time and in a real time, of
parameters involved in the process. 3 safety levels: mechanical in the unit, electronic in control interface, and the third one in
the control software.
DAB. Data Acquisition Board:
PCI Data acquisition National Instruments board to be placed in a computer slot. 16 Analog inputs. Sampling rate up
to:250 KS/s. 2 Analog outputs. 24 Digital Inputs/Outputs.
TAAUC/CCSOF.Computer Control+Data Acquisition+Data Management Software:
Flexible, open and multicontrol software. Management, processing, comparison and storage of data. Sampling velocity up
to 250,000 data per second. It allows the registration of the alarms state and the graphic representation in real time.
Cables and Accessories,. for normal operation.
Manuals: This unit is supplied with 8 manuals.
Control Interface: 490x450x470 mm. Weight: 20Kg.
2 Fans with speed control by computer. Condenser. Compressor, computer controlled. Filter. Electrical engine with speed
control by computer (it simulates the car combustion motor). Evaporator. Expansion valve. Refrigerant tank. 5 Temperature
sensors, type J. 2 Absolute pressure sensors. Flow sensor(refrigerant). Automobile control panel (including in the control
interface box). Ventilation motors visualization (including in the control interface box). Enthalpy diagram R134a.
Dimensions (approx.) =Unit: 1560x860x760 mm. Weight:150 Kg.
1
2
3
4
5
6
TTEC. Computer Controlled Bench Top Cooling Tower
1 Unit: TTEC. Bench Top Cooling Tower
Software for:
4
- Data Acquisition
- Data Management
- Computer Control
Data
Acquisition
Board
3
SCADA. EDIBON Computer Control System
Teaching
Technique
used
Always included
in the supply:
OPEN CONTROL + MULTICONTROL + REAL TIME CONTROL
SPECIFICATIONS SUMMARY
Items supplied as standard
PRACTICAL POSSIBILITIES
1 .- Process observation inside a bench
top cooling tower.
2 .- Determination of evaporation
velocity.
3 .- Mass balance. Use of psychrometric
charts.
4 .- Energy balance.
5 .- Effect of cooling load against "Wet
bulb approach".
6 .- Relation between air velocity, wet
bulb approach and head loss.
7 .- Determination of the cooling
capacity.
8 .- Determination of the cooling
capacity for different cooling
towers.
9 .- Thermodynamic properties.
10.- Evaporation from a wet bed.
11.- Observation of water flow pattern
and distribution.
12.- Control system: Temperature
sensors calibration.
13.- Control system: PID temperature
control.
14.- Control system: Flow sensors
calibration.
15.- Study of flow sensor hysteresis.
16.- Control system: Determination of
adjustment parameters of a PWM
controller.
17.- Di fferent i al pressure sensors
calibration.
Other possible practices:
18.- Variation of specific enthalpy with
pressure.
19.- Properties of air.
20.- Use of a psychometric map.
21.- Determination of water flow.
22-40 .- Practices with PLC.
TTEC. Unit:
Bench top unit. Anodized aluminium structure. Panels and main metallic elements in stainless steel. Diagram in the front
panel with similar distribution that the elements in the real unit.
TTEC/CIB. Control Interface Box :
With process diagram in the front panel. The unit control elements are permanently computer controlled. Simultaneous
visualization in the computer of all parameters involved in the process. Calibration of all sensors involved in the process.
Realtime curves representation. All the actuators values can be changed at any time from thekeyboard. Shield and filtered
signals to avoid external interferences. Real time PID control with flexibility of modifications from the computer keyboard of
the PID parameters, at any moment during the process. Open control allowing modifications, at any time and in a real time,
of parameters involved in the process. 3 safety levels: mechanical in the unit, electronic in control interface, and the third one
in the control software.
DAB. Data Acquisition Board:
PCI Data acquisition National Instruments board to be placed in a computer slot. 16 Analog inputs. Sampling rate up to:
250 KS/s. 2 Analog outputs. 24 Digital Inputs/Outputs.
TTEC/CCSOF.Computer Control+Data Acquisition+Data Management Software:
Flexible, open and multicontrol software. Management, processing, comparison and storage of data. Sampling velocity up
to 250,000 data per second. It allows the registration of the alarms state and the graphic representation in real time.
Cables and Accessories, for normal operation.
Manuals: This unit is supplied with 8 manuals.
490x330x310mm. Weight:10 Kg.
Water propeller pump, maximum flow of water of 120 l./h. -2
3
l./min. Air propeller with a fan speed computer controlled (145 m /h max., 3000 rpm). Heater resistance (60 C. Max),
computer controlled. Water tank (14l.) with water level gauge. On/Off level switch for filling the tank. Solenoid valves.
Flow sensor. 2 Differential pressure sensors, range: 0 - 1 H 0. Up to 16 Temperature sensors type J (of wet bulb, dry bulb
2
and water temperature), according to the column supplied . Range: -60C to 200C.
2
Column type B: N of levels: 8. N of sheets by level: 10. Total surface: 1.013 m .Height of packaging: 650mm. Density
2 3
Area/volume: 58 m /m .
-Optional Columns: (not included in the standard supply)
2
Column type A: N of levels: 8. N of sheets by level: 19. Total surface: 1.915 m . Height of packaging: 650 mm.
2 3
Density Area/volume: 112.64 m /m .
2
Column type C:N of levels: 8. N of sheets by level: 7. Total surface: 0.680 m . Height of packaging: 650 mm.
2 3
Density Area/volume: 40.02 m /m .
Column type D:No packaging.
Column type E: (Packing characteristics column): with packing arranged to allow measurement of air and water
properties within column. Fitted with temperature sensors in 3 points.
Sensors: 7 temperature sensors of Dry Bulb, 7 temperature sensors of Wet Bulb and 3
water temperature sensors.
N of levels: 8. N of sheets by level: 19. Height of column: 1100mm. Height of packaging: 650 mm.
2 3
Density Area/volume: 112.64 m /m .
Dimensions (approx.) =Unit: 1000 x 450 x 1400 mm. Weight: 100 Kg. Control Interface:
1
2
3
4
5
6
Non computer controlled version available.
Page 44
Cables and Accessories
2
Control
Interface Box
Manuals
5
6
More information in: www.edibon.com/products/catalogues/en/units/thermodynamicsthermotechnics/
coolintgtowers/TTEC.pdf
More information in: www.edibon.com/products/catalogues/en/units/thermodynamicsthermotechnics/
airconditioning/TAAUC.pdf
9
.
-

T
h
e
r
m
o
d
y
n
a
m
i
c
s

&

T
h
e
r
m
o
t
e
c
h
n
i
c
s
9.5- Air Conditioning (continuation)
9.6- Cooling Towers
1 Unit: TAAUC. Automobile Air Conditioning Trainer
Software for:
4
- Data Acquisition
- Data Management
- Computer Control
Data
Acquisition
Board
3
2
Control
Interface Box
SCADA. EDIBON Computer Control System
Teaching
Technique
used
Always included
in the supply:
Cables and Accessories
Manuals
5
6

You might also like