WO2012022199A1 - Procédé et système de mesure de porteuse dans un système multi-porteuses - Google Patents
Procédé et système de mesure de porteuse dans un système multi-porteuses Download PDFInfo
- Publication number
- WO2012022199A1 WO2012022199A1 PCT/CN2011/076329 CN2011076329W WO2012022199A1 WO 2012022199 A1 WO2012022199 A1 WO 2012022199A1 CN 2011076329 W CN2011076329 W CN 2011076329W WO 2012022199 A1 WO2012022199 A1 WO 2012022199A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- measurement
- carrier
- signal quality
- deactivated
- requirement
- Prior art date
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/02—Power saving arrangements
- H04W52/0209—Power saving arrangements in terminal devices
- H04W52/0225—Power saving arrangements in terminal devices using monitoring of external events, e.g. the presence of a signal
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/0091—Signaling for the administration of the divided path
- H04L5/0096—Indication of changes in allocation
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/10—Scheduling measurement reports ; Arrangements for measurement reports
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W76/00—Connection management
- H04W76/20—Manipulation of established connections
- H04W76/28—Discontinuous transmission [DTX]; Discontinuous reception [DRX]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/70—Reducing energy consumption in communication networks in wireless communication networks
Definitions
- the present invention relates to carrier measurement techniques, and more particularly to a carrier measurement method and system in a multi-carrier system. Background technique
- the Long Term Evolution (LTE) system the maximum transmission bandwidth supported by the system is 20MHz.
- LTE-A Carrier Aggregation
- UE user equipment
- UE User Equipment
- the CA aggregates two or more component carriers (CCs) to support transmission bandwidths greater than 20 ⁇ and no more than 100 MHz.
- CCs component carriers
- the LTE-A system using carrier aggregation technology is a multi-carrier system.
- FIG. 1 is a schematic diagram of carrier aggregation according to the related art. As shown in FIG. 1, each component carrier performing carrier aggregation may be continuous or discontinuous in the frequency domain. To support carrier aggregation and enable the UE to work on multiple carriers at the same time, the radio frequency structure of the UE needs to meet the corresponding requirements. For example, in the frequency division duplex mode (FDD), the UE supports downlink carrier aggregation.
- FDD frequency division duplex mode
- the UE needs to have more than two radio receivers (Receiver) to simultaneously Receiving data on discontinuous component carriers; if receiving more than two consecutive component carriers in the frequency domain, the UE needs to have a radio receiving device with a maximum bandwidth exceeding 20 MHz, compared to a radio receiving device with a maximum bandwidth of 20 MHz in a single carrier system.
- Data is simultaneously received on a plurality of consecutive component carriers, or if the UE has multiple radio receiving devices, the UE can use the plurality of radio receiving devices to simultaneously receive data on the plurality of consecutive component carriers.
- the UE supports uplink carrier aggregation.
- the UE needs to have more than two radio transmitting devices (Transmitter); if the UE is in more than two consecutive component carriers at the same time; To transmit data, the UE needs to have a radio transmitting device with a maximum bandwidth exceeding 20 MHz or more than two radio transmitting devices.
- the principle of UE support carrier aggregation under the time division duplex mode (TDD, Time Division Duplex) is also the same.
- TDD Time Division Duplex
- the base station eNB, evolved NodeB
- the base station can configure up to 5 cells for the UE.
- the base station may add a new UE to the UE by using RRC (Radio Resource Control) signaling due to the increase of the UE service traffic or the radio resource management (RRM) requirement of the base station.
- RRC Radio Resource Control
- the configuration of the cell includes, in particular, configuration information related to the uplink and downlink carriers of the newly added cell.
- the base station may delete the cell that has been configured to the UE by using RRC signaling, specifically, including the deleted cell.
- Configuration information of the uplink and downlink carriers can occur at the same time.
- the base station configures a primary serving cell (Pcell) for the UE through an explicit configuration or a protocol, and the downlink carrier working by the Pcell is called a downlink primary carrier (DL).
- PCC Downlink Primary Component Carrier
- the uplink carrier working by the Pcell is called the uplink primary carrier (UL PCC)
- the other cells other than the Pcell configured by the UE are called the secondary serving cell (Scell, Second serving
- the downlink carrier working by the Scell is called the downlink secondary carrier (DL SCC), and the uplink carrier working by the Scell is called the uplink secondary carrier (UL SCC).
- DL SCC downlink secondary carrier
- UL SCC uplink secondary carrier
- the foregoing is configured to configure multiple cells for the UE by using RRC signaling, that is, the UE works on multiple carriers,
- the UE needs to use a radio transceiver with a bandwidth exceeding 20 MHz or use multiple radio transceivers, which will greatly increase the battery power consumption of the UE. Therefore, considering the bursty characteristics of the service, although the UE may use up to 5 carriers at most, in the burst gap, the actual traffic of the UE is rarely or close to zero. At this time, if the UE continues to be in multiple Receiving/transmitting data on a carrier will result in higher power overhead. Therefore, in order to extend the working time of the UE, turn off the radio transceiver device that is not required to be turned on, and reduce unnecessary battery consumption.
- a carrier activation/deactivation mechanism can be introduced.
- the downlink carrier and the uplink carrier in one cell can be independently activated/deactivated.
- the base station activates/deactivates the secondary carrier through an explicit media access control (MAC, Medium Access Control) command notification or through an agreed implicit rule.
- MAC Media Access Control
- the primary carrier is activated once configured, that is, the activation/deactivation mechanism is only performed for the secondary carrier.
- the UE performs data reception only on the activated downlink carrier, for example, only on the Physical Downlink Control Channel (PDCCH).
- the UE On the deactivated downlink carrier, the UE does not monitor the PDCCH channel, and does not receive physical downlink sharing. Data on the channel (PDSCH, Physical Downlink Shared Channel) to save power.
- PDSCH Physical Downlink Shared Channel
- the UE only sends data on the activated uplink carrier.
- the UE stops transmitting uplink data, including stopping the transmission of the uplink reference signal (SRS, Sounding Reference Symbols), and stopping the physical uplink control channel (PUCCH, Physical Uplink).
- the control channel transmits data, and stops transmitting data on the physical uplink shared channel (PUSCH, Physical Uplink Shared Channel).
- the frequency within the system is divided into two measurement requirements, namely, the same frequency measurement requirement and the inter-frequency measurement requirement.
- the measurement requirements include: the identification time of the cell, the measurement time of the cell, the measurement accuracy, and the like.
- the measurement is mainly used to support the handover decision. Since the frequency of the intra-frequency handover is more frequent than the inter-frequency handover, the inter-frequency measurement requires the UE to adjust the radio frequency unit, and the measurement is only required at the service frequency point relative to the same-frequency measurement. More troublesome, so the measurement requirements of the same frequency are higher than the requirements of the inter-frequency measurement.
- the cell identification time is 800 ms, and the measurement period is 200 ms.
- the inter-frequency measurement is performed, if the inter-frequency frequency is configured, and the configured measurement time slot is mode 0 (period 40), Then the basic cell identification time is 3840 ms and the measurement period is 480 ms.
- the same frequency and inter-frequency measurement requirements are further relaxed with the DRX cycle.
- the UE of the LTE-A system may have three carrier configurations in the connected state, namely configuring and activating the carrier, configuring and deactivating the carrier, and not configuring the carrier.
- the active carrier the same frequency measurement requirement as the LTE system is used, and the inter-frequency measurement requirement is used for the unconfigured carrier.
- the measurement requirements are still inconclusive. Since the measurement of the deactivated carrier is more to serve the carrier management part, the deactivated carrier can be activated quickly according to the change of the service.
- the main object of the present invention is to provide a carrier measurement method and system in a multi-carrier system, which performs measurement when matching a deactivated carrier according to its state and suitable measurement requirements, thereby satisfying the use of the deactivated carrier.
- the power saving of the UE is implemented under the premise of the requirement.
- a carrier measurement method in a multi-carrier system which sets more than one measurement requirement for deactivating a carrier; the method further includes:
- the user equipment UE applies different measurement requirements according to different states in which the carrier is deactivated.
- the different states in which the deactivated carriers are located are different according to signal quality, according to different states of the wireless environment.
- the method further includes:
- the network side notifies the UE of the correspondence between the set state of the deactivated carrier and the measurement request;
- the UE applies different measurement requirements according to different states according to the deactivated carrier:
- the UE 4 determines the state of the deactivated carrier according to the signal quality information of the deactivated carrier, determines the measurement requirement of the deactivated carrier, and measures the deactivated carrier according to the determined measurement requirement.
- the method further includes:
- the value of the measured quantity of the deactivated carrier signal quality corresponds to the measurement requirement of the deactivated carrier measurement by the UE when the signal quality is good or the signal quality is poor;
- the value of the measurement amount of the deactivated carrier signal quality corresponds to the measurement requirement of the deactivated carrier measurement when the signal quality is better than the signal quality is poor.
- the method further includes:
- the value of the measured quantity of the deactivated carrier signal quality corresponds to the measurement requirement of the UE for deactivating the carrier measurement when the signal quality is good; the value of the measured quantity of the deactivated carrier signal quality corresponds to when the signal quality is poor,
- the UE requires 2 measurements for deactivation of the carrier measurement.
- the measured quantity is an absolute measured quantity or a relative measured quantity; the measured quantity is received
- the reference signal received power (RSRP, Reference Signal Received Power) or the quality of the reference signal received by the UE (RSRQ, Reference Signal Received Quality).
- the conditions for setting a good signal quality or a poor signal quality are:
- the method further includes:
- the measurement quantity for detecting the signal quality is measured, and after the measurement result is obtained, the filtering is performed, and the filtered result is used as the final measurement result of the measurement quantity.
- the measurement requirement 1 of the deactivation carrier measurement is specifically: the measurement requirement of the activated carrier is consistent with the measurement requirement of the inter-frequency cell; or the measurement requirement of the deactivated carrier and the discontinuous reception of the activated carrier configuration (DRX, Discontinuous Reception) The measurement requirements are consistent.
- the measurement requirement of the deactivation carrier measurement is 2, specifically: the measurement requirement of the deactivated carrier is consistent with the measurement requirement of the same frequency cell; or the measurement requirement of the deactivated carrier is consistent with the measurement requirement of the DRX for activating the carrier configuration.
- the measuring requirement comprises at least one of the following:
- UE's measurement capability requirements frequency measurement number and time requirements, number of cell detections and time requirements, number of cell measurements and time requirements.
- a carrier measurement system in a multi-carrier system comprising: a setting unit and a measuring unit; wherein, the setting unit is configured to set more than one measurement requirement for the deactivated carrier;
- the measuring unit is disposed in the UE, and is configured to apply different measurement requirements according to different states in which the carrier is deactivated.
- the different states in which the deactivated carriers are located are different according to the quality of the wireless environment, and the states are distinguished according to the signal quality.
- the setting unit further presets a correspondence between a state of the deactivated carrier and a measurement requirement
- the measuring unit further determines the de-excitation according to signal quality information of the deactivated carrier
- the state of the live carrier is determined, and then the measurement requirement of the deactivated carrier is determined, and the deactivated carrier is measured according to the determined measurement requirement.
- the system further includes a notification unit, configured on the network side, configured to notify the UE of the correspondence between the set state of the deactivated carrier and the measurement request;
- the measuring unit further determines a state of the deactivated carrier according to signal quality information of the deactivated carrier, and further determines a measurement requirement of the deactivated carrier, and performs the deactivated carrier according to the determined measurement request. measuring.
- the setting unit further sets a measurement amount for detecting a signal quality, and a value corresponding to a measurement quantity that is poor in signal quality and better;
- the corresponding relationship between the state of the deactivated carrier and the measurement requirement is specifically: the value of the measured quantity of the deactivated carrier signal quality corresponds to the measurement of the deactivated carrier measurement when the signal quality is good or the signal quality is poor.
- Requirement 1 the value of the measured quantity of the deactivated carrier signal quality corresponds to the measurement of the deactivated carrier measurement when the signal quality is good or the signal quality is poor.
- the value of the measurement quantity of the deactivated carrier signal quality corresponds to the measurement requirement of the deactivated carrier measurement by the UE when the signal quality is better than the signal quality is poor;
- the value of the measured quantity of the deactivated carrier signal quality corresponds to the measurement requirement of the UE for deactivating the carrier measurement when the signal quality is good; the value of the measured quantity of the deactivated carrier signal quality corresponds to the worse signal quality , setting the measurement requirement of the UE for deactivating carrier measurement 2 .
- the measurement requirement of the deactivation carrier measurement is specifically as follows: The measurement requirement of the activated carrier is consistent with the measurement requirement of the inter-frequency cell; or the measurement requirement of the deactivated carrier is consistent with the measurement requirement of the DRX for activating the carrier configuration.
- the measurement requirement of the deactivation carrier measurement is 2, specifically: the measurement requirement of the deactivated carrier is consistent with the measurement requirement of the same frequency cell; or the measurement requirement of the deactivated carrier is consistent with the measurement requirement of the DRX for activating the carrier configuration.
- the measuring requirement comprises at least one of the following:
- the measurement requirement for the deactivated carrier is first set and configured in the UE, or broadcasted to the UE by the network side or sent to the UE through dedicated signaling, and each UE deactivates the carrier according to the set measurement requirement.
- the measurement is performed, and the UE dynamically adjusts the measurement requirement of the deactivated carrier according to the signal quality change of the deactivated carrier, thereby achieving the effect of both fast activation and power saving of the deactivated carrier.
- FIG. 1 is a schematic diagram of carrier aggregation according to the related art
- Figure 2 is a schematic diagram of the dynamic adjustment measurement requirements according to the signal quality change
- Figure 2a is another schematic diagram of dynamically adjusting measurement requirements based on signal quality changes
- FIG. 3 is a schematic structural diagram of a carrier measurement system in a multi-carrier system according to the present invention. detailed description
- the basic idea of the invention is that there are multiple measurement requirements for the deactivated carrier, depending on the different states of the deactivated carrier, applying different measurement requirements.
- the corresponding relationship between the measurement status determination and the measurement requirement may be configured in the UE by using a predefined correspondence, or broadcasted to the UE by the network side or sent to the UE through dedicated signaling, and each UE goes to the set measurement request.
- the carrier is activated for measurement, so that the UE can dynamically adjust the measurement requirements for the deactivated carrier according to the state change of the deactivated carrier.
- Deactivating the state of the carrier can deactivate the radio state of the carrier, deactivate the carrier's transmission state, and deactivate the carrier's priority state.
- the radio state of the deactivated carrier is determined by the signal quality of the deactivated carrier.
- the transmission state of the deactivated carrier or the priority state of the deactivated carrier is similar to the wireless state, only The judgment condition is different.
- the transmission status may be obtained according to historical transmission statistics of the carrier, or a priority status set according to information indicated by the eNB.
- the correspondence between the measurement requirement of the deactivated carrier and the condition that the signal quality needs to be met is set.
- the UE measures the deactivated carrier according to the measurement requirement.
- the correspondence between the radio status and the measurement requirement is that when the deactivated carrier signal quality satisfies the good signal quality or the poor condition, the UE measures the deactivated carrier with a lower measurement requirement (measurement requirement 1).
- the signal quality is better or worse, and the corresponding signal quality meets the condition.
- the lower measurement requirement is relative to the higher measurement requirement, and the specific measurement is to be described in detail later, such as the LTE system.
- the inter-frequency measurement requirement is lower than the same-frequency measurement requirement, so the above-mentioned lower measurement requirement may be an inter-frequency measurement requirement in the LTE system, that is, the measurement requirement of the deactivated carrier is consistent with the inter-frequency cell measurement requirement; or The measurement requirements for DRX to activate the carrier configuration are consistent.
- the UE measures the deactivated carrier with a higher measurement requirement (measurement requirement 2).
- the higher measurement requirement may be a relatively low inter-frequency measurement requirement, as the frequency measurement requirement, that is, the measurement requirement of the deactivated carrier is consistent with the measurement requirement of the same-frequency cell or other activated serving cell; or Consistent with the measurement requirements of the DRX that activates the carrier configuration, the measurement requirements for the DRX configuration here are higher than the DRX configuration for the lower measurement requirements described above.
- the corresponding relationship may also be that when the deactivated carrier signal quality satisfies the signal quality, the UE measures the deactivated carrier with a lower measurement requirement (measurement requirement 1). When the de-energized carrier satisfies the condition of poor signal quality, the UE measures the deactivated carrier with a higher measurement requirement (measurement requirement 2).
- the foregoing signal quality condition may be specifically a threshold condition of the measurement quantity, where the measurement condition may be the power of the received reference signal in LTE (Reference Signal Received) Power, referred to as RSRP, in dBm) or the quality of the reference signal received by the UE (Reference Signal Received Quality, referred to as RSRQ, in dB).
- the threshold condition may be that the above measured quantity is higher or lower than a specific threshold, or higher than and lower than a specific threshold.
- the threshold may be an absolute threshold, such as the deactivation carrier RSRP is higher than N dBm, the deactivation carrier RSRQ is lower than M dB, or the deactivation carrier RSRP is higher than A dBm and lower than B dBm; wherein, A, B, Both M and N are real numbers.
- the threshold value may also be a relative threshold, where the relative threshold may be measured relative to a specified cell, such as relative to a serving cell, where the serving cell may be in carrier aggregation.
- the primary cell such as the deactivated carrier RSRP, is higher than the primary cell RSRQ K (real) dB.
- the threshold condition may be that the eNB notifies the UE through dedicated or public signaling, or may be specified by the UE itself, such as a threshold that can be flexibly adjusted according to its own capabilities or power saving requirements, or a threshold predefined by the protocol.
- the above signal quality may be a filtered result, for example, the measured value is subjected to conditional judgment after L3 filtering by LTE.
- the measurement requirements include the measurement capability requirements of the UE, the number of frequency measurements and time requirements, the number of cell detections and time requirements, the number of cell measurements, and the time requirement. The more the number of measurements, the shorter the measurement time means the higher the measurement requirements.
- the measurement time is taken as an example.
- the measurement period of the intra-frequency cell is 200 ms; the measurement period of the inter-frequency cell and the measurement GAP are configured and the frequency to be measured (including all the inter-frequency measurement using GAP)
- the frequency is related to the number of different system frequencies.
- gap mode 0 GAP pattemO
- the measurement period is 480x Nfreq.
- the measurement period is 240 ⁇ Nfreq, where Nfreq is the frequency.
- the number of measurements is also related to the DRX cycle.
- the DRX cycle is less than 40ms, the same frequency measurement period is the same as the unconfigured DRX same frequency measurement period, which is 200ms. When it is greater than 40ms, the same frequency measurement period is 5s.
- the frequency measurement period is related to the GAP pattern. When the DRX period is less than 160ms, the measurement period and the period are not The DRX is configured with the same frequency measurement period.
- the measurement period is 5.12x Nfreq
- the measurement period is 6.4 ⁇ Nfreq.
- the present invention does not limit the specific measurement requirement parameters.
- the existing defined measurement requirements are taken as an example, but the limitation is not limited to the above-mentioned defined measurement requirements, and the measurement requirements that may be added in the future are also applicable. .
- the wireless state is determined by the relative condition, and the condition 1 is RSRP Scell>RSRPPcell-2dBm, and the condition 2 is RSRP Scell ⁇ RSRPPcell-5dBm, and condition 3 is satisfied as condition 1 or condition 2 cannot be satisfied.
- the corresponding measurement requirements require two types of co-frequency measurement requirements, and inter-frequency measurement requirements. Which satisfies the condition 1 or condition 2 corresponding to the inter-frequency measurement requirement, and satisfies the condition 3 corresponding to the same-frequency measurement requirement.
- the base station configures two carriers for the UE to perform carrier aggregation.
- the primary cell Pcell and the secondary cell ScelL Pcell and Scell both have uplink and downlink carriers, and the downlink carrier of the Pcell belongs to the 2G Hz band. It belongs to the 800M Hz band.
- the UE uses a multi-receiver technology for carrier aggregation of carriers that are isolated from such a frequency band, that is, a carrier of one frequency band is received by a set of independent RF receiving circuits.
- the Pcell is activated by default, and the Scell is inactive by default. When the service traffic of the UE increases, the Scell is activated for data transmission.
- the eNB may notify the UE to deactivate the Scell, or the UE may use the deactivation timer, when there is no data transmission for a period of time.
- Scell can enter the deactivated state by itself.
- the eNB also configures the corresponding measurement for the UE.
- the eNB configures the UE to measure the frequency F1 where the Pcell is located, the frequency F2 where the Scell is located, and the other frequency F3, and configure the Measurement GAP to be pattern 0.
- the UE measures the frequency of the cell on the frequency at which the Pcell is located according to the same frequency measurement requirement of the non-DRX configuration, that is, the cell with the frequency of the Pcell is measured in a period of 200 ms, and the cell at the frequency of the F3 is in accordance with the regulations.
- the measurement period is 480 ⁇ Nfreq.
- the deactivation carrier is full.
- the signal quality of the foot satisfies the condition 1 (the relative threshold is RSRP Scell > RSRPPcell-2dBm in this embodiment)
- the de-activated Scell is measured using the inter-frequency measurement, otherwise the frequency of the deactivated Scell is required to be used by the same-frequency measurement.
- the upper cell performs measurements. If the Scell satisfies the RSRP Scell>RSRPPcell-2dBm at this time, the Scell signal is good and does not need to be measured frequently.
- condition 2 relative threshold RSRP Scell ⁇ RSRPPcell-5dBm
- the UE When the Scell signal is between strong and weak, it needs to be determined as soon as possible whether it is suitable for activation, or whether it is not suitable for activation. In addition, the UE also needs to shorten the measurement period of deactivating the Scell. In this embodiment, for example, when the Scell signal quality satisfies the condition When the above condition 1 or condition 2 cannot be satisfied, that is, when RSRP Scell ⁇ RSRPPcell-2dBm and RSRP Scell>RSRPPcell-5dBm, the UE uses the same frequency measurement requirement to measure it, that is, the deactivated Scell is measured every 200ms.
- the UE may enable the independent radio frequency receiving circuit to measure the cell on the frequency where the Scell is located. If the Pcell and the Scell belong to the same frequency band, as if they belong to the 2G frequency band, the Scell needs to tuned its receiver when the RSRP Scell ⁇ RSRPPcell - 2dBm and RSRP Scell>RSRPPcell-5dBm are satisfied, and simultaneously receive and measure the Pcell and the Scell, and measure the Pcell. Use the same measurement requirements as Scell.
- the UE may turn off the dedicated receiver of the Scell for the UE with the redundant receiver, and measure the Scell when the GAP is used.
- the UE may be tuned when the condition is met. The receiver only receives the Pcell, and uses the inter-frequency measurement requirement for the Scell. When the GAP is used, the measurement is performed.
- the conditions that the above signal quality should satisfy may be preset, or the eNB is configured by public signaling or dedicated signaling.
- dedicated signaling can be passed through the measurement tasks of the LTE system.
- the serving cell is better than the specified threshold 1, as in the embodiment, 80 dBm is taken, and A2 is the serving cell is less than the specified threshold 2, which is 100 dBm in this embodiment.
- the Scell satisfies the A1 event or the A2 event, it enters the trigger cell list (CellTriggerList) of the A1 event or the A2 event.
- CellTriggerList the trigger cell list of the A1 event or the A2 event.
- Scell when not inactive, Scell uses looser measurement requirements to achieve power saving.
- it can also be configured to relax the measurement in a DRX-like manner, such as DRX.
- the measurement period of more than 40ms is measured every 5s. The latter is more suitable for the Pcell configuration.
- the DRX period is configured to be 0.256s.
- the inter-frequency cell measurement period will be extended to 5.12xNfreqs.
- the deactivated Scell uses the measurement request of the active carrier, which is the same as the measurement request of the PCell. .
- FIG. 2 is a schematic diagram of dynamically adjusting measurement requirements according to signal quality changes.
- the two horizontal dashed lines in the figure are the condition 1 and condition 2 of the foregoing setting.
- the measurement requirements are relatively low, and the measurement activity is relatively small.
- the deactivated carrier condition is between the two horizontal dashed lines in the figure, the measurement activity is relatively frequent.
- Figure 2a is another schematic diagram of dynamically adjusting the measurement requirements according to the signal quality change. As shown in Figure 2a, the dashed line corresponds to the previously set condition 3. When the condition 3 (lower part of the dotted line) is not met, the measurement requirements are relatively high.
- the measurement activity is relatively frequent, and when the condition 3 (the upper part of the dotted line) is satisfied, the set measurement requirements are relatively low, and the measurement activity is relatively small.
- the above is a scenario in which two wireless states correspond to two measurement requirements.
- Another typical mode may also be a scenario in which two wireless states correspond to two measurement requirements.
- the threshold may be predefined.
- the eNB assigns to the UE, such as the above A1 event or A2 event, or an otherwise specified s-threshold. When the UE determines that the deactivated cell satisfies the A1 event or is greater than the s-threshold, the signal for deactivating the Scell is good enough to determine the go.
- the activation of the Scell can be activated, and the Scell uses the looser measurement requirements described above to achieve power saving. Otherwise, when the eNB does not satisfy the A1 event, or satisfies the A2 event or is less than the s-threshold, the signal for deactivating the Scell is not good enough at this time, and it cannot be determined that the activated Scell can be activated, and the Scell uses the above-mentioned higher measurement requirement.
- the UE dynamically adjusts the measurement requirement of the deactivated carrier according to the signal quality change of the deactivated carrier, thereby achieving the effect of both fast activation and power saving of the deactivated carrier.
- the carrier measurement system in the multi-carrier system of the present invention includes a setting unit 30 and a measurement unit 31;
- the setting unit 30 is configured to set more than one measurement requirement for the deactivated carrier
- the measuring unit 31 is disposed in the UE, and is configured to apply different measurement requirements according to different states in which the carrier is deactivated.
- the different states in which the above deactivated carriers are located are based on the signal quality to distinguish states according to the wireless environment.
- the setting unit 30 further presets a correspondence relationship between the state of the deactivated carrier and the measurement request;
- the measuring unit 31 further determines the state of the deactivated carrier according to the signal quality information of the deactivated carrier, and further determines the measurement requirement of the deactivated carrier, and determines the deactivated carrier according to the determined measurement requirement. Make measurements.
- the carrier measurement system in the multi-carrier system of the present invention further includes a notification unit (not shown in FIG. 3), which is disposed on the network side for setting the state of the set deactivated carrier. Notifying the UE of the correspondence between the measurement requirements;
- the measuring unit 31 further determines the state of the deactivated carrier according to the signal quality information of the deactivated carrier, and further determines the measurement requirement of the deactivated carrier, and determines the deactivated carrier according to the determined measurement requirement. Make measurements.
- the setting unit 30 further includes a measurement amount for detecting a signal quality, and a value corresponding to a measurement quantity that is poor in signal quality and better;
- the corresponding relationship between the state of the deactivated carrier and the measurement requirement is specifically: the value of the measured quantity of the deactivated carrier signal quality corresponds to the measurement of the deactivated carrier measurement when the signal quality is good or the signal quality is poor.
- Requirement 1 the value of the measured quantity of the deactivated carrier signal quality corresponds to the measurement of the deactivated carrier measurement when the signal quality is good or the signal quality is poor.
- the value of the measurement quantity of the deactivated carrier signal quality corresponds to the measurement requirement of the deactivated carrier measurement by the UE when the signal quality is better than the signal quality is poor;
- the value of the measured quantity of the deactivated carrier signal quality corresponds to the measurement requirement of the UE for deactivating the carrier measurement when the signal quality is good; the value of the measured quantity of the deactivated carrier signal quality corresponds to the worse signal quality , setting the measurement requirement of the UE for deactivating carrier measurement 2 .
- the measurement requirement of the deactivated carrier measurement is specifically as follows: The measurement requirement of the activated carrier is consistent with the measurement requirement of the inter-frequency cell; or the measurement requirement of the deactivated carrier is consistent with the measurement requirement of the DRX for activating the carrier configuration.
- the measurement requirement for deactivating the carrier measurement is as follows: The measurement requirement of the deactivated carrier is consistent with the measurement requirement of the same frequency cell; or, the measurement requirement of the deactivated carrier is consistent with the measurement requirement of the DRX for activating the carrier configuration.
- the above measurement requirements include at least one of the following:
- UE's measurement capability requirements frequency measurement number and time requirements, number of cell detections and time requirements, number of cell measurements and time requirements.
- the carrier measurement system in the multi-carrier system shown in FIG. 3 of the present invention is designed to implement the carrier measurement method in the foregoing multi-carrier system, and the implementation functions of the foregoing processing units may refer to the foregoing method. Understand the relevant description.
- the functions of the various processing units in the figure can be implemented by a program running on a processor, or by a specific logic circuit.
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
L'invention porte sur un procédé et un système de mesure de porteuse dans un système multi-porteuses. Le procédé comprend les étapes suivantes : au moins une exigence de mesure est configurée pour des porteuses désactivées ; conformément à différents états des porteuses désactivées, un équipement utilisateur (UE) adopte des exigences de mesure correspondantes. Le système comprend une unité de configuration (30) et une unité de mesure (31), l'unité de configuration (30) étant utilisée pour configurer au moins une exigence de mesure pour des porteuses désactivées, et l'unité de mesure (31), configurée dans l'UE, étant utilisée pour adopter des exigences de mesure correspondantes, conformément à différents états des porteuses désactivées. La présente invention prend en compte à la fois les activations rapides des porteuses désactivées et les économies d'énergie de l'UE.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010258976.0 | 2010-08-17 | ||
CN2010102589760A CN102378210A (zh) | 2010-08-17 | 2010-08-17 | 多载波系统中的载波测量方法及系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2012022199A1 true WO2012022199A1 (fr) | 2012-02-23 |
Family
ID=45604753
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2011/076329 WO2012022199A1 (fr) | 2010-08-17 | 2011-06-24 | Procédé et système de mesure de porteuse dans un système multi-porteuses |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN102378210A (fr) |
WO (1) | WO2012022199A1 (fr) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11096076B2 (en) | 2014-05-08 | 2021-08-17 | Apple Inc. | Prioritized cell identification and measurement method |
TWI745459B (zh) * | 2016-11-02 | 2021-11-11 | 日商索尼股份有限公司 | 終端裝置、基地台裝置及通訊控制方法 |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103688571B (zh) | 2012-05-11 | 2018-01-12 | 华为技术有限公司 | 待测量频率确定方法及终端 |
CN103476055B (zh) | 2012-06-05 | 2017-02-08 | 电信科学技术研究院 | 一种上行传输中断时间的确定方法和设备 |
US9730097B2 (en) | 2012-07-25 | 2017-08-08 | Mediatek Inc. | Method of efficient blind SCell activation |
JP6099329B2 (ja) * | 2012-08-02 | 2017-03-22 | シャープ株式会社 | 端末、基地局、通信方法および集積回路 |
WO2014056187A1 (fr) * | 2012-10-12 | 2014-04-17 | Empire Technology Development Llc | Affectation dynamique de porteuses d'une agrégation de porteuses dans un système lte-advanced |
CN104754660B (zh) * | 2013-12-30 | 2018-10-16 | 辰芯科技有限公司 | Lte模式下gsm邻区测量方法及系统 |
US9356744B2 (en) * | 2014-02-06 | 2016-05-31 | Mediatek Inc. | Method for deactivated secondary cell measurement and communications apparatus utilizing the same |
CN106911442A (zh) * | 2015-12-23 | 2017-06-30 | 东莞酷派软件技术有限公司 | 一种业务传输的方法及终端 |
CN110460422B (zh) * | 2017-09-26 | 2022-03-25 | 展讯通信(上海)有限公司 | 用户设备及其去激活bwp的方法、计算机可读存储介质 |
US10412614B2 (en) * | 2017-10-20 | 2019-09-10 | Futurewei Technologies, Inc. | Coordination of measurement gaps across sets of multiple frequencies |
CN110312267B (zh) * | 2018-03-27 | 2023-03-21 | 维沃移动通信有限公司 | 用于切换带宽部分的方法和设备 |
EP3918855A4 (fr) | 2019-02-02 | 2022-02-16 | ZTE Corporation | Gestion d'états de cellule de desserte |
WO2021184197A1 (fr) * | 2020-03-17 | 2021-09-23 | 华为技术有限公司 | Procédé et appareil de communication sans fil et dispositif de communication |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101299890A (zh) * | 2008-06-20 | 2008-11-05 | 中兴通讯股份有限公司 | 基于非连续接收模式的测量控制方法和装置 |
CN101500215A (zh) * | 2008-01-28 | 2009-08-05 | 大唐移动通信设备有限公司 | 多频小区系统中邻小区列表的配置方法与装置 |
CN101562835A (zh) * | 2008-04-17 | 2009-10-21 | 中兴通讯股份有限公司 | 一种终端在分层异构分布式基站间的切换方法 |
CN101605352A (zh) * | 2008-06-13 | 2009-12-16 | 华为技术有限公司 | 一种基于多载波的测量上报方法、系统、网络设备及终端 |
CN101656980A (zh) * | 2009-09-15 | 2010-02-24 | 北京天碁科技有限公司 | 一种终端测量的调度方法及终端 |
CN102143505A (zh) * | 2010-02-03 | 2011-08-03 | 华为技术有限公司 | 聚合载波小区测量的方法、装置及系统 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3866106B2 (ja) * | 2000-01-07 | 2007-01-10 | 三菱電機株式会社 | セル切換装置及びセル切換方法 |
-
2010
- 2010-08-17 CN CN2010102589760A patent/CN102378210A/zh active Pending
-
2011
- 2011-06-24 WO PCT/CN2011/076329 patent/WO2012022199A1/fr active Application Filing
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101500215A (zh) * | 2008-01-28 | 2009-08-05 | 大唐移动通信设备有限公司 | 多频小区系统中邻小区列表的配置方法与装置 |
CN101562835A (zh) * | 2008-04-17 | 2009-10-21 | 中兴通讯股份有限公司 | 一种终端在分层异构分布式基站间的切换方法 |
CN101605352A (zh) * | 2008-06-13 | 2009-12-16 | 华为技术有限公司 | 一种基于多载波的测量上报方法、系统、网络设备及终端 |
CN101299890A (zh) * | 2008-06-20 | 2008-11-05 | 中兴通讯股份有限公司 | 基于非连续接收模式的测量控制方法和装置 |
CN101656980A (zh) * | 2009-09-15 | 2010-02-24 | 北京天碁科技有限公司 | 一种终端测量的调度方法及终端 |
CN102143505A (zh) * | 2010-02-03 | 2011-08-03 | 华为技术有限公司 | 聚合载波小区测量的方法、装置及系统 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11096076B2 (en) | 2014-05-08 | 2021-08-17 | Apple Inc. | Prioritized cell identification and measurement method |
TWI745459B (zh) * | 2016-11-02 | 2021-11-11 | 日商索尼股份有限公司 | 終端裝置、基地台裝置及通訊控制方法 |
US11877277B2 (en) | 2016-11-02 | 2024-01-16 | Sony Corporation | Terminal device, base station device and method |
Also Published As
Publication number | Publication date |
---|---|
CN102378210A (zh) | 2012-03-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2012022199A1 (fr) | Procédé et système de mesure de porteuse dans un système multi-porteuses | |
US10812962B2 (en) | Aligning measurement gaps and discovery signals | |
EP3539320B1 (fr) | Mesures d'inter-fréquences sur des scells fs3 | |
EP3526914B1 (fr) | Procédés et appareil destinés à adapter une comptabilité de commutation srs pour une procédure de mesure | |
US9504057B2 (en) | Methods and apparatus for in-device coexistence detection and mitigation | |
KR102090000B1 (ko) | 보조 캐리어들의 ue-개시 동적 활성화 및 비활성화 | |
JP6522633B2 (ja) | デュアルコネクティビティのためのセルオンオフ手順 | |
EP2939485B1 (fr) | Procédé et appareil de procédures de mesure dotés d'une sous-trame dynamique composite dans un tdd dynamique | |
WO2020088451A1 (fr) | Procédés et appareils pour effectuer des mesures de canal sous commande d'économie d'énergie | |
CN107211316B (zh) | D2d业务平衡 | |
US20150282080A1 (en) | System, device, and method for configuring dual drx cycles | |
CN109997331B (zh) | 用于基于参数集适配服务小区中断的方法和设备 | |
WO2015147736A1 (fr) | Procédés pour gérer des interruptions avec de multiples cellules secondaires (scell) désactivées | |
JP2015531206A (ja) | 中断及び測定性能を制御するためのマルチキャリアシステムにおける方法及び装置 | |
CN103796286A (zh) | 一种控制ue监听载波的方法及装置 | |
CN109792669B (zh) | 无线通信系统中的小区更改 | |
CN113365307A (zh) | 一种测量管理方法及装置、通信设备 | |
WO2022095830A1 (fr) | Procédé et dispositif d'ajustement de mesure de ressource, terminal et support d'enregistrement lisible | |
WO2012040912A1 (fr) | Procédé et système de mesure de porteuse | |
KR20150114890A (ko) | 단말의 세컨더리 셀 동작 제어 방법 및 그 장치 | |
WO2011088764A1 (fr) | Procédé, système et dispositif pour le contrôle de mesures dans un système à porteuses multiples | |
WO2024233334A2 (fr) | Procédé et appareil pour faire fonctionner un récepteur de réveil à faible puissance (lp-wur) | |
WO2024233333A1 (fr) | Procédé et appareil pour faire fonctionner un récepteur de réveil à faible puissance (lp-wur) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 11817726 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 11817726 Country of ref document: EP Kind code of ref document: A1 |