US20020079136A1 - Mapping tool for tracking and/or guiding an underground boring tool - Google Patents
Mapping tool for tracking and/or guiding an underground boring tool Download PDFInfo
- Publication number
- US20020079136A1 US20020079136A1 US10/021,882 US2188201A US2002079136A1 US 20020079136 A1 US20020079136 A1 US 20020079136A1 US 2188201 A US2188201 A US 2188201A US 2002079136 A1 US2002079136 A1 US 2002079136A1
- Authority
- US
- United States
- Prior art keywords
- detector
- mapping tool
- tool
- drilling
- orientation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000013507 mapping Methods 0.000 title claims abstract description 123
- 238000005553 drilling Methods 0.000 claims abstract description 135
- 238000000034 method Methods 0.000 claims abstract description 101
- 230000005672 electromagnetic field Effects 0.000 claims abstract description 6
- 230000005291 magnetic effect Effects 0.000 claims description 74
- 238000012545 processing Methods 0.000 claims description 14
- 238000005259 measurement Methods 0.000 description 26
- 238000013459 approach Methods 0.000 description 20
- 238000010586 diagram Methods 0.000 description 17
- 230000008569 process Effects 0.000 description 16
- 230000010354 integration Effects 0.000 description 15
- 230000004907 flux Effects 0.000 description 10
- 238000004364 calculation method Methods 0.000 description 7
- 230000008901 benefit Effects 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 5
- 238000009434 installation Methods 0.000 description 5
- 238000012544 monitoring process Methods 0.000 description 5
- 230000009471 action Effects 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 210000004209 hair Anatomy 0.000 description 4
- 230000035945 sensitivity Effects 0.000 description 4
- 238000012360 testing method Methods 0.000 description 4
- 230000000994 depressogenic effect Effects 0.000 description 3
- 239000011521 glass Substances 0.000 description 3
- 238000012804 iterative process Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 239000002689 soil Substances 0.000 description 3
- 239000000654 additive Substances 0.000 description 2
- 230000000996 additive effect Effects 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 230000001419 dependent effect Effects 0.000 description 2
- 230000000881 depressing effect Effects 0.000 description 2
- 239000000835 fiber Substances 0.000 description 2
- 239000011888 foil Substances 0.000 description 2
- 238000005755 formation reaction Methods 0.000 description 2
- 239000003550 marker Substances 0.000 description 2
- 230000004044 response Effects 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 238000000844 transformation Methods 0.000 description 2
- 238000012935 Averaging Methods 0.000 description 1
- 239000004593 Epoxy Substances 0.000 description 1
- CWYNVVGOOAEACU-UHFFFAOYSA-N Fe2+ Chemical compound [Fe+2] CWYNVVGOOAEACU-UHFFFAOYSA-N 0.000 description 1
- 230000005355 Hall effect Effects 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000001133 acceleration Effects 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 238000009529 body temperature measurement Methods 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 238000013479 data entry Methods 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000005684 electric field Effects 0.000 description 1
- 230000008030 elimination Effects 0.000 description 1
- 238000003379 elimination reaction Methods 0.000 description 1
- 230000005294 ferromagnetic effect Effects 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000009499 grossing Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 230000008078 mathematical effect Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000010355 oscillation Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000002062 proliferating effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000001228 spectrum Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000013519 translation Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/04—Measuring depth or liquid level
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
- E21B47/022—Determining slope or direction of the borehole, e.g. using geomagnetism
- E21B47/0228—Determining slope or direction of the borehole, e.g. using geomagnetism using electromagnetic energy or detectors therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
- E21B47/022—Determining slope or direction of the borehole, e.g. using geomagnetism
- E21B47/0228—Determining slope or direction of the borehole, e.g. using geomagnetism using electromagnetic energy or detectors therefor
- E21B47/0232—Determining slope or direction of the borehole, e.g. using geomagnetism using electromagnetic energy or detectors therefor at least one of the energy sources or one of the detectors being located on or above the ground surface
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01Q—ANTENNAS, i.e. RADIO AERIALS
- H01Q1/00—Details of, or arrangements associated with, antennas
- H01Q1/04—Adaptation for subterranean or subaqueous use
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01Q—ANTENNAS, i.e. RADIO AERIALS
- H01Q1/00—Details of, or arrangements associated with, antennas
- H01Q1/36—Structural form of radiating elements, e.g. cone, spiral, umbrella; Particular materials used therewith
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01Q—ANTENNAS, i.e. RADIO AERIALS
- H01Q1/00—Details of, or arrangements associated with, antennas
- H01Q1/36—Structural form of radiating elements, e.g. cone, spiral, umbrella; Particular materials used therewith
- H01Q1/38—Structural form of radiating elements, e.g. cone, spiral, umbrella; Particular materials used therewith formed by a conductive layer on an insulating support
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01Q—ANTENNAS, i.e. RADIO AERIALS
- H01Q21/00—Antenna arrays or systems
- H01Q21/06—Arrays of individually energised antenna units similarly polarised and spaced apart
- H01Q21/20—Arrays of individually energised antenna units similarly polarised and spaced apart the units being spaced along or adjacent to a curvilinear path
- H01Q21/205—Arrays of individually energised antenna units similarly polarised and spaced apart the units being spaced along or adjacent to a curvilinear path providing an omnidirectional coverage
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01Q—ANTENNAS, i.e. RADIO AERIALS
- H01Q21/00—Antenna arrays or systems
- H01Q21/28—Combinations of substantially independent non-interacting antenna units or systems
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01Q—ANTENNAS, i.e. RADIO AERIALS
- H01Q21/00—Antenna arrays or systems
- H01Q21/29—Combinations of different interacting antenna units for giving a desired directional characteristic
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01Q—ANTENNAS, i.e. RADIO AERIALS
- H01Q7/00—Loop antennas with a substantially uniform current distribution around the loop and having a directional radiation pattern in a plane perpendicular to the plane of the loop
Definitions
- the present invention relates generally to systems, arrangements and methods for tracking the position of and/or guiding an underground boring tool during its operation and more particularly to tracking the position of the boring tool within a coordinate system using magnetic field intensity measurements either alone or in combination with certain physically measurable parameters. Positional information may then be used in remotely guiding the boring tool.
- the portable mapping tool includes a boring tool configured for transmitting a locating signal and at least one electromagnetic field detector which is configured for measuring the locating signal from a fixed position proximate to the surface of the ground in a drilling area.
- the mapping tool includes a housing and a transmitter arrangement supported by the housing for transmitting a setup locating signal for reception by the detector in the region for use in determining certain initial conditions at least prior to drilling.
- the certain initial conditions may include the position of the detector in the region.
- the detector may be positioned at a known location on the surface of the ground at the fixed position and the certain initial conditions may include an unknown position of the portable mapping tool at another location in the region relative to the detector at the known location.
- the portable mapping tool may include at least a first detector and a second detector at respective first and second spaced apart positions on the surface of the ground and wherein the certain initial conditions include the second position of the second detector relative to the first position of the first detector.
- the portable mapping tool may include a drill rig for actuating the boring tool from a drilling position in the region and the certain initial conditions include the drilling position relative to an at least temporarily fixed position of the portable mapping tool in the region.
- the locating signal transmitted by the boring tool is a first dipole field and the setup locating signal transmitted by the portable mapping tool is a second dipole field.
- the portable mapping tool includes a positioning arrangement cooperating with the housing for positioning the mapping tool, at least temporarily, on the detector in a predetermined way such that the orientation of the mapping tool is fixed relative to the detector on which it is positioned.
- the positioning arrangement includes an indexing configuration for engaging the detector in the predetermined way to temporarily fixedly maintain the orientation of the portable mapping tool relative to the detector.
- the indexing configuration includes a plurality of indexing pins in a configuration for engaging the detector in the predetermined way to temporarily fixedly maintain the orientation of the portable mapping tool relative to the detector.
- the portable mapping tool may further include an arrangement within the housing for determining certain orientation parameters when the mapping tool is engaged with the detector.
- this orientation determining arrangement of the mapping tool includes a configuration for determining the magnetic orientation of the mapping tool and, thereby, the magnetic orientation of the detector when engaged therewith.
- This configuration may include a magnetometer and/or a tilt sensing arrangement for determining the tilt of the mapping tool and, thereby, the tilt of the detector when engaged therewith.
- the portable mapping tool may include a processing section remote from the portable mapping tool.
- the portable mapping tool may include a telemetry arrangement for transferring the certain orientation parameters to the processing section.
- Various embodiments of the portable mapping tool may also include a display arrangement for displaying the certain orientation parameters.
- FIG. 1 is a diagrammatic elevational view of a horizontal boring operation being performed in a region using one horizontal boring tool system manufactured in accordance with the present invention.
- FIG. 2 is a diagrammatic plan view of the region of FIG. 1 further illustrating aspects of the horizontal boring operation being performed.
- FIG. 3 is a flow diagram illustrating an exemplary, planar procedure for determining the position of the boring tool of FIGS. 1 and 2 in two dimensions using two measured components of a magnetic locating signal emanated from a dipole antenna within the boring tool.
- FIG. 4 is a flow diagram illustrating a procedure which considers locating the boring tool of FIGS. 1 and 2 in three dimensions while performing a horizontal boring operation by using three measured components of the magnetic locating signal emanated from the boring tool.
- FIG. 5 is a flow diagram illustrating steps employed in an efficient triple transform technique for determining the position of the boring tool of FIGS. 1 and 2 in three dimensions in relation to an antenna cluster receiver by projecting components of the magnetic locating signal onto only two axes in a transformed coordinate system. These steps may be incorporated, for example, into the procedure of FIG. 4.
- FIGS. 6 a - c graphically illustrate yaw, pitch and roll transforms of the triple transform technique of FIG. 5, which are performed based on the orientation of the antenna cluster receiver in view of an assumed orientation of the dipole antenna from which the magnetic locating signal is transmitted, such that the desired two axis projection is accomplished.
- FIG. 7 is a flow diagram illustrating the steps of an exemplary, planar procedure for determining the position of the boring tool of FIGS. 1 and 2 in two dimensions by using a measured incremental movement in conjunction with two measured components of the magnetic locating signal wherein a least square error approach is used to compare an antenna solution with an integration solution.
- FIG. 8 is a flow diagram illustrating the steps of a procedure for locating the boring tool of FIGS. 1 and 2 in three dimensions using a measured incremental movement and a measured pitch in conjunction with a single, measured component of the magnetic locating signal.
- FIGS. 9 a - d are diagrammatic plan views of the drill rig and drill string initially shown in FIGS. 1 and 2 which are shown here to illustrate the operation of a measuring arrangement, which is manufactured in accordance with the present invention, for determining incremental movements of the drill string.
- FIG. 10 is a diagrammatic elevational view illustrating one arrangement for determining the status of a clamping arrangement initially shown in FIGS. 1 and 2.
- FIG. 11 is a perspective view of a cubic antenna manufactured in accordance with the present invention.
- FIG. 12 is a diagrammatic elevational view of a horizontal boring operation being performed in a region using another horizontal boring tool system manufactured in accordance with the present invention.
- FIG. 13 is a diagrammatic plan view of the region of FIG. 12 further illustrating aspects of the horizontal boring operation being performed.
- FIG. 14 is a diagrammatic perspective view of a mapping tool which is manufactured in accordance with the present invention.
- FIG. 15 is an illustration of one way in which a display screen of the mapping tool of FIG. 14 might appear in a setup mode.
- FIG. 16 is a flow diagram illustrating a procedure which considers locating the boring tool of FIGS. 12 and 13 in three dimensions while performing the horizontal boring operation by using three measured components of the magnetic locating signal emanated from the boring tool.
- FIG. 17 illustrates the appearance of a display screen on an operator console including plots representing the exemplary drilling run depicted in FIGS. 12 and 13 along with a steering coordinator display which is useful in guiding the boring tool relative to the illustrated plots.
- FIG. 18 illustrates the appearance of the steering coordinator of FIG. 17 for one particular point along the exemplary drilling run.
- FIG. 19 illustrates the appearance of the steering coordinator for another point along the exemplary drilling run.
- FIG. 20 is a diagrammatic plan view illustrating a drilling array layout defining a circular drilling area in association with the horizontal boring system initially shown in FIGS. 12 and 13.
- FIG. 21 is a diagrammatic plan view illustrating one modified version of the horizontal boring system, which was originally shown in FIGS. 12 and 13, that is configured for service line installation.
- FIG. 22 is a diagrammatic elevational view illustrating another modified version of the horizontal boring system, which was originally shown in FIGS. 12 and 13, that is configured for drilling into a hill or mountain.
- FIG. 23 is a diagrammatic plan view showing the horizontal boring system which was originally shown in FIGS. 12 and 13, shown here to illustrate a technique for performing long drilling runs.
- FIGS. 1 and 2 illustrate a horizontal boring operation being performed using a boring/drilling system which is manufactured in accordance with the present invention and generally indicated by the reference numeral 10 .
- the drilling operation is performed in a region of ground 12 including a boulder 14 .
- the surface of the ground is indicated by reference numeral 16 and is substantially planar for present purposes of simplicity.
- System 10 includes a drill rig 18 having a carriage 20 received for movement along the length of an opposing pair of rails 22 which are, in turn, mounted on a frame 24 .
- a conventional arrangement (not shown) is provided for moving carriage 20 along rails 22 .
- a boring tool 26 includes an asymmetric face 27 and is attached to a drill string 28 which is composed of a plurality of drill pipe sections 30 .
- the underground progression of boring tool 26 is indicated in a series of points A through D. It should be noted that, for purposes of clarity, the present example is limited to planar movement of the boring tool within a master xy coordinate system wherein the vertical axis is assumed to be non-existent, although vertical displacement will be taken into account hereinafter, as will be seen.
- the origin of the master coordinate system is specified by reference numeral 32 at the point where the boring tool enters the ground. While a Cartesian coordinate system is used as the basis for the master coordinate systems employed by the various embodiments Of the present invention which are disclosed herein, it is to be understood that this terminology is used in the specification and claims for descriptive purposes and that any suitable coordinate system may be used.
- An x axis 34 extends forward along the intended path of the boring tool, as seen in FIG. 1, while a y axis 36 extends to the right when facing in the forward direction along the x axis, as seen in FIG. 2. Further descriptions which encompass a z axis 37 (FIG. 1) will be provided at appropriate points in the discussion below.
- drill pipe sections are added to the drill string at the drill rig.
- the most recently added drill pipe section 30 a is shown on the drill rig.
- An upper end 38 of drill pipe section 30 a is held by a locking arrangement (not shown) which forms part of carriage 20 such that movement of the carriage in the direction indicated by an arrow 40 causes section 30 a to move therewith, which pushes the drill string into the ground thereby advancing the boring operation.
- a clamping arrangement 42 is used to facilitate the addition of drill pipe sections to the drill string.
- the drilling operation is controlled by an operator (not shown) at a control console 44 which itself includes a telemetry receiver 45 connected with a telemetry receiving antenna 46 , a display screen 47 , an input device such as a keyboard 48 , a processor 50 , and a plurality of control levers 52 which, for example, control movement of carriage 20 .
- lever 52 a controls clamping arrangement 42 , as will be described at an appropriate point below.
- Boring tool 26 includes a mono-axial antenna such as a dipole antenna 54 which is driven by a transmitter 56 so that a magnetic locating signal 60 is emanated from antenna 54 .
- Power may be supplied to transmitter 56 from a set of batteries 62 via a power supply 64 .
- the boring tool apparatus may be referred to as a sonde.
- an antenna cluster receiver 65 is positioned at a point 66 within the master xy coordinate system for receiving locating signal 60 .
- Antenna cluster 65 is configured for measuring components of magnetic locating signal 60 along one receiving axis or, alternatively, along two or more orthogonal receiving axes, which are referred to herein as x 1 , y r and z 4 defined within the antenna cluster and depending on the specific system configuration being used.
- the receiving axes within the antenna cluster may be defined by individual antennas such as, for example, dipole antennas (not shown) or by an antenna structure 67 .
- the antenna cluster receiving axes are not necessarily aligned with the x, y and z axes of the master coordinate system, as is evident in FIG. 2.
- Measured magnetic field components of the locating signal in terms of the master coordinate system, are denoted as B x , B y and B z , in terms of the receiving axes of the antenna cluster, measured components of magnetic locating signal 60 are referred to as B xr , B yr and B zr .
- Magnetic information measured along the receiving axes of antenna cluster 65 may be transmitted to processor 50 in operator console 44 in the form of a telemetry signal 68 which is transmitted from a telemetry antenna 69 and associated telemetry transmitter 70 .
- Telemetry signal 68 is picked up at the drill rig using telemetry receiving antenna 46 and telemetry receiver 45 .
- the telemetry information is provided to processor 50 such that the magnetic field information gained along the antenna cluster receiving axes may be interpreted so as to determine the position of the boring tool in the master coordinate system, as will be described.
- Magnetic field information may be preprocessed using a processor (not shown) located within antenna cluster 65 in order to reduce the amount of information which is transmitted from the antenna cluster to the operator console 44 .
- a number of different configurations of system 10 will be described below with reference to FIGS. 1 and 2. These configurations may differ in one aspect by the number of orthogonal magnetic field components which are measured by antenna cluster 65 . In another aspect, these configurations may utilize inputs other than the magnetic field components and, consequently, may compute the location of the boring tool in alternative ways, as will be discussed at appropriate points below.
- initial conditions In order to derive useful information from magnetic locating signal 60 , a number of initial conditions must be known and may be specified in relation to the master coordinate system prior to drilling. The number of initial conditions depends on details of the set up and data processing. There must be sufficient known initial conditions such that the procedure is well posed mathematically, as is known to those of skill in the art.
- initial conditions include (1) the transmitted strength of magnetic locating signal 60 , (2) an initial yaw (DO) of dipole antenna 54 in the master coordinate system (which is measured from the master x axis and is 0° in the present example, since dipole 54 is oriented along the x axis), (3) an initial pitch ⁇ 0 of dipole antenna 54 which is also zero in this example, (4) the location of antenna cluster 65 within the master coordinate system, (5) the initial orientation angles of the receiving axes of the antenna cluster relative to the master xy coordinate plane and (6) the initial location of the boring tool, for example, at origin 32 within the master coordinate system.
- the main purpose for obtaining initial yaw and initial pitch is to improve tracking and/or guiding accuracy and may therefore not be needed for some applications.
- antenna cluster 65 is supported by a gimbal 72 and tripod 73 having a counterweight 74 extending therebelow whereby to ensure that the antenna cluster is also maintained in a level orientation.
- Aiming the antenna axis in the northerly direction may be accomplished using a magnetometer 76 which is built into the receiver and includes a display 78 (FIG. 2) on an upper surface thereof.
- Initial conditions may be entered into system 10 , for example, using keyboard 48 .
- any number of other techniques and/or instruments may be used to establish the initial conditions.
- a tilt sensor (not shown) may be used at antenna cluster 65 in place of the gimbal and counterweight arrangement depicted.
- the need for a magnetometer in the antenna cluster may be eliminated by orienting the cluster in a specific direction such as, for example, directing (not shown) x r parallel with the master x direction.
- the remaining initial conditions may then be calculated.
- system 10 may calculate the signal strength of dipole 54 and its initial yaw angle ( ⁇ o ) wherein ⁇ o is used as an initial condition and signal strength is applied as a constant for the remainder of the drilling operation.
- step 101 the initial conditions recited above are established in step 101 following start step 100 .
- step 102 a desired course for the drill run may be laid out and entered into the system using operator console 44 so as to be displayed on display panel 47 .
- An exemplary course will be illustrated at an appropriate point below in conjunction with a description of specific provisions for guiding the boring tool along this course.
- step 103 initial values are assumed for ⁇ L and ⁇ (yaw) which may be based on the initial conditions determined in step 101 .
- the drilling operation may proceed at step 104 during which incremental movements of the boring tool may be precisely described for two dimensions by the equations:
- step 106 which provides for one way to determine the position of the boring tool, the present configuration (which is Configuration 1 in Table 1, below) uses only measured components B xr and B yr (referred to the antenna cluster 65 ) of the intensity of magnetic locating signal 60 , measured in step 106 , in determining the position of the boring tool.
- This configuration is indicated as Configuration 1 in Table 1 below.
- R is the distance between the sonde and receiving antenna cluster and x s , y s are coordinates moving with the sonde during the boring process.
- integration solution step 112 which provides a second way to determine the position of the boring tool at point A, continues to apply the assumption that the boring tool travels in the direction in which it is pointed by using ⁇ o and it also assumes a value for ⁇ L 1 at point A (i.e., it makes an educated guess). Using these values along with the x and y values from the last known/calculated position of the boring tool, step 112 computes an x int , y int position for boring tool 26 using:
- step 112 provides an historical track record of the path over which the tool has moved, monitoring both its immediately prior position and yaw for each incremental movement along the path and updating the position and yaw with successive increments.
- a compare step 108 receives the calculated position x ant , y ant from step 107 and the integration solution position x int , y int from step 112 .
- the compare step checks the two positions against one another and sends the difference to a position resolved step 114 . If the x int , y int position agrees with the x ant , y ant position, if the square difference between the positions is less than a predetermined amount, for example, by less than one square inch or if the result cannot be reduced further by continued iteration, the result is assumed to be correct and step 116 is next performed such that the system loops back to steps 106 and 112 so as to take measurements following the next ⁇ L movement.
- a solution procedure step 118 is next performed.
- the latter estimates a new value for ⁇ .
- Estimation of the new ⁇ value may be performed using a number of techniques which are known in the art for converging values of variables such as, for example, Simplex or steepest descent. These procedures determine the sensitivity of the error to changes in the variables and select increments of the variables which will drive the error toward zero.
- the new values are assumed by the system for the point/position being considered.
- the newly assumed D is then returned to steps 112 and 107 .
- Steps 107 and 112 compute new x int , y int and x ant , y ant positions, respectively, for use in compare step 108 and then the agreement between the two new positions is checked by step 114 .
- the system continues assuming and testing new values for ⁇ until such time that the position of the boring tool is sufficiently resolved, as evidenced by passing the decision test of step 114 .
- the values of ⁇ L, and ⁇ A which satisfy this iteration process then become the most recent end point within the integration solution (from a history standpoint), as the drilling operation proceeds.
- the boring tool arrives at point D with a different ⁇ than that with which it started at point B, the tool could not have moved at one constant D between points B and D, as assumed in the level one approximation.
- level two approximation Another alternative approach, which will be referred to as a level two approximation, considers these facts and will be described immediately hereinafter. At the same time, it is to be understood that the level one approximation will arrive at a solution with some error for the ⁇ L 3 increment and, as to the position and ⁇ of boring tool 26 at point D, by following the iterative procedure described thus far. This error is caused by the fact that the assumed path (with ⁇ constant) is not the actual path.
- the level two approximation is identical to the level one approximation, except for the assumptions regarding ⁇ .
- the level two approximation (still Configuration 1) assumes that the boring tool moves at a yaw angle ⁇ AV over a particular increment which is an average of the yaw angles at the beginning and end points of the increment.
- the present approximation will immediately be described with reference to the ⁇ L 3 increment. This increment, as described, starts with ⁇ B and ends with ⁇ D . Equations 1 and 2 for this two dimensional example become:
- Table 1 indicates a 3-dimensional embodiment of system 10 as Configuration 2 in which antenna cluster 65 measures B xr , B yr and B zr .
- addition of the z axis implies vertical movement and, consequently, pitch ( ⁇ ) of boring tool 26 .
- the flow diagram of FIG. 4 illustrates Configuration 2 and includes ⁇ and B z .
- step 122 must determine an initial ⁇ ( ⁇ o ) and an initial z value, which may be accomplished in the previously described setup technique by also measuring B, at antenna cluster 65 .
- the desired course of the boring tool may be entered into the system. Drilling proceeds at step 124 .
- step 125 Upon completion of first incremental movement ⁇ L 1 , the procedure moves to step 125 in which a value is assumed for ⁇ L, along with the values of ⁇ and ⁇ established as initial conditions in step 122 .
- B zr is measured along with B xr and B yr at antenna cluster 65 .
- the magnetic component measurements are provided along with ⁇ o and ⁇ o to antenna solution 128 which computes an (xyz) ant position based on these values, for example, by assuming that ⁇ o and ⁇ o have not changed over the movement and, thereafter, solving a set of equations based upon the pattern of dipole antenna 54 which emanates magnetic locating signal 60 in the now three dimensional master coordinate system.
- the (xyz) ant position is provided to compare step 130 which is similar to step 108 , above, with the inclusion of the z values.
- step 134 Concurrent with the path of steps 126 and 128 , another path including step 134 is performed. ⁇ L 1. ⁇ o and ⁇ o are passed to integration solution step 134 , which is similar to previously described integration solution step 112 , except that mathematical movement of boring tool 26 is now performed in a three dimensional space using the assumed ⁇ , ⁇ and ⁇ L. Integration solution step 134 outputs an (xyz) int position to compare step 130 . The compare step determines the difference between the antenna and integration solutions and passes this difference to a position resolved decision step 136 . If the difference is acceptable, step 138 returns the procedure to steps 125 for the next incremental movement. Otherwise, solution procedure step 140 is executed (similar in nature to previously described step 118 ).
- solution procedure 118 provides new values for ⁇ , ⁇ and ⁇ L which are assumed by the system and passed to steps 126 and 134 for use, as needed, in producing new (xyz) ant and (xyz) int positions. This loop continues until such time that step 136 is satisfied. It should also be mentioned that converting to a three dimensional positional system significantly increases the difficulties encountered in solving such a multi-variable problem as that which is presented by the present invention in the flow diagram of FIG. 4. Therefore, a highly advantageous approach will be presented immediately hereinafter which substantially reduces computational burdens placed on processor 50 .
- an exemplary dipole antenna 140 having an axis 142 within a boring tool is illustrated at an orientation and position x d , y d within the master coordinate system wherein ⁇ ⁇ 20° and ⁇ ⁇ 0°.
- magnetic locating signal 60 from dipole 140 produces a three-dimensional flux vector B which is shown in relation to the receiving axes of the antenna cluster indicated as x r , y r and z r with x r being oriented to due north and z r (FIG. 6 b ) being directed downward.
- One method of solving this three-dimensional problem is to mathematically re-orient the receiving axes of antenna cluster 65 to a new coordinate system that is aligned with dipole 140 in a specific way using the assumed values of ⁇ and ⁇ such that the problem is essentially reduced to two dimensions.
- the flow diagram of FIG. 5 illustrates steps which are incorporated into a three dimensional antenna solution such as, for example, antenna solution step 128 of FIG. 4, beginning with step 150 .
- the orientation of dipole 140 is compared with the assumed ⁇ and ⁇ values. Reorienting may then be accomplished, in view of this comparison, by using a series of three Euler transformations to create the new coordinate system in which magnetic locating signal 60 projects only onto two axes at antenna cluster receiver 65 , as will be described immediately hereinafter.
- a yaw transform step 152 may be performed initially based on the assumed ⁇ .
- a yaw of an angle ⁇ 1 is performed about the z axis (perpendicular to the plane of the paper) which creates a new x r ′, y r ′ system such that x r ′ is parallel to the projection of dipole axis 142 onto the master xy coordinate system.
- the x r ′ axis now has a P value which is equal to the assumed A
- step 154 performs a pitch transform.
- Dipole 140 is shown in the xz master coordinate plane such that the pitch, ⁇ , of the dipole can be seen.
- the effect of the pitch rotation is to align a new x r ′′, z r ′′ system so that x r ′′ is parallel with axis 142 of the dipole.
- the x r ′′ axis now has a pitch which is equal to the assumed value for ⁇ .
- B continues to project onto three dimensions at the antenna cluster in this double prime system.
- Step 156 then performs a third transform, illustrated in FIG. 6 c , which is a roll about the x r ′′ axis (which is perpendicular to the plane of the figure).
- the y r ′′ and z r ′′ axes are rotated by an angle of ⁇ 3 to align a new y r ′′′′, z r ′′′ system so that y r ′′′ is aimed directly at axis 142 of the dipole.
- step 160 the transforms of steps 156 , 154 and 152 may be reversed to convert the transform variable location of the dipole back to a location in the master xyz coordinate system.
- the inventors of the present invention have discovered that proper implementation of the aforedescribed triple transform technique using assumed angles in an antenna solution for a three dimensional problem significantly reduces processing time as compared with implementations which attempt to locate the dipole directly in terms of the master coordinate system throughout the required processing.
- system 10 may be configured to provide various inputs for use in determining the position of the boring tool, as noted previously.
- These inputs include directly measurable parameters such as, for example, ⁇ L, which may be measured at drill rig 18 by a measuring arrangement 170 , and pitch which may be measured by a pitch sensor 174 positioned within drill head 26 .
- ⁇ L directly measurable parameters
- pitch which may be measured by a pitch sensor 174 positioned within drill head 26 .
- One suitable pitch sensor is described in U.S. Pat. No. 5,337,002 which is issued to one of the inventors of the present invention and is incorporated herein by reference. A description of one highly advantageous embodiment of measuring arrangement 170 will be provided at an appropriate point hereinafter.
- ⁇ L may be precisely measured to within a fraction of an inch by monitoring changes in the length of drill string 56 at drill rig 18 .
- system 10 may utilize inputs such as ⁇ L and ⁇ within the context of a number of different approaches in solving the problem of determining the position and orientation of boring tool 26 . Two such approaches will be described hereinafter.
- a system of equations for which the number of equations or known variables is equal to the number of unknown variables is referred to as being determinate while a system in which there are more known variables than unknowns is referred to as being overspecified.
- a determinate system yields a solution set for its unknowns which precisely matches the specified parameters.
- a determinate solution can be highly sensitive to errors in the specified parameters.
- One method of reducing such sensitivity is to form an overspecified solution in which the number of equations or known variables is greater than the number of unknowns.
- a least square error technique may be employed to arrive at an overall solution in which measured values of ⁇ L and/or ⁇ may be used in conjunction with measurements of magnetic locating field 60 (B xr , B yr and B zr ) to formulate a solution for determining the position of the boring tool with a high degree of accuracy.
- LSE Least Square Error
- Configuration 3 one implementation of the Least Square Error (LSE) approach is indicated as Configuration 3 in Table 1.
- LSE Least Square Error
- the present discussion will be limited to the xy master coordinate system, ignoring the z axis for purposes of simplicity.
- the present discussion will address the LSE approach in a manner which is consistent with the previously described level two approximation (that is, use an average value for ⁇ ).
- level two approximation that is, use an average value for ⁇ .
- a start step 200 begins the flow diagram of FIG.
- step 204 the boring operation begins. Thereafter, at step 206 , ⁇ L is physically measured at the drill rig for a just completed incremental movement of boring tool 26 . ⁇ L is then provided to an integration solution step 208 . An assumed ⁇ current is then used with ⁇ L in equations 9 and 10, above, to compute ⁇ x and ⁇ y. Initially for each increment, the assumed ⁇ AV may be made equal to the last known ⁇ .
- ⁇ AV may be set to the value ⁇ o , established in initial conditions step 202
- ⁇ AV may initially be set to the final value, ⁇ A , previously established for point A.
- An (xy) int position is then calculated by the integration solution, using ⁇ AV and ⁇ L, for use in step 212 , which will be described below.
- step 209 may be performed.
- components B xr and B yr of magnetic locating signal 60 are measured by antenna cluster receiver 65 and provided to an antenna solution step 210 along with the assumed ⁇ current .
- antenna solution step 210 calculates an (xy) ant position for boring tool 26 and provides this position to step 212 .
- the latter step determines the square error (SE) based on the step 208 integration solution and the step 210 antenna solution using:
- Step 214 is then performed so as to determine if the value of SE is at its minimum value, indicating that the antenna and integration solutions have been converged to the greatest extent possible. Of course, this function cannot be performed until such time as at least one value of SE has previously been computed and stored following the start of a boring operation, for example, after ⁇ L 1 . If the SE is at a minimum, step 216 is entered wherein the system readies for the next incremental movement and the associated ⁇ current value is used in equation 12 to determine the current yaw.
- step 218 is next performed in which a solution procedure picks a new value for ⁇ current which is intended to reduce the square error.
- a solution procedure picks a new value for ⁇ current which is intended to reduce the square error.
- a number of techniques are available in the art for converging solutions to problems such as picking the new value of ⁇ current .
- the Simplex technique is utilized.
- the new ⁇ current is returned to step 208 to compute a new (xy) int .
- Antenna solution step 210 is provided with ⁇ current such that the antenna solution may be re-calculated to provide a new (xy) ant value. Therefore, each new value of ⁇ current produces new values for (xy) int and for (xy) ant which, in turn, produce a new square error value in step 212 .
- ⁇ current values is repeated until the square error value from equation 15 is minimized i.e. least square error.
- the solution for (x,y,z) sonde can be based on either the antenna result, the integration result or an average of the two. If the solution is properly converged and measurement errors are negligible then all the results would agree, i.e. zero square error. It should be mentioned that a measured ⁇ value may also be incorporated in an LSE solution for a configuration in which three dimensions are considered, as will be discussed below.
- measured inputs such as ⁇ L and ⁇ may be used in a way which may reduce the overall complexity and cost of system 10 while still maintaining a high degree of accuracy in determining the position of boring tool 26 during the drilling operation.
- the flow diagram of FIG. 8 illustrates another two dimensional implementation of system 10 which is referred to as Configuration 4 and is listed in Table 1. In this configuration, ⁇ L and ⁇ are measured and used in a level 1 approximation along with B yr . In order to further enhance the reader's understanding, it is suggested that the process of FIG. 8 may be directly compared with that of FIG.
- step 250 initial conditions are established in step 252 , for example, in the manner previously described.
- step 253 a desired course for the boring tool may be entered at operator console 44 , for example, using data gathered by surveying techniques. As noted, an exemplary desired tool course display will be provided at an appropriate point below.
- the drilling operation begins at step 254 and one incremental movement of boring tool 26 is completed in step 256 .
- step 258 ⁇ L and y component, B yr , of magnetic locating signal 60 is measured by antenna cluster receiver 65 .
- step 260 Calculations are then performed by step 260 to determine the new xy position of the boring tool and ⁇ based upon its last known position in conjunction with the measured values of ⁇ L, ⁇ and the one measured component of magnetic locating signal 60 . Since ⁇ L, ⁇ and the last ⁇ are known and assuming the tool has traveled in the direction in which it is pointed at one yaw angle (the last ⁇ ) in accordance with the level one approximation, the ⁇ x, ⁇ y and ⁇ z increments for a particular incremental movement may readily be determined using the equations:
- the ⁇ x, ⁇ y and ⁇ z components may then simply be added to the last known x, y and z coordinates so as to determine the new position of the boring tool within the master coordinate system.
- ⁇ at the new position, may then be established using the measured component B xr or B yr of the intensity of the magnetic locating signal.
- B xr or B yr are favored over the use of B zr simply because the former are most sensitive to yaw over most of the bore length.
- Configuration 4 under the flow diagram of FIG. 8, is advantageous in that processing power which must be brought to bear on its calculations is held to a minimum level.
- the steps in FIG. 8, unlike those of FIG. 4, are not iterative for respective ⁇ L movements, whereby to further simplify the calculation procedure.
- the level 1 approximation can be raised to a level 2 approximation by incorporating an iterative process into step 260 .
- An average A can be used to compute the new x, y, and z positions which, in turn, would produce a new ⁇ current . The iteration would continue until ⁇ current converged.
- Configuration 2 embodies a determinate system with a total reliance on magnetic locating field measurements while Configuration 4 embodies a determinate system using a cost effective approach in which only one magnetic measurement is made.
- Configuration 4 embodies a determinate system using a cost effective approach in which only one magnetic measurement is made.
- Table 1 and FIGS. 1 and 2 a number of other configurations of system 10 , may also be found to be useful based upon specific objectives.
- One such objective may be to assure the reliability of the calculated position of boring tool 26 by overspecifying to the greatest possible extent.
- Configuration 5 is an embodiment of system 10 which is similar to Configuration 2 except that ⁇ L and Q are both measured using measuring arrangement 170 and pitch sensor 174 , respectively. It should be appreciated that Configuration 5 may implement an LSE approach which is overspecified by two additional variables.
- pitch sensor 174 The accuracy of the measurable parameters, as well as when the measurements are available should also be considered. These considerations are applicable with regard to pitch sensor 174 . Specifically, pitch sensors are subject to producing errors in readings due to rotation and rotation accelerations of boring tool 26 during drilling due to splashing of fluid (not shown) internal to the pitch sensor. For this reason, Configuration 5 may be implemented in an alternative way by using pitch sensor readings only when the boring tool is stationary as a cross-check mode to intermittently verify the accuracy of current calculations. In this alternative implementation, the ⁇ L measurement may, of course, continue to be used as part of an LSE approach.
- a cross-check mode may also be utilized with regard to ⁇ L wherein a calculated value of ⁇ L can be compared with a measured ⁇ L value whereby to verify accuracy of current positional computations. It is to be understood that such a cross-check mode may be implemented with any embodiment of the present invention disclosed herein.
- Configuration 6 in Table 1 illustrates an approach wherein pitch is calculated, rather than using a pitch sensor or the cross-check mode above. The objective of this configuration is simply that of avoiding any need to rely on a pitch sensor. It is to be understood that the configurations shown in Table 1 and described herein are not intended to be limiting but are intended to illustrate at least a few of the broad array of variations in which system 10 may be configured in accordance with the present invention.
- signal strength is specified as a measured value for each of the configurations listed in Table 1.
- a constant output value for S may readily be achieved and may be measured for a particular transmitter prior to beginning a boring run, as described previously.
- other configurations may also be used in which the value of S is calculated as an unknown variable.
- Configurations 5 or 6 may be modified such that S is a calculated variable.
- This configuration may be useful, for example, in cases where transmitter strength may vary due to battery fatigue in a long drill run or when an operation extends over more than one day such that the transmitter operates through the night, even though the system is idle.
- the calculated value of scan can also be used, as ⁇ L was used, to verify the accuracy of the calculations.
- Weighting functions can be applied to the square error parameters (x, y, and z) to reduce sensitivity to error in measurements. For example, if the z position was found to be very sensitive to the z component of the magnetic field measurement B z and the B z measurement had poor accuracy because it was close to the background noise level, a weighting function could be used to minimize the influence of z error on the square error. The resulting solution with functions would be more accurate than the solution without weighting functions.
- a system of weighting functions could be applied to all of the square error parameters based on the sensitivity of each parameter to measurement error and an estimate of the measurement error such as the noise to signal ratio.
- FIG. 1 FIGS. 9 a - d and FIG. 10, a description of previously mentioned measuring arrangement 170 , manufactured in accordance with the present invention, will now be described in detail in relation to the operation of the drill rig.
- the reader will recall that upper end 38 of drill pipe section 30 a is held by a chuck or screw arrangement which forms part of carriage 20 .
- drill string 28 is pushed into the ground by the fact that it is attached to drill pipe section 30 a .
- Measuring arrangement 170 includes a stationary ultrasonic transmitter 282 positioned on drill frame 18 and an ultrasonic receiver 284 with an air temperature sensor 285 positioned on carriage 20 .
- Transmitter 282 and receiver 284 are each coupled to processor 50 or a separate dedicated processor (not shown).
- transmitter 282 emits an ultrasonic wave 286 that is picked up at receiver 284 such that the distance between the receiver and the transmitter may be determined to within a fraction of an inch by processor 50 using time delay and temperature measurements.
- processor 50 may accurately track the length of drill string 28 throughout a drilling operation.
- the clamping arrangement includes first and second halves 288 and 290 , respectively, which engage drill string 28 in a clamped position (FIG. 9 b ) and which permit the drill string to move laterally and/or rotate in an unclamped position (FIG. 9 a ).
- the clamping arrangement is used to hold drill string 28 while adding or removing additional lengths of drill pipe 30 a.
- FIG. 10 monitoring of the clamping arrangement is accomplished using a cooperating micro-switch 292 which is mounted within operator console 44 adjacent clamping arrangement control lever 52 a .
- an actuator arm 294 which moves in corresponding relationship with the lever, engages an actuator pin 296 whereby to close a set of contacts (not shown) within micro-switch 292 that are connected to processor 50 by conductors 298 .
- micro-switch 292 is only one of many ways in which the status of clamping arrangement 42 may be monitored by processor 52 .
- a device (not shown) other than a micro-switch may also serve in this application.
- an infrared diode and phototransistor pair may be positioned so as to monitor the status of lever 52 a .
- Another useful device could be a pressure switch, since clamp 42 is generally operated by hydraulic pressure.
- Still another device which may be used is a Hall effect sensor. The latter is advantageous in that it is completely sealed from the elements.
- processor 50 detects that clamping arrangement 42 is in its unclamped position using micro-switch 292 and increments the length of the drill string by a length corresponding to the detected change in distance between the ultrasonic receiver/transmitter pair. Additionally, processor 50 tracks incremental positions along the drill string (corresponding to points A-D in region 12 of FIGS. 1 and 2) at which positional information is measured and/or calculated.
- carriage 20 has moved as far as possible on the drill rig in the +L direction to a position E and then the clamping arrangement is moved to its clamped position. Assuming that the carriage started at a position F, the drill string is lengthened by a distance d for this movement, as indicated by measuring arrangement 170 . During normal drilling, a new section of drill pipe must be added to the drill string once the carriage reaches position E. As a matter of opportunity, system 10 may perform positional calculations when a drill pipe section is added to drill string 28 . Therefore, ⁇ L will be approximately equal to the length of a drill pipe section or d in the present example.
- carriage 20 must first be translated back to position F in the ⁇ L direction, indicated by an arrow 299 , in order to be connected with a new section of drill pipe.
- clamping arrangement 42 is in its clamped position in order to prevent any movement of the drill string and to support the drill string while the new drill pipe section is being attached since the drill string is no longer under the control of carriage 20 .
- Processor 50 detects the clamped status of the clamping arrangement and, thereafter, ignores the translational movement as having no effect on the length of the drill string. From position F and after connection to a new drill pipe section, the carriage may once again move in the +L direction to position E whereby to continue drilling, as in FIG. 9 a.
- FIG. 9 d illustrates the situation encountered when drill string 28 is being retracted from the ground in the ⁇ L direction. Because clamping arrangement 42 is in its opened position, this movement affects the length of the drill string and is used by processor 50 as decrementing the overall length of the drill string. Such a situation may be encountered, for example, if the boring tool hits some sort of underground obstruction such as boulder 14 (FIG. 1). In this case, it is common practice for the operator of the drill rig to alternately retract and push the drill string in an attempt to break through or dislodge the obstruction. Drill string measuring arrangement 170 advantageously accounts for each of these -movements since clamping arrangement 42 remains in its open position.
- measuring arrangement 170 Another significant advantage of measuring arrangement 170 resides in the fact that ultrasonic receiver/transmitter pair 282 / 284 and micro-switch 292 are positioned on the drill rig away from an area 294 where the drill string actually enters the ground. In area 294 , work is sometimes performed on the drill string using heavy tools which might easily damage an electronic or electrical component positioned in close proximity thereto. Additionally, drilling mud (not shown) is normally injected down the drill string to aid in the drilling process. This mud then flows out of the bore where the drill string enters the ground creating still another hazard for sensitive components placed nearby. It is to be understood that measuring arrangement 170 may be configured in any number of alternative ways within the scope of the present invention so long as accurate tracking of the drill string length is facilitated.
- antenna cluster receiver 65 has been described previously as being configured for measuring components of magnetic locating signal 60 along one or more axes as defined, for example, by antenna structure 67 .
- antenna structure 67 In cases where two or more axes are used, they are orthogonally disposed to one another.
- the present invention provides a highly advantageous antenna which is suitable for use as antenna structure 67 within any previously described embodiment of the system of the present invention and which is specifically configured for precisely establishing the origin of its magnetic field, regardless of the number of receiving axes, as will be described immediately hereinafter.
- a cubic antenna configured for use in the antenna cluster receiver of the present invention is generally indicated by the reference numeral 300 .
- Cubic antenna 300 is configured for reception along orthogonally disposed x, y and z axes.
- the antenna is comprised of six essentially identical printed circuit boards 302 (only 3 of which are visible in FIG. 10) which are arranged in three pairs of two along each axis and are physically attached to one another, for example, by non-conductive epoxy (not shown) so as not to affect the antenna pattern while cooperatively defining a cube.
- An ortho-rectangular spiral conductive pattern 304 is formed on one side 305 of each board with the same pattern being formed on its opposing side, although the opposing side pattern is not visible in the present figure, such that these sides are interchangeable.
- a via 306 electrically interconnects the opposing patterns. In this way, the voltage induced in each pattern by a changing magnetic field is such that the voltages are additive.
- a pair of boards 302 arranged along a particular axis, are electrically interconnected by simply interconnecting ends 308 of confronting patterns 304 to one another such that the voltages are additive (i.e. all patterns spiral around their axis in the same relative direction).
- cubic antenna 300 produces an antenna pattern having a center 310 which is located precisely at the intersection of its x, y and z axes. Therefore, cubic antenna 300 may be positioned in a particular application such that the location of center 310 of its antenna pattern is precisely known.
- the cubic antenna is particularly useful herein since the present invention contemplates highly accurate locating/steering capabilities which have not been seen heretofore.
- the introduction of one possible error in measurement resolution is eliminated by be: the fact that the location of the origin of the antenna pattern is precisely known.
- the signal produced by averaging the confronting side (i.e. circuit boards 302 ) signals will produce a value very close to the actual value at the center of the cube. For example, if the transmitter were seven feet away from a six inch cube, the error produced using one side of the cube to approximate the signal strength is about ten times larger than the error produced by summing the signals produced by the confronting boards and dividing by two.
- the principles of the cubic antenna are readily applied to a single antenna or to a two antenna array by simply eliminating the foil patterns along one or two axes, respectively, such that the pc boards on the unused axes are blank and merely serve as dielectric supports for the pc boards which do support foil patterns whereby to keep the antenna pattern precisely centered.
- Using construction techniques developed for printed circuit board manufacturing to produce boards 302 ensures accurate as well as economical manufacture of the cubic antenna.
- the cubic antenna possesses equal efficacy in transmission applications and that its use is not intended to be limited to that of a boring tool locating/guidance system, but extends to any application which may benefit from its disclosed characteristics.
- the cubic antenna may be implemented in any number of alternative ways (not shown) within the scope of the present invention, for example, using wire coils supported on a frame structure rather than pc boards.
- the wire coils could be either air core or wound on a ferromagnetic rod.
- electric field shielding could easily be added to the pc board arrangement by fabricating another layer with a radial pattern that does not have closed loops which could shield the magnetic field.
- FIGS. 12 and 13 illustrate a horizontal boring operation being performed using another boring/drilling system which is manufactured in accordance with the present invention and generally indicated by the reference numeral 500 .
- system 500 includes certain components which may be identical to previously described components of system 10 , like reference numbers will be applied wherever possible and associated descriptions will not be repeated for purposes of brevity.
- the drilling operation is performed in a region of ground 502 including a boulder 504 and an underground conduit 505 .
- the surface of the ground is indicated by reference numeral 506 .
- System 500 includes previously described drill rig 18 along with carriage 20 received on rails 22 which are mounted on frame 24 .
- Boring tool 26 is attached to drill string 28 , as before.
- the underground progression of boring tool 26 is indicated in a series of points G through R which will be considered as defining an exemplary mapped boring tool path 507 which will be used with reference to a number of systems disclosed herein.
- data from which the mapped/desired boring tool path is plotted may be gained using surveying techniques. However, these data may be provided in other ways, as will be seen below.
- the present example considers movement of boring tool 26 in a master xyz coordinate system wherein x extends forward from the drill rig, y extends to the right when facing in the positive x direction and z is directed downward into the ground.
- the origin of the xyz master coordinate system is specified by reference numeral 508 at the point where the boring tool enters the ground.
- Boring tool 26 includes dipole antenna 54 which is driven by transmitter 56 so that magnetic locating signal 60 is emanated from antenna 54 .
- antenna 54 in combination with transmitter 56 will be referred to as sonde 510 .
- a first antenna cluster receiver 512 (hereinafter receiver 1 or R1) is positioned at a point 514 within the master xyz coordinate system while a second antenna cluster receiver 516 (hereinafter receiver 2 or R2) is positioned at a point 518 . Appropriate positioning of the receivers will be described at an appropriate point below.
- Receivers 1 and 2 each pick up magnetic locating signal 60 from sonde 510 using cubic antennas 300 a and 300 b 99 , (identical to previously described cubic antenna 300 of FIG. 11), respectively, such that each receiver may detect signal 60 along three orthogonally disposed receiving axes which are indicated in FIG. 13 as R1 x , R1 y , R1 z for receiver 1 and R2 x , R2 y , R2 z for receiver 2.
- Receivers 1 and 2 are also used to record noise contamination of the surroundings by temporarily turning off magnetic locating signal 60 .
- Receiver R1 includes a telemetry transmitter 520 and a telemetry antenna 522
- receiver R2 includes a telemetry transmitter 524 and a telemetry antenna 526
- Magnetic information for R1 is encoded and transmitted as a telemetry signal 528 from telemetry antenna 522 to operator console 44 .
- antenna 46 receives telemetry signal 528 which is then provided to processor 50 .
- Telemetry transmitter 520 , antenna 522 and signal 528 will hereinafter be referred to as a telemetry link 529 .
- Magnetic information for R2 is similarly encoded and transmitted as a telemetry signal 530 from telemetry antenna 524 to operator console 44 for subsequent processing by processor 50 .
- Telemetry transmitter 524 , antenna 526 and signal 530 will hereinafter be referred to as a telemetry link 531 .
- the telemetry information from each of the receivers is used to determine the position and orientation of sonde 510 , and thereby boring tool 26 , in a highly advantageous way, as will be described hereinafter.
- the initial drilling array layout must be established such that information derived from magnetic locating signal 60 , during the drilling process, is meaningful.
- Information which is of interest as initial conditions includes: (1) the transmitted strength of magnetic locating signal 60 , (2) an initial yaw and pitch of sonde 510 in the master coordinate system (measured from the master x and z axes, respectively), (3) the coordinates of R1 and R2 within the master xyz coordinate system, and (4) the orientations of the R1 and R2 receiving axes.
- Not all initial conditions are necessary, for example, initial condition 2 is not needed if initial condition 3 is known.
- the array layout and initial conditions may be established in any number of different ways.
- receivers 1 and 2 are spaced apart such that a path between the receivers perpendicularly intersects the desired path of the boring tool and the receivers are separated by a distance d1 bisected by the intended tool path. As will be described below, a specific relationship may be maintained between the length of the drill path and distance d1.
- One method (not shown) of establishing the initial drilling array setup is through directly measuring the positions of R1 and R2 using surveying techniques.
- the receiving axes of each receiver may be oriented such that R1 x and R2 x are aimed in a direction (not shown) which is perpendicular to the desired path of the boring tool.
- Receivers 1 and 2 may also incorporate gimbal 72 and counterweight 74 , described previously with regard to FIG. 2, such that the cubic antenna within each receiver is maintained in a level orientation.
- Another method is to transmit from the boring tool transmitter at a known position, such as the starting point, and calculate the R1 and R2 positions using the same process as in FIG. 16.
- the present invention provides a highly advantageous instrument and associated method for establishing the initial array orientation and for carrying forth the drilling operation along mapped path 507 , which may be established using the aforementioned instrument, with an accuracy and ease which has not been seen heretofore.
- This instrument is referred to herein as a “mapping tool” and will be described in detail immediately hereinafter.
- mapping tool 550 is portable and includes a case 552 having a handle 554 and indexing pins 555 on the bottom of the case.
- a display panel 556 is positioned for ease of viewing and a keyboard panel 558 having a series of buttons 559 provides for entry of necessary data.
- Power is provided by a battery 560 .
- a telemetry antenna 562 is driven by a telemetry transmitter 564 for transmitting a telemetry setup signal 566 to operator console 44 (FIG. 12) and processor 50 therein. These telemetry components and associated signal make up a telemetry link 567 .
- mapping tool includes a setup dipole antenna 568 which is driven by a setup signal generator 570 , a magnetometer 572 , a tilt meter 574 and a processing section 576 .
- Setup dipole 568 is configured along with setup signal generator 570 so as to transmit a fixed, known strength setup signal 580 which is measurable in the same manner as magnetic locating signal 60 . Further details of the operation of mapping tool 550 will be provided below in conjunction with a description of its use in setting up and establishing the initial conditions for a drilling array and bore path.
- FIGS. 12 - 16 attention is now directed to the way in which the mapping tool illustrated in FIG. 14 functions during drilling array and bore path setup in a setup mode. To this end, reference will simultaneously be made to the flow diagram of FIG. 16. Turning specifically to the flow diagram, it is noted that system operation begins at start step 600 . Moving to step 602 , drilling array components including drill rig 18 , R1 and R2 are positioned as illustrated in FIGS. 12 and 13. As will be seen, exact positioning of these components is not critical within certain overall constraints which will be further described at an appropriate point below.
- R1 and R2 must be positioned within receiving range of sonde 510 when the latter is at origin 508 and such that the sonde remains within range of each receiver throughout the entirety of the drill run i.e., all the way to point R.
- Drill rig 18 should be pointed to begin drilling generally along mapped path 507 .
- initial conditions are established beginning in step 604 in which mapping tool 550 is placed on R1 such that indexing pins 555 on the mapping tool engage an arrangement of recesses 605 on the top of the receiver.
- the cooperating arrangement of pins and recesses is asymmetric to insure proper positioning of the mapping tool on a receiver such that, when so positioned, magnetometer 572 will indicate the orientation of the x axis of the receiver while tilt meter 574 will indicate the orientation of the receiver's z axis with respect to vertical (i.e., the xy plane is level).
- display panel 556 may present a setup mode screen 606 (FIG. 15) for receiver 1 which includes a magnetic orientation display 608 and a tilt display 610 each of which is shown in graphical and numerical forms. These displays are generated by processing section 576 from the outputs of magnetometer 572 and tilt sensor 574 , respectively. Using these displays, the orientation of R1 with respect to north and vertical can be established as initial conditions. This receiver orientation information may be transmitted to processor 50 via telemetry link 529 , for example, in response to depressing a first button 559 a on the mapping tool.
- step 612 is performed in which mapping tool 550 is moved to and indexed on R2 (not shown).
- the R2 x and R2 z axes as related to north and vertical, respectively, can then be determined similarly to the procedure described above for R1 at which time a second button 559 b may be depressed on the mapping tool.
- setup signal 580 is transmitted from setup dipole 568 , with the mapping tool still positioned on R2, and is received by R1.
- R1 detects signal 580 along its receiving axes and transmits this information to processor 50 via telemetry link 529 . Using this information, the relationship between R1 and R2 is established by processor 50 based on the known receiver orientations and in accordance with the dipole antenna pattern.
- mapping tool 550 is moved (not shown) to origin 508 such that setup dipole 568 is oriented in the master x axis direction.
- a fourth button 559 d is thereafter depressed and the mapping tool transmits setup signal 580 which is received by R1 and R2.
- a telemetry signal 562 also transmits the tilt to processor 50 .
- Each receiver measures signal 580 along its receiving axes and transmits this information to processor 50 via telemetry links 529 and 531 .
- processor 50 establishes the coordinates of R1 and R2 within the master coordinate system in relation to origin 508 by using the known initial conditions such as, for example, the orientation of the axes of R1 and R2 along with the known signal strength and orientation of setup dipole 568 .
- the drilling array is essentially setup such that attention may now be directed to boring tool 26 .
- step 620 the signal strength, S, of sonde 510 within the boring tool may be determined, for example, by placing the boring tool at origin 508 such that R1 and/or R2 pick up magnetic locating signal 60 and relay this information to processor 50 via telemetry links 529 and 531 , respectively. It should be noted that step 620 may not be required based on the exact configuration of system 500 .
- the number of unknown variables which specify the master coordinate location and the orientation of the boring tool (x, y, z, ⁇ , ⁇ and S) for this system is equal to the number of known variables (six, including: BR1 x , BR1 y , BR1 z , B2 x , B2 y and BR2 z ) such that the system is determinate when S is considered as an unknown variable.
- S will be considered as an unknown variable. Therefore, step 620 is not required. Alternatively, however, S may be set as a constant initially based on the measurement of step 620 .
- any one magnetic component measurement may be eliminated such that a total number of five magnetic measurements are taken since only five unknowns (x, y, z, ⁇ and ⁇ ) remain in this determinate solution.
- Still another magnetic component measurement may be eliminated if a pitch sensor is relied on to provide physically measured pitch values.
- magnetic component readings may be taken from more than two receivers. In fact, six receivers could be located at different positions and may be configured with one antenna apiece to achieve six measurements. However, it should be appreciated that considerable computational power would have to be brought to bear in order to perform the required positional computations using such a number of different receivers.
- mapping tool 550 is used in step 622 to lay out or plot mapped course 507 in a course mapping mode.
- the mapped course is ultimately displayed on display 47 at operator console 44 in a drill path elevation display 624 and a drill path overhead view display 625 , during the drilling operation.
- a target path 626 and the actual drilling path 628 taken by the boring tool are also shown.
- a surface plot of the ground is indicated by reference number 629 .
- a steering coordinator display 630 is also provided on display panel 47 . Target path 626 and steering coordinator display 630 will each be described at appropriate points below.
- the course mapping mode may be entered, for example, through a menu selection (not shown) on display 556 or by pressing a button 559 e on the mapping tool.
- a menu selection (not shown) on display 556 or by pressing a button 559 e on the mapping tool.
- an overall desired depth below the mapped surface 629 of the ground may be entered/specified for the entirety or a specific point of the drilling run on the mapping tool or, alternatively, at operator console 44 .
- the mapping tool (shown in phantom in FIGS. 12 and 13) may be placed on the ground or, in some embodiments, may be held directly above the desired point by the operator wherein the distance to the surface of the ground may be detected, for example, by an ultrasonic sensor in a walkover locator (see previously referenced U.S. Pat. No. 5,337,002).
- a button 559 f is then depressed whereby to cause transmission of setup signal 580 from dipole 568 within the mapping tool.
- R1 and R2 pick up the setup signal and transmit magnetic information corresponding with point G back to operator station 44 via telemetry links 529 and 531 , respectively.
- Processor 50 then calculates the position of point G and offsets this position downward to the desired depth as a point along the mapped course.
- Point G is then added to surface plot 629 and mapped course 507 is correspondingly extended at the specified offset therebelow.
- FIG. 17 illustrates display 47 during the actual drilling operation (i.e., the mapping mode has been completed).
- the actual updating of display 47 during the mapping mode is not illustrated since the reader is familiar with such a process.
- the mapped course may be progressively updated with the addition of each new point entered by the mapping tool or re-plotted following additional processing steps which will be described below.
- surface plot 629 and mapped course 507 may extend, at most, only to the furthest mapped point from drill rig 18 .
- step 622 subsequent points along the desired drilling path are entered in the manner of point G.
- point I Once point I has been reached, however, special provisions may be made.
- conduit 505 passes through the desired path of the boring tool at point I and at a depth which corresponds to the set drilling depth for the present drilling run. Under the assumption that the location and depth of conduit 505 are known to the system operator, the location and depth of the conduit may be entered for point I as a drilling obstacle which can be symbolically represented on display 47 .
- the conduit is denoted by an “X” 632 as representing an obstacle which the boring tool must pass either above or below.
- mapping tool 550 is highly advantageous.
- boulder 504 another type of drilling obstacle is encountered in the mapping process upon reaching point M, i.e., boulder 504 (FIGS. 12 and 13).
- mapped points L, M and N define the desired lateral path around the boulder.
- the location of boulder 504 may be entered for point M as a drilling obstacle which can be symbolically represented on display 47 .
- the boulder is indicated by a solid triangle 634 which denotes that the obstacle must be steered around laterally.
- obstacles of different types may be denoted using an unlimited number of different conventions which imply different connotations in accordance with the present invention. Symbolic identification of obstacles is particularly useful in that a system operator is reminded by such symbols that apparent anomalies in the mapped drilling path are caused by actual obstacles which must be avoided by steering. Step 622 and the mapping mode concludes upon reaching point R.
- mapping tool 550 may be configured in an unlimited number of different ways in accordance with the teachings herein. Data entry and selection may be performed in any manner either presently known or to be developed. For example, its display 556 may be menu driven and/or touch sensitive.
- the mapping tool in establishing the path which is ultimately followed by the boring tool have not been seen heretofore and are not shared by typical prior art systems such as, for example, a walkover system. In that light, the mapping tool could contain additional circuitry so that it could also perform as a walkover locator.
- mapping tool 550 information from which mapped course 507 is plotted may be entered manually, as opposed to using mapping tool 550 .
- Points along mapped course 507 may be identified, for example, using surveying techniques.
- the system may automatically use the desired drilling depth or, as described above, an override depth may be entered. Entry of obstacles essentially remains unchanged.
- the mapped course points, obstacles and any override depths are manually entered at operator console 44 .
- system 10 is considered to be indistinguishable from system 500 from the viewpoint of an operator of the system during actual drilling. Therefore, discussions appearing below with regard to steering and guiding the boring tool along target path 628 , based on information presented on display 47 , are equally applicable to system 10 .
- Point I provides an example of one such circumstance. Specifically, point I in mapped course 507 , is set to a considerably deeper depth than immediately adjacent points H and J so as to avoid conduit 505 . This results in a pronounced dip 636 in the mapped course. In most cases, a drill string will have a minimum bend radius. The latter may be violated by the sharp curvatures of dip 636 . In fact, attempting to drill along these curvatures could result in costly damage to or breakage of the drill string, along with significant project delays.
- processor 50 advantageously applies a curve fitting algorithm to mapped course 507 which considers important factors such as, for example, the minimum bend radius of the drill string, the overall contour of the mapped course, obstacles entered by the operator and the depths of points along the mapped path. Based on all of these factors, the curve fitting process generates target path 625 .
- the operator may optionally override step 638 , using the mapped course exclusively, or enter a target course of his/her own. It is noted that display of all of the information shown in FIG. 17 may not be required. In particular, target path 625 may be displayed in lieu of mapped course 507 , since the system operator may have little use for the plot of the mapped course, particularly in the case of a relatively inexperienced operator. Moreover, elimination of some information may serve to avoid unnecessary confusion on the part of the system operator. Additionally, mapped points (G-R) along the mapped course may be shown or not shown at the option of the operator. Other data may also be displayed such as, for example, the distance from the drill rig to the boring tool.
- mapping points G-R out of sequence.
- a point may be added, modified or deleted in the mapped course even after the end point (R, in this example) has been entered.
- its set drilling depth may be increased such that the mapped course passes still deeper below (not shown) conduit 505 .
- system 500 may defer plotting the mapped course until such time that the operator indicates that all of the points for the plot have been entered. Thereafter, the points may be ordered for plotting purposes prior to applying curve fitting in step 638 .
- step 642 for any particular position of the boring tool, an initial orientation ( ⁇ and ⁇ ) is assumed of sonde 510 along with its signal strength, S.
- the last known ⁇ , ⁇ and S may be used.
- step 642 may initially assume the values ⁇ G , ⁇ G and S G .
- processor 50 may modify ⁇ G , ⁇ G and S G for the assumed values based, for example, on any steering actions taken by the operator since point G.
- step 644 and during drilling components BR1 x , BR1 y , BR1 z of magnetic locating signal 60 are measured along R1's receiving axes while in step 646 components BR2 z , BR2 y and BR2 z of magnetic locating signal 60 are measured along R2's receiving axes.
- components BR1 x , BR1 y , BR1 z of magnetic locating signal 60 are measured along R1's receiving axes while in step 646 components BR2 z , BR2 y and BR2 z of magnetic locating signal 60 are measured along R2's receiving axes.
- R1 antenna solution step 648 is performed wherein the assumed values for ⁇ , ⁇ , and S are used in conjunction with BR1 x , BR1 y and BR1 z to compute an (x,y,z) R1 position. This computation is preferably performed using the triple transform technique which was described above with reference to FIGS. 5 and 6 a - c .
- R2 antenna solution step 650 is performed in a similar manner using BR2 x , BR2 y and BR2 z along with ⁇ , ⁇ and S to compute an (x,y,z) R2 position. (x,y,z) R1 and (x,y,z) R2 are provided to step 652 and a solution difference value is determined.
- step 654 the solution difference value is tested so as to determine if the solutions agree. If the test is satisfied, step 656 is performed in which the resolved position, satisfying step 654 , is stored. Thereafter, a predetermined period of time may be permitted to elapse prior to returning to magnetic field measuring steps 644 and 646 so as to allow for sufficient movement of the boring tool. If the test is not satisfied, a solution procedure 658 is entered in which new values for ⁇ , ⁇ and S are assumed. Solution procedure step 658 is configured for converging the (x,y,z) R1 and (x,y,z) R2 positions by calculating new values for S, ⁇ and ⁇ , much like previously described solution procedure step 140 of FIG. 4, by using a known convergence algorithm such as, for example, simplex or steepest descent.
- a known convergence algorithm such as, for example, simplex or steepest descent.
- the above described procedure can also be used to determine the locations of R1 and R2 if the boring tool's position and orientation are known, since the procedure calculates the position of the boring tool relative to R1 and R2.
- the angular orientation of R1 and R2 must be known. This can be accomplished by leveling and aligning one axis on each cluster in a known direction. For example, the direction could be relative to north or some optical reference such as, for example, another cluster or some object visible (i.e. line of sight) to both R1 and R2.
- drill path elevation display 624 and drill path overhead view display 625 are actively updated by processor 50 in accordance with the underground progression of boring tool 26 along actual drilling path 628 whereby to aid an operator of system 500 in guiding the boring tool.
- Previously mentioned steering coordinator display 630 provides additional assistance by graphically showing the operator an appropriate steering direction which will either keep the boring tool on target path 626 , if it is on course, or return the tool to the target path, if it is off course.
- Steering coordinator display 630 includes cross hairs 660 and a steering indicator 662 . The specific behavior and position of the steering indicator is dependent upon the particular steering action which should be undertaken by an operator using controls 52 at operator console 44 . Normally, the drill string and boring tool rotate during straight boring.
- steering indicator 662 is centered on cross hairs 660 and rotating in the direction indicated by an arrow 664 .
- This behavior simulates the action of the boring tool for straight ahead boring and, thereby, indicates that boring should proceed straight ahead in order to remain on course.
- the steering coordinator display of FIG. 17 is appropriate for positions along target path 626 corresponding to points H and K since the boring tool was on course as it passed these points, in view of the completed portion of actual drilling path 628 . In other words, the steering coordinator display of FIG. 17 would not have been correct for points H and K if, in fact, the tool had been off course.
- steering coordinator display 630 is illustrated for the position along target path 626 corresponding with point I.
- steering indicator 662 does not rotate but, rather, points at the center of cross hairs 660 from below and slightly to the right.
- FIG. 18 Comparison of FIG. 18 with FIG. 17 reveals that, at point I, mapped course 626 is proceeding upward after having passed under conduit 505 , in drill path elevation view 624 , and that actual drilling path 628 (denoting the actual position of boring tool 26 at the time that it passed by point I), in drill path overhead view 625 , is slightly to the right of target path 626 . Therefore, the operator, in order to return to the target path, should steer upward and slightly to the left, as indicated by the pointer of steering indicator 662 .
- FIG. 19 in conjunction with FIG. 17 illustrates still another steering situation corresponding with point M.
- mapped course 626 is curving downward, in drill path elevation view 624 , and curving to the left in drill path overhead view 625 .
- actual drilling path 628 is slightly to the right of target path 626 . Therefore, steering indicator 662 points at the center of cross hairs 660 from above and to the right. In response, the operator should steer downward and to the left, as indicated by the pointer of steering indicator 662 , in order to return to the target path.
- the exact algorithm used to drive the steering display can include consideration of the minimum bend radius of the drill pipe. Such consideration would permit the shortest distance to return the boring tool to the desired path without over stressing the drill pipe. Other algorithms could also be employed which reflect specific drill rig or operation restrictions.
- an automatic steering module 665 may be added to operator console 44 as shown for systems 10 and 500 .
- automatic steering module 665 may interface processor 50 (or may incorporate another processor which is not shown) with the controls 52 using suitable actuators (not shown). It is considered that the development of appropriate automatic steering software is considered to be within the capability of one skilled in the art.
- the role of the system operator may primarily comprise setting up the drilling array and, thereafter, monitoring the progress of the boring tool.
- an audio and/or visual warning may be provided if the position of the boring tool deviates from the target path by more than a predetermined distance, thereby allowing for inattentiveness on the part of the operator.
- Receiver 1 and Receiver 2 antenna solution steps 648 and 650 then utilize SC in determining (x,y,z) R1 and (x,y,z) R2, respectively.
- solution comparison step 652 may utilize an LSE approach in a manner which is consistent with the LSE approaches described previously with regard to system 10 .
- step 652 may compute the square error, SE, based on positions (xyz) R1 and (xyz) R2 wherein:
- W x , W z and W y are optional weighting functions used to improve accuracy, as described with regard to system 10 .
- System 652 can compare the two solutions using the square error in position, as previously described, or can compare the two solutions based on calculated flux at the two antenna receiver clusters. For this latter approach, the position calculated based on the flux measured at receiver 1 is used to calculate the flux at receiver 2 and vice versa. The square differences can then be summed to form an error function which can be minimized by solution procedure 658 . Weighting functions can be incorporated into the process to address such practical problems such as measurement accuracy and background noise. One such weighting function is the signal (flux) to noise ratio (S/N). The accuracy of a measurement diminishes as the signal level approaches the noise level.
- Position resolved step 654 may then determine if SE is at a minimum value i.e., the LSE. If so, step 656 is performed. On the other hand, if SE is not at a minimum, solution procedure step 658 is performed which is configured for converging the two positions based on the square error by calculating new values for ⁇ and ⁇ , much like previously described solution procedure step 218 of FIG. 7, by using a known convergence procedure such as, for example, Simplex or steepest descent. The new values of ⁇ and ⁇ are returned to steps 648 and 650 , beginning the iterative process described above until such time that SE reaches its minimum value in step 654 .
- a minimum value i.e., the LSE.
- FIG. 16 flow diagram is changed in one respect, as a result of this configuration, in that an additional step (not shown) is inserted at a node 666 immediately prior to steps 648 and 650 in which the pitch measurement is taken for the current position of the boring tool. Steps 648 and 650 then compute (x,y,z) R1 and (x,y,z) R2 based upon their respective measured magnetic components along with the measured ⁇ .
- step 652 computes SE while step 654 checks for the LSE.
- step 658 the solution procedure provides new values for P and S which are returned to steps 648 and 650 . The remainder of the procedure is performed as described above with regard to the first alternative configuration.
- a third alternative configuration (not shown) may be implemented in which S is considered as a constant and ⁇ is measured. This configuration is overspecified by two variables. A detailed discussion will not be provided herein for this alternative in that it is considered that one of skill in the art will readily be capable of constructing and using such an implementation in view of the preceding discussions. It should also be mentioned that hybrid configurations may be developed which combine selected features of system 10 and system 500 . In fact, the use of pitch sensor 174 in the second and third alternative configurations, immediately above, may be viewed as such a hybrid. Also, during a particular boring run certain parameters may be determined in different ways. For example, it has already been discussed with regard to system 10 that pitch may be determined by a pitch sensor while stationary and may be calculated while drilling.
- FIG. 20 in which an optimal drilling array layout 667 for system 500 is diagrammatically illustrated, R1 and R2 are shown separated by distance d1 along a path 668 .
- Distance d1 forms the diameter of a circular drilling area 670 .
- Drill rig 18 is arranged along the perimeter of drilling area 670 such that an intended drilling path 672 extends to a drilling target 674 .
- Intended drilling path 672 is substantially perpendicular to and bisects d1. Additionally, the intended drilling path is entirely within drilling area 670 .
- errors in position determination based on magnetic locating signal 60 may be encountered in certain circumstances. For example, a mass of ferrous metal 676 may distort the magnetic locating signal.
- the drilling array layout of FIG. 20 is highly advantageous for a particular reason. Specifically, when an error in position determination is encountered due to such distortion within drilling area 670 , system 500 exhibits a remarkable ability to recover from such errors, resulting in the ultimate arrival of boring tool 26 at target 674 . Other studies by Applicants have shown that as long as boring tool 26 is within circle 670 , regardless of tool orientation, the calculated position is less sensitive to errors.
- intended drilling path 672 is illustrated as being straight and perpendicular to d1, this is not a requirement so long as boring tool 26 is constrained to drilling area 670 , and the receivers are constrained to opposing positions on any diameter of area 670 , system 500 continues to exhibit a substantial ability to recover from positional errors. Outside the circle, the system will still function effectively, but can be more sensitive to error.
- system 700 a specially modified service line installation version of system 500 is illustrated and will be referred to hereinafter as system 700 .
- system 700 includes certain components which are identical with components used in previously described systems 10 and 500 , like reference numbers will be applied whenever possible and the reader is referred to previous descriptions of these components.
- System 700 is positioned in a street 702 opposing a home 704 with a curb 706 and sidewalk 708 therebetween.
- a pit 710 has been excavated adjacent home 704 .
- the configuration of system 700 is tailored for use in the drilling configuration of FIG. 21 wherein it is desired to install a service line such as, for example, a fiber optic line (not shown) from the street to home 704 . Specific advantages of system 700 in this drilling application will be described in detail at appropriate points below.
- system 700 includes drill rig 18 along with a pair of receivers R3 and R4. It should be mentioned that drill rig 18 is normally mounted on a truck or other vehicle in order to facilitate movement of the rig, however, this is not shown for purposes of simplicity.
- R3 and R4 include cubic antennas 300 c and 300 d , respectively.
- An electronics package 712 is associated with each cubic antenna. Electrical cables, which are not shown for purposes of simplicity, connect electronics packages 712 with operator console 44 .
- R3 and R4 unlike previously described receivers R1 and R2, do not require telemetry components.
- operator console 44 does not require telemetry components for the present configuration. Thus, the attendant costs of telemetry links are advantageously eliminated.
- R3 and R4 are mounted on outward ends 714 of a pair of receiver arms 716 and 718 .
- Inner ends 720 of the receiver arms are pivotally received in locking hinge arrangements 722 which are fixedly attached to the sides of the drill rig.
- the receiver arms are moveable between a transport position (shown in phantom) against the sides of the drill rig and a locked drilling position extending outwardly from the drill rig, as depicted. It should be appreciated that, when the receiver arms are in their locked drilling positions, R3 and R4 are in known positions and orientations which may be precisely measured, for example, as a manufacturing step and preprogrammed into the system.
- mapping may be performed using previously described mapping tool 550 , keeping in mind that the associated telemetry components at operator console 44 should be installed, if all of the advantages of the mapping tool are to be realized. If it is desired to hold the cost of system 700 to the lowest possible level, one highly advantageous technique may be employed which avoids the need for the mapping tool, as will be described immediately hereinafter.
- sonde 510 is typically configured for removal from boring tool 26 such that its batteries may be replaced or a different sonde may be installed.
- sonde 510 may be used as an elementary mapping tool.
- the sonde shown in phantom
- the operator may indicate to the system that the present location of the sonde is the end point of the drill run including a specific downward offset.
- the system then may locate the sonde at the pit and, with this straightforward process, a linear drilling run has been mapped.
- intermediate points on the drilling run whereby, for example, to avoid obstacles or for uneven terrain may be entered in a similar manner by appropriate positioning of the sonde and entry of such points into the system.
- system 700 may readily be operated by a single person.
- lines such as fiber optic cables
- System 700 provides the capability to install such lines with an ease and at a rate which has not been seen heretofore.
- its use is not considered as being limited to service line installation, but effectively extends to other drilling applications, as will be mentioned hereinafter.
- FIG. 22 illustrates still another version of system 500 that is generally indicated by the reference number 800 and referred to hereinafter as system 800 .
- System 800 is configured for drilling into the side 802 of a hill 804 and includes certain components which are identical with components used in aforedescribed systems 10 , 500 and 600 . Therefore, like reference numbers will be applied whenever possible and the reader is referred to previous descriptions of these components.
- system 800 may also be truck or other vehicle mounted (not shown). Drilling into a slope, hill or mountain may be performed, for example, in cases where hill 804 is comprised of unstable soils and/or formations.
- system 800 provides a practical and highly advantageous approach to this problem, as will be seen immediately hereinafter.
- system 800 further includes receivers R3 and R4 supported by gimbals 74 which are, in turn, received by tripods 73 .
- the receivers are maintained in a level orientation using counterweights 72 or leveled in some other way.
- Each receiver may also include a sight glass 806 which is aligned along a particular receiving axis such as, for example, the x axis (not shown) of the cubic antenna within each receiver.
- the sizes of sight glasses 806 have been exaggerated for illustrative purposes.
- R3 and R4 can be connected in lieu of telemetry with operator console 44 using a pair of cables 807 in a manner which is similar to that described with regard to system 700 , above.
- system 800 uses a rope arrangement 808 which is attached between tripods 73 supporting the receivers and a point 810 on the drill rig.
- Rope arrangement 808 includes a first rope length 812 which extends from the drill rig to R3's tripod and a second rope length 814 which extends from the drill rig to R4's tripod.
- a third rope length 816 extends between the R3 and R4 tripods.
- This latter length includes a center marker 818 which is positioned midway between the receivers. It is noted that the ropes are attached to the tripods such that the leveling action of the gimbals and counterweights, if used, is not affected.
- rope arrangement 808 is simply extended, as shown, such that center marker 818 is positioned dead ahead of drill rig 18 along a straight drilling path therefrom. Orientation of the receivers may then be set using sight glasses 806 to aim the x axis of each receiver along rope 816 .
- the x and y positions of the receivers have been established relative to the drill rig along with the orientations of the receivers.
- the vertical or z axis positions of the receivers are now established by first transmitting from sonde 510 at a known position and orientation, such as the origin, which may, for example, be at a position 820 just beyond the end of the drill rig frame prior to extending drill string 28 . Thereafter, using the magnetic data measured by each receiver, their z axis positions may be determined relative to position 820 . Drilling may then proceed.
- mapping tool 550 may be used in establishing the illustrated drilling array layout of system 800 .
- systems 500 and 700 may readily be employed in the application of drilling into a hillside. Irrespective of which system is used, the problem of drilling into a hillside is essentially resolved by the present invention. In fact, these systems are adaptable to any drilling situation disclosed herein and, further, may be effectively adapted to virtually any guided boring application.
- system 500 is illustrated in a configuration which is specifically adapted for long drilling runs.
- Drill rig 18 is illustrated, along with R1 and R2, setup and performing such a long drilling run along a drilling path 840 in an area 841 wherein boring tool 26 has reached a point T.
- R1 and R2 (shown in phantom) are initially located at positions 842 and 844 , respectively.
- a maximum through-ground transmission range exists between sonde 510 and receivers R1/R2 which is indicated as a distance d3.
- any point along drilling path 840 up to point T is, therefore, within range of both receivers, as is required for determining the position of boring tool 26 .
- an angle a is formed between d3 and drilling path 840 such that the maximum range, R, of boring tool 26 from drill rig 18 is determined by the equation:
- received magnetic components along each receiving axis of the respective receivers may be used to determine the locations of positions 846 and 848 and the orientations of R1 and R2 by transmitting magnetic locating signal 60 from the known location and orientation of boring tool 26 .
- These determinations are possible, based on dipole relations, since the only unknowns are the x, y and z coordinates for each receiver. Having established the coordinates for positions 846 and 848 , boring may proceed until such time that the boring tool reaches point U.
- R1 is moved to a position 850 (shown in phantom) that is near a point V just beyond a pit 852 which is the ultimate target of the present drilling operation.
- Point V is separated from point U by a distance d4 which is less than or equal to d3.
- R2 could be positioned somewhere between pit 852 and R1, since the boring tool would remain in range of both receivers on the remainder of path 840 to the pit. With R1 at position 850 , drilling to pit 852 may be completed.
- this “leap-frog” technique may be repeated indefinitely so long as above ground telemetry links 529 and 531 (previously described) remain within range of drill rig 18 .
- Such telemetry links typically use a 460 MHz carrier frequency and have a range exceeding one quarter of a mile. It should also be appreciated that this range could be still further extended using, for example, a relay receiver/transmitter or cabling (neither of which is shown).
- a third telemetry receiver (not shown), essentially identical with R1 and R2, may be added to the system such that two receivers remain operational while the third receiver is being relocated such that drilling is continuous.
- a suitable number of receivers it is possible to make an extended boring run without the need to move receivers which could reduce labor in performing the run and essentially eliminate interruption of the drilling process.
- the leap-frog technique is readily applicable to systems 700 and 800 wherein the receivers described with regard thereto are hardwired (i.e., connected by cables) to the drill rig.
- the addition of two or three telemetry type receivers (such as R1 and R2) and a mapping tool will provide leap frog capability.
- the added expense of the mapping tool may also be avoided by orienting the telemetry receivers in alternative ways such as described above.
- the present invention contemplates transmission of a magnetic locating signal from the boring tool using a spread spectrum technique.
- This technique is highly advantageous in extending through ground range and reducing the effects of interfering signals which are proliferating at a remarkable rate, particularly in urban areas.
Landscapes
- Physics & Mathematics (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Geophysics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Electromagnetism (AREA)
- Geophysics And Detection Of Objects (AREA)
- Details Of Aerials (AREA)
- Measurement Of Length, Angles, Or The Like Using Electric Or Magnetic Means (AREA)
Abstract
Description
- This is a continuation application of copending prior application Ser. No. 09/596,316 filed on Jun. 15, 2000 which is a continuation application of copending prior application Ser. No. 09/422,814 filed on Oct. 21, 1999 and now issued as U.S. Pat. No. 6,095,260, which is a divisional of application Ser. No. 08/835,834, filed on Apr. 16, 1997 and now issued as U.S. Pat. No. 6,035,951, the disclosures of which are incorporated by reference.
- The present invention relates generally to systems, arrangements and methods for tracking the position of and/or guiding an underground boring tool during its operation and more particularly to tracking the position of the boring tool within a coordinate system using magnetic field intensity measurements either alone or in combination with certain physically measurable parameters. Positional information may then be used in remotely guiding the boring tool.
- As will be described in more detail hereinafter, there are disclosed herein portable mapping tool arrangements and associated methods for use in a horizontal drilling system. The portable mapping tool includes a boring tool configured for transmitting a locating signal and at least one electromagnetic field detector which is configured for measuring the locating signal from a fixed position proximate to the surface of the ground in a drilling area. In one embodiment, the mapping tool includes a housing and a transmitter arrangement supported by the housing for transmitting a setup locating signal for reception by the detector in the region for use in determining certain initial conditions at least prior to drilling.
- The certain initial conditions may include the position of the detector in the region. The detector may be positioned at a known location on the surface of the ground at the fixed position and the certain initial conditions may include an unknown position of the portable mapping tool at another location in the region relative to the detector at the known location.
- The portable mapping tool may include at least a first detector and a second detector at respective first and second spaced apart positions on the surface of the ground and wherein the certain initial conditions include the second position of the second detector relative to the first position of the first detector. Alternatively, the portable mapping tool may include a drill rig for actuating the boring tool from a drilling position in the region and the certain initial conditions include the drilling position relative to an at least temporarily fixed position of the portable mapping tool in the region.
- In another embodiment, the locating signal transmitted by the boring tool is a first dipole field and the setup locating signal transmitted by the portable mapping tool is a second dipole field.
- In another embodiment, the portable mapping tool includes a positioning arrangement cooperating with the housing for positioning the mapping tool, at least temporarily, on the detector in a predetermined way such that the orientation of the mapping tool is fixed relative to the detector on which it is positioned. The positioning arrangement includes an indexing configuration for engaging the detector in the predetermined way to temporarily fixedly maintain the orientation of the portable mapping tool relative to the detector. The indexing configuration includes a plurality of indexing pins in a configuration for engaging the detector in the predetermined way to temporarily fixedly maintain the orientation of the portable mapping tool relative to the detector.
- The portable mapping tool may further include an arrangement within the housing for determining certain orientation parameters when the mapping tool is engaged with the detector. In one version, this orientation determining arrangement of the mapping tool includes a configuration for determining the magnetic orientation of the mapping tool and, thereby, the magnetic orientation of the detector when engaged therewith. This configuration may include a magnetometer and/or a tilt sensing arrangement for determining the tilt of the mapping tool and, thereby, the tilt of the detector when engaged therewith.
- In other embodiments, the portable mapping tool may include a processing section remote from the portable mapping tool. In this case, the portable mapping tool may include a telemetry arrangement for transferring the certain orientation parameters to the processing section. Various embodiments of the portable mapping tool may also include a display arrangement for displaying the certain orientation parameters.
- The present invention may be understood by reference to the following detailed description taken in conjunction with the drawings, in which:
- FIG. 1 is a diagrammatic elevational view of a horizontal boring operation being performed in a region using one horizontal boring tool system manufactured in accordance with the present invention.
- FIG. 2 is a diagrammatic plan view of the region of FIG. 1 further illustrating aspects of the horizontal boring operation being performed.
- FIG. 3 is a flow diagram illustrating an exemplary, planar procedure for determining the position of the boring tool of FIGS. 1 and 2 in two dimensions using two measured components of a magnetic locating signal emanated from a dipole antenna within the boring tool.
- FIG. 4 is a flow diagram illustrating a procedure which considers locating the boring tool of FIGS. 1 and 2 in three dimensions while performing a horizontal boring operation by using three measured components of the magnetic locating signal emanated from the boring tool.
- FIG. 5 is a flow diagram illustrating steps employed in an efficient triple transform technique for determining the position of the boring tool of FIGS. 1 and 2 in three dimensions in relation to an antenna cluster receiver by projecting components of the magnetic locating signal onto only two axes in a transformed coordinate system. These steps may be incorporated, for example, into the procedure of FIG. 4.
- FIGS. 6a-c graphically illustrate yaw, pitch and roll transforms of the triple transform technique of FIG. 5, which are performed based on the orientation of the antenna cluster receiver in view of an assumed orientation of the dipole antenna from which the magnetic locating signal is transmitted, such that the desired two axis projection is accomplished.
- FIG. 7 is a flow diagram illustrating the steps of an exemplary, planar procedure for determining the position of the boring tool of FIGS. 1 and 2 in two dimensions by using a measured incremental movement in conjunction with two measured components of the magnetic locating signal wherein a least square error approach is used to compare an antenna solution with an integration solution.
- FIG. 8 is a flow diagram illustrating the steps of a procedure for locating the boring tool of FIGS. 1 and 2 in three dimensions using a measured incremental movement and a measured pitch in conjunction with a single, measured component of the magnetic locating signal.
- FIGS. 9a-d are diagrammatic plan views of the drill rig and drill string initially shown in FIGS. 1 and 2 which are shown here to illustrate the operation of a measuring arrangement, which is manufactured in accordance with the present invention, for determining incremental movements of the drill string.
- FIG. 10 is a diagrammatic elevational view illustrating one arrangement for determining the status of a clamping arrangement initially shown in FIGS. 1 and 2.
- FIG. 11 is a perspective view of a cubic antenna manufactured in accordance with the present invention.
- FIG. 12 is a diagrammatic elevational view of a horizontal boring operation being performed in a region using another horizontal boring tool system manufactured in accordance with the present invention.
- FIG. 13 is a diagrammatic plan view of the region of FIG. 12 further illustrating aspects of the horizontal boring operation being performed.
- FIG. 14 is a diagrammatic perspective view of a mapping tool which is manufactured in accordance with the present invention.
- FIG. 15 is an illustration of one way in which a display screen of the mapping tool of FIG. 14 might appear in a setup mode.
- FIG. 16 is a flow diagram illustrating a procedure which considers locating the boring tool of FIGS. 12 and 13 in three dimensions while performing the horizontal boring operation by using three measured components of the magnetic locating signal emanated from the boring tool.
- FIG. 17 illustrates the appearance of a display screen on an operator console including plots representing the exemplary drilling run depicted in FIGS. 12 and 13 along with a steering coordinator display which is useful in guiding the boring tool relative to the illustrated plots.
- FIG. 18 illustrates the appearance of the steering coordinator of FIG. 17 for one particular point along the exemplary drilling run.
- FIG. 19 illustrates the appearance of the steering coordinator for another point along the exemplary drilling run.
- FIG. 20 is a diagrammatic plan view illustrating a drilling array layout defining a circular drilling area in association with the horizontal boring system initially shown in FIGS. 12 and 13.
- FIG. 21 is a diagrammatic plan view illustrating one modified version of the horizontal boring system, which was originally shown in FIGS. 12 and 13, that is configured for service line installation.
- FIG. 22 is a diagrammatic elevational view illustrating another modified version of the horizontal boring system, which was originally shown in FIGS. 12 and 13, that is configured for drilling into a hill or mountain.
- FIG. 23 is a diagrammatic plan view showing the horizontal boring system which was originally shown in FIGS. 12 and 13, shown here to illustrate a technique for performing long drilling runs.
- Attention is immediately directed to FIGS. 1 and 2 which illustrate a horizontal boring operation being performed using a boring/drilling system which is manufactured in accordance with the present invention and generally indicated by the
reference numeral 10. The drilling operation is performed in a region ofground 12 including aboulder 14. The surface of the ground is indicated byreference numeral 16 and is substantially planar for present purposes of simplicity. -
System 10 includes adrill rig 18 having acarriage 20 received for movement along the length of an opposing pair ofrails 22 which are, in turn, mounted on aframe 24. A conventional arrangement (not shown) is provided for movingcarriage 20 alongrails 22. Aboring tool 26 includes anasymmetric face 27 and is attached to adrill string 28 which is composed of a plurality ofdrill pipe sections 30. The underground progression ofboring tool 26 is indicated in a series of points A through D. It should be noted that, for purposes of clarity, the present example is limited to planar movement of the boring tool within a master xy coordinate system wherein the vertical axis is assumed to be non-existent, although vertical displacement will be taken into account hereinafter, as will be seen. The origin of the master coordinate system is specified byreference numeral 32 at the point where the boring tool enters the ground. While a Cartesian coordinate system is used as the basis for the master coordinate systems employed by the various embodiments Of the present invention which are disclosed herein, it is to be understood that this terminology is used in the specification and claims for descriptive purposes and that any suitable coordinate system may be used. Anx axis 34 extends forward along the intended path of the boring tool, as seen in FIG. 1, whilea y axis 36 extends to the right when facing in the forward direction along the x axis, as seen in FIG. 2. Further descriptions which encompass a z axis 37 (FIG. 1) will be provided at appropriate points in the discussion below. - As the drilling operation proceeds, respective drill pipe sections are added to the drill string at the drill rig. For example, the most recently added
drill pipe section 30 a is shown on the drill rig. Anupper end 38 ofdrill pipe section 30 a is held by a locking arrangement (not shown) which forms part ofcarriage 20 such that movement of the carriage in the direction indicated by anarrow 40causes section 30 a to move therewith, which pushes the drill string into the ground thereby advancing the boring operation. A clampingarrangement 42 is used to facilitate the addition of drill pipe sections to the drill string. The drilling operation is controlled by an operator (not shown) at acontrol console 44 which itself includes atelemetry receiver 45 connected with atelemetry receiving antenna 46, adisplay screen 47, an input device such as akeyboard 48, aprocessor 50, and a plurality ofcontrol levers 52 which, for example, control movement ofcarriage 20. In particular, lever 52 acontrols clamping arrangement 42, as will be described at an appropriate point below. - Boring
tool 26 includes a mono-axial antenna such as adipole antenna 54 which is driven by atransmitter 56 so that amagnetic locating signal 60 is emanated fromantenna 54. Power may be supplied totransmitter 56 from a set of batteries 62 via a power supply 64. For descriptive purposes, the boring tool apparatus may be referred to as a sonde. In accordance with the present invention, anantenna cluster receiver 65 is positioned at apoint 66 within the master xy coordinate system for receiving locatingsignal 60.Antenna cluster 65 is configured for measuring components of magnetic locatingsignal 60 along one receiving axis or, alternatively, along two or more orthogonal receiving axes, which are referred to herein as x1, yr and z4 defined within the antenna cluster and depending on the specific system configuration being used. For the moment, it is sufficient to note that the receiving axes within the antenna cluster may be defined by individual antennas such as, for example, dipole antennas (not shown) or by anantenna structure 67. It should also be noted that the antenna cluster receiving axes are not necessarily aligned with the x, y and z axes of the master coordinate system, as is evident in FIG. 2. One antenna structure, which is highly advantageous within the context of the present invention, will be described in detail at an appropriate point below. Measured magnetic field components of the locating signal, in terms of the master coordinate system, are denoted as Bx, By and Bz, in terms of the receiving axes of the antenna cluster, measured components of magnetic locatingsignal 60 are referred to as Bxr, Byr and Bzr. Magnetic information measured along the receiving axes ofantenna cluster 65 may be transmitted toprocessor 50 inoperator console 44 in the form of atelemetry signal 68 which is transmitted from atelemetry antenna 69 and associatedtelemetry transmitter 70.Telemetry signal 68 is picked up at the drill rig usingtelemetry receiving antenna 46 andtelemetry receiver 45. Thereafter, the telemetry information is provided toprocessor 50 such that the magnetic field information gained along the antenna cluster receiving axes may be interpreted so as to determine the position of the boring tool in the master coordinate system, as will be described. Magnetic field information may be preprocessed using a processor (not shown) located withinantenna cluster 65 in order to reduce the amount of information which is transmitted from the antenna cluster to theoperator console 44. The Bz and By components are illustrated for each of points A-D in FIG. 2 (Bz=0 in the present example). A number of different configurations ofsystem 10 will be described below with reference to FIGS. 1 and 2. These configurations may differ in one aspect by the number of orthogonal magnetic field components which are measured byantenna cluster 65. In another aspect, these configurations may utilize inputs other than the magnetic field components and, consequently, may compute the location of the boring tool in alternative ways, as will be discussed at appropriate points below. - In order to derive useful information from magnetic locating
signal 60, a number of initial conditions must be known and may be specified in relation to the master coordinate system prior to drilling. The number of initial conditions depends on details of the set up and data processing. There must be sufficient known initial conditions such that the procedure is well posed mathematically, as is known to those of skill in the art. These initial conditions include (1) the transmitted strength of magnetic locatingsignal 60, (2) an initial yaw (DO) ofdipole antenna 54 in the master coordinate system (which is measured from the master x axis and is 0° in the present example, sincedipole 54 is oriented along the x axis), (3) an initial pitch φ0 ofdipole antenna 54 which is also zero in this example, (4) the location ofantenna cluster 65 within the master coordinate system, (5) the initial orientation angles of the receiving axes of the antenna cluster relative to the master xy coordinate plane and (6) the initial location of the boring tool, for example, atorigin 32 within the master coordinate system. The main purpose for obtaining initial yaw and initial pitch is to improve tracking and/or guiding accuracy and may therefore not be needed for some applications. One relatively straightforward setup technique to initially establish these six conditions, that is, for initially orienting the components of the system is to aim one receiving axis, for example, xr ofantenna cluster 65 due north and level, as seen in FIG. 2. In one embodiment ofsystem 10,antenna cluster 65 is supported by agimbal 72 andtripod 73 having acounterweight 74 extending therebelow whereby to ensure that the antenna cluster is also maintained in a level orientation. Aiming the antenna axis in the northerly direction may be accomplished using amagnetometer 76 which is built into the receiver and includes a display 78 (FIG. 2) on an upper surface thereof. Initial conditions may be entered intosystem 10, for example, usingkeyboard 48. - It is to be understood that any number of other techniques and/or instruments may be used to establish the initial conditions. For example, a tilt sensor (not shown) may be used at
antenna cluster 65 in place of the gimbal and counterweight arrangement depicted. As another example, the need for a magnetometer in the antenna cluster may be eliminated by orienting the cluster in a specific direction such as, for example, directing (not shown) xr parallel with the master x direction. Moreover, it should be appreciated that by knowing a number of the initial conditions, the remaining initial conditions may then be calculated. As an example, if the location of the antenna cluster in the master coordinate system is physically measured such that the initial distance betweendipole 54 and the antenna cluster are known and the orientation of the antenna(s) within the antenna cluster are known,system 10 may calculate the signal strength ofdipole 54 and its initial yaw angle (βo) wherein βo is used as an initial condition and signal strength is applied as a constant for the remainder of the drilling operation. - Referring to FIG. 3 in conjunction with FIGS. 1 and 2, the initial conditions recited above are established in
step 101 followingstart step 100. Atstep 102, a desired course for the drill run may be laid out and entered into the system usingoperator console 44 so as to be displayed ondisplay panel 47. An exemplary course will be illustrated at an appropriate point below in conjunction with a description of specific provisions for guiding the boring tool along this course. Atstep 103, initial values are assumed for ΔL and β (yaw) which may be based on the initial conditions determined instep 101. The drilling operation may proceed at step 104 during which incremental movements of the boring tool may be precisely described for two dimensions by the equations: - Δx=∫ cos β(1)d1, and (1)
- Δy=∫ sin β(1)d1 (2)
- In moving from
origin 32 to point A, the boring tool moves a first incremental distance ΔL, at the initially established value of βo=0°. For the present configuration, it is assumed that the boring tool travels straight in the direction in which it is pointed such that the value of β is unchanged. Under the assumption of a two-dimensional boring process the above equations of a particular increment, ΔL, become: - Δx=ΔL cos β, and (3)
- Δy=ΔL sin β (4)
- wherein ΔL=ΔL1 and β1=βo for the first incremental movement. Upon reaching point A, the system determines the position of the boring tool in two different ways, that is, along parallel paths beginning with
steps step 106, which provides for one way to determine the position of the boring tool, the present configuration (which isConfiguration 1 in Table 1, below) uses only measured components Bxr and Byr (referred to the antenna cluster 65) of the intensity of magnetic locatingsignal 60, measured instep 106, in determining the position of the boring tool. This configuration is indicated asConfiguration 1 in Table 1 below.TABLE 1 System Configurations ({square root} indicates a measured or known value) (n/a indicates a planar configuration in which φ and the z axis are not considered) Config. Config. Config. Config. Config. Config. 1 2 3 4 5 6 ΔL {square root} {square root} {square root} {square root} φ n/a n/a {square root} {square root} Bxr {square root} {square root} {square root} {square root} {square root} Byr {square root} {square root} {square root} {square root} {square root} {square root} Bzr n/a {square root} n/a {square root} {square root} S {square root} {square root} {square root} {square root} {square root} {square root} - As will be appreciated, by knowing βo (established as an initial condition) and knowing the received value of components Bxr and Byr, respectively, of magnetic locating
signal 60 present atantenna cluster 65, but not knowing or assuming a value for ΔL1, an x,y position of the boring tool may nevertheless be calculated in anantenna solution step 107, under the assumption that the boring tool traveled in the direction of BOX using the following well known dipole equations in two dimensions: - Here R is the distance between the sonde and receiving antenna cluster and xs, ys are coordinates moving with the sonde during the boring process. By applying appropriate coordinate transformations which will be described at an appropriate point below, the x, y position of the boring tool can be determined from antenna signals Bx
r and Byr along with yaw angle β. - Still referring to FIGS.1-3,
integration solution step 112, which provides a second way to determine the position of the boring tool at point A, continues to apply the assumption that the boring tool travels in the direction in which it is pointed by using βo and it also assumes a value for ΔL1 at point A (i.e., it makes an educated guess). Using these values along with the x and y values from the last known/calculated position of the boring tool,step 112 computes an xint, yint position for boringtool 26 using: - x int =x+Δx, and (8)
- y int =y+Δy (9)
- wherein Δx and Δy are provided using
equations 3 and 4 and wherein x and y are used from the last known or calculated position of the boring tool. For example, in performing these calculations for point A, x=y=0 since the last known position of the boring tool was atorigin 32. Once the tool has moved beyond point A, values for the next point (B) will be calculated using x and y values established for point A in the procedure currently under description. Essentially,step 112 provides an historical track record of the path over which the tool has moved, monitoring both its immediately prior position and yaw for each incremental movement along the path and updating the position and yaw with successive increments. Next, a comparestep 108 receives the calculated position xant, yant fromstep 107 and the integration solution position xint, yint fromstep 112. The compare step checks the two positions against one another and sends the difference to a position resolvedstep 114. If the xint, yint position agrees with the xant, yant position, if the square difference between the positions is less than a predetermined amount, for example, by less than one square inch or if the result cannot be reduced further by continued iteration, the result is assumed to be correct and step 116 is next performed such that the system loops back tosteps solution procedure step 118 is next performed. The latter estimates a new value for β. Estimation of the new β value may be performed using a number of techniques which are known in the art for converging values of variables such as, for example, Simplex or steepest descent. These procedures determine the sensitivity of the error to changes in the variables and select increments of the variables which will drive the error toward zero. The new values are assumed by the system for the point/position being considered. The newly assumed D is then returned tosteps Steps step 108 and then the agreement between the two new positions is checked bystep 114. The system continues assuming and testing new values for β until such time that the position of the boring tool is sufficiently resolved, as evidenced by passing the decision test ofstep 114. The values of ΔL, and βA which satisfy this iteration process then become the most recent end point within the integration solution (from a history standpoint), as the drilling operation proceeds. - From point A, drilling continues so that the boring tool moves to point B. As can be seen, the tool actually does move over increment ΔL2 in a straight path at βA, similar to its movement over ΔL1 to point A. In our particular example, since the boring tool happens to continue in a straight line, βA=βo. At point B, steps 106 and 112 are repeated (assuming initially βB=βA=βo) along with the remaining procedure of FIG. 3 in accordance with
Configuration 1 to compute the new position of the boring tool and βB at point B. The assumption, in the present example, that the boring tool moves at one constant yaw angle during each of its incremental movements will be referred to as a level one approximation hereinafter. While this assumption actually holds true over the ΔL, and ΔL2 increments, it does not hold true over the ΔL3 increment. During the latter movement,boring tool 26 initially moves between points B and D at βB=βo until such time that it encountersboulder 14 at point C and is deflected to a yaw angle βC. Thereafter, the boring tool proceeds to point D at its new yaw angle of βC which is then equal to βD. One of skill in the art will appreciate that if the boring tool arrives at point D with a different β than that with which it started at point B, the tool could not have moved at one constant D between points B and D, as assumed in the level one approximation. Another alternative approach, which will be referred to as a level two approximation, considers these facts and will be described immediately hereinafter. At the same time, it is to be understood that the level one approximation will arrive at a solution with some error for the ΔL3 increment and, as to the position and β ofboring tool 26 at point D, by following the iterative procedure described thus far. This error is caused by the fact that the assumed path (with β constant) is not the actual path. - The level two approximation is identical to the level one approximation, except for the assumptions regarding β. The level two approximation (still Configuration 1) assumes that the boring tool moves at a yaw angle βAV over a particular increment which is an average of the yaw angles at the beginning and end points of the increment. For purposes of brevity, the present approximation will immediately be described with reference to the ΔL3 increment. This increment, as described, starts with βB and ends with βD.
Equations - Δx˜ΔL cos βAV, and (10)
- Δy˜ΔL sin βAV, wherein (11)
- βAV=(βcurrent+βlast)/2 (12)
- wherein ΔL=ΔL3, βlast=βB and βcurrent=βD for ΔL3. The procedure of FIG. 3 remains unchanged for the level two approximation with one exception. Specifically, βAV is calculated using
equation 12 and used instep 112 for integrating. Block 107 still calculates the current β andsolution procedure 118 still updates βcurrent. Inintegration solution step 112, the mathematical effect of using βAV is essentially that of moving the boring tool to its new location over the entire length of the ΔL3 increment at βAV, rather than βB. This assumption is quite accurate as long as the increment ΔL is much less than the minimum bend radius of the drill pipe. The influence of the addition ofz axis 37 and measurement of additional parameters will be considered in the discussion immediately following. - Referring to FIG. 4 in conjunction with FIGS. 1 through 3 and having described a two dimensional configuration for the reader's understanding, the addition of
z axis 37 will first be considered. Table 1 indicates a 3-dimensional embodiment ofsystem 10 asConfiguration 2 in whichantenna cluster 65 measures Bxr, Byr and Bzr. Of course, addition of the z axis implies vertical movement and, consequently, pitch (φ) ofboring tool 26. One of skill in the art will recognize that the discussions above remain applicable in that the addition of the z axis simply comprises another axis along which the strength Bzr of magnetic locatingsignal 60 may be measured atantenna cluster 65. The flow diagram of FIG. 4 illustratesConfiguration 2 and includes φ and Bz. (in applicable steps) in a level one approximation for purposes of simplicity. One of skill in the art may readily adapt the present implementation to alevel 2 approximation in view of the previous detailed discussion devoted to that subject. It should be noted that the logical and functional layout of the flow diagram of FIG. 4 is essentially identical with that of FIG. 3. Therefore, for purposes of brevity, descriptions of steps provided with regard to FIG. 3 will be relied on whenever possible and the present discussion will center upon those steps which are significantly affected by adding the z axis. TheConfiguration 2 procedure begins atstart step 120 and moves to initial conditions step 122 which is performed similarly to previously describedstep 102. Additionally, step 122 must determine an initial φ (φo) and an initial z value, which may be accomplished in the previously described setup technique by also measuring B, atantenna cluster 65. Atstep 123, the desired course of the boring tool may be entered into the system. Drilling proceeds atstep 124. - Upon completion of first incremental movement ΔL1, the procedure moves to step 125 in which a value is assumed for ΔL, along with the values of φ and β established as initial conditions in
step 122. Instep 126, Bzr is measured along with Bxr and Byr atantenna cluster 65. The magnetic component measurements are provided along with φo and βo toantenna solution 128 which computes an (xyz)ant position based on these values, for example, by assuming that φo and βo have not changed over the movement and, thereafter, solving a set of equations based upon the pattern ofdipole antenna 54 which emanates magnetic locatingsignal 60 in the now three dimensional master coordinate system. The (xyz)ant position is provided to comparestep 130 which is similar to step 108, above, with the inclusion of the z values. - Concurrent with the path of
steps path including step 134 is performed. ΔL1. φo and βo are passed tointegration solution step 134, which is similar to previously describedintegration solution step 112, except that mathematical movement ofboring tool 26 is now performed in a three dimensional space using the assumed φ, β and ΔL.Integration solution step 134 outputs an (xyz)int position to comparestep 130. The compare step determines the difference between the antenna and integration solutions and passes this difference to a position resolveddecision step 136. If the difference is acceptable, step 138 returns the procedure tosteps 125 for the next incremental movement. Otherwise,solution procedure step 140 is executed (similar in nature to previously described step 118). Using a known algorithm such as, for example, Simplex or steepest descent,solution procedure 118 provides new values for φ, β and ΔL which are assumed by the system and passed tosteps processor 50. - Referring to FIGS. 5 and 6a-c in conjunction with FIGS. 1 and 2, an
exemplary dipole antenna 140 having anaxis 142 within a boring tool (not shown for purposes of clarity) is illustrated at an orientation and position xd, yd within the master coordinate system wherein φ˜20° and β˜0°. Atpoint 66, whereantenna cluster 65 is located, magnetic locatingsignal 60 fromdipole 140 produces a three-dimensional flux vector B which is shown in relation to the receiving axes of the antenna cluster indicated as xr, yr and zr with xr being oriented to due north and zr (FIG. 6b) being directed downward. One method of solving this three-dimensional problem is to mathematically re-orient the receiving axes ofantenna cluster 65 to a new coordinate system that is aligned withdipole 140 in a specific way using the assumed values of β and φ such that the problem is essentially reduced to two dimensions. To that end, the flow diagram of FIG. 5 illustrates steps which are incorporated into a three dimensional antenna solution such as, for example,antenna solution step 128 of FIG. 4, beginning withstep 150. Instep 150, the orientation ofdipole 140 is compared with the assumed β and φ values. Reorienting may then be accomplished, in view of this comparison, by using a series of three Euler transformations to create the new coordinate system in whichmagnetic locating signal 60 projects only onto two axes atantenna cluster receiver 65, as will be described immediately hereinafter. - Referring to FIGS. 5 and 6a, a
yaw transform step 152 may be performed initially based on the assumed β. A yaw of an angle θ1 is performed about the z axis (perpendicular to the plane of the paper) which creates a new xr′, yr′ system such that xr′ is parallel to the projection ofdipole axis 142 onto the master xy coordinate system. In other words, the xr′ axis now has a P value which is equal to the assumed A - Turning to FIGS. 5 and 6b,
step 154 performs a pitch transform.Dipole 140 is shown in the xz master coordinate plane such that the pitch, φ, of the dipole can be seen. In the pitch transform, the xr′, zr′ system (zr′=zr) is rotated by an angle θ2 about the yr′ axis, which is now perpendicular to the plane of the paper. The effect of the pitch rotation is to align a new xr″, zr″ system so that xr″ is parallel withaxis 142 of the dipole. In other words, the xr″ axis now has a pitch which is equal to the assumed value for φ. Note that B continues to project onto three dimensions at the antenna cluster in this double prime system. -
Step 156 then performs a third transform, illustrated in FIG. 6c, which is a roll about the xr″ axis (which is perpendicular to the plane of the figure). In this transform, the yr″ and zr″ axes are rotated by an angle of θ3 to align a new yr″″, zr′″ system so that yr′″ is aimed directly ataxis 142 of the dipole. Θ3 is selected so that Bγ″″ will be zero. In this triple prime system, therefore, B projects onto xr″″ (=xr″) and zr′″, but not onto yr′″. -
- Thereafter, in
step 160, the transforms ofsteps - Referring once again to FIGS. 1 and 2,
system 10 may be configured to provide various inputs for use in determining the position of the boring tool, as noted previously. These inputs include directly measurable parameters such as, for example, ΔL, which may be measured atdrill rig 18 by a measuringarrangement 170, and pitch which may be measured by apitch sensor 174 positioned withindrill head 26. One suitable pitch sensor is described in U.S. Pat. No. 5,337,002 which is issued to one of the inventors of the present invention and is incorporated herein by reference. A description of one highly advantageous embodiment of measuringarrangement 170 will be provided at an appropriate point hereinafter. At this juncture, it is sufficient to note that ΔL may be precisely measured to within a fraction of an inch by monitoring changes in the length ofdrill string 56 atdrill rig 18. It should be appreciated thatsystem 10 may utilize inputs such as ΔL and φ within the context of a number of different approaches in solving the problem of determining the position and orientation ofboring tool 26. Two such approaches will be described hereinafter. - In the art, a system of equations for which the number of equations or known variables is equal to the number of unknown variables is referred to as being determinate while a system in which there are more known variables than unknowns is referred to as being overspecified. A determinate system yields a solution set for its unknowns which precisely matches the specified parameters. However, due to possible inaccuracies introduced, for example, by the equations themselves in matching the actual physical system being mathematically represented and measurement inaccuracies, a determinate solution can be highly sensitive to errors in the specified parameters. One method of reducing such sensitivity is to form an overspecified solution in which the number of equations or known variables is greater than the number of unknowns. In this latter case, according to a first approach, a least square error technique may be employed to arrive at an overall solution in which measured values of ΔL and/or φ may be used in conjunction with measurements of magnetic locating field60 (Bxr, Byr and Bzr) to formulate a solution for determining the position of the boring tool with a high degree of accuracy.
- Referring now to FIGS. 1, 2 and7, one implementation of the Least Square Error (LSE) approach is indicated as
Configuration 3 in Table 1. Like much of the preceding discussion with regard to FIGS. 1 and 2, the present discussion will be limited to the xy master coordinate system, ignoring the z axis for purposes of simplicity. Furthermore, the present discussion will address the LSE approach in a manner which is consistent with the previously described level two approximation (that is, use an average value for β). One of skill in the art will readily adapt the present discussion to the first order approximation which was also described previously. Astart step 200 begins the flow diagram of FIG. 7 and leads immediately tosteps step 204, the boring operation begins. Thereafter, atstep 206, ΔL is physically measured at the drill rig for a just completed incremental movement ofboring tool 26. ΔL is then provided to anintegration solution step 208. An assumed βcurrent is then used with ΔL inequations 9 and 10, above, to compute Δx and Δy. Initially for each increment, the assumed βAV may be made equal to the last known β. For example, at point A, βAV may be set to the value βo, established in initial conditions step 202, whereas at point B, βAV may initially be set to the final value, βA, previously established for point A. An (xy)int position is then calculated by the integration solution, using βAV and ΔL, for use instep 212, which will be described below. - Concurrently with
steps step 209 may be performed. Instep 209, components Bxr and Byr of magnetic locatingsignal 60 are measured byantenna cluster receiver 65 and provided to anantenna solution step 210 along with the assumed βcurrent. Based on these values,antenna solution step 210 calculates an (xy)ant position for boringtool 26 and provides this position to step 212. The latter step determines the square error (SE) based on thestep 208 integration solution and thestep 210 antenna solution using: - SE=(x int −x ant)2+(y int −x ant)2 (15)
- The square error can also be formulated in terms of Bx
r and Byr as will be discussed later in the specification. Step 214 is then performed so as to determine if the value of SE is at its minimum value, indicating that the antenna and integration solutions have been converged to the greatest extent possible. Of course, this function cannot be performed until such time as at least one value of SE has previously been computed and stored following the start of a boring operation, for example, after ΔL1. If the SE is at a minimum,step 216 is entered wherein the system readies for the next incremental movement and the associated βcurrent value is used inequation 12 to determine the current yaw. Otherwise,step 218 is next performed in which a solution procedure picks a new value for βcurrent which is intended to reduce the square error. As previously described, a number of techniques are available in the art for converging solutions to problems such as picking the new value of βcurrent. In the present example, the Simplex technique is utilized. The new βcurrent is returned to step 208 to compute a new (xy)int.Antenna solution step 210 is provided with βcurrent such that the antenna solution may be re-calculated to provide a new (xy)ant value. Therefore, each new value of βcurrent produces new values for (xy)int and for (xy)ant which, in turn, produce a new square error value instep 212. Iteration of βcurrent values is repeated until the square error value from equation 15 is minimized i.e. least square error. The solution for (x,y,z)sonde can be based on either the antenna result, the integration result or an average of the two. If the solution is properly converged and measurement errors are negligible then all the results would agree, i.e. zero square error. It should be mentioned that a measured φ value may also be incorporated in an LSE solution for a configuration in which three dimensions are considered, as will be discussed below. - As a second approach, measured inputs such as ΔL and φ may be used in a way which may reduce the overall complexity and cost of
system 10 while still maintaining a high degree of accuracy in determining the position ofboring tool 26 during the drilling operation. The flow diagram of FIG. 8 illustrates another two dimensional implementation ofsystem 10 which is referred to as Configuration 4 and is listed in Table 1. In this configuration, ΔL and φ are measured and used in alevel 1 approximation along with Byr. In order to further enhance the reader's understanding, it is suggested that the process of FIG. 8 may be directly compared with that of FIG. 4, illustratingConfiguration 2, which is also three dimensional but differs in that all three magnetic locating field axes are measured and are the sole inputs used in determining the location of the boring tool. Following astart step 250, initial conditions are established instep 252, for example, in the manner previously described. Instep 253, a desired course for the boring tool may be entered atoperator console 44, for example, using data gathered by surveying techniques. As noted, an exemplary desired tool course display will be provided at an appropriate point below. The drilling operation begins atstep 254 and one incremental movement ofboring tool 26 is completed instep 256. Instep 258, ΔL and y component, Byr, of magnetic locatingsignal 60 is measured byantenna cluster receiver 65. Calculations are then performed bystep 260 to determine the new xy position of the boring tool and β based upon its last known position in conjunction with the measured values of ΔL, φ and the one measured component of magnetic locatingsignal 60. Since ΔL, φ and the last β are known and assuming the tool has traveled in the direction in which it is pointed at one yaw angle (the last β) in accordance with the level one approximation, the Δx, Δy and Δz increments for a particular incremental movement may readily be determined using the equations: - Δx=ΔL cos φ cos β, (16)
- Δy=ΔL cos φ sin β, and (17)
- Δz=−ΔL sin φ (18)
- The Δx, Δy and Δz components may then simply be added to the last known x, y and z coordinates so as to determine the new position of the boring tool within the master coordinate system. β, at the new position, may then be established using the measured component Bxr or Byr of the intensity of the magnetic locating signal. In this instance, the use of only one magnetic intensity reading yields a solution for P which is determinate, based on known equations for a dipole antenna pattern. It should be noted that Bxr or Byr are favored over the use of Bzr simply because the former are most sensitive to yaw over most of the bore length. Following
step 260, the system readies for the next incremental movement by updating the boring tool position and then returning to step 256 fromstep 262. - In addition to reduced componentry because
antenna cluster 65 need only measure along one antenna axis, it should also be mentioned that Configuration 4, under the flow diagram of FIG. 8, is advantageous in that processing power which must be brought to bear on its calculations is held to a minimum level. The steps in FIG. 8, unlike those of FIG. 4, are not iterative for respective ΔL movements, whereby to further simplify the calculation procedure. Thelevel 1 approximation can be raised to alevel 2 approximation by incorporating an iterative process intostep 260. An average A can be used to compute the new x, y, and z positions which, in turn, would produce a new βcurrent. The iteration would continue until βcurrent converged. - As described above,
Configuration 2 embodies a determinate system with a total reliance on magnetic locating field measurements while Configuration 4 embodies a determinate system using a cost effective approach in which only one magnetic measurement is made. With reference to Table 1 and FIGS. 1 and 2, a number of other configurations ofsystem 10, may also be found to be useful based upon specific objectives. One such objective may be to assure the reliability of the calculated position ofboring tool 26 by overspecifying to the greatest possible extent. For example, Configuration 5 is an embodiment ofsystem 10 which is similar toConfiguration 2 except that ΔL and Q are both measured using measuringarrangement 170 andpitch sensor 174, respectively. It should be appreciated that Configuration 5 may implement an LSE approach which is overspecified by two additional variables. The accuracy of the measurable parameters, as well as when the measurements are available should also be considered. These considerations are applicable with regard topitch sensor 174. Specifically, pitch sensors are subject to producing errors in readings due to rotation and rotation accelerations ofboring tool 26 during drilling due to splashing of fluid (not shown) internal to the pitch sensor. For this reason, Configuration 5 may be implemented in an alternative way by using pitch sensor readings only when the boring tool is stationary as a cross-check mode to intermittently verify the accuracy of current calculations. In this alternative implementation, the ΔL measurement may, of course, continue to be used as part of an LSE approach. It should also be appreciated that a cross-check mode may also be utilized with regard to ΔL wherein a calculated value of ΔL can be compared with a measured ΔL value whereby to verify accuracy of current positional computations. It is to be understood that such a cross-check mode may be implemented with any embodiment of the present invention disclosed herein. -
Configuration 6 in Table 1 illustrates an approach wherein pitch is calculated, rather than using a pitch sensor or the cross-check mode above. The objective of this configuration is simply that of avoiding any need to rely on a pitch sensor. It is to be understood that the configurations shown in Table 1 and described herein are not intended to be limiting but are intended to illustrate at least a few of the broad array of variations in whichsystem 10 may be configured in accordance with the present invention. - It is worthy of mention that signal strength, S, is specified as a measured value for each of the configurations listed in Table 1. In view of the stability and reliability of state of the art transmitters of the type which may be used to transmit
magnetic locating signal 60, a constant output value for S may readily be achieved and may be measured for a particular transmitter prior to beginning a boring run, as described previously. However, other configurations may also be used in which the value of S is calculated as an unknown variable. For example,Configurations 5 or 6 may be modified such that S is a calculated variable. This configuration may be useful, for example, in cases where transmitter strength may vary due to battery fatigue in a long drill run or when an operation extends over more than one day such that the transmitter operates through the night, even though the system is idle. The calculated value of scan can also be used, as ΔL was used, to verify the accuracy of the calculations. - Another feature which can be added to the L.S.E. analysis is a set of weighting functions which are well known in the art. Weighting functions can be applied to the square error parameters (x, y, and z) to reduce sensitivity to error in measurements. For example, if the z position was found to be very sensitive to the z component of the magnetic field measurement Bz and the Bz measurement had poor accuracy because it was close to the background noise level, a weighting function could be used to minimize the influence of z error on the square error. The resulting solution with functions would be more accurate than the solution without weighting functions. A system of weighting functions could be applied to all of the square error parameters based on the sensitivity of each parameter to measurement error and an estimate of the measurement error such as the noise to signal ratio.
- Turning now to FIG. 1, FIGS. 9a-d and FIG. 10, a description of previously mentioned measuring
arrangement 170, manufactured in accordance with the present invention, will now be described in detail in relation to the operation of the drill rig. The reader will recall thatupper end 38 ofdrill pipe section 30 a is held by a chuck or screw arrangement which forms part ofcarriage 20. Ascarriage 20 moves in a +L direction which is indicated by anarrow 280,drill string 28 is pushed into the ground by the fact that it is attached to drillpipe section 30 a. Measuringarrangement 170 includes a stationaryultrasonic transmitter 282 positioned ondrill frame 18 and anultrasonic receiver 284 with anair temperature sensor 285 positioned oncarriage 20. It should be noted that the positions of the ultrasonic transmitter and receiver may be interchanged with no effect on measurement capabilities.Transmitter 282 andreceiver 284 are each coupled toprocessor 50 or a separate dedicated processor (not shown). In a manner which is well known in the art,transmitter 282 emits anultrasonic wave 286 that is picked up atreceiver 284 such that the distance between the receiver and the transmitter may be determined to within a fraction of an inch byprocessor 50 using time delay and temperature measurements. By monitoring movements ofcarriage 20 in whichdrill string 28 is either pushed into or pulled out of the ground and clampingarrangement 42,processor 50 may accurately track the length ofdrill string 28 throughout a drilling operation. The clamping arrangement includes first andsecond halves drill string 28 in a clamped position (FIG. 9b) and which permit the drill string to move laterally and/or rotate in an unclamped position (FIG. 9a). The clamping arrangement is used to holddrill string 28 while adding or removing additional lengths ofdrill pipe 30 a. - Turning to FIG. 10, monitoring of the clamping arrangement is accomplished using a cooperating
micro-switch 292 which is mounted withinoperator console 44 adjacent clampingarrangement control lever 52 a. When the latter is in the unclamped position, anactuator arm 294, which moves in corresponding relationship with the lever, engages anactuator pin 296 whereby to close a set of contacts (not shown) withinmicro-switch 292 that are connected toprocessor 50 byconductors 298. It is to be understood that the use ofmicro-switch 292 is only one of many ways in which the status of clampingarrangement 42 may be monitored byprocessor 52. A device (not shown) other than a micro-switch may also serve in this application. For example, an infrared diode and phototransistor pair may be positioned so as to monitor the status oflever 52 a. Another useful device could be a pressure switch, sinceclamp 42 is generally operated by hydraulic pressure. Still another device which may be used is a Hall effect sensor. The latter is advantageous in that it is completely sealed from the elements. - Referring again to FIGS. 9a-d and 10, it will be appreciated that the length of
drill string 28 in the ground can change only whenprocessor 50 receives the unclamped indication since it is only then that the drill string can be moved laterally bycarriage 20. With regard to the movement ofcarriage 20 illustrated in FIG. 9a,processor 50 detects that clampingarrangement 42 is in its unclampedposition using micro-switch 292 and increments the length of the drill string by a length corresponding to the detected change in distance between the ultrasonic receiver/transmitter pair. Additionally,processor 50 tracks incremental positions along the drill string (corresponding to points A-D inregion 12 of FIGS. 1 and 2) at which positional information is measured and/or calculated. - In FIG. 9b,
carriage 20 has moved as far as possible on the drill rig in the +L direction to a position E and then the clamping arrangement is moved to its clamped position. Assuming that the carriage started at a position F, the drill string is lengthened by a distance d for this movement, as indicated by measuringarrangement 170. During normal drilling, a new section of drill pipe must be added to the drill string once the carriage reaches position E. As a matter of opportunity,system 10 may perform positional calculations when a drill pipe section is added todrill string 28. Therefore, ΔL will be approximately equal to the length of a drill pipe section or d in the present example. - Referring now to FIG. 9c,
carriage 20 must first be translated back to position F in the −L direction, indicated by anarrow 299, in order to be connected with a new section of drill pipe. During this −L translation, however, clampingarrangement 42 is in its clamped position in order to prevent any movement of the drill string and to support the drill string while the new drill pipe section is being attached since the drill string is no longer under the control ofcarriage 20.Processor 50 detects the clamped status of the clamping arrangement and, thereafter, ignores the translational movement as having no effect on the length of the drill string. From position F and after connection to a new drill pipe section, the carriage may once again move in the +L direction to position E whereby to continue drilling, as in FIG. 9a. - FIG. 9d illustrates the situation encountered when
drill string 28 is being retracted from the ground in the −L direction. Because clampingarrangement 42 is in its opened position, this movement affects the length of the drill string and is used byprocessor 50 as decrementing the overall length of the drill string. Such a situation may be encountered, for example, if the boring tool hits some sort of underground obstruction such as boulder 14 (FIG. 1). In this case, it is common practice for the operator of the drill rig to alternately retract and push the drill string in an attempt to break through or dislodge the obstruction. Drillstring measuring arrangement 170 advantageously accounts for each of these -movements since clampingarrangement 42 remains in its open position. Another significant advantage of measuringarrangement 170 resides in the fact that ultrasonic receiver/transmitter pair 282/284 andmicro-switch 292 are positioned on the drill rig away from anarea 294 where the drill string actually enters the ground. Inarea 294, work is sometimes performed on the drill string using heavy tools which might easily damage an electronic or electrical component positioned in close proximity thereto. Additionally, drilling mud (not shown) is normally injected down the drill string to aid in the drilling process. This mud then flows out of the bore where the drill string enters the ground creating still another hazard for sensitive components placed nearby. It is to be understood that measuringarrangement 170 may be configured in any number of alternative ways within the scope of the present invention so long as accurate tracking of the drill string length is facilitated. - Turning once again to FIGS. 1 and 2,
antenna cluster receiver 65 has been described previously as being configured for measuring components of magnetic locatingsignal 60 along one or more axes as defined, for example, byantenna structure 67. In cases where two or more axes are used, they are orthogonally disposed to one another. In such antenna arrangements particularly, for example, when two or more dipole antennas are used, it is quite difficult to precisely establish the origin of the dipole array. Therefore, the present invention provides a highly advantageous antenna which is suitable for use asantenna structure 67 within any previously described embodiment of the system of the present invention and which is specifically configured for precisely establishing the origin of its magnetic field, regardless of the number of receiving axes, as will be described immediately hereinafter. - Referring to FIG. 11 a cubic antenna configured for use in the antenna cluster receiver of the present invention is generally indicated by the
reference numeral 300.Cubic antenna 300, is configured for reception along orthogonally disposed x, y and z axes. The antenna is comprised of six essentially identical printed circuit boards 302 (only 3 of which are visible in FIG. 10) which are arranged in three pairs of two along each axis and are physically attached to one another, for example, by non-conductive epoxy (not shown) so as not to affect the antenna pattern while cooperatively defining a cube. An ortho-rectangular spiralconductive pattern 304 is formed on oneside 305 of each board with the same pattern being formed on its opposing side, although the opposing side pattern is not visible in the present figure, such that these sides are interchangeable. A via 306 electrically interconnects the opposing patterns. In this way, the voltage induced in each pattern by a changing magnetic field is such that the voltages are additive. A pair ofboards 302, arranged along a particular axis, are electrically interconnected by simply interconnecting ends 308 of confrontingpatterns 304 to one another such that the voltages are additive (i.e. all patterns spiral around their axis in the same relative direction). It should be appreciated thatcubic antenna 300 produces an antenna pattern having acenter 310 which is located precisely at the intersection of its x, y and z axes. Therefore,cubic antenna 300 may be positioned in a particular application such that the location ofcenter 310 of its antenna pattern is precisely known. The cubic antenna is particularly useful herein since the present invention contemplates highly accurate locating/steering capabilities which have not been seen heretofore. Thus, the introduction of one possible error in measurement resolution is eliminated by be: the fact that the location of the origin of the antenna pattern is precisely known. Also, the signal produced by averaging the confronting side (i.e. circuit boards 302) signals will produce a value very close to the actual value at the center of the cube. For example, if the transmitter were seven feet away from a six inch cube, the error produced using one side of the cube to approximate the signal strength is about ten times larger than the error produced by summing the signals produced by the confronting boards and dividing by two. - Continuing to refer to FIG. 11, the principles of the cubic antenna are readily applied to a single antenna or to a two antenna array by simply eliminating the foil patterns along one or two axes, respectively, such that the pc boards on the unused axes are blank and merely serve as dielectric supports for the pc boards which do support foil patterns whereby to keep the antenna pattern precisely centered. Using construction techniques developed for printed circuit board manufacturing to produce
boards 302 ensures accurate as well as economical manufacture of the cubic antenna. It should also be mentioned that the cubic antenna possesses equal efficacy in transmission applications and that its use is not intended to be limited to that of a boring tool locating/guidance system, but extends to any application which may benefit from its disclosed characteristics. Additionally, the cubic antenna may be implemented in any number of alternative ways (not shown) within the scope of the present invention, for example, using wire coils supported on a frame structure rather than pc boards. The wire coils could be either air core or wound on a ferromagnetic rod. Also, electric field shielding could easily be added to the pc board arrangement by fabricating another layer with a radial pattern that does not have closed loops which could shield the magnetic field. - Attention is now directed to FIGS. 12 and 13 which illustrate a horizontal boring operation being performed using another boring/drilling system which is manufactured in accordance with the present invention and generally indicated by the
reference numeral 500. To the extent thatsystem 500 includes certain components which may be identical to previously described components ofsystem 10, like reference numbers will be applied wherever possible and associated descriptions will not be repeated for purposes of brevity. The drilling operation is performed in a region ofground 502 including aboulder 504 and anunderground conduit 505. The surface of the ground is indicated byreference numeral 506. -
System 500 includes previously describeddrill rig 18 along withcarriage 20 received onrails 22 which are mounted onframe 24.Boring tool 26 is attached todrill string 28, as before. The underground progression ofboring tool 26 is indicated in a series of points G through R which will be considered as defining an exemplary mappedboring tool path 507 which will be used with reference to a number of systems disclosed herein. As noted above, data from which the mapped/desired boring tool path is plotted may be gained using surveying techniques. However, these data may be provided in other ways, as will be seen below. The present example considers movement ofboring tool 26 in a master xyz coordinate system wherein x extends forward from the drill rig, y extends to the right when facing in the positive x direction and z is directed downward into the ground. The origin of the xyz master coordinate system is specified byreference numeral 508 at the point where the boring tool enters the ground. - Boring
tool 26 includesdipole antenna 54 which is driven bytransmitter 56 so that magnetic locatingsignal 60 is emanated fromantenna 54. With regard tosystem 500,antenna 54 in combination withtransmitter 56 will be referred to assonde 510. In accordance with the present invention, a first antenna cluster receiver 512 (hereinafterreceiver 1 or R1) is positioned at apoint 514 within the master xyz coordinate system while a second antenna cluster receiver 516 (hereinafterreceiver 2 or R2) is positioned at apoint 518. Appropriate positioning of the receivers will be described at an appropriate point below. -
Receivers signal 60 fromsonde 510 usingcubic antennas cubic antenna 300 of FIG. 11), respectively, such that each receiver may detect signal 60 along three orthogonally disposed receiving axes which are indicated in FIG. 13 as R1x, R1y, R1z forreceiver 1 and R2x, R2y, R2z forreceiver 2.Receivers signal 60. Components of locatingsignal 60, as measured along any of these axes are denoted by preceding the subscripted name of the axis with a “B”, for example, BR1x. Receiver R1 includes atelemetry transmitter 520 and atelemetry antenna 522, while receiver R2 includes atelemetry transmitter 524 and atelemetry antenna 526. Magnetic information for R1 is encoded and transmitted as atelemetry signal 528 fromtelemetry antenna 522 tooperator console 44. At the operator console,antenna 46 receivestelemetry signal 528 which is then provided toprocessor 50.Telemetry transmitter 520,antenna 522 and signal 528 will hereinafter be referred to as atelemetry link 529. Magnetic information for R2 is similarly encoded and transmitted as atelemetry signal 530 fromtelemetry antenna 524 tooperator console 44 for subsequent processing byprocessor 50.Telemetry transmitter 524,antenna 526 and signal 530 will hereinafter be referred to as atelemetry link 531. The telemetry information from each of the receivers is used to determine the position and orientation ofsonde 510, and therebyboring tool 26, in a highly advantageous way, as will be described hereinafter. - Still referring to FIGS. 12 and 13, the initial drilling array layout must be established such that information derived from magnetic locating
signal 60, during the drilling process, is meaningful. Information which is of interest as initial conditions includes: (1) the transmitted strength of magnetic locatingsignal 60, (2) an initial yaw and pitch ofsonde 510 in the master coordinate system (measured from the master x and z axes, respectively), (3) the coordinates of R1 and R2 within the master xyz coordinate system, and (4) the orientations of the R1 and R2 receiving axes. Not all initial conditions are necessary, for example,initial condition 2 is not needed ifinitial condition 3 is known. As is the case withsystem 10, the array layout and initial conditions may be established in any number of different ways. In one such way,receivers - One method (not shown) of establishing the initial drilling array setup is through directly measuring the positions of R1 and R2 using surveying techniques. The receiving axes of each receiver may be oriented such that R1x and R2x are aimed in a direction (not shown) which is perpendicular to the desired path of the boring tool.
Receivers gimbal 72 andcounterweight 74, described previously with regard to FIG. 2, such that the cubic antenna within each receiver is maintained in a level orientation. Another method is to transmit from the boring tool transmitter at a known position, such as the starting point, and calculate the R1 and R2 positions using the same process as in FIG. 16. As will be seen immediately hereinafter, the present invention provides a highly advantageous instrument and associated method for establishing the initial array orientation and for carrying forth the drilling operation along mappedpath 507, which may be established using the aforementioned instrument, with an accuracy and ease which has not been seen heretofore. This instrument is referred to herein as a “mapping tool” and will be described in detail immediately hereinafter. - Referring now to FIG. 14, a mapping tool is generally indicated by the
reference numeral 550.Mapping tool 550 is portable and includes acase 552 having ahandle 554 and indexing pins 555 on the bottom of the case. Adisplay panel 556 is positioned for ease of viewing and akeyboard panel 558 having a series ofbuttons 559 provides for entry of necessary data. Power is provided by abattery 560. Atelemetry antenna 562 is driven by atelemetry transmitter 564 for transmitting atelemetry setup signal 566 to operator console 44 (FIG. 12) andprocessor 50 therein. These telemetry components and associated signal make up atelemetry link 567. Further components of the mapping tool include asetup dipole antenna 568 which is driven by asetup signal generator 570, amagnetometer 572, atilt meter 574 and aprocessing section 576.Setup dipole 568 is configured along withsetup signal generator 570 so as to transmit a fixed, knownstrength setup signal 580 which is measurable in the same manner as magnetic locatingsignal 60. Further details of the operation ofmapping tool 550 will be provided below in conjunction with a description of its use in setting up and establishing the initial conditions for a drilling array and bore path. - Referring now to FIGS.12-16, attention is now directed to the way in which the mapping tool illustrated in FIG. 14 functions during drilling array and bore path setup in a setup mode. To this end, reference will simultaneously be made to the flow diagram of FIG. 16. Turning specifically to the flow diagram, it is noted that system operation begins at
start step 600. Moving to step 602, drilling array components includingdrill rig 18, R1 and R2 are positioned as illustrated in FIGS. 12 and 13. As will be seen, exact positioning of these components is not critical within certain overall constraints which will be further described at an appropriate point below. For the present, it is sufficient to say that R1 and R2 must be positioned within receiving range ofsonde 510 when the latter is atorigin 508 and such that the sonde remains within range of each receiver throughout the entirety of the drill run i.e., all the way to pointR. Drill rig 18 should be pointed to begin drilling generally along mappedpath 507. Following component placement, initial conditions are established beginning instep 604 in whichmapping tool 550 is placed on R1 such that indexing pins 555 on the mapping tool engage an arrangement ofrecesses 605 on the top of the receiver. It is noted that the cooperating arrangement of pins and recesses is asymmetric to insure proper positioning of the mapping tool on a receiver such that, when so positioned,magnetometer 572 will indicate the orientation of the x axis of the receiver whiletilt meter 574 will indicate the orientation of the receiver's z axis with respect to vertical (i.e., the xy plane is level). - At this point during system operation,
display panel 556 may present a setup mode screen 606 (FIG. 15) forreceiver 1 which includes amagnetic orientation display 608 and atilt display 610 each of which is shown in graphical and numerical forms. These displays are generated by processingsection 576 from the outputs ofmagnetometer 572 andtilt sensor 574, respectively. Using these displays, the orientation of R1 with respect to north and vertical can be established as initial conditions. This receiver orientation information may be transmitted toprocessor 50 viatelemetry link 529, for example, in response to depressing afirst button 559 a on the mapping tool. - Following
step 604,step 612 is performed in whichmapping tool 550 is moved to and indexed on R2 (not shown). The R2x and R2z axes as related to north and vertical, respectively, can then be determined similarly to the procedure described above for R1 at which time asecond button 559 b may be depressed on the mapping tool. Atstep 614, upon depressing athird button 559 c,setup signal 580 is transmitted fromsetup dipole 568, with the mapping tool still positioned on R2, and is received by R1. R1 detects signal 580 along its receiving axes and transmits this information toprocessor 50 viatelemetry link 529. Using this information, the relationship between R1 and R2 is established byprocessor 50 based on the known receiver orientations and in accordance with the dipole antenna pattern. - In
step 616,mapping tool 550 is moved (not shown) toorigin 508 such thatsetup dipole 568 is oriented in the master x axis direction. Afourth button 559 d is thereafter depressed and the mapping tool transmitssetup signal 580 which is received by R1 and R2. Atelemetry signal 562 also transmits the tilt toprocessor 50. Each receiver measures signal 580 along its receiving axes and transmits this information toprocessor 50 viatelemetry links step 618,processor 50 establishes the coordinates of R1 and R2 within the master coordinate system in relation toorigin 508 by using the known initial conditions such as, for example, the orientation of the axes of R1 and R2 along with the known signal strength and orientation ofsetup dipole 568. At this time, the drilling array is essentially setup such that attention may now be directed toboring tool 26. - In
step 620, the signal strength, S, ofsonde 510 within the boring tool may be determined, for example, by placing the boring tool atorigin 508 such that R1 and/or R2 pick up magnetic locatingsignal 60 and relay this information toprocessor 50 viatelemetry links step 620 may not be required based on the exact configuration ofsystem 500. Specifically, the number of unknown variables which specify the master coordinate location and the orientation of the boring tool (x, y, z, β, φ and S) for this system is equal to the number of known variables (six, including: BR1x, BR1y, BR1z, B2x, B2y and BR2z) such that the system is determinate when S is considered as an unknown variable. In the present configuration ofsystem 500, S will be considered as an unknown variable. Therefore,step 620 is not required. Alternatively, however, S may be set as a constant initially based on the measurement ofstep 620. In this case the system is overspecified, and an LSE approach may be employed, as will be further described at an appropriate point below. It should also be understood that, if S is specified as a constant, any one magnetic component measurement may be eliminated such that a total number of five magnetic measurements are taken since only five unknowns (x, y, z, β and φ) remain in this determinate solution. Still another magnetic component measurement may be eliminated if a pitch sensor is relied on to provide physically measured pitch values. Additionally, magnetic component readings may be taken from more than two receivers. In fact, six receivers could be located at different positions and may be configured with one antenna apiece to achieve six measurements. However, it should be appreciated that considerable computational power would have to be brought to bear in order to perform the required positional computations using such a number of different receivers. - Referring now to FIG. 17 in conjunction with FIGS.12-16,
mapping tool 550 is used instep 622 to lay out or plot mappedcourse 507 in a course mapping mode. The mapped course is ultimately displayed ondisplay 47 atoperator console 44 in a drillpath elevation display 624 and a drill pathoverhead view display 625, during the drilling operation. Atarget path 626 and theactual drilling path 628 taken by the boring tool are also shown. A surface plot of the ground is indicated byreference number 629. Asteering coordinator display 630 is also provided ondisplay panel 47.Target path 626 andsteering coordinator display 630 will each be described at appropriate points below. The course mapping mode may be entered, for example, through a menu selection (not shown) ondisplay 556 or by pressing a button 559 e on the mapping tool. Once in the course mapping mode, an overall desired depth below the mappedsurface 629 of the ground may be entered/specified for the entirety or a specific point of the drilling run on the mapping tool or, alternatively, atoperator console 44. - Beginning with exemplary point G, the mapping tool (shown in phantom in FIGS. 12 and 13) may be placed on the ground or, in some embodiments, may be held directly above the desired point by the operator wherein the distance to the surface of the ground may be detected, for example, by an ultrasonic sensor in a walkover locator (see previously referenced U.S. Pat. No. 5,337,002). A
button 559 f is then depressed whereby to cause transmission ofsetup signal 580 fromdipole 568 within the mapping tool. R1 and R2 pick up the setup signal and transmit magnetic information corresponding with point G back tooperator station 44 viatelemetry links Processor 50 then calculates the position of point G and offsets this position downward to the desired depth as a point along the mapped course. Point G is then added tosurface plot 629 and mappedcourse 507 is correspondingly extended at the specified offset therebelow. It should be mentioned that FIG. 17 illustratesdisplay 47 during the actual drilling operation (i.e., the mapping mode has been completed). For purposes of brevity, the actual updating ofdisplay 47 during the mapping mode is not illustrated since the reader is familiar with such a process. However, it should be appreciated that the mapped course may be progressively updated with the addition of each new point entered by the mapping tool or re-plotted following additional processing steps which will be described below. Of course, during the mapping mode,surface plot 629 and mappedcourse 507 may extend, at most, only to the furthest mapped point fromdrill rig 18. - As
step 622 continues, subsequent points along the desired drilling path are entered in the manner of point G. Once point I has been reached, however, special provisions may be made. As previously noted,conduit 505 passes through the desired path of the boring tool at point I and at a depth which corresponds to the set drilling depth for the present drilling run. Under the assumption that the location and depth ofconduit 505 are known to the system operator, the location and depth of the conduit may be entered for point I as a drilling obstacle which can be symbolically represented ondisplay 47. In the present example, the conduit is denoted by an “X” 632 as representing an obstacle which the boring tool must pass either above or below. Additionally, the set drilling depth may be overridden for point I and set, for example, to a deeper depth such that the boring tool passes belowconduit 505. In this manner, mappedcourse 507 may advantageously be tailored to clear obstacles at known depths. In many cases, the location of such obstacles is generally known. Since damaging an underground line as a result of contact with the boring tool can be quite costly, such lines are typically partially uncovered prior to drilling so that their location and depth is, in fact, precisely known. Within this context, the use ofmapping tool 550, as described, is highly advantageous. - Still considering
step 622, another type of drilling obstacle is encountered in the mapping process upon reaching point M, i.e., boulder 504 (FIGS. 12 and 13). Of course, mapped points L, M and N define the desired lateral path around the boulder. As with X “632”, denotingconduit 505, the location ofboulder 504 may be entered for point M as a drilling obstacle which can be symbolically represented ondisplay 47. In the present example, the boulder is indicated by asolid triangle 634 which denotes that the obstacle must be steered around laterally. It is to be understood that obstacles of different types may be denoted using an unlimited number of different conventions which imply different connotations in accordance with the present invention. Symbolic identification of obstacles is particularly useful in that a system operator is reminded by such symbols that apparent anomalies in the mapped drilling path are caused by actual obstacles which must be avoided by steering. Step 622 and the mapping mode concludes upon reaching point R. - It is to be understood
mapping tool 550 may be configured in an unlimited number of different ways in accordance with the teachings herein. Data entry and selection may be performed in any manner either presently known or to be developed. For example, itsdisplay 556 may be menu driven and/or touch sensitive. One of skill in the art will recognize that the advantages provided by the mapping tool in establishing the path which is ultimately followed by the boring tool have not been seen heretofore and are not shared by typical prior art systems such as, for example, a walkover system. In that light, the mapping tool could contain additional circuitry so that it could also perform as a walkover locator. - At this juncture, it is to be understood that information from which mapped
course 507 is plotted may be entered manually, as opposed to usingmapping tool 550. Points along mappedcourse 507 may be identified, for example, using surveying techniques. As these points are entered, the system may automatically use the desired drilling depth or, as described above, an override depth may be entered. Entry of obstacles essentially remains unchanged. With regard tosystem 10, in all of its various configurations, the mapped course points, obstacles and any override depths are manually entered atoperator console 44. Once this information is available toprocessor 50, the data may be ordered (for out of sequence entries) and the curve fitting process, which leads to the generation oftarget path 626 may be carried forth, as described above. In fact,system 10 is considered to be indistinguishable fromsystem 500 from the viewpoint of an operator of the system during actual drilling. Therefore, discussions appearing below with regard to steering and guiding the boring tool alongtarget path 628, based on information presented ondisplay 47, are equally applicable tosystem 10. - Referring to FIG. 17, it should be noted that drilling, strictly as defined by mapped
course 507, may not be practical or desired in certain circumstances. Point I provides an example of one such circumstance. Specifically, point I in mappedcourse 507, is set to a considerably deeper depth than immediately adjacent points H and J so as to avoidconduit 505. This results in apronounced dip 636 in the mapped course. In most cases, a drill string will have a minimum bend radius. The latter may be violated by the sharp curvatures ofdip 636. In fact, attempting to drill along these curvatures could result in costly damage to or breakage of the drill string, along with significant project delays. Therefore, in step 638,processor 50 advantageously applies a curve fitting algorithm to mappedcourse 507 which considers important factors such as, for example, the minimum bend radius of the drill string, the overall contour of the mapped course, obstacles entered by the operator and the depths of points along the mapped path. Based on all of these factors, the curve fitting process generatestarget path 625. - In comparison with the mapped path, over points G-N, it can be seen that the target path deviates significantly from mapped
path 507. In part, this deviation is due to the required depth at point I in view of the minimum bend radius of the drill string. Additionally, the contour of the ground over points K-N is somewhat rough, as is reflected in the corresponding portion of the mapped course, plusboulder 504 is encountered (at triangle 634). Thus, deviation from the target path over points K-N can also be attributed to the curve fitting process which is configured for smoothing mappedcourse 507 so as to provide for a generally straighter drilling course rather than needlessly rough surface oscillations. At the same time, however, it should be noted that the operator may optionally override step 638, using the mapped course exclusively, or enter a target course of his/her own. It is noted that display of all of the information shown in FIG. 17 may not be required. In particular,target path 625 may be displayed in lieu of mappedcourse 507, since the system operator may have little use for the plot of the mapped course, particularly in the case of a relatively inexperienced operator. Moreover, elimination of some information may serve to avoid unnecessary confusion on the part of the system operator. Additionally, mapped points (G-R) along the mapped course may be shown or not shown at the option of the operator. Other data may also be displayed such as, for example, the distance from the drill rig to the boring tool. - It is noted that the present invention contemplates mapping points G-R out of sequence. In this way, a point may be added, modified or deleted in the mapped course even after the end point (R, in this example) has been entered. As an example with reference to point I, its set drilling depth may be increased such that the mapped course passes still deeper below (not shown)
conduit 505. When a collection of points has been entered out of sequence,system 500 may defer plotting the mapped course until such time that the operator indicates that all of the points for the plot have been entered. Thereafter, the points may be ordered for plotting purposes prior to applying curve fitting in step 638. - Referring to FIGS. 16 and 17, once
target path 626 has been established, drilling may begin. Instep 642, for any particular position of the boring tool, an initial orientation (φ and β) is assumed ofsonde 510 along with its signal strength, S. Atorigin 508, typical initial values may be assigned such as, for example, φo=30°, βo=0° and a typical value for S. For subsequent positions, the last known φ, β and S may be used. For example, if boringtool 26 has just arrived at point H (not shown) enroute from point G, step 642 may initially assume the values φG, βG and SG. As will be seen, these assumed values are not particularly critical in that the system automatically computes correct values which replace the initially assumed values. Moreover,processor 50 may modify φG, βG and SG for the assumed values based, for example, on any steering actions taken by the operator since point G. - In
step 644 and during drilling, components BR1x, BR1y, BR1z of magnetic locatingsignal 60 are measured along R1's receiving axes while instep 646 components BR2z, BR2y and BR2z of magnetic locatingsignal 60 are measured along R2's receiving axes. As described above, it should be appreciated that, once values for φ, β and S are assumed, only one position within the master coordinate system will satisfy the resulting dipole relationship for this determinate system. Followingstep 644, R1antenna solution step 648 is performed wherein the assumed values for φ, β, and S are used in conjunction with BR1x, BR1y and BR1z to compute an (x,y,z)R1 position. This computation is preferably performed using the triple transform technique which was described above with reference to FIGS. 5 and 6a-c. Concurrently, R2antenna solution step 650 is performed in a similar manner using BR2x, BR2y and BR2z along with φ, β and S to compute an (x,y,z)R2 position. (x,y,z)R1 and (x,y,z)R2 are provided to step 652 and a solution difference value is determined. - In
step 654, the solution difference value is tested so as to determine if the solutions agree. If the test is satisfied,step 656 is performed in which the resolved position,satisfying step 654, is stored. Thereafter, a predetermined period of time may be permitted to elapse prior to returning to magneticfield measuring steps solution procedure 658 is entered in which new values for φ, β and S are assumed.Solution procedure step 658 is configured for converging the (x,y,z)R1 and (x,y,z)R2 positions by calculating new values for S, β and φ, much like previously describedsolution procedure step 140 of FIG. 4, by using a known convergence algorithm such as, for example, simplex or steepest descent. - The new values of S, β and φ are then assumed by the system and used in
steps step 654 is satisfied. As the boring tool progresses along itsactual drilling path 628, its position may be calculated for a multitude of points therealong. Using the triple transform technique, it has been found that a position may be calculated approximately every 0.01 seconds using a Pentium processor with the physical separation of the positions, of course, being dependent upon the speed of the boring tool. It should be appreciated that each position determination performed in accordance with the process described by FIG. 16 is essentially independent of previous position determinations. - The above described procedure can also be used to determine the locations of R1 and R2 if the boring tool's position and orientation are known, since the procedure calculates the position of the boring tool relative to R1 and R2. For this implementation, the angular orientation of R1 and R2 must be known. This can be accomplished by leveling and aligning one axis on each cluster in a known direction. For example, the direction could be relative to north or some optical reference such as, for example, another cluster or some object visible (i.e. line of sight) to both R1 and R2.
- Referring to FIGS. 12 and 17, drill
path elevation display 624 and drill pathoverhead view display 625 are actively updated byprocessor 50 in accordance with the underground progression ofboring tool 26 alongactual drilling path 628 whereby to aid an operator ofsystem 500 in guiding the boring tool. Previously mentionedsteering coordinator display 630 provides additional assistance by graphically showing the operator an appropriate steering direction which will either keep the boring tool ontarget path 626, if it is on course, or return the tool to the target path, if it is off course.Steering coordinator display 630 includescross hairs 660 and asteering indicator 662. The specific behavior and position of the steering indicator is dependent upon the particular steering action which should be undertaken by anoperator using controls 52 atoperator console 44. Normally, the drill string and boring tool rotate during straight boring. When it is desired to steer the boring tool, its rotation is stopped andasymmetric face 27 of the tool is oriented so as to deflect the tool in the desired direction. In FIG. 17, steeringindicator 662 is centered oncross hairs 660 and rotating in the direction indicated by anarrow 664. This behavior simulates the action of the boring tool for straight ahead boring and, thereby, indicates that boring should proceed straight ahead in order to remain on course. The steering coordinator display of FIG. 17 is appropriate for positions alongtarget path 626 corresponding to points H and K since the boring tool was on course as it passed these points, in view of the completed portion ofactual drilling path 628. In other words, the steering coordinator display of FIG. 17 would not have been correct for points H and K if, in fact, the tool had been off course. - Turning to FIGS. 17 and 18,
steering coordinator display 630 is illustrated for the position alongtarget path 626 corresponding with point I. In this example, steeringindicator 662 does not rotate but, rather, points at the center ofcross hairs 660 from below and slightly to the right. Comparison of FIG. 18 with FIG. 17 reveals that, at point I, mappedcourse 626 is proceeding upward after having passed underconduit 505, in drillpath elevation view 624, and that actual drilling path 628 (denoting the actual position ofboring tool 26 at the time that it passed by point I), in drill pathoverhead view 625, is slightly to the right oftarget path 626. Therefore, the operator, in order to return to the target path, should steer upward and slightly to the left, as indicated by the pointer ofsteering indicator 662. - FIG. 19 in conjunction with FIG. 17 illustrates still another steering situation corresponding with point M. Comparison of FIG. 19 with FIG. 17 shows that, at point M, mapped
course 626 is curving downward, in drillpath elevation view 624, and curving to the left in drill pathoverhead view 625. Furthermore,actual drilling path 628 is slightly to the right oftarget path 626. Therefore, steeringindicator 662 points at the center ofcross hairs 660 from above and to the right. In response, the operator should steer downward and to the left, as indicated by the pointer ofsteering indicator 662, in order to return to the target path. - It is mentioned that the exact algorithm used to drive the steering display can include consideration of the minimum bend radius of the drill pipe. Such consideration would permit the shortest distance to return the boring tool to the desired path without over stressing the drill pipe. Other algorithms could also be employed which reflect specific drill rig or operation restrictions.
- Referring to FIGS. 1 and 12, it should also be mentioned, with further regard to the subject of steering the boring tool, that the present invention contemplates implementation of a fully automatic steering arrangement. For example, an
automatic steering module 665 may be added tooperator console 44 as shown forsystems automatic steering module 665 may interface processor 50 (or may incorporate another processor which is not shown) with thecontrols 52 using suitable actuators (not shown). It is considered that the development of appropriate automatic steering software is considered to be within the capability of one skilled in the art. In an automatic steering implementation, the role of the system operator may primarily comprise setting up the drilling array and, thereafter, monitoring the progress of the boring tool. As another feature, even in the non-automatic implementations described above, an audio and/or visual warning may be provided if the position of the boring tool deviates from the target path by more than a predetermined distance, thereby allowing for inattentiveness on the part of the operator. - Having described one configuration of
system 500 in which the signal strength, S, ofsonde 510 and pitch, φ, of boringtool 26 are both considered as unknown variables, a discussion will now be provided for alternative configurations ofsystem 500 in which S and/or φ are considered as known or measured variables. Since the impacts of such changes on the flow diagram of FIG. 16 are minimal, reference will be made thereto for purposes of the present discussion with additional descriptions being provided only for modified steps or for added steps. In accordance with a first alternative configuration, S is measured instep 620 and, thereafter, set as a constant, Sc, for the entirety of the drilling run.Receiver 1 andReceiver 2 antenna solution steps 648 and 650 then utilize SC in determining (x,y,z)R1 and (x,y,z)R2, respectively. Sincesystem 500 is overspecified with S to Sc,solution comparison step 652 may utilize an LSE approach in a manner which is consistent with the LSE approaches described previously with regard tosystem 10. Specifically, step 652 may compute the square error, SE, based on positions (xyz)R1 and (xyz)R2 wherein: - SE=W x(x R1 2 −x R2 2)+W y(y R1 2 −y R2 2)+W z(z R1 2 −z R2 2) (19)
- Where Wx, Wz and Wy are optional weighting functions used to improve accuracy, as described with regard to
system 10. -
System 652 can compare the two solutions using the square error in position, as previously described, or can compare the two solutions based on calculated flux at the two antenna receiver clusters. For this latter approach, the position calculated based on the flux measured atreceiver 1 is used to calculate the flux atreceiver 2 and vice versa. The square differences can then be summed to form an error function which can be minimized bysolution procedure 658. Weighting functions can be incorporated into the process to address such practical problems such as measurement accuracy and background noise. One such weighting function is the signal (flux) to noise ratio (S/N). The accuracy of a measurement diminishes as the signal level approaches the noise level. Therefore, if the square flux error, that is, the square of the difference between the measured and calculated flux is multiplied by the S/N ratio, then more emphasis would be applied to the larger signals which would be more accurate. Limits could be applied to the weighting factors, for example, they would be limited to values less than ten. Any S/N above the value of ten would be set to ten. This would eliminate undue dominance of the solution on any one or a few variables, yet reduce the influence of the solution on signals near the noise level. - It should be mentioned here that the error function just described could also be applied to the dead reckoning system. For that system, the position determined by the integration path would be used to calculate the flux at the antenna. The calculated flux component or components would be differenced from the measured flux component or components and squared to form the square error function. Weighting functions could also be applied for the previously described purposes.
- Position resolved
step 654 may then determine if SE is at a minimum value i.e., the LSE. If so,step 656 is performed. On the other hand, if SE is not at a minimum,solution procedure step 658 is performed which is configured for converging the two positions based on the square error by calculating new values for β and φ, much like previously describedsolution procedure step 218 of FIG. 7, by using a known convergence procedure such as, for example, Simplex or steepest descent. The new values of β and φ are returned tosteps step 654. - In a second alternative configuration of
system 500 and referring initially to FIGS. 12 and 16, previously describedpitch sensor 174, positioned in boringtool 26, may be used to measure, φ, such that φ is no longer an unknown variable. It is noted that, for the present example, S will be considered as an unknown. The FIG. 16 flow diagram is changed in one respect, as a result of this configuration, in that an additional step (not shown) is inserted at anode 666 immediately prior tosteps Steps step 654 checks for the LSE. Instep 658, the solution procedure provides new values for P and S which are returned tosteps - A third alternative configuration (not shown) may be implemented in which S is considered as a constant and φ is measured. This configuration is overspecified by two variables. A detailed discussion will not be provided herein for this alternative in that it is considered that one of skill in the art will readily be capable of constructing and using such an implementation in view of the preceding discussions. It should also be mentioned that hybrid configurations may be developed which combine selected features of
system 10 andsystem 500. In fact, the use ofpitch sensor 174 in the second and third alternative configurations, immediately above, may be viewed as such a hybrid. Also, during a particular boring run certain parameters may be determined in different ways. For example, it has already been discussed with regard tosystem 10 that pitch may be determined by a pitch sensor while stationary and may be calculated while drilling. - Turning now to FIG. 20, in which an optimal
drilling array layout 667 forsystem 500 is diagrammatically illustrated, R1 and R2 are shown separated by distance d1 along apath 668. Distance d1 forms the diameter of acircular drilling area 670.Drill rig 18 is arranged along the perimeter ofdrilling area 670 such that an intendeddrilling path 672 extends to adrilling target 674. Intendeddrilling path 672 is substantially perpendicular to and bisects d1. Additionally, the intended drilling path is entirely withindrilling area 670. It should be appreciated that errors in position determination based onmagnetic locating signal 60 may be encountered in certain circumstances. For example, a mass offerrous metal 676 may distort the magnetic locating signal. In accordance with the present invention, it has been discovered that the drilling array layout of FIG. 20 is highly advantageous for a particular reason. Specifically, when an error in position determination is encountered due to such distortion withindrilling area 670,system 500 exhibits a remarkable ability to recover from such errors, resulting in the ultimate arrival of boringtool 26 attarget 674. Other studies by Applicants have shown that as long as boringtool 26 is withincircle 670, regardless of tool orientation, the calculated position is less sensitive to errors. While intendeddrilling path 672 is illustrated as being straight and perpendicular to d1, this is not a requirement so long as boringtool 26 is constrained todrilling area 670, and the receivers are constrained to opposing positions on any diameter ofarea 670,system 500 continues to exhibit a substantial ability to recover from positional errors. Outside the circle, the system will still function effectively, but can be more sensitive to error. - Turning now to FIG. 21, a specially modified service line installation version of
system 500 is illustrated and will be referred to hereinafter assystem 700. In thatsystem 700 includes certain components which are identical with components used in previously describedsystems System 700 is positioned in astreet 702 opposing ahome 704 with acurb 706 andsidewalk 708 therebetween. Apit 710 has been excavatedadjacent home 704. The configuration ofsystem 700 is tailored for use in the drilling configuration of FIG. 21 wherein it is desired to install a service line such as, for example, a fiber optic line (not shown) from the street tohome 704. Specific advantages ofsystem 700 in this drilling application will be described in detail at appropriate points below. - Still referring to FIG. 21,
system 700 includesdrill rig 18 along with a pair of receivers R3 and R4. It should be mentioned thatdrill rig 18 is normally mounted on a truck or other vehicle in order to facilitate movement of the rig, however, this is not shown for purposes of simplicity. R3 and R4 includecubic antennas 300 c and 300 d, respectively. Anelectronics package 712 is associated with each cubic antenna. Electrical cables, which are not shown for purposes of simplicity, connectelectronics packages 712 withoperator console 44. R3 and R4, unlike previously described receivers R1 and R2, do not require telemetry components. Similarly,operator console 44 does not require telemetry components for the present configuration. Thus, the attendant costs of telemetry links are advantageously eliminated. - In accordance with the present invention, R3 and R4 are mounted on
outward ends 714 of a pair ofreceiver arms hinge arrangements 722 which are fixedly attached to the sides of the drill rig. The receiver arms are moveable between a transport position (shown in phantom) against the sides of the drill rig and a locked drilling position extending outwardly from the drill rig, as depicted. It should be appreciated that, when the receiver arms are in their locked drilling positions, R3 and R4 are in known positions and orientations which may be precisely measured, for example, as a manufacturing step and preprogrammed into the system. For this reason, very little setup is required once the system is located at a drilling site beyond simply swinging out the arms and mapping points, as needed, along a desireddrilling path 723. Mapping may be performed using previously describedmapping tool 550, keeping in mind that the associated telemetry components atoperator console 44 should be installed, if all of the advantages of the mapping tool are to be realized. If it is desired to hold the cost ofsystem 700 to the lowest possible level, one highly advantageous technique may be employed which avoids the need for the mapping tool, as will be described immediately hereinafter. - Continuing to refer to FIG. 21,
sonde 510 is typically configured for removal from boringtool 26 such that its batteries may be replaced or a different sonde may be installed. In this removed state,sonde 510 may be used as an elementary mapping tool. For example, the sonde (shown in phantom) at the location ofpit 710 may be positioned on the ground, while transmitting. Atoperator console 44, the operator may indicate to the system that the present location of the sonde is the end point of the drill run including a specific downward offset. The system then may locate the sonde at the pit and, with this straightforward process, a linear drilling run has been mapped. Of course, intermediate points on the drilling run whereby, for example, to avoid obstacles or for uneven terrain may be entered in a similar manner by appropriate positioning of the sonde and entry of such points into the system. - Having described the features of
system 700, one of skill in the art will appreciate its usefulness and cost effectiveness in the installation of utility service lines, for example, to homes. With regard to cost effectiveness, one important consideration resides in the fact thatsystem 700 may readily be operated by a single person. In the case where a utility company is installing lines, such as fiber optic cables, to essentially every home within an entire city, any time saved in setup during the use of an underground boring system for a single installation will be multiplied many times over.System 700 provides the capability to install such lines with an ease and at a rate which has not been seen heretofore. However, it is to be understood that its use is not considered as being limited to service line installation, but effectively extends to other drilling applications, as will be mentioned hereinafter. - Reference is now taken to FIG. 22 which illustrates still another version of
system 500 that is generally indicated by thereference number 800 and referred to hereinafter assystem 800.System 800 is configured for drilling into theside 802 of ahill 804 and includes certain components which are identical with components used inaforedescribed systems system 800 may also be truck or other vehicle mounted (not shown). Drilling into a slope, hill or mountain may be performed, for example, in cases wherehill 804 is comprised of unstable soils and/or formations. In order to stabilize the soils or formations, steel rods (not shown) may be inserted into bores made bysystem 800. In the prior art, the task of guided drilling into a hillside has been somewhat daunting. Prior art walkover systems are not particularly suited to this application since a walkover locator must be placed directly above the boring tool in order to ascertain its position. This may not be practical for two primary reasons: (1)hillside 802 may be so steep that a person is not able to walk thereupon and (2) soil depth d2, directly above the boring tool, may rapidly increase in depth to such an extent that the “through-ground” transmission range from the boring tool to the walkover locator is quickly exceeded. Prior art homing type systems (not shown) also exhibit impracticality in this application. In these systems, the boring tool homes in on a receiving antenna system which must be positioned at or near the ultimate destination of the boring tool. Obviously, this is not a practical approach to the problem of guided drilling into a hillside since there is no way to initially position the antenna system near the end-point of the bore. In contrast,system 800, provides a practical and highly advantageous approach to this problem, as will be seen immediately hereinafter. - Continuing to refer to FIG. 22,
system 800 further includes receivers R3 and R4 supported bygimbals 74 which are, in turn, received bytripods 73. The receivers are maintained in a levelorientation using counterweights 72 or leveled in some other way. Each receiver may also include asight glass 806 which is aligned along a particular receiving axis such as, for example, the x axis (not shown) of the cubic antenna within each receiver. The sizes ofsight glasses 806 have been exaggerated for illustrative purposes. R3 and R4 can be connected in lieu of telemetry withoperator console 44 using a pair ofcables 807 in a manner which is similar to that described with regard tosystem 700, above. As is the case with all systems disclosed herein, the initial orientation of receivers R3 and R4 must be established prior to beginning the drilling operation. To that end, the use of a mapping tool has been avoided, once again, as a cost saving measure. Positioning of R3 and R4 is accomplished in the present example in an effective, but low cost manner. Specifically,system 800 uses arope arrangement 808 which is attached betweentripods 73 supporting the receivers and a point 810 on the drill rig.Rope arrangement 808 includes afirst rope length 812 which extends from the drill rig to R3's tripod and asecond rope length 814 which extends from the drill rig to R4's tripod. Athird rope length 816 extends between the R3 and R4 tripods. This latter length includes acenter marker 818 which is positioned midway between the receivers. It is noted that the ropes are attached to the tripods such that the leveling action of the gimbals and counterweights, if used, is not affected. When setting up the drilling array,rope arrangement 808 is simply extended, as shown, such thatcenter marker 818 is positioned dead ahead ofdrill rig 18 along a straight drilling path therefrom. Orientation of the receivers may then be set usingsight glasses 806 to aim the x axis of each receiver alongrope 816. - At this point, the x and y positions of the receivers have been established relative to the drill rig along with the orientations of the receivers. The vertical or z axis positions of the receivers are now established by first transmitting from
sonde 510 at a known position and orientation, such as the origin, which may, for example, be at aposition 820 just beyond the end of the drill rig frame prior to extendingdrill string 28. Thereafter, using the magnetic data measured by each receiver, their z axis positions may be determined relative toposition 820. Drilling may then proceed. Alternatively, of course,mapping tool 550 may be used in establishing the illustrated drilling array layout ofsystem 800. Many other methods for establishing the drilling array layout may also be devised within the scope of the present invention. It is to be understood thatsystems - Referring now to FIG. 23,
system 500 is illustrated in a configuration which is specifically adapted for long drilling runs.Drill rig 18 is illustrated, along with R1 and R2, setup and performing such a long drilling run along a drilling path 840 in anarea 841 whereinboring tool 26 has reached a point T. R1 and R2 (shown in phantom) are initially located atpositions sonde 510 and receivers R1/R2 which is indicated as a distance d3. For this initial positioning of R1 and R2, any point along drilling path 840 up to point T is, therefore, within range of both receivers, as is required for determining the position ofboring tool 26. Furthermore, an angle a is formed between d3 and drilling path 840 such that the maximum range, R, of boringtool 26 fromdrill rig 18 is determined by the equation: - R=2·d3 cos α (20)
- At point T, the position and orientation of the boring tool are known based upon magnetic information gathered by R1 and R2 at
positions position 846 which is generally adjacent to point T while R2 is moved to aposition 848 which is generally adjacent to a point U, along drilling path 840. Points T and U are separated by a distance of approximately d3. - Continuing to refer to FIG. 23 and after the receivers have been moved to
positions positions signal 60 from the known location and orientation ofboring tool 26. These determinations are possible, based on dipole relations, since the only unknowns are the x, y and z coordinates for each receiver. Having established the coordinates forpositions R1at position 846 by approximately d3 such that any further separation between the boring tool and R1 is likely to result in loss of locatingsignal 60 by R1. Therefore, R1 is moved to a position 850 (shown in phantom) that is near a point V just beyond apit 852 which is the ultimate target of the present drilling operation. Point V is separated from point U by a distance d4 which is less than or equal to d3. In fact, R2 could be positioned somewhere betweenpit 852 and R1, since the boring tool would remain in range of both receivers on the remainder of path 840 to the pit. With R1 atposition 850, drilling to pit 852 may be completed. It should be appreciated that this “leap-frog” technique may be repeated indefinitely so long as aboveground telemetry links 529 and 531 (previously described) remain within range ofdrill rig 18. Such telemetry links typically use a 460 MHz carrier frequency and have a range exceeding one quarter of a mile. It should also be appreciated that this range could be still further extended using, for example, a relay receiver/transmitter or cabling (neither of which is shown). - The leap-frog technique has been implemented immediately above using only the previously described components of
system 500. However, it should be appreciated that additional components may serve to expedite the drilling run. For example, a third telemetry receiver (not shown), essentially identical with R1 and R2, may be added to the system such that two receivers remain operational while the third receiver is being relocated such that drilling is continuous. With a suitable number of receivers, it is possible to make an extended boring run without the need to move receivers which could reduce labor in performing the run and essentially eliminate interruption of the drilling process. - Referring once again to FIGS. 21 and 22, it should also be appreciated that the leap-frog technique is readily applicable to
systems - For all systems disclosed herein, the present invention contemplates transmission of a magnetic locating signal from the boring tool using a spread spectrum technique. This technique is highly advantageous in extending through ground range and reducing the effects of interfering signals which are proliferating at a remarkable rate, particularly in urban areas.
- In that the boring tool apparatus and associated methods disclosed herein may be provided in a variety of different configurations, it should be understood that the present invention may be embodied in many other specific forms without departing from the spirit or scope of the invention. Therefore, the present examples and methods are to be considered as illustrative and not restrictive, and the invention is not to be limited to the details given herein, but may be modified within the scope of the appended claims.
Claims (32)
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/021,882 US6457537B1 (en) | 1997-04-16 | 2001-12-13 | Mapping tool for tracking and/or guiding an underground boring tool |
US10/229,559 US6640907B2 (en) | 1997-04-16 | 2002-08-27 | Mapping tool for tracking and/or guiding an underground boring tool |
US10/656,692 US6920943B2 (en) | 1997-04-16 | 2003-09-04 | Mapping tool for tracking and/or guiding an underground boring tool |
US11/165,886 US7080698B2 (en) | 1997-04-16 | 2005-06-24 | Mapping tool for tracking and/or guiding an underground boring tool |
US11/448,690 US7159672B2 (en) | 1997-04-16 | 2006-06-07 | Mapping tool for tracking and/or guiding an underground boring tool |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US08/835,834 US6035951A (en) | 1997-04-16 | 1997-04-16 | System for tracking and/or guiding an underground boring tool |
US09/422,814 US6095260A (en) | 1997-04-16 | 1999-10-21 | System, arrangements and associated methods for tracking and/or guiding an underground boring tool |
US09/596,316 US6454023B1 (en) | 1997-04-16 | 2000-06-15 | Mapping tool for tracking and/or guiding an underground boring tool |
US10/021,882 US6457537B1 (en) | 1997-04-16 | 2001-12-13 | Mapping tool for tracking and/or guiding an underground boring tool |
Related Parent Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US09/596,316 Continuation US6454023B1 (en) | 1997-04-16 | 2000-06-15 | Mapping tool for tracking and/or guiding an underground boring tool |
US09/596,316 Division US6454023B1 (en) | 1997-04-16 | 2000-06-15 | Mapping tool for tracking and/or guiding an underground boring tool |
Related Child Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/229,559 Continuation US6640907B2 (en) | 1997-04-16 | 2002-08-27 | Mapping tool for tracking and/or guiding an underground boring tool |
US10/229,559 Division US6640907B2 (en) | 1997-04-16 | 2002-08-27 | Mapping tool for tracking and/or guiding an underground boring tool |
Publications (2)
Publication Number | Publication Date |
---|---|
US20020079136A1 true US20020079136A1 (en) | 2002-06-27 |
US6457537B1 US6457537B1 (en) | 2002-10-01 |
Family
ID=25270593
Family Applications (10)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US08/835,834 Expired - Lifetime US6035951A (en) | 1997-04-16 | 1997-04-16 | System for tracking and/or guiding an underground boring tool |
US08/968,636 Expired - Lifetime US6005532A (en) | 1997-04-16 | 1997-11-12 | Orthogonal antenna arrangement and method |
US09/422,814 Expired - Lifetime US6095260A (en) | 1997-04-16 | 1999-10-21 | System, arrangements and associated methods for tracking and/or guiding an underground boring tool |
US09/425,319 Expired - Lifetime US6047783A (en) | 1997-04-16 | 1999-10-21 | Systems, arrangements and associated methods for tracking and/or guiding an underground boring tool |
US09/596,316 Expired - Lifetime US6454023B1 (en) | 1997-04-16 | 2000-06-15 | Mapping tool for tracking and/or guiding an underground boring tool |
US10/021,882 Expired - Lifetime US6457537B1 (en) | 1997-04-16 | 2001-12-13 | Mapping tool for tracking and/or guiding an underground boring tool |
US10/229,559 Expired - Fee Related US6640907B2 (en) | 1997-04-16 | 2002-08-27 | Mapping tool for tracking and/or guiding an underground boring tool |
US10/656,692 Expired - Fee Related US6920943B2 (en) | 1997-04-16 | 2003-09-04 | Mapping tool for tracking and/or guiding an underground boring tool |
US11/165,886 Expired - Fee Related US7080698B2 (en) | 1997-04-16 | 2005-06-24 | Mapping tool for tracking and/or guiding an underground boring tool |
US11/448,690 Expired - Fee Related US7159672B2 (en) | 1997-04-16 | 2006-06-07 | Mapping tool for tracking and/or guiding an underground boring tool |
Family Applications Before (5)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US08/835,834 Expired - Lifetime US6035951A (en) | 1997-04-16 | 1997-04-16 | System for tracking and/or guiding an underground boring tool |
US08/968,636 Expired - Lifetime US6005532A (en) | 1997-04-16 | 1997-11-12 | Orthogonal antenna arrangement and method |
US09/422,814 Expired - Lifetime US6095260A (en) | 1997-04-16 | 1999-10-21 | System, arrangements and associated methods for tracking and/or guiding an underground boring tool |
US09/425,319 Expired - Lifetime US6047783A (en) | 1997-04-16 | 1999-10-21 | Systems, arrangements and associated methods for tracking and/or guiding an underground boring tool |
US09/596,316 Expired - Lifetime US6454023B1 (en) | 1997-04-16 | 2000-06-15 | Mapping tool for tracking and/or guiding an underground boring tool |
Family Applications After (4)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/229,559 Expired - Fee Related US6640907B2 (en) | 1997-04-16 | 2002-08-27 | Mapping tool for tracking and/or guiding an underground boring tool |
US10/656,692 Expired - Fee Related US6920943B2 (en) | 1997-04-16 | 2003-09-04 | Mapping tool for tracking and/or guiding an underground boring tool |
US11/165,886 Expired - Fee Related US7080698B2 (en) | 1997-04-16 | 2005-06-24 | Mapping tool for tracking and/or guiding an underground boring tool |
US11/448,690 Expired - Fee Related US7159672B2 (en) | 1997-04-16 | 2006-06-07 | Mapping tool for tracking and/or guiding an underground boring tool |
Country Status (1)
Country | Link |
---|---|
US (10) | US6035951A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004055325A1 (en) * | 2002-12-18 | 2004-07-01 | Cmte Development Limited | Drilling head position display |
US7009399B2 (en) | 2002-10-09 | 2006-03-07 | Deepsea Power & Light | Omnidirectional sonde and line locator |
US9696447B1 (en) | 2002-10-09 | 2017-07-04 | SeeScan, Inc. | Buried object locating methods and apparatus using multiple electromagnetic signals |
US10428640B1 (en) * | 2018-10-15 | 2019-10-01 | Ozzie's Enterprises LLC | Borehole mapping tool and methods of mapping boreholes |
Families Citing this family (120)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6417666B1 (en) | 1991-03-01 | 2002-07-09 | Digital Control, Inc. | Boring tool tracking system and method using magnetic locating signal and wire-in-pipe data |
US5720354A (en) * | 1996-01-11 | 1998-02-24 | Vermeer Manufacturing Company | Trenchless underground boring system with boring tool location |
US6035951A (en) * | 1997-04-16 | 2000-03-14 | Digital Control Incorporated | System for tracking and/or guiding an underground boring tool |
US6250402B1 (en) * | 1997-04-16 | 2001-06-26 | Digital Control Incorporated | Establishing positions of locating field detectors and path mappings in underground boring tool applications |
US5988243A (en) * | 1997-07-24 | 1999-11-23 | Black & Decker Inc. | Portable work bench |
US6079506A (en) * | 1998-04-27 | 2000-06-27 | Digital Control Incorporated | Boring tool control using remote locator |
US6351215B2 (en) * | 1998-06-02 | 2002-02-26 | Rf Code, Inc. | Monitoring antenna system |
US6166506A (en) * | 1998-06-19 | 2000-12-26 | Tregaskiss, Ltd. | Wireless safety clutch |
CA2361240A1 (en) | 1999-01-13 | 2000-07-20 | Vermeer Manufacturing Company | Automated bore planning method and apparatus for horizontal directional drilling |
US6401051B1 (en) * | 1999-04-20 | 2002-06-04 | Sun Microsystems, Inc. | Method and apparatus for locating buried objects |
US6756783B2 (en) | 1999-06-01 | 2004-06-29 | Merlin Technology, Inc | Multi-frequency boring tool locating system and method |
US6308787B1 (en) | 1999-09-24 | 2001-10-30 | Vermeer Manufacturing Company | Real-time control system and method for controlling an underground boring machine |
US6408952B1 (en) | 1999-12-17 | 2002-06-25 | Vermeer Manufacturing Company | Remote lock-out system and method for a horizontal direction drilling system |
US6766869B2 (en) | 1999-12-17 | 2004-07-27 | Vermeer Manufacturing Company | Remote lock-out system and method for a horizontal directional drilling machine |
DE20008413U1 (en) * | 2000-05-11 | 2001-09-13 | CAMERON GmbH, 29227 Celle | Measuring device |
AU2002230389A1 (en) | 2000-06-14 | 2002-04-29 | Vermeer Manufacturing Company | Utility mapping and data distribution system and method |
US20080196910A1 (en) * | 2000-06-20 | 2008-08-21 | Radle Patrick J | Electrical sensing device modules for attachment to power tools and drills |
US6871712B2 (en) | 2001-07-18 | 2005-03-29 | The Charles Machine Works, Inc. | Remote control for a drilling machine |
WO2002006633A1 (en) * | 2000-07-18 | 2002-01-24 | The Charles Machine Works, Inc. | Remote control for a drilling machine |
US6496008B1 (en) * | 2000-08-17 | 2002-12-17 | Digital Control Incorporated | Flux plane locating in an underground drilling system |
US6717410B2 (en) | 2000-09-08 | 2004-04-06 | Merlin Technology, Inc. | Bore location system |
FR2819640B1 (en) * | 2001-01-12 | 2005-09-30 | France Telecom | ELECTROMAGNETIC PROBE |
US7250768B2 (en) * | 2001-04-18 | 2007-07-31 | Baker Hughes Incorporated | Apparatus and method for resistivity measurements during rotational drilling |
US6737867B2 (en) | 2001-08-22 | 2004-05-18 | Merlin Technology, Inc. | Locating arrangement and method using boring tool and cable locating signals |
WO2003027714A1 (en) * | 2001-09-25 | 2003-04-03 | Vermeer Manufacturing Company | Common interface architecture for horizontal directional drilling machines and walk-over guidance systems |
US6927741B2 (en) * | 2001-11-15 | 2005-08-09 | Merlin Technology, Inc. | Locating technique and apparatus using an approximated dipole signal |
US7443359B2 (en) * | 2002-03-12 | 2008-10-28 | Merlin Technology, Inc. | Locating technique and apparatus using an approximated dipole signal |
US6727704B2 (en) * | 2001-11-20 | 2004-04-27 | Marlin Technology, Inc. | Boring tool tracking/guiding system and method with unconstrained target location geometry |
US6538616B1 (en) | 2001-12-18 | 2003-03-25 | The United States Of America As Represented By The National Security Agency | Cubic antenna |
US6654691B2 (en) * | 2002-02-08 | 2003-11-25 | Schlumberger Technology Corporation | Well-log presentation, software and method thereof |
TW521455B (en) * | 2002-02-08 | 2003-02-21 | Taiwan Telecomm Industry Co Lt | Diminished panel antenna of digital TV |
US7000710B1 (en) * | 2002-04-01 | 2006-02-21 | The Charles Machine Works, Inc. | Automatic path generation and correction system |
US20070129434A1 (en) * | 2002-08-29 | 2007-06-07 | Richard Smith-Carliss | Analgesics and methods of use |
GB0222321D0 (en) | 2002-09-25 | 2002-10-30 | Weatherford Lamb | Expandable connection |
US6776246B1 (en) | 2002-12-11 | 2004-08-17 | The Charles Machine Works, Inc. | Apparatus and method for simultaneously locating a fixed object and tracking a beacon |
US7201236B1 (en) | 2002-12-11 | 2007-04-10 | The Charles Machine Works, Inc. | Apparatus and method for tracking multiple signal emitting objects |
US6868921B2 (en) | 2003-01-13 | 2005-03-22 | Merlin Technology, Inc. | Boring tool tracking fundamentally based on drill string length, pitch and roll |
WO2004076799A2 (en) * | 2003-02-24 | 2004-09-10 | The Charles Machine Works, Inc. | Configurable beacon for a horizontal boring machine |
US6920932B2 (en) * | 2003-04-07 | 2005-07-26 | Weatherford/Lamb, Inc. | Joint for use with expandable tubulars |
GB0311721D0 (en) | 2003-05-22 | 2003-06-25 | Weatherford Lamb | Tubing connector |
US7887103B2 (en) | 2003-05-22 | 2011-02-15 | Watherford/Lamb, Inc. | Energizing seal for expandable connections |
WO2005008017A2 (en) * | 2003-07-08 | 2005-01-27 | J.H Fletcher & Co. Inc. | Instrumented drill head, related drilling/bolting machines, and methods |
US7647987B2 (en) * | 2004-02-26 | 2010-01-19 | The Charles Machine Works, Inc. | Multiple antenna system for horizontal directional drilling |
US20050211469A1 (en) * | 2004-03-24 | 2005-09-29 | Vector Magnetics, Llc | Elongated coil assembly for electromagnetic borehole surveying |
US7946356B2 (en) * | 2004-04-15 | 2011-05-24 | National Oilwell Varco L.P. | Systems and methods for monitored drilling |
US7372276B2 (en) * | 2005-02-16 | 2008-05-13 | Goldak, Inc. | Digital locating system and device for underground object detection |
EP1703300A1 (en) * | 2005-03-17 | 2006-09-20 | Leica Geosystems AG | Method and system for determining position and orientation of an object |
US7151375B2 (en) | 2005-04-13 | 2006-12-19 | Marlin Technology, Inc. | Distinguishing false signals in cable locating |
US9329297B2 (en) | 2005-05-13 | 2016-05-03 | The Charles Machine Works, Inc. | Dipole locator using multiple measurement points |
US8928323B2 (en) | 2005-05-13 | 2015-01-06 | The Charles Machines Works, Inc. | Dipole locator using multiple measurement points |
WO2006124520A2 (en) * | 2005-05-13 | 2006-11-23 | The Charles Machine Works, Inc. | Dipole locator using multiple measurement points |
ATE438786T1 (en) | 2005-08-23 | 2009-08-15 | Charles Machine Works | SYSTEM FOR TRACKING AND MAINTAINING A HORIZONTAL DECLINED BOLE |
US8203343B1 (en) | 2005-10-12 | 2012-06-19 | Seektech, Inc. | Reconfigurable portable locator employing multiple sensor array having flexible nested orthogonal antennas |
US8089390B2 (en) | 2006-05-16 | 2012-01-03 | Underground Imaging Technologies, Inc. | Sensor cart positioning system and method |
US9646415B2 (en) * | 2006-05-16 | 2017-05-09 | Underground Imaging Technologies, Inc. | System and method for visualizing multiple-sensor subsurface imaging data |
US8264226B1 (en) | 2006-07-06 | 2012-09-11 | Seektech, Inc. | System and method for locating buried pipes and cables with a man portable locator and a transmitter in a mesh network |
US8547428B1 (en) * | 2006-11-02 | 2013-10-01 | SeeScan, Inc. | Pipe mapping system |
CA2589820A1 (en) * | 2007-05-24 | 2008-11-24 | Penguin Automated Systems Inc. | Subterranean positioning system for monitoring movement underground and method |
WO2009029269A2 (en) * | 2007-08-27 | 2009-03-05 | Vermeer Manufacturing Company | Devices and methods for dynamic boring procedure reconfiguration |
US7952357B2 (en) * | 2007-09-28 | 2011-05-31 | The Charles Machines Works, Inc. | Receiver system for determining the location of a magnetic field source |
US9547101B2 (en) | 2007-09-28 | 2017-01-17 | The Charles Machine Works, Inc. | System for tracking a downhole tool assembly using dual above-ground receiver assemblies |
US8793866B1 (en) | 2007-12-19 | 2014-08-05 | Western Digital (Fremont), Llc | Method for providing a perpendicular magnetic recording head |
US8166632B1 (en) | 2008-03-28 | 2012-05-01 | Western Digital (Fremont), Llc | Method for providing a perpendicular magnetic recording (PMR) transducer |
US8120362B2 (en) * | 2008-07-05 | 2012-02-21 | Westerngeco L.L.C. | Surveying a subterranean structure using electromagnetic measurements and microorganism content data |
CA2691410C (en) * | 2009-02-01 | 2013-04-02 | Xact Downhole Telemetry Inc. | Parallel-path acoustic telemetry isolation system and method |
US8393412B2 (en) * | 2009-02-12 | 2013-03-12 | Xact Downhole Telemetry, Inc. | System and method for accurate wellbore placement |
US8982667B2 (en) * | 2009-02-13 | 2015-03-17 | Xact Downhole Telemetry, Inc. | Acoustic telemetry stacked-ring wave delay isolator system and method |
US8711047B2 (en) * | 2009-03-13 | 2014-04-29 | Qualcomm Incorporated | Orthogonal tunable antenna array for wireless communication devices |
US20110141852A1 (en) * | 2009-06-15 | 2011-06-16 | Camwell Paul L | Air hammer optimization using acoustic telemetry |
US8729901B2 (en) | 2009-07-06 | 2014-05-20 | Merlin Technology, Inc. | Measurement device and associated method for use in frequency selection for inground transmission |
FR2954829B1 (en) * | 2009-12-31 | 2012-03-02 | Art Fi | SYSTEM FOR MEASURING AN ELECTROMAGNETIC FIELD |
US8381836B2 (en) | 2010-01-19 | 2013-02-26 | Merlin Technology Inc. | Advanced underground homing system, apparatus and method |
RU2012146407A (en) | 2010-04-19 | 2014-05-27 | Ксэкт Даунхоул Телимитри, Инк. | MEANS AND METHOD FOR SELF-CENTERING AN ADAPTER CONTAINING EM CLEARANCE WITH CONE THREAD |
US8695727B2 (en) | 2011-02-25 | 2014-04-15 | Merlin Technology, Inc. | Drill string adapter and method for inground signal coupling |
US20130054075A1 (en) * | 2011-08-22 | 2013-02-28 | Deere And Company | Location Control System for Feature Placement |
US9540879B2 (en) | 2012-01-05 | 2017-01-10 | Merlin Technology, Inc. | Directional drilling target steering apparatus and method |
US9274243B2 (en) | 2012-01-05 | 2016-03-01 | Merlin Technology, Inc. | Advanced drill string communication system, components and methods |
CN104335065B (en) | 2012-03-12 | 2017-08-25 | 弗米尔公司 | Deviation frequency homodyne GPR |
CN104541023B (en) | 2012-07-20 | 2018-05-08 | 默林科技股份有限公司 | Buried operation, system, communication and relevant apparatus and method |
US9000940B2 (en) * | 2012-08-23 | 2015-04-07 | Merlin Technology, Inc. | Drill string inground isolator in an MWD system and associated method |
US9971013B2 (en) * | 2012-11-29 | 2018-05-15 | The Charles Machine Works, Inc. | Borepath analyzer |
WO2014152019A1 (en) | 2013-03-14 | 2014-09-25 | Merlin Technology, Inc. | Directional drilling communication protocols, apparatus and methods |
US9422802B2 (en) | 2013-03-14 | 2016-08-23 | Merlin Technology, Inc. | Advanced drill string inground isolator housing in an MWD system and associated method |
US10240456B2 (en) | 2013-03-15 | 2019-03-26 | Merlin Technology, Inc. | Inground device with advanced transmit power control and associated methods |
US9425619B2 (en) | 2013-03-15 | 2016-08-23 | Merlin Technology, Inc. | Advanced inground device power control and associated methods |
US9739133B2 (en) | 2013-03-15 | 2017-08-22 | Vermeer Corporation | Imaging underground objects using spatial sampling customization |
CN104121010B (en) * | 2014-06-20 | 2017-03-22 | 重庆迈尔矿山设备开发有限公司 | Method for recording drilling depth of drilling machine and coal mine drilling machine capable of measuring and controlling drill hole operating conditions and surroundings |
US9739140B2 (en) | 2014-09-05 | 2017-08-22 | Merlin Technology, Inc. | Communication protocol in directional drilling system, apparatus and method utilizing multi-bit data symbol transmission |
US10544669B2 (en) * | 2014-09-24 | 2020-01-28 | Halliburton Energy Services, Inc. | Surface ranging technique with a surface detector |
KR101684005B1 (en) * | 2014-11-25 | 2016-12-08 | 한국과학기술원 | Undeground localization method and system |
US10436928B2 (en) | 2014-12-19 | 2019-10-08 | International Business Machines Corporation | Detection and imaging of subsurface high impedance contrast objects |
WO2016108905A1 (en) * | 2014-12-31 | 2016-07-07 | Halliburton Energy Services, Inc. | Methods and systems employing fiber optic sensors for ranging |
EP3295219B1 (en) * | 2015-05-14 | 2019-08-21 | ConocoPhillips Company | System and method for determining drill string motions using acceleration data |
AU2016262077B2 (en) | 2015-05-14 | 2021-08-26 | Conocophillips Company | System and method for determining drill string motions using acceleration data |
US10822941B2 (en) | 2015-07-21 | 2020-11-03 | The Charles Machine Works, Inc. | Underground guidance using above-ground mesh network |
US9759012B2 (en) | 2015-09-24 | 2017-09-12 | Merlin Technology, Inc. | Multimode steering and homing system, method and apparatus |
US10073186B1 (en) | 2015-10-21 | 2018-09-11 | SeeScan, Inc. | Keyed current signal utility locating systems and methods |
US11512534B2 (en) | 2016-02-05 | 2022-11-29 | The Charles Machine Works, Inc. | Method for guiding a downhole tool underground |
JP6151831B2 (en) * | 2016-08-04 | 2017-06-21 | 日本電信電話株式会社 | 3-axis loop antenna |
DE102016217614B4 (en) * | 2016-09-15 | 2023-12-14 | Vega Grieshaber Kg | Antenna arrangement |
US10563502B1 (en) | 2016-09-23 | 2020-02-18 | Merlin Technology, Inc. | Advanced sonde reliability monitoring, apparatus and associated methods |
DE102017110752A1 (en) * | 2017-05-17 | 2018-11-22 | Neosid Pemetzrieder Gmbh & Co. Kg | Multidimensional antenna |
CN107238385B (en) * | 2017-05-31 | 2019-07-12 | 中国矿业大学 | A kind of absolute pose detection system of coalcutter and method |
US10378338B2 (en) | 2017-06-28 | 2019-08-13 | Merlin Technology, Inc. | Advanced passive interference management in directional drilling system, apparatus and methods |
JP6989766B2 (en) * | 2017-09-29 | 2022-01-12 | ミツミ電機株式会社 | Radar device and target detection method |
CN108490390B (en) * | 2018-02-28 | 2022-05-17 | 北京理工大学 | Mobile magnetic source positioning device |
WO2019183374A1 (en) | 2018-03-23 | 2019-09-26 | Conocophillips Company | Virtual downhole sub |
US11397266B2 (en) | 2018-08-29 | 2022-07-26 | Subsite, Llc | GPS assisted walkover locating system and method |
US11204437B2 (en) | 2018-11-05 | 2021-12-21 | The Charles Machine Works, Inc. | Dipole locator using balanced antenna signals |
USD890143S1 (en) | 2018-11-29 | 2020-07-14 | The Charles Machine Works, Inc. | Antenna |
RU2722972C1 (en) * | 2019-05-14 | 2020-06-05 | Федеральное государственное казенное учреждение "12 Центральный научно-исследовательский институт" Министерства обороны Российской Федерации | Method for determining mutual location of objects located in mine workings (wells) |
USD914706S1 (en) | 2019-06-28 | 2021-03-30 | The Charles Machine Works, Inc. | Display screen with graphical user interface |
US11149539B2 (en) | 2019-07-23 | 2021-10-19 | Merlin Technology, Inc. | Drill planning tool for topography characterization, system and associated methods |
US11711104B2 (en) | 2019-10-21 | 2023-07-25 | The Charles Machine Works, Inc. | Noise minimization to communicate with a beacon |
US11473418B1 (en) | 2020-01-22 | 2022-10-18 | Vermeer Manufacturing Company | Horizontal directional drilling system and method |
US11994023B2 (en) | 2021-06-22 | 2024-05-28 | Merlin Technology, Inc. | Sonde with advanced battery power conservation and associated methods |
US12078053B2 (en) | 2021-08-09 | 2024-09-03 | The Charles Machine Works, Inc. | Null point depth calibration |
US11867321B1 (en) | 2021-10-21 | 2024-01-09 | Samuel Combs | Dispensing device and method of using same |
CN117166918B (en) * | 2023-09-14 | 2024-02-27 | 山东省煤田地质局物探测量队 | Self-propelled construction device based on three-dimensional seismic exploration point position correction and application method |
CN118011453B (en) * | 2024-02-05 | 2024-11-05 | 安徽望辐药业有限公司 | CZT detector efficiency calculating method and device based on crystal effective height |
Family Cites Families (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4001834A (en) * | 1975-04-08 | 1977-01-04 | Aeronutronic Ford Corporation | Printed wiring antenna and arrays fabricated thereof |
US4054881A (en) * | 1976-04-26 | 1977-10-18 | The Austin Company | Remote object position locater |
US4314251A (en) * | 1979-07-30 | 1982-02-02 | The Austin Company | Remote object position and orientation locater |
US4710708A (en) * | 1981-04-27 | 1987-12-01 | Develco | Method and apparatus employing received independent magnetic field components of a transmitted alternating magnetic field for determining location |
US4468863A (en) * | 1981-08-17 | 1984-09-04 | Applied Technologies Associates | High speed well surveying |
US4472884A (en) * | 1982-01-11 | 1984-09-25 | Applied Technologies Associates | Borehole azimuth determination using magnetic field sensor |
US4806869A (en) * | 1986-05-22 | 1989-02-21 | Flow Industries, Inc. | An above-ground arrangement for and method of locating a discrete in ground boring device |
US4806809A (en) * | 1986-06-12 | 1989-02-21 | Kabushiki Kaisha Tokai Rika Denki Seisakusho | Rotary shaft coupling device |
US5268683A (en) * | 1988-09-02 | 1993-12-07 | Stolar, Inc. | Method of transmitting data from a drillhead |
US4968978A (en) * | 1988-09-02 | 1990-11-06 | Stolar, Inc. | Long range multiple point wireless control and monitoring system |
US4909336A (en) * | 1988-09-29 | 1990-03-20 | Applied Navigation Devices | Drill steering in high magnetic interference areas |
US5070462A (en) * | 1989-09-12 | 1991-12-03 | Flowmole Corporation | Device for locating a boring machine |
US5066917A (en) * | 1990-01-17 | 1991-11-19 | Stolar, Inc. | Long feature vertical or horizontal electrical conductor detection methodology using phase coherent electromagnetic instrumentation |
US4993503A (en) * | 1990-03-27 | 1991-02-19 | Electric Power Research Institute | Horizontal boring apparatus and method |
US5231355A (en) * | 1990-06-18 | 1993-07-27 | The Charles Machine Works, Inc. | Locator transmitter having an automatically tuned antenna |
US5089779A (en) * | 1990-09-10 | 1992-02-18 | Develco, Inc. | Method and apparatus for measuring strata resistivity adjacent a borehole |
DE4035977C2 (en) * | 1990-11-12 | 1994-02-24 | Bruno Richter Gmbh & Co Kg Ele | Optical-electrical measuring method for determining cross-sectional dimensions of objects with concave or flat areas having cross-sectional shape and device therefor |
US5155442A (en) * | 1991-03-01 | 1992-10-13 | John Mercer | Position and orientation locator/monitor |
US5337002A (en) * | 1991-03-01 | 1994-08-09 | Mercer John E | Locator device for continuously locating a dipole magnetic field transmitter and its method of operation |
US5682099A (en) * | 1994-03-14 | 1997-10-28 | Baker Hughes Incorporated | Method and apparatus for signal bandpass sampling in measurement-while-drilling applications |
US5699048A (en) * | 1996-10-03 | 1997-12-16 | Industrial Technology Inc. | Omnidirectional passive electrical marker for underground use |
US6035951A (en) * | 1997-04-16 | 2000-03-14 | Digital Control Incorporated | System for tracking and/or guiding an underground boring tool |
-
1997
- 1997-04-16 US US08/835,834 patent/US6035951A/en not_active Expired - Lifetime
- 1997-11-12 US US08/968,636 patent/US6005532A/en not_active Expired - Lifetime
-
1999
- 1999-10-21 US US09/422,814 patent/US6095260A/en not_active Expired - Lifetime
- 1999-10-21 US US09/425,319 patent/US6047783A/en not_active Expired - Lifetime
-
2000
- 2000-06-15 US US09/596,316 patent/US6454023B1/en not_active Expired - Lifetime
-
2001
- 2001-12-13 US US10/021,882 patent/US6457537B1/en not_active Expired - Lifetime
-
2002
- 2002-08-27 US US10/229,559 patent/US6640907B2/en not_active Expired - Fee Related
-
2003
- 2003-09-04 US US10/656,692 patent/US6920943B2/en not_active Expired - Fee Related
-
2005
- 2005-06-24 US US11/165,886 patent/US7080698B2/en not_active Expired - Fee Related
-
2006
- 2006-06-07 US US11/448,690 patent/US7159672B2/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7009399B2 (en) | 2002-10-09 | 2006-03-07 | Deepsea Power & Light | Omnidirectional sonde and line locator |
US7498816B1 (en) | 2002-10-09 | 2009-03-03 | Seektech, Inc. | Omnidirectional sonde and line locator |
US20110037472A1 (en) * | 2002-10-09 | 2011-02-17 | Seektech, Inc. | Omnidirectional Sonde and Line Locator |
US8035390B2 (en) | 2002-10-09 | 2011-10-11 | Seektech, Inc. | Omnidirectional sonde and line locator |
US9696447B1 (en) | 2002-10-09 | 2017-07-04 | SeeScan, Inc. | Buried object locating methods and apparatus using multiple electromagnetic signals |
US9989662B1 (en) | 2002-10-09 | 2018-06-05 | SeeScan, Inc. | Buried object locating device with a plurality of spherical sensor balls that include a plurality of orthogonal antennae |
WO2004055325A1 (en) * | 2002-12-18 | 2004-07-01 | Cmte Development Limited | Drilling head position display |
US10428640B1 (en) * | 2018-10-15 | 2019-10-01 | Ozzie's Enterprises LLC | Borehole mapping tool and methods of mapping boreholes |
WO2020081057A1 (en) * | 2018-10-15 | 2020-04-23 | Ozzie's Enterprises LLC | Borehole mapping tool and methods of mapping boreholes |
US10947835B2 (en) | 2018-10-15 | 2021-03-16 | Ozzie's Enterprises LLC | Borehole mapping tool and methods of mapping boreholes |
Also Published As
Publication number | Publication date |
---|---|
US7159672B2 (en) | 2007-01-09 |
US20060225921A1 (en) | 2006-10-12 |
US6095260A (en) | 2000-08-01 |
US6005532A (en) | 1999-12-21 |
US20030051913A1 (en) | 2003-03-20 |
US20040045739A1 (en) | 2004-03-11 |
US7080698B2 (en) | 2006-07-25 |
US6920943B2 (en) | 2005-07-26 |
US6454023B1 (en) | 2002-09-24 |
US6457537B1 (en) | 2002-10-01 |
US6047783A (en) | 2000-04-11 |
US6035951A (en) | 2000-03-14 |
US6640907B2 (en) | 2003-11-04 |
US20050236185A1 (en) | 2005-10-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6640907B2 (en) | Mapping tool for tracking and/or guiding an underground boring tool | |
US10809099B2 (en) | Tracking positions of personnel, vehicles, and inanimate objects | |
US10254425B2 (en) | Locating arrangement and method using boring tool and cable locating signals | |
US7896107B2 (en) | System for tracking and maintaining on on-grade horizontal borehole | |
US20040163850A1 (en) | Boring tool tracking/guiding system and method with unconstrained target location geometry | |
US9182513B1 (en) | Determining beacon location using magnetic field shape measurements | |
JPH11508004A (en) | Positioning of independent underground boring machines | |
US9422804B2 (en) | Advanced underground homing system, apparatus and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: DIGITAL CONTROL INCORPORATED, WASHINGTON Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:MERCER, JOHN E.;HAMBLING, PETER H.;ZELLER, RUDOLF;AND OTHERS;REEL/FRAME:012399/0626;SIGNING DATES FROM 19970411 TO 19970414 |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
AS | Assignment |
Owner name: MERLIN TECHNOLOGY, INC., WASHINGTON Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:DIGITAL CONTROL INC.;REEL/FRAME:014351/0277 Effective date: 20030501 |
|
FPAY | Fee payment |
Year of fee payment: 4 |
|
FPAY | Fee payment |
Year of fee payment: 8 |
|
FPAY | Fee payment |
Year of fee payment: 12 |