RU2622965C1 - Method for carrying out water shutoff treatment in well - Google Patents
Method for carrying out water shutoff treatment in well Download PDFInfo
- Publication number
- RU2622965C1 RU2622965C1 RU2016114658A RU2016114658A RU2622965C1 RU 2622965 C1 RU2622965 C1 RU 2622965C1 RU 2016114658 A RU2016114658 A RU 2016114658A RU 2016114658 A RU2016114658 A RU 2016114658A RU 2622965 C1 RU2622965 C1 RU 2622965C1
- Authority
- RU
- Russia
- Prior art keywords
- well
- perforation
- formation
- insulating composition
- insulating
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 50
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 47
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 52
- 238000004519 manufacturing process Methods 0.000 claims abstract description 12
- 239000000203 mixture Substances 0.000 claims description 72
- 238000004078 waterproofing Methods 0.000 claims description 27
- 238000011049 filling Methods 0.000 claims description 14
- 238000005553 drilling Methods 0.000 claims description 11
- 238000005266 casting Methods 0.000 claims description 5
- 238000011010 flushing procedure Methods 0.000 claims description 4
- 230000002147 killing effect Effects 0.000 claims description 4
- 230000035515 penetration Effects 0.000 claims description 4
- 230000001186 cumulative effect Effects 0.000 claims description 3
- 239000002253 acid Substances 0.000 claims description 2
- 238000011160 research Methods 0.000 claims description 2
- 150000001875 compounds Chemical class 0.000 abstract description 10
- 239000000126 substance Substances 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract description 2
- 239000011440 grout Substances 0.000 abstract 3
- 229920006395 saturated elastomer Polymers 0.000 description 20
- 238000002156 mixing Methods 0.000 description 17
- 230000004888 barrier function Effects 0.000 description 14
- 238000005086 pumping Methods 0.000 description 13
- 239000000243 solution Substances 0.000 description 13
- 239000004568 cement Substances 0.000 description 11
- 238000009434 installation Methods 0.000 description 11
- 239000012530 fluid Substances 0.000 description 9
- 238000011161 development Methods 0.000 description 7
- 230000008569 process Effects 0.000 description 6
- 239000007924 injection Substances 0.000 description 5
- 238000002347 injection Methods 0.000 description 5
- 230000002829 reductive effect Effects 0.000 description 5
- 239000010410 layer Substances 0.000 description 4
- 238000005259 measurement Methods 0.000 description 4
- 238000002360 preparation method Methods 0.000 description 4
- 230000006378 damage Effects 0.000 description 3
- 230000007423 decrease Effects 0.000 description 3
- 239000008398 formation water Substances 0.000 description 3
- 239000004575 stone Substances 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 239000004927 clay Substances 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 238000001914 filtration Methods 0.000 description 2
- 239000013505 freshwater Substances 0.000 description 2
- 238000010438 heat treatment Methods 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 238000012935 Averaging Methods 0.000 description 1
- 238000007792 addition Methods 0.000 description 1
- 238000011888 autopsy Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- -1 for example Substances 0.000 description 1
- 230000001771 impaired effect Effects 0.000 description 1
- 230000004941 influx Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 239000011229 interlayer Substances 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
- 230000036961 partial effect Effects 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 239000004014 plasticizer Substances 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/32—Preventing gas- or water-coning phenomena, i.e. the formation of a conical column of gas or water around wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Connector Housings Or Holding Contact Members (AREA)
Abstract
Description
Область техники, к которой относится изобретениеFIELD OF THE INVENTION
Изобретение относится к нефтедобывающей промышленности, в частности к способу проведения водоизоляционных работ в скважине при разработке нефтяной залежи, подстилаемой водой.The invention relates to the oil industry, in particular to a method for carrying out waterproofing operations in a well when developing an oil reservoir underlain by water.
Уровень техникиState of the art
При традиционном способе эксплуатации скважин, расположенных в водонефтяной зоне залежи, то есть скважин, вскрывших продуктивный горизонт в области границы раздела между нефтью и водой (далее в данном документе указанная граница называется водонефтяным контактом, или ВНК), происходит подъем ВНК вблизи скважины, называемый «конусом обводнения».In the traditional method of operating wells located in the oil-water zone of the reservoir, that is, wells that have opened a productive horizon in the region of the interface between oil and water (hereinafter, this boundary is called the oil-water contact, or OWC), an OWC is raised near the well, called " flooding cone. "
На Фиг. 1 приведен пример образования зоны пониженного давления возле интервала перфорации в пласте при работе скважины по обычному способу эксплуатации скважины, когда через интервал перфорации производится отбор нефтесодержащей продукции (нефти и/или воды в чистом виде или в виде смеси с каким-либо другими частицами и компонентами, попадающими в скважину). При отборе продукции возле интервала перфорации возникает зона пониженного давления, при этом по мере отдаления от интервала перфорации степень падения давления уменьшается. Таким образом, около скважины образуется градиент давления.In FIG. Figure 1 shows an example of the formation of a zone of reduced pressure near the perforation interval in the formation during well operation according to the usual method of operating the well, when oil-containing products (oil and / or water in pure form or in the form of a mixture with any other particles and components are selected through the perforation interval falling into the well). When selecting products near the perforation interval, a zone of reduced pressure arises, and as the distance from the perforation interval, the degree of pressure drop decreases. Thus, a pressure gradient forms around the well.
В случаях, когда скважина расположена в области нефтяной залежи, подстилаемой водой, такой интервал перфорации может располагаться поблизости от границы ВНК. Как известно, при наличии градиента давления происходит движение жидкости в направлении уменьшения давления, а поскольку граница ВНК представляет собой проницаемую, подвижную поверхность, происходит движение не только нефти, но и воды, причем вода за счет больших фильтрационных свойств по пласту образует каналы поступления к кровле пласта, в том числе и в нефтеносной части.In cases where the well is located in the area of the oil reservoir underlain by water, such an interval of perforation may be located near the boundary of the oil and gas complex. As you know, in the presence of a pressure gradient, the fluid moves in the direction of decreasing pressure, and since the BHC boundary is a permeable, moving surface, not only oil but also water moves, and water forms channels of entry to the roof due to large filtration properties in the formation reservoir, including in the oil part.
Таким образом, ВНК перемещается вверх, в сторону пониженного давления, рано или поздно достигая интервала перфорации. Тем самым, как показано на фиг. 2, при обычном способе эксплуатации скважины в зоне перфорации образуется так называемый «конус обводнения». При этом происходит частичное или полное замещение нефти водой в зоне перфорации и, соответственно, снижение выработки нефтенасыщенной части пласта. После того как произошел приток воды в область перфорации, для восстановления коэффициента нефтеотдачи необходимо проводить водоизоляционные работы и по возможности сокращать или устранять образованные конусы обводнения.Thus, the KSS moves upward, towards lower pressure, sooner or later reaching the perforation interval. Thus, as shown in FIG. 2, in the conventional method of operating the well in the perforation zone, a so-called “flooding cone” is formed. In this case, partial or complete replacement of oil by water in the perforation zone and, accordingly, a decrease in the production of the oil-saturated part of the formation occur. After there has been an influx of water into the perforation area, in order to restore the oil recovery coefficient, it is necessary to carry out waterproofing work and, if possible, reduce or eliminate the formed watering cones.
Из уровня техники известны различные методики проведения водоизоляционных работ в скважине, однако большинство из них позволяют бороться с конусами обводнения лишь на какой-то ограниченный срок, так как спустя некоторый промежуток времени, часто не настолько длительный, насколько желательно с точки зрения рентабельности, скважина вновь обводняется вследствие конусообразного подъема подошвенных пластовых вод, и приходится вновь повторять водоизоляционные работы или вовсе ликвидировать скважину.Various techniques are known from the prior art for carrying out waterproofing operations in the well, however, most of them allow the cones to be flooded only for a limited time, since after a certain period of time, often not as long as is desirable from the point of view of profitability, the well will again it is flooded due to the cone-shaped rise of the bottom formation water, and it is necessary to repeat the waterproofing work again or completely liquidate the well.
Одним из аналогов предлагаемого способа является способ разработки обводненных нефтяных месторождений (патент RU 2420657 С1 «Способ разработки обводненных нефтяных месторождений», МПК E21B 43/32, E21B 33/134, опубл. 10.06.2011), содержащий разбуривание эксплуатационной скважиной, пересекающей непроницаемые естественные пропластки в продуктивном пласте, спуск обсадных колонн с последующей перфорацией продуктивного пласта, исследование нефтеводонасыщенности и интервалов залегания нефти и воды, размеров непроницаемого естественного пропластка и создание экранов из изолирующего состава, отделяющих водонасыщенные зоны пласта от нефтенасыщенных зон. По результатам исследований определяют толщину нефтенасыщенной зоны пласта. При толщине нефтенасыщенной зоны пласта более 4 метров вырезают часть обсадной колонны в интервале выше нижних перфорационных отверстий нефтенасыщенной зоны пласта и до забоя скважины. Расширяют ствол скважины в этом интервале, заливают расширенный интервал ствола скважины изолирующим составом, в качестве которого используют цементный раствор. При толщине нефтенасыщенной зоны пласта менее 4 метров вырезают часть обсадной колонны от кровли непроницаемого естественного пропластка до забоя скважины. Расширяют ствол скважины в этом интервале, заливают изолирующим составом расширенный интервал ствола и создают пакер путем введения в призабойную зону нефтенасыщенной зоны пласта скважины. При этом повышается прочность изоляции водонасыщенной зоны пласта.One of the analogues of the proposed method is a method for the development of waterlogged oil fields (patent RU 2420657 C1 "Method for the development of waterlogged oil fields", IPC E21B 43/32, E21B 33/134, published June 10, 2011), containing drilling a production well that crosses impermeable natural interlayers in the reservoir, descent of casing strings with subsequent perforation of the reservoir, study of oil saturation and intervals of occurrence of oil and water, the size of the impermeable natural layer and created e screens of an insulating composition separating from the water-saturated layer zones of oil-saturated zones. According to the research results, the thickness of the oil-saturated zone of the formation is determined. When the thickness of the oil-saturated zone of the formation is more than 4 meters, a part of the casing string is cut out in the interval above the lower perforations of the oil-saturated zone of the formation and until the bottom of the well. Expand the borehole in this interval, fill the extended interval of the borehole with an insulating composition, which is used as a cement mortar. When the thickness of the oil-saturated zone of the formation is less than 4 meters, a part of the casing is cut from the roof of an impenetrable natural layer to the bottom of the well. The wellbore is expanded in this interval, the extended interval of the wellbore is poured with an insulating composition and a packer is created by introducing the oil-saturated zone of the wellbore into the bottomhole zone. This increases the insulation strength of the water-saturated zone of the reservoir.
Тем не менее, при практическом применении этого способа выяснилось, что он также не всегда является эффективным при борьбе с обводнением скважин, особенно при попытках его применения в скважинах, пересекающих продуктивный горизонт в области ВНК без естественного непроницаемого пропластка, поскольку вода быстро доходит до вновь выполненных перфорационных отверстий снаружи по заколонному пространству возле расширенной части колонны. Более того, в данном способе подразумевается полное уничтожение всей нижней части обсадной колонны от уровня ВНК до забоя скважины и расширение этой области, что приводит к тому, что требуется очень много времени на вырезание и большое количество цемента на изоляцию расширенного интервала. При последующей эксплуатации скважины ввиду отсутствия значительной части обсадной колонны цементный камень быстро разрушается, т.е. конструкция скважины теряет свою прочность вследствие вырезания обсадной колонны от уровня ВНК до забоя скважины. Кроме того, при создании малейшей депрессии в скважине происходит разрушение призабойной зоны скважины.Nevertheless, in the practical application of this method, it turned out that it is also not always effective in dealing with watering wells, especially when trying to use it in wells that cross the productive horizon in the VOC area without a natural impermeable layer, since water quickly reaches newly completed perforations outside the annular space near the expanded part of the column. Moreover, this method involves the complete destruction of the entire lower part of the casing from the level of the oil hole to the bottom of the well and the expansion of this area, which leads to the fact that it requires a lot of time for cutting and a large amount of cement to isolate the extended interval. During subsequent operation of the well, due to the absence of a significant part of the casing, the cement stone quickly collapses, i.e. the design of the well loses its strength due to the cutting of the casing from the level of the oil well to the bottom of the well. In addition, when creating the slightest depression in the well, the bottom hole zone is destroyed.
Соответственно, при наличии дефектов цементирования вода через трещины в цементе может достигать того интервала, через который производится отбор продукции. Помимо того, данный способ требует предварительного проведения геофизических работ для определения интервалов залегания нефти и воды, что повышает трудоемкость и количество необходимого оборудования. Также в данном способе требуется предварительная кольматация нефтенасыщенного интервала, что тоже повышает трудоемкость и материалоемкость, а также ухудшает коллекторские свойства пласта.Accordingly, in the presence of cementing defects, water through cracks in the cement can reach the interval through which production is selected. In addition, this method requires the preliminary conduct of geophysical work to determine the intervals of occurrence of oil and water, which increases the complexity and amount of necessary equipment. Also in this method, preliminary colmatation of the oil-saturated interval is required, which also increases the complexity and material consumption, and also worsens the reservoir properties of the formation.
Часть указанных проблем может быть решена за счет использования технических решений способов по патентам RU 2509884 С1 («Способ разработки обводненного нефтяного месторождения», МПК Е21В 43/32, опубл. 20.03.2014) и RU 2509885 С1 («Способ разработки обводненного нефтяного месторождения», МПК E21B 43/32, опубл. 20.03.2014), однако в них требуется применение сложного дополнительного оборудования, при этом эффективное проходное сечение скважины снижается. При попытках расширить проходное сечение скважины бурением в области расширенного интервала выбуривается заливочная колонна, и тем самым пропадает ее важный экранирующий эффект, а целостность цементного моста может нарушиться, и вода может попасть внутрь колонны. Кроме того, в этих способах все равно требуется предварительное проведение геофизических исследований.Part of these problems can be solved through the use of technical solutions of the methods according to patents RU 2509884 C1 (“Method for the development of a flooded oil field”, IPC E21B 43/32, published March 20, 2014) and RU 2509885 C1 (“Method for the development of a flooded oil field” , IPC E21B 43/32, published March 20, 2014), however, they require the use of sophisticated additional equipment, while the effective borehole cross section is reduced. When trying to expand the borehole section of the well by drilling in the extended interval region, the casting column is drilled, and thereby its important shielding effect disappears, and the integrity of the cement bridge may be impaired, and water may enter the column. In addition, in these methods, a preliminary geophysical survey is still required.
Сущность изобретенияSUMMARY OF THE INVENTION
Как следует из вышесказанного, существует необходимость в разработке быстрой, надежной и низкозатратной методики проведения водоизоляционных работ в скважине, расположенной в зоне водонефтяного контакта, с длительным предотвращением при этом обводнения добываемой продукции.As follows from the foregoing, there is a need to develop a quick, reliable and low-cost method of conducting waterproofing work in a well located in the oil-water contact zone, with long-term prevention of flooding of produced products.
Настоящее изобретение направлено на устранение вышеупомянутых недостатков уровня техники и решает указанную задачу за счет применения способа проведения водоизоляционных работ в скважине, содержащего этапы, на которых:The present invention is aimed at eliminating the aforementioned disadvantages of the prior art and solves this problem by applying a method of conducting waterproofing work in a well, comprising the steps of:
подготавливают изолирующий состав в объеме, превышающем внутренний объем скважины от забоя до верхней границы интервала перфорации;preparing an insulating composition in a volume exceeding the internal volume of the well from the bottom to the upper boundary of the perforation interval;
спускают колонну заливочных труб в скважину;lower the column of filling pipes into the well;
заливают изолирующий состав в скважину по меньшей мере до верхней границы интервала перфорации с продавкой в пласт;the insulating composition is poured into the well at least up to the upper boundary of the perforation interval with a push into the formation;
извлекают колонну заливочных труб из скважины;removing the string of filling pipes from the well;
оставляют изолирующий состав на отверждение;leave the insulating composition to cure;
после отверждения изолирующего состава производят разбуривание изолирующего состава; иafter curing of the insulating composition, the insulating composition is drilled; and
производят вскрытие пласта путем щадящей перфорации скважины в кровельной части пласта,opening the formation by sparing hole perforation in the roofing part of the formation,
причем до заливки изолирующего состава:and before pouring the insulating composition:
заполняют внутреннее пространство скважины ниже верхней границы интервала перфорации составом глушения через колонну заливочных труб;fill the interior of the well below the upper boundary of the perforation interval with a killing composition through the column of filling pipes;
спускают в скважину и устанавливают ниже верхней границы интервала перфорации глухую заглушку.lowered into the well and set a blank plug below the upper boundary of the perforation interval.
Применение данного способа позволяет повысить эффективность и надежность проведения водоизоляционных работ в скважине без необходимости проведения геофизических исследований, а также продлить безводный период эксплуатации скважин, расположенных в зоне водонефтяного контакта.The application of this method allows to increase the efficiency and reliability of water-proofing operations in the well without the need for geophysical studies, as well as to extend the anhydrous period of operation of wells located in the oil-water contact zone.
Краткое описание чертежейBrief Description of the Drawings
На фиг. 1 изображен пример формирования градиента давления в зоне перфорации при обычном способе эксплуатации скважины.In FIG. 1 shows an example of the formation of a pressure gradient in a perforation zone in the conventional method of operating a well.
На фиг. 2 изображен пример образования конуса обводнения в зоне перфорации при обычном способе эксплуатации скважины.In FIG. 2 shows an example of the formation of a watering cone in a perforation zone in a conventional well operation method.
На фиг. 3 изображен пример применения способа проведения водоизоляционных работ в скважине, расположенной в зоне водонефтяного контакта, согласно варианту осуществления настоящего изобретения.In FIG. 3 depicts an example application of a method of performing waterproofing operations in a well located in a water-oil contact zone according to an embodiment of the present invention.
Подробное описание изобретенияDETAILED DESCRIPTION OF THE INVENTION
Нефтяная залежь, подстилаемая водой, обычно разрабатывается следующим образом.Water-based oil reservoirs are typically developed as follows.
Как показано на фиг. 1, подлежащий разработке пласт состоит из нефтесодержащей части и водосодержащей части, между которыми образован водонефтяной контакт (ВНК). Это нефтяное месторождение разбуривают эксплуатационной скважиной, пересекающей пласт. Далее спускают обсадную колонну (обсаживают эксплуатационную колонну) с последующим ее креплением и производят перфорацию в нефтесодержащей части пласта выше ВНК с образованием перфорационных отверстий. Затем производят добычу продукции из нефтесодержащей части пласта через перфорационные отверстия.As shown in FIG. 1, the formation to be developed consists of an oil-containing part and a water-containing part, between which an oil-water contact (WOC) is formed. This oil field is being drilled with a production well that crosses the formation. Next, the casing is lowered (the production casing is cased) with its subsequent fastening and perforation is performed in the oil-containing part of the formation above the OWC with the formation of perforations. Then produce products from the oily part of the reservoir through perforations.
В процессе эксплуатации скважины вода из водонасыщенной части пласта по заколонному пространству обсадной колонны и за счет больших фильтрационных свойств по пласту может образовывать каналы поступления к кровле пласта, в том числе и к нефтеносной части, и таким образом прорываться через нижние перфорационные отверстия нефтенасыщенной зоны пласта в скважину, при этом происходит обводнение нефти (пример этого изображен на фиг. 2).During the operation of the well, water from the water-saturated part of the formation along the annular space of the casing and due to the large filtration properties of the formation can form channels of entry to the roof of the formation, including the oil-bearing part, and thus break through the lower perforations of the oil-saturated zone of the formation in well, while there is water flooding (an example of this is shown in Fig. 2).
Если обводненность продукции скважины достигает некоторого предварительно определенного значения, например 80%, приостанавливают добычу и выполняют в этой скважине способ проведения водоизоляционных работ по настоящему изобретению, который более подробно описан ниже, и по завершении его выполнения эксплуатируют скважину с использованием новых перфорационных отверстий, сформированных при выполнении указанного способа.If the water cut of the well’s production reaches a certain predetermined value, for example, 80%, the production is stopped and the method of carrying out the waterproofing works of the present invention, which is described in more detail below, is performed in this well and, upon completion, the well is operated using new perforations formed during performing the specified method.
Предлагаемый способ проведения водоизоляционных работ в скважине, расположенной в зоне водонефтяного контакта, может быть реализован следующим образом.The proposed method of waterproofing work in a well located in the zone of oil-water contact can be implemented as follows.
В одном смесительном блоке насосной установки подготавливают изолирующий состав в объеме, превышающем внутренний объем скважины от забоя до верхней границы интервала перфорации. В качестве изолирующего состава может использоваться цементный или любой другой подходящий тампонажный раствор. В скважину, например, до уровня несколько выше забоя, с помощью спуско-подъемного устройства спускают колонну заливочных труб. Затем с использованием насосного блока насосной установки заливают изолирующий состав в скважину по меньшей мере до верхней границы интервала перфорации с продавкой (например, с помощью продавочной жидкости, подаваемой из другого смесительного блока насосной установки) в затрубное пространство через перфорационные отверстия. Извлекают колонну заливочных труб из скважины и оставляют изолирующий состав на отверждение. Время ожидания затвердевания цемента, ОЗЦ, может составлять, например, 48 часов. После отверждения изолирующего состава не только во внутренней области интервала перфорации скважины, но и в заколонном пространстве вокруг него образуется изолирующий (цементный) мост. За это время может также опуститься конус обводнения, поскольку в области перфорации в процессе проведения водоизоляционных работ нет зоны пониженного давления. Кроме того, для того, чтобы конус обводнения опустился еще больше, может выдерживаться дополнительное время, например еще 48 часов.In one mixing unit of the pump installation, an insulating composition is prepared in a volume exceeding the internal volume of the well from the bottom to the upper boundary of the perforation interval. As an insulating composition, cement or any other suitable cement slurry may be used. In the well, for example, to a level slightly above the bottom, with the help of a lifting and lowering device, a column of filling pipes is lowered. Then, using the pumping unit of the pumping unit, the insulating composition is poured into the well at least up to the upper boundary of the perforation interval with the bore (for example, using a squeezing fluid supplied from another mixing unit of the pumping unit) into the annulus through the perforations. The casing string is removed from the well and the insulating composition is left to cure. The waiting time for the curing of cement, OZZ, can be, for example, 48 hours. After curing the insulating composition, not only in the inner region of the perforation interval of the well, but also in the annular space around it, an insulating (cement) bridge is formed. During this time, the flooding cone may also drop, since there is no zone of reduced pressure in the perforation area during the waterproofing process. In addition, in order for the flooding cone to fall even further, additional time may be maintained, for example another 48 hours.
После истечения времени ожидания производят разбуривание изолирующего состава с помощью устройства бурения, например, с помощью долота и винтового забойного двигателя (ВЗД), спущенного в скважину на колонне труб. В качестве ВЗД применяют, например, двигатель винтовой забойный марки Д3-106МР.7/8.37 производства ВНИИБТ-Буровой инструмент (г. Краснодар, Россия). В качестве долота применяют, например, твердосплавное лопастное долото марки 4Л-124 РСТ производства ОАО "Азимут" (г. Уфа, Республика Башкортостан, Россия).After the waiting time has expired, the insulating composition is drilled using a drilling device, for example, using a bit and a downhole screw motor (VZD), lowered into the well on a pipe string. As a VZD, for example, a downhole screw motor of the brand D3-106MR.7 / 8.37 manufactured by VNIIBT-Drilling Instrument (Krasnodar, Russia) is used. As a bit, for example, a carbide blade bit of grade 4L-124 PCT manufactured by Azimut OJSC (Ufa, the Republic of Bashkortostan, Russia) is used.
После отверждения изолирующего состава и его разбуривания, с помощью вышеуказанной насосной установки может проводиться удаление мусора и излишков изолирующего состава из внутреннего пространства скважины промывкой технологической жидкостью, например, пресной водой плотностью 1000 кг/м3.After curing the insulating composition and drilling it, using the above pumping unit, debris and excess insulating composition can be removed from the interior of the well by flushing with a process fluid, for example, fresh water with a density of 1000 kg / m 3 .
Затем скважину вновь вводят в разработку (осваивают) как добывающую для отбора продукции из нефтенасыщенной зоны пласта. С этой целью производят вскрытие пласта путем щадящей перфорации в кровельной части пласта. Эта перфорация может выполняться, например, с помощью сверлящего перфоратора (в частности, в одном из вариантов осуществления может использоваться ПС 97-70, предназначенный для перфорирования скважин, обсаженных колоннами диаметрами 102-168 мм, выпускаемый ООО НПО "Азимут", г. Уфа, Республика Башкортостан, Россия) или с помощью кумулятивной перфорации слабыми зарядами глубокого проникновения с оппозитно-парным расположением зарядов (в частности, в одном из вариантов осуществления может использоваться ЗПКТ-73ГП). Сверлящая перфорация или кумулятивная перфорация слабыми зарядами глубокого проникновения позволяет вскрывать пласт в щадящем режиме, т.е. с минимальным разрушением цементного камня, что позволяет исключить риск повреждения целостности цементного камня за эксплуатационной колонной и сопутствующего этому возникновения заколонных перетоков.Then the well is reintroduced into the development (mastered) as production for selection of products from the oil-saturated zone of the reservoir. To this end, the formation is opened by sparing perforation in the roof of the formation. This perforation can be carried out, for example, using a drilling perforator (in particular, in one embodiment, PS 97-70 can be used for perforating wells cased with columns with diameters of 102-168 mm, manufactured by Azimut LLC, Ufa , Republic of Bashkortostan, Russia) or by cumulative perforation with weak deep penetration charges with the opposite-pair arrangement of charges (in particular, in one embodiment, ZPKT-73GP can be used). Drilling perforation or cumulative perforation with weak charges of deep penetration allows opening the formation in a sparing mode, i.e. with minimal destruction of cement stone, which eliminates the risk of damage to the integrity of the cement stone behind the production casing and the accompanying occurrence of annular flows.
В одном варианте осуществления требуемые размеры нового интервала перфорации могут быть получены исходя из тех значений обводненности продукции, которые наблюдались для данной скважины. Например, соотношение областей залегания нефти и воды в старом интервале перфорации может быть примерно равным соотношению содержания нефти и воды в продукции, полученной из данной скважины перед проведением водоизоляционных работ. За счет того, что конус обводнения мог опуститься, а также за счет продавки изолирующего состава за пределы скважины появляется возможность увеличения или по меньшей мере сохранения нового интервала перфорации по сравнению с известными из уровня техники способами, в которых, как правило, нижняя часть нефтенасыщенной зоны пласта более не задействуется при добыче. В другом варианте осуществления вскрытие пласта производят ниже кровли продуктивного пласта на 1-2 м.In one embodiment, the required dimensions of the new perforation interval can be obtained based on those values of water cut, which were observed for a given well. For example, the ratio of oil and water occurrence areas in the old perforation interval may be approximately equal to the ratio of oil and water content in products obtained from a given well prior to waterproofing. Due to the fact that the watering cone could fall, as well as due to the pushing of the insulating composition outside the well, it becomes possible to increase or at least maintain a new perforation interval compared to methods known from the prior art, in which, as a rule, the lower part of the oil-saturated zone the reservoir is no longer involved in production. In another embodiment, the autopsy is performed below the roof of the reservoir by 1-2 m.
Пример применения способа проведения водоизоляционных работ в скважине, расположенной в зоне водонефтяного контакта, изображен на фиг. 3.An example of the application of the method of waterproofing work in a well located in the oil-water contact zone is shown in FIG. 3.
Следует отметить, что заливка изолирующего состава происходит во всем интервале перфорации независимо от толщины нефтенасыщенной и водонасыщенной частей пласта. Положение интервала перфорации известно заранее, поэтому в данном случае отсутствует необходимость проводить предварительные геофизические исследования для определения конкретных зон интервала перфорации, через которые поступает нефть и вода. Соответственно, снижается трудоемкость и количество необходимого оборудования.It should be noted that the filling of the insulating composition occurs throughout the perforation interval, regardless of the thickness of the oil-saturated and water-saturated parts of the formation. The position of the perforation interval is known in advance, therefore, in this case there is no need to conduct preliminary geophysical studies to determine the specific zones of the perforation interval through which oil and water enter. Accordingly, the complexity and amount of equipment required are reduced.
Кроме того, следует отметить, что полученный в результате экран из окружающего обсадную колонну изолирующего моста надежно изолирует водонасыщенную зону пласта от нефтенасыщенной зоны, что снижает вероятность попадания воды внутрь обсадной колонны как через заколонные перетоки в нижние вновь выполненные перфорационные отверстия нефтенасыщенной зоны пласта, так и через старые перфорационные отверстия либо через трещины в цементе. При этом из-за того, что обсадная колонна не вырезается, прочность экрана за счет наличия в нем обсадной колонны сохраняется даже при разбуривании изолирующего моста внутри скважины, при перфорации новых отверстий и при наличии некоторой депрессии в скважине. Можно отметить также, что при реализации способа исключается необходимость временной изоляции пласта, что позволяет сохранить коллекторские свойства пласта. Соответственно, эффективность проведения водоизоляционных работ значительно повышается, и продлевается безводный период эксплуатации скважин, расположенных в зоне водонефтяного контакта.In addition, it should be noted that the resulting screen from the insulating bridge surrounding the casing reliably isolates the water-saturated zone of the formation from the oil-saturated zone, which reduces the likelihood of water entering the casing through the casing flows into the lower newly made perforations of the oil-saturated zone of the formation and through old perforations or through cracks in cement. Moreover, due to the fact that the casing is not cut out, the strength of the screen due to the presence of the casing in it is maintained even when the insulating bridge is drilled inside the well, when new holes are perforated, and if there is some depression in the well. It can also be noted that the implementation of the method eliminates the need for temporary isolation of the formation, which allows you to save the reservoir properties of the formation. Accordingly, the effectiveness of the waterproofing works is significantly increased, and the anhydrous period of operation of wells located in the oil-water contact zone is extended.
Как отмечалось выше, способ проведения водоизоляционных работ в скважине согласно настоящему изобретению может выполняться даже без предварительных промысловых исследований. Однако при необходимости, например для определения нового интервала перфорации, такие исследования все же могут быть проведены. При этом с целью повышения точности предпочтительно проводить их после ОЗЦ и опускания конуса обводнения, но из соображений распределения времени работ на конкретном объекте они могут выполняться и на более ранних стадиях.As noted above, the method of carrying out waterproofing work in the well according to the present invention can be performed even without preliminary field studies. However, if necessary, for example, to determine a new perforation interval, such studies can still be carried out. Moreover, in order to improve accuracy, it is preferable to carry them out after the WPC and lowering the watering cone, but for reasons of the distribution of work time at a particular object, they can be performed at earlier stages.
Кроме того, для того чтобы изолирующий состав лучше проникал в породу при его продавке, предварительно может выполняться повышение приемистости пласта путем обработки призабойной зоны скважины с помощью заливки в нее глинокислотного раствора. Для этих целей может использоваться та же насосная установка, что упоминалась ранее. При отсутствии сведений о том, насколько текущая приемистость пласта отличается от максимально возможной величины (определенной на более ранних стадиях разработки данной скважины), и соответствующего мнения о том, необходимо ли повышение приемистости, сначала может выполняться определение приемистости пласта. Данные исследования могут быть совмещены с исследованиями интервалов залегания нефти и воды.In addition, in order for the insulating composition to penetrate better into the rock when it is sold, it is possible to pre-increase the injectivity of the formation by treating the bottom-hole zone of the well by pouring a clay acid solution into it. For these purposes, the same pumping unit as previously mentioned can be used. In the absence of information about how much the current injectivity of the formation differs from the maximum possible value (determined at earlier stages of development of a given well) and the corresponding opinion on whether an increase in injectivity is necessary, a determination of the injectivity of the formation can be performed first. These studies can be combined with studies of the intervals of occurrence of oil and water.
Необходимый объем изолирующего состава может определяться следующим образом:The required volume of insulating composition can be determined as follows:
, ,
где VЗ - объем заливки, м3;where V Z - volume of filling, m 3 ;
k - коэффициент пористости пласта, доли единиц;k - formation porosity coefficient, fraction of units;
hc - высота создаваемого изолирующего моста снаружи скважины, м;h c - the height of the created insulating bridge outside the well, m;
hв - высота изолирующего моста внутри скважины (от забоя до верхней границы интервала перфорации), м;h in - the height of the insulating bridge inside the well (from the bottom to the upper boundary of the perforation interval), m;
Rм - радиус изолирующего моста, м;R m is the radius of the insulating bridge, m;
Rв - радиус скважины в области изолирующего моста внутри скважины, м.R in - radius of the well in the area of the insulating bridge inside the well, m
Все используемые параметры либо известны заранее (k, hв, Rв), либо задаются перед проведением водоизоляционных работ (hc, Rм), поэтому дополнительные измерения не требуются.All parameters used are either known in advance (k, h in , R in ), or are set before conducting waterproofing works (h c , R m ), therefore, additional measurements are not required.
В случае, если скважина имеет глубокий зумпф, для снижения расхода изолирующего состава в скважину может спускаться и устанавливаться глухая заглушка (например, пакер) ниже верхней границы интервала перфорации (например, на уровне ВНК) или ниже всего интервала перфорации. При этом для определения параметра hв в вышеуказанном выражении в качестве уровня забоя рассматривается местоположение заглушки. Чем выше будет установлена заглушка, тем меньше будет израсходовано изолирующего состава при заливке, но тем меньше будет максимально возможная высота нового интервала перфорации. При необходимости, с целью поддержания давления в скважине в области ниже заглушки может выполняться предварительное заполнение этой области внутреннего пространства скважины необходимым составом, например, составом глушения (с помощью той же насосной установки, что упоминалась ранее).If the well has a deep sump, a dummy plug (for example, a packer) can be lowered and installed below the upper boundary of the perforation interval (for example, at the level of the KSS) or below the entire perforation interval to reduce the consumption of insulating composition in the well. In this case, to determine the parameter h in the above expression, the location of the plug is considered as the level of the face. The higher the plug is installed, the less insulating compound will be consumed during pouring, but the smaller the maximum possible height of the new perforation interval. If necessary, in order to maintain pressure in the well in the area below the plug, a preliminary filling of this area of the internal space of the well with the necessary composition, for example, the killing composition (using the same pumping unit as mentioned earlier) can be performed.
Для еще большего снижения расхода изолирующего состава на разные уровни вдоль интервала перфорации может заливаться изолирующий состав с разными значениями подвижности (растекаемости) и проникающей способности. В одном варианте осуществления в нижнюю и верхнюю область создаваемого моста может заливаться изолирующий состав с меньшей подвижностью, а в область ВНК или в центральную область может заливаться изолирующий состав с большей подвижностью. Заливка и продавка может производиться поуровнево, с пошаговым подъемом колонны заливочных труб по мере заливки.To further reduce the consumption of the insulating composition at different levels along the perforation interval, an insulating composition with different values of mobility (spreadability) and penetration can be poured. In one embodiment, an insulating composition with less mobility can be poured into the lower and upper region of the bridge being created, and an insulating composition with greater mobility can be poured into the VNK region or the central region. Pouring and selling can be done on a level-by-stage basis, with step-by-step lifting of the column of filling pipes as they are filled.
Таким образом, изолирующий состав в нижней и верхней областях создаваемого моста не проникнет глубоко в пласт, тогда как изолирующий состав в центральной области за счет большей подвижности проникнет глубже, тем самым создав некий барьер между нижней и верхней областями. Тем самым, можно увеличить то пространство в пласте, которое необходимо заполнить пластовой воде до достижения перфорационных отверстий. Более того, если провести перфорацию именно в верхней области моста, возникает дополнительное неожиданное преимущество за счет того, что из-за наличия барьера градиент давления распространяется в первую очередь в нефтенасыщенную зону пласта, поэтому пластовая вода с меньшей интенсивностью движется в сторону интервала перфорации.Thus, the insulating composition in the lower and upper regions of the created bridge will not penetrate deep into the reservoir, while the insulating composition in the central region due to greater mobility will penetrate deeper, thereby creating a kind of barrier between the lower and upper regions. Thus, it is possible to increase the space in the reservoir, which must be filled with formation water before reaching the perforations. Moreover, if perforation is carried out precisely in the upper region of the bridge, an additional unexpected advantage arises due to the fact that, due to the presence of a barrier, the pressure gradient propagates primarily in the oil-saturated zone of the formation, so formation water moves with less intensity towards the perforation interval.
В других вариантах осуществления может производиться заливка по какой-либо другой схеме, однако предпочтительно, чтобы конфигурация создаваемого изолирующего моста при этом предусматривала наличие ступенчатого или какого-либо иного барьера.In other embodiments, the implementation can be done according to some other scheme, however, it is preferable that the configuration of the created insulating bridge in this case include the presence of a stepped or some other barrier.
Необходимый объем изолирующего состава при этом может определяться отдельно для каждой области, в которую предполагается заливка изолирующего состава с заданным значением подвижности.In this case, the required volume of the insulating composition can be determined separately for each region into which the insulating composition is supposed to be filled with a given mobility value.
Верхняя граница барьера (в случае, если барьер не является прямоугольным выступом относительно верхней и нижней областей изолирующего моста, она может задаваться усреднением или произвольно вдоль верхней поверхности барьера может задаваться на основании требуемых размеров нового интервала перфорации.The upper boundary of the barrier (if the barrier is not a rectangular protrusion relative to the upper and lower regions of the insulating bridge, it can be set by averaging or arbitrarily set along the upper surface of the barrier based on the required dimensions of the new perforation interval.
Значения подвижности изолирующего состава могут регулироваться на стадии приготовления раствора, до его заливки в скважину, с помощью изменения состава раствора, температуры раствора и/или параметров перемешивания раствора. Для этого в насосной установке может быть предусмотрен блок управления, который в соответствии с заданной конфигурацией создаваемого изолирующего моста регулирует значения подвижности изолирующего состава. Например, для повышения подвижности в изолирующий состав могут вводиться вода или химические реагенты, такие как пластификаторы. Повышение температуры раствора приводит к снижению подвижности изолирующего состава. Изменение времени и интенсивности перемешивания раствора также приводит к изменению подвижности изолирующего состава. Кроме того, значения подвижности изолирующего состава могут регулироваться путем приложения различного давления в процессе нагнетания.The mobility values of the insulating composition can be adjusted at the stage of preparation of the solution, before it is poured into the well, by changing the composition of the solution, the temperature of the solution and / or the parameters of mixing the solution. For this, a control unit can be provided in the pump installation, which, in accordance with the specified configuration of the insulating bridge being created, controls the mobility values of the insulating composition. For example, to increase mobility, water or chemicals, such as plasticizers, can be introduced into the insulating composition. An increase in the temperature of the solution leads to a decrease in the mobility of the insulating composition. Changing the time and intensity of mixing the solution also leads to a change in the mobility of the insulating composition. In addition, the mobility values of the insulating composition can be controlled by applying different pressures during the injection process.
Следует понимать, что на практике в каждом отдельно взятом случае с целью обеспечения наиболее продуктивной работы бригад и применения необходимого оборудования порядок выполнения этапов способа проведения водоизоляционных работ в скважине согласно настоящему изобретению может отличаться от того порядка, который конкретно описан в данном документе, без отступления от сущности и объема настоящего изобретения. Например, спуск колонны заливочных труб в скважину и подготовка по меньшей мере части изолирующего состава могут производиться одновременно.It should be understood that in practice in each individual case, in order to ensure the most productive work of the teams and the use of the necessary equipment, the procedure for performing the steps of the method of conducting waterproofing work in the well according to the present invention may differ from the order that is specifically described in this document, without departing from the essence and scope of the present invention. For example, the descent of a pipe string into a well and the preparation of at least a portion of the insulating composition can be carried out simultaneously.
Далее будет раскрыта система для проведения водоизоляционных работ в скважине. В целом, данная система предназначена для выполнения этапов раскрытого выше способа проведения водоизоляционных работ. В частности, система содержит колонну заливочных труб, спуско-подъемное устройство, насосную установку, устройство бурения и устройство перфорации.Next will be disclosed a system for conducting waterproofing work in the well. In general, this system is designed to perform the steps of the method of waterproofing work disclosed above. In particular, the system comprises a column of casting pipes, a hoisting device, a pumping unit, a drilling device and a perforation device.
Спуско-подъемное устройство выполнено с возможностью спуска и подъема оборудования в скважину и из нее.The lowering and lifting device is configured to lower and raise equipment into and out of the well.
Насосная установка содержит первый смесительный блок, выполненный с возможностью подготовки изолирующего состава в объеме, превышающем внутренний объем скважины от забоя до верхней границы интервала перфорации; второй смесительный блок, выполненный с возможностью подготовки технологической жидкости; насосный блок, соединенный с первым смесительным блоком, вторым смесительным блоком и колонной заливочных труб и выполненный с возможностью заливки изолирующего состава через колонну заливочных труб, предварительно спущенную в скважину спуско-подъемным устройством, в скважину по меньшей мере до верхней границы интервала перфорации с продавкой в пласт с помощью технологической (в данном случае продавочной) жидкости, подаваемой из второго смесительного блока; и блок управления, соединенный с первым смесительным блоком, вторым смесительным блоком и насосным блоком и выполненный с возможностью управления приготовлением растворов и жидкостей и нагнетанием их в скважину.The pump installation includes a first mixing unit configured to prepare an insulating composition in a volume exceeding the internal volume of the well from the bottom to the upper boundary of the perforation interval; a second mixing unit configured to prepare the process fluid; a pumping unit connected to the first mixing unit, the second mixing unit and the casting pipe string and configured to fill the insulating composition through the casting pipe string, previously lowered into the well by a launching and lifting device, into the well at least to the upper boundary of the perforation interval with a sale in formation using technological (in this case, squeezing) fluid supplied from the second mixing unit; and a control unit connected to the first mixing unit, the second mixing unit and the pump unit and configured to control the preparation of solutions and fluids and pumping them into the well.
Устройство бурения выполнено с возможностью разбуривания отвержденного изолирующего состава после отверждения изолирующего состава.The drilling device is configured to drill a cured insulating composition after curing the insulating composition.
Устройство перфорации выполнено с возможностью щадящей перфорации скважины в кровельной части пласта.The perforation device is configured to sparingly perforate the well in the roof of the formation.
Насосный блок может содержать один или более насосов, например, поршневых или плунжерных.The pump unit may contain one or more pumps, for example, piston or plunger.
Насосная установка может дополнительно содержать другие емкости или смесительные блоки для хранения и подготовки воды, химических реагентов, самих растворов и жидкостей и их компонентов. Емкости, смесительные блоки и насосный блок могут соединяться между собой системой трубопроводов.The pump installation may additionally contain other containers or mixing blocks for storing and preparing water, chemicals, solutions themselves and liquids and their components. Tanks, mixing units and a pump unit can be interconnected by a piping system.
Насосная установка может дополнительно содержать блок нагрева, выполненный с возможностью нагрева одной или более емкостей, смесительных блоков или трубопроводов насосной установки.The pump installation may further comprise a heating unit configured to heat one or more containers, mixing units or pipelines of the pump installation.
Для контроля параметров приготавливаемого раствора и нагнетания насосная установка может дополнительно содержать блок измерения, включающий в себя один или более датчиков, например, плотномер, термометр, консистометр, расходомер и т.д. Блок измерения может измерять параметры окружающей среды, параметры сред в емкостях и смесительных блоках, параметры подготовки растворов, параметры нагнетания и другие параметры, связанные с работой установки, и отправлять результаты измерений в блок управления.To control the parameters of the prepared solution and injection, the pumping unit may further comprise a measurement unit including one or more sensors, for example, a densitometer, thermometer, consistometer, flowmeter, etc. The measuring unit can measure the environmental parameters, the parameters of the media in containers and mixing units, the parameters of the preparation of solutions, the discharge parameters and other parameters associated with the operation of the installation, and send the measurement results to the control unit.
На основании полученных данных блок управления может управлять другими блоками, например, регулировать степень открытия клапанов для изменения объема подаваемых компонентов или смесей в смесительные блоки и в скважину, регулировать время и интенсивность перемешивания и температуру нагрева подготавливаемых смесей, давление нагнетания и т.д.Based on the data obtained, the control unit can control other units, for example, adjust the degree of opening of the valves to change the volume of supplied components or mixtures to the mixing blocks and into the well, adjust the time and intensity of mixing and the heating temperature of the prepared mixtures, discharge pressure, etc.
Насосный блок может быть дополнительно выполнен с возможностью промывки внутреннего пространства скважины путем прокачки через нее промывочной жидкости, например, пресной воды плотностью 1000 кг/м3.The pump unit may be further configured to flush the interior of the well by pumping flushing fluid through it, for example, fresh water with a density of 1000 kg / m 3 .
Для определения приемистости пласта насосный блок может быть дополнительно выполнен с возможностью нагнетания в призабойную зону скважины воды или технологической (например, промывочной) жидкости под заданным давлением, а блок измерения при этом может быть дополнительно выполнен с возможностью измерения объемного расхода нагнетаемой в единицу времени жидкости. Блок управления сравнивает полученную от блока измерения величину текущей приемистости пласта с максимально возможной величиной (определенной на более ранних стадиях разработки данной скважины), и если текущая приемистость пласта отличается от максимально возможной на предварительно определенную величину, блок управления сигнализирует о необходимости повышения приемистости пласта и выполняет соответствующее управление насосным блоком. При этом с целью повышения приемистости пласта насосный блок может быть дополнительно выполнен с возможностью нагнетания в призабойную зону скважины глинокислотного раствора.To determine the injectivity of the formation, the pumping unit can be additionally configured to inject water or technological (e.g., flushing) fluid into the bottomhole zone of the well at a predetermined pressure, and the measuring unit can be further configured to measure the volumetric flow rate of fluid injected per unit time. The control unit compares the current injectivity of the formation obtained from the measurement unit with the maximum possible value (determined at earlier stages of development of a given well), and if the current injectivity of the formation differs from the maximum possible by a predetermined value, the control unit signals the need to increase the injectivity of the formation and performs appropriate control of the pump unit. At the same time, in order to increase the injectivity of the formation, the pumping unit can be additionally configured to inject clay solution into the bottomhole zone of the well.
Насосная установка может дополнительно содержать блок ввода, выполненный с возможностью ввода в блок управления требуемых параметров для проведения водоизоляционных работ, в том числе ввода конфигурации создаваемого изолирующего моста. Блок управления в соответствии с заданной конфигурацией создаваемого изолирующего моста регулирует значения подвижности изолирующего состава и управляет нагнетанием изолирующего состава в скважину, как указано выше.The pump installation may further comprise an input unit configured to input into the control unit the required parameters for carrying out waterproofing operations, including inputting the configuration of the created insulating bridge. The control unit in accordance with the specified configuration of the created insulating bridge regulates the mobility of the insulating composition and controls the injection of the insulating composition into the well, as described above.
Насосная установка может дополнительно содержать блок памяти, выполненный с возможностью приема из блока управления и хранения контролируемых параметров процесса проведения водоизоляционных работ. Блок памяти при этом может быть частью блока управления.The pump installation may further comprise a memory unit configured to receive from the control unit and store controlled parameters of the waterproofing process. The memory unit can be part of the control unit.
Насосная установка может дополнительно содержать блок вывода, выполненный с возможностью вывода контролируемых параметров процесса проведения водоизоляционных работ из блока управления и/или из блока памяти. Например, блок вывода может быть выполнен в виде принтера или дисплея.The pump installation may further comprise an output unit configured to output controlled parameters of the waterproofing process from the control unit and / or from the memory unit. For example, the output unit may be in the form of a printer or display.
В одном варианте осуществления блок управления выполнен с возможностью регулировки подвижности приготавливаемого изолирующего состава так, чтобы в нижнюю и верхнюю область создаваемого моста заливался изолирующий состав с меньшей подвижностью, а в область ВНК или в центральную область заливался изолирующий состав с большей подвижностью.In one embodiment, the control unit is configured to adjust the mobility of the prepared insulating composition so that an insulating composition with less mobility is poured into the lower and upper region of the bridge being created, and an insulating composition with greater mobility is poured into the BHK or the central region.
Блок управления может управлять нагнетанием так, чтобы способствовать поуровневой заливке и продавке при пошаговом подъеме колонны заливочных труб по мере заливки.The control unit can control the injection in such a way as to facilitate level-by-level pouring and squeezing during step-by-step lifting of the pipe string as it is filled.
В других вариантах осуществления блок управления может управлять нагнетанием по какой-либо другой схеме, однако предпочтительно, чтобы конфигурация создаваемого изолирующего моста при этом предусматривала наличие ступенчатого или какого-либо иного барьера.In other embodiments, the control unit may control the injection according to some other scheme, however, it is preferable that the configuration of the insulating bridge being created provide for the presence of a stepped or some other barrier.
Конфигурация создаваемого изолирующего моста, вводимая в блок управления, может включать в себя текущее положение интервала перфорации, требуемые размеры нового интервала перфорации, данные об очертаниях создаваемого изолирующего моста, таблицу соответствия между уровнями в скважине и значениями подвижности изолирующего состава, подлежащего заливке на данные уровни, и т.д.The configuration of the insulating bridge to be created, introduced into the control unit, may include the current position of the perforation interval, the required dimensions of the new perforation interval, data on the outlines of the insulating bridge being created, a table of correspondence between the levels in the well and the mobility values of the insulating composition to be filled at these levels, etc.
При этом блок управления может определять необходимый объем изолирующего состава отдельно для каждой области, в которую предполагается заливка изолирующего состава с заданным значением подвижности.In this case, the control unit can determine the required volume of the insulating composition separately for each area into which it is assumed to fill the insulating composition with a given mobility value.
Кроме того, если в блок управления введено лишь текущее положение интервала перфорации, блок управления может самостоятельно задавать положение и размеры барьера. Верхняя граница барьера может задаваться блоком управления на основании требуемых размеров нового интервала перфорации, вводимых в блок управления через блок ввода или предварительно определенных (сохраненных) в памяти блока управления (например, 1-2 м от кровли продуктивного пласта). Нижняя граница барьера может задаваться блоком управления согласно предварительно определенным схемам, сохраненным в нем. Например, нижняя граница барьера может задаваться посередине между верхней границей барьера и нижней границей всего создаваемого моста. В другом варианте осуществления нижняя граница барьера может отстоять на предварительно заданное расстояние от верхней. Чем меньше это расстояние, тем меньше расход изолирующего состава, но тем сложнее реализовать надлежащую заливку и продавку в пласт и тем менее надежен будет барьер.In addition, if only the current position of the perforation interval is entered into the control unit, the control unit can independently set the position and dimensions of the barrier. The upper boundary of the barrier can be set by the control unit on the basis of the required dimensions of the new perforation interval entered into the control unit through the input unit or previously defined (stored) in the memory of the control unit (for example, 1-2 m from the roof of the reservoir). The lower boundary of the barrier can be set by the control unit according to the predefined circuits stored in it. For example, the lower boundary of the barrier can be set in the middle between the upper boundary of the barrier and the lower boundary of the entire bridge being created. In another embodiment, the lower boundary of the barrier may be a predetermined distance from the upper. The smaller this distance, the lower the consumption of the insulating composition, but the more difficult it is to implement proper filling and pushing into the formation and the less reliable the barrier will be.
Специалист должен понимать, что существует множество различных вариантов реализации блока управления. В частности, блок управления может быть выполнен в виде компьютера, в виде микроконтроллера или процессора, соединенного с памятью, в виде программируемой логической интегральной схемы, в виде набора дискретных компонентов или в какой-либо комбинации вышеуказанного и т.д.The specialist should understand that there are many different options for the implementation of the control unit. In particular, the control unit can be made in the form of a computer, in the form of a microcontroller or processor connected to a memory, in the form of a programmable logic integrated circuit, in the form of a set of discrete components, or in any combination of the above, etc.
Насосная установка может быть стационарной или смонтированной на мобильной платформе.The pump installation can be stationary or mounted on a mobile platform.
Помимо вышеуказанного, система для проведения водоизоляционных работ может содержать устройство для установки глухой заглушки (например, пакер) ниже верхней границы интервала перфорации (например, на уровне ВНК) или ниже всего интервала перфорации. С целью поддержания давления в скважине в области ниже заглушки блок управления может выдавать соответствующую команду в насосный блок, а насосный блок, в свою очередь, может быть дополнительно выполнен с возможностью заливки состава глушения в эту область скважины.In addition to the above, the system for carrying out waterproofing operations may include a device for installing a blind plug (for example, a packer) below the upper boundary of the perforation interval (for example, at the level of the KSS) or below the entire perforation interval. In order to maintain pressure in the well in the area below the plug, the control unit can issue an appropriate command to the pump unit, and the pump unit, in turn, can be additionally configured to fill the killing composition in this area of the well.
Также система для проведения водоизоляционных работ может содержать оборудование для проведения геофизических исследований, в частности, выполненное с возможностью определения интервалов залегания нефти и воды.Also, the system for carrying out waterproofing operations may contain equipment for conducting geophysical surveys, in particular, configured to determine the intervals of occurrence of oil and water.
Применение предлагаемых способов и систем позволяет снизить подвижность подошвенных вод в вертикальном направлении, увеличить безводный период эксплуатации скважин и конечный коэффициент нефтеотдачи, снизить затраты времени и ресурсов, избежать необходимости частого проведения водоизоляционных работ, или иными словами, повысить эффективность и надежность эксплуатации скважин, расположенных в зоне водонефтяного контакта.The application of the proposed methods and systems allows to reduce the mobility of bottom water in the vertical direction, to increase the anhydrous period of operation of wells and the final oil recovery coefficient, to reduce the cost of time and resources, to avoid the need for frequent waterproofing works, or in other words, to increase the efficiency and reliability of operation of wells located in oil-water contact zone.
Следует понимать, что конкретные варианты осуществления, описанные выше, являются лишь примерами и не должны рассматриваться как ограничение настоящего изобретения, и специалисты в данной области техники могут внести в него изменения и дополнения без отступления от сущности и объема изобретения. Объем изобретения задается последующей прилагаемой формулой изобретения.It should be understood that the specific embodiments described above are merely examples and should not be construed as limiting the present invention, and those skilled in the art can make changes and additions thereto without departing from the spirit and scope of the invention. The scope of the invention is defined by the following appended claims.
Claims (32)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2016114658A RU2622965C1 (en) | 2016-04-14 | 2016-04-14 | Method for carrying out water shutoff treatment in well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2016114658A RU2622965C1 (en) | 2016-04-14 | 2016-04-14 | Method for carrying out water shutoff treatment in well |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2014142137/03A Division RU2586120C2 (en) | 2014-10-17 | 2014-10-17 | Method and system for waterproofing works in well |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2622965C1 true RU2622965C1 (en) | 2017-06-21 |
Family
ID=59241362
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2016114658A RU2622965C1 (en) | 2016-04-14 | 2016-04-14 | Method for carrying out water shutoff treatment in well |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2622965C1 (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4630679A (en) * | 1985-03-27 | 1986-12-23 | Dowell Schlumberger Incorporated | Method for treatment and/or workover of injection wells |
RU2231630C1 (en) * | 2002-11-15 | 2004-06-27 | Общество с ограниченной ответственностью "ТюменНИИгипрогаз" | Method for restoring productiveness and starting operation of standing oil and gas wells |
RU2304697C1 (en) * | 2005-12-02 | 2007-08-20 | Николай Александрович Петров | Well completion method |
RU2485296C1 (en) * | 2011-12-14 | 2013-06-20 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Method for improvement of hydrodynamic communication of well with productive formation |
RU2509884C1 (en) * | 2012-10-02 | 2014-03-20 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Development method of water-flooded oil deposit |
RU2536515C1 (en) * | 2013-09-30 | 2014-12-27 | Эльмир Саттарович Кузяев | Method of productivity recovery and commissioning of non-operating oil and gas wells |
-
2016
- 2016-04-14 RU RU2016114658A patent/RU2622965C1/en active IP Right Revival
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4630679A (en) * | 1985-03-27 | 1986-12-23 | Dowell Schlumberger Incorporated | Method for treatment and/or workover of injection wells |
RU2231630C1 (en) * | 2002-11-15 | 2004-06-27 | Общество с ограниченной ответственностью "ТюменНИИгипрогаз" | Method for restoring productiveness and starting operation of standing oil and gas wells |
RU2304697C1 (en) * | 2005-12-02 | 2007-08-20 | Николай Александрович Петров | Well completion method |
RU2485296C1 (en) * | 2011-12-14 | 2013-06-20 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Method for improvement of hydrodynamic communication of well with productive formation |
RU2509884C1 (en) * | 2012-10-02 | 2014-03-20 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Development method of water-flooded oil deposit |
RU2536515C1 (en) * | 2013-09-30 | 2014-12-27 | Эльмир Саттарович Кузяев | Method of productivity recovery and commissioning of non-operating oil and gas wells |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20240060390A1 (en) | Additive Manufacture of Wellbore Tubulars | |
RU2483209C1 (en) | Method of hydraulic fracturing of well formation | |
US2784787A (en) | Method of suppressing water and gas coning in oil wells | |
US7640983B2 (en) | Method to cement a perforated casing | |
RU2447265C1 (en) | Method for horizontal well operation | |
RU2509884C1 (en) | Development method of water-flooded oil deposit | |
RU2618538C1 (en) | Procedure for water shutoff treatment in well | |
US9074470B2 (en) | Methods for drilling and stimulating subterranean formations for recovering hydrocarbon and natural gas resources | |
RU2743478C1 (en) | Difficult turonian gas production method | |
RU2622965C1 (en) | Method for carrying out water shutoff treatment in well | |
RU2613382C1 (en) | Method of water shutoff works in well | |
RU2695906C1 (en) | Method for development of weakly permeable oil deposit with application of horizontal wells and water and gas impact | |
RU2524800C1 (en) | Development of inhomogeneous deposit by inclined and horizontal wells | |
RU2586120C2 (en) | Method and system for waterproofing works in well | |
RU2494247C1 (en) | Development method of water-flooded oil deposit | |
RU2510456C2 (en) | Formation method of vertically directed fracture at hydraulic fracturing of productive formation | |
RU2564722C1 (en) | Method of operation of hydrocarbons reservoir | |
RU2605974C2 (en) | Plant for water insulation works in well | |
RU2509885C1 (en) | Development method of water-flooded oil deposit | |
RU2601707C1 (en) | Method of development of oil and gas condensate deposit | |
RU2584435C1 (en) | Method of developing oil deposits | |
RU2425961C1 (en) | Well operation method | |
RU2792128C1 (en) | Method for cementing the conductor, a technical column during the construction of wells | |
RU2520033C1 (en) | Method of horizontal oil well construction | |
RU2808347C1 (en) | Method for eliminating annular circulation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20171018 |
|
NF4A | Reinstatement of patent |
Effective date: 20190426 |