Info

Publication number
JP6098994B2
JP6098994B2 JP2013136545A JP2013136545A JP6098994B2 JP 6098994 B2 JP6098994 B2 JP 6098994B2 JP 2013136545 A JP2013136545 A JP 2013136545A JP 2013136545 A JP2013136545 A JP 2013136545A JP 6098994 B2 JP6098994 B2 JP 6098994B2
Authority
JP
Japan
Prior art keywords
hot water
temperature
heat
heat demand
water storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013136545A
Other languages
Japanese (ja)
Other versions
JP2015010773A (en
Inventor
岩本 淳
淳 岩本
直人 岩澤
直人 岩澤
山下 諭
諭 山下
邦彦 中野
邦彦 中野
山本 格
格 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Noritz Corp
Original Assignee
Noritz Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Noritz Corp filed Critical Noritz Corp
Priority to JP2013136545A priority Critical patent/JP6098994B2/en
Publication of JP2015010773A publication Critical patent/JP2015010773A/en
Application granted granted Critical
Publication of JP6098994B2 publication Critical patent/JP6098994B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)

Description

本発明は、ヒートポンプ式給湯システムに関し、さらに詳しくは、貯湯タンクに貯留される湯水の温度を、予測される熱需要量に応じて変更するように構成されたヒートポンプ式給湯システムに関する。   The present invention relates to a heat pump hot water supply system, and more particularly, to a heat pump hot water supply system configured to change the temperature of hot water stored in a hot water storage tank according to an estimated amount of heat demand.

ヒートポンプ式給湯システムとしては、過去の熱需要に基づく学習能力をもち、今後の熱需要の発生時期や熱需要量を比較的細かく予測し、予測された熱需要に対応した熱量の湯水をヒートポンプの運転により生成して貯湯タンクに貯留させる動作を、できる限り熱需要の発生時期の直前に行なわせるようにしたものがある。従来においては、このような方式とは異なり、たとえば夜間電力を利用してヒートポンプを運転させることにより1日分の熱需要に対応した湯水を一括して生成させてから貯湯タンクに貯留させるようにしたものもあるが、このようなものと比較すると、前記前者のものは、貯湯タンクからの放熱ロスを少なくできる。また、貯湯タンクに貯留される湯水の熱量を実際の熱需要に対して、より的確に対応させることができる。したがって、湯余りや湯不足が生じることを抑制する上で好ましい。さらに、貯湯タンクとしては、1日分の熱需要に対応する湯水を貯留可能なサイズのものを用いる必要がなく、小型の貯湯タンクを用いればよいこととなり、設備コストを廉価にすることもできる。   The heat pump hot water supply system has a learning ability based on past heat demand, predicts the generation time of heat demand and the amount of heat demand in the future relatively finely, and uses the heat pump of the heat amount corresponding to the predicted heat demand. There is a system in which the operation generated by operation and stored in the hot water storage tank is performed as soon as possible just before the generation time of heat demand. Conventionally, unlike such a method, for example, by operating a heat pump using nighttime power, hot water corresponding to the heat demand for one day is generated in a lump and then stored in a hot water storage tank. However, the former can reduce the heat radiation loss from the hot water storage tank as compared with the above. Further, the amount of hot water stored in the hot water storage tank can be more accurately met with actual heat demand. Therefore, it is preferable for suppressing the occurrence of excess hot water or shortage of hot water. Furthermore, as a hot water storage tank, it is not necessary to use a size that can store hot water corresponding to the heat demand for one day, and a small hot water storage tank may be used, and the equipment cost can be reduced. .

一方、ヒートポンプのCOP(成績係数)を高くするには、ヒートポンプによる加熱湯水温度をたとえば50℃程度の比較的低めの温度とすることが好ましい。ただし、湯水温度を一律にそのような低めの温度としたのでは、熱需要量が多い場合に不足を生じる。このため、従来では、熱需要が予測される場合において、その熱需要量が多く、所定の閾値を超える場合には、湯水温度をたとえば65℃程度の高めの温度とすることが行なわれている。   On the other hand, in order to increase the COP (coefficient of performance) of the heat pump, it is preferable to set the temperature of the hot water supplied by the heat pump to a relatively low temperature of about 50 ° C., for example. However, if the hot water temperature is uniformly set to such a low temperature, a shortage occurs when there is a large amount of heat demand. For this reason, conventionally, when heat demand is predicted, when the amount of heat demand is large and exceeds a predetermined threshold, the hot water temperature is set to a high temperature of about 65 ° C., for example. .

しかしながら、従来においては、次に述べるように、改善すべき余地があった。   However, in the past, there was room for improvement as described below.

すなわち、従来においては、たとえばある程度の時間間隔を隔てて複数の熱需要が生じることが予測され、最初の熱需要の量が比較的少なく、かつ次の熱需要の量がかなり多い場合には、最初の熱需要に対する貯湯温度は低めの温度(たとえば50℃)とされ、次の熱需要に対する貯湯温度は高めの温度(たとえば65℃)とされる。ところが、このように設定したのでは、最初の熱需要の実際の熱需要量が予測を下回る少量であって、貯湯タンク内に低めの温度の湯水が湯余り状態になると、次の熱需要に対応すべく貯湯タンク内の湯水熱量をかなり多くようとしても、前記した低めの温度の湯水が存在することに起因し、貯湯タンク内の湯水熱量を多くすることが困難となる場合がある。これでは、次の熱需要に対し、貯湯タンク内の湯水熱量に不足を生じることとなり、適切ではない。したがって、そのような事態が生じないようにすることが望まれる。   That is, in the past, for example, when it is predicted that a plurality of heat demands occur at a certain time interval, the amount of the first heat demand is relatively small, and the amount of the next heat demand is considerably large, The hot water storage temperature for the first heat demand is set to a lower temperature (for example, 50 ° C.), and the hot water storage temperature for the next heat demand is set to a higher temperature (for example, 65 ° C.). However, with this setting, if the actual heat demand of the first heat demand is less than expected and the hot water at a lower temperature in the hot water storage tank becomes surplus, the next heat demand will be met. Even if it is attempted to increase the amount of hot water in the hot water storage tank to cope with it, it may be difficult to increase the amount of hot water in the hot water storage tank due to the presence of the low temperature hot water described above. In this case, the amount of hot water in the hot water storage tank is insufficient for the next heat demand, which is not appropriate. Therefore, it is desirable to prevent such a situation from occurring.

特開平5−118660号公報Japanese Patent Laid-Open No. 5-118660 特許第4688586号公報Japanese Patent No. 4688586

本発明は、前記したような事情のもとで考え出されたものであって、システム全体のエ
ネルギ効率を良好にしつつ、湯不足などの不具合が生じないようにすることが可能なヒートポンプ式給湯システムを提供することを、その課題としている。
The present invention has been conceived under the circumstances as described above, and is a heat pump hot water supply capable of improving the energy efficiency of the entire system and preventing problems such as lack of hot water from occurring. The challenge is to provide a system.

上記の課題を解決するため、本発明では、次の技術的手段を講じている。   In order to solve the above problems, the present invention takes the following technical means.

本発明により提供されるヒートポンプ式給湯システムは、ヒートポンプと、このヒートポンプによって加熱された湯水を貯留し、かつこの湯水を所定の出湯口または熱負荷に供給可能な貯湯タンクと、過去の熱需要に基づく学習能力をもち、今後の熱需要の発生時期および熱需要量を予測し、かつ予測される熱需要の発生前に前記ヒートポンプを運転させて熱需要に対応する熱量の湯水を前記貯湯タンクに貯留させる制御を実行する制御手段と、を備えており、前記制御手段は、熱需要に対応する湯水を前記貯湯タンクに貯留させる場合において、熱需要量が所定の閾値以下である場合には、この熱需要に対応する貯湯温度を所定の第1の温度にする一方、熱需要量が前記閾値を超える場合には、貯湯温度を前記第1の温度よりも高温の第2の温度とする制御を実行するように構成されている、ヒートポンプ式給湯システムであって、前記制御手段は、貯湯温度を前記第2の温度とする熱需要が予測される場合において、この熱需要の発生前の所定時間内に別の熱需要があると予測される場合には、その熱需要量の多少には関係なく、前記別の熱需要に対応する貯湯温度を前記第2の温度とする制御を実行するように構成されていることを特徴としている。   The heat pump type hot water supply system provided by the present invention stores a heat pump, a hot water storage tank that stores hot water heated by the heat pump, and can supply the hot water to a predetermined outlet or heat load, and to the past heat demand. Based on the learning ability, predicting the future heat demand generation time and heat demand, and operating the heat pump before the predicted heat demand occurs to supply the hot water with the heat quantity corresponding to the heat demand to the hot water storage tank. Control means for executing control for storing, and when the hot water corresponding to the heat demand is stored in the hot water storage tank and the heat demand is equal to or less than a predetermined threshold, While the hot water storage temperature corresponding to this heat demand is set to a predetermined first temperature, and the amount of heat demand exceeds the threshold, the hot water storage temperature is set to a second temperature higher than the first temperature. A heat pump hot water supply system configured to execute control for temperature, wherein the control means is configured to control the heat demand when a heat demand for a hot water storage temperature as the second temperature is predicted. When it is predicted that there is another heat demand within a predetermined time before the occurrence, the hot water storage temperature corresponding to the other heat demand is set as the second temperature regardless of the amount of the heat demand. It is characterized by being configured to execute control.

このような構成によれば、次のような効果が得られる。
すなわち、貯湯温度を第2の温度(高めの温度)とする熱需要が予測される場合において、この熱需要の発生前の所定時間内に別の熱需要があると、その熱需要量が少なく、その貯湯温度が第1の温度(低めの温度)で十分であったとしても、この別の熱需要に対応する貯湯温度は第2の温度とされる。したがって、前記した別の熱需要の量が予測された熱需要量よりも少なく、湯余りが生じたとしても、貯湯タンクに残存する湯水は、第2の温度(高めの温度)となる。このため、その後に発生する熱需要に対し、必要な熱量の湯水を貯湯タンクに貯留させることができる。その結果、前記従来技術とは異なり、湯不足を生じないようにすることが可能となる。
一方、本発明においては、前記したような場合を除き、基本的には、熱需要量が所定の閾値以下である場合には、貯湯温度が第1の温度(低めの温度)とされるために、ヒートポンプの成績係数を高くし、エネルギ効率をよくすることが可能である。
According to such a configuration, the following effects can be obtained.
That is, in the case where heat demand with the hot water storage temperature being the second temperature (higher temperature) is predicted, if there is another heat demand within a predetermined time before the occurrence of this heat demand, the amount of heat demand is small. Even if the hot water storage temperature is sufficient at the first temperature (lower temperature), the hot water storage temperature corresponding to this other heat demand is set as the second temperature. Therefore, even if the amount of other heat demand described above is smaller than the predicted heat demand amount and there is a surplus of hot water, the hot water remaining in the hot water storage tank becomes the second temperature (higher temperature). For this reason, it is possible to store hot water with a necessary amount of heat in the hot water storage tank for the heat demand generated thereafter. As a result, unlike the prior art, it becomes possible to prevent hot water shortage.
On the other hand, in the present invention, except for the cases described above, basically, when the heat demand is equal to or less than a predetermined threshold, the hot water storage temperature is set to the first temperature (lower temperature). In addition, the coefficient of performance of the heat pump can be increased and energy efficiency can be improved.

本発明において、好ましくは、前記所定時間は、可変値とされ、かつ貯湯温度が前記第2の温度とされる熱需要が発生する前に別の熱需要が発生する頻度が高いと予測される場合には、そうでない場合よりも長い時間に設定されるように構成されている。   In the present invention, preferably, the predetermined time is set to a variable value, and it is predicted that another heat demand is frequently generated before the heat demand at which the hot water storage temperature is the second temperature is generated. In some cases, it is configured to be set to a longer time than otherwise.

このような構成によれば、貯湯温度が第2の温度とされる熱需要が発生する前に、別の熱需要が発生する頻度が高いと予測される場合には、当該別の熱需要に対応する貯湯温度が第2の温度に設定され易くなる。したがって、熱需要の発生頻度が高い場合に、湯不足を生じ難くすることができる。これとは反対に、熱需要の発生頻度が低い場合には、貯湯温度が強制的に第2の温度に設定されることは抑制されるために、湯余りが多く生じるといったことも適切に回避される。   According to such a configuration, when it is predicted that the frequency of occurrence of another heat demand is high before the heat demand at which the hot water storage temperature is the second temperature is generated, The corresponding hot water storage temperature is easily set to the second temperature. Therefore, it is possible to make it difficult for hot water shortages to occur when the frequency of heat demand is high. On the other hand, when the frequency of heat demand is low, the hot water storage temperature is suppressed from being set to the second temperature forcibly, so that excessive hot water is appropriately avoided. Is done.

本発明において、好ましくは、前記貯湯タンクから前記所定の出湯口または熱負荷に供給される湯水をその途中で加熱可能な補助熱源機を、さらに備えており、前記制御手段は、熱需要量が前記閾値を超える場合であっても、貯湯温度を前記第2の温度にする場合と比べて、貯湯温度を前記第1の温度にしてからその不足熱量を前記補助熱源機によって補う場合の方が、エネルギ効率が高いと判断した場合には、貯湯温度を前記第1の温度にす
るように構成されている。
In the present invention, preferably, it further includes an auxiliary heat source device capable of heating hot water supplied from the hot water storage tank to the predetermined outlet or heat load in the middle thereof, and the control means has a heat demand amount. Even when the threshold value is exceeded, compared to the case where the hot water storage temperature is set to the second temperature, the case where the hot water storage temperature is set to the first temperature and then the insufficient heat amount is compensated by the auxiliary heat source device. When it is determined that the energy efficiency is high, the hot water storage temperature is set to the first temperature.

このような構成によれば、補助熱源機を備えた給湯システムのエネルギ効率を高いものとすることができる。なお、貯湯タンクに湯切れを生じた場合には、補助熱源機によって適切に対処することが可能である。   According to such a configuration, the energy efficiency of the hot water supply system including the auxiliary heat source device can be increased. In addition, when hot water runs out in the hot water storage tank, it is possible to appropriately cope with the auxiliary heat source machine.

本発明のその他の特徴および利点は、添付図面を参照して以下に行なう発明の実施の形態の説明から、より明らかになるであろう。   Other features and advantages of the present invention will become more apparent from the following description of embodiments of the present invention with reference to the accompanying drawings.

本発明に係るヒートポンプ式給湯システムの一例を示す概略説明図である。It is a schematic explanatory drawing which shows an example of the heat pump type hot water supply system which concerns on this invention. 図1に示すヒートポンプ式給湯システムが具備する制御部の動作処理手順の一例を示すフローチャートである。It is a flowchart which shows an example of the operation processing procedure of the control part which the heat pump type hot-water supply system shown in FIG. 1 comprises. (a),(b)は、図1に示すヒートポンプ式給湯システムが具備する制御部で実行される処理の一部を理解するための説明図である。(A), (b) is explanatory drawing for understanding a part of process performed by the control part which the heat pump type hot-water supply system shown in FIG. 1 comprises.

以下、本発明の好ましい実施の形態について、図面を参照して具体的に説明する。   Hereinafter, preferred embodiments of the present invention will be specifically described with reference to the drawings.

図1に示すヒートポンプ式給湯システムAは、ヒートポンプ1と、貯湯タンクユニットUとを組み合わせて構成されている。   The heat pump hot water supply system A shown in FIG. 1 is configured by combining a heat pump 1 and a hot water storage tank unit U.

ヒートポンプ1は、従来既知のものと同様であり、たとえばCO2などの冷媒の循環路に、ファン10aを利用して取り込まれる空気から熱を吸収する蒸発器10、圧縮器11、凝縮器としての湯水加熱用の熱交換器12、および膨張弁13が設けられたものである。 The heat pump 1 is the same as a conventionally known one. For example, an evaporator 10, a compressor 11, and a condenser that absorb heat from air taken in using a fan 10 a into a circulation path of a refrigerant such as CO 2 . A heat exchanger 12 for heating hot water and an expansion valve 13 are provided.

貯湯タンクユニットUは、貯湯タンク2、補助熱源機3、および制御部4を具備している。   The hot water storage tank unit U includes a hot water storage tank 2, an auxiliary heat source device 3, and a control unit 4.

貯湯タンク2の下部および上部は、ヒートポンプ1の熱交換器に12に対し、配管部50a,50bを介して接続されている。配管部50aに設けられた循環ポンプP1が駆動されると、矢印N11〜N13で示す経路で湯水が流通し、貯湯タンク2の下部から流出した湯水は熱交換器12によって加熱されてから、貯湯タンク2内の上部に戻される。このことにより、貯湯タンク2への貯湯がなされる。   A lower part and an upper part of the hot water storage tank 2 are connected to the heat exchanger 12 of the heat pump 1 via the piping parts 50a and 50b. When the circulation pump P1 provided in the pipe section 50a is driven, hot water flows through the paths indicated by arrows N11 to N13, and the hot water flowing out from the lower portion of the hot water storage tank 2 is heated by the heat exchanger 12, and then stored in hot water. It is returned to the upper part in the tank 2. As a result, hot water is stored in the hot water storage tank 2.

貯湯タンク2の下部および上部には、入水口61aを有する入水管61および出湯口62aを有する出湯管62が接続されている。出湯口62aに配管接続された給湯栓90が開状態にされると、貯湯タンク2内への入水圧によって貯湯タンク2内の湯水は出湯管62に流出し、流出口62aから給湯栓90に向けて供給される。なお、図面では省略しているが、本実施形態のヒートポンプ式給湯システムAにおいては、浴槽への湯張りなどを行なうための風呂給湯も可能とされている。   Connected to the lower and upper portions of the hot water storage tank 2 are a water inlet pipe 61 having a water inlet 61a and a hot water outlet pipe 62 having a hot water outlet 62a. When the hot water tap 90 piped to the hot water outlet 62a is opened, the hot water in the hot water storage tank 2 flows out into the hot water outlet pipe 62 due to the water pressure in the hot water storage tank 2, and enters the hot water tap 90 from the outlet 62a. Supplied towards. In addition, although omitted in the drawings, in the heat pump hot water supply system A of the present embodiment, bath hot water for performing hot water filling in a bathtub or the like is also possible.

補助熱源機3は、貯湯タンク2に湯量不足が生じた場合などにおいて、湯水加熱を行なうのに利用されるものであり、その構成は、たとえばガス瞬間式湯沸器と同様である。具体的には、この補助熱源機3は、バーナ30および熱交換器31が缶体32内に収容され、熱交換器31に供給された湯水をバーナ30によって迅速に加熱できるように構成されている。補助熱源機3の入水側配管部70aは、ポンプP2および三方弁V1を介して貯湯タンク2の上部に繋がっている。補助熱源機3の出湯側配管部70bは、三方弁V2を介して出湯管62に繋がっている。このため、出湯口62aから給湯栓90に向けて出湯
が行なわれる場合に、三方弁V2を切り替えることによって、矢印N21,N22に示すように、補助熱源機3によって加熱された湯水を出湯口62aに供給することが可能である。
The auxiliary heat source unit 3 is used for heating hot water when the amount of hot water in the hot water storage tank 2 is insufficient, and the configuration thereof is the same as that of a gas instantaneous water heater, for example. Specifically, the auxiliary heat source unit 3 is configured such that the burner 30 and the heat exchanger 31 are accommodated in the can 32 and hot water supplied to the heat exchanger 31 can be quickly heated by the burner 30. Yes. The incoming water side piping part 70a of the auxiliary heat source unit 3 is connected to the upper part of the hot water storage tank 2 via the pump P2 and the three-way valve V1. The hot water side piping part 70b of the auxiliary heat source device 3 is connected to the hot water pipe 62 via a three-way valve V2. For this reason, when the hot water is discharged from the hot water outlet 62a toward the hot water tap 90, the hot water heated by the auxiliary heat source device 3 is switched to the hot water outlet 62a by switching the three-way valve V2, as indicated by arrows N21 and N22. Can be supplied.

補助熱源機3の出湯側配管部70bに分岐接続された配管部71には、熱交換器92が設けられている。この熱交換器92は、熱負荷の1つであり、たとえば床暖房装置などの暖房端末91用の熱媒を加熱するためのものである。ポンプP3の駆動によって熱交換器92と暖房端末91との間を熱媒が循環流通可能である。なお、図1に示す三方弁V1,V3間は、配管部63を介して接続されており、熱交換器92を通過して三方弁V3に到達した湯水を、貯湯タンク2を介することなく補助熱源機3に再度送り込んで加熱することが可能となっている。   A heat exchanger 92 is provided in the pipe part 71 branched and connected to the hot water side pipe part 70b of the auxiliary heat source unit 3. The heat exchanger 92 is one of heat loads, and is for heating a heat medium for the heating terminal 91 such as a floor heating device. The heat medium can circulate between the heat exchanger 92 and the heating terminal 91 by driving the pump P3. Note that the three-way valves V1 and V3 shown in FIG. 1 are connected via a pipe portion 63, so that hot water that has passed through the heat exchanger 92 and reaches the three-way valve V3 is supported without going through the hot water storage tank 2. It can be sent again to the heat source unit 3 and heated.

制御部4は、本発明でいう制御手段の一例に相当し、マイクロコンピュータなどを用いて構成されている。この制御部4は、貯湯タンクユニットUの各部の動作制御やデータ処理を実行するとともに、ヒートポンプ1の制御部(図示略)と協働してヒートポンプ式給湯システムAの全体の動作制御も実行する。制御部4には、リモコン8が通信接続されている。リモコン8は、データ用の表示部80、および複数の操作スイッチ81を有しており、これらの操作スイッチ81を操作することによって、たとえば暖房端末91の運転開始や、浴槽への湯張りなどについてのタイマ予約が可能である。   The control unit 4 corresponds to an example of a control unit referred to in the present invention, and is configured using a microcomputer or the like. The control unit 4 executes operation control and data processing of each part of the hot water storage tank unit U, and also performs overall operation control of the heat pump hot water supply system A in cooperation with a control unit (not shown) of the heat pump 1. . A remote controller 8 is communicatively connected to the control unit 4. The remote controller 8 has a data display unit 80 and a plurality of operation switches 81. By operating these operation switches 81, for example, about the start of operation of the heating terminal 91 or hot water filling in a bathtub, etc. Timer reservation is possible.

制御部4は、過去の熱需要(給湯運転実績)に基づき、今後の熱需要を予測する学習能力を有している。このような学習能力自体は、既知であるため、省略する。なお、本実施形態における熱需要の予測は、たとえば1時間などの比較的短い時間を単位として行なわれ(10時〜11時,11時〜12時など)、熱需要が発生する場合にはその熱需要量が予測される。この予測に際しては、風呂給湯予約や暖房運転予約などの事情も考慮される。予測対象期間は、たとえば現時刻から9時間先までの期間であるなど、基本的には現時刻から所定時間内に限定されている。制御部4は、熱需要が予測される場合には、この熱需要が発生すると予測される時期までに貯湯タンク2への貯湯動作が間に合うように、できる限り熱需要の発生予測時期に近いタイミングでヒートポンプ1の運転を開始させることにより、前記熱需要に対応した熱量の湯水を貯湯タンク2に貯留させる制御を実行する。その際の貯湯温度としては、低めの第1の温度T1(たとえば50℃)と、それよりも高い第2の温度T2(たとえば65℃)とがあり、これらのうちのいずれか一方が選択されるが、その選択処理の具体的な手順については後述する。   The control unit 4 has a learning capability for predicting future heat demand based on past heat demand (hot water supply operation results). Since such learning ability itself is known, it is omitted. The prediction of heat demand in the present embodiment is performed in units of relatively short time such as 1 hour (10:00 to 11:00, 11:00 to 12:00, etc.), and when heat demand occurs, Heat demand is predicted. In making this prediction, circumstances such as a bath hot water reservation and a heating operation reservation are also taken into consideration. The prediction target period is basically limited to a predetermined time from the current time, for example, a period from the current time to 9 hours ahead. When the heat demand is predicted, the control unit 4 is as close as possible to the predicted heat demand generation time so that the hot water storage operation to the hot water storage tank 2 is in time by the time when the heat demand is predicted to occur. Then, by starting the operation of the heat pump 1, control is performed to store the hot water in the amount of heat corresponding to the heat demand in the hot water storage tank 2. The hot water storage temperature at that time includes a lower first temperature T1 (for example, 50 ° C.) and a higher second temperature T2 (for example, 65 ° C.), and one of these is selected. However, a specific procedure of the selection process will be described later.

次に、前記したヒートポンプ式給湯システムAの作用について説明する。併せて、制御部4の動作処理手順の一例について、図2のフローチャートおよび図3を参照しつつ説明する。   Next, the operation of the heat pump hot water supply system A will be described. In addition, an example of the operation processing procedure of the control unit 4 will be described with reference to the flowchart of FIG. 2 and FIG.

まず、制御部4は、過去の熱需要に基づき、今後の熱需要を予測する処理を短周期で繰り返し実行している(S1)。この熱需要の予測は、現時刻からたとえば9時間程度先までの熱需要の発生を予測するものであって、具体的には、熱需要の発生時刻およびその熱需要量を予測する。   First, the control part 4 repeatedly performs the process which estimates the future heat demand based on the past heat demand in a short cycle (S1). This prediction of heat demand is to predict the generation of heat demand from the current time, for example, about nine hours ahead, and specifically, the generation time of heat demand and the amount of heat demand thereof are predicted.

制御部4は、熱需要が予測される場合には、その熱需要量が所定の閾値Th以下であるか否かを判断する。この判断において、熱需要量が比較的少なく、閾値Th以下である場合には、前記熱需要に対応する貯湯温度を、低めの温度である第1の温度T1(たとえば50℃)に決定する(S2:YES,S3)。貯湯温度を低めの温度にすれば、ヒートポンプ1の成績係数を高くすることが可能である。
閾値Thは、たとえば次の式で求められる値である。
Th=貯湯タンクの容量×(第1の温度−保持入水温度)
ここで、保持入水温度とは、貯湯タンク2内の最下部の湯水温度、あるいは貯湯タンク2内の最下部に近い入水配管部内の湯水温度である。
閾値Thを上記した値とすれば、貯湯タンク内に第1の温度T1で貯湯を行なった場合に、この湯水の熱量によって熱需要が賄えるか否かの判断がなされることとなり、熱需要が賄える場合(熱需要量が閾値Th以下の場合)には、貯湯温度が第1の温度T1に決定されることとなる。ただし、本発明においては、閾値Thとして、前記した値とは異なる値を採用することが可能である。
なお、熱需要量の予測値としては、1時間当たりの熱需要量の予測値に代えて、たとえば2時間当たりの予測値を用いることもできる。このようにすれば、熱需要が、たとえば16時45分〜17時15分にわたって発生する熱需要量が大きいものであるにも拘わらず、16時45分〜17時00分までの小量の熱需要と、17時00分〜17時15分までの少量の熱需要との2つの熱需要が単に発生しているだけであると過誤判断される虞をなくすことができる。
When the heat demand is predicted, the control unit 4 determines whether the heat demand is equal to or less than a predetermined threshold Th. In this determination, when the heat demand is relatively small and is equal to or less than the threshold Th, the hot water storage temperature corresponding to the heat demand is determined to be a first temperature T1 (for example, 50 ° C.) that is a lower temperature ( S2: YES, S3). If the hot water storage temperature is set to a lower temperature, the coefficient of performance of the heat pump 1 can be increased.
The threshold value Th is a value obtained by the following equation, for example.
Th = capacity of hot water storage tank × (first temperature−holding water temperature)
Here, the retained incoming water temperature is the lowest hot water temperature in the hot water storage tank 2 or the hot water temperature in the incoming water piping section near the lowermost part in the hot water storage tank 2.
When the threshold value Th is set to the above-described value, when hot water is stored in the hot water storage tank at the first temperature T1, it is determined whether the heat demand can be covered by the amount of heat of the hot water. In the case where it can be covered (when the heat demand is equal to or less than the threshold Th), the hot water storage temperature is determined to be the first temperature T1. However, in the present invention, it is possible to employ a value different from the above value as the threshold Th.
As the predicted value of the heat demand, for example, a predicted value per two hours can be used instead of the predicted value of the heat demand per hour. In this way, a small amount of heat from 16:45 to 17:00, despite the large amount of heat demand generated from 16:45 to 17:15, for example. It is possible to eliminate the possibility of erroneous determination that the two heat demands, that is, the heat demand and a small amount of heat demand from 17:00 to 17:15, are merely generated.

前記したステップS2:YESの場合とは異なり、予測される熱需要量が多く、閾値Thを超える場合には、制御部4は、原則的には、後述するように熱需要に対応する貯湯温度を第2の温度T2(たとえば65℃)とする(S2:NO,S6)。ただし、それ以前の処理として、制御部4は、貯湯温度を第2の温度T2とする場合と、貯湯温度を第1の温度T1とした上でその不足分については補助熱源機3を用いて補う場合とのそれぞれのエネルギ効率を比較する。その結果、後者の方がエネルギ効率がよいと判断した場合には、貯湯温度を第1の温度T1とする(S2:NO,S5:NO,S3)。これに対し、前者の方がエネルギ効率がよいと判断した場合には、貯湯温度を第2の温度T2とする(S5:YES,S6)。貯湯温度を第2の温度T2に設定するデータ処理は、たとえば制御部4の記憶部に記憶されている熱需要の予測データのうち、該当する熱需要のデータに対し、貯湯温度を第2の温度T2とする旨のフラグをオンとすることにより行なわれる。
なお、熱需要が、暖房端末91の使用である場合や、リモコン8によって所定の熱需要については貯湯温度が第2の温度T2とすることが予め指定されているような場合には、閾値Thと熱需要量とを比較するようなことなく、貯湯温度を第2の温度T2とするように構成することも可能である。
Unlike the case of step S2: YES described above, when the predicted heat demand is large and exceeds the threshold Th, the control unit 4 basically stores the hot water temperature corresponding to the heat demand as described later. Is a second temperature T2 (for example, 65 ° C.) (S2: NO, S6). However, as a process before that, the controller 4 uses the auxiliary heat source device 3 for the case where the hot water storage temperature is set to the second temperature T2 and the shortage of the hot water storage temperature is set to the first temperature T1. Each energy efficiency is compared with the case of making up. As a result, when it is determined that the latter is more energy efficient, the hot water storage temperature is set to the first temperature T1 (S2: NO, S5: NO, S3). On the other hand, when it is determined that the former is more energy efficient, the hot water storage temperature is set to the second temperature T2 (S5: YES, S6). In the data processing for setting the hot water storage temperature to the second temperature T2, for example, among the predicted heat demand data stored in the storage unit of the control unit 4, the hot water storage temperature is set to the second hot water temperature for the corresponding heat demand data. This is done by turning on a flag indicating the temperature T2.
In addition, when the heat demand is the use of the heating terminal 91, or when the hot water storage temperature is designated in advance as the second temperature T2 for the predetermined heat demand by the remote controller 8, the threshold Th It is also possible to configure the hot water storage temperature to be the second temperature T2 without comparing the amount of heat with the amount of heat demand.

前記したように貯湯温度を第2の温度T2とする処理が実行された場合には、この熱需要の前の所定時間(たとえば、3時間)内に、別の熱需要が発生するか否かがさらに判断される(S7)。この判断において、前記所定時間内に別の熱需要が発生する場合には、この別の熱需要については、その熱需要量の多少には関係なく、強制的にその貯湯温度を第2の温度T2に設定し、所定のフラグをオンとする(S7:YES,S8)。なお、前記した所定時間は、後述するように、可変とすることができる。
前記したような貯湯温度の設定処理は、たとえばヒートポンプ式給湯システムAの運転を強制的にオフにするなどの特定の終了操作などがなされない限り、繰り返し継続して実行される(S4:NO,S1)。
As described above, when the process of setting the hot water storage temperature to the second temperature T2 is executed, whether or not another heat demand is generated within a predetermined time (for example, 3 hours) before this heat demand. Is further determined (S7). In this determination, when another heat demand is generated within the predetermined time, the hot water storage temperature is forcibly set to the second temperature regardless of the amount of the heat demand. T2 is set and a predetermined flag is turned on (S7: YES, S8). The predetermined time described above can be made variable as will be described later.
The hot water storage temperature setting process as described above is repeatedly executed continuously unless a specific end operation such as forcibly turning off the operation of the heat pump hot water supply system A is performed (S4: NO, S1).

前記した貯湯温度についての処理は、より具体的には、図3に示すような処理である。
図3(a)は、現時刻から熱需要予測対象期間(たとえば9時間)の範囲内において、2つの熱需要D1,D2が予測されている状態を示している。なお、時間軸の1目盛りは、1時間に相当している。2つの熱需要D1,D2は、ともに熱需要量が比較的少なく、その貯湯温度は第1の温度T1に設定されている。図3(b)は、図3(a)の時期から適当な時間が経過した場合を示しており、前記した2つの熱需要D1,D2の発生時期の後に、新たな熱需要D3が予測されている。この新たな熱需要D3は、熱需要量が多く、その貯湯温度は第2の温度T2に設定され、その旨のフラグがオンとされている。これに伴い、熱需要D3の発生時期前の所定時間(たとえば3時間)内に発生すると予測されている熱需要D2については、同図(a)の場合とは異なり、貯湯温度が第2の温度T2に
切り替えられ、その旨のフラグがオンとされる。
図3(b)においては、熱需要D2,D3の相互間の期間Pa中に熱需要が存在しないにも拘わらず、この期間Pa中においても、所定のフラグがオンとされている。これは、たとえば前記の期間Pa中に熱需要が仮に発生した場合には、この熱需要に対応する貯湯温度を、熱需要量の多少には関係なく第2の温度T2にするのに役立つ。
More specifically, the process for the hot water storage temperature is a process as shown in FIG.
FIG. 3A shows a state in which two heat demands D1 and D2 are predicted within the range of the heat demand prediction target period (for example, 9 hours) from the current time. One scale on the time axis corresponds to one hour. Both of the two heat demands D1 and D2 have a relatively small amount of heat demand, and the hot water storage temperature is set to the first temperature T1. FIG. 3B shows a case where an appropriate time has elapsed from the time of FIG. 3A, and a new heat demand D3 is predicted after the occurrence time of the two heat demands D1 and D2. ing. This new heat demand D3 has a large amount of heat demand, its hot water storage temperature is set to the second temperature T2, and a flag to that effect is turned on. Accordingly, the heat demand D2 that is predicted to occur within a predetermined time (for example, 3 hours) before the generation time of the heat demand D3 is different from the case of FIG. The temperature is switched to T2, and a flag to that effect is turned on.
In FIG. 3B, the predetermined flag is turned on during the period Pa even though there is no heat demand during the period Pa between the heat demands D2 and D3. For example, if a heat demand occurs during the period Pa, for example, the hot water storage temperature corresponding to the heat demand is useful for setting the second temperature T2 regardless of the amount of heat demand.

前記した動作制御によれば、熱需要D2の実際の熱需要量が予測した値よりも少なく、熱需要D2が終了した時点において貯湯タンク2に湯余りが生じたとしても、この湯余りとなっている湯水温度は、高めの温度である第2の温度T2である。したがって、その後の熱需要D3に対応し得るように貯湯タンク2に貯留される湯水の熱量を多くする処理を的確に実行することが可能となる。本実施形態とは異なり、仮に、貯湯タンク2に低めの温度である第1の温度T1の湯水が多く存在していたのでは、貯湯タンク2に貯留される湯水の熱量を熱需要D3に対応し得るように多くすることが困難となるが、本実施形態では、そのような不具合を防止することができる。湯不足が生じた場合には、補助熱源機3を利用して湯切れ状態を生じないようにできるものの、補助熱源機3を想定外に運転させることによってエネルギ効率が低くなる事態を適切に回避することが可能である。   According to the above-described operation control, even if a hot water surplus occurs in the hot water storage tank 2 when the actual heat demand of the heat demand D2 is less than the predicted value and the heat demand D2 is finished, this hot water surplus is generated. The hot and cold water temperature is the second temperature T2, which is a higher temperature. Therefore, it is possible to accurately execute the process of increasing the amount of hot water stored in the hot water storage tank 2 so as to be able to cope with the subsequent heat demand D3. Unlike the present embodiment, if there is a lot of hot water at the first temperature T1, which is a lower temperature, in the hot water storage tank 2, the amount of hot water stored in the hot water storage tank 2 corresponds to the heat demand D3. However, in this embodiment, such a problem can be prevented. When there is a shortage of hot water, the auxiliary heat source unit 3 can be used to prevent the hot water from running out, but the situation where the energy efficiency is lowered by operating the auxiliary heat source unit 3 unexpectedly is appropriately avoided. Is possible.

図2におけるステップS7の「所定時間」については、可変値とすることが可能である。より具体的には、制御部4は、過去の熱需要のデータを記憶しており、たとえば曜日ごとの熱需要の頻度を把握している。このため、たとえば熱需要D3が発生する日が、熱需要の発生頻度が高い曜日(たとえば日曜日)であって、熱需要D3の発生時期の前に別の熱需要が多く発生する可能性が高い場合には、前記「所定時間」をたとえば3時間よりも長くするといった処理を行なわせることができる。この場合、熱需要の発生頻度に応じて、「所定時間」をたとえば3時間から9時間までの範囲で選択するように構成することもできる。このようにすれば、熱需要D3に先立って発生する他の多くの熱需要のそれぞれに対し、その貯湯温度を第2の温度T2に設定することができ、湯不足を解消することがより確実化される。   The “predetermined time” in step S7 in FIG. 2 can be a variable value. More specifically, the control part 4 has memorize | stored the data of the past heat demand, for example, grasps | ascertains the frequency of the heat demand for every day of the week. For this reason, for example, the day when the heat demand D3 occurs is a day of the week when the frequency of heat demand is high (for example, Sunday), and there is a high possibility that another heat demand will occur before the time when the heat demand D3 occurs. In such a case, the “predetermined time” can be made longer than 3 hours, for example. In this case, the “predetermined time” may be selected in a range of 3 hours to 9 hours, for example, according to the occurrence frequency of heat demand. In this way, for each of many other heat demands that occur prior to the heat demand D3, the hot water storage temperature can be set to the second temperature T2, and it is more reliable to eliminate the hot water shortage. It becomes.

本発明は、上述した実施形態の内容に限定されない。本発明に係るヒートポンプ式給湯システムの各部の具体的な構成は、本発明の意図する範囲内において種々に設計変更自在である。   The present invention is not limited to the contents of the above-described embodiment. The specific configuration of each part of the heat pump hot water supply system according to the present invention can be variously modified within the range intended by the present invention.

本発明でいう第1の温度、および第2の温度の具体的な値は、50℃や65℃に限定されず、これ以外の温度とすることができる。また、第1の温度および第2の温度は、それぞれ1種類の温度に限らず、たとえば第2の温度として、65℃と70℃との2種類があり、第2の温度を選択する場合に、65℃と70℃とのいずれか一方を選択するように構成されていてもかまわない。本発明でいう所定の閾値の具体的な値が、上述の実施形態で述べられた値に限定されないことは既に述べたとおりである。   The specific values of the first temperature and the second temperature in the present invention are not limited to 50 ° C. or 65 ° C., and may be other temperatures. In addition, the first temperature and the second temperature are not limited to one kind of temperature, respectively. For example, there are two kinds of the second temperature, 65 ° C. and 70 ° C., and the second temperature is selected. , 65 ° C. or 70 ° C. may be selected. As described above, the specific value of the predetermined threshold in the present invention is not limited to the value described in the above embodiment.

本発明に係るヒートポンプ式給湯システムは、補助熱源機を具備しないものとして構成することも可能である。なお、補助熱源機を具備させる場合、補助熱源機としては、ガス燃焼方式のものに限らず、オイル燃焼方式のもの、あるいは電熱ヒータなどとすることもできる。   The heat pump hot water supply system according to the present invention may be configured not to include an auxiliary heat source machine. When the auxiliary heat source unit is provided, the auxiliary heat source unit is not limited to the gas combustion type, but may be an oil combustion type or an electric heater.

A ヒートポンプ式給湯システム
1 ヒートポンプ
2 貯湯タンク
3 補助熱源機
4 制御部(制御手段)
A Heat pump type hot water supply system 1 Heat pump 2 Hot water storage tank 3 Auxiliary heat source machine 4 Control unit (control means)

Claims (3)

ヒートポンプと、
このヒートポンプによって加熱された湯水を貯留し、かつこの湯水を所定の出湯口または熱負荷に供給可能な貯湯タンクと、
過去の熱需要に基づく学習能力をもち、今後の熱需要の発生時期および熱需要量を予測し、かつ予測される熱需要の発生前に前記ヒートポンプを運転させて熱需要に対応する熱量の湯水を前記貯湯タンクに貯留させる制御を実行する制御手段と、
を備えており、
前記制御手段は、熱需要に対応する湯水を前記貯湯タンクに貯留させる場合において、熱需要量が所定の閾値以下である場合には、この熱需要に対応する貯湯温度を所定の第1の温度にする一方、熱需要量が前記閾値を超える場合には、貯湯温度を前記第1の温度よりも高温の第2の温度とする制御を実行するように構成されている、ヒートポンプ式給湯システムであって、
前記制御手段は、貯湯温度を前記第2の温度とする熱需要が予測される場合において、この熱需要の発生前の所定時間内に別の熱需要があると予測される場合には、その熱需要量の多少には関係なく、前記別の熱需要に対応する貯湯温度を前記第2の温度とする制御を実行するように構成されていることを特徴とする、ヒートポンプ式給湯システム。
A heat pump,
A hot water storage tank for storing hot water heated by the heat pump and supplying the hot water to a predetermined outlet or heat load;
Hot water that has learning ability based on past heat demand, predicts the future generation time and heat demand of the heat demand, and operates the heat pump before the predicted heat demand occurs to respond to the heat demand Control means for executing control for storing the hot water in the hot water storage tank;
With
In the case where the hot water corresponding to the heat demand is stored in the hot water storage tank, the control means sets the hot water storage temperature corresponding to the heat demand to a predetermined first temperature when the amount of heat demand is not more than a predetermined threshold. On the other hand, when the amount of heat demand exceeds the threshold, the heat pump hot water supply system is configured to execute control to set the hot water storage temperature to a second temperature higher than the first temperature. There,
In the case where the heat demand with the hot water storage temperature as the second temperature is predicted, the control means, when it is predicted that there is another heat demand within a predetermined time before the occurrence of the heat demand, Regardless of the amount of heat demand, the heat pump hot water supply system is configured to execute control so that the hot water storage temperature corresponding to the other heat demand is the second temperature.
請求項1に記載のヒートポンプ式給湯システムであって、
前記所定時間は、可変値とされ、かつ貯湯温度が前記第2の温度とされる熱需要が発生する前に別の熱需要が発生する頻度が高いと予測される場合には、そうでない場合よりも長い時間に設定されるように構成されている、ヒートポンプ式給湯システム。
The heat pump hot water supply system according to claim 1,
The predetermined time is a variable value, and when it is predicted that the frequency of generating another heat demand is high before the heat demand where the hot water storage temperature is the second temperature is generated, otherwise A heat pump hot water supply system configured to be set for a longer time.
請求項1または2に記載のヒートポンプ式給湯システムであって、
前記貯湯タンクから前記所定の出湯口または熱負荷に供給される湯水をその途中で加熱可能な補助熱源機を、さらに備えており、
前記制御手段は、熱需要量が前記閾値を超える場合であっても、貯湯温度を前記第2の温度にする場合と比べて、貯湯温度を前記第1の温度にしてからその不足熱量を前記補助熱源機によって補う場合の方が、エネルギ効率が高いと判断した場合には、貯湯温度を前記第1の温度にするように構成されている、ヒートポンプ式給湯システム。
The heat pump hot water supply system according to claim 1 or 2,
An auxiliary heat source machine capable of heating hot water supplied from the hot water storage tank to the predetermined outlet or heat load in the middle thereof;
Even if the heat demand exceeds the threshold value, the control means sets the hot water storage temperature to the first temperature and then sets the shortage heat amount to the second temperature compared to the case where the hot water storage temperature is set to the second temperature. A heat pump hot water supply system configured to set the hot water storage temperature to the first temperature when it is determined that the energy efficiency is higher in the case of supplementing with an auxiliary heat source device.
JP2013136545A 2013-06-28 2013-06-28 Heat pump hot water supply system Active JP6098994B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013136545A JP6098994B2 (en) 2013-06-28 2013-06-28 Heat pump hot water supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013136545A JP6098994B2 (en) 2013-06-28 2013-06-28 Heat pump hot water supply system

Publications (2)

Publication Number Publication Date
JP2015010773A JP2015010773A (en) 2015-01-19
JP6098994B2 true JP6098994B2 (en) 2017-03-22

Family

ID=52304088

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013136545A Active JP6098994B2 (en) 2013-06-28 2013-06-28 Heat pump hot water supply system

Country Status (1)

Country Link
JP (1) JP6098994B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6513498B2 (en) * 2015-06-15 2019-05-15 大和ハウス工業株式会社 Hot water supply system
CN105222339A (en) * 2015-10-30 2016-01-06 深圳安能热电器科技有限公司 A kind of nanometer air energy duplex machine
JP6672982B2 (en) * 2016-04-20 2020-03-25 株式会社ノーリツ Hot water storage system
CN107062589A (en) * 2017-03-29 2017-08-18 广州鼎富电子科技有限公司 A kind of air energy heat pump and gas furnace combined heated system and method
US20240093907A1 (en) 2021-02-07 2024-03-21 Octopus Energy Heating Limited Methods and systems for predictive heated water provision

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005083585A (en) * 2003-09-04 2005-03-31 Mitsubishi Electric Corp Heat pump-type hot water supply system
JP5203855B2 (en) * 2007-10-10 2013-06-05 パナソニック株式会社 Hot water storage type hot water supply apparatus, operation planning apparatus, and operation planning method
JP5084807B2 (en) * 2009-05-08 2012-11-28 三菱電機株式会社 Hot water storage hot water supply system

Also Published As

Publication number Publication date
JP2015010773A (en) 2015-01-19

Similar Documents

Publication Publication Date Title
KR101222331B1 (en) Heat-pump hot water apparatus
JP6098994B2 (en) Heat pump hot water supply system
JP5492346B2 (en) Air conditioning and hot water supply system
JP6261724B2 (en) Heat pump chilling system and control method thereof
JP5126345B2 (en) Hot water storage hot water supply system
JPWO2016059837A1 (en) Heat pump heating system
JP2019007692A (en) Storage water heater
JP6115820B2 (en) Heat pump hot water supply system
JP5991128B2 (en) Heat pump hot water supply system
JP5401946B2 (en) Hot water storage water heater
JP6672982B2 (en) Hot water storage system
EP3450875B1 (en) Hot-water supply system
JP6700589B2 (en) Hot water storage system
JP2010032150A (en) Heat pump water heater
JP2012072969A (en) Method of controlling electric water heater, and control device for the same
JP6036016B2 (en) Heat pump hot water supply system
JP5580244B2 (en) Hot water storage water heater
JP5950159B2 (en) Cogeneration system
JP5986455B2 (en) Hot water storage water heater
JP6650279B2 (en) Hot water supply system
JP5498130B2 (en) Boiling set temperature determination method of heat pump hot water storage type hot water supply and heating system
JP6531035B2 (en) Thermal equipment
JP7101487B2 (en) Heat supply system
JP2018159526A (en) Hot water supply system
JP6604165B2 (en) Heat pump type water heater

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160527

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170130

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170131

R150 Certificate of patent or registration of utility model

Ref document number: 6098994

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170212

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250