JP3301966B2 - Shade concrete block - Google Patents

Shade concrete block

Info

Publication number
JP3301966B2
JP3301966B2 JP19378598A JP19378598A JP3301966B2 JP 3301966 B2 JP3301966 B2 JP 3301966B2 JP 19378598 A JP19378598 A JP 19378598A JP 19378598 A JP19378598 A JP 19378598A JP 3301966 B2 JP3301966 B2 JP 3301966B2
Authority
JP
Japan
Prior art keywords
steel sheet
sheet pile
concrete block
pile wall
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP19378598A
Other languages
Japanese (ja)
Other versions
JP2000008342A (en
Inventor
重一 畠中
Original Assignee
株式会社ケンチ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社ケンチ filed Critical 株式会社ケンチ
Priority to JP19378598A priority Critical patent/JP3301966B2/en
Publication of JP2000008342A publication Critical patent/JP2000008342A/en
Application granted granted Critical
Publication of JP3301966B2 publication Critical patent/JP3301966B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、河岸、海岸等の護
岸工事等において、矢板壁上部に笠コンクリートを構築
する際に使用される笠コンクリートブロックに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a cap concrete block used for constructing a cap concrete on an upper part of a sheet pile wall in revetment work on a riverbank, a seashore, or the like.

【0002】[0002]

【従来の技術】従来、河岸、海岸等を鋼製矢板を用いて
護岸する場合においては、一般的に河岸に沿って連続打
設された鋼矢板の上部の腐食防止、及び景観の向上を目
的として笠コンクリートが設けられる。
2. Description of the Related Art Conventionally, in the case of bank protection of river banks, shores, and the like using steel sheet piles, the purpose is generally to prevent corrosion of upper portions of steel sheet piles continuously laid along the river banks and to improve the landscape. Shade concrete is provided.

【0003】この笠コンクリートを鋼矢板の上部に構築
する方法としては、例えば図6、7に示されるような方
法がある。以下図面に基づいて説明すると、まず図6に
示されるように河岸に沿って連続打設された鋼矢板01
により形成される鋼矢板壁011の陸A側に、開口部0
3が形成された天板04と、該天板04の前端より垂下
された前側板05と、該前側板05の下端より水平後方
に突設し、先端が連接によって形成される鋼矢板01側
面の凹凸部に挿嵌可能な凹凸部06が形成された底板0
7とから構成される笠コンクリートブロック02の天板
04の後部を支持する後側板08を垂設するとともに、
鋼矢板01上端には支持手段010を設けておく。
As a method of constructing the cap concrete on the upper part of the steel sheet pile, for example, there is a method as shown in FIGS. Referring to the drawings, first, as shown in FIG. 6, steel sheet piles 01 continuously driven along the river banks.
The opening 0 is located on the land A side of the steel sheet pile wall 011 formed by
3, a front plate 05 hanging down from the front end of the top plate 04, and a steel sheet pile 01 side projecting horizontally rearward from the lower end of the front plate 05 and having a leading end formed by articulation. Bottom plate 0 having uneven portions 06 that can be inserted into the uneven portions
7 and a rear side plate 08 for supporting the rear portion of the top plate 04 of the cap concrete block 02 composed of
A support means 010 is provided on the upper end of the steel sheet pile 01.

【0004】次に前述のように構成される笠コンクリー
トブロック02を、図6のようにクレーン(図示略)等
によりを吊り下げ、支持手段010及び後側板08を介
して支持されるように鋼矢板壁011の上端部長手方向
にわたって敷設し、隣接する笠コンクリートブロック0
2同士、及び笠コンクリートブロック02の天板04の
後部と後側板08の上部とを連結する。このように笠コ
ンクリートブロック02が鋼矢板01の上端部に連設さ
れた後、笠コンクリートブロック02の開口部03から
生コンクリートが流し込まれ、これを養生させて鋼矢板
壁の笠コンクリートの施工が完了する。
[0004] Next, as shown in FIG. 6, the shade concrete block 02 constructed as described above is suspended by a crane (not shown) or the like, and steel is supported so as to be supported via the support means 010 and the rear side plate 08. It is laid in the longitudinal direction of the upper end portion of the sheet pile wall 011 and the adjacent concrete block 0
2 and the rear part of the top plate 04 of the shade concrete block 02 and the upper part of the rear side plate 08 are connected. After the coping concrete block 02 is connected to the upper end of the steel sheet pile 01 in this way, fresh concrete is poured from the opening portion 03 of the coping concrete block 02, and the raw concrete is cured to construct the coping concrete of the steel sheet pile wall. Complete.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、このよ
うな笠コンクリートブロックを用いて笠コンクリートを
構築する場合、笠コンクリートブロック02の内部に生
コンクリートが流し込まれると、鋼矢板01より川B側
に流入された生コンクリートの荷重が底板07に加わる
ことにより笠コンクリートブロックの重心が前側板側に
偏るため、笠コンクリートブロック02の天板04の後
部が押し上げられ、後側板08との接続部が開かれてし
まい、その部分から生コンクリートが洩れ出したり、あ
るいは笠コンクリートブロック02が鋼矢板壁011の
上端部より逸脱してしまう恐れがあった。
However, in the case of constructing a capping concrete using such a capping concrete block, when ready-mixed concrete is poured into the capping concrete block 02, it flows from the steel sheet pile 01 to the river B side. When the load of the prepared concrete is applied to the bottom plate 07, the center of gravity of the cap concrete block is biased toward the front plate, so that the rear part of the top plate 04 of the cap concrete block 02 is pushed up, and the connection with the rear plate 08 is opened. As a result, there is a risk that the ready-mixed concrete leaks out of that portion, or that the cap concrete block 02 deviates from the upper end of the steel sheet pile wall 011.

【0006】そこで、生コンクリートが養生されるまで
の間、底板07の下面を鋼矢板01に固着された支持金
具09(図7参照)等で下方から支持するといった方法
が考えられるが、底板07は鋼矢板01の川B側に位置
しているため、支持金具09の固設が難しく、また危険
であるばかりか、施工後に外部に露出して景観が損なわ
れるといった問題があった。
Therefore, a method may be considered in which the lower surface of the bottom plate 07 is supported from below by a support fitting 09 (see FIG. 7) fixed to the steel sheet pile 01 until the ready-mixed concrete is cured. Since the steel sheet pile 01 is located on the river B side of the steel sheet pile 01, there is a problem that it is difficult to fix the support metal fittings 09, it is dangerous, and it is exposed to the outside after the construction and the scenery is damaged.

【0007】本発明は、上記問題点を解決するためにな
されたもので、鋼矢板壁の上端部に、容易に、かつ安全
に笠コンクリートを構築することが出来る鋼矢板壁の笠
コンクリートブロックを提供することを目的としてい
る。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and a shank concrete block of a steel sheet pile wall capable of easily and safely constructing a shank concrete is provided at the upper end of the steel sheet pile wall. It is intended to provide.

【0008】[0008]

【課題を解決するための手段】上記課題を解決するため
に、本発明の笠コンクリートブロックは、鋼矢板を連続
打設することにより構築される鋼矢板壁の上部周囲を囲
繞するように設けられ、内部に生コンクリートを打設す
ることにより、前記鋼矢板壁の上部に笠コンクリートを
形成出来る笠コンクリートブロックであって、全体が略
筒状に一体的に成形されたプレキャストコンクリートか
らなり、その上面部には開口部が形成され、また、底面
部には前記鋼矢板壁の上部横断面形状とほぼ同じ形状に
形成された鋼矢板壁の上部を挿通可能とする溝部が、前
記底面部を長手方向左右側にそれぞれ分割するように形
成されており、前記溝部に鋼矢板壁の上部を挿通するこ
とで鋼矢板壁の上部周囲を囲繞出来るようになっている
ことを特徴としている。この特徴によれば、笠コンクリ
ートブロックは筒状に一体的に形成されているので、溝
部に鋼矢板壁の上部を挿通すれば、現場においてブロッ
クを組み立てることなく、鋼矢板壁の長手方向左右側に
底面部がそれぞれ配設されてブロック内部に生コンクリ
ートを保持出来るようになるので、笠コンクリートブロ
ックの傾きが抑えられ、施工工程が簡素化されるばかり
か、全体の強度が向上されるため、鋼矢板壁の上端部に
強固な笠コンクリートを簡単に構築できる。
In order to solve the above-mentioned problems, a concrete cap block of the present invention is provided so as to surround an upper periphery of a steel sheet pile wall constructed by continuously driving steel sheet piles. A cast concrete block capable of forming cast concrete on the upper part of the steel sheet pile wall by casting fresh concrete into the inside thereof, the whole being made of precast concrete integrally formed in a substantially cylindrical shape, An opening is formed in the portion, and the bottom portion has a shape substantially the same as the upper cross-sectional shape of the steel sheet pile wall.
A groove portion through which the upper portion of the formed steel sheet pile wall can be inserted is formed so as to divide the bottom surface portion into left and right sides in the longitudinal direction, and the upper portion of the steel sheet pile wall is inserted into the groove portion. It is characterized in that it can surround the upper part of the wall. According to this feature, since the cap concrete block is integrally formed in a tubular shape, if the upper part of the steel sheet pile wall is inserted into the groove, the block is not assembled at the site, and the left and right sides of the steel sheet pile wall in the longitudinal direction are not assembled. The bottom part is arranged in each block so that ready-mixed concrete can be held inside the block.
In addition to reducing the inclination of the rack, simplifying the construction process and improving the overall strength, it is possible to easily build a strong cap concrete at the upper end of the steel sheet pile wall.

【0009】[0009]

【0010】本発明の笠コンクリートは、前記底面部
が、前記溝部によって前記笠コンクリートブロックの長
手方向左右側にほぼ均等に分割されていることが好まし
い。このようにすることで、笠コンクリートブロック内
に流入された生コンクリートの荷重は、鋼矢板壁の長手
方向左右側の底面部にそれぞれほぼ均等に加わるので、
重心が偏りにくくなり、安定性がより向上される。よっ
て生コンクリートが硬化するまでの間に笠コンクリート
ブロックが傾いたり逸脱しにくくなる。
[0010] In the cap concrete according to the present invention, it is preferable that the bottom portion is substantially equally divided into the left and right sides in the longitudinal direction of the cap concrete block by the grooves. By doing in this way, the load of the ready-mixed concrete that has flowed into the shank concrete block is almost equally applied to the bottom portions on the left and right sides in the longitudinal direction of the steel sheet pile wall,
The center of gravity is less likely to be biased, and the stability is further improved. Therefore, the shade concrete block does not easily tilt or deviate until the ready-mixed concrete hardens.

【0011】[0011]

【発明の実施の形態】以下、本発明の笠コンクリートブ
ロックを図面に基づいて説明していくと、図1に示され
るように笠コンクリートブロック2は、複数の開口部3
が形成された天板4と、前側板5及び後側板6と、底板
7とから、角筒状に一体的に構成されてなるプレキャス
トコンクリート製のブロックである。底板7には、図2
に示されるように複数の鋼矢板1が連続打設されること
により形成される鋼矢板壁10の上部を挿通可能とする
溝部8が長手方向にわたって波型に形成されており、ほ
ぼ同面積を有する前側板5より連設される底板7aと、
後側板6より連設される底板7bとに分割されている。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view of a concrete block according to the present invention; FIG.
Is a block made of precast concrete integrally formed in a square tubular shape from the top plate 4, the front plate 5, the rear plate 6, and the bottom plate 7 on which are formed. As shown in FIG.
As shown in FIG. 2, a groove 8 which is formed by continuously driving a plurality of steel sheet piles 1 and which can be inserted into an upper portion of a steel sheet pile wall 10 is formed in a wavy shape in the longitudinal direction, and has approximately the same area. A bottom plate 7a continuously provided from the front side plate 5 having
It is divided into a rear plate 6 and a bottom plate 7b continuously provided.

【0012】なお、この溝部8は種々の形状に構築され
る鋼矢板壁10の上縁部に沿うように形成されるもので
あり、鋼矢板壁の形状に対応して種々に変形可能であ
る。
The groove 8 is formed along the upper edge of the steel sheet pile wall 10 constructed in various shapes, and can be variously deformed according to the shape of the steel sheet pile wall. .

【0013】図2には、河岸に沿って複数本の鋼矢板1
が連続打設されることにより形成された鋼矢板壁10の
上部に笠コンクリートブロック2が連設された状態が示
されており、図中笠コンクリートブロック2を挟んで左
側が陸A側、右側が川B側になっている。
FIG. 2 shows a plurality of steel sheet piles 1 along the riverbank.
Is shown in a state in which the cap concrete block 2 is continuously provided on the upper part of the steel sheet pile wall 10 formed by continuous casting, and the left side is the land A side and the right side is sandwiching the cap concrete block 2 in the figure. Is on the river B side.

【0014】図2における符号11は、後述するが笠コ
ンクリートブロック2を鋼矢板壁10の上端に載置する
際に天板4の下面を支持する支持手段であり、図3に示
されるように鋼矢板1の上端に固着されるナット11a
と、このナット11a内に螺合するボルト11bとから
構成されている。このボルト11bは所定長さを有して
おり、高さ調節が出来るようになっているため、河岸に
沿って連続打設された鋼矢板1の上端の高さ位置がそれ
ぞれ異なっていても、複数のボルト11bをもって笠コ
ンクリートブロック2を前後左右方向略水平な状態で載
置することが出来るようになっている。
Reference numeral 11 in FIG. 2 denotes a support means for supporting the lower surface of the top plate 4 when the concrete block 2 is placed on the upper end of the steel sheet pile wall 10 as will be described later. As shown in FIG. Nut 11a fixed to the upper end of steel sheet pile 1
And a bolt 11b screwed into the nut 11a. Since the bolt 11b has a predetermined length and can be adjusted in height, even if the height position of the upper end of the steel sheet pile 1 continuously cast along the river bank is different, With the plurality of bolts 11b, the cap concrete block 2 can be placed in a substantially horizontal state in the front-rear and left-right directions.

【0015】次に、上述のように構成された笠コンクリ
ートブロック2を用いた鋼矢板壁の笠コンクリートの施
工手順を図面に基づいて説明する。
Next, the procedure for constructing the concrete for the sheet pile wall using the concrete block 2 constructed as described above will be described with reference to the drawings.

【0016】先ず、従来の技術において説明したよう
に、河川敷等の護岸工事に際し、複数の鋼矢板1を、相
互に連接されるように河岸に沿って連続打設し、鋼矢板
壁10を構築する。
First, as described in the prior art, a plurality of steel sheet piles 1 are continuously driven along a river bank so as to be connected to each other, thereby constructing a steel sheet pile wall 10 at the time of revetment work of a riverbed or the like. I do.

【0017】次に、所定の鋼矢板1の上端部に、各笠コ
ンクリートブロック2の天板4の下面を支持する支持手
段11が笠コンクリートブロック2に対応して取付けら
れ、各ボルト11bの上端が予め所定高さ位置に設定さ
れる。なお、本実施例においてナット11aは鋼矢板1
の上端部に対して溶接にて固着されるが、固着方法は溶
接以外の方法により行われてもよい。
Next, a support means 11 for supporting the lower surface of the top plate 4 of each cap concrete block 2 is attached to the upper end of a predetermined steel sheet pile 1 in correspondence with the cap concrete block 2, and the upper end of each bolt 11b is provided. Is set at a predetermined height position in advance. In this embodiment, the nut 11a is a steel sheet pile 1
Is fixed to the upper end portion by welding, but the fixing method may be performed by a method other than welding.

【0018】そして笠コンクリートブロック2を該ブロ
ック2の単体毎に牽引ロープにより吊上げ(例えば従来
の図6参照)て鋼矢板壁10の上部まで移動した後、笠
コンクリートブロック2の溝部8に鋼矢板壁10の上部
が挿通されるように下降させれば、笠コンクリートブロ
ック2の天板4の下面が支持手段11により支持されて
鋼矢板壁10の上端部に敷設される(図3参照)。この
時鋼矢板壁10の上部の周囲が笠コンクリートブロック
2により囲繞される。
Then, the cap concrete block 2 is lifted by a tow rope for each block 2 (for example, see FIG. 6) and moved to the upper portion of the steel sheet pile wall 10, and then the steel sheet pile is inserted into the groove 8 of the concrete block 2. When the upper part of the wall 10 is lowered so as to be inserted, the lower surface of the top plate 4 of the cap concrete block 2 is supported by the support means 11 and laid on the upper end of the steel sheet pile wall 10 (see FIG. 3). At this time, the periphery of the upper part of the steel sheet pile wall 10 is surrounded by the shade concrete block 2.

【0019】また、本実施例においては、図3に示され
るように笠コンクリートブロック2の鋼矢板壁10の川
B側に位置する底板7aの先端面7a’に予めゴム製等
のスペーサ9が固着されている。そして敷設時にこのス
ペーサ9を鋼矢板壁10の側面に当接させることで、先
端面7a’と鋼矢板壁10の側面との間の間隙からのコ
ンクリートの流出が防止されるとともに、当接による衝
撃を吸収して笠コンクリートブロック2の破損が防止さ
れるようになっている。
In this embodiment, as shown in FIG. 3, a spacer 9 made of rubber or the like is previously provided on the distal end surface 7a 'of the bottom plate 7a located on the river B side of the steel sheet pile wall 10 of the shank concrete block 2. It is fixed. The spacer 9 is brought into contact with the side surface of the steel sheet pile wall 10 at the time of laying, so that concrete can be prevented from flowing out from the gap between the tip end surface 7a 'and the side surface of the steel sheet pile wall 10, and the spacer 9 The shock is absorbed to prevent the concrete block 2 from being damaged.

【0020】次に図4に示されるように生コンクリート
が開口部3を介して笠コンクリートブロック2内に流し
込まれる。ここで、鋼矢板壁10を挟んで陸A側、川B
側に流入される生コンクリートは底板7b、及び底板7
aにより内部に保持されるため、それぞれの底板7a、
7bにほぼ均等の荷重が加わる。よって笠コンクリート
ブロック2の重心が生コンクリートの荷重により陸Aも
しくは川B側に偏って、笠コンクリートブロック2が傾
いたり鋼矢板壁10の上端部より逸脱すること等がなく
なる。
Next, as shown in FIG. 4, ready-mixed concrete is poured into the shade concrete block 2 through the opening 3. Here, land A side, river B across steel sheet pile wall 10
The ready-mixed concrete flowing into the side is a bottom plate 7b,
a, each bottom plate 7a,
A substantially uniform load is applied to 7b. Therefore, the center of gravity of the cap concrete block 2 is deviated toward the land A or the river B due to the load of the ready-mixed concrete, so that the cap concrete block 2 does not tilt or deviate from the upper end of the steel sheet pile wall 10.

【0021】また、笠コンクリートブロック2の重心が
陸A、もしくは川B側に偏っても、底板7aもしくは底
板7bの先端面が鋼矢板壁10の側面に当接規制される
ことにより、笠コンクリートブロック2の傾斜や鋼矢板
壁10の上端部からの逸脱が防止される。
Further, even if the center of gravity of the cap concrete block 2 is deviated toward the land A or the river B, the tip surface of the bottom plate 7a or 7b is abutted against the side surface of the steel sheet pile wall 10 so that the cap concrete is prevented. The inclination of the block 2 and the deviation from the upper end of the steel sheet pile wall 10 are prevented.

【0022】最後に図5に示されるように笠コンクリー
トブロック2内に生コンクリートが充填された後、開口
部3内の生コンクリートをならし、生コンクリートを養
生する。そして生コンクリートが硬化された後、陸A側
には笠コンクリートブロック2の天板4上面とほぼ同高
さ位置まで土砂が積層され、その上面にコンクリートを
打設してコンクリート層等を形成することで、笠コンク
リートの施工が完了する。
Finally, as shown in FIG. 5, after the ready-mixed concrete is filled in the shade concrete block 2, the ready-mixed concrete in the opening 3 is leveled, and the ready-mixed concrete is cured. Then, after the ready-mixed concrete is hardened, earth and sand are stacked on the land A side up to a position substantially equal to the upper surface of the top plate 4 of the shade concrete block 2, and concrete is cast on the upper surface to form a concrete layer or the like. This completes the construction of the shade concrete.

【0023】このように笠コンクリートブロック2は、
鋼矢板壁10の上部を溝部内に挿通するだけで鋼矢板壁
10の上部を簡単に囲繞出来るので、この笠コンクリー
トブロック内に生コンクリートを充填させるだけで鋼矢
板壁10の上端部に笠コンクリートを容易に構築するこ
とが出来る。また、内部に流し込まれた生コンクリート
の荷重は、鋼矢板壁10を挟んで陸A側、川B側それぞ
れに加わるため、笠コンクリートブロックが傾いたり、
鋼矢板壁10の上端部から容易に逸脱することがない。
As described above, the cap concrete block 2
The upper portion of the steel sheet pile wall 10 can be easily surrounded by merely inserting the upper portion of the steel sheet pile wall 10 into the groove. Can be easily constructed. Moreover, since the load of the ready-mixed concrete poured into the interior is applied to each of the land A side and the river B side with the steel sheet pile wall 10 interposed therebetween, the cap concrete block is inclined,
There is no easy deviation from the upper end of the steel sheet pile wall 10.

【0024】以上、本発明の実施形態を図面によって説
明してきたが、具体的な構成はこれら実施形態に限られ
るものではなく、本発明の要旨を逸脱しない範囲におけ
る変更や追加があっても本発明に含まれる。
Although the embodiments of the present invention have been described with reference to the drawings, the specific configuration is not limited to these embodiments, and even if there are changes and additions without departing from the gist of the present invention, the present invention will be described. Included in the invention.

【0025】例えば、本実施例における笠コンクリート
ブロックは略角筒形状に形成されてなるが、特に形状は
限定されるものでなく、略円筒形状及び多角形状のもの
等、種々に変形可能である。
For example, the cap concrete block in this embodiment is formed in a substantially rectangular tube shape, but the shape is not particularly limited, and can be variously deformed, such as a substantially cylindrical shape and a polygonal shape. .

【0026】[0026]

【発明の効果】本発明は次の効果を奏する。The present invention has the following effects.

【0027】(a)請求項1の発明によれば、笠コンク
リートブロックは筒状に一体的に形成されているので、
溝部に鋼矢板壁の上部を挿通すれば、現場においてブロ
ックを組み立てることなく、鋼矢板壁の長手方向左右側
に底面部がそれぞれ配設されてブロック内部に生コンク
リートを保持出来るようになるので、笠コンクリートブ
ロックの傾きが抑えられ、施工工程が簡素化されるばか
りか、全体の強度が向上されるため、鋼矢板壁の上端部
に強固な笠コンクリートを簡単に構築できる。
(A) According to the first aspect of the present invention, since the cap concrete block is integrally formed in a tubular shape,
If the upper part of the steel sheet pile wall is inserted into the groove, the bottom part is arranged on the left and right sides in the longitudinal direction of the steel sheet pile wall without assembling the block at the site, so that the ready-mixed concrete can be held inside the block, Shade concrete
Not only the inclination of the lock is suppressed and the construction process is simplified, but also the overall strength is improved, so that a strong cap concrete can be easily constructed at the upper end of the steel sheet pile wall.

【0028】(b)請求項2の発明によれば、笠コンク
リートブロック内に流入された生コンクリートの荷重
は、鋼矢板壁の長手方向左右側の底面部にそれぞれほぼ
均等に加わるので、重心が偏りにくくなり、生コンクリ
ートが硬化するまでの間に笠コンクリートブロックが傾
いたり逸脱しにくくなる。
(B) According to the second aspect of the present invention, the load of the ready-mixed concrete that has flowed into the concrete block is substantially evenly applied to the left and right bottom surfaces in the longitudinal direction of the steel sheet pile wall. It is less likely to be biased, and the shade concrete block is less likely to tilt or deviate until the ready-mixed concrete hardens.

【0029】[0029]

【0030】[0030]

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施例としての笠コンクリートブロッ
クを示す斜視図である。
FIG. 1 is a perspective view showing a shade concrete block as an embodiment of the present invention.

【図2】図1の笠コンクリートブロックが鋼矢板壁の上
端部に敷設された状態を示す平面図である。
FIG. 2 is a plan view showing a state in which the cap concrete block of FIG. 1 is laid on an upper end portion of a steel sheet pile wall.

【図3】図1のA−A断面図である。FIG. 3 is a sectional view taken along line AA of FIG. 1;

【図4】図1の笠コンクリートブロック内に生コンクリ
ートが流し込まれている状態を示す断面図である。
FIG. 4 is a cross-sectional view showing a state where ready-mixed concrete is poured into the shade concrete block of FIG.

【図5】施工完了後の笠コンクリートを示す断面図であ
る。
FIG. 5 is a cross-sectional view showing the shade concrete after completion of construction.

【図6】従来の笠コンクリートブロックの施工状態を示
す斜視図である。
FIG. 6 is a perspective view showing a construction state of a conventional shade concrete block.

【図7】従来の笠コンクリートブロックが鋼矢板壁の上
端部に敷設された状態を示す断面図である。
FIG. 7 is a cross-sectional view showing a state in which a conventional shade concrete block is laid at the upper end of a steel sheet pile wall.

【符号の説明】 1 鋼矢板 2 笠コンクリートブロック 3 開口部 4 天板(上面部) 5 前側板 6 後側板 7、7a、7b 底板(底面部) 7a’ 先端面 8 溝部 9 スペーサ 10 鋼矢板壁 11 支持部材 11a ナット 11b ボルト A 陸側 B 川側[Description of Signs] 1 Steel sheet pile 2 Shade concrete block 3 Opening 4 Top plate (upper part) 5 Front side plate 6 Rear side plate 7, 7a, 7b Bottom plate (bottom part) 7a 'Tip surface 8 Groove 9 Spacer 10 Steel sheet pile wall 11 Support member 11a Nut 11b Bolt A Land side B River side

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 鋼矢板を連続打設することにより構築さ
れる鋼矢板壁の上部周囲を囲繞するように設けられ、内
部に生コンクリートを打設することにより、前記鋼矢板
壁の上部に笠コンクリートを形成出来る笠コンクリート
ブロックであって、 全体が略筒状に一体的に成形されたプレキャストコンク
リートからなり、その上面部には開口部が形成され、ま
た、底面部には前記鋼矢板壁の上部横断面形状とほぼ同
じ形状に形成された鋼矢板壁の上部を挿通可能とする溝
部が、前記底面部を長手方向左右側にそれぞれ分割する
ように形成されており、前記溝部に鋼矢板壁の上部を挿
通することで鋼矢板壁の上部周囲を囲繞出来るようにな
っていることを特徴とする笠コンクリートブロック。
1. A steel sheet pile wall constructed by continuously casting steel sheet piles is provided so as to surround the upper periphery of the steel sheet pile wall. A shade concrete block capable of forming concrete, the entirety of which is made of precast concrete integrally molded in a substantially cylindrical shape, an opening is formed on an upper surface thereof, and a steel sheet pile wall is formed on a bottom surface thereof. Approximately the same as the upper cross section
A groove portion through which the upper portion of the steel sheet pile wall formed in the same shape can be inserted is formed so as to divide the bottom portion into left and right sides in the longitudinal direction, and the upper portion of the steel sheet pile wall is inserted into the groove portion. Shade concrete block characterized by being able to surround the upper periphery of the steel sheet pile wall.
【請求項2】 前記底面部が、前記溝部によって前記笠
コンクリートブロックの長手方向左右側にほぼ均等に分
割されている請求項1に記載の笠コンクリートブロッ
ク。
2. The cap according to claim 1, wherein the bottom portion is formed by the groove.
Almost equally distributed on the left and right sides in the longitudinal direction of the concrete block
The shade concrete block according to claim 1, which is split .
JP19378598A 1998-06-24 1998-06-24 Shade concrete block Expired - Lifetime JP3301966B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19378598A JP3301966B2 (en) 1998-06-24 1998-06-24 Shade concrete block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19378598A JP3301966B2 (en) 1998-06-24 1998-06-24 Shade concrete block

Publications (2)

Publication Number Publication Date
JP2000008342A JP2000008342A (en) 2000-01-11
JP3301966B2 true JP3301966B2 (en) 2002-07-15

Family

ID=16313765

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19378598A Expired - Lifetime JP3301966B2 (en) 1998-06-24 1998-06-24 Shade concrete block

Country Status (1)

Country Link
JP (1) JP3301966B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5307372B2 (en) * 2007-08-31 2013-10-02 ランデス株式会社 Construction method of revetment retaining wall and shade concrete block and bottom formwork used for it

Also Published As

Publication number Publication date
JP2000008342A (en) 2000-01-11

Similar Documents

Publication Publication Date Title
DK1748119T3 (en) Prefabricated foundation and support for building structures
US5669737A (en) Wall retention system
KR102012367B1 (en) Bridge using temporary bridge and construction method
US5123777A (en) Construction elements
JP3301966B2 (en) Shade concrete block
JP2797045B2 (en) Solid foundation method with stabilizer
CN114960543A (en) Construction method of jacket structure wharf
JP3308493B2 (en) Construction method of shade concrete of steel sheet pile wall
JP3301967B2 (en) Shade concrete block
JP3236858B2 (en) Quay construction method
JP2860780B2 (en) Large concrete block
JP2868725B2 (en) Seawall repair method
CN221895601U (en) Single-column pier anti-toppling reinforcing structure
CN218757417U (en) Prestressed concrete sheet pile and supporting and retaining structure assembled by prestressed concrete sheet pile
CN214738246U (en) Pile plate type anchor cable retaining wall
KR102249603B1 (en) Retaining wall construction method
JP3242160B2 (en) Concrete formwork and its construction method
CN206396765U (en) The assembling structure of system of deep foundation pit support
JPH081057B2 (en) How to build artificial ground
JP2680561B2 (en) Caisson, continuous wall construction method using the same, and retaining wall support structure.
JPH0115715Y2 (en)
JP3050729U (en) Seismic cistern
JP2671942B2 (en) Pier
JP2922782B2 (en) Construction method of large structure on super soft ground
JPH0649824A (en) Breakwater

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080426

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110426

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110426

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term