Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ulgor SCL
Original Assignee
Ulgor SCL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ulgor SCLfiledCriticalUlgor SCL
Priority to ES1973193215UpriorityCriticalpatent/ES193215Y/en
Publication of ES193215UpublicationCriticalpatent/ES193215U/en
Application grantedgrantedCritical
Publication of ES193215YpublicationCriticalpatent/ES193215Y/en
Improved boiler, characterized essentially by the fact of being constituted of a casing opened by one of its ends, in which a support of electrical heating resistances of the liquid contained in the boiler is positioned and fixed in a sealed manner, being hidden and protected the terminals for connection of said resistors by a cover; all this in such a way that the electrical resistances of the casing can be dismantled when releasing the support with respect to said casing of the casing. (Machine-translation by Google Translate, not legally binding)